Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 46

 

  Главная      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     44      45      46      47     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 46

 

 

C

ONSTRUCTION

 

 

3.  Filling Baskets 

Kinks and folds in the wire mesh shall be removed prior to filling the gabion cages, which 
shall be aligned per the Contract plans and then filled with stone placed and compacted to 
meet the unit weight requirements of Paragraph 4 below. 

Stone  shall  be  placed  in  compacted  layers  not  more  than  350  mm  deep  then  tamped  or 
vibrated. If cross-connecting wires are required, the Contractor shall adjust the number and 
depth  of  layers  so  that  wires  occur  between  the  compacted  layers  of  stone.  Internal 
connecting wires shall be placed in each unrestrained exterior basket cell greater than 0.3 m 
high,  including  interior  basket  cells  left  temporarily  unrestrained.  Internal  connecting  wires 
shall be placed concurrently with rock placement.  

Stone shall be placed in close contact in the unit to minimise voids. Gabion cages may be 
filled by machine with sufficient hand work to accomplish requirements of this specification. 
Exposed face or faces shall be hand-placed using selected stones to prevent bulging of the 
gabion cell and to improve appearance. 

Care  shall  be  taken  to  protect the  vertical  panels  and  diaphragms from  being  bent  during 
filling operations. Last lifts of stone in each cell shall be level with the top of the gabion to 
properly close the lid and provide an even surface for the next course.  

4.  Unit Weight Requirements and Test 

One unit weight test shall be conducted by the Contractor to test for each 380 m3 of gabions 
placed.  Specified  frequencies  of  the  provided  tests  may  be  reduced  by  the  Engineer, 
provided the specified minimum unit weight has been consistently achieved. 

Either of the following unit weight tests shall be conducted to prove the density of completed 
gabions: 

i.  A filled gabion basket shall be selected from the completed structure and weighed  

ii.  A gabion basket shall be filled with stone from a loaded truck that has been weighed. 

After filling, the truck and unused stone shall be weighed again. Differences between the 
weights shall be used to determine the weight per m

3

 of the stone in the gabion. 

Minimum unit weights of the filled gabion basket shall be 1,600 kg/m3. Should the unit weight 
be less than required, the Engineer shall reject the gabion and require the Contractor to pass 
additional unit weight tests before completing other gabions. 

5.  Gabion Basket Erection 

Empty gabion baskets shall be placed on the foundation and adjacent baskets interconnected 
along the top and vertical edges using permanent fasteners. Where lacing wire is used, wire 
shall be wrapped with alternating single and double loops every-other mesh opening, and 
not more than 150 mm apart. Where spiral binders are used, ends shall be crimped to secure 
the binders in place. Where alternate fasteners are used, they shall be spaced in every mesh 
opening and not more than 150 mm apart.  

Each row or tier of baskets shall be reasonably straight and shall conform to alignment and 
grade. Hexagonal mesh baskets shall be stretched endwise before filling. Each basket shall 
be filled completely so that the secured lid rests upon layer of stones. Each basket shall be 
laced securely to all adjacent baskets and its lid then laced or clipped to the sides, ends, and 
diaphragms, in the manner described above. 

Gabion  cage  corners  shall  be  securely  wired  together  to  provide  a  uniform  surface  and 
ensure that the surface does not resemble a series of blocks or panels. 

All selvage wires at the end of adjacent baskets shall be laced together. Bottom selvage of 
the basket being constructed on a previously constructed basket shall be laced to the top of 
that basket. Empty gabions stacked on filled gabions shall be laced to the filled gabion at the 

C

ONSTRUCTION

 

 

front, side, and back. Vertical joints between baskets of adjacent rows and layers shall be 
staggered by at least one cell length. 

After  filling  the  baskets,  the  Contractor  shall  secure  the  lids  to  the  sides,  ends,  and 
diaphragms in the manner  described above. All exposed basket surfaces shall be smooth 
and neat with no sharp rock edges projecting through the wire mesh. 

Backfilling behind or around gabions shall conform to Section 2.5 of Chapter 2, Earthworks, 
using an acceptable, lightweight mechanical or vibratory compactor within 1-m of the gabion 
baskets.  Fine grained soil backfill shall be separated from the stone filled baskets by a layer 
of geotextile fabric and aggregate material meeting the requirements of Table 2-4 of Chapter 
2, Earthworks, unless otherwise shown on the Contract plans or approved by the Engineer. 

All  necessary  bolts,  nuts,  and  hardware  shall  be  supplied  by  the  Contractor  for  complete 
assembly of the units into a continuous wall of connected units. Gabion walls shall be erected 
according to the fabricator's or manufacturer's instructions. On curves, the proper curvature 
for the face shall be obtained by using shorter stringers in the front or rear panels. Walls shall 
be constructed to within ±25 mm from the lines and elevations shown on the Contract plans. 

6.  Gabion Mattress Erection 

Gabions forming aprons and revetments shall be filled by random stones packed in the first 
layer and selected stones used for the top layer, so as to resemble normal stone riprap. Least 
dimension  of  stones  for  gabion  mattress  applications  shall  be  as  shown  on  the  Contract 
plans, typically 75 mm to 300 mm.  

7.4  Slope Protection  

This  work  shall  consist  of  preparing  the  foundation  and  applying  materials  to  protect  a  slope  in 
accordance  with  the  Contract  plans,  Particular  Specifications  and  requirements  of  these 
Specifications, as approved by the Engineer. Work shall conform with the locations, lines, grades, 
and dimensions as shown on the Contract plans or as staked by the Engineer or any other innovative 
but  economical  solution  not  mentioned  herein  but  approved  by  the  Engineer  and  the  DoT/ 
Mnucipalities at no extra cost to client. Various approaches to slope protection are discussed herein 
and as follows:  

  Slope paving, Section 7.4.1 

  Wire mesh slope protection, Section 7.4.2 

  Riprap slope protection, Section 7.4.3  

  Coarse aggregate covering, Section 7.4.4  

7.4.1 Slope Paving 

7.4.1.1 

Description 

This work consists of covering a graded slope with cast-in-situ-reinforced concrete, brick, precast 
concrete blocks, grouted rock, or cellular concrete blocks

.  

