labor shall be used so that there is continual production and distribution of the asphalt course being 
constructed.  Intermittent or “STOP & GO” type of operations will not be permitted by the Engineer. 

Equipment approved for use shall not be removed from the site without the approval of the Engineer. 

Contractor shall furnish the Engineer with the manufacturer's catalogues, specifications and other 
published data for the equipment and machinery he proposes to use. 

a.  Mixing Plant  

All plants used by the Contractor for the preparation of asphalt hot mixes shall comply with all the 
requirements of Paragraph  1 of  Sub-article (a) of Article  3.3.3.1.  In addition,  batch mixing plants 
shall comply with the requirements of Paragraph 2 of Sub-article (a) of Article 3.3.3.1. 

1.  Requirements for all Plants 

Automatic Operation   

Plant shall be designed, coordinated and operated so as to continually produce asphalt mix 
within  the  job  mix  tolerances  specified.  Plant  shall  be  equipped  and  operated  so  that  the 
proportioning of the hot aggregate, commercial filler and bitumen, together with the dry and 
wet mixing cycles, are all controlled automatically.  Positive interlock shall be provided so that 
proportioning,  mixing  and  discharge  are  accomplished  by  one  operation  without  manual 
control of the separate phases. 

Cold Feed System   

Plant shall include a sufficient number of cold storage bins so that there is at least one bin for 
each  different  stockpile  of  material  being  used.    Intermixing  of  material  from  different 
stockpiles in one bin or on the ground prior to putting into the bin is prohibited.  Cold bins and 
loading equipment used shall be compatible to prevent overflow between bins. Baffle plates 
shall also be used between bins to prevent overflow of one bin into another. Each cold bin 
shall  include  an  accurate  means  for  continuously  feeding  the  required  amount  of  mineral 
aggregate so that uniform production shall be approved by the Engineer and shall be checked 
and calibrated as often as he may deem necessary to ensure its continued accuracy. Change 
of settings shall be made only with the approval of the Engineer. 

Drier   

A drier of satisfactory design shall be provided.  Drier shall be capable of uniformly drying 
and  heating  the  aggregate  to  the  moisture  and  temperature  required  without  leaving  any 
visible unburned oil or carbon residue on the aggregate when discharged from the drier. 

Dust Collector 

Plant shall be provided with a dust collector designed to waste, or to return in a constant and 
uniform flow to the hot elevator, all or part of the material collected.  Prior to permitting the 
return of such collected dust, the Engineer will examine its characteristics in relation to the 
mix requirements and will designate the quantity to be returned. 

Plant shall have a screen cover and such additional housings and emission control equipment 
as  may  be  necessary  to  ensure  the  proper  control  of  dust  in  accordance  with  all  local 
regulations relating to control of dust. 

Screens 

Plant  screens  shall  be  capable  of  screening  all  aggregates  to  the  specified  sizes  and 
proportions.  They shall have capacities equal to or greater than the maximum rated capacity 
of the plant.  Screens shall be placed directly above the storage bins for the heated aggregate 
and shall receive the material coming from the drier.  They shall have an operating efficiency 
such that the aggregate deposited in any bin shall not contain more than 10 % of oversize or 
undersize  material.    This  screen  tolerance  shall  not  invalidate  the  job  mix  tolerances 
specified. 

 

 

 

Hot Bins 

Plant shall include at least three storage bins for hot aggregate of sufficient size to supply the 
pugmill when it is operating at full capacity.  They shall be arranged to ensure separate and 
adequate  storage  of  appropriate  fractions  of  the  aggregate.    Each  compartment  shall  be 
provided with an overflow pipe that shall be of such size and at such location as to prevent 
any backing up of material into other bins or against the screens.  Bins shall be so constructed 
that  samples  can  be  readily  obtained  therefrom.    An  additional  dry  storage  bin  shall  be 
provided for commercial mineral filler and provision shall be made for proportioning this filler 
into the mix. 

Equipment for Preparation of Bituminous Material 

Tanks for storage of bituminous material shall be equipped for  heating the material, using 
positive  and  automatic  control  at  all  times,  to  a  temperature  within  the  specified  range.  
Heating shall be accomplished by steam coils, hot oil, electricity or other approved means 
such  that  no flame shall  come  in  contact  with the  heating  tank.  Circulating  system for  the 
bituminous  material  shall  be  of  adequate  size  to  ensure  proper  and  continuous  circulation 
during the entire operating period. Suitable means shall be provided either by steam or hot 
oil  jackets  or  other  insulation  for  maintaining  the  specified  temperature  of  the  bituminous 
material in the pipeline, meters, weigh buckets, spray bars, and other containers and flow 
lines.  Storage tank capacity shall be sufficient for at least one day's operation.  Circulation 
return  lines  to  the  asphalt  storage  tanks  shall  be  submerged  to  the  same  elevation  in  the 
storage tanks as the feeder line (two or three vertical slots may be cut in the return line above 
the high level mark to break vacuum when reversing the pump). 

Contractor shall provide a sampling outlet in the bituminous material feedline connecting the 
plant storage tanks to the bituminous material weighing or metering box.  Outlet shall consist 
of a valve installed in such a manner that samples may be withdrawn from the line slowly at 
any time during plant operation.  Location of the sampling outlet shall be readily accessible 
and free from obstruction. A drainage receptacle shall be provided for flushing the outlet prior 
to sampling. 

Thermometric Equipment 

An armored thermometer reading from 38

 C to 204

 C shall be fixed in the bituminous feed 

line at a suitable location near the discharge valve at the pugmill.  Similar devices shall be 
fixed in the heating and storage tanks. 

Plant  shall  be  further  equipped  with  either  an  approved  dial-scale,  mercury-actuated 
thermometer, an electric pyrometer, or other approved thermometric instruments placed at 
the  discharge  chute  of  the  drier  and  in  the  hot  fines  bin  so  as  to  register  automatically  or 
indicate the temperature of the heated aggregates. For better regulation of the temperature 
of the aggregates, replacement of any thermometer by an approved temperature-recording 
apparatus may be required by the Engineer and he may further require that daily temperature 
charts be submitted to him by the Contractor. 

Control of Mixing Time 

Plant shall be equipped with positive means to govern the time of mixing and to maintain it 
constant unless changed at the direction of the Engineer. 

Pugmill 

Pugmill shall include equipment to deliver the bituminous materials in a thin uniform sheet or 
in multiple sprays over the full length of the mixer. 

Temporary Storage of Mix 

Plants  may  be  equipped  with  skiffs  or  elevators  for  delivering  hot  mix  to  hoppers  or  silos 
before  discharging  to  hauling  units.  Skiffs  or  elevators  shall  not  be  sprayed  with  diesel  or 
other solvents; where necessary they may be sprayed with a minimum amount of lime water, 

 

 

 

soap or detergent solution.  Hoppers or silos shall be of such design that no segregation or 
loss in temperature of the mix occurs. 

