Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 26

 

 

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.3.12.8 

Rejecting Fresh Concrete 

Prior to sampling, the Engineer may reject any batch or load of concrete that appears defective in 
composition  without  testing.  This  includes  cement  content  or  aggregate  proportions.  Rejected 
material shall not be incorporated in the structure.  

4.3.12.9 

Concrete with Nonconforming Strength 

Concrete with tested compressive strengths (refer to Section 4.3.12) that fail to meet acceptance 
level requirements will be rejected.  Rejected concrete and the associated work shall be removed 
and replaced at the Contractors expense.  Removal and replacement limits will be evaluated and 
approved by the Engineer prior to start of the Contractor’s removal work. 

4.3.13 

 Curing Materials 

All concrete curing compounds and concrete evaporation retardants must demonstrate conformance 
to the requirements of these Standard Specifications. Each lot of the material shall be sampled at 
the site of the works and tested for acceptance.  

Material that fails to meet the requirements of these Standard Specifications shall not be used.  

4.3.13.1 

Sheet Materials for Curing Concrete 

Sheet materials for curing concrete shall meet the requirements of ASTM C171, “Sheet Materials for 
Curing Concrete,” except that only the white, reflective type shall be used. 

4.3.13.2 

Liquid Membrane-forming Concrete Curing Compounds 

Liquid membrane-forming compounds used for curing concrete shall conform to ASTM C309, Type 
1D or 2, Class A or B, requirements; except that the loss of water within 72 hours shall not exceed 
0.40 kg/m

2

 for all applications, per ASTM C156. 

4.3.13.3 

Burlap Cloth 

Burlap cloth shall meet the requirements of AASHTO M 182, Class 4. 

4.3.13.4 

Sampling 

A  product  sample  shall  be  submitted  for  each  material  under  consideration,  with  the  request  for 
approval of material. Sample sizes shall be per the applicable testing standard as described in the 
subsections of Section 4.3.13, specifically:  

  Sheet materials: ASTM C171 

  Liquid membrane-forming compounds: ASTM C309 

  Burlap cloth: AASHTO M 182 

Sample containers for liquid membrane-forming concrete curing compound shall be standard friction 
seal  500  ml  cans,  lined  to  prevent  rusting.  Cans  for  sampling  at  the  manufacturing  site  shall  be 
provided by the manufacturer.  

Sampling  of  liquid  membrane-forming  concrete  curing  compound  shall  comply  with  the  following 
procedures, as applicable:  

For production sampling, the following should occur:  

1.  Select 3 samples during actual transfer, or filling, operations to the shipping containers. 

2.  Take the first sample from the fill stream after 15 %, but before 30 %, of material has been 

transferred or filled. Label the sample No. 1 and indicate the approximate number of drums 
filled. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

3.  Take the second sample from the fill stream after 40 %, but before 60 %, of material has been 

transferred or filled. Label the sample No. 2 and indicate the approximate number of drums 
filled.  

4.  Take the third sample from the fill stream after 70 %, but before 90 %, of material has been 

transferred or filled. Label the sample No. 3 and indicate the approximate number of drums 
filled. 

For sampling drums, the following should occur:  

a.  Select three drums, at random, for each identifiable lot or batch.  

b.  Thoroughly disperse material in each drum with a mechanical mixer. 

c.  Check each drum for complete dispersion by scraping a 25 mm by 25 mm slat, or similar object, 

along the drum bottom. 

1.  Remove  the  slat  and  examine  the  end  for  settlement  and  material  along  the  length  for 

uniform appearance.  

d.  Secure a sample, using a 25 mm diameter tube or pipe, for each of the three drums. 

1.  Insert the tube or pipe to within approximately 150 mm of the bottom of the drum, place the 

palm of the hand over the open end of the tube or pipe to form a seal and withdraw the tube 
over the sample can and discharge sufficient material to fill the can. 

2.  Discharge the remainder of material back into the drum. 

e.  Allow material in the tube to drain down to a drip and wipe material from the exterior of the 

tube before sampling another drum. 

When drums cannot be identified by lot or batch, segregate into groups of no more than 20 drums 
each.  Assign  a  lot  or  batch  number  to  each  group  and  sample  according  to  the  drum  sampling 
procedure. If there are 3 drums or less, sample each drum. 

For bulk storage sampling, the following should occur:  

a.  Bulk  storage  tanks  must  be  designed  for  recirculation;  therefore,  have  fixed  stirrers  or  use 

portable stirrers to insure complete mixing prior to discharge or use of material. 

b.  Ensure  complete  mixing  as  described  in  Step  3  of  the  drum  sampling  procedure,  prior  to 

sampling. 

c.  Bulk  storage  tanks  with re-circulating  systems may  be  sampled from  a  re-circulating  line  or 

from the discharge line. Discharge approximately 19 l into a clean container before securing 
sample. 

1.  Circulate  for  3 to  5  minutes,  discharge  approximately  19  l  and  secure  a second  sample. 

Repeat the circulation and discharge. Secure a third sample. Number the samples in the 
order taken. 

2.  Discharged  material  may  be  returned  to  the  storage  tank  if  clean  containers  have  been 

used. 

d.  Bulk storage tanks using mixers may be sampled in the same manner as drums, using a tube. 

1.  Secure three samples: 1 from the top third of the tank, 1 from the middle third, and 1 from 

the bottom third. 

Under no conditions shall two or more portions of material be blended or mixed to form a composite 
sample. 

Samples of liquid membrane-forming compounds for curing concrete must be labelled with the batch 
number; the part of the batch represented, i.e., the first, middle, or last third; the total batch quantity 
represented; and the producer, material type, date of sampling, date of manufacture, and sampler's 
name. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Cost of sampling, testing, and processing shall be borne by the Contractor. 

4.3.13.5 

Tests and Acceptance 

Material shall be accepted based on the Engineer

’s approval of a request for approval of materials, 

which shall include the following information:  

1.  Company name 

2.  Physical and mailing addresses 

3.  Type of material 

4.  Laboratory test report for each material with test data showing compliance with these standard 

specifications 

5.  Contact person and telephone number 

4.3.14 

Steel Reinforcing Bar 

Concrete reinforcement shall meet the requirements of Chapter 5. 

