3.3.4 Cold Planning 

Cold planning shall be performed as shown on the plans or directed by the Engineer to areas which 
will receive an overlay. 

3.3.4.1  Surface Preparation 

Prior to cold planning begins, the Engineer will approve that the existing pavement surface is sound 
and it does not exhibit any structural failure.  Any structural failure based on the Engineer

’s judgment 

shall  be  removed  in  accordance  with  Section  2.3.2  of  Chapter  2,  Earthworks,  of  these  Standard 
Specifications.   

If the existing pavement will be overlaid, the Contractor shall profile the pavement as follows, unless 
otherwise directed by the Engineer. 

1.  Contractor  shall  remove  the  required  thickness  of  asphalt  by  means  of  cold  planning.  

Contractor is responsible for controlling dust to the approval of the Engineer. 

2.  Final  surface  elevation  of the  milled  surface  shall  not  vary  more  than  4 mm from  the final 

surface elevations in profile and cross-section. 

3.  Milled material shall be stockpiled off-site for future use by the department, if directed by the 

Engineer.  Otherwise, the removed asphalt shall become the property of the Contractor.  

3.3.4.2  Surface Preparation for Overlays/ Rehabilitation 

Contractor shall prepare the existing pavement as shown on the Contract plans for an application of 
overlay.  Preparation shall include, but not by way of limitation, all cleaning, scraping and performing 
various types of repairs necessary to correct structural failures, deterioration, drainage and grade 
elevations in compliance with lines, grades, thicknesses and typical sections shown on the Contract 
plans, or as required by field conditions, and shall be carried out as required herein or as directed 
by the Engineer. 

a.  Materials   

Materials  required  for  various  repairs  shall  be  in  accordance  with  the  requirements  of  applicable 
sections of these specifications. 

b.  Construction 

Before the application of an overlay, the existing pavement surface shall be swept clean of all dirt, 
loose and foreign matter by the use of hand brooms or mechanical sweepers of approved type in a 
manner approved by the Engineer.  All sand, mud, dust and other loose material so swept off shall 
then be disposed of in accordance with Section 2.3.2 of Chapter 2, Earthworks, of these Standard 
Specifications. 

Filling and compacting of ruts and depressions with wearing course material to the general level of 
the surface shall immediately follow the operation of cleaning the surface.   Contractor shall check 
the level of patch work with a straight edge and make corrections as required. 

When  directed  by  the  Engineer,  the  Contractor  shall  make  all  necessary  repairs  to  the  existing 
pavement surface (potholes, failed areas, depressed areas, utility cuts, cracks, or other damaged 
areas).   

Immediately prior to the placement of the overlay, tack coat material shall be applied to the areas to 
be resurfaced. 

Care shall be exercised to prevent spraying tack coat materials upon adjacent sidewalks, structures, 
plants  and  shrubbery,  adjacent  property  and  improvements,  and  any  other  improvements  and 
facilities  not  specifically  mentioned.    Any  of  the  above  mentioned  facilities  so  damaged  shall  be 
cleaned or replaced to the satisfaction of the Engineer at the expense of the Contractor. 

 

 

 

Contact  surfaces  of  kerbs,  gulleys,  inlets,  catch  basins,  manholes  and  other  structures  shall  be 
painted  with  a  thin  uniform  coating  of  tack  coat  material  immediately  before  asphaltic  material  is 
placed against them. Tack coat shall be carefully applied and in such a manner that the tack coat 
shall not show above the surface of the finished pavement, all in accordance with Section 3.4.2. 

In executing the construction of the single lift surface treatment, the Contractor shall adhere to the 
steps described above.  However, in left or right turning areas the following steps shall be followed, 
unless otherwise directed by the Engineer. 

1.  Comply with the applicable requirements of maintenance of traffic and related work, of these 

specifications. 

2.  Contractor shall remove completely the existing kerb, including haunching and blinding at the 

road  shoulder  or  median,  and  the  resulting  excavation  shall  be  filled  with  borrow  material 
compacted  to  95  %  maximum  dry  density  as  specified  in  Section  2.5.3  of  Chapter  2, 
Earthworks, of these Standard Specifications. 

3.  Cut the existing pavement to neat lines at a distance of 250 mm from the removed kerb edge 

of the pavement.  Remove the existing wearing and base courses in accordance with Section 
2.3.2  of  Chapter  2,  Earthworks,  of  these  Standard  Specifications.  Exposed  250  mm  of 
existing subgrade shall be prepared prior to placing asphaltic concrete overlays, as specified 
in Section 3.62.6 of Chapter 2, Earthworks, of these Standard Specifications 

4.  Subgrade area shall be compacted and prepared in compliance with lines, grades, thickness 

and typical sections shown on the Contract plans and as specified in Section 2.5.3 of Chapter 
2, Earthworks, of these Standard Specifications. 

5.  Prior  to  placement  of  permanent  pavement,  the  Contractor  shall  prime  coat  the  subgrade 

area  as  shown  on  the  Contract  plans  and  as  specified  in  Section  3.4.1.  Where  existing 
pavement  has  been  removed,  the  top  300  mm  of  subgrade  shall  be  compacted  to  95  % 
modified proctor density as specified in  Section 3.62.6 of Chapter 2, Earthworks, of these 
Standard Specifications. 

6.  Final surface of the subbase course shall be finished so that after final compaction and just 

prior to placement of base or pavement courses, the surface elevation shall not vary more 
than 10 mm from a five-meter straight-edge at any location.  Surface shall be completed to 
the above tolerance and approved by the Engineer prior to any work at a given location or 
placing an overlying course, all in accordance with Sub-article b of Article 3.2.2.3. 

7.  Place tack coat as directed by the Engineer on the sand-asphalt subbase course immediately 

prior to placing an asphaltic base course, or on the base course in those cases where the 
base course has been utilized by traffic prior to the placement of the wearing course, all in 
accordance with Section 3.4.2. 