7.4.1.2 

Materials 

Materials  shall  conform  to  the  requirements  of  the  Contract  plans,  the  Engineer,  and  these 
Specifications,  including  those  sections  specifically  noted  in  Table  7-22. Other materials  required 
shall be as specified in the particular specifications. 

C

ONSTRUCTION

 

 

Table 7-22: Materials for concrete slope paving 

Material 

Specifications Requirements 

Bedding course 

Gradation 

Liquid limit 

 

AASHTO T 27, AASHTO T 11 

AASHTO T 89 

Concrete and its constituent materials 

Section  4.3  of  Chapter  4,  Concrete 
Works 

Grout 

Article 4.3.10.4 of Chapter 4, 
Concrete Works 

Shotcrete for slope paving 

Cement, water, aggregate;  

Wire mesh reinforcement 

Article 4.3.10.5 of Chapter 4, 
Concrete Works 

Section 4.3 of Chapter 4, Concrete 
Works  

Section 7.4.2 

Concrete  masonry  blocks,  precast  concrete  blocks, 
brick, cellular concrete blocks, mortar 

Section 6.2.2 of Chapter 6, Masonry 

Rock* and mortar for rock masonry 

Section 6.3.2 of Chapter 6, Masonry 

Geotextile for separation or soil stabilization 

Article 

2.5.2.9 

of 

Chapter 

2, 

Earthworks 

Topsoil 

Article 

2.2.2.5 

of 

Chapter 

2, 

Earthworks 

*Rock for slope paving shall conform to the requirements of Article 6.3.2.1 of Chapter 6, 
Masonry, unless otherwise shown on the Contract plans or directed of the Engineer.  

7.4.1.3 

Construction Requirements 

a.  Footing and Preparation of Slope 

Surfaces requiring slope protection shall be thoroughly compacted and neatly trimmed to conform to 
the  line,  grade,  and  detail  in  the  Contract  plans.  Minimum  required  compaction  for  slopes  where 
bedding course is installed shall be 3 passes of a lightweight mechanical tamper, roller, or vibratory 
system.  

Excavation  and  backfill  for  the  slope  foundation  shall  be  constructed  in  accordance  with  Article 
2.4.2.11of Chapter 2, Earthworks. Footings, if required, shall be unreinforced concrete, as shown in 
the Contract plans. No curing or strength testing of the footing concrete is required, and a wood float 
finish  is  acceptable.  Footing  costs  shall  be  incidental  to  the  slope  protection  with  no  separate 
measurement or payment. 

When  required,  geotextile  shall  be  placed  per  Section  2.7  of  Chapter  2,  Earthworks.  Ends  of  the 
geotextile  shall  be  buried  for  anchorage.  Strips  shall  be  pinned  at  1.5  m  intervals  to  hold  the 
geotextile lap in place until concrete is placed. Any torn or punctured geotextile shall be repaired or 
replaced in accordance with Section 2.7.3 of Chapter 2, Earthworks. 

b.  Installing Brick, Precast Concrete Blocks, and Grouted Rock 

Brick, precast concrete blocks, or rock shall be placed in the following manner:  

  In a uniform plane 

C

ONSTRUCTION

 

 

  Starting at the bottom of the slope  

  Such that they rest firmly and evenly against the slope with no rocking  

  In horizontal parallel courses with the longest dimension placed parallel to the bottom of the 

slope and flat faces along the plane of the finished slope protection  

  Such that joints in successive courses do not align with joints in the preceding course 

After each brick or block is placed, mortar shall be applied on the exposed sides in such quantities 
that when the adjacent brick or block is placed and rammed into position, the mortar is within 13 mm 
of the surface and not protruding above the top.  

Brick and masonry block joints shall be 13 mm wide, or less. Grouted rock joints shall be 25 mm 
wide, or less. All mortar stain shall be cleaned from the surface. 

For grouted rock installation, rocks shall be placed as described above, and then grouted in sections. 
A  heavy  flat  steel  sheet  dropped  from  a  height  of  2  m  may  be  used  to  flatten  and  level  the  rock 
surface after placement of the rock and prior to grouting.  

c.  Architectural Grouted Rock Placement 

Work shall be performed as described in Sub-article b, of Article 7.4.1.3, with the following additional 
requirements:  

1.  Rock shall conform to one of the classes of masonry work defined in Section 6.3.3 of Chapter 

6, Masonry  

2.  Grout shall be Class G6, meeting the requirements of Article 4.3.10.4 of Chapter 4, Concrete 

Works  

3. 

Rock shall be installed by masons experienced in the work. Documentation of each mason’s 
experience shall be provided by the Contractor upon request of the Engineer  

4.  Rock shall be selected for appearance; colour; grain pattern; and smooth, large, flat surfaces 

to be placed on top. Rock selection shall be in accordance with the  Contract plans and the 
direction of the Engineer  

5.  Rock  shall  be  placed  on  a  mortar  bed  conforming  to  the thickness requirements  in  Section 

6.3.3 of Chapter 6, Masonry. Unless otherwise shown on the Contract plans, mortar shall meet 
the requirements of Section 6.3.2 of Chapter 6, Masonry, and may be preblended or mixed on-
site. Mortar beds shall not lay longer than 45 minutes or until mortar begins to set before placing 
rock.  

6.  Freshly placed rock shall be damp cured for at least 72 hours prior to grouting.  

7.  Pointing and grouting material shall be the same as for the mortar bed. 

8.  Test  sections  shall  be  prepared  for  approval  of  the  Engineer  regarding  colour,  shape, 

smoothness, technique, and overall aesthetic. Test sections shall be required for each set of 
different  sizes  or  colours  or  patterns,  as  required  on  the  Contract  plans  or  the  Particular 
Specifications.  

