Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 23

 

 

3.2.3.1  Description 

Item of work consist of furnishing and placing one or more layers of wet mix macadam, including 
additives if required, on a prepared surface in accordance with these specifications and in conformity 
with  the  lines,  grades,  thicknesses  and  typical  cross-sections  shown  on  the  Contract  plans  or 
established by the Engineer.

 

3.2.3.2  Materials 

All  aggregates  for  Wet  Mix  Macadam  shall  consist  of  crushed  gravel,  crushed  rock  or  stone 
fragments obtained by crushing gravel that has first been screened in such a manner that no less 
than 90 % of the material to be crushed is retained on a 4.75 mm sieve. 

Amount of crushing shall be regulated so that at least 100 %, by weight, of the pieces retained on 
the 4.75 mm sieve have at least 1 fractured face. 

All aggregates for wet mix macadam shall conform to the requirements of Table 3-7. 

Table 3-7:  Physical requirements of aggregate for wet mix macadam 

Loss of sodium sulphate soundness test (AASHTO T 104) 

10 % maximum 

Loss of magnesium sulfate soundness test (AASHTO T 104) 

 12 % maximum 

Loss of abrasion test (AASHTO T 96) 

30 % maximum 

Thin and elongated pieces, by weight (B.S.  812

 

5 % maximum 

Friable particles (AASHTO T 112) 

0.25 % maximum 

Material for wet mix macadam shall conform to the requirements in Table 3-8. 

Table 3-8:  Material requirements for wet mix macadam 

Standard sieve size 

Percentage passing by 

weight 

50 mm 

100 

37.5 mm 

95 – 100 

19.0 mm 

60 – 80 

9.5 mm 

40 – 60 

4.75 mm 

25 – 40 

2.36 mm 

15 – 30 

600 µm 

8 – 22 

75 µm 

0 – 8 

Liquid limit (AASHTO T 89) 

25 maximum 

Plasticity index (AASHTO T 90) 

4 maximum 

Sand equivalent (AASTHO T 176) 

45  minimum 

Maximum dry density (AASTHO T 180) 

2.20 gr./cc 

CBR on remolded sample after 4 days soaking at 98 % MDD (AASHTO - 

T193

 

 

80% Minimum 

One sample every 1,000 m

3

 shall be tested for grading, soundness, loss by abrasion, maximum dry 

density, plasticity index, sand equivalent, and CBR. One in-situ density test shall be taken every 300 
m

2

 of laid wet mix macadam. 

3.2.3.3  Construction Requirements 

a.  Subgrade Preparation

Unless other subgrade preparation is indicated on the Contract plans or as a pay item in the bills of 
quantities, the Contractor shall, prior to the delivery of materials for the wet mix macadam, prepare 
the roadbed surface by sprinkling, blading, rolling, and lightly scarifying where necessary, until the 
proper  cross  slope  is  obtained.    However,  in  the  process  of  shaping  an  existing  roadbed,  the 
originally compacted crust or top portion of the roadbed shall be disturbed as little as possible.   

When completed and ready for wet mix macadam construction, the roadbed shall be well compacted, 
smooth, hard and uniform, all irregularities having been bladed out and rolled down. 

b.  Compaction Trials

If  directed  by  the  Engineer,  prior  to  the  commencement  of  wet  mix  macadam  operations,  the 
Contractor shall construct trial lengths, not to exceed 1 km.  Material used in the trials shall be that 
approved  for  use  as  wet  mix  macadam  and  the  equipment  used  shall  be  that  accepted  as  the 
Contractor

’s approved detailed list of resources.

 

Aim of these trials is to determine the adequacy of the Contractor

’s equipment, the loose thickness 

measurements  necessary  to  result  in  the  specified  compacted  layer  thickness,  the  field  moisture 
content, and the relationship between the number of compaction passes and the resulting density of 
the material. 

Contractor  may  proceed  with  wet  mix  macadam  work  only  after  the  method  and  procedures 
established in the compaction trial have been approved by the Engineer. 

c.  Method of Construction

Wet mix macadam shall be combined into a uniform mixture and water added only in a central mixing 
plant before final placement of the material.  Mixing and watering by windrows will not be permitted. 
When binder is to be added, it shall be combined with the wet mix macadam by thoroughly mixing 
the binder and wet mix macadam in the central mixing plant. 

Moisture added to the aggregates shall be that required, as designated by the Engineer, to obtain 
the  specified  density  thereby  preparing  an  aggregate  completely  ready  for  compaction  after 
spreading on the roadbed.  In no case will wetting of aggregates in stockpiles or trucks be permitted. 