Safety Requirements 

Adequate and safe stairways to the mixer platform and guarded ladders to other plant units 
shall be placed at all points required for accessibility to all plant operations. Accessibility to 
the top of truck bodies shall be provided by means of a platform or other suitable device to 
enable  the  Engineer  to  obtain  mixture  temperature  data.    To  facilitate  handling  scale 
calibration equipment, sampling equipment, etc., a hoist or pulley system shall be provided 
to raise or lower the equipment from the ground to platform or vice versa.  All gears, pulleys, 
chains,  sprockets  and  other  dangerous  moving  parts  shall  be  thoroughly  guarded  and 
protected.  Ample and unobstructed passage shall be maintained at all times in and around 
the  truck  loading  space.    This  space  shall  be  kept  free  from  drippings  from  the  mixing 
platform. 

Environmental Control 

Prior to the Engineer's approval of the asphalt plant, current certifications must be submitted 
that  establishes  the  Department  has  inspected  and  approved  the  environmental  control 
devices  fitted  to  the  plant  and  that  it  is  in  full  compliance  with  the  Government's  current 
regulations related to protection of the environment. 

2.  Special requirements for Batching Plant 

Weigh Box Hopper 

Plant shall include means for accurately weighing each size of aggregate in a weigh box or 
hopper, suspended on scales, ample in size to hold a full batch without hand raking or running 
over.  Weigh box or hopper shall be supported on fulcrums and knife edges so constructed 
that they will not be easily thrown out of alignment or adjustment.  All edges, ends and sides 
of weighing hoppers shall be free from contact with any supporting rods and columns or other 
equipment that shall in any way affect the proper functioning of the hopper.  There shall also 
be sufficient clearance between hoppers and supporting devices to prevent accumulations of 
foreign materials.  Discharge gate of the weigh box shall be so hung that the aggregate shall 
not be segregated when dumped into the mixer and shall close tightly when the hopper is 
empty so that no material is allowed to leak into the batch in the mixer during the process of 
weighing the next batch. 

Scales and Meters 

Scales or meters used for  proportioning aggregate, commercial filler  and bitumen shall be 
accurate to one percent of the indicated quantity.  Scales and meters shall be substantially 
constructed  and  those  that  are  sensitive  and  that  easily  get  out  of  adjustment  shall  be 
replaced.    Scales  shall  be  constructed  and  located  so  as  to  prevent  vibration  in  the  dial 
pointer. 

Scales for weighing aggregate and commercial filler may be either the beam or springless 
dial type and shall be of standard make and design. Graduation intervals shall be not more 
than  0.1  %  of  the  nominal  scale  capacity.    Dial  scales  shall  be  equipped  with  adjustable 
pointers for controlling automatically the weighing of each aggregate and filler.  Pointer shall 
be set close to the dial face to prevent excessive parallax and all dial faces shall be so located 
that  they  shall  be  in  plain  view  of  the  operator  at  all  times.    Weighing  sequence  of  hot 
aggregates shall progress from coarse to fine. 

Bituminous material shall be automatically proportioned by either weighing or metering.  The 
minimum  graduation  shall  be  not  more  than  1  liter  or  1  kg.  Bituminous  scales  and  weigh 
buckets shall be such that the required amount of bitumen is provided in a single weighing 
and delivered to the pugmill without loss due to overflow, splashing or spillage.  Bituminous 
weigh  buckets  shall  be  satisfactorily  insulated  to  prevent  loss  of  heat  in  the  bitumen  or 
accumulation of bitumen in the bucket.  Bituminous metering devices shall be rotating positive 

 

 

 

displacement pumps and shall be capable of providing the designated quantity of material for 
each batch. 

All scales and meters shall be approved by the Engineer and shall be checked and calibrated 
as  often  as  he  may  deem  necessary  to  ensure  their  continued  accuracy.  Contractor  shall 
provide and have at hand the necessary standard weights and other necessary equipment 
in order to perform testing and calibration of all scales and meters in a practical manner.  An 
accurate platform scale with a capacity of 250 kg or more and an accuracy of 0.5 % of the 
load shall also be provided. 

Pugmill Mixer 

Batch mixer shall be an approved twin pugmill type, capable of producing a uniform mixture 
within the job-mix tolerances.  Batch mixer shall be of such design to permit visual inspection 
of the mix.  Mixer shall be so constructed as to prevent leakage of contents and its capacity 
shall not be less than 600 kg per batch.  Mixer shall be enclosed and shall have an accurate 
time lock to control the operation of a complete mixing cycle by locking the weigh box gate 
after  the charging  of  the  mixer  until  the  closing of  the mixer  gate  at the completion  of  the 
cycle.  Mixer shall lock the bitumen supply throughout the dry mixing period and shall lock 
the mixer gate throughout the dry and wet mixing periods.  Dry mixing period is defined as 
the  interval  of  time  between  opening  of  the  weigh  box  gate  and  the  start  of  application  of 
bitumen. 

Wet mixing period is the interval between the time the bituminous material is spread on the 
aggregate and the time the mixer gate is opened.  Control of the time shall be flexible and 
capable of being set at intervals of not more than five seconds throughout cycles up to three 
minutes.  A mechanical batch counter  shall be so designed as to register only completely 
mixed batches. 

Mixer  shall  be  equipped  with  a  sufficient  number  of  paddles  or  blades  in  a  suitable 
arrangement to produce a proper and uniformly mixed batch.  The clearance of blades from 
all fixed and moving parts shall not exceed 20 mm except in the case of aggregates having 
a nominal maximum size of over 25.4 mm in which case the clearance shall be so adjusted 
as to prevent undue breakage of the coarse aggregate during the mixing operation. 

Asphalt Plant shall meet the requirements of ASTM D 995. The plant shall be equipped with 
facilities to provide computer printout. The print out shall indicate the quantity of the materials 
in each batch against their respective target value. The print out shall contain the following 
information: 

Batch  time  ,  temperature  of  aggregates  ,  temperature  of  bitumen  ,  temperature  of  mix, 
quantity of aggregates from different hot bin , the quantity of filler and  quantity of bitumen ( 
by weight of total mix ). 

A copy of full set of computer printout covering full 

day’s protection shall be handed over to 

the Engineer at the end of the day’s production 

Hauling Equipment 

Vehicles used for the transport of aggregates or bituminous mix shall have tight, clean and smooth 
metal beds and shall be free from dust, screenings,  petroleum oil, volatile or other mineral spirits 
which may affect the material being hauled.  Vehicle metal bed shall, if required, be sprayed with a 
minimum amount of soapy water or lime solution to prevent bituminous mix from adhering to the bed.  
After  spraying,  the  truck  shall  be  raised  and  thoroughly  drained;  no  excess  solution  shall  be 
permitted. Use of diesel or other solvents to spray in the truck bed is prohibited. Provision shall be 
made for covering truck loads with canvas or other suitable material of such size as to protect the 
bituminous mix from the weather. 

