S
YSTEM
Subcontractor shall perform all required performance and reliability tests, as specified in Article
9.6.3.1.
9.5.3.7
Other Subsystem Configurations
Descriptions and detailed Specifications that are included in the Contract Documents are intended
to be as definitive as possible. However, they are not meant to preclude other possible subsystem
configurations. Subcontractors who have well-developed hardware or software subsystems that
differ from those described or specified shall submit with their Tender all details and particulars of
their subsystems. Consideration will be given to alternative configurations, provided that they show
major advantages without a sacrifice in performance, compatibility with the existing traffic control
system, maintainability or reliability. However, after the execution of the Contract, no substitution
shall be made unless approved in advance by the Engineer in writing.
9.5.3.8
Installation of Pedestrian Signal Heads
Under this Contract the Subcontractor shall furnish and install all pedestrian signal heads, control
mechanisms and cables within sidewalk pylons or on poles as provided and installed for the
respective intersection, interchange or roadway construction as directed by the Engineer.
To ensure correct positioning of the equipment installed under this Contract, the Subcontractor shall
be responsible for coordination with the work executed under separate contracts in accordance with
the requirements of respective Clauses under Department of Transport Conditions of Contract and
Further Requirements in the Contract Documents.
9.5.3.9
Installation of Controller Communication Cables
All cable shall be installed, spliced, connected to terminal strips, tested and connected to the proper
equipment to produce a complete and operating traffic control system. Cables shall be pulled
through the conduit with a cable grip designed to provide a firm hold on the exterior covering of the
cable. All cable shall be pulled with a minimum of dragging on the ground or pavement.
Cable feeders shall be used. Powered soapstone, talc or other approved lubricants shall be used to
facilitate the pulling of the cable through the conduit.
Cable ends shall be taped to exclude moisture until the connections are made or the terminals
attached. Cable shield shall be connected to terminals to provide electrical continuity. Cables shall
enter junction boxes through the bottom only. Drop loops shall be provided in cables.
9.5.3.10
Installation of Electrical Components and Accessories
Installation of all electrical equipment for the traffic control system shall meet the requirements as
specified in this section as well as the applicable sections and clauses of Chapter 10, Lighting and
Electrical Distribution Works.
9.6
Intelligent Transportation Systems
9.6.1
Description
This Specification covers descriptions and requirements of the components and materials forming
part of the intelligent transportation systems. All components, items, systems and sub-systems
supplied and/or implemented under this Contract shall strictly comply with requirements and
specifications stipulated in this Specification and the Abu Dhabi
Traffic Signals and Electronic
Warning and Information Manual
. System shall be compatible, and capable of integration with any
existing system, and operate in harmony with the existing system.
All non-civil works required under this section shall be executed by an Owner pre-approved
Subcontractor (from herein referred to as Subcontractor). Subcontractor shall be a well established
ITS contractor and shall have carried out a number of works of similar nature and magnitude as this
Contract. Subcontractor shall have previous experience in the hardware, software, principles and