9.  Test sections shall be either of the following:  

  Placed on the worksite. In this case, acceptable test sections may be incorporated into the 

works after approval by the Engineer, and unacceptable test sections shall be removed and 
replaced until the test section is approved by the Engineer  

  Placed on test panels measuring at least 3 m on a side. Backings shall be either plywood 

or  existing  ground  at  a  location  outside  the  worksite.  In  this  case,  test  sections  shall  be 
removed and redone, if unacceptable  

10.  Acceptable test sections shall be preserved and protected from damage, including sunlight, 

until all permanent installations have received the Engineer

’s approval  

C

ONSTRUCTION

 

 

d.  Placing Cellular Concrete Blocks 

Cellular  concrete  blocks  shall  be  placed  according  to  the  Contract  plans,  starting  in  a  trench  or 
against a suitable anchorage at the bottom of the slope. Each block shall be laid perpendicular to 
the slope and bed firmly against adjoining blocks. Misaligned joints or breaks at slope changes shall 
be filled with grout. Individual blocks shall not be grouted to each other. 

Topsoil shall be spread loosely over the cellular block slope paving, partially filling the cell openings. 
If required, turf establishment shall be performed as shown on the Contract plans. 

e.  Cast-in-situ Reinforced Concrete 

Prior  to  concrete  placement,  surfaces  shall  be  damp,  but  application  shall  not  be  made  on  any 
surface on which freestanding water exists.  

Wire mesh reinforcement shall be placed continuously through joints with minimum laps of one mesh 
spacing, or 150 mm, whichever is greater. Laps shall be securely fastened at the ends. During the 
placement of the concrete, the reinforcement shall be secured so as to provide at least 30 mm of 
cover. 

Concrete placement shall begin at the bottom of the slope. Methods for depositing and compacting 
concrete shall result in a compact, dense, and impervious concrete with a uniform plane surface. 
Horizontal joints shall be parallel to the bottom of the slope. Vertical joints shall be perpendicular to 
the horizontal joints. Cold joints shall not require filler. 

Newly constructed concrete shall be finished per Article 7.6.4.4 with additional details as shown in 
the  Contract  plans. Outside  edges  of  the  slab  and  all  joints  shall  be  finished  with  a  6  mm  radius 
edging tool. 

Curing shall be performed in accordance with Article 3.8.3.8 of Chapter 3, Pavement. 

Additional requirements for poured concrete slope protection shall be as follows: 

  Concrete shall be the class shown in the Contract plans, or Class C15/20, in conformance with 

Chapter 4, Concrete Works. 

  Toe  walls  shall  be  constructed  as  necessary  or  indicated  on  the  Contract  plans  or  at  the 

direction of the Engineer.  

For shotcrete slope protection, the Contractor shall comply with the requirements of Section 7.3.3.  

7.4.2 Wire Mesh Slope Protection 

7.4.2.1 

Description 

This work  constructs wire mesh slope protection in accordance with these  Specifications  and the 
details, lines and dimensions shown on the Contract plans, as approved by the Engineer. 

7.4.2.2 

Materials 

All metal material used in the construction of wire mesh slope protection shall be new and galvanised. 
Imperfectly galvanised material or material upon which serious abrasion of galvanising occurs will 
not be acceptable. Materials shall further conform to the requirements of Table 7-23 and Table 7-24.  

Wire  mesh  for  slope  protection  shall  be  either  diamond  chain-link  or  hexagonal  double-twisted, 
conforming to the respective requirements of Table 7-23. Wire shall be galvanised prior to weaving 
and mesh shall be of nonraveling construction. Edges shall be selvedged so as to prevent unraveling 
and develop the full strength of the mesh.  

C

ONSTRUCTION

 

 

Table 7-23: Material requirements for wire mesh reinforcement 

Property 

Requirements for 

Diamond Chain-Link 

Requirements for Hexagonal Double-

Twisted 

Meeting  the  requirements 
of: 

AASHTO M 181 

ASTM  A641M,  Class  3,  finish  5,  soft 
temper 

Steel wire diameter 

3.8 mm 

3.0 mm**

 

Galvanizing*

 

ASTM A392, zinc 
coating shall be ≥250 
g/m

2

 uncoated wire 

surface 

Zinc  coating  ASTM  A641M  tested  in 
accordance with ASTM A370. 
High  grade  or  special  high  grade  in 
accordance with ASTM B6, Table 1. 
Weight determined by ASTM A90. 

Size of opening in mesh 

90 mm by 140 mm 

85 mm by 115 mm, about 60 cm

Selvedges 

Nominal diameter 

Knuckled 

3.9 mm 

 

3.9 mm 

Lacing wire 

Diameter 

N/A 

Same type as for mesh 

2.2 mm**

 

Minimum  tensile  strength 
per ASTM A370 

N/A 

415 MPa 

*Galvanizing shall be done before weaving. 

**After galvanising. 

Acceptance of all materials shall be based on certificates of compliance submitted to the Engineer 
for approval.  

Table 7-24: Material requirements for wire mesh slope protection components 

Material 

Requirement 

Wire Rope 

Material 

Diameter 

Standard 

 

Zinc-coated steel structural wire rope 

15.9 mm 

ASTM A603, Class A, ASTM A475 

Hardware 

Rings 

Lightweight wire rope thimbles 

Wire rope clips 

Galvanizing  

Rings, thimbles, wire rope clips, U-
bolts  

Castings 

Forgings 

 

Drop-forged steel, heat treated after forging 

Approximately 6.3 kg per 100 

Drop-forged steel or cast steel 

 

AASHTO M 232M, Class C 

AASHTO M 232M, Class A 

AASHTO M 232M, Class B 

Hog rings and tie wire 

 

Manufactured from 2.9 mm of steel wire meeting 
Federal Specification QQ-W-461H, AISI numbers 

C

ONSTRUCTION

 

 

Material 

Requirement 

1010 and 1015, finish five; of medium hardness and 
tensile strength; Class 3 coating 

Grout for anchors 

Class G3, per Article 4.3.10.4 of Chapter 4, Concrete 
Works 

Anchor rods 

Material 

Eye construction 

 
Galvanization 

 

ASTM A36M  

Drop-forged  or  formed  with  a  full-penetration  weld 
and shall develop 100 % of rod strength  

ASTM A153M 

7.4.2.3 

Construction Requirements 

a.  Anchors 

Contractor shall install anchors of the type shown in conformance to the layout shown in the Contract 
plans. Spacings and numbers of the anchors and wire ropes, as shown in the Contract plans, are 
approximate only, and the  Engineer will give the  Contractor the required spacing to hold the wire 
mesh against the slope. Backfill material shall be thoroughly compacted. 

b.  Wire Rope Assembly 

Wire rope assembly shall be in place before the wire mesh is attached. Bottom wire rope shall not 
be tensioned. No wire rope splicing will be allowed. 

c.  Wire Mesh 

Wire mesh shall be fastened to the completed wire rope assembly as shown in the Contract plans.  

