Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 45

 

 

C

ONSTRUCTION

 

 

7.3.2.3 

Construction Requirements 

Excavation and backfill shall be in accordance with the requirements of Articles 2.4.2.11 and 2.5.2.4 
of Chapter 2, Earthworks. If shafts are required, they shall be constructed in accordance with the 
shaft  installation  plan,  as  approved  by  the  Engineer  and  the  requirements  of  Chapter  17,  Drilled 
Piles, and Chapter 18, Driven Piles.  

a.  Trench, Grade Beam, or Spread Footing Construction 

Footing construction shall conform to the requirements of Table 7-10.  

Table 7-10: Requirements for trench, grade beam, or spread footing construction

 

Boundary Wall Foundations 

Description 

Specifications Requirements 

Below the existing ground line 

Article 2.4.2.11 of Chapter 2, Earthworks, to the limits and 
construction stages shown in the Contract plans;  

Article 2.4.2.5 of Chapter 2, Earthworks, for removal of 
unsuitable soils. 

Above the existing ground line 

Place and compact backfill material in accordance with 
Article 2.5.3.2 of Chapter 2, Earthworks.  

To  retail  their  configuration  during  concrete  placement,  the  steel  reinforcing  bar  cage  and  the 
boundary  wall  anchor  bolts  shall  be  installed  and  rigidly  braced  prior  to  grade  beam  and  spread 
footing concrete placement. Contractor shall not place individual or loose steel reinforcing bars and 
anchor bolts and shall not install anchor bolts during or after concrete placement. 

b.  Cast-in-situ Concrete Panel Construction 

Construction of cast-in-situ concrete panels for boundary walls shall conform to Chapter 4, Concrete 
Works.  Formwork  shall  comply  with  the  requirements  of  Section  1.20.8  of  Chapter  1,  General 
Requirements. 

Cast-in-situ concrete panel tops shall conform to the top of the wall profile shown in the  Contract 
plans and the relevant tolerances included in Table 20-6 of Chapter 20, Earth Retaining Systems. 
Where  a  vertical  step  is  constructed  to  provide  elevation  change  between  adjacent  panels,  the 
dimension of the step shall be 0.5 m. Each horizontal run between steps shall be a minimum of 15 
m long. 

c.  Precast Concrete Panel Fabrication and Erection 

Precast  concrete  panels  shall  be  fabricated  and  erected  by  the  Contractor  in  accordance  with 
Section 4.4.8 of Chapter 4, Concrete Works, and the additional requirements of this section. 

An experienced supervisor shall be provided by the Contractor for panel construction and erection 
having at least 2 years of successful experience in the proposed construction methods, similar to 
the size and amount required for the project. Personnel may, at the Engineer

’s option, be required 

to demonstrate technical competence by performing sample work or by displaying their qualifications 
or certificates at no additional cost to the Owner. 

Unless  otherwise  noted in  the  Contract  plans  and  the  particular  specifications,  concrete surfaces 
shall receive a Class 2 finish in accordance with Section 4.4.3 of Chapter 4, Concrete Works.  

Precast concrete panels shall be cast by the Contractor horizontally, with the traffic side surface cast 
against  the  form  liner  on  the  bottom.  These  panels  shall  be  fully  supported  to  avoid  bowing  and 
sagging surfaces. Formwork shall comply with Section 1.20.8 of Chapter 1, General Requirements. 

After  receiving the  Engineer

’s approval of the shop drawings, the  Contractor shall cast 1 precast 

concrete panel to be used as the sample panel, which shall be constructed in accordance with the 

C

ONSTRUCTION

 

 

procedure  and  details  specified  in  the  shop  drawings  approved  by  the  Engineer.  These  sample 
panels shall be made available by the Contractor to the Engineer for approval.  

Upon receiving the Engineer

’s approval of the sample panel, the Contractor shall continue production 

of  precast  concrete  panels  for  the  boundary  wall.  All  precast  concrete  panels  will  be  evaluated 
against the sample panel for the quality of workmanship exhibited. Sample panels shall be retained 
at the fabrication site until all precast concrete panels have been fabricated and have received the 
Engineer

’s approval. After completing precast concrete panel fabrication, the Contractor may utilise 

the sample panel in production. 

Precast concrete panels for boundary walls shall not exceed the scalar tolerances described in Table 
7-11 
 

Table 7-11: Construction tolerances for boundary walls 

Parameter 

Tolerance 

Height of precast boundary wall panel 

±3 mm per 1.5 m, not to exceed 6 mm total 

Width of precast boundary wall panel 

±3 mm per 1.5 m, not to exceed 6 mm total 

Thickness of precast boundary wall panel 

±6 mm 

Difference  between  the  measurement  of  the 
diagonal of the faces of the panels 

< 13 mm 

Offset of precast concrete wall stem panels 

(Deviation from a straight line extending 1.5 m 
on each side of the panel joint) 

-

 

Across panel face 

-

 

Across top of wall 

 

 

±10 mm 

±10 mm 

Joint space tolerances 

As shown in the Contract plans 

Position of wall 

10 mm 

Alignment of wall 

2 minutes 

Average levels of wall 

+10 mm 

Verticality of wall 

±10 mm 

Surface regularity of wall 

3 mm 

Precast  concrete  panels  shall  not  be  erected  until  the  foundations  for  the  panels  have  attained a 
minimum compressive strength of 24  MPa. Wall panels shall be adequately supported to prevent 
overturning and to prevent collapse until permanent connections are completed. 

Bolts  connecting  the  precast  concrete  panels  to  their  foundation  shall  be  tightened  to  snug  tight, 
which is defined as the tightness reached by either a few blows from an impact wrench or the full 
effort  of  a  person  using  a  spud  wrench.  If  the  Contract  plans  call  for  welded  connections,  the 
Contractor shall meet the structural welding requirements of ACI 551.1R.  

Joints between precast concrete panels shall be sealed with a backer rod and sealant system as 
specified on the Contract plans. Both 

sides of the joint’s full length shall be sealed. 

