e)  Mixing temperature range and minimum compaction temperature for the performance 

grade asphalt to be used in the mix 

iii.  Antistrip additives:  If part of the job-mix formula:   

a)  0.5 liter of liquid antistrip additive or 5 kg of cement, fly ash, or lime antistrip additive 

b)   Name of product 

c)  Manufacturer 

d)  Material safety data sheet 

e)  Dosage rate 

iv.  Recycled asphalt pavement material.  If part of the job-mix formula:  

a)  Source and percentage of recycled asphalt pavement material 

b)  Average gradation of the recycled asphalt pavement material 

c)  Percent asphalt binder in the recycled asphalt pavement 

d)  Target value for the asphalt binder content (that considers the percent asphalt binder 

in  the  recycled  asphalt pavement)  and the  percent  new  (virgin)  asphalt binder  to  be 
added to the mix 

e)  100  kg  representative  sample  of  recycled  asphalt  pavement  material.    For  existing 

pavements,  mill  where  designated  by  the  Engineer  to  the  pavement  removal  depth.  
Sample the removed material and replace it with an approved asphalt concrete mix.  
Do not use the replacement material in the recycled mix 

f)  4 liters of recycling agent, if part of the job-mix formula

 

 

3.  Verification 

Engineer  will  review  and  shall  perform  design  verification  testing.    If  verification  testing  is 
performed, the information supplied in the Contractor

’s design must agree with the verification 

test results within the tolerances shown below. 

i.  Aggregate  gradations:    Representative  aggregate  samples  from  each  stockpile,  when 

combined according to the Contractor

’s recommendation for stockpile percentages, shall 

be within the gradation defined by the target values plus or minus the following tolerance 
for each sieve. 

Table 3-25:  Aggregate gradation target value tolerances 

Sieve Size

 

Tolerance, % (±)

 

25 mm

 

3.0

 

19 mm

 

3.0

 

12.5 mm

 

3.0

 

9.5 mm

 

3.0

 

4.75 mm

 

3.0

 

2.36 mm

 

3.0

 

425 

m

 

2.0

 

75 

1.0

 

ii.  Voids in mineral aggregate (VMA):   Contractor

’s VMA result is verified if the Engineers 

result is not below the minimum specification limit. 

 

 

 

iii.  Voids filled with asphalt (VFA).

  

The Contractor

’s VFA result is verified if the Engineers 

result is within the specification limits in Table 3-24 

iv.  Air voids (Va):  Contractor

’s Va result is verified if the Engineers result at the same design 

asphalt binder content is within 1.0 % of the specification value. 

v.  Tensile strength ratio (TSR):  Contractor

’s percent retained strength result is verified if the 

Engineers result is above the minimum specification value. 

4.  Changes and Resubmissions 

If  a  job-mix  formula  is  rejected  or  a  material  source  or  the  recycled  asphalt  pavement  is 
changed, submit a new job-mix formula for acceptance.  Up to 21 days may be required to 
evaluate a change.  Approved changes in target values will not be applied retroactively for 
payment. 

Engineer

’s job-mix formula evaluation costs will be deducted from the Contractors payment, 

when resulting from the following: 

i.  Contractor-requested changes to the approved job-mix formula 

ii.  Contractor requests for additional job-mix formula evaluations 

iii.  Additional testing necessary due to the failure of a submitted job-mix formula 

5.  Acceptance 

Do not begin mix production until the job-mix formula is accepted by the Engineer. 

b.  Marshall Method 

All of the criteria shown in  

Table  3-27 shall  be  considered  in  designing  and  evaluating  each type  of  mix.  Optimum  bitumen 
content determined by the Marshall Method, as per the latest edition of Asphalt Institute MS-2 for 
calculating the volumetric properties and for fixing the optimum bitumen content of each type of mix 
and the same, shall be used in preparing specimens for the Immersion compression (AASHTO T-
165) test. 

1.  Types of Asphaltic Concrete  

Types of asphaltic concrete mixes shall be as shown on the Contract plans/ typical cross-
sections of the contract drawings and the combined grading shall conform to table 3-28  

Table 3-26:  Aggregate grading of asphaltic concrete mixes 

 

Base course 

Binder course 

Wearing course 

Coarse 

Fine 

Sieve opening 

size 

Percent passing by weight 

37.5 mm 

100 

 

25.0 mm 

72-100 

100 

100 

19.0 mm 

60-89 

80-100 

86-100 

100 

12.5 mm 

46-76 

63-85 

69-87 

66-95 

9.5 mm 

40-67 

57-77 

58-78 

54-88 

4.75 mm 

30-54 

40-60 

40-60 

37-70 

2.36 mm 

22-43 

25-45 

25-45 

26-52 

 

 

 

 

Base course 

Binder course 

Wearing course 

Coarse 

Fine 

Sieve opening 

size 

Percent passing by weight 

1.18 mm 

15-36 

20-36 

20-37 

18-40 

600 µm 

10-28 

13-27 

13-27 

13-30 

300 µm 

6-22 

8-19 

8-19 

8-23 

150 µm 

4-14 

5-13 

5-13 

6-16 

75 µm 

2-8 

2-8 

2-8 

2-8 

 

Table 3-27  Design criteria for hot mix asphalt (HMA) 

Properties 

Bituminous 

 base course 

Bitumin

ous 

binder 

course 

Bituminous 

wearing course 

Type/category of 

road 

Parkin

g lots, 

minor 

roads, 

drivew

ays, 

etc. 

(light, 
traffic 

volum

e) 

Sector 

roads 

(mediu

traffic 

volume) 

Main 

roads, 

highway

s, truck 

roads, 

etc. 