Wet mix macadam shall be delivered to the roadbed as a uniform mixture and shall be placed on the 
existing roadway, prepared subbase, or prepared subgrade, as the case may be, in a uniform layer 
or  layers  not  exceeding 150  mm  in  compacted  thickness.   Spreading  shall  be  done  by  means  of 
approved self-propelled stone box spreader, distributing the material to the required width and loose 
thickness.  When the required thickness is greater than 150 mm, the materials shall be spread in 
layers of equal thickness but no less than 100 mm. 

Material shall be so handled, as to avoid segregation.  If an aggregate spreader causes segregation 
in  the  material,  or  leaves  ridges  or  other  objectionable  marks  on  the  surface  which  cannot  be 
eliminated  easily  or  prevented  by  adjustment  of  the  spreader  operation,  such  spreader  shall  be 
removed and replaced by another box spreader.  No “skin” patching will be permitted. 

No hauling or  placement of material will be permitted when,  in the judgment of the  Engineer, the 
weather or road conditions are such that hauling operations will cause cutting or rutting of the road 
surface or cause contamination of the wet mix macadam. 

Rolling  shall  be  continued  until  the  entire  thickness  of  each  layer  is  thoroughly  and  uniformly 
compacted to the density specified.  Final rolling of the compacted wet mix macadam shall be done 
with a self-propelled roller.  Rolling shall be accompanied by sufficient blading in a manner approved 
by the Engineer, to ensure a smooth surface, free from ruts or ridges and having the proper section 
and cross slope.  When additional water is required, it shall be added in the amount and manner 
approved by the Engineer.  Each layer of wet mix macadam shall be completely compacted by the 
Contractor and approved by the Engineer prior to the delivery of the materials for a succeeding layer. 

Surface of the finished wet mix macadam will be tested with 5 m straight-edge by the Engineer at 
selected locations.  Variation of the surface from the testing edge of the straight-edge between any 
2 contacts with the surface shall at no point exceed 6 mm when placed on or parallel to the centerline 
or 6 mm when placed perpendicular to the centerline of the roadway.  Wet mix macadam shall be 
compacted to the thickness and cross section as shown on the Contract plans and shall not vary by 
more than 5 mm from the required elevation.  All humps and depressions and thickness deficiencies 
exceeding the specified tolerances shall be corrected by removing the defective work or by adding 
new material, as directed by the Engineer. 

If the material for the wet mix macadam is laid and compacted in more than 1 layer, the Contractor 
shall plan and coordinate the work in such a manner that the previously placed and compacted layers 
be allowed ample time for drying and the development of sufficient stability, before vehicles hauling 
materials  for  the  succeeding  layers  or  other  heavy  equipment  are  permitted  on  the  wet  mix 
macadam.  Prior to placing the succeeding layers of materials, the top of the under-layer shall be 
made sufficiently moist to insure bond between the layers.  Edges and edge slopes of the wet mix 
macadam shall be bladed or otherwise dressed to conform to the lines and dimensions shown on 
the  Contract  plans  and  present  straight,  neat  and  workmanlike  lines  and  slopes  as  free  of  loose 
material as practicable. 

Contractor shall also plan the work and handle the various operations so that the least amount of 
water  will  be  lost  by  evaporation  from  uncompleted  surfaces.    If  the  Contractor  delays  placing  of 
succeeding layers of wet mix macadam material to the extent that additional water must be applied 
to prevent raveling or excessive dripping, the application of such water shall be at the Contractor

’s 

expense and not be considered as the basis for a Claim for additional compensation.  Water shall 
be applied at such times and in such quantities as directed by the  Engineer.  If after the wet mix 
macadam is compacted, any areas are above or below the proper grade and true elevations, such 
areas shall be loosened and after having had additional materials added or excess material removed, 
as the case may require, shall be reconstructed as described herein.  If after the wet mix macadam 
is compacted any areas fail to meet the specified density and gradation requirements, such areas 
shall be loosened or removed as directed by the Engineer and reconstructed as described herein. 

Following the construction of the wet mix macadam, the compacted layer shall be maintained by the 
Contractor  at  his  expense.    Contractor  shall  blade,  broom,  and  otherwise  maintains  the  wet  mix 
macadam, keeping it free from raveling and other defects until such time as the bituminous prime or 
other surface is applied.  Water shall be applied at such times and in such quantities as directed by 
the Engineer. 