Precast  concrete  panel  tops  shall  conform  to  the  top  of  wall  profile  shown  in  the  Contract  plans. 
Where a vertical step is constructed to provide an elevation change between adjacent panels, the 
dimension of the step shall be 0.5 m. Each horizontal run between steps shall be a minimum of 15 
m long. 

C

ONSTRUCTION

 

 

d.  Tilt-up Wall Construction 

Tilt-up wall construction shall be done as shown on the Contract plans and approved shop drawings. 
Precast concrete wall panels shall  be cast-in-situ, in close proximity to their permanent locations. 
Sequence for this type of precast construction shall be as follows: 

1.  Erect the wall panels in place by tilting them up to their permanent location 

2.  Temporarily brace the panels in place 

3.  Complete the permanent connections required to secure the precast tilt-up panel 

4.  Remove the temporary supports  

A levelling pad shall be constructed for wall panels using high-strength mortar so that the panel in 
place will have a level tolerance within 1 to 500. Levelling pads and foundations shall be inspected 
and any errors, such as levelness or embedded article locations, shall be corrected prior to lifting the 
wall panels into place. 

Contractor may use spreader bars, chockers with equaliser sheaves, adjustable bracing, and other 
erecting accessories, as required, to place panels in their permanent locations. Bracing equipment 
must meet applicable codes. 

Panels shall be tilted from the casting platform to slope within 1 horizontal to 6 vertical. Their initial 
setting shall be plumb within 75 mm of true vertical with adjustable braces to vertical tolerance of 1 
to 500.  Contractor shall leave the braces in place until panels are secured in their final location. 

Panel  erection  shall  not  commence  until  representative  concrete  test  cubes  have  a  minimum 
compressive strength as specified on the Contract plans and Section 4.4.8 of Chapter 4, Concrete 
Works.  

Pickup points in concrete panels shall be located so that concrete tensile stresses during erection 
do not exceed 10 % of the cylinder compressive strength at time of erection. 

Panels  may  be  connected  to  steel  columns,  precast  concrete  columns,  or  cast-in-situ  concrete 
columns. Details of connecting panels to supporting structures must be indicated on the  Contract 
plans or shop drawings. For cast-in-situ columns, horizontal reinforcing rods at the sides of panels 
shall extend a minimum of 200 mm into column forms. 

Panels shall be bolted to the supporting structure with high-strength bolts that meet the requirements 
of ASTM A325, Type 1, and then panels shall be welded to the supporting structure. 

Joints  between  wall  panels  and  foundation  and  joints  between  wall  panels  and  columns  shall  be 
packed with mortar of the class shown in the Contract plans and meeting the requirements of Article 
4.3.15.6 of Chapter 4, Concrete Works. 

Holes  in  panels  left  after  lifting  rigging  has  been  removed  shall  be  packed  with  nonshrink  mortar 
meeting the requirements of Article 4.3.10.4 of Chapter 4, Concrete Works, and finished to match 
adjacent surfaces. 

e.  Masonry Wall Construction 

Construction  requirements  for  masonry  boundary  walls  shall  be  in  accordance  with  Chapter  6, 
Masonry.  

f.  Access Doors and Concrete Landing Pads 

Access doors and door frames shall be installed by the Contractor as shown on the Contract plans, 
with the access doors opening toward the roadway side. Door frames shall be set in place with grout 
conforming to the requirements for grout for anchor bolts as defined in Article 4.3.10.4 of Chapter 4, 
Concrete Works, with the grout completely filling the void between the door frame and the boundary 
wall panel. 

C

ONSTRUCTION

 

 

Required  coats  of  paint  shall  be  applied  by  the  Contractor,  as  specified  in  the  Particular 
Specifications and applicable requirements of Chapter 24, Painting, to all exposed metal surfaces of 
access doors and frames, except for stainless steel surfaces. 

Concrete landing pads shall be constructed on the roadway side of each access door location by the 
Contractor, as shown in the Contract plans. Concrete shall be Class C25/20. 

g.  Finish Ground Line 

Ground lines on both sides of the boundary wall shall be contoured and dressed by the Contractor 
to the following specifications:  

  Provide the minimum cover over the foundation as shown in the Contract plans  

  Ensure good drainage away from the barrier 

After the access roads are no longer needed for boundary wall construction activities, the Contractor 
shall  restore  the  area  to  the  original  condition.  Access  roads  shall  be  recontoured  to  match  the 
surrounding ground levels, as approved by the Engineer. 

7.3.3 Shotcrete Facing 

7.3.3.1 

Description 

This work constructs shotcrete facing, also called pneumatically placed concrete, as shown in the 
Contract plans.  

Shotcrete facing consists of mortar or concrete conveyed through a hose and pneumatically applied 
to prepared surfaces with reinforcing material in place, using either the dry- or wet-mix processes. 

Dry-mix processes consist of thoroughly mixing a proportional combination of dry-fine aggregate and 
cement and conveying the mixture through a delivery hose to a special nozzle where water is added 
and mixed with the other materials immediately prior to its discharge from the nozzle.  

Wet-mix  processes  consist  of  premixing,  by  mechanical  methods,  a  proportional  combination  of 
cement,  aggregate,  and  water  required  to  produce  mortar  or  concrete;  conveying  the  mortar  or 
concrete through the delivery hose to the special nozzle where additional compressed air is added 
at the nozzle prior to its discharge. 

7.3.3.2 

Materials 

Materials  shall  conform  to  the  requirements  of  the  Contract  plans,  these  Specifications  and  as 
approved by the Engineer, including those sections specifically noted in Table 7-12. Other materials 
required shall be as specified in the Particular Specifications. 

Table 7-12: Materials for shotcrete facing 

Material 

Specifications Requirements 

Shotcrete and its constituent materials;  

Steel reinforcing bar;  

Preformed joint filler;  

Waterstops. 

