Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 55

 

 

S

YSTEM

 

 

No post-installation test shall be considered complete unless the system and its components being 
tested meet, in the judgment of the Engineer, all the material, operating and performance criteria 
established in the Contract Documents. 

Any  system  or  its components that fail  to  pass any  post-installation  test  shall  be  replaced  by the 
Subcontractor  at  his  own  expense  until  the  replacement  passes  all  post-installation  tests  to  the 
satisfaction of the Engineer. 

If the reason of failure of a system or its components to pass any post-installation test is identified 
by  the  Engineer  as  an  equipment  or  system  design  deficiency,  the  Subcontractor  shall  make 
necessary  design  modifications  to  that  system  or  its  components  at  his  own  expense,  and  shall 
repeat all post-installation tests on the modified system and its components to the satisfaction of the 
Engineer.  Engineer shall have the option of rejecting a modified system and/or its components and 
requesting  the  Subcontractor  to  supply  at  his  own  expense  a  system  and/or  its  components  of 
different design and/or manufacture.  Once the design of a system or its components is modified as 
described  above,  such  design  modification  shall  be  incorporated,  at  the  Subcontractor's  own 
expense,  into  all  like  systems  and  components,  whether  already  installed  and  tested,  or  to  be 
installed in the future. 

Subcontractor shall provide and set up all the test equipment necessary for post-installation tests 
and shall conduct the tests under the supervision and to the satisfaction of the Engineer. 

All  costs  associated  with  the  post-installation  tests  shall  be  borne  by  the  Subcontractor  as  an 
incidental part of his bid price for the system being tested. No separate payment shall be made for 
post-installation tests. 

No system shall be started-up unless the Engineer issues a post-installation test certificate indicating 
that the system has passed required tests to his satisfaction. 

Following issuance of the post-installation certificate:  

1.  The Contractor shall perform a System Start-up and Initial Operation for one month; and 
2.  The system shall be subjected to a 60-day Reliability Test  

Satisfactory passage of any system in post-installation tests shall not relieve the Subcontractor from 
any  of  his  responsibilities  of  system  performance  under  this  Contract  until  a  final  acceptance 
certificate is issued by the Engineer. 

f.  Traffic Control System 

Post-installation tests shall be performed in the presence of 

the Employer’s representative on the 

following systems, after each system is fully installed and ready for testing and commissioning, as 
per the following items: 

1.  Complete intersection controls including local controller, detectors, signal poles and mast 

arms, vehicular signals, pedestrian signals, cable and wiring, and all components, parts 
and appurtenances. 

2.  Complete  interconnection  (progression)  controls along  a  major  artery  including  master 

controller,  detectors,  communications  interface,  cable  and  wiring,  and  all  components, 
parts and appurtenances.  This also includes additional system detectors. 

3.  Automatic  transfer  dual  power  supply  panels,  free  right  turn  signals  and  pedestrian 

pushbuttons. 

4.  Additional Intersections placed under central computer control, including all components, 

parts  and  appurtenances.    This  also  includes  performance  checking  of  all 
communications cables. 

5.  Additional loops for traffic violation recording equipment complete. 

g.  Intelligent Transportation System 

The required post-installation test consists of the following components: 

S

YSTEM

 

 

1.  Production and submission of site acceptance test plans to the Engineer for review and 

approval. 

2.  Commissioning of head-end subsystem equipment (verification of function for a particular 

piece of the ITS Platform equipment)  

3.  Functional verification for one field installation of each  subsystem field equipment type 

installed. All aspects of the manufacturer-supplied IDDs shall be verified for one complete 
communications interface of each subsystem field equipment type. 

4.  End to end testing shall be conducted as a part of the acceptance test. 

Subsystem equipment site acceptance testing shall be exhaustive and performed in a manner so as 
to not disrupt the ongoing work of the traffic management centre. 

h.  Certification of Results 

Subcontractor shall notify the Engineer when the site acceptance tests are to be undertaken. 

Subcontractor shall forward to the Engineer duly certified copies of the results when the tests have 
been successfully completed. 

When the Engineer has received these test results, and is satisfied the site has passed the tests, 
the Engineer and/or the Owner will notify the Subcontractor/Contractor in writing that the site has 
passed the site acceptance test.  

Prior to acceptance and commissioning of the systems, system design document shall be developed; 
which  shall  encompass  all  of  the  revisions  and  details  pertinent  to  the  actual  development  and 
implementation of the systems, including a revised requirements compliance matrix. 

