Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 54

 

 

S

YSTEM

 

 

3.  Dual ring configuration to the extent possible 
4.  Easy to install and operate 
5.  Compact design 

A digital transmission system, based on state-of-the-art fibre optic technology, shall be required to 
carry all voice, data, LAN and video information, as shown in the Contract Plans and directed by the 
Engineer. Usage of copper cable for long-distance transmission purposes that exceeds 90 m shall 
not  be  allowed  due  to  the  inherent  disadvantages  of  copper  cable  (attenuation  of  signals, 
susceptibility  to  electromagnetic  influences  and  high  costs  for  cable  sizes  necessary  to  carry  the 
required amount of signals). 

An IP-based transmission system with Ethernet switches shall carry all channels for voice, data, LAN 
and video communications. As virtually all information is transmitted via the IP network, the system 
shall  be  implemented  using  two  physically  independent  cable  routes  wherever  applicable  and 
possible and as approved by the Engineer. In case of a partial network failure, this will ensure that 
the remaining part is not affected. The network shall be logically configured by VLANs (virtual local 
area network) which allow separation of the various types of flow (video, voice, data, order, etc.) and 
allows  affecting  a  different  priority  level  to  them  so  that  there  is  no  disturbance  in  the  transfer  of 
information as approved by the Engineer. 

9.6.2.9 

Network Management System 

Subcontractor shall furnish, install, configure, and integrate a network management system (NMS) 
to  monitor,  manage  and  administrate  the  traffic  management  system  communication  network 
(TMSCN) as shown in the Contract plans, as directed by the Engineer. The NMS shall be compatible 
with the 

Employer’s legacy NMS. The NMS shall be a powerful and flexible open platform network 

infrastructure (hardware and software) management tool, providing enhanced features to manage 
the TMSCN connected systems and components, and shall include all necessary NMS equipment - 
servers, switches, routers, firewalls, etc as shown on the 

Subcontractor’s approved Drawings. Such 

as system fibre and Ethernet switches regardless of the model, shall deliver customizable network 
management capabilities that scale to meet the needs of the largest and advanced networks.  

NMS shall include network configuration and change management functionality, giving control over 
bulk configurations and scheduling. It shall be able to create detailed audit trails of network changes, 
to perform firmware upgrades and to manage the software configuration of the networked devices. 
NMS  shall  be  able  to represent  the  status  of the  network  using  several graphics  approach.  NMS 
shall  be  fully  client-server  and  supports  multiple  distributed  users  with  varying  access  levels  and 
individualized network resource control.  

NMS  shall  be  supplied  with  enough  capacity  and  licenses  to  cover  all  the  TMSCN  systems  with 
additional  spare  capacity  of  50  %.The  NMS  shall  be  integrated  as  ATMS  component  so  that  the 
operator in the control room can see and take action on the alarm coming from NMS. NMS shall 
support open protocols to permit the control of multiple suppliers. NMS shall visualize, monitor and 
pro-actively manage the  network,  including  analyzing  traffic  loads  and  generating statistical trend 
reports. NMS shall support multiple vendors, softwares and ensure compatibility with major suppliers 
including but not limited to: Cisco, Moxa and Juniper. 

a.  Field Equipment Cabinet Remote Switch  

Subcontractor shall furnish, install, and configure a field equipment cabinet remote switch (FRS) 

– 

access field switch - in field equipment cabinets (FEC) to interface the ITS field devices with the fibre 
optics or Ethernet communication backbone as directed by Engineer. 

FRS switch shall be an industrial class, fan less, modular and layer 2 managed fibre Ethernet switch. 
As a minimum, standard layer 2 switches are required, however, layer 3 switches are acceptable or 
desired.  Switch  shall  be  of  reconfigurable  model  in  which  the  type  of  ports  and  modules  of  each 
switch can be configured as needed based on the location of the switch as approved by the Engineer 
and as shown in Contract plans. Subcontractor will be requested to keep some modules as spare to 
be  used  when  needed  as  directed  by  the  Engineer.  FRS  shall  comply  with  the  following 
requirements: 

S

YSTEM

 

 

1.  General requirements: 

i. 

FRS shall include, as minimum, three of one (1) Gbps single mode fibre 
ports for the interface with the fibre backbone. 

ii. 

FRS shall include, as a minimum, a combination of four (4) ports or more 
to connect the ITS devices on the field. This combination might vary from 
one location to another as following: four (4) fibre ports (8 fibre cores) 100 
BaseF(x), and 4 RJ45 ports100 BaseT(x) or combination of Fibre and RJ4 
ports  based  on  every  site  condition  and  as  approved  by  the  Engineer. 
Switch  shall  be  capable  to  accept  at  least  another  module  with  four  (4) 
additional fibre (8 fibre cores) or four (4) additional RJ45 ports as required.  

iii. 

Ports  configuration  of  the  FRS  switch  may  vary  from  one  location  to 
another as needed and as approved by the Engineer.  However, in most 
cases, a combination of two (2) fibre ports (4 fibre cores) and two (2) RJ-
45 ports will be required per each module. Wherever only 2 RJ-45 ports 
or 2 fibre ports will be used, the other two (2) spare ports shall be fibre. 
For the spare modules, 65 % shall be supplied with 4 fibre ports (S.M), 30 
% with combination ports, two (2) ports RJ-45 and two (2) ports fibre, 5 % 
all RJ-45 ports as approved by the Engineer. 

iv. 

For  Signalized  junctions,  the  FRS  shall  include,  as  a  minimum,  a 
combination  of  eight  (8)  ports  or  more.  This  combination  might  vary  as 
directed by the Engineer. 

v. 

Power  supply  adaptors  and  accessories  of  the  FRS  switch  shall  be 
provided  by  the  same  manufacturer  and  shall  be  considered  within  the 
FRS switch cost.  

vi. 

Power supply and fibre modules environmental specs shall be the same 
as the switch environmental specs. 

vii. 

1  Gbit  fibre  port  shall  be  capable  of  aggregating  and  transmitting  at  a 
minimum distance of 30 km. 

viii. 

Fibre modules cost shall be considered within the FRS switch cost.  

ix. 

Spare fibre modules shall be supplied and kept as spare at locations as 
directed by the Engineer.  

x. 

Fibre  modules  shall  be  supplied  by  the  same  switch  manufacturer  and 
shall comply with the environmental specs of the switch or as directed by 
the Engineer.  

xi. 

FRS switch shall be capable to function in ring and star topologies.   

xii. 

FRS switch shall require no infield electrical or optical adjustments or inline 
attenuators to ease installation. 

xiii. 

FRS switch shall provide power, link speed, and fibre port status indicating 
LED’s for monitoring proper system operation. Switch shall also provide a 
contact closure for a loss of fibre-fibre alarm. 

xiv. 

Support  IEEE  802.1X  (authentication).  Moreover,  other  static  port  lock 
solutions shall be implemented as approved by the Engineer. Switch shall 
be configured to protect static MAC address for a specific port.    

xv. 

Support IEEE 802.1Q (VLans). 

xvi. 

FRS switch shall provide automatic resettable solid state current limiters 
and independent voltage regulators fibre to reduce the chance of a “single 
point of failure” of the system. 

xvii. 

FRS switch shall have a dual power supply inputs.  

2.  FRS switch shall provide a console connection for local management of the device. Data 

specifications: 

i. 

Data interface: Ethernet IEEE802.3 

ii. 