(heavy 

traffic 

volume) 

All 

roads 

categori

es 

Parkin

g lots, 

minor 

roads, 

drivew

ays, 

etc. 

(light, 
traffic 

volum

e) 

Sector 

roads 

(mediu

m traffic 

volume) 

Main 

roads, 

highw

ays, 

truck 

roads, 

etc. 

(heavy 

traffic 

volum

e) 

Penetration grade of 
bitumen* 

60/70 

40/50 or 

60/70 

40/50 or 

60/70 

60/70 or 

40/50 

60/70 

40/50 or 

60/70 

40/50 

or PG  

Number of compaction 
blows each end of 
specimen by freely 
held Marshall hammer 

75 

75 

75 

75 

75 

75 

75 

Stability (Marshall) 
minimum kg 

1000 

1100 

1200 

1300 

1400 

1500 

1600 

Flow (Marshall) mm 

2 - 4 

2 - 4 

2 - 4 

2 - 4 

2 - 4 

2 - 4 

2 - 4 

Stiffness minimum 
kg/mm (minimum) 

400 

400 

500 

500 

450 

450 

550 

  Percent air 

voids in mix 

3 - 5 

4 - 7 

5 - 7 

5 - 7 

3 - 5 

4 - 7 

5 - 7 

  Percent  voids 

in mineral 
aggregate 
(VMA), % 
minimum  

11 

13 

13 

13 

13 

14 

14.5 

  Percent  voids 

filled with 

60-75 

55-70 

50-65 

50-70 

60-75 

55-70 

50-65 

 

 

 

Properties 

Bituminous 

 base course 

Bitumin

ous 

binder 

course 

Bituminous 

wearing course 

Type/category of 

road 

Parkin

g lots, 

minor 

roads, 

drivew

ays, 

etc. 

(light, 
traffic 

volum

e) 

Sector 

roads 

(mediu

traffic 

volume) 

Main 

roads, 

highway

s, truck 

roads, 

etc. 

(heavy 

traffic 

volume) 

All 

roads 

categori

es 

Parkin

g lots, 

minor 

roads, 

drivew

ays, 

etc. 

(light, 
traffic 

volum

e) 

Sector 

roads 

(mediu

m traffic 

volume) 

Main 

roads, 

highw

ays, 

truck 

roads, 

etc. 

(heavy 

traffic 

volum

e) 

Asphalt Binder 

Bitumen content % by 
weight of mix 

3.3-4.0 

3.2-3.9 

3.1-3.8 

3.4-4.1 

3.4-4.4 

3.4-4.2 

3.4-4.2 

Loss of Marshall 
stability by 
submerging 
specimens in water at 
60

O

 C for 24 hours as 

compared to stability 
measured after 
submersion in water at 
60

O

 C for 30 minutes 

(max. % loss) 

25 

25 

25 

20 

20 

20 

20 

Residual voids in total 
mix checked on the 
Job standard grading 
but upper percentage 
limit of binder content 
applying 

600 blows 

on each face 

 

 

OR 

 

Residual voids in 
total mix by PRD as 
per BS 598-104  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Filler to bitumen ratio 

0.8 

– 

1.4

 

 

 

Material for asphaltic concrete shall be combined so as to be well graded within the limits given 
in  Table  3-28.    Combined  gradations  which  approach  maximum  limits  on  some  sieves  and 
minimum limits on other sieves shall be avoided. 

 

 

 

2.  Job Mix Formula and Allowable Tolerances 

The Contractor shall be responsible for the design and performance of all bituminous mixes. 
The  Contractor  shall  submit,  for  the  Engineer's  approval,  a  proposed  "Laboratory  Design 
Mixture"  together  with  all  applicable  design  data  meeting  these  specifications  and 
requirements of Table 3-26 and  

Table 3-27 at least 30 days prior to commencement of the works.   

Engineer will review the proposed job-mix formula by the Contractor and shall perform design 
verification testing.  The Engineer will take samples of materials proposed for use in the mix in 
order to check their quality and to cross check the proposed mix design for which the Contractor 
shall  repeat  the  laboratory  design  exercise  in  the  site  laboratory  under  the  supervision  of 
Engineer to confirm the Marshall properties submitted by the Contractor and fix the job mix 
formula.  

The information supplied by the contractor for the laboratory design mixture must agree with 
the verification test results  

After receiving the approval of aggregate and bitumen from the Engineer, the Contractor shall 
make a written request for the approval of the job mix formula prepared by the Contractor under 
the supervision of the Engineer in the laboratory.  

Approval of the job mix formula by the Engineer shall in no way relieve the Contractor of his 
responsibilities  and  obligations  stipulated  in  the  contract  and  the  Contractor  shall  be 
responsible for the soundness of the asphalt paving mixes and the satisfactory execution and 
performance of the asphalt paving courses. 

After the job mix formula has been established and approved the contractor shall carry out 
plant and site trials. All mixes from the plant shall be produced within the following tolerance 
as indicated to table 3-30. 

 

Table 3-28:  Job mix tolerance (for plant produced mix)  

Aggregate retained on 4.75mm sieve or large 

± 5.0 % 

Aggregate passing 4.75mm sieve and retained on 1.18mm sieve 

± 4.0 % 

Aggregate passing 1.18mm sieve and retained on 0.075mm sieve  

 

 

± 2.0 % 

Aggregate passing 0.075mm sieve    

 

± 1.0 % 

Bitumen Binder 

± 0.2 % 

Temperature of mixing 

± 10

O

 C 

The  approved  Laboratory  Design  Mixture  shall  be  used  for  agreeing  the  approved  Job 
Standard Mixture. 

