Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 44

 

  Главная      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     42      43      44      45     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 44

 

 

C

ONSTRUCTION

 

 

a.  Rail Element for W-beam and Thrie-beam  

Steel rail elements including the terminal sections shall meet the chemical and physical requirements 
of AASHTO M 180 for Type II, Class B. Base metal for rail elements shall not contain more than 0.04 
% phosphorous nor more than 0.05 % sulphur. For 150-mm channel rails and splice plates, the rail 
elements shall meet the requirements of ASTM A36M or ASTM A992M.  

Rail sections and end sections shall be form rolled to the shapes shown on the Contract plans, and 
shall be hot-dipped galvanised after fabrication, per AASHTO M 111M or ASTM A123M. 

Rail elements, back-up plates, reducer sections, and end sections shall conform to AASHTO-AGC-
ARTBA, A Guide to Standardized Highway Barrier Hardware, except as modified by these Standard 
Specifications or the Contract plans.  

All fabrication shall be complete before galvanising, including the following:  

1.  Holes  in  the  plates,  which  shall  be  slotted  to  permit  expansion  and  Contraction  and  to 

facilitate erection  

2.  Edges of the rail, which shall be rolled or rounded so as to present no sharp edges  

3.  Radius of curvature less than 46 m, which shall be shaped in the fabrication shop  

Each  rail  element  shall  be  permanently  marked  per  AASHTO  M  180.  Curved  sections  shall 
additionally be marked 

in the same manner with the radius of the curved section in the format “R = 

xx m”. Markings shall be located on the back of the metal beam rail section away from traffic and 
visible after erection. 

Systems other than AASHTO M180 W-beam and all highway safety hardware accepted shall comply 
with the Test Level-3 (TL-3) as per National Cooperative Highway Research Program (NCHR) report 
350 / AASHTO manual MASH (Manual for Assessing Safety Hard-wares) crash test criteria all as 
per the Engineer’s recommendations. 

b.  Wire Rope  

Ropes for railing shall be coreless with a diameter of 19 mm. They shall have a breaking load of at 
least 177 kN. Rope for railing shall exhibit a minimum modulus of elasticity of 83,000 MPa based 
on an area of 283.5 mm

2

, after pre-stressing by an approved method, to ensure that they behave 

elastically and retains tension when in service. 

All wire used for the manufacture of ropes for railing shall be general purpose type II wire that has 
been zinc-coated by the hot dip method as outlined in AASHTO M 30 

All threaded terminals and rigging screws shall be hot dip galvanized according to AASHTO M 232. 

c.  Posts and Blocks  

Posts and blocks shall be fabricated and installed to the dimensions, tolerances, and requirements 
shown  in  the  Contract  plans.  Except  for  terminal  or  anchor  assemblies,  all  posts  for  any  one 
continuous length of guardrail shall be of the same material.  

Top diameter of posts shall measure 150 mm to 230 mm, provided that posts with widely varying 
diameters shall not be used together in the same length of guardrail. Posts shall be concrete, steel 
or  composite, as described by the material below. Blocks shall be timber, steel, or composite, as 
described by the material below.  

Impact  performance  of  some  features  of  railing  system  depends  on  dynamic  soil  structure 
interaction. The soil shall be tested in accordance with the approved backfill and compaction criteria 
as per Chapter 2, Earthworks, of these standard specifications 

1.  Concrete Posts 

Concrete posts shall be precast in the shape and dimensions shown on the Contract plans 
in accordance with the requirements of Section 4.4.8 of Chapter 4, Concrete Works.  

C

ONSTRUCTION

 

 

Class  C40/20  concrete  shall  be  used  in  the  construction  of  all  concrete  posts.  Steel 
reinforcing bars shall comply with the requirements of Chapter 5, Reinforcing Steel. 

2.  Steel Posts and Blocks 

Steel posts shall be of the type and size shown on the  Contract plans or described in the 
particular specifications. 

Steel posts shall be rolled sections conforming to the material requirements of ASTM A36. 
Steel blocks and base plates shall conform to either ASTM A36 or ASTM A992M. Steel posts, 
blocks, and base plates shall be galvanised in accordance with Sub-article d of Article 7.2.1.2. 
All fabrication shall be completed prior to galvanising.   

Welding shall conform to Sections 23.4.11 and 23.6.10 of Chapter 23, Steel Structures, of 
these standard specifications. 

3.  Composite Posts and Blocks 

Contractor shall provide the Engineer with the following documentation for composite posts 
or blocks to be used for guardrail installations:  

  Certification  that  the  material  meets  the  requirements  of  the  National  Cooperative 

Highway Research Program Report 350 Test Level 3 (TL-3) design speed category  

  Certification from the producer or supplier stating the material composition. Material shall 

contain a minimum of 60% recycled material comprised of any combination of recycled 
polyethylene; polypropylene; polyvinyl chloride; tire cord; and/or rubber, including natural 
or styrene butadiene rubber 

  Certification from the producer or supplier stating that the material is thermal and process 

stabilised to prevent ultra-violet degradation.  

One post and one block shall be submitted by the Contractor to the Engineer for testing. Test 
samples shall be accompanied by a drawing showing the dimensions of the post and block. 
If changes occur in the producer, the type, dimensions, or material composition of the posts 
or blocks, the Contractor shall notify the Engineer and provide additional samples for testing 
at no cost to the Owner, as requested by the Engineer.  

d.  Galvanising and Repair 

Galvanising shall be by the hot dip process in accordance with the standards identified in Table 7-3. 
All  fabrication  shall  be  completed  and  ready  for  assembly  before  galvanising.  No  fabrication, 
including  forming,  cutting,  shearing,  punching,  drilling,  bending,  welding,  or  riveting  shall  be 
permitted after galvanising. Galvanised guardrails shall not be nested when stacked for storage. 