Data rate: 10/100 Mbps 

iii. 

Port: RJ45  

3.  Optical  specifications:  Optical  fibre:  100  BaseFX,  1000  BaseSFP  9/125  micron  single 

mode (duplex) or SFP+ as approved by the Engineer.  

4.  Electrical specifications  

S

YSTEM

 

 

i. 

Power supply unit: less than 50 W  

ii. 

Industrial model dual power supply 

iii. 

AC or DC operation 

5.  Environmental specifications: 

i. 

MTBF: at least 150,000 Hours 

ii. 

Operating Temp: 0

o

 C to +75

o

 C.  

iii. 

Relative humidity: 10 % to 95 % no condensing. 

6.  Regulatory  agencies/approvals  and  listings:  As a  minimum,  FCC  Part  15  Class  A,  EN 

55022 Class A, EN 50121-4, safety: UL 508, UL Class1 Div2 and EN 61000-4-(2 to 6)  

7.  Technology  standards  and  protocols:  Shall  support  open  standards  and  protocols. 

Proprietary protocols shall not be used. As a minimum, SNMP V1/V2/V3, HTTP/TFTP, 
DHCP,  Port  security  IP  and  MAC,  802.1x,  IEEE  802.1Q,  GMRP,  IEEE  802.3x,  IEEE 
1588, IEEE 802.1D, IGMP Snooping, PIM-DM, PIM-SM, RSTP, QoS  

8.  Physical features: 

i. 

Industrial fanless switch  

ii. 

Minimum housing protection shall be IP20    

b.  Ethernet Fibre Transceiver 

Subcontractor shall furnish, install, configure, and test device Ethernet fibre transceivers as approved 
by the Engineer, to convert the RJ45 port of  the ITS device to a fibre port in order to connect with 
the access field switch if the distance between them is more than 90 m. It shall be industrial type and 
capable to survive under a temperature of 75

o

 C as a minimum. This item will not be required if the 

ITS device will be facilitated with SFP module port. 

c.  Wireless Ethernet Bridge 

Subcontractor shall furnish, install, configure, and test a high speed wireless Ethernet bridge (WEB) 
as  directed  by  the  Engineer.  WEB  shall  be  a  microwave  system  that  operates  on  an  approved 
frequency  channel,  and shall  include  an  in-door  unit  (IDU),  an  out-door unit  (ODU),  a  microwave 
antenna,  a  RF  cable  and  network  management  tools  (NMT).  ODU  shall  include  radio  data 
transmitter/  receiver  modules  and  may  be  integrated  with  an  IDU  that  is  compliant  with  the 
requirements in this specification. WEB shall be compliant with the IEEE 802.3, 802.3u and 802.3d 
Ethernet standards.  

WED can also be supplied as an integrated assembly including the ODU and microwave antenna. If 
supplied as such, this item shall include outdoor Category 6 cable to connect the assembly to the 
cabinet and Ethernet switch. 

Assembly shall include provision for system configuration, setting for antenna alignment, ability to 
set  up  tools  for  network  management,  and  ability  to  monitor  the  system  alarm  and  system 
performance testing. Subcontractor shall provide a fully operational assembly with all cabling and 
terminations matched to support the selected components. 

d.  Fibre Optic Cable 

Subcontractor shall furnish, install, splice and test all the required fibre optic cable as shown on the 
Contract plans and as approved by the Engineer. All splicing kits, splice machines, OTDR machines, 
fibre optic cable caps, moisture/water sealant, terminators, splice trays, pigtails and accessories to 
complete the fibre optic network shall be provided as incidentals.  

All equipment for installation, splicing and testing shall be provided by the Subcontractor. In general 
96, 48, 24, 12, and 6 core single mode fibre (SMF) optical cables are  used in the Emirate of Abu 
Dhabi. Typically a 48 core S.M fibre cable will be required for the backbone and 12 S.M as access 
cable as directed by the Engineer. 

Fibre optic cable shall be suitable for installation in an underground conduit environment including 
constant immersion in water. All cables shall be loose-tube, non-metallic construction. Cables shall 
include a double armoured outer jacket layer to provide environmental protection from the weather 
and rodents.  

S

YSTEM

 

 

All fibres in the fibre optic cable shall be spliced and/or terminated as indicated on the Contract plans 
and as specified herein. Fibre cuts and splices shall only be made at the pullbox nearest the traffic 
signal controller, ITS equipment, field equipment cabinet, communications hub, as directed by the 
Engineer. 

Quantity  of  fibres  within  the  cable  shall  be  as  shown  on  the  Contract  plans,  as  required  in  the 
Particular Specifications or as indicated in the Bills of Quantities. 

Fibre optic cable shall be provided in continuous lengths. Each fibre shall be pulled from the same 
optical waveguide form and shall be free of splices. Each optical fibre shall consist of a doped silica 
core surrounded by a concentric silica cladding.  Use of any other materials is not allowed unless 
otherwise approved by the Engineer. 

Subcontractor shall perform all necessary works to provide a complete end to end cable connection 
between  the  field  device  and  the  nearest  field  equipment  cabinet  as  per  the  manufacturer 
requirements  and  as  approved  by  the  Engineer.  Subcontractor  shall  establish  fibre  optic  links 
between the field equipment cabinet to the nearest splice pull box. Subcontractor shall perform the 
required splicing to connect to the nearest field equipment cabinet that shall house the fibre remote 
switch, and that shall be connected directly to the traffic control centre through the fibre optic network 
as shown in the Contract plans and as approved by the Engineer. 

Subcontractor shall install additional fibre segments in case the existing segment exceeds 60 % of 
fibre usage. For all new cables/segments, the fibre usage shall not exceed 40 % of the total fibres 
per each cable. 

Subcontractor  shall  conduct  a  study  for  the  required  fibre  usage  in  the  locations  for  all  new 
installations and prepare all fibre optic connection diagrams, splice tables, and fibre usage sheets to 
reflect available, reserved and used fibres in each segment that shall be submitted to the Engineer 
for  review  and  approval.  At  least  2  dark  fibres  shall  be  reserved  in  each  fibre  segment  for  other 
agency uses unless otherwise approved by the Engineer. Optical fibre cables shall also comply with 
the following requirements: 

1.  Attenuation: Nominal attenuation shall be 0.4 db/km maximum at a wavelength of 1300 nm. 

Attenuation shall not exceed 0.3 db/km maximum at a wavelength of 1550 nm. 

2.  Bandwidth:  Single  mode  fibres  shall  have  a  maximum  dispersion  of  3.5  pico 

seconds/nanometre km at 1300 nm. 

3.  Testing: All optical fibres shall be proof tested by the fibre manufacturer at a minimum load 

of 100 kpsi. All optical fibres shall be 100 % attenuation tested at the factory for compliance 
with  performance  specifications  described  herein.  The  attenuation  of  each  fibre  shall  be 
provided with each cable reel. 

4.  Fibres: Quantity of fibres contained in the fibre optic cable shall be 48 in 4 fibres 

 ×

 12 tubes 

configuration unless otherwise approved by the Engineer, and 12 in 4 fibres x 3 tubes the 
fibres shall have a nominal core diameter of 8 to 10 microns. Fibre outer diameter shall be 
125 plus or minus 3 microns. Inside Abu Dhabi City Island, the Quantity of fibre optic cable 
shall  match  the  existing  fibre  cable  in  the  city  to  easy  the  interface  as  directed  by  the 
Engineer. 