Article 4.3.10.5 of Chapter 4, Concrete Works 

Chapter 5, Reinforcing Steel 

Article 4.3.15.2 of Chapter 4, Concrete Works 

Section 4.3.16 of Chapter 4, Concrete Works 

Gravel backfill  

Section 2.5 of Chapter 2, Earthworks 

Pipe underdrains 

Section  12.1.3  of  Chapter  12,  Stormwater 
Drainage 

C

ONSTRUCTION

 

 

Shotcrete  shall  be  proportioned  to  produce  a  30  MPa  compressive  strength  at  28  days,  in 
accordance with Article 4.3.10.5 of Chapter 4, Concrete Works.  

7.3.3.3 

Construction Requirements 

Prior to construction of any shotcrete facing, the Contractor shall do the following:  

  Submit and receive the Engineer

’s approval for shotcrete mix design, proposed methods and 

equipment  to  finish  and  cure  the  shotcrete,  and  documentation  of  the  nozzle  operators’ 
experience in applying shotcrete per Sub-article a, of Article 7.3.1.1. 

  Finely grade, and thoroughly compact, all surfaces on which shotcrete is to be placed to the 

lines and grades shown on the Contract plans or established by the Engineer  

  Uniformly water all surfaces on which shotcrete is to be placed so that water will not be drawn 

from the freshly placed shotcrete.  

  Remove any curing compound on previously placed shotcrete surfaces by sandblasting.  

  Install reinforcement of the shotcrete as shown in the Contract plans  

i.  Wire reinforcement shall be securely fastened to the steel reinforcing bars so that it will be 

25 mm to 38 mm from the face of the shotcrete at all locations, unless otherwise shown in 
the Contract plans  

ii.  Wire reinforcement shall be lapped 1.5 squares in all directions, unless otherwise shown in 

the Contract plans 

  Install  noncorroding  alignment  wires  and  depth  gauges  every  2  m  longitudinally  and 

transversely, with no less than 2 gauges per increment of surface area to receive the shotcrete, 
to establish thickness, and plane surface of the completed facing.  

  Install  alignment  wires  at  corners  and  offsets  not  established  by formwork.  Contractor  shall 

ensure that the alignment wires are tight, true to line, and placed to allow further tightening.  

  Complete and receive the Engineer

’s approval for preconstruction testing.  

If forms are used, they shall be plywood sheathing or other suitable material, true to line and grade, 
and  sufficiently  rigid to resist  deflection  during  shotcrete  placement.  They  shall  be  constructed to 
permit the escape of air and rebound during the gunning operation. 

a.  Equipment 

Equipment  to  be  used  shall  be  approved  by  the  Engineer  prior  to  placement  of  slope  protection. 
Contractor shall furnish the Engineer 

with 2 copies of the manufacturer’s specifications and operating 

instructions for the equipment used.  

Equipment shall deliver a continuous, smooth stream of uniformly mixed material accurately and at 
the proper velocity, to produce a uniform shotcrete facing that meets the additional criteria of these 
specifications. Equipment used with the wet-mix process shall be the pneumatic feed type, unless 
the Engineer provides written approval of a positive displacement feed type.  

For dry-mix shotcrete, the following is required:  

1.  Nozzle shall be equipped with a manually operated water ring for directing an even distribution 

of water through the fine aggregate-cement mixture 

2.  Nozzle water ring shall provide ready adjustment to vary the quantity of water 

For wet-mix shotcrete, the following is required:  

1.  Nozzle shall be fitted with an air ring for injecting additional compressed air into the premixed 

material flow. 

2.  Size of delivery hose shall be 32 mm to 64 mm.  

C

ONSTRUCTION

 

 

3.  Air compressors shall have ample capacity to furnish an adequate supply of clean dry air to 

maintain required nozzle velocity for all phases of the work and simultaneously operate a blow 
pipe for removing rebound. 

4.  Air hose shall be equipped with a filter to prevent oil or grease contamination of the shotcrete. 

Constant air pressure shall be maintained in the placing machine when using the dry-mix process, 
or at the nozzle when using the wet-mix process. Minimum required air pressure shall be at least 
550 kPa for hoses shorter than 30 m and shall increase by 35 kPa for each additional 15 m of hose 
or fraction thereof.  

b.  Testing 

A 300-mm by 300-mm shotcrete test panel shall be prepared in accordance with AASHTO T 24M to 
evaluate shotcrete quality, strength, and aesthetics. Both preproduction and production test panels 
shall be prepared.  

At  least  3  cores  shall  be  removed  from  the  preconstruction  panels  and  at  least  3  cores  from  the 
production panels. All cores obtained for the purpose of shotcrete strength testing shall comply with 
the following:  

1.  Core diameter shall be at least 3 times the maximum aggregate size and a minimum of 50 mm 

2.  Core height shall be a minimum of 1.5 times the core diameter 

3.  Cores removed from the panels shall be immediately wrapped in wet burlap and sealed in a 

plastic bag  

4.  Cores shall be clearly marked to identify from where they were taken and whether they are for 

preproduction or production testing. For production testing, the section of the wall represented 
by the cores shall be clearly marked on the cores  

5.  Cores shall be delivered to the Engineer within 2 hours of coring.  

Remaining test panels shall be the property of the Contractor. 

c.  Preproduction Testing 

At least one 300-mm by 300-mm test panel shall be prepared for each mix design for evaluation and 
testing of the shotcrete quality and strength, and at least one 1.25 m by 1.25 m qualification panel 
for evaluation and approval of the proposed method for shotcrete installation, finishing, and curing.  

All test panels shall be constructed using the same methods and initial curing proposed to construct 
the shotcrete facing, except that the 300-mm panel shall not include wire reinforcement and shall be 
constructed to the minimum thickness necessary to obtain the required core samples. Nozzlemen 
proposed for production shotcreting shall also apply the shotcrete for the preproduction panels.  

Qualification panels, measuring 1.25 m in size, shall be constructed to the thickness of the production 
facing.  

Test data and a visual description shall be submitted by the Contractor of each core to the Engineer 
for approval. Submittal shall include the following:  

1.  Details  concerning  presence  of  voids,  sand  pockets,  lamination,  and  other  inadequacies. 

Visual  quality  of  the  cores  shall  not  be  lower  than  grade  2  according  to  shotcrete  grading 
requirements of ACI 506.2. 