When  necessary,  in  order  that  a  bituminous  mixture  be  delivered  on  the  road  at  the  specified 
temperature, truck beds shall be insulated to obtain workable temperature of the mix and all covers 
shall  be  securely  fastened.    Any  truck  causing  excessive  segregation  of  material  by  its  spring 
suspension  or  other  contributing  factors,  or  that  shows  oil  leaks  in  detrimental  amounts,  or  that 

 

 

 

causes undue delays, shall, upon the direction of the Engineer, be removed from the work until such 
faults are corrected. End dump trucks shall be equipped with chains on the tail gates for control when 
dumping the mix into the paving machine. 

Contractor shall provide an adequate number of trucks of such size, speed and condition to ensure 
orderly and continuous operations of the work. 

b.  Pavers    

Use  pavers  that  are  self-contained,  power-propelled  units,  provided  with  an  activated  screed  or 
strike-off  assembly,  heated  if  necessary,  and  capable  of  spreading  and  finishing  courses  of 
bituminous  mixture  in  lane  and  shoulder  widths  applicable  to  the  specified  typical  section  and 
thicknesses shown on the plans. 

Pavers shall be equipped with a receiving hopper having sufficient capacity for a uniform spreading 
operation.  It shall be equipped with the screed with automatic controls which will make adjustments 
in both transverse and longitudinal direction. External longitudinal reference devices used to pick up 
grade information for the automatic sensing control shall conform to the following: 

1.  When  picking  up  grade  information  from  an  underlying  base,  the  external  longitudinal 

reference device shall be a floating beam at least 9 m long or an 8 m non-contact averaging 
ski with a minimum of 4 sensors 

2.  When  picking  up  grade  information  from  an  adjacent  compacted  pavement  course  or  a 

concrete surface, the external longitudinal reference device shall be a floating beam or a non-
contact averaging ski with a minimum of 2 sensors. Either referencing device shall be at least 
3 m in length. 

3.  When using a floating beam to pick up grade information, place the sensing device in the 

middle  third  of  the  floating  beam.    A  non-contact  sensor  may  be  used  to  pick  up  grade 
information from a newly placed adjacent compacted course only when approved. 

Should the automatic controls fail to function properly, finishing the half shift with manual controls 
may be approved. Do not resume until the controls are repaired. 

Pavers shall employ mechanical devices as equalizing runners, straight edge runners, even arms or 
other compensating devices to maintain trueness of grade and to confine the edges of the pavement 
to  true  lines  without  the  use  of  stationary  side  forms.    Equipment  shall  include  blending  or  joint 
leveling devices for smoothing and adjusting longitudinal joints between lanes.  Assembly shall be 
designed and operated in such manner that it shall place the material at the required compacted 
thickness. 

Electronic screeds shall include automatic feed controls to maintain a constant level of material along 
the  full  length  of  the  screed,  automatic  profile  grade  control  and  automatic  slope  control.    Profile 
grade controller shall be activated by a travelling, articulated averaging beam of not less than 9.14 
m in length or taut stringline (wire) set to grade.  Automatic slope control shall be equipped with a 
proportioning  manual  override  to  enable  smooth  transition  of  changing  slope  rates.    Automatic 
screed controls shall be approved by the Engineer prior to use. 

If, during construction, it is found that the spreading and finishing equipment in operation leaves in 
the  pavement  surface  tracks  or  indented  areas  or  other  objectionable  irregularities  that  are  not 
satisfactorily corrected by scheduled operations, the use of such equipment shall be discontinued 
and other satisfactory spreading and finishing equipment shall be provided by the Contractor. 

c.  Rollers 

Rolling equipment shall consist of vibratory steel-wheeled rollers, steel wheel rollers and pneumatic-
tired rollers as required by the Engineer for proper compaction and finishing of the asphalt surface.  
Unless  otherwise  permitted,  rollers  shall  be  equipped  with  reversible  or  dual  controls  to  allow 
operation both forward and backward with the operator always facing in the direction of movement. 

 

 

 

Breakdown rollers shall be a 2 axle tandem steel wheeled weighing not less than 9.1 metric tons and 
capable of rolling with or without vibration. 

Steel  wheel  rollers  shall  be  self-propelled  and  equipped  with  power  units  of  not  less  than  four 
cylinders  and  under  working  conditions  shall  develop  contact  pressures  under  the  compression 
wheels of 44-64 kN per meter of width.   

Rollers shall be equipped with adjustable scrapers to keep the wheel surface clean and with efficient 
means of keeping them wet to prevent mixes from sticking.  These surfaces shall have no flat areas 
or projections which shall mar the surface of the asphalt courses.  Vibratory steel-wheeled rollers 
shall have dual drums with a minimum weight of 62 kN.  Vibrating frequency shall be between 2000 
to 3000 cycles per minute with individual controls for each tandem.   

All steel-wheeled rollers shall be in good condition and the contractor shall furnish to the Engineer 
the manufacturer's technical data for each roller and no roller shall be used except after approval of 
the Engineer. 

Pneumatic tired rollers shall weigh not less than 12 tons and be equipped with pneumatic tires of 
equal  size  and  diameter  mounted  on  2  axles  attached  to  a  rigid  frame  equipped  with  a  loading 
platform or body suitable for ballast loading. Minimum width between the outer edge of the outside 
tires on a given axle is 1.5 m. Use tires with satisfactory treads. Space the tires on the rear axle so 
that the entire gap between adjacent tires on the front axle will be covered by the tread of the rear 
tires. Uniformly inflate the tires so that the air pressure in the tires will not vary more than 35 kPa. 
Use the tire manufacturer’s recommended inflation pressure. Use a minimum tire size of 185 mm x 
375 mm, 4 ply. Fully skirt roller with rigid material to within 25 mm of the pavement surface. 

Pneumatic-tired rollers shall be in good condition and with enough ballast space to provide uniform 
wheel loadings as may be required 

Contractor shall furnish to the Engineer charts or tabulations showing the contact areas and contact 
pressures for the full range of tire inflation pressures and for the full range of tire loadings for each 
type and size compactor tire furnished and used in pneumatic-tired rollers. 

Total operating weight and tire pressure may be varied by order of the Engineer to obtain contact 
pressures which shall result in the required asphalt course density. 

Finish roller shall be 2-axle tandem steel wheeled weighing not less than 7.2 metric tons. 

d.  Asphalt Distributor 

Asphalt distributor truck shall be of the pressure type with insulated tanks.  Use of gravity distributors 
will  not  be  permitted  by  the  Engineer.    Distributor  shall  have  pneumatic  tires  of  such  width  and 
number that the load produced on the road surface shall not exceed 98 kN per meter of tire width. 

Spray bars shall have a minimum length of 2.04 meters and shall be of the full circulating type.  Spray 
bar extensions shall also be of the full circulating type.  Spray bar shall be adjustable to maintain a 
constant height above the surface to be treated.  Spray bar nozzles shall be slotted and shall be of 
such  design  so  as  to  provide  a  uniform  unbroken  spread  of  bituminous  material  on  the  surface.  
Valves shall be operated by levers so that one or all valves may be quickly opened or closed in one 
operation.  Distributor shall be equipped with a hose and nozzle attachment to be used for spotting 
areas inaccessible to the distributor.  Distributor and booster tanks shall be so maintained at all times 
as to prevent dripping of bituminous material from any part of the equipment. 