8.  Construct new kerbs in accordance with Section 7.6.3 of Chapter 7, Incidental construction, 

of these Standard Specifications. 

9.  Place  and  compact  asphaltic  concrete  base,  thickness  of  160  mm  or  as  shown  on  the 

Contract plans, placed in the widened areas, in two lifts of 80 mm each, all in accordance 
with the requirements for Section 3.3.3. 

10. Place tack coat as directed by the Engineer immediately prior to placing any new asphaltic 

material over a previously placed asphaltic course, where the previous course has become 
“dirty” as the result of traffic using the surface, all in accordance with Section 3.4.2. 

11. Place and compact asphaltic concrete wearing course, 60 mm minimum thickness over the 

turn area in one lift unless otherwise shown on the Contract plans or directed by the Engineer, 
all in accordance with the requirements for 3.3.3. 

12. Place and compact asphaltic concrete wearing course, 40 mm minimum thickness, over the 

turning lanes and existing pavement in one lift unless otherwise shown on the Contract plans 
or directed by the Engineer, all in accordance with the requirements for Section 3.3.3. 

 

 

 

13. Install pavement markings in accordance with Chapter 8, Traffic markings and signs, of these 

Standard Specifications 

3.4  Bituminous Prime and Tack Coats 

3.4.1 Medium Cure Liquid Asphalt Prime Coat  

3.4.1.1  Description  

This work shall consist of furnishing and applying liquid asphalt prime coat to previously prepared 
and approved granular sub-base/ aggregate base courses or wet mix macadam prior to placement 
of hot mix overlay. Such work shall be performed as specified herein or as directed by the Engineer.

 

3.4.1.2  Materials  

a.  Liquid Asphalt 

Liquid asphalt shall be of the medium curing type MC-70 grade and shall comply with AASHTO M-
82 as modified by the Table 3-37. Application rate shall be between 0.6 and 1.0 kg/m

2. 

However the 

exact rate of application will be determined by the engineer following trials to be carried out by the 
contractor. 

 

Table 3-37:  Medium cure liquid asphalt 

Description 

MC-70 

Min. 

Max. 

Saybolt furol viscosity @ 50

 C,  sec. 

60 

120 

Flash point (tag open cut), 

 C 

38 

Distillation: 

Distillate (% of total distillate to 360

 C) 

To 225

 C 

To 260

 C 

To 315

 C 

 
 

20 
65 

 
 

20 
60 
90 

Residue from distillation to 360

 C, percent by volume 

55 

 

Tests on residue from distillation: 

Penetration 25

 C, 

100 g, 5 sec. 

Ductility, 25

 C, cm 

Solubility in Trichloroethylene, % 

Water, % 

 
 

120 
100 

99 

 
 

250 

 

0.2 

 

 

 

The surface to be prime coated shall be uniformly smooth and firm and true to the grades and cross-
section  shown  on  the  drawings  within  specified  tolerances,  and  so  maintained  throughout  prime 
coating. Prime coat shall not be placed on a soft, uneven base. When required, the surface to be 
primed shall be lightly bladed and compacted and the Engineer may instruct a light application of 
water to facilitate penetration. Priming will not be permitted when the surface is wet. 

Prime coat shall not be applied when the ambient temperature is less than 13 deg. C or during rain, 
fog, dust storms or other unsuitable weather. The application temperature for MC-70 liquid asphalt 
shall be between 50deg. C and 80 deg. C as approved by the Engineer. 

Traffic shall be kept off the prime coat until it has penetrated the subgrade or road base and fully 
cured. It should be left undisturbed for a sufficient period of time to allow adequate penetration of the 

 

 

 

prime coat or as otherwise directed by the Engineer. The required period of time for penetration of 
the prime coat shall be determined by site trials conducted by the contractor to allow a minimum of 
10mm of penetration of prime coat into the subbase, base or wet mix macadam course with no visible 
wet spots at the surface. 

The Contractor shall furnish and spread at his cost sufficient clean fine sand, of an approved quality, 
to blot up areas which show an excess of prime coat. 

The primed surface shall be maintained in a good, clean condition at all times until the next course 
is placed. Any surface irregularities or holes in the primed surface, however caused, shall be repaired 
and corrected to the Engineer's satisfaction. 

b.  Blotter Material 

Blotter material, if required, shall be clean natural sand and shall comply with the requirements of 
the specifications given in Paragraph 4 of Sub-article b of Article 3.3.2.5. 

3.4.1.3  Construction Requirements 

a.  Weather limitations 

Prime coat shall not be applied when the ambient temperature is less than 13

 C nor during rain, 

fog, dust-storms or other unsuitable weather. 

b.  Application Temperature 

Application temperature for the MC-70 liquid asphalt shall be between 60

 C and 85

 C as directed 

by the Engineer. 

c.  Equipment Required 

Equipment used by the Contractor shall include an asphalt distributor in accordance with Sub-article 
d  of  Article  3.3.3.1  as  well  as  a  power  broom  and  a  power  blower.    Power  broom  shall  be  self-
propelled  and  equipped with  a  cylindrical,  rotating  nylon  bristle  brush  of not  less than  760  mm  in 
diameter and not less than 1.8 m in length.  Brush shall be capable of being angled to the right and 
left with adjustable ground pressure.  Where necessary for the proper preparation of the surface, 
motor graders, rollers, water trucks, and other related equipment shall also be provided. 

d.  Surface Preparation 

Immediately  before  applying  the  prime  coat,  all  loose  dirt,  earth  and  other  objectionable  material 
shall be removed from the surface with a power broom of approved design and/or a power blower 
as required, and any ruts, soft spots or unacceptable irregularities in the surface shall be repaired in 
accordance with the instructions of the Engineer.  If the Engineer so requires, the surface shall be 
lightly  bladed  and  rolled  immediately  prior  to  the  application  of  the  prime  coat,  in  which  case 
brooming or blowing may not be required.  Engineer may direct that a light application of water be 
made  just  prior  to  the  application  of  liquid  asphalt  to  facilitate  penetration.    Priming  will  not  be 
permitted by the Engineer when there is free water present on the surface. 

e.  Method of Operation 

After  preparing  the  road  surface  as  above,  the  liquid  asphalt  shall  be  applied  by  means  of  the 
distributor  at  the  temperature  and  rate  directed  by  the  Engineer.    Hand-spraying  of  restricted, 
inaccessible areas is permitted, subject to the approval of the Engineer. 