If the Engineer/Owner decides the site equipment is not in accordance with the Contract, he may 
reject the equipment at the site, and he will inform the Subcontractor/Contractor of the reasons in 
writing. 

i.  Commissioning of Subsystem Field Equipment 

In the case of all subsystem field equipment, following shipment of equipment to the Project location, 
all  head-end subsystem equipment pre-loaded with the relevant software application programs or 
simulations shall be inspected and tested at the 

Subcontractor’s facility to verify that equipment is 

working prior to installation on site. 

j.  Approval for Commencement of Integration and Reliability Tests 

Engineer  will  notify  the  Subcontractor  in  writing  of  outstanding  faults  detected  during  the 
commissioning of In-station equipment tests and defects detected during or after these tests. 

Subcontractor shall prepare proposals for rectifying defects and the additional tests to be conducted 
after defects are rectified. Proposals shall be submitted to the Engineer for approval. 

All defects detected during or subsequent to the commissioning tests shall have been rectified and 
successfully passed their tests prior to site acceptance for any site. 

k.  Reliability Test 

 

Upon successful completion of the post-installation test and commissioning, the system components 

are subjected to a 60-day reliability test. During this test any system failure is considered to have 
reset the 60-day time-period to zero. Determination of which failures constitute a system failure is at 
the discretion of the Engineer and the Owner.   

Reliability Testing shall be conducted on all components, systems, and functions affected, changed 
or installed, including but not limited to: 

S

YSTEM

 

 

l.  System Start-up and Initial Operation 

Following the issuance of a post-installation test certificate by the Engineer, the Subcontractor shall 
start-up the system that passed the post-installation tests, and shall continuously operate the system 
for an initial operation period of one month. 

Engineer  and  the  Owner's  personnel  shall  be  present  at  the  start-up  and  initial  operation  of  all 
equipment, components and systems. 

During  the  initial  operation  period  the  Subcontractor  shall  continuously  observe  and  monitor  the 
operation  of  the  system  and  shall  make  final  adjustments  and  corrections  to  the  system  to  the 
satisfaction of the Engineer.  If during the initial operation period major system and/or component 
defects are identified which,  in the judgment of the Engineer, require modifications to the system 
and/or its components, the initial operation period shall restart following the completion of the subject 
modifications to the satisfaction of the Engineer. 

m. Conditional Acceptance 

When a system, started-up and initially operated according to the requirements of  Sub-article l of 
Article 9.6.3.1, above, performs to the satisfaction of the Engineer during the initial operation period 
of one month, the Engineer shall issue a conditional acceptance certificate to indicate that the subject 
system  has  been  conditionally  accepted.    Conditional  acceptance  certificate  shall  relieve  the 
Subcontractor  from  his  responsibilities  concerning  the  performance  of  the  system  except  for  the 
Subcontractor's operation and maintenance responsibilities as described in Sub-article c of Article 
9.6.5. 

9.6.4 

Project Handover / Take Over 

This section provides general requirements for the handover process of the installed project to the 
Owner. The Owner has a procedure in place for the handover of traffic control system assets.  The 
Contractor shall follow the detailed instructions provided in that document.   

The  project  handover  phase  will  start  when  the  project  implementation  is  substantially  complete, 
however the steps required for the successful project handover shall start as early as possible, prior 
to  the  Taking-Over-Certificate.  The  goal  of  the  handover  process  is  to  ensure  that  the  installed 
systems and equipment is constructed in accordance to all applicable standards and to the Owners 
satisfaction, and to ensure that the new equipment can be maintained and operated properly once 
installed.  

Prior to the issuance of the Taking-Over-Certificate the Contractor shall submit to the Engineer all 
the required documentation including but not limited to: 

a.  List of all ITS assets 
b.  Project Documentation 

  Submittals 

  O&M Manuals 

  Training Manuals 

  Test Reports 

  Record Drawings 

  Incident Response Plans etc 

c.  Developed software with all documentation and licenses 
d.  Any specialty software used in project development with licenses 
e.  Inventory of spare parts and maintenance tools 
f.  Operations and Maintenance Plan 
g.  Operations and Maintenance Staffing Plan 

S

YSTEM

 

 

9.6.5 

Operations, Maintenance and Final Acceptance 

As  part  of  this  Contract,  the  Subcontractor  shall  operate  and  maintain  the  systems,  subsystems, 
parts and components of the traffic control system for the periods of time specified as follows: 