2.  Sample identification, including mix designs and test panel numbers and orientation. 

3.  Date and time of sample preparation, including curing conditions and sample dimensions 

4.  Date, time, and type of test 

5.  Complete test results, including load and deformation data during testing, sketch of sample 

before and after testing, and any unusual occurrences observed 

6.  Name and signature of person performing the test 

C

ONSTRUCTION

 

 

7.  Location of steel reinforcement, if used, covered by shotcrete 

8.  Name and experience qualifications of the nozzleman 

Production  shotcrete  work  shall  not  begin  until  satisfactory  test  results  are  obtained  and  the 
preproduction panels are approved by the Engineer. 

d.  Production Testing 

Testing of shotcrete shall meet the applicable requirements of Article 4.3.10.5 of Chapter 4, Concrete 
Works, and as specified herein. 

At least one 300 mm by 300 mm panel shall be made for each section of facing shotcrete, where a 
section  is  defined  as  1-

day’s placement. Panel thickness shall be as thick as the structure being 

constructed but not less than 75 mm.  

Panels shall be prepared by applying shotcrete mix to a piece of plywood that is true and not warped, 
bowed,  or  deformed  in  any  way  using  the  same  methods  and  initial  curing  used  to  construct  the 
shotcrete  wall;  except  that  production  panels  shall  not  have  wire  reinforcement.  Panels  shall  be 
constructed to the minimum thickness necessary to obtain the required core samples.  

Cores shall be obtained from the panels and tested in accordance with the requirements of AASHTO 
T 24. Cores shall have a minimum diameter of 75 mm and a length to diameter ratio of at least 1.  

Cut surfaces of the test specimens will be carefully examined for soundness and uniformity of the 
material and shall be free from laminations and sand pockets. 

If the production shotcrete is found unsuitable based on the results of the test panels, the sections 
of  the  wall  represented  by  the  test  panels  shall  be  repaired  or  replaced  to  the  satisfaction  of  the 
Engineer at no additional cost to the Owner.  

e.  Qualifications of Contractor

’s Personnel 

All  nozzle  operators  shall  have  at  least  1-

year’s  experience  in  the  application  of  shotcrete.  Each 

nozzle operator will be qualified, by the Engineer, to place shotcrete, after successfully completing 
1 test panel for each shooting position and surface type expected to be encountered. Satisfactory 
evidence of such experience shall be provided to the Engineer for approval when requested. 

Qualification will be based on a visual inspection of the shotcrete density, void structure, and finished 
appearance along with a minimum seven-day compressive strength of 17.5 MPa determined from 
the average test results from two cores taken from each test panel. 

Notification  shall  be  provided  by  the  Contractor  to  the  Engineer  not  less  than  2-days  prior  to  the 
shooting of a qualification panel. Mix design for the shotcrete shall be the same as that planned for 
the wall being shot. 

Shotcrete shall be placed only by personnel qualified by the Engineer. If shotcrete finish Alternative 
B or C is specified, per Table 7-13, evidence shall be provided that all shotcrete crew members have 
completed at least 3 projects in the last 3 years where such finishing, or sculpturing, and texturing of 
shotcrete was performed. 

f.  Shotcrete Application 

Nozzlemen who created acceptable test panels shall be used for production shotcrete application.  

During  construction,  the  Contractor  shall  protect  all  retaining  walls,  columns  and  structures  from 
concrete  splash  or  overspray.  Suitable  covering  shall  be  provided  if  such  protection  is  deemed 
necessary by the Engineer.  

Shotcrete shall be applied within 45 minutes of adding cement to the mixture. As shotcrete leaves 
the nozzle, its velocity shall be maintained uniform and at a rate approved by the Engineer for the 
given job conditions. Rebound or previously expended material in the shotcrete mix shall not be used 
in any portion of the work. All rebound shall be removed prior to final set and before placement of 
the shotcrete on adjacent surfaces. 

C

ONSTRUCTION

 

 

Shotcrete shall not be applied during any precipitation of sufficient intensity that can cause the in-
place shotcrete to run or during wind conditions that can cause separation of the nozzle flow. 

A clean, dry supply of compressed air that is sufficient for maintaining adequate nozzle velocity for 
all parts for the work and for simultaneous operation of a blow pipe for cleaning away rebound shall 
be  maintained  at  all  times.  Thickness,  method  of  support,  air  pressure,  and  rate  of  placement  of 
shotcrete  shall  be  controlled  to  prevent  sagging  or  sloughing  of  freshly  applied  shotcrete.  If  the 
shotcrete must be applied in 2 layers to achieve the required thickness without sagging or sloughing, 
an initial layer of shotcrete may be placed, broomed, or scarified, and allowed to harden. Surfaces 
may then be dampened and an additional layer applied. 

Shotcrete  shall  be  applied  from  the  lower  part  of the  area  upwards.  Surfaces  to  be shot  shall  be 
damp, but free of standing water. Nozzles shall be held at an angle approximately perpendicular to 
the  working  face  and  at  a  distance  that  will  keep  rebound  at  a  minimum  and  compaction  will  be 
maximised,  typically  600  mm  to  1,500  mm.  Shotcrete  shall  emerge  from  the  nozzle  in  a  steady, 
uninterrupted flow. 

If, for any reason, the flow becomes intermittent, the nozzle shall be diverted from the work until a 
steady flow resumes. Surface defects shall be repaired as soon as possible after initial placement of 
the  shotcrete.  All  shotcrete  that  lacks  uniformity,  which  exhibits  segregation,  honeycombing,  or 
lamination 

— or which contains any dry patches, slugs, voids, or sand pockets — shall be removed 

and replaced with fresh shotcrete by the  Contractor, to the satisfaction of the  Engineer and at no 
cost to the Owner. 

Premolded expansion joint material measuring 13 mm thick and conforming to the requirements of 
Article 4.3.15.2 of Chapter 4, Concrete Works, shall be placed at 18 m intervals on all shotcrete or 
concrete bank protection.  Weakened plane joints, or  scoring, shall be at 4.5 m intervals between 
expansion joints. All expansion joint material shall extend the full depth of the concrete being placed 
and shall be flush with the top of the finished surface; furthermore, expansion joint material shall be 
supported, prior to the placement of the concrete, as to ensure tight joints. Reinforcing material shall 
be cut at all expansion joints. 