Hog rings on the vertical lap splices shall be placed in a single row centred on the splice.  

Horizontal  splices  joining  2  rolls  of  mesh  shall  be  made  by  removing  a  horizontal  end  wire  and 
reweaving through the ends of the fabric to form a continuous mesh.  

All top and bottom laps shall be made by folding the mesh to the outside, away from the slope, to 
avoid the possibility of falling material hanging up in the folds.  

Bottom of the mesh shall be located so that material dislodged under the mesh can drain freely from 
the bottom, yet will not flow or bounce onto the roadway. Ends of all tie wires shall be secured to the 
mesh with a minimum of 1.5 turns. 

Wire  mesh  shall  not  be  tensioned  in  any  direction,  but  is  to  remain  loose  so  as  to  increase  its 
dampening  effect  on  rolling  rocks.  Any  mesh  or  wire  rope  damaged  due  to  the  Contractor

’s 

operations shall be replaced by the Contractor at no expense to the Owner. 

7.4.3 Riprap Slope Protection  

7.4.3.1 

Description 

This work furnishes and places riprap for slope protection, as shown on the Contract plans. Riprap 
shall consist of broken stone, broken concrete rubble, or concrete in sacks. Riprap classes shall be 
as defined herein.  

7.4.3.2 

Material 

Riprap rock shall be hard, durable, angular rock that is resistant to weathering and water action and 
free  of  organic  or  other  unsuitable  material  as  approved  by  the  Engineer.  Shale,  rock  with  shale 
seams, or other fissile or fissured rock that may break into smaller pieces in the process of handling 

C

ONSTRUCTION

 

 

and placing shall not be used. Riprap rock shall conform to the gradations in Table 7-25. Grading of 
the riprap shall be determined by the Engineer by visual inspection of the load before it is dumped 
into place; or, if so ordered by the Engineer, by dumping individual loads on a flat surface and sorting 
and measuring the individual rocks contained in the load. 

Table 7-25: Classes of riprap, defined by gradation 

 

Percent of Rock by Mass 

20 % 

30 % 

40 % 

10 %* 

Class 1 

Mass (kg) 

[Size (mm)**] 

10 to 15 

[150 to 200] 

5 to 10 

[125 to 150] 

0.5 to 5 

[50 125] 

0 to 0.5 

[0 to 50] 

Class 2 

Mass (kg) 

[Size (mm)**] 

25 to 50 

[200 to 250] 

10 to 25 

[150 to 200] 

1 to 10 

[75 to 150] 

0 to 1 

[0 to 75] 

Class 3 

Mass (kg) 

[Size (mm)**] 

100 to 150 

[350 to 400] 

50 to 100 

[250 to 350] 

5 to 50 

[125 to 250] 

0 to 5 

[0 to 125] 

Class 4 

Mass (kg) 

[Size (mm)**] 

250 to 350 

[450 to 500] 

100 to 250 

[350 to 450] 

10 to 100 

[150 to 350] 

0 to 10 

[0 to 150] 

Class 5 

Mass (kg) 

[Size (mm)**] 

700 to 1,000 

[650 to 700] 

350 to 700 

[500 to 650] 

25 to 350 

[200 to 500] 

0 to 25 

[0 to 200] 

Class 6 

Mass (kg) 

[Size (mm)**] 

850 to 1,600 

[700 to 850] 

500 to 850 

[550 to 700] 

50 to 500 

[250 to 550] 

0 to 50 

[0 to 250] 

*Spalls and rock fragments graded to provide a stable dense mass shall be furnished by the Contractor.

 

**Approximate cubic dimension. Volume of a rock with these cubic dimensions has a mass approximately 
equal to the mass specified. Rock with breadth and thickness at least one-third its length shall be furnished.

 

Quarry  spalls  shall  consist  of  broken  stone  or  broken  concrete  rubble.  Riprap  and  quarry  spalls 
consisting of broken stone or concrete rubble shall be free from segregation, seams, cracks, and 
other defects tending to destroy its resistance to weather and shall conform to Table 7-26. 

Table 7-26: Quality requirements for riprap and quarry spalls 

Aggregate property 

Test Method 

Requirement 

Los Angeles wear, 500 

Rev. 

AASHTO T 96 

50 % maximum 

Specific gravity 

AASHTO T 85 

2.55 minimum 

Absorption 

AASHTO T 85

 

 

4.2 % maximum 

Coarse durability index 

AASHTO T 210 

50 minimum 

Should the riprap contain insufficient spalls, the Contractor shall furnish and place supplementary 
spall material from a source approved by the Engineer, at the Contractor

’s expense. 

Grout shall meet the requirements set out in Article 4.3.10.4 of Chapter 4, Concrete Works, and grout 
and shall be of the class specified in the Contract plans.  

a.  Hand-placed Riprap  

Hand-placed riprap shall be as nearly rectangular as possible, and 60 % of the stones shall have a 
cubic dimension of not less than 300 mm. No stone shall be used that is less than 150 mm thick. 

C

ONSTRUCTION

 

 

b.  Sack Riprap 

Sack  riprap  shall  consist  of  concrete  placed  in  sacks  made  of  at  least  AASHTO  M  182,  Class  3 
burlap, having a capacity of approximately 0.05 m

3

. Each sack shall be filled with concrete. 

Concrete  for  sack  riprap  exposed  to  fresh  water  and  salt  water  shall  be  Class  C20.  Aggregate 
gradation for sack riprap shall conform to the following, or as approved by the Engineer:  

  100 % passing the 50-mm sieve 

  45 % to 89 % passing the 6-mm sieve  

  0 % to 12 % passing the 0.075-mm sieve 

c.  Quarry Spalls 

Quarry spalls shall meet the requirements for grading in Table 7-27.  