Prime coat shall usually be applied to one half or one third of the road width at a time. When applied 
in two or more lanes, there shall be a 150 mm overlap of asphalt material along adjoining edges of 
the lanes.  It should be noted that no overlapping is allowed at the transverse joints and that thick 
paper shall be used at the joint to protect the previous application and the joining application shall 
begin  on  the  paper.    After  use,  the  paper  shall  be  removed  and  satisfactorily  disposed  of  by  the 
Contractor. Care shall be taken that the application of bituminous material at the junctions of spreads 

 

 

 

is  not  in  excess  of the  specified  amount.   Excess  bituminous  material  shall  be  removed from  the 
surface. 

Prime coat shall be uniformly applied with the distributor within a maximum of 48 hours preceding 
placement of asphaltic concrete paving.  Do not place plant mix bituminous courses until the prime 
coat has set.  

f.  Maintenance and Traffic 

Traffic shall not be permitted on the primed surface until the asphaltic material has penetrated and 
dried and, in the judgment of the Engineer, will not be picked up under traffic.  If it becomes necessary 
to permit traffic prior to that time, but in no case sooner than 24 hours after the application of the 
asphaltic material, blotter material shall be applied as directed by the Engineer and traffic shall be 
permitted to use the lanes so treated.  Blotter material shall be spread from trucks operated backward 
so that the wheels will not travel in uncovered wet asphaltic material.  When applying blotter material 
to an asphalt treated lane that adjoins a lane that has not been treated, a strip at least 200 mm wide 
along the adjoining edge shall be left devoid of blotter material in order to permit an overlap of asphalt 
material. 

Contractor shall maintain the primed surface in a good clean condition and prior to the application of 
the next course, any surface irregularities shall be corrected and all excessive blotter material, dirt 
or other objectionable materials shall be removed. 

3.4.2 Emulsified Asphalt Prime Coat 

3.4.2.1 Description 

This  work  shall  consist  of  furnishing  and  applying  emulsified  asphalt  prime  coat  to  previously 
prepared  and  approved  granular  subbase/aggregate  base  courses  or  wet  mix  macadam  prior  to 
placement of hot mix asphalt layer. This work shall be performed as specified herein or as directed 
by the Engineer. 

3.4.2.2 Materials 

Emulsified  asphalt  shall be  of  slow  setting type and  shall  comply  with the  following  properties  as 
shown in Table 3-40. Application Rate shall be between .8 l/m2 to 1.2 l/m2.However, the exact rate 
of application will be determined by the Engineer following trials to be carried out by the contractor: 

Table 3- 40 Emulsified Asphalt Prime Coat 

Property 

       Specification 

  Test Method 

Water content (%m/m) 

         42-46 

     ASTM D244 

 Saybolt Furol Viscosity @ 
50C

 

(sfs)

 

       

  10-35 

   ASTM D 7496 

Residue on Sieving %  

          <.10 

       
         ASTM D 6933 
 

     Particles >710 micron 
      Particles >150 micron 

           <.25 

Particle Charge 

        Positive 

       ASTM D244 

   *

Emulsified asphalt prime coat shall be kept in a tank with proper agitation facilities to keep it homogenous  

3.4.2.3 Construction Requirements 

The surface to be prime coated shall be uniformly smooth and firm and true to the grades and 
cross- section shown on the drawings within specified tolerances, and so maintained throughout 
prime coating. 

 Emulsified asphalt Prime coat shall not be applied when the ambient temperature is less than 
10C, or during rain, fog, dust storms or other unsuitable weather. The emulsified asphalt   can be 

 

 

 

applied cold, or it can be heated up to maximum temperature of 45C. and as approved by the 
Engineer. 

Traffic shall be kept off the prime coat until it has penetrated the subgrade or road base and fully 
cured. It should be left undisturbed for a sufficient period of time to allow adequate penetration of 
prime coat or as otherwise directed by the Engineer. The required  period of time for penetration of 
the emulsified asphalt  prime coat shall be determined by site trials  conducted by the contractor, 
which shall not be less than 6 hours to allow for a minimum of 8mm of penetration  into the 
subbase, base ,or wet mix macadam with no visible wet spots at the surface. 

The contractor shall furnish and spread at his own cost sufficient clean fine sand of an approved 
quality to blot up areas which shows an excess of prime coat. 

The primed surface shall be maintained in a good clean condition at all times until the asphalt 
course is placed. Any surface irregularities, or holes, in the primed surface, however caused shall 
be repaired and corrected to the Engineers satisfaction.  

3.4.3 Tack Coat  

3.4.3.1  Description 

This  work  shall  consist  of  furnishing  and  applying  slow  setting  emulsified  asphalt  tack  coat  to 
asphaltic  base  course,  an  existing road  surface, concrete  bridge  deck,  approach  slabs  and  other 
concrete  surfaces  prior  to  placing  asphaltic  concrete  wearing  course  in  accordance  with  these 
specifications and the Contract plans or as directed by the Engineer.

 

3.4.3.2  Material  

Emulsified  asphalt  shall  be  of  the  slow-setting  Cationic  or  Anionic  type  of  the  CSS-1h  or  SS-1h 
grades respectively. Emulsified asphalt CSS 1h shall be in accordance with AASHTO M208 and SS 
1h shall be in accordance with AASHTO M 140. 

Approved  emulsion  will  be  diluted  with  approximately  an  equal  quantity  of  water  and  thoroughly 
mixed as directed by the Engineer. Diluted emulsion shall be applied at a rate of 0.18 to 0.35 kg/m

2

unless shown otherwise on the Contract plans or as directed by the Engineer. 