Engineer shall determine when the surface of the wet  mix macadam is in the proper condition to 
permit the bituminous prime and/or surfacing to be applied.  If the Contractor chooses not to apply 
the bituminous prime and/or surfacing at that time, he must continue to maintain the surface of the 
wet mix macadam, including the application of necessary water, at his expense until such time as 
the  bituminous  prime  coat  and/or  surfacing  is  applied.    Any  additional  expense  incurred  by  the 
Contractor  because  of  his  failure  to  apply  the  bituminous  prime  coat  and/or  surfacing  when  so 
permitted by the Engineer will not be considered as the basis for a Claim for additional compensation. 

3.2.4.1  Description 

Cement stabilized subbase/base shall consist of material aggregate uniformly mixed with cement 
and water, placed and compacted in one single layer on a prepared granular subbase in conformity 
with the Contract plans and this specifications or as established by the Engineer.  Thickness and 
width of the cement stabilized subbase/ base layer shall be as shown on the Contract plans. 

3.2.4.2  Materials 

a.  Mineral Aggregates

Mineral aggregates shall be either naturally occurring granular material or crushed stone or gravel 
or combination thereof and shall conform to requirements in Table 3-9. 

Table 3-9:  Aggregates for cement stabilized subbase/base 

Test 

Limits 

Sampling ASTM D75 

-- 

Liquid limit BS 1377- 2 : Test 4.5 

25 % max. 

Linear shrinkage (BS 1377-2 Method 6.5) 

3 % max. 

Plasticity index (BS 1377- 2 Test 5.4) 

4 max. 

Aggregate crushing value (BS 812-110:1990) 

25 % max. 

Water absorption (ASTM C128 / C127) 

2.0 % max. 

Flakiness index (BS 812-105-105.1) 

30 max. 

Elongation index (BS 812-105-105.2) 

30 max. 

Los Angeles abrasion loss (ASTM C-131

  

or C-535 ) 

30 % max. 

Soundness loss (ASTM C88) 5 cycles (magnesium sulfate) 

12 % max 

Organic Matter Content (BS 1377-3

  

Method 3) 

0.2 % max. 

Chloride Content (Acid Soluble) BS 812-117

 

 

1% max. 

Sulfate Content (Acid Soluble) BS EN 1744-1

 

 

0.5% max. 

Sand equivalent (ASTM D 2419). 

45 min. 

All of the combined aggregates retained on the Standard AASHTO 5 mm sieve shall have not more 
than 5 % of flat elongated pieces and, when tested in accordance with AASHTO T-11

 

and AASHTO 

T-27 shall conform to the grading limits (i.e. all in aggregate grading without cement) in Table 3-10.

Table 3-10: Combined aggregates grading limits 

Sieve Size 

Percent Passing 

53 mm 

100 

37.5 mm 

85 

– 100 

20 mm 

65 

– 90 

Percent Passing 

10 mm 

40 

– 75 

5 mm 

25 

– 45 

2.36 mm 

15 

– 30 

0.600 mm 

– 18 

0.075 mm 

– 6 

Coarse  aggregate  shall  consist  of  crushed  rock  only,  each  particle  shall  have  a  minimum  of  two 
crushed face. Fine aggregate shall be crushed rock or naturally occurring material.   

At least one sample from each stock pile every 1000 m

3

 shall be taken for abrasion, sand equivalent, 

plasticity index and grading. 

b.  Cement

Cement shall be sulfate resisting and shall conform to the latest standard requirements of AASHTO 
M 85 for Type V. One 2 kg sample for quality test shall be taken from each 1,700 bags or equivalent. 

c.  Water

Water shall be clean and free from oil, alkali, vegetable matter, salt. Water shall be in sufficient supply 
for mixing and curing.  4-litre sample shall be obtained prior to use from each source and at least 
once a week during the production for quality. 

d.  Job Mix

At least 30 days prior to the date the Contractor intends to begin construction of the cement stabilized 
upper  subbase,  and  after  receiving  approval  of  the  aggregates  from  the  Engineer  and  after  the 
delivery on site of the cement specified for this work, the Contractor shall make written request for 
the approved job-mix formula from the Engineer.  Job-mix formula will be prepared by the Contractor, 
and will be tested by the Engineer. 