Table 7-27: Quarry spalls gradation 

Sieve Size 

Percent Passing 

200 mm 

100 % 

75 mm 

≤40 % 

18 mm 

≤10 % 

7.4.3.3 

Construction Requirements 

a.  Excavation and Preparation for Riprap 

Foundations for riprap shall be excavated below probable scour, or to the elevation shown in the 
Contract plans, and no rock shall be laid nor concrete placed until the footing is approved by  the 
Engineer.  

Excavation below the level of the intersection of the slope to be protected and the adjacent original 
ground or the channel floor or slope shall meet the requirements for ditch excavation in accordance 
with  Article  2.4.2.9  of  Chapter  2,  Earthworks.  All  excavation  or  backfill  above  the  level  of  the 
intersection described above and all dressing of the slope to be protected shall be included in the 
Contract price for the class of riprap to be placed. Before placing riprap, the slopes shall be dressed 
to the lines and grades as staked. 

Where required, geotextile fabric shall be placed loosely, not stretched, prior to riprap placement as 
shown on the Contract plans and in accordance with Section 2.7 of Chapter 2, Earthworks. Strips of 
fabric shall overlap at least 600 mm at each joint. On horizontal joints, the uphill strip shall overlap 
the downhill strip. On vertical joints, the upstream strip shall overlap the downstream strip.  

Geosynthetic fabric shall be protected at all times during construction from exposure to sunlight, and 
total exposure shall not exceed 14 calendar days. 

When  the maximum  size  of  the rock  to  be  placed  on  fabric  exceeds  450  mm,  the  fabric  shall  be 
protected during the placement of the rock by a layer of bedding material spread uniformly on the 
fabric to a minimum depth of 150 mm. Compaction of the bedding shall not be required. Rocks shall 
be placed carefully on the bedding material and fabric in such a manner as not to damage the fabric. 
If,  in  the  opinion  of  the  Engineer,  the  fabric  is  damaged  or  displaced  to  the  extent  that  it  cannot 
function  as  intended,  the  Contractor  shall  remove  the  rock;  regrade  the  area,  if  necessary;  and 
replace the fabric at no additional expense to the Owner. 

b.  Loose Riprap 

Loose riprap shall be placed in such a manner that all relatively large stones are essentially in contact 
with each other, and all voids filled with the finer materials to provide a well graded compact mass. 

C

ONSTRUCTION

 

 

Stone  shall  be  dumped  on  the  slope  in  a  manner  that  will  ensure  the  riprap  attains  its  specified 
thickness  in  one  operation.  When  dumping  or  placing,  the  Contractor  shall  use  care  to  avoid 
disturbing the underlying material. 

Placing in layers parallel to the slope will not be permitted. A 300-mm tolerance for loose riprap will 
be allowed from slope plane and grade line in the finished surface. Hand placing or rearranging of 
individual rock may be necessary to obtain the specified results. 

c.  Hand-placed Riprap 

Stones  shall  be  laid  by  hand  on  prepared  slopes  to  such  thickness  as  may  be  ordered  by  the 
Engineer. Riprap shall be started at the toe of the embankment by digging a trench and placing a 
course of the largest stones therein. Each stone shall be placed so that it rests on the slope of the 
embankment and not wholly on the stone below, and it shall be thoroughly tamped or driven into 
place. Exposed face of all hand-placed riprap shall be made as smooth as the shape and size of the 
stones will permit and shall not vary more than 75 mm from a plane surface on the required slope. 

d.  Keyed Riprap 

Keyed riprap, also called plated riprap, is rock placed on a prepared surface and set into place by 
impact pressure to seat the rocks together and form a relative flat and uniform rock surface. Rock 
shall first be placed per Sub-article b, of Article 7.4.3.3. Then, the riprap is set into place by exerting 
impact  pressure  with  a  hydraulic-powered  bucket  or  an  approximate  2,000  kg  flat-faced  mass. 
Impact  shall  be  repeated  until  the  rock  is  firmly  seated  and  forms  a  reasonably  uniform  surface 
without reducing the effective sizes of the rocks. Levelling or plating process shall not be to an impact 
force that breaks the rock. 

e.  Sack Riprap 

Sack riprap shall be deposited in the trench and on the slope of the embankment to be protected in 
accordance with the Contract plans or as ordered by the Engineer. Concrete shall be placed in the 
sacks to a uniform volume leaving sufficient room for effectively tying the sacks.  

Sacks shall then be placed in longitudinal rows in the trench and on the slope to lie parallel with the 
slope.  In  placing  the  sacks  on  the  slope,  their  outside  faces  shall  be  laid  against  a  heavy  timber 
header or screed so that each layer will be true to the line and grade. Tied ends of the sack shall be 
turned under and the sack firmly pressed into place against the header or screed.  

Sacks in longitudinal rows shall be placed with the bottom of one sack adjacent to the top of the next 
sack. Joints shall be staggered in successive rows. 

f.  Quarry Spalls 

Quarry  spalls  shall  be  placed  in  ditches  and  on  slopes  to  be  protected,  in  accordance  with  the 
Contract plans or as directed by the Engineer. After placement, the quarry spalls shall be compacted 
to be uniformly dense and unyielding. 

g.  Filter Blanket 

When required, a filter blanket shall be placed on the prepared slope or area to the full thickness 
shown on the Contract plans using methods that will not cause segregation of particle sizes within 
the  bedding.  Surfaces  of  the  finished  layer  shall  be  even  and  free  from  mounds  or  windrows. 
Additional layers of filter material, when required, shall be placed using methods that will not cause 
mixing of the materials in the different layers. 

h.  Grouted Riprap 

Grouted riprap is rock placed or keyed on a prepared surface with the voids filled with grout. Rock 
shall first be placed in accordance with Sub-articles b or d, of Article 7.4.3.3. Then, the Contractor 
shall thoroughly moisten the rocks and wash excess fines from the riprap or to the underside of the 

C

ONSTRUCTION

 

 

riprap. Grout shall be placed to prevent segregation, beginning at the lowest elevation of the riprap. 
All voids shall be filled without unseating the rocks.  