Consistently produce a mixture with asphalt content at the target value. Do not use the above 
operational tolerance as a means to alter the asphalt content target value. 

3.  Acceptance Sampling and Testing of HMA Mixture   

Samples  of  loose  asphaltic  concrete  mix  shall  normally  be  taken  behind  the  paver  before 
compaction  and  shall  be  obtained  in  accordance  with  AASHTO  T-168.  Samples  of 
compacted asphaltic concrete shall be obtained by coring in accordance with Method B of 
AASHTO  T-230.    Determination  of  bitumen  content  and  extraction  gradation  may  be 
performed on either loose or  compacted samples in accordance with AASHTO  T-164 and 
AASHTO T-30 except that the ash correction shall be determined by using a bitumenometer.  
Specific  gravity  of  the  compacted  asphalt  concrete  cores  will  be  measured  in  accordance 
with AASHTO T-230. 

 

 

 

4.  Marshall Mix Materials  

a.  Fine Aggregate  

Fine  aggregate  is that  portion  of  the  mineral  aggregate  passing  the  2.36  mm  sieve.    Fine 
aggregate shall consist of crushed sand and shall be of such gradation that when combined 
with  other  aggregates  in  proper  proportions,  the  resultant  mixture  shall  meet  the  required 
gradation.  Source of crushed fine aggregate is considered as the crusher site at which it is 
produced. Crushed  sand shall be produced by crushing clean coarse aggregate and shall 
not be thin, flaky or elongated.   

Fine aggregate including filler shall be obtained from 100% crushed gravel or crushed rock 
pre-screened to exclude natural uncrushed fine material or weathered unsound fines. Use of 
dune sand will not be permitted. 

Fine  aggregate  shall  be clean  and  free from  organic  matter,  clay,  cemented  particles  and 
other extraneous or detrimental materials.  Individual stockpiles of aggregate containing more 
than 10 % by weight of fine aggregate shall be tested for sand equivalent.  Fine aggregates 
shall meet the additional requirements listed in Table 3-29 

Table 3-29:  Hot mix asphalt concrete fine aggregate requirements 

Mix design tests 

Test method 

Requirements 

Sampling 

AASHTO T-2 

Sieve analysis 

AASHTO T-27 and AASHTO T-

11 

Sand equivalency 

AASHTO T-176 

Min. 55 % 

Sodium sulfate soundness 

AASHTO T-104

 

 

Max. 10 % 

Magnesium sulfate soundness 

AASHTO T-104 

Max. 12 % 

b.  Coarse aggregate  

Coarse  aggregate  is  that  portion  of  the  mineral  aggregate  retained  on  the  2.36  mm  sieve.  
Coarse aggregate shall consist of crushed natural stones and gravel.  Crushed particles shall 
be cubic and angular in shape and shall not be thin, flaky or elongated.  Gradation shall be 
such that when combined with other aggregate fractions in proper proportions, the resultant 
mixture shall meet the required gradation.  Source of crushed aggregate is considered to be 
the crushing site from which it is produced.   

Coarse aggregate shall be clean and free from organic matter, clay, cemented particles and 
other  extraneous  or  detrimental  material.  Coarse  aggregate  shall  meet  the  requirements  of 
Table 3-30 and Table 3-31.   

Table 3-30:  Hot mix asphalt concrete coarse aggregate requirements 

Project control and mix design 

tests 

Test method 

Requirements 

Sieve analysis 

AASHTO T-27

 

and AASHTO T-11 

Sampling 

AASHTO T-2  

Fractured faces base course 

AASHTO TP-61 

90 % min. 

(Two fracture 

faces) 

Fractured faces wearing course 

AASHTO TP-61 

90 % min. 

(Two fracture 

faces) 

 

 

 

Project control and mix design 

tests 

Test method 

Requirements 

Flakiness 

B.S. 812  

Less than 30 % 

Sodium sulfate soundness 

AASHTO T-104

 

 

10 % max. 

Abrasion loss 

AASHTO T-96

 

 

40 % max. 

Plasticity index (blending with sand to 

eliminate plasticity will not be 

permitted) 

 

Non plastic 

Absorption of coarse aggregate 

AASHTO T 85

 

 

2 % max. 

Table 3-31:  Hot mix asphalt concrete aggregate source requirements 

Source requirement tests 

Test methods 

Requirements 

Percentage of wear (500 Rev.) 

AASHTO T96 

37 % max. 

Soundness (coarse aggregate)           

(5 Cycles, magnesium sulfate) 

AASHTO T104

 

 

10 % max loss 

Soundness (coarse aggregate)           

(5 Cycles, magnesium sulfate) 

AASHTO T104 

12 % max. loss 

Absorption of coarse aggregate 

AASHTO T85

 

 

2 % max. 

Specific gravity (fine aggregate) 

AASHTO T84

 

 

2.75 min. 

Specific gravity (coarse aggregate) 

AASHTO T85 

2.75 min. 

c.  Steel slag aggregate 
 
Steel slag aggregate shall be accepted for use in HMA mixtures, as partial or complete 
replacement of natural crushed aggregate, for all projects  only within the geographical 
areas  under  the  jurisdiction  of  Abu  Dhabi  City  Municipality.  The  percentage  of 
replacement of natural aggregates with steel slag aggregate shall be based on suitable 
trials  and  tests  to  demonstrate  compliance  with  performance  criteria.  Steel  slag 
aggregate  and  HMA  mixtures  with  steel  slag  aggregate  shall  meet  the  requirements 
specified in the Appendix 1 of Chapter 3 of these specifications. 
 
d.  Commercial mineral filler 

Commercial  mineral  filler  shall  consist  of  finely  ground  particles  of  limestone,  cement,  or 
hydrated  lime  in  accordance  with  AASHTO  M-17.  It  shall  be thoroughly dry  and free  from 
lumps and shall meet the gradation requirements of AASHTO M-17. 