1.  Complete intersection controls (including local controller, detectors, signal poles and mast 

arms, vehicular signals, pedestrian signals, cable and wiring, and all components, parts and 
appurtenances); Additional loops for traffic violation recording equipment for one year from 
the date of the conditional acceptance certificate   

2.  Complete  interconnection  (progression)  controls  along  a  major  artery  (including  master 

controller,  interconnection  detectors,  communications  interface,  cable  and  wiring,  and  all 
components, parts and appurtenances); additional system detectors for one year from the 
date of the conditional acceptance certificate: 

3.  Automatic  transfer  dual  power  supply  panels,  free  right  turn  signals,  and  pedestrian 

pushbuttons (including all components, parts and appurtenances) for one year from the date 
of the conditional acceptance certificate: 

4.  Additional intersections placed under the central computer control (including all components, 

parts  and  appurtenances,  and  operation  of  traffic  computer  control  plans  and  traffic 
engineering software); audio and computer communication cables for one year from the date 
of the conditional acceptance certificate  

5.  All ITS  and electromechanical equipment installed in the  contract for three years from the 

date of the taking-over-certificate. 

Subcontractor's  system  operation  responsibilities  during  the  time  period  specified  above  shall 
include,  but  not  by  way  of  limitation,  continuous  monitoring  of  system  performance  and  traffic 
conditions; adjustment and modification of timing patterns and time plans to satisfy requirements of 
changing  traffic  and  field  conditions;  malfunction  diagnosis  and  implementation  of  corrective 
measures; and other operational activities as specified in the contract Documents and as directed 
by the Owner and/or the Engineer. 

Subcontractor's system maintenance responsibilities during the time periods specified above shall 
include, but not by way of limitation, periodic cleaning of exposed system components; replacement 
and/or repair of damaged units; replacement of worn-out parts and burnt-out illumination sources 
(e.g. bulbs); periodic maintenance of all components that require such periodic maintenance; and 
other maintenance activities as specified in the Contract Documents and as directed by the Owner 
and/or the Engineer.   

Subcontractor  shall  also  repair  or  replace  as  directed  by  the  Owner  and/or  the  Engineer,  at  the 
module or subsystem level whichever deemed proper by the Owner and/or the Engineer, any failure 
whatsoever  that  occurs  during  the  maintenance  periods  specified  above.    Subcontractor  shall 
maintain records of all maintenance and repair calls and equipment failures by type and component 
(including cost).  The records shall indicate the time required to restore operations to full functioning 
level. These records shall be available for the Owner

’s and Engineer’s inspection and use during the 

Subcontractor's operation and maintenance period. 

Subcontractor shall maintain, in his Project area or regional office, an adequate level of competent 
and  experienced  operational  and  maintenance  personnel  (including  engineers,  technicians, 
mechanics, etc.) capable of performing the above specified operational and maintenance activities 
to the satisfaction of the Owner and the Engineer.  If, at any time during the life of this Contract, the 
capabilities  and/or  levels  of  staff  maintained  by  the  Subcontractor  in  his  Project  area  or  regional 
office  are,  in  the  judgment  of  the  Owner  and/or  the  Engineer,  insufficient  to  carry  out  the 
Subcontractor's operation and maintenance responsibilities as specified herein, the Subcontractor 
upon notification by the Owner and/or the Engineer, shall take necessary action to substitute and/or 
supplement his staff resources to the satisfaction of the Owner and/or the Engineer. 

Subcontractor  shall  initiate  a  response  to  maintenance  calls  and  failures  in  accordance  with  the 
requirements of Sub-article c of Article 9.6.5, and shall use replacement equipment to restore the 
system to its operational level as quickly as practical and to the satisfaction of the Employer and/or 
the Engineer.  

S

YSTEM

 

 

At the end of the Subcontractor's operation and maintenance period, all components of the  traffic 
control  system  shall  be  capable  of  operating  in  accordance  with  and  to  the  full  satisfaction  of  all 
requirements of the Contract Documents.  Subcontractor shall demonstrate to the satisfaction of the 
Owner that the traffic control system is capable of operating in the manner, accuracy and level set 
forth  by  these  Contract  Documents,  as  directed  by  the  Engineer,  and  as  checked  by  the  post-
installation tests and verified. 