4.3.15 

Joint Sealing Materials 

Use of joint fillers, pads, waterstops, proprietary or custom-built expansion-joint assemblies, or other 
incidental materials used in forming, constructing, and sealing permanent joints, shall be subject to 
the approval of the Engineer. Joint filler and sealants shall conform to drawing requirements. When 
not specified, one of the joint fillers identified in these specifications may be used. 

Samples  for  each  lot  taken  by,  or  in  the  presence  of,  the  Engineer  shall  be  submitted  by  the 
Contractor to the Engineer for approval. Samples must be submitted for testing 14 days prior to use 
in the works. 

Each lot of the joint filler or sealant shall be identified with the batch and lot number, material, the 
batch quantity, the date and time of manufacture, and the name and address of the manufacturer; 
and  shall  be  accompanied  by  the  manufacturer's  certification  attesting  compliance  with  this 
specification.

 

When required by the Engineer, the Contractor shall submit test certificates issued by 

an approved, independent testing authority to confirm that the respective materials comply with the 
specified  requirements,  or  a  certificate  by  the  patent  holder  or  designer  certifying  that  the 
manufactured item complies in all respects with relevant product specifications. 

4.3.15.1 

Fixed-joint Seal 

Joint sealer shall repel the intrusion of stones, dirt, and other material into the joint or into the material 
itself. Joint sealer shall be neoprene, preformed or extruded type, of the size and shape indicated 
on  the  Contract  plans.  Preformed  joint  sealer  material  shall  comply  with  the  requirements  of 
AASHTO  M  220  or  ASTM  D2628.  Lubricant  adhesive,  for  use  with  the  preformed  sealer,  shall 
conform to ASTM D4070. 

Shape, width, and depth of the sealer shall meet the following requirements:  

1.  Such that it is compressed to the point of being substantially solid with a minimum of air spaces 

when installed at the minimum joint opening.  

2.  Such that the top centre of the exposed surface is depressed below the surface of the sealer 

edges when compressed.  

3.  Approved by the Engineer prior to being furnished. 

Sealer  shall  be  flexible  and  pliable  and  retain  its  elasticity  at temperatures  from  -28°  C  to  54°  C. 
Sealer  shall  not  develop  appreciable  permanent  set  after  full  compression  of  the  approved  joint 
shape for the full effective life of the material. It shall be compatible with the material of which the 
joint  surfaces  are  composed  and  be  relatively  unaffected  by  the  normal  moisture  in  the  material. 
Joint sealer shall not be field spliced, except when specifically permitted by the Engineer.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

Each  lot  of  the  adhesive  shall  be  delivered  in  containers  plainly  marked  with  the  manufacturer's 
certification attesting compliance with this specification. 

4.3.15.2 

Preformed Joint Fillers 

Preformed joint fillers shall be furnished in a single piece for the depth and width required for the 
joint with a thickness not less than 13 mm. 

Table 4-28: Joint fillers

 

Type

 

Specification

 

Preformed expansion joint filler 

 

(bituminous type)

 

AASHTO M 33 or 

 

ASTM D1751

 

Preformed sponge-rubber and cork expansion joint fillers

 

AASHTO M 153*

 

Type I 

 sponge-rubber 

 

Type II 

 cork 

 

Type III 

 self-expanding cork

 

Preformed expansion joint fillers 

 

(nonextruding and resilient bituminous types)

 

AASHTO M 213

 

Flexible cellular joint filler 

 

ASTM D1056, Type 2, 

 

Grade 4 or 5

 

*Compression test specimen shall recover to at least 65 % of its thickness before testing. Compressive 
strength shall be at least 0.07 MPa.

 

4.3.15.3 

Backer Rod 

Backer rod, or backing material, shall conform to the requirements of ASTM D5249.  Sealant shall 
be a compatible sealant as recommended by the rod manufacture. Backer rod sizes shall conform 
to Table 4-29. 

Table 4-29: Backer rod sizes

 

Joint width after preparation 

Rod diameter 

8 mm 

9 mm 

9 mm 

13 mm 

13 mm 

16 mm 

16 mm 

19 mm 

19 mm 

25 mm 

25 mm 

32 mm 

32 mm 

38 mm 

38 mm 

50 mm 

Material  containing  bitumen  or  solvents  shall  not  be  used  with  thermosetting  chemically  curing 
sealants.  

4.3.15.4 

Joint Sealants 

Sealers  for  joints  not  coming  in  contact  with  bituminous  materials  shall  be  a  2-component,  cold-
curing polysulphide liquid polymer meeting Federal Specification, TT-S-227e, Type II, Class A, or as 
approved by the Engineer or as shown in the Contract plans. Sealer shall be gun grade, or Type II, 

W

ORKS

 

 

Second Edition -SEP 2020 

 

suitable for both horizontal and vertical joints. Where a primer is to be used in conjunction with the 
sealant, it shall be of the prescribed proprietary material. 

For proprietary asphalt-rubber products, the Contractor shall furnish the following: 

1.  Source and grade of asphalt binder 

2.  Total granulated rubber content and mass, as percent of the asphalt-rubber mixture 

3.  Granulated rubber types and content of each type, if blend 

4.  Mass as a percent of combined rubber 

5.  Gradation of granulated rubber 

6.  Type of asphalt modifier, if any 

7.  Quantity of asphalt modifier and mass as a percent of asphalt binder 

8.  Heating and application temperatures 

9.  Manufacturer's recommended application procedures 

10.  Other additives 

Thermosetting chemically curing sealants shall comply with the requirements of ASTM C920. Final 
international  rubber  hardness  degree  (IRHD)  hardness  of  the  sealant  shall  be  20  +5.  Silicone 
sealants shall comply with the requirements of the project particular specifications. Other sealants 
may be used, if approved by the Engineer, after the Contractor has furnished the Engineer with full 
information and specifications. 

4.3.15.5 

Hot-poured Joint Sealants 

Hot-poured joint sealants shall meet the requirements of ASTM D6690 and be sampled and tested 
per ASTM D5167 and ASTM D5329. In addition, the sealant shall have a flash point per AASHTO T 
48 of 205° C minimum.  