When hydrated lime is used as mineral filler, the hydrated lime shall comply with the following 
requirements:   

  Hydrated lime shall comply with the definitions given in ASTM C51   

  Sampling, packaging and marking of hydrated lime shall be in accordance with ASTM 

C50   

  Storage and use of the hydrated lime shall at all times be such as to protect the material 

from the weather 

  Hydrated  lime  shall  comply  with  the  gradation  shown  in  Table  3-32  when  tested  in 

accordance with AASHTO T-219. 

Table 3-32:  Gradation of hydrated lime 

 

 

 

Sieve Size 

Minimum % passing 

600 µm 

95 

75 µm 

80 

  When tested by ASTM C25, hydrated lime shall comply with the chemical requirements 

shown in Table 3-33 

Table 3-33:  Chemical requirements for hydrated lime 

Test 

Requirement 

Min. 

Max. 

Free moisture (%) 

3.0 

Available lime index as CaO (%) 

50 

Carbon dioxide CO

2

 (%) 

Unhydrated lime (%) 

When cement is used as mineral filler, it shall meet the requirements of Type V cement in 
accordance with AASHTO M-85 (ASTM C150). 

e.  Asphalt Binder 

Unless otherwise required in the particular specifications, asphalt binder specified for use in 
the asphalt mixes shall be 60-70 or 40-50 penetration grade as per Table 3-34, in accordance 
with  AASHTO  M-20

 

and  as  shown  in  Table  3-34.  Asphalt  binder  for  Marshall  mix  designs 

requiring a performance graded (PG) bitumen shall meet the requirements of article 3.3.2.5, 
sub-article (a), point 1. 

 

Table 3-34:  Penetration grade Asphalt Binder 

 

60 – 70 

40 - 50 

Test 

Min 

Max 

Min 

Max 

Penetration @ 25

 C, 100 g 5 sec 

60 

70 

40 

50 

Flash point, Cleveland open cup, 

232 

232 

Ductility at 25° C, cm 

100 

100 

Solubility in trichloroethylene, % 

99 

99 

Kinematics viscosity (centistokes) at 135 ° C  

240 

280 

Softening Point Ring & Ball apparatus 

48 

52 

51 

55 

Thin film oven test, 3.2 mm, 163

 C, 5-hour loss on 

heating, % 

0.8 

0.8 

Penetration of residue, % of original 

(after thin film oven test) 

54 

58 

Ductility of residue @ 25

 C, 

 C, 

5 cm per minute, cm 

50 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Automatic  recording  equipment  shall  maintain  a record  of  each material  used,  including  quantity, 
number of batches mixed and classification of mix, and dates and times of operations. Form of data 
output shall be acceptable to the Engineer.  

At  all  times  when  concreting  is  being  carried  out,  the  Contractor  shall  have  available  sufficient 
standby plant to cover the operations of mixing, transporting, placing and compaction of concrete in 
the event of plant breakdowns. 

A  plant  appraisal  has  to  be  conducted  and  approved  by  the  Engineer  prior  to  any  approval  of 
concrete mix and batching commencement. 

4.3.11.2 

Transporting and Placing 

Contractor shall arrange his methods for transporting and placing concrete so that:  

1.  Contamination, segregation or loss of constituents does not occur;  

2.  Concreting  shall  proceed  continuously  for  the  whole  of  a  pour  without  interruption  by  meal 

breaks, change of shift, movements of placing positions, and the like;  

3.  Transport  of  concrete  from  mixer  to  placing  equipment  shall  be  only  by  means  of  purpose 

made a

gitating trucks operated at the manufacturer’s recommended agitating and discharge 

speeds, operating continuously from commencement of the pour and discharging within  the 
time  specified  in  Table  4-27  from  the  introduction  of  cement  into  the  mixer.  Time  of  such 
introduction shall be recorded on the delivery note together with the weight of the constituents 
of each mix;  

4.  Concrete shall be compacted in its final position within 15 minutes of its discharge from the 

mixer or from the agitator truck.  

Before concreting is commenced, the reinforcement and other embedded items shall be cleaned of 
all deleterious matter including concrete 'splash' from previous concreting operations. All forms and 
falsework  shall  be  carefully  examined  and  the  space  to  be  occupied  by  the  concrete  thoroughly 
cleaned out.  

Adequate notice must be given to the Engineer that areas are ready for concreting to enable the 
Engineer to attend and make necessary tests, inspections and checks.  

Concrete shall not be placed in any part of the works until the Engineer's consent has been given. If 
concreting is not started within 24 hours of consent being given, consent shall again be obtained 
from the Engineer. Concreting shall then proceed continuously over the area between construction 
joints.  

All concrete shall be placed in the positions and to the sequences indicated on the Contract plans, 
in  the  Specification  or  as  directed  by  the  Engineer  and  by  such  means  as  shall  prevent 
contamination, segregation or loss of constituent materials.  

When deposited, concrete shall not have a temperature of more than 32

C. 

Concrete  shall  be  deposited  as  nearly  as  possible  in  its  final  position  and  shall  be  brought  up  in 
horizontal layers not exceeding 300mm in compacted depth. Where lateral spreading of concrete in 
the forms is necessary it shall be carried out by approved means and not by the use of vibrators. 
Concrete shall not be allowed to freely fall more than 1.2 m.  