All costs associated with operations and maintenance activities for the periods specified herein shall 
be borne by the Contractor as an incidental part of his bid price for the items shown on the Bills of 
Quantities, operated and maintained by the Subcontractor.  No separate payment shall be made for 
any operations and maintenance prior to Final Acceptance. 

a.  Maintenance and Repair Shop Facilities 

Subcontractor shall use the existing maintenance and repair shop in the Project vicinity traffic control 
centre building or as directed by the Owner to service all equipment, components and appurtenances 
of the Traffic control system. 

b.  Operation and Maintenance Manuals 

As  part  of  this  Contract,  the  Subcontractor  shall  prepare  and  submit  to  the  Owner  operation  and 
service/maintenance manuals. 

Subcontractor shall prepare two separate sets of manuals for the  traffic control system.  First  set 
shall  cover  in  detail  the  operation  and  relationship  of  all  equipment,  components  and  systems.  
Second set shall cover the maintenance and service requirements for all components of the traffic 
control  system  together  with  all  data  and  related  information  for  all  equipment,  components, 
materials and appurtenances for the traffic control system.  All manuals shall be suitably bound with 
hard covers, and identified as to the project and content. 

All manuals shall be neatly typewritten or mechanically printed with both a table of contents and an 
alphabetical index in each volume identifying and locating the contents therein.  All manuals shall be 
arranged in a clear, logical and systematic order. 

All manuals shall be prepared in English. 

Each  manual  shall  contain  the  name  of  the  Subcontractor,  name  of  the  responsible  principal  or 
representative in the Project vicinity, his local office telephone number, and his office particulars both 
locally and at the Subcontractor's headquarters. 

All  manuals  shall  be  updated  as  the  installation  progresses  and  additional  intersection  and/or 
interchanges are added to the system and the system control is expanded.  Subcontractor shall be 
responsible for checking and updating all manuals. Provided manuals shall address the entire traffic 
control system (TSC) and sub-systems (TSC and ITS) and shall provide detailed information on each 
component  of  the  system.  Operation  manuals  shall  include  a  sufficient  amount  of  technical 
information  to  provide  a  good  understanding  of  the  system  appropriate  for  the  system  operator. 
Service  and  maintenance  manuals  shall  contain  all  technical  information  required  for  the  entire 
system servicing and maintenance. At a minimum, these manuals must incorporate copies of the 
manufacturer’s  hardware,  software,  maintenance  information,  troubleshooting  procedures  for  the 
entire system and for each sub-component of the system, preventive maintenance information and 
corrective maintenance of each component. Document should include a recommended spares listing 
and identification of every replaceable part of each component, i.e., a complete listing of the lowest 
replaceable unit (LRU) and the spares recommendation for each for ongoing maintenance. 

Subcontractor  shall  provide  comprehensive  coverage  of  each  section.  Information  on  each 
subsection of the system shall be grouped into one section of the manual. 

Three  copies  of  each  set  of  manuals  shall  be  submitted  to  the  Owner  through  the  Engineer,  as 
follows: 

S

YSTEM

 

 

1.  Operation  manuals:    Operation  manuals  shall  include  all  particulars  and  details  for  the 

operation of all components of the traffic control system which shall include but not by way 
of limitation the following: 

i. 

All written test shall be organized in a consistent format, related to the installation and 
under separate headings for the different procedures of operations. 

ii. 

Operation  manuals  shall  identify  each  intersection  and/or  interchange  and  the 
relationship of each subsystem and control system. 

iii. 

All instructions shall be organized in a sequence for the various intersections and/or 
interchanges, and operation of each system. 

iv. 

Manuals  shall  include  a  description  of  equipment,  components,  materials  and 
appurtenances.  Functions, normal operating characteristics and limiting conditions 
along with engineering data, test and other pertinent information for the traffic control 
system shall be included. 

v. 

Instructions shall clearly describe procedures to be followed in the event of failure of 
any subsystem or control system. 

vi. 

Instructions  shall  be  given  as  to  procedure  to  be  followed  in  the  start-up  of  the 
subsystem and control systems. 

vii. 

Instructions shall be given as to procedures to follow to coordinate in the event any 
portion of the system is altered in any way such as adjusting or resetting of timing or 
sequencing of any controls. 

viii. 

Special  operating  instructions  shall  be  provided  as  may  be  required  by  various 
systems of control. 

ix. 

Instructions for the regulation, control, shutdown, start-up and emergency operations 
of all systems and controls shall be provided. 

2.  Service  and  maintenance  manuals:    Service  and  maintenance  manuals  shall  include  all 

particulars and details for servicing and maintaining of all components of the traffic control 
system which shall include but not by way of limitation the following: 

i. 