Specific  gravity  of  asphaltic  material  shall  be  determined  by  ASTM  D3142  standard  which  shall 
establish the kilograms per liter based on the specific gravity at 15.5° C for the material furnished. 

3.4.3.3  Construction  

a.  Weather Limitations 

Tack coat shall not be applied when the ambient temperature is less than 13

 C nor during rain, fog, 

dust-storms or other unsuitable weather. 

b.  Application Temperature 

Application temperature for the diluted emulsified asphalt shall be between 10

 C and 60

 C or as 

directed by the Engineer. 

c.  Equipment required 

Equipment used by the Contractor shall include an asphalt distributor in accordance with Sub-article 
d  of  Article  3.3.3.1,  as  well  as  a  power  broom  and  a  power  blower.    Power  broom  shall  be  self-
propelled  and  equipped with  a  cylindrical,  rotating  nylon  bristle  brush  of not  less than  760  mm  in 
diameter and not less than 1.82 m in length.  Brush shall be capable of being angled to the right  

 

 

 

 

and left with adjustable ground pressure.  In addition, the Contractor shall supply and utilize efficient 
and approved equipment for diluting the emulsified asphalt with water. 

d.  Surface Preparation 

Full width of the surface to be treated shall be cleaned with a power broom or power blower to remove 
dust, dirt or other objectionable materials.  All fatty or unsuitable patches, excess cracks or joint filler 
and  all  surplus  bituminous  material  shall  be  corrected  in  accordance  with  the  instructions  of  the 
Engineer.  Surface shall be dry when treated. 

e.  Method of Operation 

Immediately after cleaning the surface, the diluted emulsified asphalt shall be applied by means of 
the distributor truck at the temperature and rate directed by the Engineer.  Hand spray of inaccessible 
areas is permitted, subject to the approval of the Engineer. 

Mixing and placing of the asphaltic material shall progress at a rate so that contamination of previous 
lifts by dust and dirt and/or loss of bond capability shall not occur.  If, in the opinion of the Engineer, 
loss of bond capability has taken place, an additional tack coat shall be applied to the surface of the 
previous lifts as directed by the Engineer. 

Surface of structures, kerbstones and other appurtenances adjacent to areas being treated shall be 
protected in such a manner as to prevent their being spattered or marred. 

After  application,  the  surface  shall  be  cured  prior  to  placement  of  asphalt  concrete.        Tack  coat 
surface shall be protected prior to placement of the asphalt concrete.   

Tack coat shall be uniformly applied with the distributor within 24 hours preceding the placement of 
the covering course. 

If the tack coat is unavoidably damaged by rain or dust, or paving operations delayed longer than 24 
hours,  it shall  be  allowed to  dry,  shall  be  cleaned  again  by  a  power  broom  or  power  blower  and, 
when directed by the Engineer, a subsequent light application of tack coat applied to the surface.  
No additional payment will be made by the department for this work. 

Where, in the opinion of the Engineer, a tack coat is not necessary between layers of freshly placed 
courses, he may by written direction eliminate the tack coat, in which case there will be no payment 
for tack coat for the areas concerned.  Any cleaning required in these areas shall be considered to 
be included in the overlaying asphaltic concrete course and no separate payment will be made. 

3.5  Bituminous Surface Treatment   

3.5.1 Single or Multiple Asphalt Surface Treatment 

3.5.1.1  Description 

This work consists of constructing a single or multiple asphalt surface treatment with aggregate or 
pre-coated aggregate.  This work also includes constructing an asphalt fog seal without aggregate

3.5.1.2  Material 

a.  Aggregates 

Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel. Use 
only one type of aggregate on a project.  Size, grade, and combine the aggregate fractions in mix 
proportions conforming to the following: 

1.  Los Angeles abrasion, AASHTO T 96: 40 % max. 

2.  Sodium sulfate soundness loss, AASHTO T 104:  12 % max. 

3.  Density, AASHTO T 19M:  1100 kg/m

3

 min. 

5.  Adherent coating on the aggregate, ASTM D 5711:  0.5 % max.

6.  Fractured faces, ASTM D5821:  75 % min.

7.  Flakiness index, BS 812: Part 10: Section 105.1.:  30 max

8.  Durability index (coarse), AASHTO T 210:  35 min.

9.  Durability index (fine), AASHTO T 210:  35 min.

10. Free from Clay lumps and friable particles, AASHTO T 112.

11. Free from organic or other deleterious material

Do not use lightweight aggregate according to AASHTO M 195. 

Grading  shall  be  per  designation  type  shown  on  the  Contract  plans  or  as  included  in  the  bills  of 
quantities, as approved by the Engineer and as described in Table 3-38. 

b.  Asphalt

Asphalt is designated as shown in AASHTO M 20 or M 226 for asphalt binder and AASHTO M 140
or M 208 for emulsified asphalt. 

Table 3-38:  Target value ranges for single and multiple course surface treatment aggregate 

gradation 

Sieve Size

 

Percent by  mass  passing designated  sieve 

(AASHTO  T  27

 

and AASHTO  T 11)

 

Grading  designation

 

A

 

B

 

C

 

D

 

E

 

F

 

37.5 mm 

100* 

25 mm 

90-100(3) 

100*

19 mm 

0-35(5) 

90-100(3) 

100*

12.5 mm 

0-8(3) 

0-35(5) 

90-100(3) 

100*

9.5 mm 

0-12(3) 

0-35(5) 

85-100(3) 

100* 

100*

4.25 mm 

0-12(3)

0-35(5)

85-100(3)

85-100*

2.36 mm 

0-8(3)

0-23(4)

75 µm 

0-1* 

0-1* 

0-1* 

0-1* 

0-1* 

0-10*

*Statistical procedures do not apply.
(X)  Allowable deviations (±) from the target values

c.  Submittals

Submit the following information and samples for approval at least 21 days before placement: 

1.  Aggregate  samples:    35  kg  from  each  stockpile  produced  and  the  gradation  range

represented by each 

2.  Aggregate gradation target values:  Proposed percentage of each stockpile to be used and

the proposed target value for each sieve size. 