1.  Mix Design

Job-mix formula shall combine the mineral aggregates with cement and water in such proportions 
as to produce a mixture conforming to the following requirements: 

i.  Trial  dry  mix  design  shall  be  done  so  as  to  achieve  the  grading  requirement  as  specified

above  and  to  achieve  maximum  density  (per  ASTM  D1557)  from  the  coarse  and  fine 
aggregate  combination  (without  cement),  by  different  trials.  Modified  proctor  test  shall  be 
done  in  150  mm  diameter  mould  to  achieve  maximum  dry  density  (MDD)  and  optimum 
moisture content (OMC). 

ii.  4 % cement by weight of total dry mix shall be added to the finalized gradation with maximum

density. 

iii.  Final  checking  of  the  gradation  shall  be  conducted  after  the  addition  of  the  cement.  All  in

aggregate gradation shall be within design tolerance limit and the specification requirement. 

iv.  Cement (4% of total dry mix) plus varied amount of water (increment of +/- 1.0 % of OMC)

shall  be  added  to  final  3  trial  design  mixes  after  accounting  for  water  absorption  by 
aggregates to ascertain the design optimum moisture content for workable laboratory mix. 
Mixing of the design mixes shall be done in a mixer of adequate capacity to make at least 9 
unconfined  compressive  strength  (UCS)  samples  (ASTM  D1633).  Mixing  time  for  the  trial 
mixes shall be 2 minutes in the mixer. 

v.  Consistency (workability) of the trial design mixes produced in laboratory shall be judged and

recorded  after  every  30  minutes  of  mixing  the  cement  and  water.  Design  OMC  shall  be 
decided based on consistency observed after 60 minutes. 

 

 

 

vi.  UCS sample shall be prepared in a clean oiled/no sticky mould to avoid any damage to the 

UCS sample. Casting of the UCS sample shall be done immediately after 60 minutes for all 
the  three  trial  design  mixes  in  three  layers  and  56  uniformly  distributed  blows  per  layers.  
Adequate care shall be taken to make the top surface of the UCS sample free of irregularity. 
After casting, the UCS samples shall be kept in moist covered (with wet cloth) for 24 hours 
at  16 to 27  degree  centigrade.  After  24  hours the  sample  shall  be taken  out  of the  mould 
carefully and shall be put in water bath for curing for 3-day, 7 days and 28 day total duration 
at 16 to 27 degree centigrade. 

2.  Test Method  

Following laboratory test procedure shall be carried out for satisfactory results. Sample shall be 
taken out of water bath one hour before the testing time. UCS sample shall be wiped around with 
damp cloth to make it saturated surface dry (SSD). UCS specimens prepared and cured as above 
shall be subjected to compressive strength tests in accordance with AASHTO T 22

 

(ASTM C39). 

A  plywood/packing  shall  be  kept  on  top  and  bottom  of  the  sample  for  uniform  application  of 
loading. An approved calibrated universal testing machine (UTM) of adequate capacity shall be 
used to apply the loading. Maximum loading to failure shall be recorded and reported as failure 
load.  Failure pattern shall be recorded and calculation of the unconfined compressive strength 
shall be done by dividing the failure load to the average plan area of the sample. The density and 
strength shall be as in Table 3-11. 

Table 3-11:  Minimum density and strength requirements 

MDD as per BS 1377-4 test 3.7 

2.1 mg/m

3

 min. 

Unconfined compression test at 7 days 

6.0 ± 1 MPa 

Strengths shall be obtained on the average of at least three specimens and individual test results 
moving more than 15 % from the average shall be discarded. 

3.  Tolerances 

All production mixture shall conform to the job-mix approved by the Engineer, within ranges of 
tolerances as follows: 

Aggregate passing 4.75 mm sieve or larger 

 

 

+/- 5 % 

Aggregate passing 2.00 mm sieve or larger 

 

 

+/- 2 % 

Cement 

 

 

 

 

 

 

 

+/- 0.2 % 

Water 

 

 

 

 

 

 

 

+/- 1 % 

Unconfined compressive strength  

 

 

 

+/- 20 %  

Each day the Engineer will take as many samples of the materials and mixtures as he considers 
necessary for checking the required characteristics of the mixtures. 

At least one set of 6 specimens shall be prepared during the placing operations, every 500 linear 
metres of furnished mixture to check the required strengths of the mixture. 

When unsatisfactory results or changed conditions make it necessary, the Engineer may require 
that a new job-mix be prepared. 

Should a change in material be encountered or should a change in a source of material be made, 
a new job-mix formula shall be submitted and approved before the mixture containing the new 
material is delivered.  Job materials will be rejected if they are found not to have the characteristics 
required by the established job-mix formula. 

Sampling and testing shall be performed by the Contractor at his expense, under the observation 
of the Engineer. 

e.  Plant and Equipment

Plant and equipment shall be according to the type and number outline in the Contractor

’s detailed 

programme of works, as approved by the Engineer.  All equipment, tools, machinery and plants must 
be maintained in a satisfactory working condition. 

3.2.4.3  Construction Requirements 

Mixing of the aggregate, cement and water shall be accomplished by the plant-mixed method only. 

a.  Preparation of Granular Subbase

Top surface of granular subbase ready to receive cement stabilized upper subbase, (immediately 
prior to spreading) shall conform to the compaction and elevation tolerance otherwise specified, and 
shall be free of loose or extraneous material. 