Where chutes are used in the placing of concrete they shall be of an accepted design and shall be 
used at  slopes acceptable to the Engineer. Concrete shall not be pumped or  discharged through 
aluminium alloy conduits.  

Where concrete is placed by pumping, the Contractor shall take all precautions necessary to regulate 
the velocity of discharge in order to prevent segregation of the concrete or damage and distortion to 
the reinforcement and other embedded items and formwork.  

During the placing of concrete for reinforced work a competent steel-fixer and carpenter shall be in 
constant attendance to adjust or correct the position of reinforcement and formwork as necessary. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Time-table for a pour of concrete is to be so arranged that no face of concrete shall be left more than 
20 minutes before fresh concrete is deposited against it or more than 90 minutes after the mixing of 
the concrete forming the face, whichever is the less.  

All concrete shall be compacted using internal (immersion) mechanical vibrators unless otherwise 
specified  or  ordered.  Vibrating  shall  be  carried  out  to  a  plan  acceptable  to  the  Engineer  and  no 
workmen shall be allowed to be operators without having received special training. Vibrators shall 
be of approved pattern and arrangement, and care shall be taken to avoid segregation and to ensure 
adequate.  

A  sufficient  number  of  vibrators  in  serviceable  condition  shall  be  on  site  to  ensure  that  spare 
equipment is always available in the event of breakdowns.  

Vibration shall not be applied by way of the reinforcement. Where vibrators of the immersion type 
are used, contact with reinforcement and all inserts shall be avoided as far as is practicable. 

4.3.11.3 

Qualification of Concrete Suppliers 

All commercially available concrete shall be batched in a prequalified manual, semi-automatic, or 
automatic plant as described in this section of these Standard Specifications and per the applicable 
requirements  of  Article  4.3.11.1.  Delays  to  the  Contractor  due  to  problems  in  getting  the  plant 
certified shall not be the responsibility of the Engineer.  

Batch  plant  qualification shall  be  obtained  through  a  National  Ready  Mixed  Concrete  Association 
(NRMCA)  certified  batch  plant  inspector  using the  NRMCA batch  plant  checklist  or  an  equivalent 
method as approved by the Engineer. Copies of the following documentation shall be provided by 
the Contractor to the Engineer: 

1.

  Current certificate of conformance 

2.

  Concrete mix designs  

3.

  Truck list 

4.

  Batch plant scale certification 

5.

  Admixture dispensing certification 

6.

  Volumetric water batching devices, including water metres and verification 

Requirements for central-mixed concrete include the following:  

a.  Mixers shall be equipped with a timer that prevents the batch from discharging until the batch 

has been mixed for the prescribed mixing time.  

b.  Concrete shall be mixed for at least 1 minute after all materials and water have been introduced 

into  the  drum.  Shorter  mixing  time  may  be  allowed  if  the  mixer  performance  is  tested  in 
accordance with AASHTO M 157 Annex A1, Concrete Uniformity Requirements. 

c.  Concrete  transported  by  truck  mixer/agitator  shall  not  undergo  more  than  250-revolutions 

before beginning discharging. To remain below this limit, the supplier may agitate the concrete 
intermittently within the prescribed time limit. When water or admixtures are added after the 
load  is  initially  mixed,  an  additional  30-revolutions  shall  be  required  at  the  recommended 
mixing speed. 

d.  Tests shall be conducted by either: 

1.  The project site lab 

2.  An approved independent lab certified by ADQCC 

e.  Flow of water into the mixer shall be uniform with a portion of the water entering in advance of 

the  cementitious  material  and  aggregates  and  all  of  the  water  entering  within  the  first  15 
seconds of the mixing time. 

Requirements for shrink-mixed concrete include the following:  

W

ORKS

 

 

Second Edition -SEP 2020 

 

  Mixing time in the stationary mixer shall be at least 30 seconds or until the ingredients have 

been thoroughly blended.  

  Mixing time in the transit mixer shall be at least 70 revolutions at the mixing speed designated 

by the manufacturer of the mixer.  

 

Following  mixing,  the  concrete  in  the  transit  mixer  may  be  agitated  at  the  manufacturer’s 
designated agitation speed.  

  A  maximum  of  320  revolutions  total  for  mixing  and  agitation  shall  be  permitted  prior  to 

discharge.  

Requirements for transit-mixed concrete include the following:  

1.  Mixers and agitators shall always operate within the capacity and speed-of-rotation limits set 

by the manufacturer. 

2.  Any fully loaded mixer shall keep the concrete uniformly mixed. 

3.  All mixers and agitators shall be capable of discharging the concrete at a steady rate.  

4.  In transit-mixing, mixing shall begin within 30 seconds after the cementitious material is added 

to the aggregates. 

5.  Water used for cleaning the mixer shall be discharged prior to further batching. 

Only those transit mixers that meet the following requirements shall be allowed to deliver concrete:  

a.  Operational revolution counter 

b.  Functional device for measurement of water added 

c.  Mixing drums free of concrete build-up 

d.  Mixing blades that meet the minimum specifications of the drum manufacturer 

e.  Metal data plates attached to each mixer and agitator that clearly display:  

1.  Maximum concrete capacity of the drum or container for mixing and agitating; and  

2.  Rotation speed of the drum or blades for both the agitation and mixing speeds 

f. 

A  copy  of  the  manufacturer’s  blade  dimensions  and  configuration  on  file  at  the  concrete 
producer’s office 

g.  No components made of aluminium or magnesium alloys that contact plastic concrete during 

mixing and transporting 

h.  Smooth,  mortar-tight,  metal  bodies  capable  of  discharging  the  concrete  at  a  satisfactory 

controlled rate without segregation. If discharge of concrete is accomplished by tilting the body, 
the surface of the load shall be retarded by a suitable baffle. 