 

Construction joints in the shotcrete shall be uniformly tapered over a minimum distance of twice the 
thickness of the shotcrete layer. Surface of the joints shall be cleaned and thoroughly wetted before 
adjacent shotcrete is placed. Shotcrete shall be placed in a manner that provides a finish with uniform 
texture and colour across the construction joint. Square construction joints shall not be used.  

When shotcrete is specified in the Contract plans as the final fascia finish, the curing requirements 
specified  in  Section  4.4.2  of  Chapter  4,  Concrete  Works,  shall  apply.  For  intermediate  shotcrete 
surfaces,  or  if  a  stained  or  finished  final  surface  is  required,  liquid  membrane-forming  curing 
compound method of curing shall not be used. Shotcrete shall be cured by applying a clear liquid 
membrane-forming  curing  compound  in  accordance  with  Article  4.4.2.3  of  Chapter  4,  Concrete 
Works.  Curing  compounds  shall  be  applied  immediately  after  final  gunning.  Two  coats  of  curing 
compound shall be applied to the shotcrete surface immediately after finishing.  

If field inspection or testing, by the Engineer, indicates that any shotcrete produced fails to meet the 
requirements,  the  Contractor  shall  immediately  modify  procedures,  equipment,  or  system,  as 
necessary 

— and as approved by the Engineer — to produce material that meets requirements. All 

substandard shotcrete already placed shall be repaired by the Contractor, to the satisfaction of the 
Engineer, at no additional cost to the Owner. Such repairs may include removal and replacement of 
all affected materials.  

Contractor shall remove alignment wires after facing construction is complete. 

A written report shall be prepared and submitted by the Contractor to the Engineer within 24 hours 
of shotcrete production and application for each shift. Report shall include the following:  

1.  Quantity and location of shotcrete applied, including sketches of the areas placed  

2.  Observations  of  success  or  problems  of  equipment  operation,  application,  final  product 

condition, and any other relevant issues during production and application 

C

ONSTRUCTION

 

 

3.  Batch numbers, if applicable 

4.  Name of nozzleman 

5.  Names and signature of person performing the observation 

g.  Shotcrete Finishing 

After the shotcrete has been placed as nearly as practicable to the required thickness and shape 
outlined by forms and ground wires, the surface shall be checked with a straightedge and any low 
spots or depression shall be brought up to proper grade by placing additional shotcrete in such a 
manner that the finished surface shall be smooth and uniform.  

When the shotcrete facing is an interim coating to be covered by a subsequent shotcrete coating or 
a cast-in-situ concrete fascia later under the same Contract, the Contractor shall strike-off the surface 
of the shotcrete facing with a roughened surface as specified in Section 4.4.4 of Chapter 4, Concrete 
Works. Grooves of the roughened surface shall be either vertical or horizontal. 

When the shotcrete facing provides the finished exposed final surface, the shotcrete face shall be 
finished  using  the  alternative  aesthetic  treatment  shown  in  the  Contract  plans.  Alternatives  are 
described in Table 7-13. Shotcrete surfaces shall have a natural gun finish, unless otherwise shown 
on the Contract plans or specified in the Particular Specifications, as approved by the Engineer. 

Table 7-13: Aesthetic alternatives for shotcrete facing 

 

Description 

After the surface has taken its initial set (crumbling slightly when cut), the surface shall be 
broom finished to secure a uniform surface texture. 

Shotcrete shall be applied in a thickness a fraction beyond the alignment wires and forms. 
Shotcrete shall stiffen to the point where the surface does not pull or crack when screeded 
with a rod or trowel. Excess material shall be trimmed, sliced, or scraped to true lines and 
grades. Alignment wires shall be removed and the surface shall receive a steel trowel finish, 
leaving  a  smooth  uniform  texture  and  colour.  Once  the  shotcrete  has  cured,  pigmented 
sealer shall be applied to the shotcrete face. Shotcrete surface shall be completed to within 
a tolerance of 13 mm of true line and grade. 

Shotcrete  shall  be  hand-sculptured,  coloured,  and  textured to  simulate  the  relief, jointing, 
and texture of the natural backdrop surrounding the facing. Ends and base of the facing shall 
transition in appearance as appropriate to more nearly match the colour and texture of the 
adjoining  roadway  fill  slopes.  This  may  be  achieved  by  broadcasting  fine  and  coarse 
aggregates, rocks, and other native materials into the final surface of the shotcrete while it 
is still wet, allowing sufficient embedment into the shotcrete to become a permanent part of 
the surface. 

7.3.4 Gravity Walls 

7.3.4.1 

Description 

This work shall consist of furnishing and installing units for gravity walls in accordance with the details 
shown on the Contract plans as required herein or as described in the Particular Specifications, as 
approved by the Engineer. Gravity walls retain earth by virtue of their mass, without reinforcement 
that extends into the retained earth. Types of gravity walls are described herein, as follows:  

  Rock wall, Article 7.3.4.2  

  Concrete block wall, Article 7.3.4.3  

  Gabion wall, Article 7.3.4.4 

C

ONSTRUCTION

 

 

7.3.4.2 

Rock Wall 

a.  Materials 

Rock for rock walls and chinking material shall consist of hard, sound, and durable material, free 
from seams, cracks, and other defects that can destroy its resistance to weather, and shall meet the 
minimum requirements of Table 7-14.  

Table 7-14: Requirements for rock for rock walls and chinking material 

Test 

Test method 

Requirements 

Specific gravity 

AASHTO T 85 

2.55 minimum 

LA wear 

AASHTO T 96 

50 % maximum 

Absorption 

AASHTO T 85 

3 % maximum 

Rock for rock wall sizes are approximately as described in Table 7-15. Minimum average dimension 
of chinking material shall be 100 mm.  

