No post-installation test shall be considered complete unless the system and its components being Any system or its components that fail to pass any post-installation test shall be replaced by the If the reason of failure of a system or its components to pass any post-installation test is identified Subcontractor shall provide and set up all the test equipment necessary for post-installation tests All costs associated with the post-installation tests shall be borne by the Subcontractor as an No system shall be started-up unless the Engineer issues a post-installation test certificate indicating Following issuance of the post-installation certificate: 1. The Contractor shall perform a System Start-up and Initial Operation for one month; and Satisfactory passage of any system in post-installation tests shall not relieve the Subcontractor from f. Traffic Control System Post-installation tests shall be performed in the presence of the Employer’s representative on the following systems, after each system is fully installed and ready for testing and commissioning, as 1. Complete intersection controls including local controller, detectors, signal poles and mast arms, vehicular signals, pedestrian signals, cable and wiring, and all components, parts 2. Complete interconnection (progression) controls along a major artery including master controller, detectors, communications interface, cable and wiring, and all components, 3. Automatic transfer dual power supply panels, free right turn signals and pedestrian pushbuttons. 4. Additional Intersections placed under central computer control, including all components, parts and appurtenances. This also includes performance checking of all 5. Additional loops for traffic violation recording equipment complete. g. Intelligent Transportation System The required post-installation test consists of the following components: |