For each project, the plant manager shall examine mixers and agitators to check for any build-up of 
hardened concrete or worn blades biannually, or as required. If this examination reveals a problem, 
or  if  the  Engineer  wishes  to  test  the  quality  of  the  concrete,  slump  tests  may  be  performed  with 
samples taken at approximately the one-quarter and three-quarter points as the batch is discharged. 
Maximum allowable slump difference shall be as follows: 

  If the average of the 2 slump tests is <100 mm, the difference shall be <25 mm; or 

  If the average of the 2 slump tests is >100 mm, the difference shall be <37 mm 

If the slump difference exceeds these limits, the equipment shall not be used until the faulty condition 
is corrected. However, the equipment may continue in use if longer mixing times or smaller loads 
produce  batches  that  pass  the  slump  uniformity  tests.  All  concrete  production  facilities  shall  be 
subject  to  verification  inspections  at  the  discretion  of  the  Engineer.  Verification  inspections  are  a 
check for current scale certifications, accuracy of water metering devices, accuracy of the batching 

W

ORKS

 

 

Second Edition -SEP 2020 

 

process,  and  verification  of  coarse  aggregate  quality.  If  the  concrete  producer  fails  to  pass  the 
verification inspection, the following actions shall be taken: 

1.  For the first violation, a written warning shall be provided. 

2.  For  the  second  violation,  the  Engineer  shall  give  written  notification  and  assess  a  price 

reduction equal to 15% of the invoice cost of the concrete that is supplied from the time of the 
infraction until the deficient condition is corrected. 

3.  For the third violation, the Contractor is suspended from providing concrete until all deficiencies 

causing  the  violation  have  been  permanently  corrected  and  the  plant  and  equipment  have 
been re-inspected and meet all the prequalification requirements. 

4.3.11.4 

Batching and Delivering Permeable Concrete 

Batching of permeable concrete requires special attention.  Batch plant shall ensure that aggregate 
has been triple washed to remove fines and stored in a no-fines silo.  Trucks to be used in delivering 
and mixing the material shall have their drums thoroughly flushed and cleaned prior to loading.   

4.3.12 

Acceptance of Concrete 

All concrete shall be accepted based on the approved qualifications of the materials, mix and the 
testing of the as-delivered mixed concrete to the jobsite. All concrete shall be accepted based on 
adherence to the requirements of these standard specifications for temperature, slump, air content, 
and compressive strength at 28 days, as tested and determined by the Engineer. 

A sublot is defined as the material represented by an individual strength test. An individual strength 
test is the average compressive strength of cubes from the same sample of material. 

Each sublot shall be deemed to have met the specified compressive strength requirement when both 
of the following conditions are met: 

a.  Individual strength tests do not fall below the specified strength by more than 12.5 % or 3.5 

MPa, whichever is least. 

b.  An  individual  strength test  averaged  with the  2  preceding  individual  strength  tests meets  or 

exceeds specified strength for the same class and exact mix number of concrete on the same 
Contract.  

When compressive strengths fail to satisfy one or both of the above requirements, the  Contractor 
may request acceptance of in-place concrete strength based on core results. This method shall not 
be used if the Engineer determines coring would be harmful to the integrity of the structure. If allowed, 
the Contractor shall obtain the cores in accordance with AASHTO T 24M and deliver them to the 
Engineer for testing in accordance with AASHTO T 22. If the concrete in the structure will be dry 
under service conditions, the core will be air dried at a temperature of between 15

C and 27

C and 

at a relative humidity of less than 60 % for 7 days before testing, and shall be tested air dry. 

Acceptance for each sublot by the core method requires that the average compressive strength of 3 
cores  be  at  least  85  %  of  the  specified  strength  with  not  1  core  less  than  75  %  of  the  specified 
strength. When the  Contractor requests strength analysis by coring, the results obtained shall be 
accepted by both parties as conclusive and supersede all other strength data for the concrete sublot. 

If the Contractor elects to core, cores shall be obtained no later than 50 days after initial concrete 
placement. Engineer must concur in the locations to be cored. Repair of cored areas shall be the 
responsibility of the Contractor. Cost incurred in coring and testing, including repair of core locations, 
shall be borne by the Contractor. 

4.3.12.1 

Certification of Compliance 

Commercial  suppliers  shall  provide  a  certificate  of  compliance  for  each  truckload  of  concrete. 
Certificate of compliance shall verify that the delivered concrete is in compliance with the mix design 
and a responsible representative of the concrete producer shall sign it, affirming the accuracy of the 
information  provided.  For  ready-mix  concrete,  the  certificate  of  compliance  shall  include  as  a 

W

ORKS

 

 

Second Edition -SEP 2020 

 

minimum the batching facility, date, and quantity batched per load. Certificates of compliance shall 
include the information given in Table 4-23, and may be machine-produced records or printed forms 
filled  in  by  hand.  Ready-mix  commercial  concrete  shall  be  subject  to  the  Engineer

’s  acceptance 

testing of the as-delivered product as specified in Section 4.3.12.  

Table 4-23: Certificate of compliance requirements for each truckload of concrete

 

1.

 

Manufacturer plant or batching facility

 

2.

 

Contracting agency Contract number

 

3.

 

Date

 

4.

 

Time batched

 

5.

 

Truck number

 

6.

 

Initial revolution counter reading

 

7.

 

Quantity batched this load

 

8.

 

Type of concrete by class and producer design mix number

 

9.

 

Cementitious material producer, type, and mill certification number.  Mill test number as required 
by Section 

Packaging and Marking i

s the basis for acceptance of cementitious material 

 

10.