Physical  properties  of  the  joint  sealer,  when  mixed  in  accordance  with  the  manufacturer’s 
recommendations, shall be per Table 4-30.   

Table 4-30: Poured rubber joint sealer

 

Property 

Criteria 

Colour

 

Gray or black 

Viscosity

Pourable and self-levelling at 10ºC 

Application life

≥ 3 hours at 22º C and 50 % relative humidity 

Set to touch 

≤ 24 hours at 22º C and 50 % relative humidity 

Curing time 

≤ 96 hours at 22º C and 50 % relative humidity 

Non-volatile content 

≥ 92 % 

Hardness rating (durometer 

“Shore A”)  5 to 35 

Resiliency 

≥ 80 % 

Bond test methods 

In  accordance  with  this  section  of  the  standard 
specifications 

Note  1:  Viscosity  and  application  life  may  be  waived  if  the  material  is  mixed  and  placed  by  a 
pump and mixer approved by the Engineer. Suitable primer, if required by the manufacturer, shall 
be furnished with each joint sealer. Primer shall be suitable for brush or spray application at 10ºC 
or higher and shall cure sufficiently at 10º C to pour the joint within 24 hours. It shall be considered 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Property 

Criteria 

as an integral part of the sealer system. Any failure of the sealer in the test described herein, 
attributable to the primer, shall be grounds for rejection or re-testing. 

Acceptance of joint sealing compound for use on a project shall be on the basis of laboratory tests 
of samples representative of each batch of material to be used on the job. A period of at least two 
weeks  shall  be  allowed  for  completion  of  tests.  Each  container  of  the  compound  shall  be  clearly 
identified by its batch number.  

Bond test for joint sealants shall be made per the following procedure: 

a.  Scope: This method covers the bond test for joint sealers. 

b.  Bond test apparatuses include the following: 

1.  Bond extension apparatus shall consist of an extension machine, similar to that described 

in federal specifications, SS-R-406, so designed that the specimen can be extended for four 
hours at a uniform rate of approximately 3.175mm per hour. It shall consist essentially of 
one  or  more  screws  rotated  by  an  electric  motor  through  suitable  gear  reductions.  Self-
aligning  plates  or  grips, one  fixed  and  the  other carried  by  the  rotating  screw  or  screws, 
shall be provided for holding the test specimen in position during testing. Machines must be 
capable of reversing themselves for the recompression cycle. Bond extension machine shall 
be housed in a refrigeration unit capable of maintaining a temperature of -18° C ±2° C.  

2.  Concrete blocks shall measure 25.4 mm by 76.2 mm by 50.8 mm. 

3.  Spacers made of brass or steel shall measure:  

i.  152.4 mm by 25.4 mm by 12.7 mm, or 

ii.  50.8 mm by 25.4 mm by 12.7 mm 

4.  Release agents shall consist of 50 % talc, 35 % glycerine, and 15 % water-soluble medical 

lubricant blended into a smooth paste, where percentages are by weight. 

c.  Bond test preparation includes the following:  

1.  Prior to use, the cured blocks shall be removed from storage in 98 % relative humidity, and 

acid etched with hydrochloric acid. Blocks shall be rinsed with water, wiped and allowed to 
surface dry before using. Three prepared blocks shall then be placed on a glass plate and 
a  spacer  152.4  mm  by  25.4  mm  by  12.7  mm  placed  between  them.  At  each  end  of  the 
spacer block, a spacer block 50.8 mm by 25.4 mm by 12.7 mm shall be placed on end. Prior 
to  using,  the  spacer  blocks  shall  be  coated  with  a  release  agent.  When  the  blocks  are 
pushed together and secured with rubber bands, a joint that measures 152.4 mm by 25.4 
mm by 12.7 mm in size is formed. Hot-poured joint sealer, prepared as per ASTM D 5167, 
is poured in the formed joint to the top of the spacer blocks. Test specimens shall be allowed 
to cool at standard conditions at least 2 hours; they shall be flush with the top and bottom 
of  the  block;  and  shall  be  trimmed  using  a  heated  metal  knife.  Test  specimens  shall  be 
placed in a freezer or extension chamber to equilibrate to testing temperature for at least 4 
hours prior to first extension. 

2. 

Two  component  joint  sealers  shall  be  prepared  according  the  manufacturer’s 
recommendations and poured in the formed joint to the top of the spacer blocks. Allow to 
cure for 96 hours. 

3.  Three samples are required for each test. 

d.  Bond test procedures consist of the following: 

1.  Remove the spacers and insert the test specimens in the clamps of the extension machine. 

Bond extension machines must be at -18° C ±2° C. Blocks shall then be extended to 12.7 
mm in approximately 4 hours. Specimen shall be removed within 30 minutes post extension 
and immediately inspected for obvious separations. Spacer strips shall be replaced and the 

W

ORKS

 

 

Second Edition -SEP 2020 

 

blocks allowed to recompress at room temperature for 2 hours. This completes one cycle. 
Specimens shall be returned to the freezer for at least 4 hours prior to the next extension. 
This cycle shall be repeated 2more times for 3 total test cycles. Immediately following final 
extension  cycle,  the  Contractor  shall  determine  conformance  to  respective  material 
specifications. 

2.  Development of any crack, separation, or other opening in the joint sealer or between the 

joint sealer and the block shall be considered as a failure to pass the bond extension test.  

4.3.15.6 

Joint Mortar 

A  completed mortar joint  shall  be  formed  with  a bead  on  the  outside  and  finished  smooth  on  the 
inside of the sections and cured per the manufacturer’s recommendations.  Masonry mortar shall be 
proportioned to meet the requirements of Article 4.3.10.4.  

4.3.15.7 

Bond Breakers 

Bond breaker shall be a nonstaining type which will provide positive bond prevention.  Polyethylene 
tape-coated paper, metal foil, or similar material may be used where bond breakers are required. 

4.3.16 

Waterstops 

Waterstops shall be of the type, size, and shape specified in the Contract documents. They shall 
conform  to  the  requirements  of  Article  21.9.1.6  of  Chapter  21,  Concrete  Structures,  of  theses 
standard specifications. 