Grout may be delivered to the place of final deposit by any means that will ensure uniformity and 
prevent  segregation  of  the  grout.  If  penetration  of  grout  is  not  obtained  by  gravity  flow  into  the 
interstices,  the  grout  shall  be  spaded  or  rodded  to  completely  fill  the  voids  in  the  rock  blanket. 
Pressure grouting shall not unseat the stones, and during placing by this method, the grout shall be 
spaded or rodded into the voids. 

Penetration of the grout shall be to the depth shown on the Contract plans. When a rough surface is 
specified,  stone  shall  be  brushed  until  25  %  to  50  %  of  the  depth  of  the  maximum  size  stone  is 
exposed. For a smooth surface, grout shall fill interstices to within 13 mm of the surface. 

Curing of the grout shall be in accordance with the requirements of Sub-article f, of Article 7.3.3.3 
At  the  option  of  the  Contractor,  shotcrete  conforming  to  the  requirements  of  Article  4.3.10.5  of 
Chapter 4, Concrete Works, may be furnished in lieu of grout. 

Each layer of grouted riprap shall be 1.5 m or less in thickness. Contractor shall allow 3 days curing 
time  before  adding  the  next  layer  of  riprap  and  grout.  Weep  holes  shall  be  provided  through  the 
grouted riprap, as required by the Contract plans or the Engineer. Grouted riprap shall be cured by 
placing wet blankets to keep it moist for 3 days after the work is completed.  

7.4.4 Coarse Aggregate Covering 

This work consists of a layer of coarse aggregate placed to a uniform depth to the limits and for the 
depth shown on the Contract plans as approved by the Engineer.  

Selection of aggregate sizes and colour requirements 

— or other required architectural attributes — 

shall be as shown in the Contract plans or as directed by the Engineer. Unless otherwise indicated, 
coarse  aggregate  shall  be  size  4  coarse  aggregate  as  defined  in  Article  4.3.7.3  of  Chapter  4, 
Concrete Works. Course aggregate used for surface covering shall be approved by the  Engineer 
prior to installation.  

Areas on which the coarse aggregate covering is to be placed shall be shaped to a reasonably true 
surface prior to placement. Coarse gravel shall be spread by any suitable means that shall not crush 
it and shall be shaped to a smooth uniform finished grade.  

7.5  Concrete Kerbs, Gutters, Parapets, and Barriers 

7.5.1 Description 

This work constructs reinforced concrete kerb, kerb and gutter, gutter, parapet, median barrier, and 
side  barrier  to  the  type,  dimensions,  and  details  shown  in  the  Contract  plans  or  directed  by  the 
Engineer.  This  work  includes  both  temporary  and  permanent  applications.  Barrier,  parapet,  kerb, 
and gutter may be on grade or structures. Construction shall conform to the details, lines and grades 
shown  on the  Contract plans,  as  required  in these  Specifications,  and  as  may  be  required  in the 
Particular Specifications, as approved by the Engineer.  Construction methods shall be one of the 
following: 

  Cast-in-situ fixed-form  

  Cast-in-situ slip-form 

  Precast 

This work may also include the removal, storage, and resetting of temporary barrier at the locations 
shown on the Contract plans or as approved by the Engineer. 

7.5.2 Materials 

Unless otherwise specified in the Contract plans or by the Engineer, materials shall conform to the 
requirements of Table 7-28.  

C

ONSTRUCTION

 

 

Table 7-28: Material requirements for concrete barriers, parapets, kerbs, and gutters 

Material 

Requirement Specifications 

Concrete and its constituent materials; 
premolded joint filler; joint sealer; water-
reducing admixture 
Reinforcing steel 

Section 4.3 of Chapter 4, Concrete Works 
 
Chapter 5, Reinforcing Steel 

Paint formulas 

Articles  8.2.2.7  or  8.2.2.8  of  Chapter  8,  Traffic 
Markings and Signs. 

Water-repellent compound 

Table 24-13 of Chapter 24, Painting   

Wire rope 

Material 
Galvanization  
Weave 
Minimum diameter 
Minimum breaking strength 

Class 6 x 19 
Improved plow steel 
ASTM A603 
Right regular lay and fibre core 
16 mm  
13.6 metric tons 

Anchor bolts 

Nuts for anchor bolts 
Lubrication 
Washers for anchor bolts 

ASTM F1554 and S2, S3, and S4*; Grade 105 
AASHTO M 291M, Grade DH 
AASHTO M 291M, and S2(*)(**) 
ASTM F436 

Unfinished bolts 

Nuts for unfinished bolts 

Washers for unfinished bolts 

ASTM A307 Grade A or B 

ASTM A563 Grade A 

ASTM F844 

Grout for permanent precast barrier 

Meet the requirements for grout for ground anchors, 
Article 4.3.10.4 of Chapter 4, Concrete Works 

*Supplemental requirements are designated with an S prefix. 
**Documentation  shall  include  the  name,  method  of  application,  and  dilution  of  the  lubricant 
applied to the nuts. 

All  hardware  shall  be  galvanised  per  AASHTO  M  232M,  tested  by  the  manufacturer,  marked  or 
identified per the relevant specification, and inspected prior to shipping to the site of the works.  

A manufacturer’s certificate of compliance that demonstrates conformance to these specifications 
and the applicable standards referenced herein shall be submitted by the Contractor to the Engineer 
for approval. A sample of the anchor bolt, nut, and washer shall be provided by the Contractor for 
testing, if requested by the Engineer.  

Minimum concrete strengths for various applications shall be as described in Table 7-29.  

Table 7-29: Minimum required concrete strengths for kerb, gutter, parapet, and barrier 

Application 

Minimum Concrete Requirements 

Cast-in-situ kerb, kerb and gutter, gutter not at driveway 
entrances 

Class C20 

Cast-in-situ kerb, kerb and gutter, gutter along driveway 
entrances 

Class C30 

Precast kerb, parapet, and barrier 

Class C30 

All barriers and parapets 

Class C30 

Pavement, cap, or slab between concrete barriers 

Class C15 

C

ONSTRUCTION

 

 

For precast kerb, cement content shall be at least 400 kg/m

3

, and the aggregate gradation shall meet 

the requirements for nominal maximum size 19 mm aggregate as shown in Article 4.3.7.4 of Chapter 
4, Concrete Works.  