5.  Core/clad concentricity error: Core/clad concentricity error shall be within plus or minus 0.5 

micron. 

6.  Primary coating: Each fibre shall have a high density polymer coating of a minimum of 250 

micron to prevent abrasion of the fibre surface or as approved by the Engineer. 

7.  Buffering:  Cable  shall  be  of  gel-filled,  loose  tube  construction  with  up  to  12  buffer  tubes 

wrapped around a dielectric central strength member. All fibre(s) shall be contained within 
buffer tubes, and each buffer tube shall have an inside diameter much greater than the total 
diameter(s) of the fibre(s) it supports. 

8.   Each fibre or group of fibres shall be free-floating within the tubes such that all mechanically 

or environmentally induced stress placed upon the cable is de-coupled from the fibres. Air 
within the buffer tubes shall be displaced with a gel to prevent entry by water and to facilitate 
free movement of the fibre(s) within. 

S

YSTEM

 

 

9.  Tensile strength/crush strength: Cable shall be capable of withstanding a pulling tension of 

2700 N under load conditions and 600 N under static conditions and a crush resistance of 
5000  N/m  (length  of  cable),  without  changing  the  characteristics  of  the  optical  fibres. 
Requirements for a higher pulling tension may be accepted as approved by the Engineer. 

10. Bend radius: cable shall be capable of withstanding a bending radius of 15 times its outer 

diameter during operation and 15 times its outer diameter during installation without changing 
the characteristics of the optical fibres. 

11. Cable configuration: Fibre-optic cable shall have a reverse oscillation or planetary stranding 

structure. Cables constructed of less than six fibres shall have a buffer tube provided for each 
fibre; cables constructed of more than six fibres may have several fibres occupy a buffer tube, 
with equal distribution of fibres as far as practical. Jacket construction and the configuration 
of the groups shall be such that they can easily be separated at splice points, permitting one 
set of fibres to be cut and spliced while the others remain continuous.  

12. Subcontractor  shall  submit  proposed  cable  designs  for  the  Engineer's  approval  prior  to 

procurement and installation of cable plant.  

13. Cable shall have a water-block tape between the buffer tubes and throughout the remainder 

of the cable to prevent entry of water. A binder wrapping strength member of aramid fibres 
shall be provided as a final layer prior to application of the outer jacket. 

14. Subcontractor  shall  demonstrate  crush  and  abrasion  resistance  of  final  cable  design  and 

adequacy for conduit installation under full tensile loads and multiple bends. 

15. Diameter: Outer diameter of each cable shall be less than 20 mm. 
16. Colour coding: Each fibre buffer jacket shall be colour coded separately. Within unit tubes or 

sub-bundles, each fibre shall have a distinctly different colour coding. Buffer tubes shall be 
colour coded in compliance with EIA/TIA-598 "Colour Coding of Fibre Optic Cables". All fibres 
shall be colour coded in compliance with EIA/TIA-598 "Colour Coding of Fibre Optic Cables". 
In  buffer  tubes  containing  multiple  fibres,  the  colours  shall  be  stable  during  temperature 
cycling and not subject to fading or smearing onto each other or into the gel filling material. 
Colours shall not cause fibres to stick together. 

17. Cable jacket: The outer jacket shall be yellow in  colour unless otherwise  approved by the 

Engineer.  

18. Outer  jacket  shall  be  constructed  of  medium  density  polyethylene  with  minimum  jacket 

thickness  of  1.4  mm.  Jacketing  material  shall  be  applied  directly  over  the  tensile  strength 
members and flooding compound. The outer jacket shall be UV and fungus resistant.   

19. A permanent marking shall be employed on the outer jacket of the cable which shall show 

the  date  of  manufacture  and  the  manufacturer's  name.  A  numerical  sequence  shall  be 
marked  on  the  outer jacket,  at  intervals  no  greater  than  3  m, to facilitate  determination  of 
length of cable and amount of cable remaining on the reel. Height of the marking shall be 2.5 
mm nominal. In addition, cable tags with permanent markings shall be provided that include 
the words "Owners Name - Fibre-Optic Cable" at all pullbox and cable access locations. 

20. Optical connectors: All permanent connector installations shall utilize factory installed/tested 

connectors. Field installed connectors shall not be allowed. 

21. Optical  connectors  furnished  for  installation  on  optical  patch  cords  and  pigtails  shall  be 

compatible with the connector sleeves on the fibre distribution panels. 

22. Connectors shall meet, as a minimum, the following specifications: 

i. 

Attenuation: (average, 3 readings, 120 degree spacing): 0.4 dB/km, maximum @ 
1300 nm 

ii. 

Mechanical stability: 0.3 dB change, maximum 

iii. 

Tensile stability: 0.3 dB change, maximum 

iv. 

Thermal stability: (5 cycles, -20

o

 to +60

o

 C) 0.4 dB change, 

v. 

Maximum splice losses shall not exceed 0.02 dB 

23. Environmental:  Cable  shall  be  capable  of  withstanding  the  following  environmental 

conditions: 

i. 

Installation: -30

o

 to +70

o

 C 

ii. 

Storage/operation: -40

o

 to +70

o

 C 

iii. 

Humidity: 0 to 100 % 

24. Fibre optic testing: 

S

YSTEM

 

 

i. 

Fibre optic splices: Splice losses shall not exceed 0.02 dB.  Subcontractor shall 
provide  evidence  of  each  splice  performed  and  submit  to  the  Engineer  for 
approval. 

ii. 

Optical time domain reflectometer (OTDR) testing: All fibre links shall be tested 
bi-directionally after splicing and termination. All fibres shall be tested for attention 
loss using an OTDR set to 2-point loss measurement parameters. Marker points 
shall be placed at the beginning and end of each backscatter signature recorded 
by 

the  OTDR  machine  in  accordance  with  the  OTDR  machine’s  manufacturer 

instructions. 

iii. 

Each fibre shall have a unique identification and numbering sequence which shall 
be submitted to the Engineer for review and approval. Each trace shall contain as 
a minimum: 

a)  Cable/sheath length. This is not the same as optical fibre length 
b)  2-point dB loss 
c)  Attenuation in dB/km 
d)  Fibre type 
e)  Wavelength used 
f)  Pulse width selection 
g)  Fibre/cable identification 

iv. 

Stored fibre trace shall allow full manipulation of the trace when viewed with the 
PC emulation software. Both a hard copy and a soft copy of each trace shall be 
submitted to the Engineer for review and approval. 

v. 

Proper pulse width selection is required to minimize attenuation dead zone effect 
(10 ns pulse: SM dead zone=10m). Any links which fail the above tests shall be 
replaced and retested by the Subcontractor at his own expenses. 

vi. 

All links which contain splice points or interconnect points shall also contain and 
additional  “Events  Display  Table”  to  accompany  the  OTDR  trace.  This  display 
shall show the distance to the events, distance between multiple events, loss of 
each event in dB, and a description of the event (reflective, non-reflective, gains, 
and cable end). 

e.  Fibre Optic Patch Panel 

Subcontractor shall furnish, install, splice and test a 24-port (12 duplex ports) or 48-port (24 duplex 
ports)  fibre  optic  patch  panel  to  be  located  in  each  field  equipment  cabinet,  as  approved  by  the 
Engineer. 