Table 7-3: Galvanising standards for guardrail applications 

Element 

Standard 

Beam  rail  elements  and  terminal 
sections

 

AASHTO M 180, Class B, Type 2 

Fabricated  items,  rolled,  pressed  or 
forged  steel  shapes,  plates,  pipes, 
tubular items, bars, posts 

AASHTO M 111M or ASTM A 123M 

Bolts,  nuts,  washers,  plates,  rods, 
casings, fasteners, and other hardware 

AASHTO M 232M or 

ASTM A 153M 

Anchor cables 

Federal  Specification  RR-W-410,  Table  II,  galvanized 
at finished size 

C

ONSTRUCTION

 

 

Precautions shall be taken against embrittlement, warpage, and distortion in accordance with ASTM 
A143M, and in accordance with ASTM A384M.  

Galvanised parts shall be visually inspected by the Contractor to evaluate their fitness for the works. 
Galvanising coating shall be uniform and bright. Concerns shall be addressed per Table 7-4.  

Table 7-4: Appearance concerns for galvanised parts 

Appearance 

Remedy 

White rust  

(white powdery residue)  

  Indicates moisture 

White rust shall be removed from articles that will be in 
direct contact with soil and from articles where heavy 
layers of white dust that have caused the coating to pit. 
Light  coatings  of  white  dust  shall  remain  or  be 
removed at the Engineer

’s direction.  

Red rust 

  Indicates uncoated areas 

Articles  shall  be  inspected  for  gaps  in  coverage  and 
repaired or rejected at the direction of the Engineer.  

Alligator cracking 

(spider webbing)  

Dull gray colour 

Composition of the base metal may cause dark lines 
or  a  dull  gray  colour.  Adhesion  shall  be  tested,  as 
described below, to determine whether the coating is 
acceptable.  

Adhesion of the coating shall be acceptable if, when tapped with a small hammer, the coating does 
not scale, flake, or break.  

1.  Repair of Galvanisation 

After  erection,  all  parts  of  galvanised  elements  on  which  the  galvanising  has  become 
scratched, chipped, or otherwise damaged shall be repaired by painting it with 2 coats of high 
zinc-dust content galvanising repair paint meeting the requirements of ASTM A780 / A780M 
– 09, Method 2. Bare spots as wide as 3 mm across are acceptable unless they are numerous 
in  the  opinion  of  the  Engineer.  Runs  or  drips  of  zinc  coating  are  acceptable  unless  they 
interfere with the intended use of the product. Excessive zinc accumulations shall be carefully 
hand-filed.  

Surfaces to be repaired shall be clean, dry, and free from contaminants such as oil, grease, 
corrosion products, and welding slag or flux. Surfaces shall be cleaned to near-white metal 
by wire brushing, light grinding, or mild blasting extending into the surrounding undamaged 
coating to provide a smooth repair. To attain the required dry-film thickness, the Contractor 
shall  spray  or  brush-apply  the  paint  to  the  prepared  area  in  accordance  with  the  paint 
manufacturer’s instructions. Multiple passes shall be required for spray application. 

After completing repair and cooling or curing, the measured thickness of the galvanisation in 
the repaired area shall be 1.5 times the thickness required for the specified galvanising up to 
0.1 mm.  

Paint shall not be used to repair galvanising damage caused by welding. As an alternative to 
paint,  galvanising  repair  may  be  accomplished  by  zinc-based  solders  or  sprayed  zinc. 
Surfaces  shall  be  prepared  as  for  paint  repair,  and  thickness  of  the  zinc  coating  in  the 
repaired  area  shall  be  the  same  as  the  thickness  required  for  the  specified  galvanising. 
Procedures for these 2 alternative processes shall be as follows:  

i.  For zinc-based solders: Preheat cleaned areas to a temperature between 315

C and 400

C. Wire-brush while heating and evenly distribute a layer of zinc solder. When repair is 
complete,  flush  the  repaired  area  with  water  or  wipe  with  a  damp  cloth  to  remove  flux 
residue. 

C

ONSTRUCTION

 

 

ii.  For sprayed zinc: Apply coating by metal-spraying pistols fed with either zinc wire or zinc 

powder.  Provide  a  coating  that  is  uniform  and  free  of  lumps,  coarse  areas,  or  loose 
particles. 

e.  Hardware  

All fastenings shall be new wrought iron or medium steel and in conformance with the dimensional 
requirements  of  the  Contract  plans.  Structural  steel  shapes,  plates,  bars,  and  strips  used  in 
fabrication of hardware and all miscellaneous steel shall conform to the requirements of ASTM A36.  

All  fastenings,  plates,  structural  shapes,  bars,  and  strips  shall  be  galvanised  per  Sub-article  d  of 
Article 7.2.1.2. 

Table 7-5: Hardware requirements and acceptance criteria 

Hardware 

Criteria 

Acceptance 

Bolts

 

ASTM  A  307  Grade 

Field  verification  and  documentation  that  bolt  heads 
are stamped 307A 

High-strength 
bolts 

ASTM A 325 Type 3 

Manufacturer’s certificate of compliance** 

Nuts 

ASTM  A  563  Grade 

Manufacturer’s certificate of compliance** 

Washers 

ASTM F 844* 

Manufacturer’s certificate of compliance** 

Notes:  
*Unless otherwise specified.  
**

Manufacturer’s certificate of compliance must be accepted by the Engineer prior to installing 
any of the hardware.  

f.  Anchors 

Guardrail  end  treatments  shall  be  furnished  by  the  Contractor  in  accordance  with  manufacturer 
requirements and the details shown on the Contract plans. Assembly and installation information for 
the  guardrail  end  treatments  shall  by  obtained  by  the  Contractor  from  the  manufacturer;  and 
installation  and  repair  manuals  specific  to  the  guardrail  end  treatments  shall  be  prepared  by  the 
manufacturer and supplied to the Engineer by the Contractor. 

Unless  otherwise  indicated  in  the  Contract  plans 

or  the  manufacturer’s  instructions,  anchor 

assemblies shall meet the requirements of Table 7-6.  

Table 7-6: Guardrail anchor requirements 

Guardrail anchor component 

Requirement 

Foundation tubes 

Shall  be  fabricated  from  steel  conforming  to  the 
requirements  of  ASTM  A500M,  Grade  B;  or  ASTM 
A501.  

Anchor plate assembly 

Shall develop a minimum tensile strength of 178 kN. 

Anchor plate and metal plates 

Shall be fabricated of steel conforming to ASTM A36.  

I-beam posts  

Shall conform to ASTM A36 or ASTM A992M.  