4.4 

Construction Requirements 

The concrete construction shall be as indicated on the Contract plans, as specified herein and as 
directed by the Engineer. 

4.4.1 

Placing Concrete 

Prior to the start of concrete placement of any element of the work, the Contractor shall review his 
concrete placement methodology and program with the Engineer, unless this review requirement is 
otherwise waived by the Engineer.  Contractor’s concrete placement methodology and program shall 
be included in his program of works submittal, which shall meet the requirements of Section 1.6.2.  
This  program  of  works  may  need  to  be  updated  by  the  Contractor  for  any  specific  concrete 
placement, if directed by the Engineer.  

Concrete  shall  be  placed  immediately  after  mixing  by  the  Contractor.  Contractor  shall  provide 
sufficient capacity in the concrete producing plant and concrete transporting arrangements to avoid 
cold joints. Cold joints are defined as locations where one concrete pour ends and becomes non-
plastic before the next concrete pour begins. 

Transport of concrete from the mixers to the place of final deposit shall be by methods that prevent 
the separation, loss, or contamination of any of the ingredients. Any method using pipes or chutes 
for  transporting  concrete  will  not  be  permitted,  except  with  the  written  approval  of  the  Engineer. 
Engineer may require that all structural concrete mixing, placement, and curing be accomplished in 
shaded  areas.  Concrete  shall  not  be  placed  in  locations  where  nearby  vibrations  could  harm  the 
concrete’s initial set or strength.  

Concrete shall always be plastic and workable. Maximum time to discharge beyond the requirements 
of Article 4.3.12.7 may be reduced by the Engineer to ensure plasticity and workability.  

Methods for placing and consolidating concrete shall:  

1.

  Deposit concrete as near its final position as possible 

2.

  Place each layer of concrete before the previous layer commences to set  

W

ORKS

 

 

Second Edition -SEP 2020 

 

3.

  Produce  a  compact,  dense,  homogeneous,  and  impervious  concrete  with  smooth  faces  on 

exposed surfaces substantially free from water and air pockets, or honeycombs 

4.

  Work  the  concrete  around  the  reinforcement  steel,  ducts,  embedded  fittings,  and  into  the 

corners of the formwork 

Methods for placing and consolidating concrete shall not:  

a.  Leave a line of separation between layers 

b.  Segregate materials or aggregates 

c.  Displace reinforcing steel 

d.  Cause water to collect at the ends, corners, or along the faces of the forms 

e.  Move concrete over long distances 

f.  Allow surface water, such as rain, to affect or damage surface mortar quality or cause a flow 

or wash the concrete surface 

g.  Allow concrete to free fall more than 1 m 

To  convey  the  concrete  as  near  as  possible  to  its  final  position,  drop  chutes  of  rubber  or  metal 
conforming to the chutes, troughs, and conveyor belts requirements in Article 4.4.1.1 shall be used 
for small sections and bottom dump buckets or other suitable vessels for large sections. All vibration, 
consolidation, and finishing operations shall occur immediately after concrete is placed in its final 
position. Plastering is not permitted.  

Prior to concrete placement for any part of the works, the Engineer shall evaluate and approve the 
following:  

1.  Placement of reinforcement steel 

2.  Method and sequence of placing concrete 

3.  Formwork 

4.  Depth and character of foundation 

Immediately  prior  to  concrete  placement  for  any  part  of  the  works,  the  conditions  of  forms  and 
foundations shall be:  

a.  Thoroughly clean, with no dirt, shavings, loose stones, or other debris 

b.  Free from material that might adhere to or discolour the concrete 

c.  Free from standing water. Contractor shall remove standing water by pumping, if necessary.  

d.  Saturated  with  water,  for  foundations,  excavations,  and  absorbent  form  materials  such  as 

timber 

e.  Treated  with  a  non-staining  material  to  prevent  adherence  to  the  concrete,  for  exposed 

surfaces 

After acceptance, concrete shall not be modified by the addition of water or in any other manner to 
facilitate handling or for any other reason.  

Thickness of the layers shall be:  

1.

  150 mm to 300 mm for reinforced concrete 

2.

  Up to 450 mm for unreinforced concrete 

3.

  As instructed by the Engineer, dependent on the width of forms, amount of reinforcement and 

the necessity of placing each layer before the previous one commences to set 

To protect the initial set of  the concrete, the  Contractor shall provide the following protections for 
freshly  placed  concrete  for  at  least  72  hours  after  the  time  of  placing  and  until  the  Engineer 
determines the concrete is not vulnerable to these factors. Contractor shall:  

W

ORKS

 

 

Second Edition -SEP 2020 

 

a.  Prevent jarring of the forms 

b.  Prevent strain on the ends of projecting reinforcement steel 

c.  Install fencing or otherwise prevent persons from walking or placing articles on the concrete 

d.  Protect the concrete from rain, dust storms, chemical attack, and the harmful effects of sun, 

heat, wind, flowing water, vibrations, and shocks.  

Concrete  washout  water  shall  be  collected  and  disposed  of  in  accordance  with  all  applicable 
regulations. In no case shall washout water be allowed to enter any storm drains or other surface 
waters.  

If a concrete pump is used as the placing system, the pump priming slurry shall be discarded before 
placement.  Initial  acceptance  testing  may  be  delayed  until  the  pump  priming  slurry  has  been 
eliminated. Eliminating the priming slurry from the concrete may require that several cubic metres of 
concrete  are  discharged  through  the  pumping  system  and  discarded.  Use  of  a  concrete  pump 
requires a reserve pump or other backup equipment at the site. When concrete pumps are used for 
placement,  a  Contractor

’s  representative  shall,  prior  to  use  on  the  first  placement  of  each  day, 

visually inspect the pumps’ water chamber for water leakage. Pumps that allow free water to flow 
past the piston shall not be used by the Contractor.  

Any section of defective concrete shall be removed at the Contractor

’s expense.  

4.4.1.1 

Chutes, Troughs, and Conveyor Belts 

All chutes, troughs, and pipes shall be kept clean and free from coatings of hardened concrete by 
thoroughly flushing with water after each run. Water used for flushing shall not be discharged into 
the  works.  No  aluminium  chutes,  tremies,  troughs,  or  conduits  shall  be  used  to  pump  or  place 
concrete. 