 

Fly ash, if used, brand and type

 

11.

 

Mix design weight per cubic metre and actual batched weights for:

 

12.

 

Cementitious material

 

13.

 

Fly ash, if used

 

14.

 

Coarse aggregate and moisture content for each size

1

 

15.

 

Fine aggregate and moisture content

1

 

16.

 

Water, including free moisture in aggregates

 

17.

 

Admixtures brand and total quantity batched

 

18.

 

Air-entraining admixture

 

19.

 

Water reducing admixture

 

20.

 

Other admixtures

 

21.

 

Approved aggregate gradation designation

 

22.

 

For concretes that use combined aggregate gradation, the certificate of compliance shall include 
the aggregate components and moisture contents for each size in lieu of the aggregate information 
described above. 

 

4.3.12.2 

Conformance to Mix Design 

Cementitious  materials  and  coarse  and  fine  aggregate  weights  shall  be  within  the  following 
tolerances of the mix design: 

Table 4-24: Conformance to mix design in production

 

Condition:

 

Batch Volume ≤ 4 m

3

 

Batch Volume > 4 m

3

 

Cementitious materials in mix

 

Cement

 

+5 % -1 %

 

+5 % -1 %

 

+5 % -1 %

 

Aggregate

 

+10 % -2 %

 

+2 % -2 %

 

 

Fly ash

 

 

 

+5 % -1 %

 

Ground  granulated 
blast-furnace slag

 

 

 

+5 % -1 %

 

Microsilica

 

 

 

±10 %

 

Water  shall  allow  for  moisture  content  of  aggregates,  volume  of  liquid  admixtures,  and  shall  not 
exceed the maximum water specified in the mix design.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.3.12.3 

Sampling and Testing Methods 

Concrete properties shall be determined from concrete as delivered to the project and as accepted 
by the Contractor for placement. It shall be the Contractor

’s responsibility to provide adequate and 

representative samples of the fresh concrete to a location designated by the Engineer for the testing 
of concrete properties and making of specimens. Sampling and testing methods for acceptance of 
concrete for slump, temperature, and air content, if applicable, shall be completed by the Contractor 
and Engineer as follows: 

Table 4-25: Sampling and testing methods for acceptance of concrete

 

Concrete Property or Process

 

Test Method

 

Sampling freshly mixed concrete

 

AASHTO T 141

 

Slump of hydraulic cement concrete

 

AASHTO T 119M

 

Temperature of freshly mixed cementitious material concrete

 

AASHTO T 309M

 

Air content of freshly mixed concrete by the pressure method

 

AASHTO T 152

 

Making and curing of concrete cube test specimens 

 

BS EN 12390-1, BS EN 12390-2

 

Compressive strength testing of cube test specimens

 

BS EN 12390-3

 

Sampling and testing shall be performed as follows:  

a.  Before concrete placement from the first truck load.  

b.  For each load until 2 successive loads meet all applicable acceptance test requirements. 

c.  On  1  for  every  5  truckloads,  after  2  successive  tests  indicate  that  the  concrete  is  within 

specified limits.   

d.  When the results for any subsequent acceptance test indicate that the concrete, as delivered 

and approved by the Contractor for placement, does not conform to the specified limits, the 
sampling and testing frequency shall be resumed for each truck load. Whenever 2 successive 
subsequent tests indicate that the concrete is within the specified limits, the random sampling 
and testing frequency of 1 for every 5 truckloads may resume. 

Except  for  the  first  load  of  concrete,  up  to  0.5  m

3

  may  be  placed  prior  to  testing  for  acceptance. 

Loads to be sampled shall be selected per a random selection process. 

Sampling and testing for a placement of one class of concrete consisting of 50 m

3

 or less shall be 

as listed above, except that sampling and testing shall continue until 1 load meets all of the applicable 
acceptance requirements. After 1 set of tests indicate that the concrete is within specified limits, the 
remaining concrete to be placed may be accepted by visual inspection. 

Contractor performed testing shall be performed by a testing laboratory whose equipment has been 
calibrated  within  1  year  prior  to  testing,  and  testers  shall  be  either  ACI  certified  or  qualified  in 
accordance with AASHTO R 18. 

Concrete shall be tested for compressive strength per BS EN 12390-3 at the same frequency as the 
acceptance tests for temperature, consistency, and air content. Six test cubes shall be taken at each 
time, numbered consecutively and marked with the date, the section of work from which it was taken 
and any other information required. Cubes shall then be dispatched to the approved laboratory for 
curing and testing for compressive strength.  

Contractor shall provide and maintain cure boxes for curing concrete test cubes and shall provide, 
maintain, and operate all necessary power sources and connections needed to operate the curing 
box. Concrete cubes shall be cured in a cure box in accordance with AASHTO T 23. Cure boxes 
shall maintain a temperature between 16

C and 27

C for concrete with specified strengths less than 

40 MPa and between 20

C and 26° C for concrete with specified strengths of 40 MPa and higher. A 

W

ORKS

 

 

Second Edition -SEP 2020 

 

minimum/maximum thermometer shall be installed to measure the internal temperature of the cure 
box. Thermometer shall be readable from outside of the box and be capable of recording the high 
and low temperatures in a 24-hour period. Cure boxes shall create an environment that prevents 
moisture loss from the concrete specimens. Box tops shall have a working lock and the interior shall 
be rustproof. 