All metal components of the anchor and 
cable  assembly,  including  fittings,  and 
not less than the top 210 mm of I-beam 
posts 

Shall  be  hot-dipped  galvanized  in  accordance  with 
Sub-article d of Article 7.2.1.2 of these Specifications.  

C

ONSTRUCTION

 

 

Guardrail anchor component 

Requirement 

Anchor cable 

Shall  be  19  mm  preformed,  6  wire  strand  core  or 
independent wire rope core (IWRC), galvanized, right 
regular lay manufactured of improved plow-steel with 
a minimum breaking strength of 190 kN. 

Swaged cable fittings 

Shall develop 100 

% of the cable’s specified breaking 

strength. 

Swaged fitting and stud assembly 

Shall  be  of  steel  conforming  to  the  requirements  of 
AISI  C-1035,  annealed,  and  galvanized  suitable  for 
cold swaging.  

Cement concrete 

Shall  be  Class  C15/20  concrete  conforming  to  the 
requirements of Chapter 4, Concrete Works, of these 
Standard Specifications.  

Cement grout 

Shall be Class G2 in accordance with Article 4.3.10.4 
of Chapter 4, of these Standard Specifications. 

Two certified copies of the mill test reports of the cable used shall be furnished to the Engineer. One 
swaged fitting attached to 1 m of cable shall be furnished to the Engineer for testing.  

g.  Reflectors for Guardrail 

Reflectors  for  guardrail  shall  be  prismatic  guardrail  reflector  tabs  or  prismatic  guardrail-mounted 
barrier markers and shall have the following characteristics: 

1.  Prismatic guardrail reflector tabs:  

i.  Minimum body thickness of 5 mm  

ii.  Galvanised steel or ultraviolet-resistant plastic 

2.  Prismatic reflectors:  

i.  85 mm in diameter 

ii. 

Secured to the body in accordance with the manufacturer’s recommendations 

3.  Prismatic guardrail mounted barrier markers:  

i.  Ultraviolet-resistant 

ii.  Trapezoidal-shaped body 

4.  Post-mounted L-shaped barrier markers and flexible guardrail markers:  

i.  Made of a high quality impact and ultraviolet resistant, flexible, white-coloured plastic, 

or similar material 

ii.  Minimum thickness of 5 mm 

iii.  Rectangular body that is flat, curvilinear, or tubular with a width between 75 mm and 

100 mm  

5.  Minimum reflective area for L-shaped, post-mounted barrier markers shall be 645 mm

2

6.  Reflectorized surface for flexible guardrail markers shall be 75 mm by 125 mm. 

Guardrail delineator material shall be specifically manufactured to provide roadside delineation. All 
delineators shall consist of complete units that are precut, pre-drilled as applicable, and ready to be 
installed  in the  field.  Delineators  shall  be  packaged  in such  a  manner  as  to  prevent  damage  and 
deterioration during shipping, handling, and storage. 

A certificate of compliance stating that the reflectors comply with the following requirements shall be 
supplied by the Contractor: 

C

ONSTRUCTION

 

 

1.  Retro-reflectors shall consist of a plastic face, referred to as the lens, and an opaque back 

fused  to  the  lens  under  heat  and  pressure  around  the  entire  perimeter  to  form  a 
homogeneous unit permanently sealed against dust, water, and water vapour  

2.  Retro-reflectors shall be of the colour shown in the Contract plans  

3.  Lens shall consist of a smooth front surface free from projections or indentations other than 

for identification and a rear surface bearing a prismatic configuration such that it will effect 
total internal reflection of light  

4.  Manufacturer's trademark shall be moulded legibly into the face of the lens 

Specific intensity of each acrylic retro-reflector shall be at least the minimum values in Table 7-7 with 
measurements made with retro-reflectors spinning. 

Lenses  shall  have  a  retro-reflective  area  of  not  less  than  4,195  mm

2

.  Retro-reflection  shall  be 

provided  by  the  lens  prismatic  optical  elements.  To  test  if  a  retro-reflector  is  adequately  sealed 
against dust, water, or air, the Contractor shall perform the following: 

1.  Submerge 50 samples in water bath at room temperature  

2.  Subject the submerged samples to a vacuum of 127 mm gauge for 5 minutes.  

3.  Restore atmospheric pressure and leave samples submerged for 5 minutes.  

4.  Remove and examine the samples for water intake, which shall constitute a failure.  

Failure of 3 or more units shall be cause for rejection of the entire lot. 

Delineators shall consist of an acrylic plastic retro-reflector unit mounted in a housing fabricated of 
1.60 mm  3003-H-14  or similar  aluminium,  or  of cold-rolled,  hot-dipped  galvanised  steel,  having a 
thickness of 1.62 mm. Housing dimensions, including assembly and post-mounting hardware, will 
be as shown on the Contract plans or as specified in the Contract. Attachment hardware shall permit 
easy removal with the proper tools, but removal shall not be possible without the use of such tools. 
Housing shall be protected against corrosion, as recommended by the manufacturer. 

Table 7-7: Minimum specific intensity per unit area (SIA) for clear reflectors 

Observation Angle 

(degrees) 

Entrance Angle 

(degrees) 

Minimum SIA 

(candelas per Lux per m

2

0.1 

2,550 

0.1 

20 

995 

h.  Inspection and acceptance of materials 

Before the rail elements are fabricated, the Contractor shall notify the Engineer so that inspections 
may  be  provided.  Arrangements  for  facilities  necessary  for  the  inspection  of  material  and 
workmanship at the point of fabrication of the rail element shall be made by the Contractor and the 
Engineer shall be allowed free access to necessary parts of the premises. 

Materials or workmanship that does not fulfil the requirements of these Standard Specifications shall 
be  rejected  by  the  Engineer.  Mill  test  reports  certifying  that  the  steel  used  in  fabricating  the  rail 
elements meet the requirements of these Standard Specifications shall be accepted by the Engineer, 
who reserves the right to require the Contractor to furnish samples of the steel proposed for use and 
to  determine  that  the  steel  meets  the  requirements  of  these  specifications.  Steel  rail  elements, 
fittings,  end  section  hardware,  and  bolts,  as  well as reflectors,  may  be  accepted  by  the  Engineer 
based on the manufacturer’s certification of compliance. 