7.5.3 Construction Requirements 

Unless otherwise indicated on the Contract plans or specified in the Particular Specifications, kerbs, 
gutters, kerb and gutter, parapets, and barriers shall conform to the following:  

  Constructed in straight line segments  

  Cast-in-situ, if located on superstructures or approach slabs, and constructed after the deck is 

complete and all post-tensioning has been accomplished  

  Cast-in-situ using fixed forms if installed in conjunction with light standard foundations and sign 

bridge foundations  

Maximum allowable deviation from a 3 m straightedge held longitudinally on all surfaces shall be 6 
mm. For single sloped barrier the maximum allowable deviation from a straightedge held along the 
vertical sloped face of the barrier shall be 6 mm.  

Segments of cast-in-situ barrier, parapet or kerb may be joined to precast barrier, parapet or kerb 
where transitions, split barriers or gaps shorter than 3 m require it. At each joint of this type, the cast-
in-situ segment shall include hardware that ties both its ends to abutting precast sections. 

7.5.3.1 

Preparation of the Foundation 

Foundations for kerb, gutter, kerb and gutter, parapet, and barrier shall be either prepared subgrade 
or pavement. Subgrade shall be firm, unyielding material that consists of the following:  

  Shaped to the line, grade, and cross section shown in the Contract plans  

  Thoroughly compacted  

  Watered thoroughly, leaving no standing water just before concrete is placed 

Prepared subgrade surfaces shall be proof-rolled to check for unstable areas and areas requiring 
additional  compaction.  Unsuitable  material  shall  be  removed  per  Article  2.4.2.7  of  Chapter  2, 
Earthworks. Any excavated surfaces for the concrete bedding shall be watered and compacted to a 
minimum of 95 % maximum density.  

Clamps,  spreaders,  and  braces  shall  be  used  where  required  to  insure  rigid  forms.  When  the 
roadway section slopes away from the gutter, the slope of the gutter shall be formed to match the 
roadway cross slope. 

All  old  pavements  and  any  portion  of  new  pavements  constructed  under this  Contract,  which  are 
covered with oil or grease within the kerb limits, shall be further cleaned as follows: 

1.  Pavement shall be flushed with water 

2.  Where patches of oil, tar, or grease occur, these areas shall be scrubbed with a solvent-type 

cleaner and brush or broom 

3.  Pavement surfaces shall then be thoroughly rinsed  

7.5.3.2 

Kerb Painting 

Kerb painting shall be accomplished in accordance with Sub-articles 8.2.3.3b, 8.2.3.3e and 8.2.3.3h 
of Chapter 8, Traffic marking and Signs. Kerbs along main roads, sector roads, and parking areas 
shall be painted as shown on the Contract plans. Lengths for each band shall be 1.20 m. Paint shall 
be on the exposed kerb surfaces after kerb and pavement are in place or as directed by the Engineer.  

All kerb paint shall be applied to a minimum dry film thickness of 150 microns (in 2 coats) and achieve 
a minimum tensile adhesion of 2.0 MPa. 

C

ONSTRUCTION

 

 

In accordance with the TCDM, kerb painting treatment in Abu Dhabi denotes parking classifications 
and restrictions. The colours used indicate the following: 

 

  Kerbs painted grey 

 

 

- standard kerb 

-new kerbing is not to be painted 

  Kerbs painted blue and black  

-standard parking charges apply 

  Kerbs painted blue and white  

-premium parking charges apply 

  Kerbs painted yellow and grey 

 

-parking prohibited 

-to be applied at sectors where paid parking is operated 

  Kerbs painted yellow   

 

-visibility marking (junctions, entry/exits, intersections, 

roundabouts, and traffic separation islands) 

  Kerbs painted red 

 

 

 

-parking prohibited (adjacent to fire hydrants) 

  Kerbs painted blue 

 

 

-parking for disabled persons 

7.5.3.3 

Cast-in-situ Fixed-form  

a.  Formwork 

Forms  shall  be  steel  or plywood  that  is  coated with  plastic.  Formwork  and  details,  including  form 
liners, shall comply with the requirements of  Section 1.20.8 of  Chapter  1, General Requirements, 
and shall be capable of being removed without injuring the green concrete. Forms used more than 
once shall be thoroughly cleaned and any forms that have become worn, splintered, or warped shall 
not be used again.  

Side forms shall rest throughout their length on firm ground. Top of any form or the Contract face of 
a straight form shall not vary from a true plane by more than 6 mm in 3 m. Forms for use on curves 
shall be capable of installation to within 12 mm of the true curve and if the radius is less than 50 m, 
shall be either flexible material or shaped to fit the curve. Forms shall be designed so that they may 
be securely fastened together in the correct position.  

Formwork  shall  be  properly  cleaned  and  oiled  prior  to  the  placement  of  concrete.  Formwork,  in 
general, shall remain in place for at least 12 hours after concrete placement, except that formwork 
shall be removed as required to permit texturing. 

Forms  may  be  placed  using  machine  methods,  if  approved  by  the  Engineer,  provided  that  the 
Contractor  consistently  produces  an  acceptable  finished  product,  true  to  line,  grade  and  cross 
section.  

Removal of forms shall be by a method acceptable to the Engineer and shall be performed to avoid 
excessive shock and straining of the concrete.  

b.  Concrete Placement 

Concrete placement and vibration shall conform to the requirements of Section 4.4.1 of Chapter 4, 
Concrete Works.  

Small amounts of consolidated concrete totalling not more than 0.06 m

3

 in volume, and spaced at 

least 3 m apart, may be used to support reinforcing steel within barrier forms, and they shall provide 
50 mm minimum clearance to the outside face of the barrier.  

Edge chamfers shall be formed by attaching chamfer strips to the forms.  

c.  Expansion and Dummy Joints 

Expansion joints shall be placed as shown on the Contract plans and at the following locations:  

1.  Beginning and ends of kerb returns 

C

ONSTRUCTION

 

 

2.  Kerb abutting drainage structures 

3.  Kerb abutting bridges 

4.  Radius points 

5.  Cold joints with existing kerbs and gutters 

6.  Every 4.5 m or less for kerb, gutter, and kerb and gutter  

7.  Every 30 m for barriers with dummy joints every 3 m 

Expansion joints shall cover the full cross section with 10 mm premoulded joint filler, except between 
kerb or gutter and cement concrete pavement. Expansion joints shall be a 6 mm-thick, 150 mm deep 
premoulded joint filler placed between the surfaces to prevent cracking.  