3.5.1.3  Application temperatures 

Apply asphalt at temperatures according to construction requirements 

a.  Equipment

Furnish equipment as follows: 

1.  Asphalt distributor

i.  Capable of heating asphalt evenly

ii.  Adjustable full circulation spray bar to 4.6 m width

iii.  Positive  controls  including  tachometer,  pressure  gauge,  volume  measuring  device,  or

calibrated tank to uniformly deposit asphalt over the full width within 0.08 liter per square 
meter of the required rate 

iv.  Thermometer for measuring the asphalt temperature in the tank

2.  Asphalt samples:  Two 1-liter samples of asphalt binder or emulsified asphalt from the same

source and of the type to be used for the surface treatment 

3.  Spread rates:  Proposed spread rate for the aggregate and asphalt material.

Table 3-39:  Asphalt application temperatures 

 degrees C 

Type and grade of asphalt 

Temperature ranges 

minimum - maximum 

Spraying 

temperatures 

Mixing temperatures a 

Cut-back asphalt 

MC-30

RC or MC-70 

RC or MC-250 

RC or MC-800 

RC or MC-3000 

30  - 

b

 

50  -  

b

 

75  - 

b

 

95 -  

b

 

110 - 

b

 

60   -  80

c

 

75   -  100

c

 

80   -  115

c

 

Emulsified asphalt 

RS-1 

RS-2 

MS-1 

MS-2, MS-2h 

HFMS-1, 2, 2h, 2s 

SS-1, 1h, CSS-1, 1h CRS-1 

CRS-2 

CMS-2, CMS-2h 

20  -  60 

50  -  85 

20  -  70 

20  -  70 

20   -   70

d

 

50  -  85 

60  -  85 

40  -  70 

20  -  70 

20  -  70 

10  -  70 

20  -  70 

50  -  60 

Asphalt Binder All grades 

180 max 

180 max 

a

  Temperature of mix immediately after discharge. 

b  

Maximum temperature at which fogging or foaming does not occur. 

c

  Temperature may be above flash point.  Take precautions to prevent fire or 

explosion. 

d

  For fog seals and tack coats. 

4.  Rotary power broom

i.  Self-propelled

 

 

 

ii.  Capable of controlling the vertical broom pressure 

5.  Pneumatic-tire  rollers.    Furnish  a  minimum  of  two  pneumatic-tire  rollers  both  with  the 

following capabilities: 

i.  Self-propelled 

ii.  Minimum compacting width 

– 1.5 m 

iii.  Gross weight adjustable within the range of 3.5 to 6.5 kg per mm of compaction width 

6.  Aggregate spreader 

i.  Self-propelled 

ii.  Minimum of 4 pneumatic tires on 2 axles 

iii.  Positive controls to uniformly deposit the aggregate over the full width of asphalt within 10 

% by mass of the required rates 

7.  Other equipment:  Other equipment of proven performance may be used in addition to or in 

lieu  of  the  specified  equipment  when  approved  by  the  Engineer.    Provide  two-way 
communication between the asphalt distributor and the aggregate spreader if the roadway 
alignment does not permit visual contact. 

b.  Surface Preparation 

On existing asphalt surfaces, ensure that the surface is dry.  Immediately before placing the layer, 
remove loose dirt and other objectionable material from the surface by approved methods.  Fog seal 
patches using a slow setting emulsion diluted with equal part water.  Apply the diluted emulsion at a 
rate of 0.65 liters per square meter. 

On existing aggregate surfaces, prime the surface according to Section 3.4.1.  Allow the primed surface 
to cure at least 5 days for cutback asphalt or 24 hours for asphalt emulsions.  Ensure that the primed 
surface is dry for surface treatments using asphalt binder or slightly damp for surface treatments using 
emulsified asphalt. 

c.  Weather Limitations 

Apply surface treatments with aggregate only when ambient air and surface temperatures are above 
16

 C and rising, when the weather is not foggy or rainy, and when rain is not anticipated for at least 

24 hours after application. 

Apply fog seals only when the ambient air and surface temperatures are above 10

 C and rising, 

when the weather is not foggy or rainy, and when rain is not anticipated for at least 24 hours after 
application. 

Complete all surface treatment applications 2 hours before sunset. 

d.  Production Start-up Procedures for Surface Treatments  

At least 10 days before the start of constructing all surface treatments containing aggregate, arrange 
for a pre-surface treatment conference.  Coordinate attendance with the Engineer and any applicable 
subcontractors.  Be prepared to discuss or submit the following: 

1.  Proposed schedule of operations 

2.  List of all equipment and personnel to be used in the production and construction of the work 

3.  Proposed traffic control plan 

4.  Establish

 

minimum  frequency  schedule  for  process  control  sampling  and  testing  (to  be 

performed by the Contractor) 

5.  Discuss asphalt and aggregate application procedures 

6.  Discuss spill prevention and safety contingency plan 

 

 

 

7.  Provide 7 days advance notice before constructing all asphalt surface treatments containing 

aggregate.  Also use these start-up procedures when resuming production after termination 
due to nonconforming work 

On the first day of placement of each surface treatment layer, or whenever there is a change in the 
surface texture or aggregate gradation, construct a 150-meter control strip that is one-lane wide. 

Construct  the control  strip  using  material,  lay-down,  and  compaction  procedures  intended for  the 
remainder of the surface treatment.  Cease production after construction of the control strip until the 
material and the control strip are evaluated and accepted. 

Acceptable control strips may remain in place and will be accepted as a part of the completed surface 
treatment. 