C

ONSTRUCTION

 

 

7.2.1.3 

Construction Requirements 

Guardrail shall be installed in accordance with approved shop drawings and in compliance with the 
lines, dimensions, details, and locations indicated on the Contract plans or directed by the Engineer. 
Guardrail installation shall be consistent with the man

ufacturer’s recommendations.  

Minimum height of the guardrail shall be 725 mm, ±25 mm measured from the top of the rail to the 
finished shoulder surface.  

Guardrail  shall  be  braced  to  prevent movement, and  all  bolts  shall  be  tightened  prior  to  any  post 
holes being backfilled.  

Guardrail shall be erected such that the final configuration has no projecting ends that might interfere 
with  or  endanger  traffic.  Anchors  and  terminals  shall  be  provided  and  reflectors  shall  be  fixed  in 
accordance with the details shown on the Contract plans. 

Any  pavement  damaged  during  guardrail  construction  shall  be  repaired  as  approved  by  the 
Engineer.  

a.  Erection of Posts 

Unless otherwise indicated on the Contract plans, all posts shall be set vertically in holes with the 
diameters, spacing, and positions indicated on the Contract plans. Post holes shall be backfilled with 
C30/20 concrete tamped into place or as indicated on Contract plans. After backfilling is complete 
and the bracing has been removed, the posts shall be rigid and vertical; and the guardrail shall be 
firmly fixed to the posts and true to line and level.  

In any continuous length of guardrail, the same type of post shall be used.  

When  the  Contract  plans  require  that  the  ends  of  a  section  of  guardrail  be  curved  outward  or 
downward, posts shall be set to accommodate the curve. End treatment of the guardrail and length 
of post shall be as shown in the Contract plans. 

Posts may be placed in dug or drilled holes. Ramming or driving will be permitted only if approved 
by the Engineer and if it can be accomplished without damaging the posts, pavement, shoulders, 
and adjacent slopes. In broken rock embankments, pre-punching holes will be permitted only prior 
to final shoulder or median compaction, surfacing, and paving. Posts shall be protected from traffic 
at all times by attaching the rail elements or by a method approved by the Engineer.  

When  driving  of  posts  is  approved,  it  shall  be  accomplished  in  a  manner  that  prevents  battering, 
burring, separation of the galvanising from the steel, or distortion of the post. Posts shall be driven 
plumb with approved power hammers or gravity hammers to the required line and grade. Approved 
power hammers are steam, compressed air, vibratory, or diesel. A structural steel driving head shall 
be  suitable  for  the  type  and  size  of  post  being  driven.  Wood  cushion  blocks  shall  be  used,  as 
necessary, to prevent damage to the post. Rope mat, belting, or other similar cushioning material 
may also be used. Any post that is bent or otherwise damaged to the extent it is unfit for use in the 
finished work, as determined by the Engineer, shall be removed and replaced at no additional cost 
to the Owner.  

Pilot  holes  may  be  used  when  required  or  permitted.  Size  and  depth  of  pilot  holes  shall  be  as 
approved by the Engineer based on results of trial operations of the first few posts driven.  

Where  wood  posts  with  rectangular  sections  are  used,  the  posts  shall  be  set  so  that  the  longest 
dimension is perpendicular to the rail.  

Posts shall be embedded a minimum of 1 m, or as shown on the Contract plans.  

Post holes shall be backfilled with Class C25 concrete tamped into place in layers not to exceed 100 
mm of compacted thickness, or as indicated on the Contract plans.  

Where the elevation of the top surface of a culvert or other similar installation prevents the placement 
of a post of the specified length, the posts shall be anchored in accordance with the details shown 
on the Contract plans. 

C

ONSTRUCTION

 

 

b.  Erection of Rail 

Rail elements shall be erected to produce a smooth, continuous rail paralleling the line and grade of 
the roadway surface or as shown on the Contract plans.  

Steel rail sections shall be galvanised per Sub-article d of Article 7.2.1.2. After galvanising, special 
detail holes may be cut in the field, only when necessary and approved by the Engineer. Any holes, 
nicks, gouges, or scratches in the railing’s galvanised surface shall be repaired per Paragraph 1 of 
Sub-article d of Article 7.2.1.2. 

Blocks shall be set so that their tops are level with the top of the post, ±13 mm, unless otherwise 
shown on the Contract plans. 

Bolts at expansion joints shall be located at the centre of the slotted holes. Rail plate splice joints 
shall lap in the direction of traffic. Splices shall be located at posts, and spaced at intervals of 7.6 m 
or less. Rail plates shall make contact over the entire area of the splice.  

When nested, W-beam or thrie-beam is specified and two sections of guardrail, 1 set inside the other, 
shall be installed. Inside and outside rail elements shall not be staggered.  

Galvanised rail plates shall be fastened to the posts with galvanised hardware of the size and kind 
shown in the Contract plans. Bolts shall be sufficiently long to extend 13 mm, or 2 threads, beyond 
the nuts, or longer, where required for adjustments. Bolts extending more than 50 mm beyond the 
nut shall be cut off so as to be less than 13 mm beyond the nut.  

Bolts shall be tightened per the manufacturer’s installation instructions and, except where otherwise 
required at expansion joints, shall be drawn tight. Bolts through expansion joints shall be drawn up 
as tight  as  possible  without  being tight  enough  to  prevent the rail  elements  from  sliding  past  one 
another longitudinally.  

Reflectorized  tabs  shall  be  installed  on  posts  at  the  locations  shown  on  the  Contract  plans  and 
spaced at a maximum interval of 11.5 m. Slotted part of the tab shall be installed under the mounting 
bolt head so that the reflectorized surface of the tab faces oncoming traffic. Exposed ends of the 
slotted part of the tab shall be bent up against and then over the top of the bolt head. 

Guardrail constructed under traffic shall be installed in the direction of traffic flow to constitute the 
least hazard to the public. 

c.  Wire Rope Installation 

Installation  of  the  cable  railing  shall  comply  with  the  manufacturer's  instructions  and  working 
drawings for the Project. 