Chute  lengths  and  slopes  shall  not  cause  segregation.  Where  steep  slopes  are  required,  chutes 
shall be equipped with baffle boards or be in short lengths that reverse the direction of movement. 
Spouts and baffles shall be provided at the lower end to minimise segregation.  

If the concrete will drop more than 1 m, it shall be deposited through a sheet metal or other approved 
conduit. If the form slopes, the concrete shall be lowered through approved conduit to keep it from 
sliding down one side of the form.  

To prevent segregation, the maximum length of any conveyor belt used to transport concrete shall 
be 90 m. If concrete requires protection from the sun or rain, the Contractor shall cover the belt. 

4.4.1.2 

Continuity of Concrete Work 

Casting of concrete shall not commence until a sufficient quantity of approved material is at hand to 
ensure continuity of operation, nor shall work commence until there is sufficient equipment in reserve 
in case of breakdown. 

Concreting in any one part or section of the work shall be carried out in one continuous operation 
and no interruption of concreting work longer than 30 minutes shall be allowed unless the Engineer 
approves  a  longer  time.  Each  layer  shall  be  placed  and  consolidated  before  the  preceding  layer 
takes initial set.  

Fresh  concrete  shall  not  be  placed  against  concrete  that  has  been  in  position  for  more  than  30 
minutes  unless  a  construction  joint  has  been  formed.  If  a  longer  interruption  is  allowed,  no  fresh 
concrete shall be deposited on or against the concrete placed before the interruption until the latter 
is  sufficiently  set to  resist  injury, at  least  one  hour.  Same  shall  apply  to adjacent  pours  at  abrupt 
changes in sections. Particular care shall be taken to ensure that partially set concrete shall not be 
damaged by shock or any other cause whatsoever. 

If directed by the Engineer, required in the Particular Specifications, or shown in the Contract plans, 
the  Contractor shall place concrete in any particular  section of the works without  any interruption 
whatsoever from the beginning to the end of the operation. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.4.1.3 

Hot Weather Protection and Temperature Limits 

When the shade air temperature is 32° C and rising, the Contractor shall take special precautions 
during all concrete operations to prevent the concrete temperature from exceeding 32° C prior to 
placement.  Concrete  that  fails  to  conform  to  the  maximum  temperature  requirement  prior  to 
placement shall be rejected. 

Fresh concrete placed at air temperatures exceeding 32° C shall be shaded from the direct rays of 
the sun to the satisfaction of the  Engineer. Concrete is not to be mixed or  placed without special 
protection and precautions, as approved by the Engineer, when the shade air temperature is 40° C 
or above. 

To maintain a concrete placement temperature less than 32° C, the Contractor may implement any 
combination of the following methods:  

a.  Shade or cool the aggregate stockpiles 

1.  Sprinkle coarse aggregate with water 

i. 

Monitor the pile’s moisture content and the mixing water to account for the free water 
in the aggregate 

ii. 

Remove from at least 300 mm above the bottom of the piles 

2.  Sprinkling of fine aggregate piles with water shall not be allowed 

b.  Shade the concrete mixing plant 

c.  Cool the mixing water 

1.  By refrigeration 

2.  By liquid nitrogen 

3.  By substituting well-crushed ice of a size that will melt completely during mixing for part of 

the mix water on a kg-for-kg basis 

d.  Screen  and  cover  concrete  in  transit,  concrete  placement,  and  concrete  curing  to  protect  it 

from wind and sun 

e.  Sprinkle  forms,  subgrade,  and  reinforcing  steel  with  cool  water  just  prior  to  placement  of 

concrete to cool all concrete-contact surfaces to less than 32°C before placement.  

In  hot  weather,  the  Contractor  shall  minimise  the  time  between  mixing  and  placing  and  shall  not 
permit mixer trucks to remain in the sun while waiting to discharge concrete. Chutes, conveyors, and 
pump lines shall be shaded. Curing shall commence immediately after concrete has been placed. 

If the evaporation rate at the concreting site is 0.5 kg/m

2

 of surface per hour or more, the Contractor 

shall surround the fresh concrete with an enclosure to protect the concrete from wind blowing across 
its surface until the curing compound is applied.  

4.4.1.4 

Concrete Exposed to Seawater 

All concrete placement shall be done in the dry where the completed structure will be in contact with 
seawater  or  brackish  ground  water.  Prior  to  removing  dewatering  and  cofferdams,  all  exterior 
surfaces  of  concrete  exposed  to  seawater  or  brackish  ground  water  shall  be  cured  and  water 
proofing or protection coatings applied, as required in the Contract plans or Particular Specifications. 

4.4.1.5 

Concrete Exposed to Alkaline Soils or Water 

Requirements  for  concrete  in  seawater  shall  also  apply  to  concrete  in  alkaline  soils  or  water.  In 
addition, the Contractor shall: 

1.  Let the concrete set at least 30 days, longer if possible, before allowing soil or water to contact 

it directly 

W

ORKS

 

 

Second Edition -SEP 2020 

 

2.  Vibrate  each  batch  of  concrete  immediately  after  it  has  been  placed  into  the  forms,  using 

enough vibrating tampers to do this effectively, and 

3.  Hand tamp, if necessary, to produce smooth, dense outside surfaces 

4.4.1.6 

Vibration of Concrete 

Unless otherwise permitted by the  Engineer, concrete shall be compacted by means of vibrators. 
Enough vibrators shall be supplied by the Contractor to consolidate the concrete, according to the 
requirements  of this  section.  Standby  vibrators  shall  also  be  made  available  by  the  Contractor  in 
case of breakdowns. At least 2 vibrators shall be available at locations in which more than 25 m

3

 of 

concrete  is  to  be  placed.  The  placement  of  the  vibrators  shall  be  strictly  vertical  to  avoid  air 
entrapment in the concrete. The size of the vibrators shall be for the intended purpose and approved 
by the Engineer as per the method statement or Inspection and Testing Plan (ITP). 

Each vibrator shall meet the following requirements: 

a.  Be designed to operate while submerged in the concrete 

b.  Vibrate at a rate of at least 7,000 pulses per minute 

c.  Be of a diameter that is compatible with the spacing of the reinforcement, and 

d.  Receive the Engineer

’s approval on its type and method of use. 

