Главная Manuals Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)
|
|
|
S YSTEM
39. Mean time between failures (MTBF) of the installed controller shall be greater than 100,000 hours. 40. Volume - density operations: Microprocessor controllers shall provide for volume- density operation. In this mode of operation, the green interval in each phase shall consist of a 41. Minimum green time shall be guaranteed irrespective of whether vehicle demand exists or not. 42. Vehicle actuation: Full vehicle actuation shall be provided as specified herein. However, signals shall also be capable of operating in a semi-actuated mode with a selected phase 43. Vehicle extension (passage). The vehicle extension (passage) shall be reset by vehicle actuations on this phase when the signal is green (after minimum green has expired) and 44. Pedestrian signal control: Pedestrian signals shall be controlled by the local intersection controllers. Pedestrian signal intervals shall be capable of being timed concurrently with 45. Pedestrian intervals and termination of green: Pedestrian timing shall be concurrent with the above vehicle intervals (Minimum green time and Vehicle extension). Pedestrian intervals i. Extension time has expired ii. Gap timer has expired iii. Maximum extension has expired 46. Clearance intervals: Following the green interval, there shall be a flashing green and yellow (amber) change interval which is timed in accordance with the setting for that phase. There 47. Ranges and increments: Ranges and increments of the volume-density timing intervals for each phase shall be as shown in Table 9-8. Table 9-8 : Ranges and increments Interval Range (sec) Increment (sec) Minimum green 0 - 199 1 Extension (passage) 0 - 19.9 0.1 Maximum extension 0 - 199 1 |