Contractor shall install cable in continuous lengths. Before tightening bolts and finishing installation 
of  cables,  the  Contractor  shall  check  and  adjust  alignment.  Unless  the  Contract  plans,  particular 
specification  or  manufacturers  recommendations  specify  otherwise,  the  Contractor  shall  torque 
bolted connections from 60 to 70 Nm. Bolts shall extend at least 6 mm but not more than 25 mm 
beyond the nuts. 

Contractor shall use rigging screws to join railing ropes together and to create tension. No rope shall 
be longer than 154 m. Immediately in front of each anchorage, a 6 m long tail rope shall connect to 
the anchorage in the ground. Both ends of every rope shall have a threaded terminal of right-hand 
or left-hand thread as appropriate to ensure that rigging screws effective provide tension. Rope ends 
shall  insert  at  least  25 mm  into rigging  screws. A  tail  rope  with  right-hand thread  on  its  end  shall 
connect to the anchor. 

When  all  components  are  in  place,  the  Contractor  shall  turn  the  rigging  screws  to  tension  ropes 
uniformly to 25 kN.  Contractor shall not place backfill above the tops of concrete anchor footings 
before tensioning cables. 

Each anchor shall have a check rope that is 1.8 m long and 8 mm diameter with a galvanized thimble 
at one end and a fork terminal at the other. Such check ropes shall have a breaking load of at least 

C

ONSTRUCTION

 

 

39 kN when tested as an assembly. Each check rope’s thimble shall pass over the end of the tail 
rope and the fork terminal that is connected to the anchor. 

Owner shall accept equivalent galvanised wire rope with a minimum breaking strength of at least 
194 kN. 

d.  Terminal and Anchor Installation 

Assembly and installation of guardrail anchors and terminals shall include the following:  

 

Supervised  at  all  times  by  a  manufacturer’s  representative  or  an  installer  who  has  been 
trained  and  certified  by  the  manufacturer.  A  copy  of  the  installer’s  certification  shall  be 
provided to the Engineer prior to installation  

  As  shown  on  the  Contract  plans 

and  in  accordance  with  the  manufacturer’s 

recommendations 

Terminal  anchor  posts  shall  be  backfilled  with  concrete  unless  otherwise  shown  on  the  Contract 
plans.  Concrete  footings  shall  be  poured  against  moist,  undisturbed  earth.  Concrete  footing  tops 
shall be smooth trowelled to slope away from the post. Immediately after placing concrete footings, 
at least 100 mm of loose moistened earth free of clods or gravel shall be placed over the footing, or 
the  footing  shall  be  sprayed  with  an  approved  liquid  membrane-curing  compound,  per  Article 
4.3.13.2  of  Chapter  4,  Concrete  Works.  After  the  footing  has  cured,  excess  excavated  material, 
including earth on top of the footing, shall be removed.  

All excavation and backfilling required for installation of anchors shall be performed in accordance 
with Sections 2.4 and 2.5 of Chapter 2, Earth Works, of these standard specifications. Bolts shall be 
tightened to the tension specified by the manufacturer or the Contract plans. Anchor cables shall be 
tightened sufficiently to eliminate all slack. When tightening, the anchor cable shall be restrained to 
prevent twisting. 

Where the elevation of the top surface of a culvert or other similar installation prevents the placement 
of a post to the specified length, the posts shall be anchored in accordance with the details shown 
on the Contract plans. 

Foundation tubes used with wood breakaway posts shall be driven prior to installing the wood post.  

e.  Transitions 

Guardrail transitions to concrete barriers or other barrier systems shall be constructed in accordance 
with the details shown on the Contract plans. 

f.  Kerb 

Where the Contract plans call for kerb with guardrail or in the transitions, kerbs shall be installed per 
Section 7.5.  

g.  Shop Drawings 

Shop drawings shall be submitted by the Contractor to the Engineer for review and approval. Shop 
drawings shall be complete with all details necessary to fabricate and install the guardrail proposed 
for use in the works in accordance with the manufacturer’s recommendations. Additional drawings 
required by the Engineer shall be submitted by the Contractor for the Engineer

’s approval.  

h.  Guardrail Construction Exposed to Traffic 

Any section of beam guardrail that is removed for modification shall be replaced within 5 calendar 
days of the date the guardrail is removed. These operations shall be conducted in such a manner 
that fixed objects and beam guardrail posts shall be protected by the  Contractor from traffic at all 
times by attaching the rail elements and all associated hardware or by a method  approved by the 
Engineer. At the end of each day, guardrail sections having an exposed end toward oncoming traffic 
shall have a terminal end section bolted securely in place. 

C

ONSTRUCTION

 

 

i.  Access Control Gates 

Access control gates shall be placed to line and grade as shown in the Contract plans or per the 
direction of the Engineer. Gate posts shall be installed per Sub-article a of Article 7.2.1.3.  

j.  Removing Guardrail and Guardrail Anchors 

Guardrail end treatments shall be moved or removed in accordance with the Contract plans and as 
directed by the Engineer. Salvageable materials shall be handled as directed on the Contract plans 
or in the Particular Specifications. Unsalvageable materials shall be disposed of in accordance with 
applicable regulations.  

Removal of the guardrail shall include removal of all guardrail components, including the rail, cable, 
hardware, posts, transition sections, expansion sections, and terminal sections.  

Removal of guardrail anchors shall include removal of the anchor assembly in its entirety, including 
concrete bases, rebar, steel tubes and any other appurtenances in the anchor assembly.  

All  holes  resulting  from  the  removal  of  the  guardrail  posts  and  anchors  shall  be  backfilled  with 
granular material in layers no more than 150 mm thick and compacted to the approximate density of 
the adjacent material. Removed guardrail items shall become the property of the Contractor. 

Every effort to reuse suitable existing guardrails rather than dispose of them and purchase new units 
shall be made by the Contractor. Removal of existing guardrails shall be carried out as follows: 

1.  All guardrails, reflective plates, and end units shall be loosened  

2.  Posts shall be carefully dug out and the holes shall be filled and compacted  

3.  Hardware  and  reflectors  shall  be  placed  into  bags,  after  which  all  the  material  shall  be 

transported to a store approved by the Engineer and stored in groups by type 

Material intended for reuse shall be unpacked and inspected by the Engineer, who shall determine 
suitability for reuse. Reusable material shall then be stored separately from material that is deemed 
unsuitable for reuse.  

k.  Construct Guardrail from Salvage 

Salvaged guardrail, guardrail transitions, anchor assemblies, and other guardrail systems shall be 
constructed at the locations shown on the Contract plans in accordance with the specifications for 
new guardrail.  