Immediately after the concrete is placed, vibration shall be applied in the fresh batch at the point of 
deposit.  Care  shall  be  taken  not  to  displace  reinforcement  nor  to  disturb  or  affect  partially  set 
concrete. In vibrating the concrete, the Contractor shall: 

1.  Space the vibrators evenly, no farther apart than 10 times the diameter of the vibrator 

2.  Ensure  that  vibration  intensity  is  great  enough  to  visibly  affect  a  weight  of  25  mm  slump 

concrete across a radius of at least 460 mm 

3.  Insert the vibrators slowly to a depth that will effectively vibrate the full depth of each layer, 

penetrating into the previous layer so that the fresh concrete will be worked into the previously 
placed layer on multilayer pours 

4.  Protect partially hardened, or non-plastic, concrete by preventing the vibrator from penetrating 

it  or  making  direct  contact  with  steel  that  extends  into  it.  Vibrators  shall  not  penetrate  non-
plastic concrete when only the vibrator’s own weight is applied 

5.  Continue each immersion in one place until shortly after air bubbles cease to appear on the 

surface of the concrete, and not long enough to form pools of grout 

6.  Continue vibration long enough to consolidate the concrete thoroughly, but not so long as to 

segregate it 

7.  Withdraw the vibrator slowly, gradually, and vertically when the process is complete to ensure 

no air pockets are formed 

8.  Not use vibrators to move concrete from one point to another in the forms, and 

9.  Avoid vibrator contact with reinforcement and formwork shall.  

When vibrating and finishing top surfaces that shall be exposed to weather or wear the Contractor 
shall not draw water or laitance to the surface. In high lifts, the top layer shall be shallow and made 
up of a concrete mix as stiff as can be effectively vibrated and finished. 

To produce a smooth, dense finish on outside surfaces, the Contractor shall hand-tamp the concrete.  

Vibration shall be applied by experienced labourers. Previously completed concrete pours shall not 
be subjected to disturbance by vibration within 4 to 24 hours of having been compacted. Vibrators 
shall not be attached to reinforcement in any circumstance.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.4.1.7 

Underwater Concrete 

Placing  concrete  under  water  shall  be  allowed  only  in  circumstances  where  it  is  not  feasible  to 
dewater the location before the concrete is placed. No concrete shall be placed in running water. 
Placement of concrete underwater shall be done using the methodology required in Section 21.7.4 
of Chapter 21, Concrete Structures, of these Standard Specifications. 

4.4.2 

Curing Concrete 

All  newly  placed  concrete  shall  be  cured,  which  shall  begin  immediately  after  finishing.  Concrete 
surfaces  shall  receive continuous  moisture  for  at  least  7  days. When  continuous  moisture  or  wet 
curing is required, the Contractor shall keep the concrete surfaces wet with water during curing.  

Curing shall be performed so that moisture is always present. Improperly cured concrete shall be 
considered defective and evaluated for rejection and reduced payment. Placing operations shall be 
stopped by the Engineer until the Contractor can put proper curing procedures into effect. 

Adopted  curing  method  shall  be  subject  to  the  Engineer's  approval  and  shall  not  cause  staining, 
contamination, or marring of the surface of the concrete. Method A shall be used for curing exposed 
concrete surfaces,  unless  otherwise  approved  by  the  Engineer. When  permitted  in  writing  by  the 
Engineer, the Contractor may use one of the following methods of curing exposed concrete surfaces. 

4.4.2.1 

Method A: Supplying Continuous Moisture  

Continuous moisture shall  be  provided  by the  Contractor  by  watering  a covering  of  heavy-quilted 
blankets or burlap and covering with white reflective type sheeting, or by wetting the outside surfaces 
of wood forms. Either approach shall be executed such that concrete surfaces remain wet with water 
continuously. Watering shall include supplying additional moisture by ponding, sprinkling, or fogging. 
Sawdust  or  coverings  that  cause  unsightly  discolouration  of  concrete  shall  not  be  used  by  the 
Contractor.  Coverings  shall  be  placed  as  soon  as  possible  after  finishing  operations  have  been 
completed and there is no danger of surface damage. Coverings shall be kept continuously moist; 
any method that results in the concrete being alternately wet and dry shall be considered an improper 
curing procedure.  

4.4.2.2 

Method B: Preventing Moisture Loss  

This  method  shall  consist  of  preventing  moisture  loss  from  the  concrete.  It  may  be  done  with  a 
combination of waterproof paper, white reflective plastic sheeting, or liquid membrane-forming curing 
compound. Paper and sheeting shall be securely anchored at the edges so as to effectively minimise 
moisture loss.  

If a formed surface is to be rubbed, the concrete shall be kept moist before and during the rubbing, 
and the curing shall be initiated immediately following the first rub while the concrete surface is still 
moist.  

Runoff water shall be collected and disposed of in accordance with all applicable regulations. In no 
case shall runoff water be allowed to enter any lakes, streams, or other surface waters. 

Steam curing concrete is acceptable for precast units.  

a.  Waterproof Paper 

Waterproof paper shall be the widest practicable width and adjacent sheets shall overlap a minimum 
of 150 mm and shall be tightly sealed with a pressure sensitive tape, mastic, glue, or other approved 
methods to form a complete waterproof cover of the entire concrete surface. Paper shall be secured 
so that wind shall not displace it. If any portion of the sheets is broken or damaged before expiration 
of the curing period, the Contractor shall repair the broken or damaged area immediately. Sections 
that have lost their waterproof qualities shall not be used. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

b.  White Reflective Plastic Sheeting 

White reflective plastic sheeting shall be used in the same manner as required for waterproof paper 
and shall comply with Section 4.3.134.3.13.1.  

c.  Curing Compounds 

Only Type 2 liquid membrane-forming curing compounds complying with AASHTO M 148 may be 
used, when approved by the Engineer, as the initial and final curing agents on concrete, subject to 
the following limitations: 

1.

  If the membrane film is broken or damaged at any time during the curing period, the area or 

areas shall be recoated to the original requirements 

2.