Repeat the control strip process until an acceptable control strip is produced. 

e.  Asphalt Application 

Calibrate  the  asphalt  distributor  spray  bar  height,  nozzle  angle,  and  pump  pressure  and  check 
longitudinal  and  transverse  spread  rates  weekly  according  to  ASTM  D  2995.    If  different  asphalt 
distributors are used, calibrate each before use on the project.  Ensure that the length of the spread 
is no more than can be covered with aggregate immediately after application. 

Protect the surfaces of nearby objects to prevent spattering or marring.  Spread building paper on 
the  surface  for  a  sufficient  distance  from  the  beginning  and  end  of  each  application  so  the  flow 
through the distributor nozzles may be started and stopped on the paper. 

Engineer  will  approve  the  exact  application  rate,  temperature,  and  area  to  be  treated  before 
application and may make adjustments for variations in field conditions.  Apply the asphalt uniformly 
with an asphalt distributor.  Move distributor forward at the proper application speed at the time the 
spray bar is opened.  Use care not to apply excess asphalt at the junction of spreads. 

Correct skipped areas or deficiencies.  Remove and dispose of paper or other material used. 

f.  Aggregate Application   

When using asphalt binder, the aggregate surface should be dry.  When using emulsified asphalt, 
the aggregate surface should be moist. 

Engineer will approve the exact application rate and area to be treated before application.  Apply the 
aggregate uniformly with an aggregate spreader immediately after the asphalt is applied.  Operate 
aggregate spreader so the asphalt is covered with the aggregate before wheels pass over it.  During 
part-width construction, leave uncovered a strip of sprayed asphalt approximately 150 mm wide to 
permit an overlap of asphalt material. 

Immediately  correct  excesses  and  deficiencies  by  brooming  or  by  the  addition  or  removal  of 
aggregate until a uniform texture is achieved.  Use hand methods in areas not accessible to power 
equipment. 

When pre-coated aggregates are used, they may be mixed on the job or at a central mixing plant.  
Uniformly coat the aggregate with 1.0 to 2.0 % residual asphalt, by weight of aggregate.  Maintain 
the  flow  qualities  of  the  pre-coated  aggregate,  so  it  is  satisfactorily  spread  with  an  aggregate 
spreader. 

Operate rollers at a maximum speed of 8 km/hr.  Do not permit the aggregate to be displaced by 
pickup  or  sticking  of  material  to  the  tire  surface.    Sufficiently  roll  the  surface  to  uniformly  and 
thoroughly bond the aggregate over the full width.  Complete rolling within 1 hour after the asphalt is 
applied to the surface. 

g.  Single-Course Surface Treatment  

A  single-course  surface  treatment  consists  of  applying  asphalt  material  onto  an  existing  surface 
immediately followed by a single, uniform application of aggregate.  Apply the asphalt and aggregate 

During the initial 45  minutes after completion of rolling, limit the traffic speeds to 15 km/hr.  Limit 
traffic speeds to 30 km/hr for 24 hours. 

Lightly broom the aggregate surface on the morning after construction.  Maintain the surface for 4 
days  to  absorb  any  free  asphalt  and  by  repairing  areas  deficient  in  aggregate.    Sweep  excess 
material from the surface using a rotary power broom when the temperature is less than 24 

C.  Do 

not displace embedded material. 

Table 3-40  Quantities of material for single-course surface treatment 

Designation

 

Nominal maximum 

size of aggregate

 

Aggregate 

gradation

(a)

 

Estimated 

quantity of 

aggregate 

(b)

kg/m

2

Estimated 

quantity of 

emulsified 

asphalt

(c)

 

L/m

2

 

Estimated 

quantity of 

asphalt 

binder

(c)

 

L/m

2

 

1A 

19.0 mm 

22 

– 27 

1.8 

– 2.5 

1.2 

– 1.7 

1B 

12.5 mm 

14 

– 16 

1.4 

– 2.0 

0.9 

– 1.4 

1C 

9.5 mm 

11 

– 14 

0.9 

– 1.6 

0.6 

– 1.1 

1D 

4.75 mm 

– 11 

0.7 

– 1.0 

0.5 

– 0.8 

1E 

Sand 

– 8 

0.5 

– 0.8 

0.4 

– 0.7 

(a)

 See Table 3-38 for aggregate gradations.

(b)

  Aggregate  masses  are for  aggregates  having a  bulk  specific  gravity  of  2.65,  as  determined  by

AASHTO T 84 and T 85.  Make proportionate corrections when the aggregate furnished has a 
bulk specific gravity above 2.75 or below 2.55. 

(c)

 Adjust the asphalt content for the condition of the road.

Table 3-41:  Quantities of material for double course surface treatments 

Designation 

(Thickness) 

Nominal 

maximum 

size of 

aggregate 

Aggregat

gradation 

(a)

Estimated 

quantity of 

aggregate 

(b)

 

kg/m

2

 

Estimated 

quantity of 

emulsified 

asphalt

(c)

 

L/m

2

 

Estimated 

quantity of  

asphalt 

Binder

(c) 

L/m

2

 

2A (12.5 mm) 

1

st

 Application 

9.5 mm 

14 

– 19 

0.9 

– 1.4 

0.5 

– 1.0 

2

nd

 

Application 

4.75 mm 

– 8 

1.4 

– 1.8 

0.8 

– 1.3 

2B (16.0 mm) 

1

st

 Application 

12.5 mm 

16 

– 22 

1.4 

– 1.8 

0.8 

– 1.3 

2

nd

 

Application 

4.75 mm 

– 11 

1.8 

– 2.3 

1.1 

– 1.5 

2C (19.0 mm) 

1

st

 Application 

19.0 mm 

22 

– 27 

1.6 

– 2.3 

1.0 

– 1.5 

2

nd

 

Application 

9.5 mm 

11 

– 14 

2.3 

– 2.7 

1.5 

– 1.9 

(a)

 See Table 3-38 for aggregate gradations.

(b)

 Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84

 

and T 85.

Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55. 