In  hot  weather,  the  top  surface  of  granular  subbase  shall  be  moistened  before  spreading  of  the 
cement stabilized upper subbase, in order to prevent evaporation. 

b.  General Requirements of Plant Mixed Method

Aggregates and cement shall be proportioned and mixed in accordance with the following: 

Plant-mixed cement stabilized subbase/ base shall be mixed at a central mixing plant by either batch 
type mixing using revolving blade or rotary drum mixers or by continuous type mixing as approved 
of the Contractor.  Aggregates and cement may be proportioned either by weight or by volume. Plant 
shall be calibrated to produce the design mix proportion to the satisfaction of Engineer. 

In all plants, the water shall be proportioned by weight or volume and there shall be means by which 
the  Engineer  may  readily  verify  the  amount  of  water  per  batch  or  the  rate  of  flow  for  continuous 
mixing.  Time of the addition of water or the points at which it is introduced into the mixer shall be as 
approved by the Engineer. 

Moisture content of the completed mixture shall be at least the optimum moisture content plus or 
minus one percentage point at the point of delivery to the paving work site. 

In all the plants, cement shall be added in such a manner that it is uniformly distributed throughout 
the aggregates during the mixing operation. 

Safe and convenient facilities shall be provided for sampling cement in the supply line to the weight 
hopper or pugmill. 

Charge in a batch mixer, or the rate of feed to continuous mixer, shall not  exceed that which will 
permit complete mixing of all the material.  Dead areas in the mixer, in which the material does not 
move or is not sufficiently agitated, shall be corrected. 

Cement  content  of  the  completed  mixture  of  cement  stabilized  upper  subbase,  after  it  has  been 
spread on the granular subbase and prior to initial compaction, shall meet the specified requirements 
when sampled and tested. 

Cement feeder and the aggregate feeders shall be equipped with devices by which the rate of feed 
can be determined while the plant is in full operation. 

c.  Spreading Cement Stabilized Subbase/Base

Immediately prior to depositing plant-mixed cement stabilized subbase/base the area to be covered 
shall be moistened and kept moist, but not excessively wet. 

If less than 2 lanes are to be spread, not more than 2 hours shall elapse between the time of placing 
the  material  in  adjacent  lanes  to  result  in  a  2-lane  width.    However,  if  traffic  conditions  preclude 
placement  of  cement  stabilised  subbase/base  in  adjacent  lanes  within  hours,  the  Engineer  may 
authorize such longer time as may be necessary. 

Longitudinal construction joints shall fall within +/-300 mm of lane lines. 

Cement stabilized subbase/base placed on areas inaccessible to mechanical spreading equipment 
may be spread in one layer by methods approved by the  Engineer.  After spreading, the material 
shall be thoroughly compacted to the required line grades, and cross section by means of pneumatic 
tampers or with other compacting equipment which consistently obtains the degree of compaction 
required. 

In  addition,  spreading  of  cement  stabilized  subbase/base  shall  conform  to  the  directions  of  the 
Engineer. 

Use of motor graders will not be permitted during the spreading and compacting operating.  Motor 
graders  may  be  used  to  trim  the  edges  and  surface  of  the  cement  stabilized  subbase/base  after 
compaction in order to finish the subbase within the tolerances specified. 

Mixture  shall  be  spread  in  one  operation  with  a  self-propelled  mechanical  spreader  ready  for 
compaction  without  further  shaping.    Equipment  not  propelled  by  the  unloading  vehicle  will  be 
considered self-propelled.  Spreader shall be provided with a screed that strikes off and distributes 
the material to the full width being spread and to the surface tolerances specified.  Screed shall be 
adjustable to produce the required cross section.    Screed action includes any cutting, crowding, or 
other practical motion that produces a finished surface texture of uniform appearance. 

d.  Compacting

Compacting  equipment  shall  produce  the  required  compaction  within  the  operation  time  limit. 
Cement stabilized subbase/base shall be spread and compacted in only one layer according to the 
provisions specified herein.  Initial compaction shall follow the spreading operating immediately and 
shall have at least one complete full coverage of the stabilised material. 

When the finished surface after initial compaction is outside the tolerance specified hereinafter, all 
high spots shall be trimmed off to within the specified tolerances.  Filling of low areas by drifting or 
hauling of trimmed material is prohibited.   

Excess  material  may  be  placed  as  aggregate  for  shoulder  construction  or  when  directed  by  the 
Engineer. 