Subcontractor shall furnish,  install, splice,  and test a 12-port (6 duplex ports) or 6-port (3 duplex) 
fibre  optic  patch  panel  with  IP-66  protection  on  or  within  the  video  surveillance  camera  pole  and 
wherever needed, as directed by the Engineer. 

Each  panel  shall  be  equipped  with  all  required  patch  cords,  pigtails,  connectors,  mounting 
accessories as an integrated part of the panel. In addition, 25 % additional spare patch cords shall 
be furnished as part of each patch panel. No separate measurement or payment shall be made for 
patch cords and any costs incurred by the Subcontractor in so doing shall be considered incidental 
to the cost per fibre optic patch panel. 

f.  Fibre Optic Patch Cords 

Fibre optic patch cords shall be a rugged type provided to cross connect the fibre patch panel to the 
fibre-optic  transmission  equipment.  These  jumpers  shall  be  orange  in  colour  for  multimode  fibre, 
yellow in colour for single-mode fibre and shall have strain relief on the connectors. Fibre shall have 
a 900 micron polymer coating with tight buffer tube, Kevlar strength member and a PVC jacket. 

Patch cords shall be sufficient in length plus 1.0 m spare length or as approved by the Engineer.  

Optical patch cords shall consist of a section of single fibre, jacketed cable equipped with factory 
installed  optical  connectors  at  both  ends,  in  single-fibre  simplex,  dual-fibre  duplex  or  multi-fibre 
configurations as required. 

S

YSTEM

 

 

Each jacketed fibre shall have a tensile strength in excess of 222 N. 

g.  STP CAT-6 Cable 

Category  6  (CAT-6)  cables  shall  meet  TIA/EIA-568-B.2-1  requirements.  CAT-6  cable  shall  be 
connected to all IP copper interfaces for all Ethernet devices. For all outdoor installations the cable 
jacket  shall  be  durable,  high-density  polyethylene  insulation,  PVC  jacket.  CAT-6  cable  shall  be 
compact for ease of installation and be able to connect high speed local area networks (LANs) to 
transmit  video  and  data.  CAT-  6  shall  be  STP  for  outdoor/field Installations  and  shall  be  UTP for 
indoor installations. 

CAT-6 shall meet or exceed the following features:  

1.  Physical characteristics: 

i. 

Conductors: 23 AWG solid copper 

ii. 

Insulation: 

a) 

Plenum: low smoke flame retardant 

b) 

Thermoplastic (FEP) 

c) 

Riser and LSZH: polyolefin (PE) 

iii. 

Cable core: Four twisted pairs cabled around a centre member 

iv. 

Jacket with rip cord: 

2.  Cable jacket shall be printed at intervals indicating:  

i. 

Cable code  

ii. 

AWG 

iii. 

Listings (NEC code) 

iv. 

Verification 

v. 

Date 

vi. 

Manufacturing traceability code 

3.  Temperature: 5° C to at least 60° C 
4.  Transmission characteristics: At least 300 MHz are minimum guaranteed values 
5.  DC resistance @ 20° C, max.: 9.38 ohms/100 m  

i. 

DC resistance unbalance, max.: 5 % 

6.  Mutual capacitance, max.: 5.6 nF/100 m 
7.  Capacitance unbalance pair to ground, max.: 330 pF/100 m 
8.  Input impedance: 

i. 

100 ± 15 ohms from 1 to 100 MHz 

ii. 

100 ± 22 ohms from 101 to 200 MHz 

iii. 

100 ± 32 ohms from 201 to 300 MHz 

9.  Nominal velocity of propagation (NVP): 

i. 

Plenum: 72 % @ 10 MHz 

ii. 

Riser: 68 % @ 10 MHz 

10. Propagation delay (skew), max.: 25 ns/100 m 
11. Cat  6  cable  termination  protection:  Subcontractor  shall  be  responsible  to  provide  the 

terminated cable with guards. 

Before  a  cable  is  plugged  into  the  camera  port,  an  RJ45  guard  shall  be  used  to  protect  the  port 
against any unauthorized accidental unplugging and to tightly fix the RJ45 to the camera port. This 
guard shall have the following specification as a minimum: 

1.  Halogen-free plastic. 
2.  Can be exchangeable and reusable. 
3.  These guards shall be fixed at the camera ends. 
4.  All RJ45 connections shall be protected with a boot of a colour similar to the cable colour.  

h.  STP Cat-6 Patch Panel 

Subcontractor shall furnish, install and terminate multi-port Ethernet STP Cat-6 patch panels in the 
FEC cabinets as shown on the Contract plans, as may be required in the Particular Specifications 
and as approved by the Engineer.  All Ethernet STP CAT6 cables from the ITS field devices shall be 

S

YSTEM

 

 

directly terminated at the outdoor STP CAT6 copper patch panel inside the AFS equipment cabinet. 
Patch  panel  shall  meet  ANSI/TIA/EIA568A5  performance  requirements  for  STP  category  6. 
Terminations shall be 568B compliant. Patch panel shall include all required patch cords and patch 
cables  necessary to  connect  all  equipment  to the  panel. In  addition,  25 %  additional  spare  patch 
cords shall be furnished as part of each patch panel. No separate measurement or payment shall 
be made for patch cords and any costs incurred by the Subcontractor in so doing shall be considered 
incidental to the cost per STP Cat-6 patch panel. 

STP Cat-6 patch panels shall be in accordance with the following specifications:  

1.  8 Ports RJ-45 STP Cat-6  
2.  Patch panel shall be fitted with metal cable manager for convenience of cable management 
3.  Highly resistance and inflaming retarding material, Grade UL94-0 
4.  Module part shall be fitted with shield, protecting inner IDC contact from irregular working in 

rugged environment 

5.  Meet or exceed the current T568A and T568B standard 
6.  Rustproof metal framework 
7.  Dustproof and weather proof housing, IP-66 
8.  Enclosed shielded patch panel 

9.6.2.10 

ITS Electrical and Control Cables 

This  item  provides the electrical  supply to  the ITS  equipment  from the  field  equipment cabinet  or 
other power sources. It shall comply with all electrical conductor requirements as per Article 9.5.2.4 
and in accordance with the applicable sections and clauses of Chapter 10, Lighting and Electrical 
Distribution Works. 

Electrical conductor shall be at least 3 core, PVC/PVC, steel wire armoured and shall be installed to 
maintain  a  voltage  drop  of  less  than  3  %,  and  sized  according  to  the  load  of  the  respective  ITS 
equipment.  Cable shall be of outdoor type cross linked polyethylene  (XLPE) semi conductor tape 
insulated,  individually  copper  tape  screened,  steel  wire  armoured.  Cables  shall  be  sized 
appropriately  to  meet  the  manufacturers  requirements,  and  as  detailed  in  the  Specifications  and 
Contract plans. 

Cable  shall  have  a  bending  radius  of  at  least  13  times  the  overall  diameter  and  shall  be  able  to 
operate at temperature range of 0

o

 to 80

o

 C. 

Unless  specified  elsewhere  in  the  Specifications,  all  system  cabling  shall  be  compatible  with  the 
manufacturer requirements.  Wherever  possible,  the  manufacture

’s recommended cables shall be 

preferred. 