If any salvaged materials are deemed unsuitable for reuse by the  Engineer, or if the quantities of 
salvaged materials are insufficient to complete the work, the Contractor shall furnish new materials 
in sufficient quantities to complete the work.  

Where new bolt holes in rail elements are required, the holes shall be made by drilling or punching. 
Flame-cut bolt holes shall not be permitted. Galvanisation shall be repaired per Paragraph 1 of Sub-
article d of Article 7.2.1.2. 

Guardrails, end units, and steel posts suitable for reuse shall be cleaned and regalvanized.  

Items designated to be reused that are lost, damaged, or destroyed as a result of the Contractor's 
operations shall be repaired or replaced by the Contractor at no additional cost to the Owner. Existing 
posts, blocks, rail elements, or hardware that are not required for guardrail reconstruction or that the 
Engineer deems unsuitable for reconstruction, shall be removed and disposed of as approved by 
the Engineer. 

l.  Raising Guardrail 

When raising guardrail anchors and guardrail terminals, the existing guardrail posts shall be raised 
to attain the height shown in the Contract plans, measured from the top of the rail to the finished 
shoulder  surface.  Material  around  each  post  shall  be  tamped  to  prevent  settlement  of  the  raised 
post.  

C

ONSTRUCTION

 

 

For  raising  all  other  guardrail,  the  existing  guardrail  posts  shall  not  be  raised  to  attain  the  new 
mounting height. Existing rail elements and blocks shall be removed from the guardrail post. New 
holes shall be drilled by the Contractor in the existing posts to accommodate the button-head bolts.  

Any existing posts and blocks that are unsuitable for reuse shall be removed and replaced by the 
Contractor, as directed by the Engineer. Voids from post removals shall be backfilled and compacted 
to the approximate density of the surrounding soil. A new guardrail post shall then be furnished and 
installed by the Contractor to provide the necessary mounting height. 

7.2.2 Impact Attenuator Systems 

7.2.2.1 

Description 

This work shall consist of furnishing, constructing, repairing, and removing permanent and temporary 
impact attenuator systems, as shown in the Contract plans. Attenuation devices shall be approved 
by the Engineer in advance of their use in the works.  

This work shall include the connection to a concrete barrier, bridge abutment, or a transition section 
identified  in  the  Contract  plans;  the  construction  of  a  steel  reinforced  concrete  pad  or  concrete 
backup; and anchorage to the pavement, if required by the 

manufacturer’s assembly and installation 

procedures. 

All impact attenuator systems accepted shall comply with the Test Level-3 (TL-3) as per National 
Cooperative Highway Research Program (NCHR) report 350 / AASHTO manual MASH (Manual for 
Assessing Safety Hard-

wares) crash test criteria all as per the Engineer’s recommendations. 

7.2.2.2 

Materials 

Materials  for  impact  attenuator  systems  shall  be  new,  except  undamaged  sand  barrel  impact 
attenuators that have been previously utilised, which may be used in a temporary impact attenuator 
array only if inspected and approved by the Engineer prior to use.  

Sand for inertial barrier systems shall not contain more than 5 % water by weight. Commercial grade 
urea shall be thoroughly mixed with the sand in an amount equal to 5 %, by weight, of the sand. 
Materials  shall  be  as  required  by  the  manufacturer  for  proper  installation  of  these  proprietary 
systems.  

7.2.2.3 

Construction Requirements 

Attenuation devices shall be placed at the locations shown on the Contract plans or as directed by 
the Engineer.  

Assembly  and  installation  of  all  attenuator  systems,  except  those  utilising  sand  barrels,  shall  be 
supervised at all times by either a manufacturer’s representative or an installer who has been trained 
and certified by the system manufacturer. If the supervision is provided by a trained installer, a copy 
of  the  installer  certification  shall  be  provided  to  the  Engineer  prior  to  installation.  Assembly  and 
installation shall be in accordance with the manufacturer’s recommendations.  

A complete set of replacement parts shall be provided by the Contractor on the jobsite for each type 
of temporary impact attenuator in use on the project and shall repair all damaged impact attenuators 
immediately.  

When installation of the attenuation device is complete, all trash shall be removed from its area, and 
the soil surface around it shall be graded to the elevation indicated on the Contract plans. When the 
Engineer determines that a temporary impact attenuator is no longer needed, then the Contractor 
shall remove that attenuator from the project. Removed equipment shall remain the property of the 
Contractor. 

Any  welding  required  shall  be  performed  in  accordance  with  the  requirements  of  the  American 
Welding Society (AWS) Structural Welding Code AWS D 1.1M. 

C

ONSTRUCTION

 

 

Attenuators shall be removed from existing locations and stockpiled or discarded as designated on 
the Contract plans or as directed by the Engineer. Salvageable units shall be cleaned and repaired 
before inspection by the Engineer and delivered to the Owner storeyards. Unsalvageable or excess 
materials shall be discarded in accordance with applicable regulations. 

7.3  Walls 

7.3.1 General 

This work shall consist of furnishing all materials and fabricating and installing walls at the locations 
and in accordance with the details shown on the Contract plans, the Particular Specifications, these 
Specifications, and as approved by the Engineer.  

All  walls  are  presumed  permanent  unless  otherwise  specified  in  the  Contract  plans.  Temporary 
retaining walls shall be identified as such in the Contract plans, and are defined as those walls and 
wall components constructed and removed or abandoned before the physical completion date of the 
work or as shown in the Contract plans.  

Areas  with  continuous  retaining  walls  shall  have  the  same  facing  design.  To  use  2  or  more  wall 
systems, the Contractor shall provide drawings for approval by the Engineer indicating the proposed 
design arrangement. 