Maintenance  procedures  concerning  routine  operation  of  the  system  with  details 
covering the intervals and sequence of maintaining all equipment, components and 
appurtenances of the complete system. 

ii. 

Particulars and details on the adjusting and checking of the complete system. 

iii. 

A guide to the servicing and "trouble-shooting" of the system. 

iv. 

All particulars and details for the replacement, disassembly, repair and reassembly of 
all equipment components and appurtenances. 

v. 

Instructions regarding the use of lubricants and cleaning materials and the methods 
to  be  employed  in  the  use  of  same.  Further,  the  instructions  shall  include  all 
precautions to be employed in the use of lubricants and cleaning materials. 

vi. 

Complete information on all materials including but not by way of limitation the traffic 
poles,  mast  arms,  signal  heads,  controllers,  detectors  and  all  other  materials  as 
specified herein and/or furnished and installed by the Contractor. 

vii. 

Description  of  the  theory  of  operation,  circuit  schematics,  logic  diagrams  and 
maintenance procedures. 

viii. 

Where  required,  the  Subcontractor  shall  furnish  separate  service  manuals  for 
individual items of equipment, components and/or control systems. 

3.  In  addition  to  other  requirements  specified  herein,  the  service  and  maintenance  manuals 

shall  contain  a  listing  and  description  of  spare  parts  and  materials  required  for  the  Traffic 
Control System with recommendations as to the quantity to be maintained and the procedure 
as to the replacement of spare parts and materials. 

c.  Operations and Maintenance (O&M) Phase 

Subcontractor shall respond to maintenance calls and failures 24 hours, 7 days a week, and shall 
use  replacement  equipment  to  restore  the  system  to  its  operational  level  as  quickly  as  practical. 
Subcontractor shall  carryout  periodic  maintenance  checkups for  specific  tasks  as  directed  by  the 
Engineer. 

S

YSTEM

 

 

After the subcontractor detects or is notified of an emergency maintenance related system failure, 
the Contractor's maintenance staffs shall mobilise to attend and resolve the emergency maintenance 
failure within: 

  Ten  (I0)  minutes  following  operator  verification  during  the  hours  of  6:00  am  to  7:00  pm, 

Sunday through Thursday; and 

  one (1) hour at all other times outside these hours 

On arrival at the site, the Contractor shall analyze the situation and develop an estimate of the time 
required for repairs and analyze if lane closure(s) are necessary. The Contractor shall determine if 
the repair should be initiated immediately or if the situation should be monitored through peak traffic 
hours  and  repaired  during  off-peak  traffic  hours.  If  the  repair  time  will  exceed  two  hours,  the 
Contractor shall notify the Owner immediately and begin preparation of a contingency plan. A work-
around should be considered if it would not negatively impact any part of the Project operations. The 
Contractor shall notify the Owner when the maintenance actions have been completed and describe 
any resulting operational restrictions. 

At the end of the Contractor's warranty period, the complete system shall be capable of operating in 
accordance with and to the full satisfaction of all requirements of the Contract Documents. Contractor 
shall demonstrate to the satisfaction of the Owner that these systems are capable of operating in the 
manner, accuracy, and level set forth by these Contract Documents, as directed by the Engineer, 
and as checked by the post installation tests and verified. After this time, the Engineer shall issue 
the final acceptance certificate. 

Upon successful completion of the warranty period of the installed systems, the Engineer shall issue 
a  final  acceptance  certificate.  Final  acceptance  certificate  shall  relieve  the  Contractor  from  his 
responsibilities concerning the signal system

’s performance. 

All costs associated with warranty activities for the periods specified herein shall be borne by the 
Contractor  as  an  incidental  part  of  his  bid  price  for  the  items  shown  on  the  Bills  of  Quantities, 
operated  and  maintained  by  the  Subcontractor.  No  separate  payment  will  be  made  for  any 
operations and maintenance prior to final acceptance. 

Upon  successful  completion  of  the  construction  works  of  this  Contract  and  the  issuance  of  the 
conditional acceptance certificate, the Subcontractor will be required to provide sufficient staffing to 
operate the system for a period as specified in the BOQ. Maintenance period shall be renewable at 
the client discretion for another equal or less period. 

Subcontractor shall submit his proposed quality management plan to the Engineer for review and 
approval. 

Subcontractor shall perform all operations and maintenance (O&M) of the system under the direct 
participation of the Engineer and as directed by the Engineer and/or the Owner. It will be understood 
that  the  maintenance  of  the  individual  system  components  shall  be  the  responsibility  of  the 
Subcontractor 

during this period which shall be free to organize it with the individual subsystems’ 

subcontractors. Subcontractor will be required to assign a minimum level of staffing specialists (traffic 
engineer, systems engineer, and electromechanical engineer) to be available permanently during 
this period. 