 Adjust the asphalt content of the first application for the condition of the road.

h.  Double and Triple-Course Surface Treatment

Double-  and  triple-course  surface  treatments  consist  of  applying  multiple  layers  of  asphalt  and 
aggregate.  Apply each asphalt and aggregate layer according to the approximate rates shown in 
Table 3-41 and Table 3-42.  Determine the exact rates based on approved control strips. 

No wait is required between surface treatment applications when using an asphalt binder.  Wait at 
least 24 hours between applications when using emulsified asphalt. 

Table 3-42:  Quantities of material for triple-course surface treatments 

Designation 

(thickness) 

Nominal 

maximum 

size of 

aggregate 

Aggregate 

gradation

(a)

 

Estimated 

quantity of 

aggregate 

(b)

 

kg/m

2

 

Estimated 

quantity of 

emulsified 

asphalt

(c) 

L/m

2

 

Estimated 

quantity of 

asphalt binder

(c) 

L/m

2

 

3A (12.5 mm) 

1

st

 Application 

9.5 mm 

14 – 19 

0.9 – 1.4 

0.5 – 1.0 

2

nd

 Application 

4.75 mm 

5 – 8 

1.1 – 1.6 

0.7 – 1.2 

3

rd

 Application 

Sand 

5 – 8 

0.9 – 1.4 

0.5 – 1.0 

3B (16.0 mm) 

1

st

 Application 

12.5 mm 

16 – 22 

0.9 – 1.4 

0.5 – 1.0 

2

nd

 Application 

9.5 mm 

8 – 11 

1.4 – 1.8 

0.8 – 1.3 

3

rd

 Application 

4.75 mm 

5 – 8 

0.9 – 1.4 

0.5 – 1.0 

3C (19.0 mm) 

1

st

 Application 

19.0 mm 

19 – 25 

1.1 – 1.6 

0.7 – 1.2 

2

nd

 Application 

9.5 mm 

11 – 14 

1.4 – 1.8 

0.8 – 1.3 

3

rd

 Application 

4.75 mm 

5 – 8 

1.1 – 1.6 

0.7 – 1.2 

(a)

 See Table 3-38 for aggregate gradations.

(b)

Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined

by AASHTO T 84 and T 85.  Make proportionate corrections when the aggregate furnished 
has a bulk specific gravity above 2.75 or below 2.55. 

(c)

 Adjust the asphalt content of the first application for the condition of the road.

i.  Acceptance

See Table 3-43 for sampling and testing requirements. Asphalt binder, and emulsified asphalt and 
aggregate will be evaluated under Article 3.5.1.2. 

Table 3-43:  Sampling and testing requirements 

Material or 

product 

Type of 

acceptance 

Characteristic 

Test methods 

specifications 

Sampling 

frequency 

Point of 

sampling 

Split 

sample 

Report 

time 

Aggregate 
surface 
treatment 
source 
quality 

(a)

 

Measured 
and tested 
for 
conformance 

LA abrasion 

AASHTO T96 

1 per type 
and source 
of material 

Source of 
material 

Yes, when 
requested 

Before 
using 

Sodium sulfate 
soundness 

AASHTO T104

 

  1 per type 

and source 
of material 

Source of 
material 

Yes, when 
requested 

Before 
using 

Fractured 
faces 

ASTM D5821 

1 per type 
and source 
of material 

Source of 
material 

Yes, when 
requested 

Before 
using 

Flat and 

ASTM D4791 

1 per type 

Source of 

Yes, when  Before 

 

 

 

Material or 

product 

Type of 

acceptance 

Characteristic 

Test methods 

specifications 

Sampling 

frequency 

Point of 

sampling 

Split 

sample 

Report 

time 

elongated 

and source 
of material 

material 

requested 

using 

Durability 
index (coarse 
and fine) 

AASHTO T210 

1 per type 
and source 
of material 

Source of 
material 

Yes, when 
requested 

Before 
using 

Clay lumps 
and friable 
particles 

AASHTO T112 

1 per type 
and source 
of material 

Source of 
material 

Yes, when 
requested 

Before 
using 

Aggregate 
surface 
treatment 
aggregate 

(a)

 

Statistical 

Gradation 

AASHTO  T27 
and T11

 

 

1 per 750 t 

Production 
belt or 
spreader 

Yes 

24 
hours 

Measured 
and tested 
for 
conformance 

Fractured 
faces 

 

ASTM D5821

 

 

1 per 750 t 

Production 
belt or 
spreader 

Yes 

24 
hours 

Liquid limit 

(b)

 

AASHTO T89

 

 

1 per 750 t 

Production 
belt or 
spreader 

Yes 

24 
hours 

Asphalt 
binder

(c)

 or 

emulsified 
asphalt

(c)

 

Measured 
and tested 
for 
conformance 

Quality 

AASHTO M 20  
or M 226 for 
asphalt binder 

AASHTO M 
140 or M 208 
for emulsified 
asphalt 

1 per 
tanker truck 
including 
trailer 

Point of 
shipment 
delivery 

Two 1-litre 
samples 

(a)

 Applies to each aggregate grade furnished.  

(b)

 For blotter material only.  

(c)

Applied to each asphalt 

material furnished. 

3.5.2   Micro Surfacing Specifications  

Micro Surfacing is a cold mix blend of high quality aggregates, polymer modified emulsions, water 
and mineral fillers mixed according to a predetermined mix design from a laboratory. 

It is applied to existing, higher volume, heavy traffic roads and highways that are still in fair to good 
condition, as a means of a cost effective preventative maintenance. It can reduce deterioration by 
sealing, prevents further oxidization, corrects raveling and provides or replaces a high degree of skid 
resistance.  It  can  also  correct  wheel  rutting,  (up  to  38mm  thick)  or  re-profile  a  road.  It  has  a  life 
expectancy exceeding seven years. 

It  is  applied  to  existing  pavements  using  a  specialized  micro  box,  (more  comparable  to  a  paver 
screed than a slurry box) which is connected to the micro mixing unit, as shown on the right. The 
micro box is variable width, allowing total coverage of a single lane in one pass. 