Required pile or drilled shaft foundations shall be constructed in accordance with Chapter 17, Drilled 
Piles, and Chapter 18, Driven Piles, of these standard specifications, for drilled or driven piles or the 
pertinent standard. Rustication, colour coating, or other treatments shall be in accordance with the 
details shown on the Contract plans. 

When  the  Contract  plans  call  for  epoxy  coating  of  steel  earth  reinforcements,  all  steel  used  in 
concrete panels and coping, including connectors, dowels, stirrups, and reinforcing steel, shall be 
epoxy coated. 

7.3.1.1 

Submittals 

Shop  drawings  and  design  calculations  that  completely  describe  all  the  information  needed  to 
construct the wall elements and install the walls per Table 7-8 shall be submitted by the Contractor 
for review and approval. 

Table 7-8: Preparation, submittal, and review of submittals for walls 

Shop drawings and design calculations shall be:  

Prepared: 

 Under a lead 

structural 
Engineer

’s 

direction*  

 To scale 

 Per standard 

drafting procedures 

 So as to be legible

 

 With all terms 

defined

 

Submitted: 

  Enough in advance of need to 

allow for the review process, 
including rejection, revision, or 
resubmittal 

  In accordance with Contract 

requirements 

  With sufficient details to 

completely fabricate and install 
the element of work 

  On standard paper sizes, 

typically A1, A3, or A4

 

Reviewed: 

 In the order the Engineer 

receives them 

 In the sequence specified by the 

Contractor when several 
drawings or calculations are 
presented simultaneously or at 
the Engineer

’s discretion if no 

sequence is specified.  

 Within 14 calendar days for the 

first item, and within 14 
additional calendar days for each 
additional item submitted 
simultaneously

 

C

ONSTRUCTION

 

 

Shop drawings and design calculations shall be:  

* Lead structural Engineer shall have at least 10 years of experience, and/ or otherwise have a 

license to practice structural Engineering in their country of origin, and shall be approved by 
the Engineer.  

Contractor shall comply with all submittal requirements that are applicable to each wall and shall not 
begin wall construction activities, including access construction, excavation, and precast fabrication, 
until receiving the Engineer

’s approval of all submittals that are applicable for that wall. Approval of 

the Contractor

’s proposed wall construction details and methods shall not relieve the Contractor of 

its responsibility to construct the walls in accordance with the requirements of these Specifications. 

In  addition  to  the  submittals  described  in  the  following  subsections,  the  Contractor  shall  submit 
excavation  shoring  drawings  to  the  Engineer  for  approval,  in  accordance  with  Article  2.4.2.11  of 
Chapter  2,  Earthworks,  and  formwork  drawings  in  accordance  with  Section  1.20.8  of  Chapter  1, 
General Requirements. 

a.  Shop Drawings and Design Calculations Submittals 

For each wall, the Contractor shall submit to the Engineer for approval working drawings, details, 
and  design  calculations  that  provide  all  of  the  information  needed  to  fabricate  wall  elements  and 
install the wall in conformance with the Contract plans, these Specifications, and the direction of the 
Engineer.  

Any  particular  requirements  of  the  approved  detailed  specifications  for  any  approved  proprietary 
systems shall govern over conflicting or incompatible requirements contained within this section of 
the specifications.  

Work on an individual wall shall not commence until the Engineer has approved the required shop 
drawings and design calculations for that wall. Testing of soil nails or permanent ground anchors 
shall not commence until the Engineer has approved the load cell, jack, pressure gauge, and master 
pressure gauge calibrations. 

Shop drawings for each wall shall include, but not by way of limitation, the  Contractor

’s proposed 

methods and materials for all applicable items identified below:  

1.  Shapes and dimensions of wall elements 

2.  Construction sequence and method of forming precast wall elements  

3.  Material specifications 

4.  Size, quantity, and details of the following: 

i.  Reinforcing steel  

ii. 

Lifting hardware, with the manufacturer’s recommended safe working capacity, including 
support point locations 

iii.  Additional reinforcement provided at lifting and support locations 

iv.  Railing and coping  

v.  Pads, fillers, and filter fabric, with manufacturer identified 

vi.  Support footings 

5.  Joint and joint filler details 

6.  Surface finish details 

7.  Erection block outs  

8.  Numbered panel layout showing horizontal and vertical alignment of the walls with existing and 

proposed ground lines 

C

ONSTRUCTION

 

 

9.  Elevation view showing the following:  

i.  Elevation at the top of the wall, at all horizontal and vertical break points, and at least every 

15 m along the wall 

ii.  Elevations at the base of welded wire mats or the top of levelling pads and foundations, 

and the distance along the face of the wall to all steps in the welded wire mats, foundations 
and levelling pads 

iii.  Designation of the type of panel, block, or module  

iv.  Location of the original and final ground line 

v.  Length, size, and number of geogrids or mesh or strips, and the distance along the face 

of the wall to where changes in length of the geogrids or mesh or strips occur  

vi.  Length, size, and wire sizes and spacing of the welded wire mats and backing mats, and 

the distance along the face of the wall to where changes in length, size, and wire sizes 
and spacing of the welded wire mats and backing mats occur 

10.  Plan view showing the following:  

i.  Offset from the construction centreline to the face of the wall at all changes in horizontal 

alignment  

ii.  Limit of the widest module, geogrid, mesh, strip, or welded wire mat  

iii.  Centreline of any drainage structure or drainage pipe which is behind or passes under or 

through the wall 

iv.  Actual  lengths  proposed  for  the  reinforcing  layers  and  the  locations  of  each  product 

proposed for use in each of the reinforcing layers 

11.  General notes required for design and construction of the wall 

12.  All horizontal and vertical curve data affecting wall construction 

13.  Summary quantities of those items on the elevation sheet of each wall, including incidental 

items  

14.  Cross sections showing limits of construction. In fill sections, the cross section shall show the 

limits and extent of select granular backfill material placed above original ground 

15.  Limits and dimensions of reinforced soil volume 

16.  Contractor

’s proposed wall construction method, including proposed forming systems, types 

of equipment to be used, proposed erection sequence and details of how the backfill will be 
retained during each stage of construction 