Table 7-15: Sizes of rock for rock wall 

Rock size 

Rock Weight (kg) 

Average Dimension (mm) 

One man 

20 to 90 

300 to 450 

Two man 

90 to 300 

450 to 700 

Three man 

300 to 900 

700 to 925 

Four man 

900 to 1,800 

925 to 1,225 

Five man 

1,800 to 2,700 

1,225 to 1,375 

Six man 

2,700 to 3,600 

1,375 to 1,525 

Backfill  for  rock  walls  shall  be  crushed  gravel  measuring  between  50  mm  and  150  mm  in  size. 
Acceptance shall be determined by visual inspection by the Engineer. 

Gabion  cribbing,  wire  mesh  fabric,  polyvinyl-chloride  coating  for  welded-wire  mesh  fabric,  gabion 
basket fasteners, and stone shall be as described in Sub-article b, of Article 7.3.4.4. Construction 
geotextile shall be as defined in Article 2.5.2.9 of Chapter 2, Earthworks.   

b.  Construction Requirements 

Completed wall shall meet the tolerances of Table 7-16.  

Table 7-16: Geometric tolerances for rock walls 

Wall Dimension 

Tolerance 

Wall batter 

6:1 or flatter as specified in the Contract plans 

Exterior  slope  plane  and 
grade  

±150 mm 

Maximum 

void 

between 

adjacent rocks 

150  mm,  as  measured  at  the  smallest  dimensions  of  the  void 
within the thickness of the wall 

Excavation shall conform to the requirements of Article 2.4.2.11 of Chapter 2, Earthworks, of these 
standard  specifications,  and  to  the  limits  and  construction  stages  shown  on  the  Contract  plans. 
Excavation  limits  shall  be  restricted  by  the  Contractor  to  the  length  of  rock  wall  that  can  be 
constructed in one day of work, except as otherwise noted. Excavation beyond these limits may be 

C

ONSTRUCTION

 

 

permitted  by  the  Engineer  provided  the  Contractor  either  demonstrates  that  the  excavation  will 
remain stable until the rock wall is completed, or the Contractor shores the excavation in accordance 
with Article 2.4.2.11 of Chapter 2, Earthworks. 

Slope  above  the  rock  wall  shall  be  established  prior  to  excavating  for  the  wall.  For  rock  walls 
constructed in fills, the fill shall be overbuilt and cut back to construct the wall. 

An  L-shaped  sample  section  of  wall  shall  be  constructed  at  least  1.5  m  high  and  2.5  m  long, 
demonstrating construction of the following elements:  

  Face wall 

  Top wall 

  Method of turning corners  

  Method of forming joints 

Prior  to  rock  placement,  the  foundation,  if  not  in  rock,  shall  be  compacted  as  approved  by  the 
Engineer. Any foundation soils found to be unsuitable shall be removed and replaced in accordance 
with Article 2.4.2.7 of Chapter 2, Earthworks. 

Geotextile placement shall be as shown on the Contract plans. 

Rocks shall be placed to conform to the following requirements:  

1.  Foundation masonry may be constructed at any time 

2.  Bottom  course  of  rocks  shall  be  in  full  contact  with  the  foundation  soils.  If  necessary,  the 

excavation  shall  be  shaped  to  fit  the  rocks.  Rocks  may  be  dropped  to  shape  the  ground 
provided the rocks do not crack. Cracked rocks shall be replaced and the foundation regraded 
to fit the replacement rock 

3.  There shall be no continuous joint planes in either the vertical or lateral direction  

4.  Face stones shall be set in random bond to produce the effect shown on the Contract plans 

and to correspond with the approved sample section 

5.  Each rock shall bear on at least 2 rocks below it, where possible  

6.  Each face stone shall bond with all contiguous face stones at least 150 mm longitudinally and 

50 mm vertically 

7.  Rock orientation shall consist of the following: 

i.  Maximise flat surface contact points between adjacent rocks  

ii.  Minimise point-to-point contact between adjacent rocks 

iii.  Arrange natural irregularities in the rocks so as to key the rocks together and to key the 

courses together 

In constructing rock masonry walls, the Contractor shall not do the following:  

  Construct any masonry other than foundation masonry until the sample is approved 

  Extend beds in an unbroken line through more than 5 rocks 

  Extend joints through more than 2 rocks 

  Construct so that the corners of four stones are adjacent to each other  

  Group small rocks or rocks of the same size, colour, or texture  

Rocks shall increase in size from the top of the wall to the bottom at a uniform rate. Minimum rock 
sizes, as referenced from the top of the wall, shall be as in Table 7-17.  

C

ONSTRUCTION

 

 

Table 7-17: Minimum rock sizes 

Depth from Top of Wall (metres) 

Minimum Rock Size at Depth from Top of Wall 

Top of wall 

Two man or larger 

Three man 

Four man 

12 

Five man 

Where voids larger than 150 mm are present, chinking rock shall be keyed between the rocks to fill 
the void. Backfill for the rock wall shall be placed behind each course and tamped to provide a stable 
condition prior to placing rocks for the next successive course. 

Where headers are required, the Contractor shall distribute headers uniformly throughout the walls 
of structures to form at least 20 % of the faces. 

Individual rocks composing the backing and heart shall be bonded with the rocks in the face wall and 
with each other, where applicable, per the wall design shown on the  Contract plans. All openings 
and interstices in the backing shall be filled completely with mortar or with quarry spalls surrounded 
completely by mortar. 

Copings shall be constructed as shown on the Contract plans. Where coping is not required, the top 
of the wall shall be finished with rocks measuring 0.5 m to 1.5 m long, at least 150 mm high, and 
wide enough to cover the top of the wall. Rock heights shall be random for the top course, and rocks 
shall be laid such that the top course is an integral part of the wall, pitched to line in both vertical and 
horizontal planes. 

Parapet walls shall be constructed with  selected stones, squared, and pitched to line, with heads 
dressed in the ends and in all exposed angles and corners. Headers shall be interlocked with as 
many headers as possible, extending entirely through the wall. Both the headers and stretchers shall 
be interlocked in the 2 faces of the wall. Headers and stretchers shall comprise nearly the whole 
volume of the wall. All interstices and spalls shall be completely filled with mortar. 