Distributor shall be equipped with devices and charts to provide for accurate and rapid determination 
and control of the amount of bituminous material being applied and with a tachometer of the auxiliary 
wheel  type  reading  speed  in  meters  per  minute.    Spreading  equipment  shall  be  provided  with  a 
separate  power  unit  for  the  pump  or  a  variable  displacement  pump  driven  by  a  hydrostatic 
transmission  so  that  a  uniform  application  of  bituminous  material,  in  controlled  amounts,  may  be 
made  ranging  from  0.15  to  5.0  kg/m

2

  and  with  a  range  of  pressure  from  441  to  1,324  kN/m

2.

  

Distributor shall have satisfactory heating equipment and thermometers in order to provide the full 
range of application temperatures for the bituminous material being used. 

 

 

 

Prior to the commencement of the work and as required by the Engineer, the bituminous distributor 
shall be checked and calibrated such that the rate of transverse spread or longitudinal spread shall 
not vary more than ten percent from the required rate of application. 

e.  Cold Planer 

Cold planer proposed for use shall meet the following minimum requirements: 

1.  Specialized  equipment  designed  specifically  for  the  purpose  of  removing,  and/or  surface 

treating or leveling asphaltic or concrete pavement using a rotating cutter mandrel. 

2.  Capable of cutting flush to kerbs or other vertical objects. 

3.  Control system capable of maintaining profiles and cross-slopes such that after planing the 

resulting surface will be within plus or minus four millimeters of the required profile and cross-
slope. 

4.  Capable of performing single pass cuts of up to 150 mm depth. 

5.  Approved by the Engineer for the specific use intended. 

f.  Unacceptable Equipment 

Engineer will have the right to stop the use of any equipment or plant which he deems to be inferior 
to  the  quality  required  and  to  instruct  the  removal  of  such  equipment  and  to  have  it  replaced  by 
suitable equipment or to alter the method of operation at any time. 

Contractor shall immediately comply with such instructions without being entitled to any indemnities 
or extensions as a result of such instructions. Contractor shall not be allowed to use any equipment 
or plant before obtaining the approval of the Engineer, and the Contractor shall undertake to follow 
sound technical methods of operation and to engage skilled and trained operators, mechanics and 
labor to carry out the works.  Engineer will have the right to expel any operators, mechanics or labor 
and to instruct suitable replacement thereof at any time he deems such action is necessary. 

3.3.3.2  Field Trial  

On the first day of bituminous mix production, produce trial mixture of 450 metric tons at the 
optimum binder content. Complete production of the trial mixture the same shift. Produce the 
trial  mixture  at  the  medium  speed  used  during  the  plant  calibration.  Trial  mixture  may  be 
placed on the shoulder of the roadway or the passing lane of four lane roadways and become 
a section of the completed roadway.  For other roadways, place trial mixture at an approved 
location. Field trial mixture shall conform to job-mix formula.  

Acceptance  of  the  plant  produced  trial  mixture  will  be  based  on  test  results  meeting  the 
requirements  of this  section with the  aggregate  gradation within the  job mix  ranges  given 
and the in-place densities meeting the requirements of Article 3.3.3.8.
 

When  test  results  of  the  trial  mixture  do  not  meet  the  requirements,  additional  plant  trial 
mixture may be required and the required tests performed.   

A  revised  job-mix  formula  (if  applicable)  will  be  required  based  on  the  results  of  the  tests 
performed on the field trial plant produced mixtures. Asphalt content will be selected, based 
on meeting the specifications for Marshall stability and percent air voids. 

Should there be a change in sources of material, establish a new approved mix design and a 
new job-mix formula 

3.3.3.3  Weather Limitations 

Production  and  spreading  of  asphaltic  concrete  mix  shall  not  be  permitted  when  the  ambient 
temperature is less than 8

C, nor during rain, fog, dust-storms or other unsuitable weather.

 

 

 

 

3.3.3.4  Surface Preparation   

Areas to be paved shall be true to lines and grades shown on the Contract plans and shall have a 
properly prepared surface prior to the start of paving operations. Areas to be paved shall be prepared 
in compliance with these specifications and the particular specifications. 

When an asphaltic concrete pavement course is to be placed on top of an existing pavement, the 
existing pavement surface shall be prepared in accordance with Article 3.3.4.2. 

Priming or tacking of surfaces to be paved shall be in accordance with 3.4. 

Surface of kerbs, vertical faces of existing pavements and all structures in actual contact with asphalt 
mixes shall be painted with a thin and complete coating of tack coat, as approved by the Engineer, 
to provide a closely bonded, watertight joint. 

All  openings  or  structures  in  the  road  for  water,  drainage  and  other  specified  utilities  shall  be 
constructed and their positions and levels determined before the start of paving operations. 

All utility trenches, cut in the bituminous road surfaces shall be backfilled, compacted and prepared, 
all in accordance with Article 3.3.4.2. 

3.3.3.5  Preparation of Asphaltic Concrete Mixes 

a.  Preparation of Asphalt Binder   

Asphalt Binder shall be heated to a temperature to yield viscosities in the range of 150-300 mm

2

/sec. 

(75-150 seconds Saybolt-Furol) when delivered to the mixer, as determined from the temperature 
viscosity chart of the product used.  Asphalt Binder shall not be used if foaming occurs nor shall it 
be heated above 177

 C at any time. 

b.  Preparation and Handling of Mineral Aggregate   

Coarse and fine aggregate shall be stored at the asphalt plant in such a manner that the separate 
stockpiles will not become intermixed.  Stockpiles shall be of sufficient size to provide a minimum 
quantity  of  one  week's  continuous  production  of  asphalt  mix.    Aggregates  brought  to  the  asphalt 
plant to supplement stocks should be tested and approved prior to placing in the existing approved 
stockpiles. 

Cold  bins  shall  be  calibrated  with  the  materials  to  be  used  and  the  settings  shall  be  such  as  to 
produce  a  combined  gradation  in  accordance  with  the  job  mix.  Proportioning  shall  be  such  that 
surpluses and shortages in the hot bins shall not cause breaks in the continuous operation.  All the 
above shall be as approved by the Engineer. 

Materials  shall  be  thoroughly  dried  and  heated  so  that  their  temperature  is  within  8

  C  of  the 

temperature needed to satisfy the viscosity requirements of the Asphalt Binder.  In no case shall the 
materials be introduced into the pugmill with a temperature, including the 8

 C tolerance permitted, 

of more than that at which the Asphalt Binder has a viscosity of 75 seconds Saybolt-Furol.  Moisture 
content of the heated and dried materials shall not exceed 0.5 %.  Quantity of materials fed through 
the drier shall in all cases be held to an amount which can be thoroughly dried and heated within the 
limits specified. 