Subcontractor  shall  maintain  an  engineering  and  technical  staff  with  24-hour  /  7-days  per  week 
availability to respond promptly to maintenance calls and failures. In addition, the Subcontractor shall 
perform periodic preventative maintenance operations on the field and central equipment as needed 
and  as  directed  by  the  Engineer.  Subc

ontractor’s  engineering  staff  shall  update  and  verify  the 

response plans, ensuring that the plans are current with changing conditions and as directed by the 
Engineer. 

Subcontractor shall provide at least 1 Engineer and 1 technician at site, for each major system, in 
accordance with Article 9.6.5 of these Specifications, to be permanently located at the control centre 
and perform the daily operation and maintenance tasks. Subcontractor may combine staff disciplines 
to operate and maintain multiple system if approved by the Engineer. Subcontractor staff shall be 
fully  qualified  with  adequate  education  and  at  least  3  years  experience  working  with  the  relevant 

S

YSTEM

 

 

equipment. Additionally, the staff shall also have manufacturer certifications for installing, operating 
and troubleshooting the deployed systems. 

Mean  time  to  repair  (MTTR)  shall  not  exceed  four  (4)  hours,  including  travel  time  to  the  site. 
Subcontractor  shall  maintain  all  the  required  spares  on  site  with  all  required  maintenance 
documentation. Spare parts shall be sufficient to meet the system availability requirements. 

Subcontractor shall carry out all required preventive and responsive maintenance duties and shall 
document  all  activities  performed  in  an  electronic  data  base  accessible  by  the  Engineer  and  the 
Owner.  

System availability shall not be less than 99 % calculated on a quarterly basis.  Monthly operation 
and maintenance fees shall be adjusted in the event the system availability requirement is not met. 
Amount of adjustment shall be calculated based on 5 % deduction from the following month service 
fees for every additional one hour of down time. 

d.  System Performance Parameters  

Using  the  system  data,  the  Subcontractor  shall  guarantee  high  level  of  system  reliability  and 
maintainability. System indicators shall be developed for each major subsystem and equipment as 
directed by the Engineer and as follows: 

1. 

Availability of the central control system 

2. 

Availability of the communication system 

3. 

Availability of the peripheral system 

4. 

System efficiency 

Parameters to be developed for this purpose shall include, but not by way of limitation, the following: 

1. 

MTBF (mean time between failures) 

2. 

MTTR (mean time to repair) 

3. 

Availability index equal to [100 

– ( MTTR / MTBF + MTTR )*100] 

e.  Spare Parts and Tools 

Subcontractor shall maintain at the traffic  management centre, all recommended spare parts and 
tools described in the approved spare parts list.  Subcontractor shall maintain the minimum quantities 
of  consumable  materials,  replacement  parts,  and  tools  specified  in  the  approved  spare  parts  list. 
These items shall be used as needed for the maintenance of the  traffic management system and 
ITS systems and roadway devices and systems for the Contract term, and shall be restocked to the 
minimum acceptable quantities at the end of each month.  

Replacement parts shall be the latest compatible technology, equal to or better in function and quality 
to  meet  or  exceed  the  original  equipment  manufacturers  standards  for  the  existing  system 
component or equipment, and by its use, does not cause a required system upgrade. Subcontractor 
shall maintain inventory control of all replacement parts and equipment. 

All  equipment  and  component  parts  that  are  furnished  shall  be  new,  unused  and  shall  otherwise 
meet all requirements of the Contract. All parts shall be of high quality workmanship and no part or 
attachment shall be applied contrary to the manufacturer's recommendations or standard practice.  

Subcontractor  shall  not  install  spare  parts  that  are  deemed  damaged  or  faulty  by  the  Engineer, 
Owner or the manufacturer. Installation shall be carried out as part of the Contract monthly routine 
works  in  accordance  with  the  Contract  plans  and  Specifications  and  as  directed  by  the  Engineer 
and/or Owner. No separate payment will be allowed for these works unless otherwise specified in 
the Bills of Quantities. 

Spare part inventory shall include all the types and quantities of parts identified as spare parts or 
lowest replaceable units in the systems and equipment records. On a monthly basis, at a minimum, 
spare part and consumable inventories shall be checked against the requirements in the systems 

 

 

 

 

 

 

 