17.  All details needed to do the following:  

i.  Incorporate or connect to coping, railing, drainage features, conduit, sign, signal, luminaire 

or other required elements  

ii.  Bend steel reinforcing bar, per Section 5.4.1 of Chapter 5, Reinforcing Steel. 

iii.  Construct foundations and levelling pads, including details for steps in the foundations or 

levelling pads, as well as allowable and actual maximum bearing pressures for AASHTO 
load groups I and VII  

iv.  Construct all modules and facing elements. Details shall show all dimensions necessary 

to  construct  the  element,  all  steel  reinforcing  bars  in  the  element,  and  the  location  of 
reinforcement element attachment devices embedded in precast units  

v.  Traffic or pedestrian barrier at the top of the wall, if shown in the Contract plans, including 

interaction with bridge approach slabs  

C

ONSTRUCTION

 

 

18.  Method and equipment used to support precast wall elements during storage, transporting, 

and erection  

19.  Erection sequence, including method for lifting panels, placing and adjusting panels to proper 

alignment and grade, and supporting panels during bolting, grouting, and backfilling operations 

20.  Levelling pad elevations, which may vary from the elevations shown on the Contract plans. 

Unless  otherwise  indicated,  at  least  300  mm  of  cover  from  the  top  of  the  levelling  pad  to 
finished grade shall be provided 

21.  Shop  drawings  for  all  structural  steel  wall  elements,  including  steel  soldier  piles  and 

permanent ground anchors  

25.  Rate of placing concrete so as to prevent cold joints, considering the wall thickness, height, 

and volume of concrete to be placed  

Design calculations for each wall shall include, but not by way of limitation, all items that apply to the 
following:  

1.  Calculations for precast wall elements  

2.  Calculations for the connection between the precast wall elements and the cast-in-situ footing  

3.  Calculations for modifications to the cast-in-situ footing details as shown in the Contract plans  

4.  Calculations for the range of heights and loading conditions on the Project  

5.  Calculations for internal and external stability as described in the Contract plans  

6.  Summary of all design parameters used  

7.  Material types, strength values, assumed allowable loads and loading combinations  

8.  Factor-of-safety parameters 

b.  Wall Access Plan Submittals 

If construction of a wall requires access for work activities, then the  Contractor shall submit to the 
Engineer  for  approval  a  wall  access  plan,  which  shall  include,  but  not  by  way  of  limitation,  the 
following:  

1.  Locations of access to the wall construction sites 

2.  Method,  materials,  and  equipment  used  to  construct  the  access,  remove  the  access,  and 

recontour and reseed the disturbed ground 

c.  Shaft Installation Plan Submittals 

For  construction  of  walls  with  shafts,  the  Contractor  shall  submit  a  shaft  construction  plan  to  the 
Engineer for approval at least 14 days in advance of the proposed start of work. Shaft installation 
shall not begin until the Engineer

’s approval of the shaft installation plan is received.  

Submittals shall comply with the applicable requirements of Chapter 17, Drilled Piles, and Chapter 
18, Driven Piles, of these standard specifications. 

d. 

Manufacturer’s Certificate of Compliance 

Unless  acceptance  of  materials  is  defined  otherwise  in  these  specifications,  the  Contractor  shall 
furnish to the Engineer 

a manufacturer’s certificate of compliance with each shipment of materials, 

certifying that the materials conform to the specified material requirements. A copy of all test results 
necessary to assure compliance with the  Specifications, shall be submitted to the Engineer along 
with each manufacturer’s certificate of compliance.  

7.3.1.2 

Shaft Foundations 

Shaft foundations shall comply with the requirements of Chapter 17, Drilled Piles, and Chapter 18, 
Driven Piles, of these standard specifications. 

C

ONSTRUCTION

 

 

7.3.2 Boundary Walls 

7.3.2.1 

Description 

This  work  constructs  boundary  walls,  also  called  perimeter  walls  or  privacy  walls,  including  the 
following different types:  

1.  Reinforced  concrete  walls  (refer  to  Chapter  4,  Concrete  Works,  of  these  Standard 

Specifications) 

2.  Precast post and panel walls, which use precast grooved posts with precast panels slid into 

the post grooves after the posts are erected, or use of a tilt-up-type panel construction where 
the posts are cast-in-situ after the panels are set upright  

3.  Reinforced posts and upper frame with concrete block infill and plastered decorative finish  

4.  Walls with openings having decorative aluminised grill panel  

Boundary walls, as addressed in this section of these standard specifications, are not retaining walls. 
Boundary  walls  that  are  required  to  retain  material  shall  be  constructed  as  retaining  walls  in 
accordance with Chapter 20, Earth Retaining Systems, of these Standard Specifications.  

Decorative lighting for boundary walls shall conform to the requirements of Particular Specifications.  

7.3.2.2 

Materials 

Concrete shall be of the compressive strength shown on the Contract plans and shall conform to the 
applicable  requirements  of  Chapter  4,  Concrete  Works,  unless  otherwise  shown  on  the  Contract 
plans. 

1.  Concrete for precast wall panels shall be Class C30/20.  

2.  Concrete for shafts shall be Class C30/20P.  

3.  Concrete Class C30/20W shall be used for shafts placed in water.  

4.  Concrete for trench, grade beam, or spread footing foundations shall conform to Class C30/20.  

Materials shall conform to the requirements of the Contract plans, as approved by the Engineer, and 
these  Specifications,  including  those  sections  specifically  noted  in  Table  7-9.  Other  materials 
required shall be as specified in the Particular Specifications. 

Table 7-9: Materials for boundary walls 

Material 

Specifications Requirements 

PCC  and  its  constituent  materials;  steel 
reinforcing  bar;  premoulded  joint  filler  and 
waterstops. 

Section 4.3 of Chapter 4, Concrete Works, and 
Section 5.3 of Chapter 5, Reinforcing Steel 

Bolts and nuts shall be stainless steel. 

ASTM F738M  

Paints. 

Chapter 24, Painting 

Gravel backfill. 

Section 2.5 of Chapter 2, Earthworks 

Pipe underdrains. 

Section  12.1.3  of  Chapter  12,  Stormwater 
Drainage 

Decorative wall finishes. 

Section 7.8  

 

 

 

 

 

 

 

Content      ..     42      43      44      45     ..