Heated  materials  shall  be  screened  into  sizes  such  that  they  may  be  combined  into  a  gradation 
meeting the requirements of the job mix formula and the hot aggregate storage bins shall be such 
as  to  minimize  segregation  and  loss  of  temperature  of  aggregate.    Hot  bins  shall  be  drawn  and 
cleaned of material at the end of each day's operation. 

c.  Proportioning and Mixing   

Heated ingredients together with the mineral filler and Asphalt Binder shall be combined in such a 
manner  so  as  to  produce  a  mixture  which,  when  emptied  from  the  pugmill,  complies  with  the 
requirements of the job mix formula.  Plant settings, once established, shall not be changed without 
the approval of the Engineer. 

 

 

 

Temperature of the aggregate immediately prior to mixing shall be within ±8

 C of the temperature 

of  the  Asphalt  Binder  and  the  temperature  of  the  aggregate  and  asphalt  prior  to  mixing  shall  be 
approximately that of the completed mix as defined in the job mix formula approved by the Engineer.  
Mix temperature shall be within the limits set out in the job mix formula when emptied from the mixer  

Mineral filler in a cold dry state shall be proportioned into the mixer either with the aggregate or after 
the introduction of the Asphalt Binder to avoid loss of filler that may occur in dry mixing as a result of 
turbulence in the mixer. 

When anti-stripping additive is required, the additive device shall be calibrated and set so that the 
specified amount of anti-stripping additive is thoroughly mixed with the bitumen just prior to entering 
the pugmill. 

d.  Control of Mixing Time   

In a batch type plant, the Engineer will designate the length of time of both dry and set mixing periods 
to ensure a uniformly and completely coated mix.  Mixing period time shall not be altered unless so 
ordered by the Engineer.  A dry mixing period of not less than four seconds shall precede the addition 
of the Asphalt Binder to the mix. Excess wet mixing shall be avoided.  Wet mixing shall continue as 
long as is necessary to obtain a thoroughly blended mix but shall not exceed 75 seconds nor be less 
than 40 seconds. 

In continuous type plants, the weights shall be determined for the job from tests made under the 
supervision  of  the  Engineer  and  the  determination  of  mixing  time  shall  be  by  the  weight,  unless 
otherwise required: 

 

Mixing time, sec. =

Pugmill dead capacity, kg

Pugmill output, kg per sec.

 

Equation 3-1:  Mixing Time 

Maximum mixing time in batch or continuous type plants shall be limited as directed by the Engineer 
to avoid undue changes in the characteristics of the asphalt material. 

3.3.3.6  Delivery of the Asphaltic Concrete Mixes 

Dispatching of the hauling vehicles to the job site shall be so scheduled that all material delivered 
may be placed in daylight, unless the Engineer approves the use of artificial light. Delivery of material 
shall be at a uniform rate and in an amount well within the capacity of the paving and compacting 
equipment. 

The mix shall be delivered to the paver at a temperature determined from the temperature-viscosity 
curve. 

All precautions shall be taken to protect the mix from the weather. 

3.3.3.7  Spreading and Finishing 

a.  General 

Spreading and finishing equipment complying with Article 3.3.3.1 shall be used.  Mix shall be laid 
upon an approved surface in accordance with the specifications and only when weather conditions 
are suitable.  Upon arrival at the point of use, the asphalt mix shall be spread and struck off to the 
grade, elevation and cross-section shape intended, either over the entire width or over such partial 
width as may be required. If the mix does not comply with the requirements, it shall not be used but 
shall be discarded. All bituminous mixes shall be introduced to the paver at a temperature not less 
than  135  deg.  C  and  not  more  than  163  deg.  C.  Mixes  outside  this  temperature  range  shall  be 
discarded. 

 

 

 

Asphalt course shall be constructed to proposed levels and shall be homogeneous and providing, 
after  compaction,  an  even  surface  free  from  undulations,  rises  or  depressions,  and  within  the 
tolerances stipulated.  In no case shall construction of a new asphaltic concrete course begin until 
the previously laid course has been tested and approved in accordance with these specifications. 

Asphalt course shall be laid in more than one layer, with no layer exceeding 100 mm in thickness 
unless  otherwise  shown  on  the  Contract  plans  or  approved  by  the  Engineer.    Bitumen  mixtures 
except on levelling course shall be spread in a placement thickness so that, after rolling the normal 
thickness of the compacted bituminous material shall be:  

  Base Course:    

Min. 6 cm.  

Max. 10 cm.  

  Binder Course:  

Min. 5 cm.  

Max. 8 cm.  

  Wearing Course: 

Min. 4 cm.  

Max. 6 cm. 

Where successive layers are to be placed, second layer shall be placed as soon as practicable after 
the first layer has been finished, rolled and cooled. Unless otherwise directed by the Engineer, the 
surface of the existing layer shall be cleaned and a thin tack coat will be applied. 

Transverse joints in succeeding layers shall be offset at least 2 m. Longitudinal joints shall be offset 
at least 150 mm.  All joints shall be a minimum of 150 mm from all pavement markings. 

Use of motor graders or hand spreading of the asphalt mix shall not be permitted except in places 
where it is impractical to use pavers and shall be only with the specific permission of the Engineer.  
This shall be to avoid segregation of the asphalt mix and shall comply with all conditions regarding 
trueness of level, thickness and homogeneity of the mix. 

Automatic screed controls shall be required on all pavers and shall be used for paving courses as 
approved by the Engineer. 

b.  Preliminary Survey and Reference String Line  

The Contractor shall make the survey required for the reference grade. When the survey is approved 
by  the  Engineer,  the  Contractor  shall  erect  and  maintain  an  approved  reference  string  line  and 
operate the paver to conform to the string line for the initial layer and/or any other layers as directed. 
Elevation  control  point  stakes  for  the  first  layer  of  bituminous  paving  course  shall  be  set  at  a 
maximum spacing of twenty (20) metres. For subsequent layer, control point shall be set at ten (10) 
metres maximum spacing. The Contractor shall furnish and maintain an approved mobile string line 
for  all  layers  not  laid  with  the  erected  string  line.  The  string  line  shall  be  erected  parallel  to  the 
reference grade, and the bituminous mixture shall be spread at a constant elevation above, below 
or at the string line elevation as directed.  

The use of the automatically controlled bituminous paver, to provide both longitudinal and transverse 
control, shall include the furnishing and maintaining of a string line, whether it be erected or mobile, 
by the Contractor. The longitudinal and transverse controls shall operate independent of each other, 
to  the  extent  that the  surface  of  the  bituminous mixture  will  conform to the  string  line  and  will  be 
uniform in cross-section or crown. 

The Contractor shall establish the centreline points and shall maintain the location of the points until 
the completion of the surfacing or as directed. When directed by the Engineer, the Contractor shall 
erect a string line, to be used as a guide for the finishing machine, in order to maintain  a uniform 
edge  alignment.  If  any  other  method  is  proposed  by  the  Contractor,  it  shall  be  approved  by  the 
Engineer. 

c.  Machine Spreading  

The  Contractor  shall make  a  survey  of  the  centreline  profile  and  crown of  the  existing  surface  or 
base  and  determine  or  calculate  a  Reference  Grade  Line  and  shall  furnish  to  the  Engineer  for 
reference and approval the full values at each profile point necessary to erect the Reference String 
Line.  