9.6.2.11 

Cabinets and Enclosures 

a.  Equipment Cabinet(s) 

Equipment  cabinets  (EC)  shall  be  used  to  house  the  system  equipments  and  components  in  the 
traffic control centre. Dimensions of each cabinet shall be identical, sufficient to house the system 
equipment, as approved by the Engineer. Cabinet shall be of 14 gauge steel un-welded construction. 
Cabinet shall have a perforated front door, louvered and perforated side panels, and a louvered and 
perforated  rear  door  cooling  fan  units,  sized  to  cool  the  enclosed  equipment  and  rated  at  "quiet 
operation"  shall  be  included  in  each  cabinet.  Cabinet  shall  have  lockable  front  and  rear  doors. 
Cabinet(s) shall  include  provisions  for  cable  and  conduit  entry through  the  top  and  bottom  of  the 
cabinet. All cables shall be neatly harnessed and routed within the cabinet using approved cable 
management  techniques.  All  cables  shall  be  labelled  in  accordance  with  ANSI/EIA/TIA  606-A 
standards. 

Each  EC  shall  be  corrosion  resistant.  Each  EC  shall  be  completely  ventilated.  Each  EC  shall  be 
wired  from  single  phase,  240  V  AC,  50  Hz  power  with  a  power  disconnect  switch,  from  the 
appropriate power panel. All communications equipment and components in each cabinet shall use 
this as the primary source of power. Subcontractor shall be requested to submit a calculation for the 

S

YSTEM

 

 

air follow in each EC in which the number of required fans for ventilation process will be decided as 
approved by the Engineer.  

Separate terminal blocks shall be provided for each power connection within the cabinet and these 
blocks shall be considered subsidiary obligation to the respective Bill of Quantities items. 

Each EC shall include frames for equivalent EIA-310-C standard 48.26 cm rack mounting. 

Each EC shall have a unique ID plate and shall include a list of all items installed inside the cabinet. 

b.  Field Equipment Cabinets 

Field  equipment  cabinet  (FEC)  shall  house  the  video  surveillance  field  equipment  and 
communications equipment as shown on the Contract plans. FEC shall be provided with fully wired 
back panels, with all the necessary terminal boards, wiring, harnesses, connectors and attachment 
hardware for  each cabinet  location. All terminals and panel facilities shall be placed on the lower 
portion of the FEC walls below all shelves. 

Each FEC shall be provided complete with all internal components, back and side panels, terminal 
strips,  harnesses,  and  connectors  as  well  as  all  mounting  hardware  necessary  to  provide  for 
installation  of  equipment  as  described  on  the  Contract  plans  and  as  required  by  the  Particular 
Specifications. 

All FECs shall be identical in size, shape and quality throughout the entire project. In addition, the 
FECs shall be equipped internally as specified herein. 

Details of the FEC design and equipment layout shall be submitted to the Engineer for review and 
approval prior to fabrication.  

Each FEC, as a minimum, shall be supplied with the following: 

1.  Adjustable shelves, as required 
2.  Backpanel 
3.  Surge  protection  for  video  connections,  power  connections,  and  communications 

connections 

4.  Terminal strips 
5.  Interconnect harnesses with connectors 
6.  Jack for field telephone 
7.  On/off light 
8.  "Door open" connection to backpanel 
9.  Interior holder for FEC documentation as shown on the Contract plans 
10. All necessary installation and mounting hardware 

Electrical requirements shall include the following items: 

1.  Backpanel: This panel shall include the following components: 

i. 

Single phase isolator 

–Contractor shall install one isolator unit in each field 

equipment  cabinet  to  isolate  the  main  power  source  from  the  field 
equipment cabinet when needed. Isolator shall be UL listed. Isolator shall 
not be affected by ambient temperature, humidity and other environmental 
conditions prevailing in the Project region. 

ii. 

Circuit  breakers  -  Circuit  breakers  shall  be  approved  and  listed  by 
Underwriters Laboratories. Operating mechanism shall be enclosed and 
the switches shall be marked to indicate whether they are in the closed or 
open position. Contacts shall be silver alloy enclosed in an arc quenching 
chamber. Each video surveillance field equipment cabinet shall have, as 
a minimum, a single-pole, 20-amp circuit breaker. Circuit breaker shall be 
unaffected  by  ambient  temperature  range,  relative  humidity,  applied 
power,  and  the  shock  and  vibration  range  specified  in  Section  2, 
"Environmental  Standards  and  Test  Procedures"  of  NEMA  TS2-1992  or 
EMEA standard equivalent. Circuit breaker shall have an interrupt capacity 
of 5,000 amperes and insulation resistance of 100 megohms at 500 V DC. 

S

YSTEM

 

 

iii. 

Power line surge protection - Power line surge protectors shall be provided 
and installed as described below. 

2.  Standards: 

i. 

Housing material PBT (Polybutylene terephthalate) 

ii. 

Inflammability class acc. to UL 94 V0 

iii. 

Standards for air and creepage distances: DIN VDE 0110-1 

iv. 

Standards for air and creepage distances: IEC 60664-1: 1992-10 

v. 

Standards for air and creepage distances: IEC 61643-1 

vi. 

Surge voltage category III 

vii. 

Contamination class 2 

viii. 

Degree of protection: IP20 

ix. 

Mounting type DIN rail 35 mm 

x. 

Design DIN rail module, two-section, divisible 

xi. 

Number of positions 1 

xii. 

Ambient temperature (operation) -10 °C to 80 °C 

xiii. 

Message surge protection faulty Optical, remote indicator contact 

xiv. 

Direction of action 1L-N/PE 

3.  Protective circuit: 

a)  IEC category I + II 
b)  EN type T1 + T2 
c)  Lightning protection class III-IV /50 kA (TT, TN-C-S) 
d)  Nominal voltage UN 240 V AC (230 V AC. 240 V AC) 
e)  Arrester rated voltage Uc (L-N) 350 V AC 
f)  Arrester rated voltage Uc (L-PEN) 350 V AC 
g)  Rated load current 125 A (TA=55°C) 
h)  Nominal discharge surge 

current In (8/20) μs (L-N) 25 kA 

i) 

Nominal discharge surge current In (8/20) μs (L-PEN) 25 kA 

j) 

Lightning test current (10/350) μs, charge 12.5 As 

k) 

Lightning test current (10/350) μs, specific energy 160.00 kJ/Ω 

l) 

Lightning test current (10/350) μs, peak value limp 25 kA 

m)  Protection level Up (L-

N) ≤ 1.5 kV 

n)  Protection level Up (L-

PEN) ≤ 1.5 kV 

o)  Residual voltage (L-

N) ≤ 1.3 kV 

p)  Residual voltage (L-

N) ≤ 1.1 kV (10 kA) 

q)  Residual voltage (L-

N) ≤ 1 kV (5 kA) 

r)  Residual voltage (L-

PEN) ≤ 1.3 kV 

s)  Residual voltage (L-

PEN) ≤ 1.1 kV (10 kA) 

t)  Residual voltage (L-

PEN) ≤ 1 kV (5 kA) 

u)  Residual voltage (L-

PEN) ≤ 1 kV (3 kA) 

v)  Clamping voltage SVR (L-

N) ≤ 0.9 kV 

w)  Clamping voltage SVR (L-

PEN) ≤ 0.9 kV 

x)  Response time (L-

N) ≤ 25 ns 

y)  Response time (L-

N) ≤ 25 ns 

z)  Short circuit resistance ICC with max. backup fuse (effective) 25 kA 
aa) Follow current quenching capacity If (L-N) 25 kA (264 V AC) 
bb) Follow current quenching capacity If (L-PE) 25 kA (264 V AC) 
cc) Follow current quenching capacity If (L-N) 3 kA (350 V AC) 
dd) Follow current quenching capacity If (L-PE) 3 kA (350 V AC) 
ee) Power cable input junction terminals - Power distribution blocks suitable 

for use as a power feed and junction points for two and three wire circuits 
shall be provided. The line side of each circuit shall be capable of handling 
two size 1/0 AWG conductors. 