Excess  material  may  also  be  used  at  other  locations  in  the  work,  provided  said  excess  material 
complies with applicable specification requirements or shall be otherwise disposed of as permitted 
by the Engineer. 

Following such trimming, the finished surface shall be thoroughly compacted so that the entire layer 
of cement stabilized subbase/base conforms to the compaction requirements hereinafter specified. 
Final  compaction  shall  be  accomplished  in  such a  manner that  no  loose material  remains  on  the 
surface and all tear marks are eliminated. 

Relative compaction of cement stabilized subbase/base shall not be less than 98 % of the reference 
design maximum dry density for the specified mixture. 

Areas  of  the  finished  cement  stabilized  subbase/base  which  are  of  less  thickness  than  as  stated 
above shall be removed and replaced with fresh mixture which complies with the requirements of 
these specifications, all at the expense of the Contractor. 

Surface  shall  be  kept  moist  at  all  times  for  at  least  7days  or  until  such  time  as  directed  by  the 
Engineer. 

Not more than 2 hours shall elapse between the time water is added to the aggregate and cement, 
and the time of  completion of  initial compaction prior to  trimming.  Not more than 2½ hours shall 
elapse between the time water is added to the aggregate and cement and the time completion of 
final compaction after trimming. 

f.  Construction Joints

At the end of each day’s work and when cement stabilized subbase/base operations are delayed or 
stopped for more than 2 hours a construction joint shall be made in thoroughly compacted material, 
normal to the centre line of the roadbed, with a vertical face.  Additional mixture shall not be placed 
until the construction joint has been approved by the Engineer. 

Where cement stabilized subbase/base has been finally compacted more than one hour, longitudinal 
joints  shall  be  constructed  by  cutting  vertically  into  the  existing  edge.    Material  cut  away  may  be 
disposed of as specified for excess material.  Face of the cut joints shall be moistened in advance 
of placing the adjacent layer. 

g.  Curing

Completed cement stabilized subbase/base shall be covered with wet hessian cloth and watered so 
as to keep moist at all time for at least 7 days or for the duration as directed by Engineer. Hessian 
cloth shall be applied on the same day that final compaction is performed and as soon after said 
compaction as is practicable. 

No equipment or traffic will be permitted on the completed cement stabilized subbase/base during 
the first 7 days unless otherwise permitted by the Engineer. 

h.  Surface Tolerances

At final compaction the finished surface of the cement stabilized upper subbase shall be uniform and 
shall  not  deviate  at  any  point  more  than  6  mm  from  the  bottom  of  3  m  straightedge  laid  in  any 
direction. 

Top  of  the  layer  shall  not  vary  from  the  required  elevation  by  more  than  6  mm.    All  bumps  and 
depressions exceeding the specified tolerance shall be corrected by removing the defective work 
and replacing it with new material as directed by the Engineer, all at the expense of the Contractor. 

i.  Thickness Requirements

Thickness of the completed cement stabilized subbase/base shall not vary more than 10 mm from 
the thickness shown on the  Contract plans.  Sufficient measurements of thickness shall be taken 
before and after compacting to establish the relationship between the thickness of the un-compacted 
material and the completed work.  Thickness shall be controlled first by measurements taken of the 
un-compacted  material.    When  the  measurements  indicate  that  an  area  will  not  be  within  the 
allowable  tolerance  for  the  completed  work,  the  un-compacted  area  shall  be  corrected  while  the 
material is still in workable condition. 

Immediately after final compaction the thickness shall be measured at one or more points in each 
300 m of the laid lane width of stabilised subbase/base layer.  Measurement shall be made by means 
of test holes or other approved methods.  Points for measurement shall be selected by the Engineer 
at random locations within each 300 m sections of the laid lane width in such a manner as to avoid 
any regular pattern.  Various points on the cross section shall be covered. 

Whenever a measurement indicates a variation from the thickness shown on the Contract plans of 
more  than  the  allowable  tolerance,  additional  measurements  shall  be  taken  at  intervals  of 
approximately 50 m until the measurements indicate the thickness is within the allowable tolerance. 
Any area not within the allowable tolerance shall be corrected by removing the defective work and 
replacing it with new material as directed by the Engineer all at the expense of the Contractor. Cutting 

j.  Compaction Control and Testing

Compaction of the cement stabilized subbase/base shall be controlled as the work progresses by 
means of field density tests. 

Field density tests shall be carried out immediately after compaction and before hardening of the 
material  in  accordance  with  AASHTO  T  191

 

or  AASHTO  T  205

 

or  as  directed  by  the  Engineer. 