  Curing  compounds  shall  be  applied  to  unformed  surfaces  as  soon  as  the  water  sheen  has 

practically disappeared from the concrete, or as soon as the forms have been removed from 
surfaces not to be rubbed 

3.

  Curing compounds shall not be used on areas receiving a rubbed finish 

4.

  If there is to be any delay in applying curing compound, the surface shall receive moist curing 

until the compound can be applied 

5.

  Curing  compounds  shall  be  applied  with  equipment  that  shall  produce  a  fine  spray,  and  all 

compounds  shall  be  thoroughly  agitated  just  prior  to  use.  Surfaces  shall  be  sprayed  again 
immediately at right angles to the first application with a rate for each application at not less 
than 1 litre for each 3.6 m

2

 of surface. Care shall be taken to prevent application to joints where 

concrete bond is required to reinforcement steel, and to joints where joint sealer is to be placed 

6.

  No curing compound shall be used on fixed-form concrete barriers 

Timber formwork covering the concrete shall be moistened with water at frequent intervals to keep 
it from drying during the curing period. Metal formwork exposed to the sun must be shaded from its 
direct rays, painted white, or otherwise protected during the curing period. When forms are removed 
before  the  end  of  the  curing  period,  specified  curing  procedures  shall  be  implemented  by  the 
Contractor and continued until the end of the specified curing period. 

4.4.2.3 

Method C: Curing Compound 

Under the curing compound method, the Contractor shall: 

a.  Spray 2 coats of clear curing compound, Type 1D, on the concrete surface after the free water 

has disappeared. Coverage of combined coats shall be at least 4 L/15 m

2

b.  Cover the structure with white, reflective sheeting for at least 10 days, beginning no later than 

the morning after applying the curing compound.  

c.  After  the  10-day  curing  period,  remove  the  curing  compound  as  necessary  by  light 

sandblasting  or  by  spraying  with  a  high-pressure  water  jet  to  produce  an  even  surface 
appearance. Water jet equipment shall use clean fresh water and shall produce at least 175 
kg/cm

2

 at the nozzle with a discharge of at least 15 l/minute. Nozzles shall have a 25

o

 tip and 

shall  be  held  no more than  250  mm  from the  surface  being  cleaned.  Curing  compounds  or 
concrete sealers proposals, made by the Contractor, shall be evaluated by the Engineer and 
approvals shall be made in writing. As a minimum, the Contractor

’s proposal shall include the 

following: 

1.  Product identity 

2. 

Manufacturer’s recommended application rate 

3.  Method of application and necessary equipment 

4.  Material safety data sheet (MSDS) 

5.  Sample of the material for testing 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Contractor shall allow 14 working days for evaluating the proposal and testing the material. 

4.4.2.4 

Method D: Wet Blankets 

Under the wet-cure method, the Contractor shall: 

1.  Provide an initial cure period by continuous fogging or mist spraying for at  least the first 24 

hours. 

2.  After the initial cure period, cover the structure with a heavy quilted blanket. 

3.  Keep the blankets continuously wet for at least 10 days. No additional finishing is required at 

the end of the curing period. 

In the event any member or portion of the work prove, after removal of the formwork, to be of inferior 
workmanship or to be in any way whatsoever defective, or should crushing tests on samples taken 
from  the  work  show  that  the  concrete  used  therein  is  of  inferior  quality,  such  work  shall,  at  the 
discretion of the Engineer, be cut out and replaced. 

4.4.2.5 

Curing Slip-form Construction 

Slip-form construction shall be finished by the Contractor by:  

1.  Steel trowelling to close all surface pockmarks and holes; and  

2.  For plain surfaces, lightly brushing the front and back face with vertical strokes and the top 

surface with transverse strokes.  

After finishing, the Contractor shall cure the slip-form construction by using either Method C, curing 
compound, or Method D, wet blankets, as described below.  

Where slip-form work was performed, the concrete shall be protected against the weather and rapid 
drying out by means of a 4 m wide skirt attached to the lower perimeter of the formwork and hanging 
over the working platform. Skirts shall consist of hessian in the summer months and of canvas or 
other  suitable  material  in  winter  and  shall  be  weighted  at  the  bottom  to  prevent flapping  in  windy 
conditions. To wet the concrete, the Contractor shall use a fixed spraybar, which shall be connected 
to a suitable high-pressure water supply, along the full-length of the sliding formwork.  

4.4.2.6 

Insulated Curing 

The insulated curing method shall allow for a waterproof cover with a 1000 gauge polyethelene sheet 
and then insulated with 50mm rigid closed cells extruded polystyrene thermal board insulation.  Over 
the polystyrene thermal board, a 1000 gauge polyethelene sheet is again placed to avoid moisture 
ingress  into  the  Styrofoam/thermal  board.    The  whole  system  is  to  be  wrapped  properly  to  avoid 
displacements during the curing period (normally 10 days for pozzolanic concrete). 

4.4.3 

Concrete Finishing 

All concrete shall show a smooth, dense, uniform surface after the forms are removed. If it is porous, 
the Contractor shall bear the cost of repairing it. Contractor shall clean and refinish any stained or 
discoloured surfaces that may have resulted from their work or from construction delays. 

Surfaces that are specified in the Contract documents to be “troweled” shall after the concrete is 
partially set, finished to a smooth surface by troweling with a steel trowel until a slick surface free of 
bleed water is produced. Surface shall then be brushed with a fine brush using parallel strokes. 

Surface finishes for formed concrete surfaces shall be classified as follows: 

  Class 1: Ordinary surface finish 

  Class 2: Rubbed finish 

  Class 3: Tooled finish  

  Class 4: Sandblast finish 

W

ORKS

 

 

Second Edition -SEP 2020 

 

  Class 5: Wire brush or scrubbed finish 

Requirements for Class 1 to 5 surface finishes shall be in accordance with Section 21.12 of Chapter 
21, Concrete Structures, of these standard specifications. 

All concrete shall be given a Class 1, Ordinary Surface Finish, and if further finishing is required, 
such  other  type  of  finish  as  is  specified.  If  not  otherwise  specified  in  the  Contract  documents, 
exposed surfaces shall be given a Class 2, Rubbed Finish. Class 3, 4, or 5 finishes shall be applied 
only where specified in the Contract documents. Surfaces covered with fill do not require a surface 
finish. 