ff)  All power sockets shall be PVC type as approved by the Engineer. 
gg) AC neutral and equipment ground wiring shall be electrically isolated from 

the line wiring by an insulation resistance of at least 10 megohms when 

S

YSTEM

 

 

measured at the AC neutral. AC neutral and equipment grounding wiring 
shall be colour coded white and green respectively. 

hh) Backpanel  shall  be  utilized  to  distribute  and  properly  interconnect  all 

cabinet wiring related to the specific complement of equipment called out 
on the Contract plans. Each item of equipment including any furnished by 
the  Owner  shall  have  its  cable  harness  properly  terminated  at  terminal 
boards  on  the  backpanel.  All  functions  available  at  the  equipment 
connector shall be carried in the connector cable harness to the terminal 
blocks from the power distribution panel mounted on the left side panel of 
the cabinet. 

4.  Wiring: All FEC wiring shall be identified by the use of insulated pre-printed sleeving slipped 

over the wire before attachment of the lug or making the connection. The wire markers shall 
carry this legend in plain words with sufficient details so that a translating sheet will not be 
required. Wiring shall also comply with the following items: 

i. 

All  wires  shall  be  cut  to  the  proper  length  before  assembly.  No  wires  shall  be 
doubled  back  to take  up  slack.  Harnesses to  connectors  shall  be  covered  with 
woven braid finger cuffs. Cables shall be secured with nylon cable clamps. 

ii. 

Service  loops  shall  be  provided  to  facilitate  removal  and  replacement  of 
assemblies, panels and modules. 

iii. 

All  wiring  containing  line  voltage  AC  shall  be  routed  and  bundled  separately 
and/or shielded from all low voltage, i.e., control circuits. All conductors and live 
terminals or parts which could be hazardous to maintenance personnel, shall be 
covered with suitable insulating material. 

iv. 

All conductors used on the cabinet wiring shall be No. 22 AWG or larger with a 
minimum of 19 strands. Conductors shall conform to MIL SPEC MIL-W-168780, 
Type  B  or  D  or  equivalent  EMEA  standards.  Insulation  shall  have  a  minimum 
thickness of 10 mils. All wiring containing line voltage shall be a minimum size of 
No. 14 AWG. 

5.  Terminal strips: Terminal strips located on the backpanel shall be accessible to the extent 

that it shall not be necessary to remove the electronic equipment from the Video surveillance 
field equipment cabinet to make an inspection or connection. 

Terminal blocks shall be two-position, multiple pole barrier type. Shorting bars shall be provided in 
each  of  the  positions  provided  along  with  an  integral  marking  strip.  Terminal  blocks  shall  be  so 
arranged  that  they  shall  not  upset  the  entrance,  terminating  and  connection  of  incoming  field 
conductors. All terminals shall be suitably identified by legends permanently affixed and attached to 
the  terminal  blocks.  No  more  than  3  conductors  shall  be  brought  to  any  one  terminal  screw.  No 
electrically energized components or connectors shall extend beyond the protection afforded by the 
barriers. All terminal blocks shall be located below the shelves. Terminals used for field connections 
shall secure conductors by means of a No. 10-32 nickel or cadmium plated brass binder head screw. 
Terminals used for inter-wiring connections, but not for field connections, shall secure conductors by 
means of a No. 5-32 nickel plated brass binder head screw. 

As a minimum, all connections to and from the electronic equipment shall terminate to an inter-wiring 
type  block.  These  blocks  will  act  as  intermediate  connection  points  for  all  electronic  equipment 
input/output. 

6.  Cabinet  internal  grounding:  FEC  internal  ground  shall  consist  of  one  or  more  ground  busbars 
permanently affixed to the video surveillance field equipment cabinet and connected to the grounding 
electrode. Bare stranded No. 6 AWG copper wire shall be used between busbars and between the 
busbar and grounding electrode. Each copper ground busbar shall have a minimum of 20 connector 
points, each capable of securing at least one No. 10 AWG conductor. AC neutral and equipment 
ground wiring shall return to these busbars. 

7. Mechanical Specifications: FEC shall meet the following requirements: 

i. 

Size  and  construction:  FEC  shall  be  moulded  glass  reinforced  plastic 
(GRP) for all video surveillance camera equipped locations and shall be 

S

YSTEM

 

 

free standing and suitable for outdoor installation. FEC shall have suitable 
ribbing to provide sturdiness. All metallic parts of the cabinet, including but 
not  limited  to,  bolts,  nuts,  washers,  latches  and  glanding  plate  shall  be 
corrosion resistant in the conditions prevailing in the Project region. FEC 
shall  be  installed  directly  on  the  levelled  concrete  FEC  foundation  as 
indicated on the Contract plans. FEC opening side shall be facing away 
from  the  adjacent  roadway  or  as  approved  by  the  Engineer.  The  FECs 
shall  be  clean-cut  in  design  and  appearance  and  have  the  following 
minimum dimensions: 

  38.1 cm depth, 50.8 cm width, 91.4 cm height. 

ii. 

FECs shall consist of only one compartment and shall have a reinforced 
lockable door. The compartment shall be protected against dust and water 
in accordance with the IEC Standard IP-43. 

iii. 

Door shall be pad lockable. Pad locks and master keys shall be supplied. 
All locks shall be keyed identically. In addition to padlocks, two separate 
latches shall also be provided within the doors, one (within the right panel) 
lockable  with  a  key  and  another  (within  the  left  door  panel)  internally 
lockable by sliding a bolt. All hinges and appurtenant  materials shall be 
stainless steel. Label indicating "PROPERTY OF OWNERS Name" and a 
danger sign, both in English and Arabic shall be provided. 

iv. 

GRP  wall  thickness  shall  not  be  less  than  4.5  mm  and  the  bottom 
thickness shall not be less than 6.0 mm. Outside dimensions and internal 
connections  shall  be  as  indicated  on  the  Contract  plans  and  specified 
herein.  A  short  circuit  test  certificate  shall  be  submitted  with  the  shop 
drawings. Doors with gun metal hinges, arranged to give maximum access 
for cabling and maintenance, shall be provided. 

v. 

Ventilation: FECs shall be provided with vent openings to allow convection 
cooling of electronic components. Each cabinet shall be provided with a 
fan rated at a minimum of 2.8 m

3

 per minute. Fan or cooling system shall 

be capable of operating continuously for a minimum of 6000 hours in a 60

o

 

C environment, without the need for after-installation maintenance. Each 
cabinet shall be provided with a thermostat to control the operation of the 
fan  or  cooling  system.  Thermostat  turn-on  point  shall  be  manually 
adjustable from 30° C and 55° C, with a differential of not more than 6° C 
between automatic turn-on and turn-off. 

vi. 

Serial  Number:  FECs  shall  be  provided  with  a  unique  five-digit  serial 
number. Entire identification code and number shall be either stamped on 
a  metal  plate  which  is  riveted  to  the  cabinet,  stamped  directly  on  the 
cabinet,  or  engraved  on  a  metalized  Mylar  plate  that  is  epoxied  to  the 
cabinet on the upper right hand cabinet side wall. 

vii. 