Weep holes shall be installed for all walls and abutments at the lowest points where free outlets can 
be obtained. Weep holes shall be spaced no more than 3 m centre-to-centre. 

7.3.4.3 

Concrete Block Wall 

a.  Description 

Concrete block walls are defined as a wall of modular blocks acting as a gravity wall to retain soil or 
act as a boundary wall. Modular blocks may have features designed to interlock the blocks together. 
However  concrete  block  walls  shall  not  include  reinforcement  of  the  retained  soil,  nor  any 
reinforcement connection between the modular blocks and the retained soil. Concrete block walls 
shall be constructed as shown in the Contract plans and as specified in the Particular Specifications. 

b.  Materials 

Materials  for  concrete  blocks  and  mortar  shall  conform  to  the  requirements  of  Section  6.2.2  of 
Chapter 6, Masonry. 

c.  Construction Requirements 

Construction requirements shall conform to Section 6.2.3 of Chapter 6, Masonry.  

C

ONSTRUCTION

 

 

7.3.4.4 

Gabion Wall 

a.  Description 

Gabion  walls  consist  of  flexible  galvanised  or  aluminised  steel-wire  mesh  baskets  or  mattresses, 
called gabion cages, filled with stone. Gabion cages shall be constructed from wire of a specified 
thickness with uniform openings and coated as the Contract plans and these Specifications require. 
For gabion walls, earth is retained by virtue of the weight of the filled wire baskets.  

b.  Material 

Materials shall conform to the specific requirements of this section, and additional materials shall be 
as specified in these Specifications. Of particular note are the materials in Article 2.5.2.9 of Chapter 
2, Earthworks, specifically: geotextile fabric, backfill, and base course.  

1.  Gabion Baskets and Mattresses 

Gabion  cages  shall  be  either  baskets,  typically  used  for  wall  applications,  or  mattresses, 
which  are  typically  used  as  single-layer  aprons  for  revetments  or  channel  lining  type 
applications.  Dimensions  shall  be  as  shown  on  the  Contract  plans  or  as  approved  by  the 
Engineer. Typical dimensions for each shall be as in Table 7-18. Gabions shall be furnished 
in the required dimensions, ±5 %. 

Table 7-18: Typical gabion basket and gabion mattress dimensions 

Dimension 

Basket 

Mattress 

Length 

1 m, 2 m, 3 m, and 4 m 

6 m 

Width 

1.0 m 

2.0  m 

Depth 

0.3 m, 0.5 m, and 1 m 

0.2 m, 0.3 m, and 0.5 m 

Diaphragm spacing 

1.0  m 

0.6 m or 1.0  m 

Wire for the construction of gabions shall be either galvanised steel wire conforming to ASTM 
A  641M,  Class  3,  soft  temper,  or  aluminised  steel  wire  conforming  to  ASTM  A809,  soft 
temper. Wire shall have a minimum tensile strength of 415 MPa when tested in accordance 
with ASTM A370. Properties of gabion baskets shall conform to Table 7-19. Only one type of 
mesh and protective coating shall be used throughout a structure. Tolerance on the specified 
diameter of all wire shall be ±2.5 %. 

Table 7-19: Requirements for gabion baskets 

Property 

Requirement for baskets 

≥ 300 mm in the 

vertical 

dimension 

< 300 mm in the 

vertical dimension 

Nominal dimensions of the mesh openings 

≤ 115 mm 

≤ 85 mm 

Maximum area of any mesh opening 

≤ 65 cm

< 39 cm

Hexagonal twisted wire mesh 

Nominal wire size (galvanized or aluminized) 

Minimum selvedge wire diameter 

 

3 mm 

3.8 mm 

 

2.2 mm 

2.7 mm 

Welded wire mesh 

Diameter of galvanized steel wire for fabricating 
mesh 

 

2.7 mm 

 

2.0 mm 

C

ONSTRUCTION

 

 

Property 

Requirement for baskets 

≥ 300 mm in the 

vertical 

dimension 

< 300 mm in the 

vertical dimension 

Size of rectangular openings 

PVC coating, if required  

Nominal thickness 

Minimum thickness 

75 mm by 75 mm 

 

0.55 mm 

0.38 mm 

38 mm by 75 mm 

 

0.55 mm 

0.38 mm 

Gabion  baskets  shall  be  either  hexagon-twisted  wire  mesh  or  welded  wire  mesh  with  the 
following properties, as applicable:  

i. 

Hexagon twisted wire mesh, per ASTM A 975: 

a) Formed from galvanised or aluminised wire 

b) Uniform hexagonal pattern with nonravelling double twist  

c)  Perimeter  edges  of  the  mesh  for  each  panel  tied  to  a  selvedge  wire  that  is  the 

same composition as the body mesh 

ii. 

Welded wire mesh, ASTM 974: 

a) Fabricated from galvanised steel wire, galvanised before fabrication  

b) Uniform  rectangular  pattern  with  a  resistance  weld  at  each  connection  in 

accordance with ASTM A 185M 

c)  PVC coating, if required, fusion bonded to the welded wire mesh 

A manufacturer’s certificate of compliance stating that wire baskets or mattresses, stiffeners, 
lacing wire, and spiral connectors conform to the requirements established herein shall be 
provided by the Contractor to the Engineer.  

Wire mesh shall be fabricated in a manner to be nonravelling, meaning the wire mesh shall 
resist  pulling  apart  at  any  of  the  connections  forming  the  mesh  when  a  single  strand  in  a 
section of mesh is cut. 

PVC  coating  shall  apply  to  welded  wire  mesh  only  and  PVC-coating  material  shall  be 
accepted  by  certified  test  reports  of  an  independent  laboratory.  Initial  properties  of  PVC-
coating material shall have a demonstrated ability to conform to the requirements of  Table 
7-20. 
 

