c. Plant Mixed
a. Mixing
Thoroughly mix materials in the proportions designated on the mix design, in a plant that
meets the requirements “Mixing Plant.” Mix at optimum moisture content, unless otherwise
directed, until a homogeneous mixture is obtained.
b. Placing
Place lime-treated base on a subgrade or subbase prepared in accordance with details
shown on the plans. Bring the prepared roadway to the moisture content directed. Haul lime-
treated base to the roadway in clean trucks and begin placement immediately. Spread and
shape in a uniform layer with an approved spreader. Construct individual layers to the
thickness shown on the plans, the same day as delivered, unless otherwise approved. Do
not place lifts exceeding a compacted depth of 20 cm. Correct or replace segregated areas
as directed.
d. Compaction
Compact the mixture using density control, unless otherwise shown on the plans. Multiple lifts are
permitted when shown on the plans or approved. Bring each layer to the moisture content directed.
Determine the moisture content of the mixture at the beginning and during compaction.
Begin rolling longitudinally at the sides and proceed toward the center, overlapping on successive
trips by at least one-half the width of the roller unit. Operate rollers at a speed between 3 and 10
KMPH, as directed.
Rework, recompact, and refinish material that fails to meet or that loses required moisture, density,
stability, or finish before the next course is placed or the project is accepted.
e. Reworking a Section
When a section is reworked within 72 hours after completion of compaction, rework the section to
provide the required density. When a section is reworked more than 72 hr. after completion of
compaction, add additional lime at 25% of the percentage determined “Mix Design.” Reworking
includes loosening, adding material or removing unacceptable material if necessary, mixing as
directed, compacting, and finishing. When density control is specified, determine a new maximum
density of the reworked material and compact.
f. Construction joints
Construct vertical joints between segmented areas of lime-treated base. The vertical face may be
created by using a header or by cutting back the face to approximately vertical. Place successive
base courses using the same methods as the first course. Offset construction joints by at least 15
cm.
g. Curing
Cure for 5 days with wet hessian cloth and watered so as to keep moist at all time or by applying an
asphalt emulsion at a rate of 0.2 to 0.50 kg/m2 as directed. Maintain moisture during curing.
No equipment or traffic will be permitted on the completed cement stabilized subbase/base during
the first 7 days unless otherwise permitted by the Engineer