Shelves: Adjustable shelves shall be provided in each FEC as required to 
support the equipment as specified on the plans. Shelf adjustment shall 
be at 50.8 mm intervals in the vertical position. 

viii. 

Shelves  shall  be  removable  and  capable  of  supporting  the  electronic 
equipment. There shall be a minimum of 25.4 mm between the rear and 
front  edge  of  the  shelf  and  the  back  inside  wall  and  door  of  the  FEC, 
respectively, to allow room for the equipment cables. 

8.  Protector  and  cabinet  configuration:  All  ungrounded  conductor  wires  entering  or 

leaving the FEC shall be provided with surge protectors. The conductor leads and the 
surge  protector  leads  shall  be  kept  as  short  as  possible  with  all  conductor  bends 
formed to the maximum possible radius. Protector units shall be located as near as 
possible (150 mm) to the entry or exit point, and as far as possible from any electrical 
equipment. Protector ground lead shall be connected directly to the ground bus. 

9.  Surge  protector  utilized  for  AC  power  shall  not  dissipate  any  energy  and  shall  not 

provide any series impedance during standby operation. Unit shall return to its non-

S

YSTEM

 

 

shunting mode after the passage of any surge and shall not allow the shunting of AC 
power. 

c.  Outdoor Splice Enclosure 

Outdoor  optical  splice  enclosure  shall  be  IP-68  and  shall  be  capable  of  aerial,  duct  or  buried 
applications. The splice enclosure shall include splice trays. 

The  splice  enclosure  shall  be  suitable  for  application  in  the  temperature  range  of  -40

o

  to  +70

o

C. 

Splice  enclosure  shall  provide  space  allowing  entry  of  fibre-optic  cable  without  exceeding  the 
minimum bend radius of the cable. 

The splice enclosure shall be capable of through, branch or mid-span type splice locations. 

Splice enclosures shall be designed to permit selective fibre splicing (looping a backbone cable in 
and out while only cutting into the desired fibres). 

Splice enclosures shall allow splicing of all fibres up to 400 fibres or as specified on the  Contract 
plans. 

The  splice  enclosure  shall  be  completely  air  tight,  waterproof,  re-enterable  and  shall  utilize  an 
encapsulant to prevent the ingress of moisture. 

The splice enclosure shall be designed to protect the buffer tubes and the splice trays, and shall be 
re-enterable. 

The splice trays shall be capable of accommodating the required number of splices, either fusion or 
mechanical, including storage and protection of slack fibre. 

d.  Equipment Enclosure (Pole Mount)  

Equipment enclosure (EE) shall be used to house communication system components as required 
on the Contract plans or the Particular Specifications and when approved by the Engineer. EE shall 
be pole mounted to be installed on VSS camera poles where fibre communication is required in order 
to house the required 12 S.M patch-panel. EE shall be of non-metallic, nonconductive construction. 
EE  shall  be  IP55  compliant.  Each  enclosure  shall  include  permanent  identification  markings  in 
sequential numbering as approved by the Engineer. Markings shall be in both English and Arabic.  

Each EE shall include provisions for mounting the enclosure as per site design and condition and as 
approved by the Engineer. 

Each  EE  shall  be  sized  appropriately  to  house  the  necessary  components  as  approved  by  the 
Engineer with at least 25 % additional spare space. 

Each  EE  shall  include  a  hinged  front  panel,  secured  by  stainless  steel  screws,  and  with  a 
tamperproof lock. All locks shall be keyed alike. Each EE shall be supplied with 240 volt AC, single-
phase,  50  Hz  from  the  local  power  panel  and  to  be  grounded  service  through  industry  standard 
plugs. 

1.  Subcontractor shall submit a complete internal design for the EE for review and approval by 

the Engineer. Each EE Design shall include the following features, as a minimum: 

i. 

Back plate for equipment mounting. 

ii. 

Four louvers with each enclosure for air circulation.  

iii. 

Sufficient  fan  model  for  such  applications  to  be  proposed  by  the  contractor  and 
approved by the Engineer.  

iv. 

Single-phase isolator to isolate the main power source from the EE1. Subcontractor 
shall  propose  a  sufficient  isolator  model  to  be  reviewed  and  approved  by  the 
Engineer. 

v. 

Main  circuit  breaker,  Subcontractor  shall  propose  the  breaker  current  values  to  be 
reviewed and approved by the Engineer.  

vi. 

Electrical  sockets  shall  be  of  PVC  type  with  on/off  buttons  or  surge  suppresser 
equivalent for such installations.  

vii. 

Din rails  

S

YSTEM

 

 

viii. 

PVC trunks for internal cabling management.  

ix. 

Terminal blocks.  

x. 

Grounded plug.  

9.6.2.12 

Solar Power System 

Subcontractor shall furnish a solar power system that is self-cleaning, for low power devices such 
as  video  surveillance  cameras,  road  weather  information  stations,  and  road  vehicle  detectors  as 
shown on the Contract plans, as required in the Particular Specifications and as approved  by the 
Engineer.  

Solar panels shall be installed on DMS and LCSCS gantries to provide power to low power devices 
as directed by the Engineer.   

Subcontractor shall furnish and install a solar power system for video surveillance cameras, radar 
vehicle detectors, and road weather information stations, as directed by the Engineer.  

Solar cells should be constructed of crystalline silicon either as single or poly-crystalline wafers, or 
layers  of  photovoltaic  active  material  placed  on  a  glass  superstrate  or  a  metal  substrate  using 
vacuum-deposition manufacturing techniques. 

a.  Technical Requirements 

 The solar power system shall include the following items: 

1.  A  power  storage  system  comprising  a  number  of  batteries  in  a  cabinet  mounted  on  an 

appropriately sized foundation adjacent to the structure on  which 

the 

solar 

panel 

is 

attached. 

2.  Power conversion equipment including an inverter to convert the PV modules'  

DC output 

to AC compatible with the ADDC power supply; 

3.  Appropriate support and mounting hardware, wiring, and safety disconnects 

Subcontractor shall submit for review and approval by the Engineer, the design and drawings of the 
proposed  system  that  show  the  solar  panel  attachment  to  the  structure,  battery  cabinet,  cabinet 
foundations, and associated cabling and civil works. Drawings shall indicate that the solar panel: 

  Will receive maximum exposure to the sun;  

  Will not be shaded by site obstructions such as nearby buildings or vegetation. 

9.6.3 

Construction Requirements 

9.6.3.1 

Testing and Conditional Acceptance 

During the execution of this Contract, the Subcontractor shall be required to perform, in the presence 
of  and  to  the  satisfaction  of  the  Engineer,  pre-installation  and  post-installation  tests  on  all  of  the 
system  components.    Purpose  of  these  tests  shall  be  to  demonstrate  to  the  satisfaction  of  the 
Engineer  that  all  system  components  function  properly  and  are  capable  of  meeting  all  the 
requirements and Specifications of the Contract Documents.  Tests shall be performed according to 
a test plan to be prepared and submitted by the Subcontractor at the beginning of the Contract and 
to be approved by the Engineer, and under conditions as directed by the Engineer that simulate to 
the extent practical the environmental and operating conditions that will be encountered during actual 
field operations after installation.  Test plan shall describe test equipment to be used, procedures to 
be  followed,  measurements  to  be  taken,  and  pass-fail  criteria  to  be  employed.    Engineer  shall 
approve  the  test  plan  with  revisions  and/or  additions  if  he  deems  necessary.    All  tests  shall  be 
conducted in accordance with the approved test plan. 

