Kerb openings at driveways and sidewalk ramps shall be constructed by the Contractor as shown Formwork, expansion joints, curing, and finishing shall be completed in accordance with the 1. Surfaces shall be finished immediately after slip-forming 2. Foundation pavement shall be dry and cleaned of loose and deleterious material prior to slip- form kerb placement 3. Placing concrete on an unstable, saturated base will not be permitted. If required, the base shall be damped with water prior to placing concrete In constructing the slip-form work, the Contractor shall do the following: a. Consolidate concrete so as to be free of honeycomb b. Provide concrete of a consistency that will maintain the shape of the barrier, parapet, kerb, or gutter without support c. Minimise starting and stopping of the slip-form operation by ensuring a continuous supply of concrete. d. Provide a wire line or laser guided controls to maintain vertical and horizontal alignment of the slip-form machine e. Operate the slip-form machine within th e manufacturer’s recommended speed f. Provide rails or supports at the required grade instead of sensor controls, at the Contractor ’s option Curing shall conform to Article 4.4.2.5 of Chapter 4, Concrete Works. 7.5.3.5 Precast Kerb, Parapet and Barrier Units shall be precast in sections per the Contract plans and as directed by the Engineer. Unless the • By hydraulically pressing concrete • Per Section 4.4.8 of Chapter 4, Concrete Works Requirements for each casting method are described in the following subsections. Additional • No concrete barrier shall be shipped until test cylinders made of the same concrete and cured under the same conditions show the concrete has reached 30 MPa • No concrete kerb shall be shipped from the manufacturing plant prior to 21 days after manufacture, however, shorter period may be accepted, if approved by engineer, but shall not All barriers in the same project, except end sections and variable-length units needed for closure, Table 7-30: Tolerances for precast barrier Dimension Tolerance |