On the initial traffic lane paving operation, the asphaltic mixture shall be spread with the bituminous 
paver to a grade line constant to the Reference String Line.  

 

 

 

The erection and maintenance of the Reference String Line shall be so coordinated that the string 
will be taut and free from sags at the time it is in use as a guide for the paver.  

On the second and subsequent layers, the asphaltic mixture shall be spread as described for the 
initial layer except that the spreading of the asphalt shall conform to a Mobile String Line.  

The Mobile String Line or equivalent shall be used as the reference guide on all paving operations, 
except when the Reference String Line is used or other provisions are made and approved by the 
Engineer.  

On new construction, where paving starts on fresh earth subgrade, the survey may, if approved by 
the Engineer, be delayed to the surface of the first layer and the use of the Reference Grade Line 
may be delayed to the first lay- down operation of the second course.  

If the existing surface is one of acceptable centreline grade, as determined by the Engineer from the 
Contractor's profile survey, the Engineer may permit the use of the mobile String Line for all layers.  

No mixture shall be placed prior to the Engineer's approval of the Contractor's proposed  methods 
and procedures for placing the mixture. 

d.  Levelling Course  

A levelling course, consisting of a layer of bituminous material of variable thickness may be used to 
eliminate irregularities in existing surfaces or based and to vary existing cross-section elements of 
roadways.  

In areas where levelling courses are required, as determined by the Engineer, the Contractor shall 
make  survey  of  the  existing  surface  or  base.  When  the  survey  is  approved,  the  Engineer  will 
determine and inform the Contractor of the precise locations and thicknesses of levelling course to 
obtain the smoothest possible riding surface. Upon receipt of the locations and thicknesses from the 
Engineer, the Contractor shall proceed with the placement of the "Levelling Course". 

3.3.3.8  Compaction 

Compaction  Temperature  must  be  checked  against  appropriate  values  determined  from 
Temperature-Viscosity Curves. 

Rolling  equipment  for  use  in  compacting  asphalt  mixes  shall  meet  the  requirements  of  section 
3.3.3.1.c.  At least three rollers shall be required at all times:  one self-propelled pneumatic-tired and 
two steel-wheeled rollers.  As many additional rollers shall be used as necessary to provide specified 
asphalt course density and surface characteristics in an orderly, efficient and continuous manner. 

Immediately after the asphalt mix has been spread and struck off, the surface shall be checked and 
any irregularities adjusted and then compacted thoroughly and uniformly by rolling. 

To prevent adhesion of the mix to steel-wheeled rollers, the wheels shall be kept properly moistened 
but excess water will not be permitted by the Engineer. 

After the longitudinal joints and edges have been compacted, rolling shall start longitudinally at the 
sides  of  the  road  and  shall  gradually  progress  towards  the  center.    On  super-elevated  sections, 
rolling shall begin on the low side and progress to the high side, overlapping on successive trips by 
at  least  one-half  the  width  of tandem rollers  and  uniformly  lapping  each preceding track.   Rollers 
shall move at a slow but uniform speed with the drive wheels nearest the paver.  Speed shall not 
exceed 4.8 km/hr. for steel-wheeled rollers or 8.0 km/hr. for pneumatic-tired rollers. Operating speed 
shall be approved by the Engineer. 

Line of rolling shall not be changed suddenly or the direction of rolling reversed suddenly.  If rolling 
causes displacement of the material, the affected areas shall be loosened at once with hand tools 
and restored to the original grade of the loose material before being re-rolled.  Heavy equipment or 
rollers shall not be permitted to stand on the finished surface before it has been compacted and has 
thoroughly cooled. 

When paving in a single width, the first lane placed shall be rolled in the following order: 

 

 

 

1.  Transverse joints 

2.  Longitudinal joints 

3.  Outside edge 

4.  Initial or breakdown rolling, beginning on the low side and progressing towards the high side 

5.  Second rolling 

6.  Finish rolling 

When paving in echelon, five to ten centimeters of the edge which the second paver is following shall 
be  left  unrolled.    Edges  shall  not  be  exposed  more  than  fifteen  minutes  without  being  rolled.  
Particular attention shall be given to the construction of the transverse and longitudinal joints in all 
courses. 

a.  Transverse Joints   

Transverse joints shall be carefully constructed and thoroughly compacted to provide a smooth riding 
surface.    Joints  shall  be  checked  with  a  straight-edge  to  assure  smoothness  and  true  alignment. 
Joints shall be formed with a bulkhead, such as a board, to provide a straight line and vertical face.  
If the joint has been distorted by traffic or by other means, it shall be trimmed to line and the face 
shall be painted with a thin coating of emulsified asphalt before the fresh material is placed against 
it.  To obtain thorough compaction of these joints, the material placed against the joint shall be tightly 
pushed against the vertical face with a steel-wheeled roller.  Roller shall be placed on the previously 
compacted material transversely so that not more than 150 mm of the rear rolling wheel rides on the 
edge of the joint. Roller shall be operated to pinch and press the mix into place at the transverse 
joint.  Roller shall continue to roll along this line, shifting its position gradually across the joint, in 150 
to 200 mm increments, until the joint has been rolled with the entire width of the roller wheel.  Rolling 
shall be continued until a thoroughly compacted, neat joint is obtained more than 150 mm of the rear 
rolling wheel rides on the edge of the joint. Roller shall be operated to pinch and press the mix into 
place at the transverse joint.  Roller shall continue to roll along this line, shifting its position gradually 
across the joint, in 150 to 200 mm increments, until the joint has been rolled with the entire width of 
the roller wheel.  Rolling shall be continued until a thoroughly compacted, neat joint is obtained. 

b.  Longitudinal Joints   

Longitudinal joints shall be rolled directly behind the paving operations.  First lane placed shall be 
true to line and grade and have a vertical face.  Material being placed in the abutting lane shall then 
be tightly pushed against the face of the previously placed lane.  Before rolling, the coarse aggregate 
in the material overlapping the joint shall be carefully removed with a rake and discarded.  Rolling 
shall be performed with a steel-wheeled roller. 

Roller  shall be shifted over  onto the previously placed lane so that not more than 150 mm of the 
roller wheel rides on the edges of the newly laid lane.  Rollers shall then be operated to pinch and 
press  the  fine  material  gradually  across  the  joint.    Rolling  shall  be  continued  until  a  thoroughly 
compacted, neat joint is obtained. 

When the abutting lane is not placed in the same day, or the joint is distorted during the day's work 
by  traffic  or  by  other means, the  edge  of  the  lane  shall  be  carefully  trimmed to  line,  cleaned  and 
painted with a thin coating of emulsified asphalt before the abutting lane is placed. 

c.  Edges 

Edges  of  the  asphalt  course  shall  be  rolled  concurrently  with  or  immediately  after  rolling  the 
longitudinal joint. 

Care shall be exercised in consolidating the course along the entire length of the edges.  Before it is 
compacted, the material along the unsupported edges shall be slightly elevated with hand tools.  This 
will permit the full weight of the roller wheel to bear on the material to the extreme edges of the mat. 