A  moisture-proof seal  shall  be  provided  between  the  lid  and  the  box.  Each  cure  box shall  be the 
appropriate  size  to  accommodate  the  number  of  concrete  acceptance  cubes  necessary  or  the 
Contractor shall provide additional cure boxes. Once concrete cubes are placed in the cure box, the 
box  shall  not  be  moved  until  the  cubes  have  been  cured  in  accordance  with  these  Standard 
Specifications. When concrete is placed at multiple locations simultaneously, multiple cure boxes 
shall be provided. 

Concrete cubes shall be protected within the cure boxes from excessive vibration and shock waves 
during the curing period. 

4.3.12.4 

Point of Acceptance 

Determination of concrete properties for acceptance shall be made based on samples taken at the 
discharge of the placement system, or otherwise at the truck discharge. 

Once the Contractor has turned over the concrete for acceptance testing, no more mix adjustment 
shall be allowed, and the concrete shall be accepted or rejected. 

Concrete shall not be placed until tests for slump, temperature, and entrained air, if applicable, have 
been completed by the Engineer, and the results indicate that the concrete is within acceptable limits.  

Test cubes Nos. 1, 3 and 5 (from an individual sample as required in Article 4.3.12.3) shall be tested 
after 7 days. 

If the average of the three 7-day test cubes is below the minimum requirement, the Contractor shall 
immediately stop all concreting until the material and equipment are checked and any deficiencies 
are corrected. If the Contractor elects to remove and replace the defective concrete without waiting 
for the results of the 28-day test, concreting can then continue entirely at the responsibility of the 
Contractor. Cube numbers 2, 4, and 6, shall be considered three individual samples or sets and after 
28 days of curing shall be tested as specified above. If any cube in any set shows definite evidence, 
other  than  low  strength,  of  improper  sampling,  moulding,  handling,  curing,  or  testing,  it  shall  be 
discarded and the strength of the remaining cube shall then be considered the test result for that set.  

Final acceptance of the concrete works is based on 28 days of compressive strength testing on the 
cubes. Work is considered in compliance if the average of the compressive strength tests equals or 
exceeds the minimum specified for the class of concrete being placed, and if the average of the three 
cubes in any one set does not fall below the specified minimum strength by more than 3.5 MPa.  

If  the  results  of  the  28-day  testing  are  unsatisfactory,  the  Contractor,  in  accordance  with  the 
instructions of the Engineer, shall conduct tests in the suspect parts of the structure. Concrete may 
be  test  loaded  in  situ  or  cylindrical  test  cores  may  be  drilled  out  and  tested  in  accordance  with 
AASHTO  T 22. Should the tests prove that the concrete is unsatisfactory or  below the standards 
specified, the Engineer may order the removal and replacement of existing concrete with concrete 
of the specified quality or accept it at a reduced payment. All the above shall be at the expense and 
responsibility of the Contractor. 

4.3.12.5 

Water-to-cement Ratio Conformance 

Actual water-to-cement ratio shall be determined from the certified proportions of the mix. No water 
shall  be added after acceptance testing or after placement has begun. Excess water shall not be 
permitted and any batch containing such excess will be rejected. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

 For slip-formed concrete, water may be added during placement but shall not exceed the maximum 
water cement ratio in the mix design, and shall meet the requirements for consistency as described 
in Article 4.3.12.6. If water is added in concrete used in slip forming, an air and temperature test shall 
be taken prior to resuming placement to ensure that specification conformance has been maintained.  

Frequent tests, including the slump test, shall be carried out to ensure that consistent water content 
is maintained. 

4.3.12.6 

Consistency 

Slump  shall  not  exceed  the  allowable  range  identified  herein.  Slump  tests  shall  be  performed  in 
accordance  with  AASHTO  T  119M  or  ASTM  C143M.  Maximum  slump  for  concrete  should  be  as 
indicated in Table 4-26, unless otherwise approved by the engineer. 

Table 4-26: Maximum slump for concrete

 

Condition

 

Maximum Slump

 

Maximum Slump with a 

High-Range Water Reducer

 

Vibrated Class C25 or stronger concrete 

 

90 mm

 

140 mm*

 

All other vibrated concrete

 

115 mm

 

165 mm

 

Non-vibrated concrete

 

180 mm

 

230 mm

 

Pipe  and  utility  bedding  and  cases  where 
water reducer is used per Section

 4.3.6 

230 mm

 

NA

 

Concrete  placed  in  kerbs,  gutters,  and 
sidewalks

 

140 mm

 

190 mm

 

*Some mixes with combinations of mineral/chemical additives may produce slumps higher than this value 
while meeting the other specified performance values.  Approval for this case will be based on review and 
acceptance of trial mixes. 

 

Concrete transport and placement equipment shall be shaded or wrapped, as necessary, to prevent 
loss of slump and workability during high temperature conditions. 

4.3.12.7 

Temperature and Time for Placement of Concrete 

Temperature and time for placement of concrete shall meet the requirements of Table 4-27. 

Table 4-27: Acceptable time and temperature limits for placement of concrete

 

Time to Completely Discharge Batch of Concrete

 

(Measured from time cement added to concrete mixture) 

 

Allowable Concrete 

Temperature Range

 

 0 to 1.5 hours maximum

 

12° C to 32° C

 

1.5 hours to 1.75 hours maximum

 

12° C to 24° C

 

1.75 hours to 2 hours maximum with the Engineer

’s approval

 

12° C to 24° C

 

Time to discharge may be extended upon written request from the Contractor. This time extension 
shall be considered on a case-by-case basis and requires the use of specific retardation admixtures 
and the approval of the Engineer.  

When conditions are such that the concrete may experience an accelerated initial set, the Engineer 
may require a shorter time to discharge.  

Precast concrete that is heat-cured per Article 4.4.84.4.8.3 shall remain between 10° C and 32

while being placed.   

 

 

 

 

 

 

 