Frequency of testing shall be 1 test every 100 lin. m of laid lane width. Field density of the compacted 
cement stabilized subbase/base shall not be less than 98% of the reference design maximum dry 
density. 

k.  Weather Limitation

Cement stabilized subbase/base shall not be mixed or placed when the atmospheric temperature is 
over 30

o

 C or when the weather is rainy. 

Temperature  requirements  may  be  waived  but  only  when  so  directed  by  the  Engineer.  When 
temperature  is  higher  than  30

o

  C,  particular  care  shall  be  exercised  in  order  to  minimize  water 

evaporation from the mixture. 

In this case a test section shall be executed at the high temperature foreseen during the working 
period in order to evaluate the water content necessary to compensate evaporation and to establish 
actual setting time. 

According to such test section the Engineer may order pre-moistening of aggregates before cement 
mixing and watering of the granular subbase finished surface level. 

However particular attention shall be paid to prevent shrinkage due to excess of water. Contractor 
shall perform all tests required by the Engineer on said section at his own expenses. 

Engineer will give approval of the test section not before 7 days from the completion of curing. 

l.  Trial Lengths for Cement Stabilized Upper Subbase

Prior to the commencement of the cement stabilized subbase/base operations, the Contractor shall 
construct  trial  lengths  (not  to  exceed  250  m)  to  demonstrate  adequacy  plant  and  equipment  and 
competence  in  performance  of  entire  operation  of  production  and  laying  and  compliance  to  the 
specifications.   

Design mix used in the trials shall be those approved for use as cement stabilized subbase/base 
and the equipment used shall be that according to the Contractor's approved detailed programme of 
work.  Trial  lengths  shall  not  form  part  of  the  permanent  works  but  may  be  permitted  in  the 
construction of temporary detours of sufficient length. 

Contractor may proceed with the cement stabilized subbase/base work only after the methods and 
procedures established in the compaction trials have been approved by the Engineer. 

3.2.5 Asphalt Treated Base 

3.2.5.1  Description 

Asphalt treated subbase and base courses shall be composed of mineral aggregates, mineral filler 
and bitumen combined in an asphalt mixing plant.  Several mineral aggregates may be sized and 
combined  in  such  proportions  that  the  resulting  blend  is  well-graded  and  is  within  the  specified 
gradation  requirements.    Incorporation  of  mineral  filler  and/or  other  ingredients  shall  be  in  such 
amounts as found appropriate to meet the required criteria and test limits specified and as instructed 
by the Engineer.

 

Contractor  shall  furnish,  place  and  compact  a  course  of  bituminous  stabilized  granular  material 
composed of mineral aggregates, mineral filler  and bitumen combined in an asphalt mixing plant. 

3.2.5.2  Materials 

Unless  otherwise  indicated  on  the  Contract  plans,  specified  in  the  particular  specifications,  or 
directed by the Engineer, all sand asphalt base shall comply with the requirements of asphalt treated 
Type B as specified in Sub-article a of Article 3.2.5.2.  

Materials  used  in  asphalt  treated  subbase  and  base  courses  shall  meet  the  requirements  of  the 
following sub paragraphs of paragraph 4 of sub-article b of Article 3.3.2.5:  

  Fine Aggregate

  Coarse Aggregate

  Commercial Mineral Filler

  Asphalt Binder

  Hydrated Lime

a.  Types of Asphalt Treated Subbase and Base Courses

Types of asphalt treated shall be as designated on the Contract plans or in the bills of quantities and 
shall comply with the compositions as described below and as shown in Table 3-12.

 

1.  Asphalt treated type A shall consist of natural or crushed mineral, aggregate, hydrated lime,

commercial mineral filler and bitumen combined to meet the specification requirements, and 
shall be constructed to the thickness as indicated on the Contract plans.  A minimum of 1.5 
%  hydrated  lime  by  weight  of  total  mineral  aggregates  shall  be  added  in  accordance  with 
Sub-article a of Article 3.3.3.1. 

2.  Asphalt treated type B shall consist of crushed coarse aggregate, natural and/or crushed fine

aggregate,  hydrated  lime,  commercial  mineral  filler  and  bitumen  combined  as  otherwise 
specified and shall be constructed to the thickness as indicated on the  Contract plans.  A 
minimum  of  1.5  %  hydrated  lime  by  weight  of  total  mineral  aggregate  shall  be  added  in 
accordance  with  Sub-article  a  of  Article 3.3.3.1.   Fine  aggregate  portion shall  consist of  a 
minimum of 25 % crushed sand. 

3.  Asphalt treated type C shall consist of natural or crushed mineral aggregates, commercial

mineral  filler  and  bitumen  combined  to  meet  the  requirements  as  otherwise  specified  and 
shall be constructed to the thickness shown on the Contract plans. 