Contraction joints shall be placed every 3 m, except where closure requires a lesser interval, but 
they shall not be closer than 1.2 m. They may be formed with forms or by sawing or by using sheet 
metal templates, with the following requirements:  

1.  Sheet metal templates:  

  Shall be of the dimensions, and set to the lines, shown in the Contract plans 

  Shall hold firmly during concrete placement 

  Shall remain in place until the concrete has set sufficient to hold its shape  

  Shall be removed while the forms are still in place 

2.  Sawn joints shall be completed:  

  As soon as the concrete has hardened to the degree that excessive ravelling will not occur  

  Before shrinkage cracking begins 

d.  Curing and Finishing 

Curing for barriers shall conform to Method A, supplying continuous moisture, per Article 4.4.2.1 of 
Chapter 4, Concrete Works, and the additional requirements or exceptions of this section. Membrane 
curing compound shall not be used on barriers.  

Kerb, gutter, and kerb and gutter shall be cured for at least 72 hours by one of the methods specified 
for cement concrete pavement curing in Article 3.8.3.8 of Chapter 3, Pavement. 

Exposed kerb and gutter surfaces shall be finished with a trowel and edger. Within 24 hours after 
concrete placement, forms on the roadway face of kerbs shall be removed, and the concrete treated 
with a float finish. Tops and faces of the kerbs shall receive a light brush finish, and the top of the 
gutters shall receive a broom finish. Minor defects shall be filled with Class M6 mortar per  Article 
4.3.10.4 of Chapter 4, Concrete Works. Plastering shall not be allowed on the face of the kerb. 

To finish cast-in-situ, fixed-form barriers, the Contractor shall complete the following procedure:  

While the forms are in place, the Contractor shall:  

1.  Brush the top surface with a fine bristle brush 

2.  Cover the top surface with heavy, quilted blankets 

3.  Spray water on the blankets and forms at intervals short enough to keep them thoroughly wet 

for 72 hours 

 After removing the forms, the Contractor shall: 

1.  Remove all lips and edgings with sharp tools or chisels 

2.  Fill all holes with mortar 

3.  True up corners of openings 

C

ONSTRUCTION

 

 

4.  Remove concrete projecting beyond the true surface by stoning or grinding 

After  removing  the  forms,  the  Contractor  shall  cover  the  barrier  with  heavy,  quilted  blankets,  not 
burlap, and keep the blankets continuously wet for at least 7 days. During this time, the Contractor 
may perform the required finishing work if the entire structure is kept covered and wet except the 
immediate work area. Otherwise, no finishing work may be done until at least 10 days after pouring.  

After the 10-day curing period, the Contractor shall remove all form-release agent, mud, dust, and 
other foreign substances from the structure by either light sandblasting and washing with water, or 
by spraying with a high-pressure water jet. Water jet equipment shall use clean fresh water and shall 
produce at least 105 kg/cm

2

 at the nozzle with a discharge of at least 11 litres per minute. Water jet 

nozzles shall have a 25-degree tip and shall be held no more than 230 mm from the surface being 
washed. 

After  cleaning,  the  Contractor  shall  use  brushes  to  rub  Class  M6  mortar  into  air  holes  and  small 
crevices  on  all  surfaces,  except  the  brushed  top.  As  soon  as  the  mortar  takes  its  initial  set,  the 
Contractor shall rub it off with a piece of sacking or carpet. Structure shall then be covered with wet 
blankets for at least 48 hours. 

Completed concrete surfaces shall be even in colour and texture with a uniformly smooth, dense 
surface, no rock pockets, and no holes larger than 6 mm across. 

7.5.3.4 

Cast-in-situ, Slip-formed Kerb, Parapet, and Barrier 

Slip-formed, also called extruded, cement concrete kerb, gutter, kerb and gutter, parapet, and barrier 
shall conform to the applicable requirements of Chapter 4, Concrete Works, for materials, placement 
and testing. Slip-formed work shall be placed, shaped, and compacted to the required line and grade 
as  shown  in  the  Contract  plans  or  as  directed  by  the  Engineer  with  approved  equipment.  When 
placing of concrete is suspended for more than 45 minutes, a construction joint shall be formed and 
its location shall not be at a Contraction joint.  

A trial slip form placement for each type of kerb, parapet, or barrier shall be performed for acceptance 
by  the  Engineer  to  demonstrate  the  adequacy  of  the  slip-form  equipment  and  the  Contractor

’s 

operation. Trial sections may be included as part of the finished work and left in place if accepted by 
the Engineer. Otherwise trial sections shall be broken up, removed, and disposed of, as approved 
by the Engineer. 

Slip-form equipment shall be approved by the Engineer prior to use and shall consist of the following:  

a.  Self-propelled 

b.  Capable of shaping and thoroughly compacting concrete to the required cross section 

c.  Easily adjustable vertically during the forward motion of the machine to provide variable heights 

necessary to conform to the required grade  

d.  Capable of continually comparing the slip-form work to the grade guideline by way of a pointer 

or gauge attached to the machine  

If required by the Engineer, the Contractor shall demonstrate that the specific slip-form equipment 
proposed for use can satisfactorily place the concrete mix. If, at any time, the placement results are 
not satisfactory to the Engineer, the use of the slip-form equipment shall be discontinued. Additional 
equipment and small tools necessary for completing the work shall be provided by the Contractor. 
Supply of concrete to the machine shall be sufficient for uninterrupted placement to the full width and 
depth of the mould on the slip-form machine.  

A water-reducing admixture may be used in the concrete mix, provided the finished kerb and gutter 
retain the required line and shape.  

Cement concrete kerb on pavement shall be anchored to the existing pavement by steel tie bars 
placed 300 mm on each side of every joint. Tie bars shall meet the dimensions shown in the Contract 
plans. Joints in the kerb shall be spaced at 3-m intervals. Joints shall be cut vertically and to the 
depth shown in the Contract plans. 

 

 

 

 

 

 

 