Crews ahead of the unit set up traffic control, and sweep the road before applying the micro surface. 
Operators  of  the  units  monitor  the  mixing  and  application.  After  a  short  curing  time  traffic  will  be 
allowed to resume use of the freshly rehabilitated lane. 

There are 3 different classes of Micro Surfacing, each using different size aggregates: 

1.  Type I: (fine aggregate) Recommended for Maintenance work. 

Recommended application rates are 4.5 - 6.5 kg/ m

2

 

2.  Type II: (6.4mm aggregate) Recommended for Urban and Residential Streets and Airport 

Runways. Recommended application rates are 5.4-10.8 kg/ m2 

3.  Type III: (9.5mm aggregate) Recommended for highways and wheel ruts. 

Recommended application rates are 8.1-16.3 kg/ m2 

Description 

The Contractor shall furnish all labour, equipment, material, supplies, signage,  traffic control, and 
other incidentals necessary to provide Micro Surfacing. Micro Surfacing shall consist of a mixture of 
an approved polymer-modified emulsified asphalt, mineral aggregate, water, and specified additives, 
proportioned, mixed and uniformly spread over a properly prepared asphalt surface. The completed 
Micro Surfacing shall leave a homogeneous mat, adhere firmly to the prepared surface, and have a 
skid-resistant surface texture throughout its service life. 

3.5.2.2  

Materials 

a.  Emulsified Asphalt Material

The emulsion for Micro Surfacing shall be Emulsified Asphalt grade (CQS-1P) conforming to ASTM 
D 2397 and AASHTO M 208.  The modified emulsion shall contain a minimum of 3% polymer, SBR 
latex, or natural latex by weight. 

Table 3-44:  Emulsified asphalt material requirements 

Test on Emulsion 

Minimum 

Maximum 

AASHTO Test 

Viscosity, Say bolt Furol, 25o C,s 

15 

100 

T-59

Storage Stability Test, One day, % 

T-59

Particle Charge Test 

Positive 

Sieve Test, %(a) 

0.1 

T-59

Distillation: 

Oil distillate, by volume, % 

.5 

T-59

Residue, % 

62* 

T-59

Test on Residue from Distillation: 

Penetration, 25o C, 100g, 5s 

40 

90 

T-49

Ductility, 25o C, 50 mm / sec 

50 

T-51

Solubility in Trichloroethylene, % 

97 

T-44

Softening Point, Ring-and-Ball, C 

57.2 

T-53

*The standard distillation procedure shall be modified as follows:

The temperature on the lower thermometer shall be brought slowly to 175

o

 C ±5

o

 C and maintained 

at this point for 20 minutes. The total distillation shall be completed in 60 ±5 minutes from the first 
application of heat. 

b.  Aggregate

The  aggregate  shall  consist  of  manufactured  granite  crusher  fines.  The  smooth  textured  crusher 
fines shall have less than 1.25% water absorption. The aggregate shall be grey in colour and clean 
and free from organic matter, other deleterious substances and clay balls. 

Oversized granular material and/or presence of clay balls will require the project to be stopped and 
shall meet the following requirements: 

Table 3-45:  Gradation Table 

– Aggregate (percent passing) 

Type I 

Type II 

Type III 

Tolerance 

9.50 mm 

100 

100 

4.76 mm 

100 

90-100

70-90

+ or - 5%

2.38 mm 

90-100

65-90

45-70

+ or - 5%

1.19 mm 

60-90

45-70

28-50

+ or - 5%

0.60 mm 

40-65

30-50

19-34

+ or - 5%

0.30 mm 

18-30

7-18

+ or - 4%

0.15 mm 

10-21

7-18

+ or - 3%

0.075 mm 

10-20

5-15

5-15

+ or - 2%

Resistance to Degradation 

(ASTM C131grading D) 

15% maximum loss 

Soundness of Aggregate 

(ASTM C88) 

10% maximum loss 

Sand Equivalent Value 

(ASTM D2419A) 

65 minimum 

LA Abrasion 

(AASHTO T96) 

20% maximum loss 

c.  Mineral Filler

Cement, or other approved filler meeting the requirements of AASHTO M 17 or ASTM D242 shall 
be used if required by the mix design. They shall be considered as part of the dry aggregate. 

d.  Water

All  water  used  shall  be  potable  and  free  of  dissolved  materials  which  may  affect  the  mix 
characteristics or finished characteristics of the product. Filler shall be of the specific type specified 
in the mix design. 

e.  Additives

Additives may be used to accelerate or retard the break-set of the Micro Surfacing or to improve the 
resulting finished surface. The use of additives in the Micro Surfacing mix (or individual materials) 
shall  be  made  initially  in  quantities  predetermined  by  the  mix  design  with  field  adjustments,  if 
required, after approval by the Engineer. 

3.5.2.3  Micro Surfacing Mix Design Specifications 

Before work begins, the Contractor shall submit a mix design covering the specific materials to be 
used on the project. The manufacturer of the polymer modified emulsion shall develop the job mix 
formula and present certified test results for the Contractor's approval. Compatibility of the aggregate 
and polymer modified emulsified asphalt shall be certified by the emulsion manufacturer. The mix 
design shall be in accordance with the ISSA TB-136 Wet Track Abrasion Loss, Six Day Soak with a 
maximum loss of 807.4 grams/m

2

. The emulsion supplier shall also provide a base line of emulsion 

to  the  Owner  for  testing  of  latex  percentages.  The  Micro  Surfacing  mixture  shall  meet  the 
specifications shown in Table 3-46. 

Table 3-46:  Micro Surfacing Mixture specification 

ISSA TEST NO. 

DESCRIPTION 

SPECIFICATION 

ISSA TB-113 

Mix Time at 23.9°C 

Controllable to 120 seconds minimum 

ISSA TB-114 

Wet Stripping 

Pass (90% Minimum) 

ISSA TB-139 

Wet Cohesion 

 

 

 

 

 

 

 