Table 7-20: Material requirements for PVC coating 

Property 

Test 

Method 

Requirement 

Specific gravity 

ASTM D792  1.2 to 1.4 

Tensile strength 

ASTM D638 

≥ 15.75 MPa 

Modulus of elasticity 

ASTM D638 

≥ 13.65 MPa at 100 Strain 

Shore A-hardness 

ASTM 

D2240 

≥ 75 

Brittleness temperature 

ASTM D746 

≤-9.4

C

ONSTRUCTION

 

 

Property 

Test 

Method 

Requirement 

Salt spray exposure and 
ultraviolet (UV) light 
exposure 

ASTM B117  PVC shall show no effect after the following: 

3,000 hours of salt spray exposure; and, 

3,000  hours  of  UV  light  exposure  using  apparatus 
Type E, 63° C, and ASTM D1499. 

After  the  salt  spray  test  and  UV  light  exposure 
specified  above,  the  PVC  coating  shall  not  crack, 
blister, split, nor exhibit visible change in colour, and 
material properties shall be within the following:  

±6 % of original specific gravity. 

±25 % of original tensile strength. 

±25 % of original modulus of elasticity. 

±10 % of original resistance to abrasion. 

Where selvedge is not woven integrally with the mesh but has to be tied to the cut ends of 
the mesh, it shall be attached by tying the cut ends of the mesh to the selvedge, so that a 
force of not less than 8.5 kN applied in the same plane as the mesh at a point on the selvedge 
of a mesh sample of 1m in length will be required to separate it from the mesh. 

Diaphragms and end panels require selvedge on the top and vertical sides only. End panels 
shall be attached by the cut ends of the mesh wires at the bottom of the panel being twisted 
around the selvedge on the base of the gabion. Similarly, diaphragms shall be attached by 
the cut ends of the mesh being twisted to the joints of the mesh in the base of the gabion. In 
all cases, at least 6 kN/m of force shall be required to separate panels from the base. 

2.  Fasteners for Basket Assembly 

Fasteners shall consist of one or more of the following materials:  

  Lacing wire, nominal sized 2.2 mm galvanised steel wire or aluminised steel wire, with the 

same coating as the basket mesh 

  Spiral binders, for welded wire panels, nominal diameter 2.7 mm steel wire with a 75mm 

pitch having the same specifications and coating as the wire mesh  

  Alternate fasteners must remain closed when subjected to a 2.67 kN tensile force when 

confining the maximum number of wires to be confined. Installation procedures and test 
results for alternate fasteners shall be submitted for approval. Alternate fasteners shall be 
approved by the Engineer prior to use  

Internal connecting wires shall be the same as required for lacing wire. Alternate stiffeners 
may be used with the gabion manufacturer’s approval. 

3.  Fabrication of Baskets 

Gabions shall be made so that the sides, ends, lid, and diaphragms can be assembled into 
rectangular baskets of the required sizes at the work site. Common wall construction may be 
used in gabion structures up to 4 m high. Common wall construction includes any basket that 
uses its top to serve as the bottom of the one above it, or where one wall also serves as a 
wall to an adjacent basket. When gabion structures are more than 4 m high, the baskets shall 
have independent sides, ends, top, and bottom.  

Each gabion shall be divided by diaphragms into cells the same length as horizontal basket 
width.  Diaphragms  shall  be  made  of  the  same  mesh  and  gage  as  the  basket  body.  All 
perimeter and diaphragm edges shall be laced or clipped together so that joints are at least 

C

ONSTRUCTION

 

 

as strong as the body of the mesh itself. Ends of the lacing shall be anchored by three tight 
turns around the selvage wire. 

Strength and flexibility at a point of connection shall be at least equal to that of the mesh. 

4.  Stone 

Gabions shall be filled with clean, hard, durable stone as approved by the Engineer. Stone 
shall be free of shale, caliche, or other soft particles and shall be dense enough to pass the 
unit weight test described in the construction requirements of this section while meeting the 
requirements for gradation in Table 7-21.  

Table 7-21: Gradation and fracture requirements of stone for filling gabions 

Sieve size 

Percent passing 

200 mm square 

100 

150 mm square 

75 to 90 

100 mm square 

0 to 10 

Percent fracture 

75 minimum 

c.  Construction Requirements 

1.  Foundations 

Before placing any gabion cribbing, the Contractor shall excavate the foundation or bed to 
the  specified  width,  line,  and  grade  in  accordance  with  Article  2.4.2.11of  Chapter  2, 
Earthworks.  Foundation  soils  found  to  be  unsuitable  shall  be  removed  and  replaced  in 
accordance with Article 2.4.2.7 of Chapter 2, Earthworks. Excavation for toe or cut-off walls 
shall be made to the neat lines of the wall. 

For rocky foundations, 200 mm of aggregate material meeting the requirements of Table 2-
4 of Chapter 2, Earthworks, shall be placed under the wall base elements. 

Where required, a foundation trench along the toe of the revetment or wall shall be excavated 
to the dimensions shown on the Contract plans or indicated by the Engineer. 

Where geotextile filter fabric is required, it shall be placed as shown on the  Contract plans 
with minimum overlaps of  300 mm by 1,000 mm. Its movement shall be prevented during 
filling of the gabion cages by a method acceptable to the Engineer.  

2.  Baskets  

Gabion baskets and mattresses may be fabricated from either woven or welded steel wire, 
but, a gabion structure shall not include both. Baskets may be assembled with fasteners that 
meet the requirements of Sub-article b, of Article 7.3.4.4, but a perimeter or diaphragm edge 
shall not include both lacing wire and clip fasteners. 

During basket assembly, structure erection, cell filling, or backfilling, the Contractor shall take 
care not to damage wire coatings. Any damage shall be repaired to the satisfaction of the 
Engineer, or the damaged portion removed and replaced at no additional cost to the Owner. 
Basket  panels  shall  be  rotated  into  position  and  the  vertical  edges  joined  with  fasteners. 
Temporary  fasteners  may  be  used  for  basket  assembly,  if  they  are  supplemented  during 
structure erection with permanent fasteners. Diaphragms shall be rotated into position and 
joined along the vertical edges. 

All perimeter edges of gabions are to be securely selvaged or bound so that the joints formed 
by tying the selvages have at least the same strength as the body of the mesh. 

 

 

 

 

 

 

 