All surfaces of concrete that are not placed against forms shall be finished in accordance with Section 
21.10 of Chapter 21, Concrete Structures, of these standard specifications. 

4.4.4 

Construction and Expansion Joints 

Construction joints shall be installed:  

1.

  To the positions, dimensions, and types shown in the Contract plans.  

2.

  As specified herein.  

3.

  As approved by the Engineer, including additions, deletions, or relocations from the information 

shown in the Contract plans.  

4.

  As requested in writing by the Contractor, accompanied by a drawing that depicts them, and 

approved by the Engineer.  

5.

  In response to breakdowns or other unforeseen and unavoidable delays, with the Engineer

’s 

approval and with the Engineer

’s designation of bonded or unbonded. 

Any added costs that result from Contractor-initiated changes shall be borne by the Contractor.  

Concreting  shall  be  carried  out  continuously  at  construction  joints,  which  shall  be  formed  at  right 
angles to the axis of the member. Construction joints shall be formed neatly with grade strips or other 
approved methods. Irregular  or wavy pour lines will not be accepted by the  Engineer. Wire mesh 
forming material shall not be used. All joints shall be horizontal, vertical, or perpendicular to the main 
reinforcement. An edger shall not be used on any construction joint, and the Contractor shall remove 
any lip or edging before making the adjacent pour. Face edges of all joints that are exposed to view 
shall be carefully finished true to line and elevation. 

Construction  joints  in  abutment  walls,  wing  walls,  and  barrels  of  box  culverts  shall  be  placed  at 
intervals not exceeding 9 m, except as otherwise indicated on the Contract plans or approved by the 
Engineer. 

For definitions of the various types of joints refer to the AASHTO Load and resistance factor design 
(LRFD) Bridge design specifications. 

Waterstops shall be installed in all joints where the Engineer determines that ingress or egress of 
water is detrimental regardless of whether such waterstops are shown on the Contract plans. 

If  the  Contract  plans  require  a roughened  surface  on the joint,  the  Contractor  shall  strike  it  off to 
leave grooves at right angles to the length of the member. Grooves shall be 12 mm to 25 mm wide, 
6 mm to 12 mm deep, and spaced equally at twice the width of the groove. If the first strike-off does 
not  produce the required  roughness, the  Contractor  shall  repeat the  process  before the concrete 
reaches initial set. Final surface shall be clean and without laitance or loose material. 

If the Contract plans do not require a roughened surface, the Contractor shall include shear keys at 
all construction joints. These keys shall provide a positive, mechanical bond. Shear keys shall be 
formed depressions and the forms shall not be removed until the concrete has been in place at least 
12 hr. Forms shall be slightly bevelled to ensure ready removal. Raised shear keys are not allowed. 

Shear keys for the tops of beams, at tops and bottoms of boxed girder webs, in diaphragms, and in 
crossbeams shall:  

W

ORKS

 

 

Second Edition -SEP 2020 

 

1.  Be formed with 50 mm by 200 mm wood blocks 

2.  Measure 200 mm lengthwise along the beam or girder stem 

3.  Measure 100 mm less than the width of the stem, beam, crossbeam, or other adjacent element 

as measured transverse to the stem 

4.  Be spaced at 400 mm centre-to-centre. 

Unless the  Contract plans  show otherwise, in locations not named above, shear keys shall equal 
approximately one-third of the joint  area and shall be approximately 40 mm deep. Before placing 
new concrete against cured concrete, the Contractor shall thoroughly clean and roughen the cured 
face and wet it with water. Before placing the reinforcing mat for footings on seals, the  Contractor 
shall:  

a.  Remove all scum, laitance, and loose gravel and sediment 

b.  Clean the construction joint at the top of the seals 

c.  Chip off any high spots on the seals that would prevent the footing steel from being placed in 

the position required by the Contract plans.  

Shear keys formed into, or out from, the surface of the previously placed concrete, or steel dowels, 
shall be used where required. Shear keys formed into the concrete shall be formed by the insertion 
and subsequent removal of bevelled wood strips that shall be thoroughly saturated with water prior 
to insertion. Steel dowels may, at the discretion of the Engineer, be used in lieu of keys. Size and 
spacing  of  the  keys  and  dowels  shall  be  as  shown  in  the  Contract  plans,  or  as  directed  by  the 
Engineer.  

4.4.4.1 

Preparing the Surfaces 

When the concrete has set and while it is still green, the surface film and all loose material shall be 
removed  without  disturbing  the  aggregate  by  means  of  a  water  jet  assisted  by  light  brushing  to 
expose the aggregate and leave a sound, irregular surface. Where this is not possible, the surface 
film  shall  be  removed  after  the  concrete  has  hardened,  by  mechanical  means  appropriate  to  the 
degree  of  hardness  of  the  concrete  so  as  to  expose  the  aggregate  and  leave  a  sound,  irregular 
surface. Roughened surfaces shall be washed with clean water to remove all laitance, dirt, and loose 
particles.  

Surface retarding agents may be used only with the Engineer

’s approval. 

4.4.4.2 

Placing Fresh Concrete at Construction Joints 

Where  fresh  concrete  is  placed  on the  same  day  as  when  the  construction joint  was formed, the 
fresh concrete shall be cast directly against the face of the construction joint. 

When  concreting  recommences  a  day  or  more  after  the  construction  joint  has  been  formed,  the 
Contractor shall abide by the following procedure: 

1.  Construction  joints  shall  be  kept  constantly  wet  for  at  least  6  hours.  Surface  shall  be  in  a 

saturated, surface dry condition when concreting begins again. 

2.  Any dirt, excess water, and loose particles shall be removed prior to re-concreting. 

3.  For horizontal construction joints a 25 mm thick concrete layer of the same grade of concrete 

made richer by reducing the coarse aggregate content by 25 % shall be placed on the joint 
plane immediately before concreting. 

4.  For vertical construction joints the fresh concrete shall be placed against a surface prepared 

as described above to a saturated, surface-dry condition. 

 

 

 

 

 

 

 