 

 

 

d.  Breakdown Rolling 

Breakdown rolling shall immediately follow the rolling of the longitudinal joints and edges.  Rollers 
shall be operated as close to the paver as possible to obtain adequate density without causing undue 
displacement.    In  no  case  shall  the  mix  temperature  be  allowed  to  drop  below  110

  C  prior  to 

breakdown  rolling.  If  it  is  so  happens,  such  areas  shall  be  identified  on  site,  removed  from  the 
permanent work and replaced with approved mix complying with all applicable requirements. If the 
breakdown  roller  is  steel-wheeled,  it  shall  be  operated  with  the  drive  wheel  nearest  the  finishing 
machine. Pneumatic-tired rollers may be used as breakdown rollers. 

e.  Intermediate Rolling 

Pneumatic-tired  rollers  or  steel-wheeled  rollers  described  in  c)  shall  be  used  for  the  intermediate 
rolling. Intermediate rolling shall follow the breakdown rolling as closely as possible and while the 
paving mix is still of a temperature that will result in maximum density from this operation.  Rollers 
shall  be  used  continuously  after  the  initial  rolling  until  all  of  the  mix  placed  has  been  thoroughly 
compacted.  Turning of rollers on the hot paving mix which causes undue displacement will not be 
permitted by the Engineer. 

f.  Finish Rolling 

Finished rolling shall be accomplished while the material is still warm enough for the removal of roller 
marks. 

All rolling operations shall be conducted in close sequence. 

In  places  inaccessible  for  the  operation  of  standard  rollers  as  specified,  compaction  shall  be 
performed by manual or mechanical tampers of such design as to give the desired density. 

After final rolling, the smoothness, levels, cross falls, density and thickness shall be checked and 
any  irregularity  of  the  surface  exceeding  the  specified  limits  and  any  areas  defective  in  texture, 
density  or  composition  shall  be  corrected  as  directed  by  the  Engineer,  including  removal  and 
replacement at the Contractor's expense as directed by the Engineer. 

3.3.3.9  Protection of the Asphalt Courses 

Sections of the newly finished work shall be protected from traffic of any kind until the mix has been 
properly compacted and cooled to ambient temperature.  In no case shall traffic be permitted less 
than 12 hours after completion of the asphalt course unless a shorter period is authorized by the 
Engineer. 

3.3.3.10 

Testing  and  Acceptance  of  Completed  Asphaltic  Concrete 

Courses 

Each  completed  asphalt  concrete  course  shall  be  tested  and  approved  in  accordance  with  the 
following requirements prior to placing any subsequent asphalt concrete course. 

Contractor shall, at his own expense, cut samples from each completed asphalt course during the 
progress  of  the  work  and  before  final  acceptance  of  the  project,  all  as  directed  by  the  Engineer.  
Compacted samples shall be taken by coring in accordance with AASHTO T-230, for testing by the 
Engineer.  Where the Contractor fails to provide cores as required by the Engineer, the Engineer 
may  arrange  for  the  taking  of  cores  at  the  Contractor's  expense.    Samples  shall  be  taken  of  the 
asphalt mix for the full depth of the course from the location directed by the Engineer at a rate of not 
less than one sample per 200 linear meters of road. 

Whenever deficiencies are noted in loose mix samples or core samples, the Engineer may direct the 
taking  of  additional  cores  at  the  Contractor's  expense  in  order  to  define  the  area  of  pavement 
involved. 

Hot asphalt mix shall be placed and compacted in holes left by sampling. 

 

 

 

a.  Requirements for compaction of asphalt concrete courses  

Degree of compaction is the ratio of the specific gravity of the pavement sample to the specific gravity 
of the laboratory Marshall specimens prepared in accordance with the job mix formula. 

Minimum degree of compaction required for the various types of asphalt concrete, expressed as a 
percentage, shall meet the requirements of Table 3-36. 

Table 3-36:  Minimum degree of required compaction 

Type of Mix 

Minimum degree of compaction 

required 

Base Course 

98 % 

Binder Course 

98 % 

Wearing Course 

98 % 

In the event the specific gravity of samples cut from any asphalt concrete course fail to comply with 
the minimum required, this will be considered a major defect in the work on the basis of which the 
portion of the asphalt course represented by these samples shall be rejected. 

Degree of compaction in excess of 101.5% shall not be permitted. The specific gravity of compacted 
asphalt cores shall be measured in accordance with ASTM D 2726/AASHTO T-230. 

Degree  of  compaction  for  all  asphalt  layers  with  respect  to  maximum  theoretical  Specific 
gravity shall be calculated and documented. 

 

b.  Requirements for Air Voids, Asphalt Content and Gradation 

Samples of the mixed materials shall be taken from the first two hundred tones and from every two 
hundred  tones  thereafter  to  determine  aggregate  grading  and  binder  content.  Samples  of  loose 
asphaltic concrete mix shall be taken behind the paver before compaction and shall be obtained in 
accordance  with,  ASTM  D-979.  Samples  of  compacted  asphaltic  concrete  shall  be  obtained  by 
coring in accordance with Method B of AASHTO T-230.  

If the grading of the mix falls outside of the Job Mix Limit (JML) the second part of the mix shall be 
checked. If the average grading indicate a maximum of three (3) sieves out of JML by maximum 1% 
or a maximum of two (2) sieves out of JML by maximum 2% the material shall be accepted in the 
permanent  works  when  an  additional  one  year  guarantee  shall  be  provided  by  the  contractor  on 
condition that the laid mix meet all other aspects of the specification. However, if it so happens twice 
within  15 

days’ time, the works shall be suspended, hot bin samples re-cheeked and adjustment 

made in the plant and if required re-designed.  

Determination  of  bitumen  content  and  extraction  gradation  may  be  performed  on  either  loose  or 
compacted samples in accordance with AASHTO T-164 and AASHTO T-30 except that the mass of 
mineral matter in the total volume of the extract shall be determined by using a bitumen meter or 
other  equipment  and  procedures  which  give  equally  satisfactory  results.  The  specific  gravity  of 
compacted  asphalt  course  shall  be  measured  in  accordance  with  AASHTO  T-230.  Gmm  as  per 
ASTM D-2041shall be checked on daily bases and used for calculating air voids.  

If any of these tests show results which are not in accordance with approved job standard mix within 
permissible variations the material shall be rejected and suitable adjustments shall immediately be 
made to ensure compliance therewith. Samples of the mixed material shall be taken at least twice a 
day or as determined by the Engineer for making Marshall Specimens to determine stability, flow 
and unit weight. For the samples to be taken for the making of daily Marshall Specimens the mixing 
pug mill temperature shall be set to the mixing temperature as specified in AASHTO T-245 and the 
compaction temperature of the moulds shall also be in accordance with AASHTO T-245.  Should for 
practical reasons the pug mill temperature be different from that used in AASHTO T-245 then the 
Engineer  shall  set  the  compaction  temperatures  for  the  moulds  to  so  compensate.  All  approved 
sampling  and  testing  required  under  the  sub-clause  of  this  clause  shall  be  undertaken  by  the 

 

 

 

Engineer. Sampling and testing by the Engineer in no way relives the Contractor of his responsibility 
for regular quality control testing in order to ensure compliance with the Specifications.  