Subcontractor shall supply complete equipment manuals which will show test point electronic values 
together  with  component  descriptions  and  wiring  diagrams.    These  manuals  shall  be  complete 
printed documents, not a compendium of loose-leaf material. 

S

YSTEM

 

 

No  equipment  or  subsystem  shall  be  considered  accepted  until  the  Engineer  issues  a  final 
acceptance certificate as described under Sub-article f of Article 9.6.5 

a.  Pre-installation Testing 

All pre-installation tests shall be performed in accordance with the approved test plan. 

Each  piece  of  equipment,  component,  element,  appurtenance,  and/or  subsystem  of  the  ITS  and 
traffic control system shall be individually tested by the Subcontractor in the presence of and to the 
satisfaction of the Engineer before installation. 

Pre-installation tests shall emphasize proper operation and functioning of each unit of equipment, 
component, element, appurtenance and/or subsystem, whether manufactured and/or assembled by 
the Subcontractor himself or supplied by a manufacturer other than the Subcontractor. 

No  pre-installation  test  shall  be  considered  complete  unless  the  unit  being  tested  meets,  in  the 
judgment  of  the  Engineer,  all  the  material,  operating  and  performance  criteria  established  in  the 
Contract Documents. 

Any unit that fails to pass any pre-installation test shall be so marked by the Engineer and shall be 
replaced by the Subcontractor at his own expense until the replacement passes all pre-installation 
tests to the satisfaction of the Engineer.  Repairing a faulty unit shall not be acceptable.  If the reason 
for failure of a unit to pass any pre-installation test is identified by the Engineer as an equipment or 
system design deficiency, the Subcontractor shall make necessary design modifications to that unit 
at his own expense, and shall repeat all pre-installation tests on the modified unit to the satisfaction 
of  the  Engineer.    Engineer  has  the  option  of  rejecting  a  modified  unit  and  requesting  the 
Subcontractor to supply at his own expense a unit of different design and/or manufacture. 

Once  the  design  of  a  unit  is  modified  as  described  above,  such  design  modification  shall  be 
incorporated, at the Subcontractor's own expense, into all like units, whether already installed and 
tested, or to be installed in the future. 

Unless otherwise directed by the Engineer, pre-installation tests shall be performed at the testing 
laboratory in the traffic computer centre building. All costs associated with the pre-installation tests 
shall be borne by the Subcontractor as an incidental part of his bid price for the unit being tested. No 
separate payment shall be made for pre-installation tests. 

No  unit  shall  be  installed  in  the  field  unless  the  Engineer  issues  a  pre-installation  test  certificate 
indicating that the unit has passed required tests to his satisfaction. 

Engineer has the option of waiving pre-installation testing requirements for a group of like units, after 
testing a sufficient number of units, randomly selected by him, from such group of like units. 

Satisfactory passage of any unit in pre-installation tests shall not relieve the Subcontractor from any 
of his responsibilities of equipment performance under this Contract. 

b.  Factory Acceptance Testing 

Owner  and  the  Engineer  have  the  right  to  inspect,  with  use  of  their  representatives,  any  or  all 
equipment,  components  and/or  parts  of  the  system  during  the  manufacture,  preparation  and/or 
assembly at the Subcontractor’s vendor’s home plant and/or his regional facilities. 

For this purpose, the Subcontractor shall notify the Engineer in writing at least four weeks in advance 
of  the commencement  of  such manufacture,  preparation  and/or  assembly. If the  Engineer/Owner 
uses its right of  inspection, no manufactured, prepared and/or assembled equipment, component 
and/or part shall be shipped to the job site without the inspection approval of the Engineer/Owner

’s 

representative. 

Subcontractor shall conduct factory acceptance testing (FAT) for the following major subsystems; 
traffic  signal  system,  digital  video  management  system,  dynamic  message  sign  and  lane  control 
speed control signs, and integrated traffic signal, ITS and central computer system software. Each 
FAT shall have all required systems and software complete and staged at the home plant and include 
as necessary simulation of interface subsystem to ensure adequate testing.  

S

YSTEM

 

 

Subcontractor shall bear all expenses related to the factory acceptance testing. All travel, lodging, 
living, local transportation and miscellaneous expenses, as requested by the Engineer, for a period 
up to two weeks each incurred by the representatives (up to four representatives of the Owner and 
up to two representatives of the Engineer) in connection with such inspection at the Subcontractor 
vendor’s home plant(s) and/or factory (s) shall be paid for by the Subcontractor. Business class travel 
is required for the Owner and Engineer representatives. At least 1 of the 

Subcontractor’s staff shall 

be in attendance. 

In the  event that  a  factory  acceptance  test  fails requiring  a  postponement  and  another trip  to the 
location  at  a  later  date, the  Subcontractor  shall absorb  the  cost  of  the revisit,  including  the  costs 
incurred due to changed travel plans. 

c.  Independent Testing Supervision and Verification 

At the Owner

’s and Engineer’s discretion the Subcontractor shall provide services of an independent 

entity to act as overseer of all testing activities. This entity shall also certify test results and approve 
any test procedures and plans.  Cost  of engaging a separate firm to perform these tasks shall be 
included in the bid price as a provisional item. 

d.  Integration Tests 

Subcontractor  shall  submit  integrated  system  test  procedures 

–  which  will  be  used  to  test  the 

compliance with the functional requirements of the systems as a whole. This procedure shall also 
include detailed functionality testing of any system for which a separate system functionality test was 
not developed.  Full integration test shall demonstrate that all subsystems can be controlled locally 
(if applicable) from system head-end and from the central system as approved by the Engineer.  In 
addition,  any  and  all  functions  which  require  input  from  multiple  subsystems  shall  be  explicitly 
demonstrated. 

e.  Post-installation Tests 

Following the installation of equipment, components, elements, appurtenances and/or subsystems 
of  the  traffic control system  and intelligent  transportation system, the Subcontractor shall perform 
post-installation/site acceptance tests in the presence of and to the satisfaction of the Engineer.  All 
post-installation tests shall be performed in accordance with the approved test plan. 

Post-installation tests shall emphasize the functional operation and performance of a system as well 
as the performance of its components. 

Post-installation  tests  shall  include,  but  not  limited  by,  the  following,  after  each  system  is  fully 
installed and ready for testing: 

1.  Complete  intersection  controls  including  local  controller,  detectors,  signal  poles  and  mast 

arms, vehicular signals, pedestrian signals, cable and wiring, and all components, parts and 
appurtenances 

2.  Complete  interconnection  (progression)  controls  along  a  major  artery,  including  the  traffic 

signal  system  central  computer  system,  detectors,  communications  interface,  cable  and 
wiring, and all components, parts and appurtenances. This also includes additional system 
detectors. 

3.  Automatic  Transfer  Dual  Power  Supply  Panels,  Free  Right  Turn  Signals  and  Pedestrian 

Pushbuttons 

4.  Additional  Intersections  placed  under  the  Central  Computer  Control,  including  all 

components,  parts  and  appurtenances.  This  also  includes  performance  checking  of  all 
communications cables. 

5.  Traveller information signs, video surveillance cameras, vehicle detection system, roadway 

weather  information  system,  over-height  vehicle  detection  system,  and  communications 
system. 

 

 

 

 

 

 

 