If the Marshall stability of the mix is found a maximum of 200 kgf less than the minimum specified 
requirement, fresh hot bin samples shall be taken and six Marshall Specimens made on the average 
grading and bitumen content of the production date. If the stability is found satisfactory the material 
laid  on  site  shall  be  accepted  without  any  deduction.  If  not,  the  material  shall  be  removed  and 
replaced at contractor’s cost. 

The density of the compacted mixes shall be related to the daily Marshall Density, which shall be 
determined by taking the average of four standard Marshall specimens made from samples of the 
mix  taken  from  the  mixing  plant  or  paver.  The  density  of  each  sample  shall  be  determined  and 
compared with the mean value. Any individual result which varies from the mean by more than 0.015 
gm/cc  shall  be  rejected.  Marshall  tests  shall  be  repeated  on  a  daily  basis  to  establish  the  daily 
Marshal Density for that particular day's production. The daily Marshall Density shall not vary from 
the job mix Design Density by more than + 0.75%. If it does, the higher of the densities (daily Marshall 
Density or Job Standard Density) shall be applied to satisfy the requirements of in-situ compaction. 
However, the in-situ air voids shall not be less than 4.5% and more than 8.5% if it so happens the 
matter shall be investigated. In the event of recurrent the hot bin samples shall be immediately taken, 
the specific gravity rechecked and the situation rectified 

– if needed the mix redesigned.  

The “Job Standard Mixture Reference Density” (JSMD) shall be obtained by making six standard 
Marshall Specime

ns from samples of the approved “Job Standard Mixture” determining the relative 

density or each and comparing them with the mean values of the six. Any individual result which 
differs from the mean by more than 0.015 gm/cc shall be rejected and provided not more than two 
results  are  so rejected  the  mean  of  the  remaining  results  shall  be  designated  the  “Job  Standard 
Mixture Reference Density”. Generally the average density of the specimens made for checking the 
loss of stability of the mix shall be taken as JSMD unless otherwise directed by the Engineer. 

In  the  event  it  transpires  from  the  analysis  conducted  on  samples  of  loose  mix  or  cores  that  the 
asphalt content or aggregate gradation are beyond the permissible tolerances specified for the job 
mix formula  established for  each respective asphalt course mix,  as determined by the  Engineer, 
such variation affects the characteristics of the asphalt mix as far as its compliance with the Contract 
conditions and specifications is concerned, this shall be considered a major defect in the work on 
the basis of which the portion of the asphalt course represented by these samples shall be rejected. 

c.  Requirements for Thickness 

Total constructed thickness of asphaltic concrete base course or asphaltic concrete wearing course 
used for new construction, reconstruction or roadway widening shall not vary more than 6 mm from 
the total thickness shown on the Contract plans and included in the bills of quantities. 

In the event the constructed thickness of the asphaltic concrete base course or asphaltic concrete 
wearing course is 6 mm more than the total thickness shown on the Contract plans, the area shall 
be corrected as directed by the Engineer by removing the excess material in an approved manner 
to provide the required thickness. 

In the event the constructed thickness of the asphaltic concrete base course or asphaltic concrete 
wearing course is 6 mm less than the total thickness shown on the Contract plans, the Contractor 
shall provide additional material in the next course (base course or wearing course). In no case shall 
the deficiency of the base course exceed 12 mm and in no case shall the deficiency of the wearing 
course exceed 8 mm.  In the event the total thickness of the wearing course is less than the total 
thickness required by the Contract plans by more than 6 mm, the Contractor shall remove the top 
layer of 50 mm or to a depth as directed by the Engineer and a new layer constructed so the total 
thickness of the wearing course is within the limits indicated on the Contract plans and as specified 
herein. 

Asphaltic concrete base course and the asphaltic concrete wearing course shall be constructed to 
the grade level as shown on the Contract plans, as specified and as approved by the Engineer. 

 

 

 

In no case shall the total sum thickness of the subbase, base course and wearing course be less 
than the total sum thickness of all courses shown on the Contract plans. 

Tolerances specified herein shall not invalidate the tolerances set forth for the evenness of surfaces 
of the asphaltic concrete courses. 

d.  Requirements for Evenness of Surface 

Engineer shall test the evenness of surface for each course of the various asphalt concrete courses 
incorporated in the Contract to ascertain their compliance with the conditions, these specifications 
and  the  Contract  plans  with  regard  to  levels,  longitudinal  falls,  cross-sections  and  evenness  of 
surface. 

Contractor shall put at the disposal of the Engineer a five-meter straight-edge and a crown template 
of sturdy construction and approved design and enough labor to assist in the checking operations. 

Any layer containing deviations or variations exceeding the following tolerances shall be corrected 
or removed and replaced, at the expense of the Contractor, to the satisfaction of the Engineer and 
according to the following specifications: 

1.  Variation  in  the  levels  of  the  profile  grade  line  after  construction  shall  not  exceed  one 

centimeter from the levels indicated on the Contract plans. 

2.  When  tested  by  a  five-meter  straight-edge  placed  at  right  angle  and  parallel  to  the  road 

centerline at intervals not exceeding two meters, or when tested by a crown template placed 
at  right  angle  to  the  road  centerline  at  intervals  not  exceeding  half  the  template  length, 
variation of the surface of the road from the testing edge between any two contacts with the 
surface shall not exceed the following maximum tolerances: 

i. 

Base Course:  6 mm 

ii. 

Wearing Course:  4 mm 

Tolerances herein specified for evenness of surface shall not invalidate the tolerances set 
forth for thickness of the asphalt concrete courses. 

3.  In no case shall the final surface of the roadway be constructed such that surface water will 

stand on the roadway in depths exceeding the above maximum tolerances. 

4.  The rideability of the completed final wearing course, or other desired surface courses, shall 

be tested using laser road surface profile measurement equipment complying with the latest 
edition  of  ASTM  E950,  Class  1  device  (or  other  equivalent  and  internationally  recognized 
standard). The device shall measure both wheel paths with laser height sensing instruments 
and it shall have a valid calibration certificate. 

The IRI shall be computed according to the latest edition of ASTM E1926 (or other equivalent 
and internationally recognized standard) from the longitudinal profile measurements of the 
road surface 

5.  Rideability  of  the  finished  wearing  course  when  tested  with  a  laser  road  surface  testing 

machine shall have an International roughness index not exceeding the following values: 

i. 

Average value over a 400 m section 

a) 

For posted speed ≥ 100 km/hr:  ≤ 0.90 

b)  For posted speed 80 km

/hr:  ≤ 1.10 

c) 

For posted speed 60 km/hr:  ≤ 1.30 

d) 

For posted speed < 60 km/hr:  ≤ 1.50 

ii. 

Peak value over a 25 m section:  ≤ 1.5  (not more than 2 values per 400 meters) 

All humps and depressions exceeding the specified tolerance shall be corrected by removing  the 
defective work and placing it with new material as directed by the Engineer at the Contractors cost. 

 

 

 

 

 

 

 