Commercial mineral filler shall be used in all types of Asphalt treated mixes as necessary to meet 
gradation and design criteria. 

Minimum quantity of hydrated lime specified for type A and type B asphalt treated shall be increased 
as necessary to meet design criteria. 

b.  Design Criteria

Laboratory test specimens of the  asphalt treated mix shall be prepared and tested in accordance 
with the procedures set forth for the Marshall method of mix design.  Mix designs shall be checked 
and approved by the Engineer prior to use.

 

Test  requirements  and  criteria  for  asphalt  treated  mixes  prepared  as  otherwise  specified  and  as 
indicated in Table 3-12.  

Table 3-12:  Asphalt treated mixes composition including hydrated lime & commercial 

mineral filler as required 

 

 

 

Standard sieve size 

Percent passing by weight 

Type A 

Type B 

Type C 

25.0 mm 

100 

 

100 

19.0 mm 

95-100 

 

95-100 

9.5 mm 

85-100 

100 

85-100 

4.75 mm 

85-100 

2.36 mm 

58-100 

70-85 

58-100 

600 µm 

22-74 

38-56 

22-74 

300 µm 

10-50 

27-43 

10-50 

75 µm 

4-12 

4-12 

4-12 

Asphalt Binder percent by weight of total 
mineral aggregate 

5.0 - 8.0 

5.0 - 8.0 

5.0 - 8.0 

 

Table 3-13:  Design criteria for asphalt treated 

Test 

Type A 

Min. - Max. 

Type B 

Min. - Max. 

Type C 

Min. - Max. 

Marshall specimens (ASTM D1559)

 

Number of compaction blows, each end of 

specimen 

50 

50 

50 

Stability, kg 

200 

175 

150 

Flow, 0.25 mm 

8 - 20 

8 - 20 

8 - 20 

Air voids, % 

3 -  18 

3 - 18 

3 - 18 

Immersion compression specimens (AASHTO T165)

 

Index of retained strength 

50 

60 

No 

requirement 

c.  Job mix Formula and Allowable Tolerances 

All the provisions of Paragraph 2 of Sub-article b of Article 3.3.2.5 shall apply, except as specified 
below for the maximum permissible ranges of tolerances: 

  Passing sieves 4.75 mm and larger   

 

 

± 5.0 % 

  Passing sieves 2.36 mm, 600 µm and 300 µm 

 

± 7.0 % 

  Passing sieve 75 µm   

 

 

 

± 2.0 % 

  Asphalt Binder  

 

 

 

 

± 0.4 % 

d.  Sampling and Testing of Asphalt Treated 

Sampling  and  testing  of  asphalt  treated  shall  be  in  accordance  with  the  procedures  set  forth  in 
Paragraph 3 of Sub- article b of Article 3.3.2.5.  

Contractor shall comply with all of  the provisions of  Section 3.3.3 with respect to  asphalt treated, 
subject to the following modifications and additions: 

1.  Preparation and handling of mineral aggregates:  Moisture content of the heated and dried

aggregate shall not exceed 1.0 %.  If the Engineer so requires, the angle of the drier shall be 
reduced  to  such  a  position  as  to  hold  material  in  the  drier  for  a  longer  period  of  time  for 
optimum condition of heating and drying. 

2.  Proportioning  and  mixing:    Heated  ingredients  shall  be  combined  in  such  a  manner  as  to

produce a mixture which when emptied from the mixer shall have a temperature of between 
107° C and 149° C.  Temperature of the aggregate immediately prior to mixing shall be within 
± 7.0°C of the temperature of the Asphalt Binder and the temperature of the aggregate and 
asphalt prior to mixing shall be approximately that of the completed mix as defined in the job 
mix  formula  approved  by  the  Engineer.    Mix  temperature  shall  be  within  the  allowable 
tolerance set out in the job mix formula when emptied from the mixer but in no case shall 
exceed 149° C. Filler shall be proportioned into the mixer with the aggregate in the quantities 
specified in the job mix formula, all as approved by the Engineer. 

3.  Delivery of the mix: Mix shall be delivered to the job site at a temperature between 80° C and

149° C and shall in all cases comply with the temperature and with the permissible variation 
thereof set out in the job mix formula for mix temperature on delivery to the job site. 

4.  Spreading of the mix:  Asphalt treated subbase and base courses shall be laid in maximum

50 mm layers.  Thinner layers shall be used if excessive shoving, etc., occurs.  Any additional 
layers shall be placed as soon as practicable after the first layer has been executed to the 
required grade, line, cross-section and density; finished, rolled and cooled; and after the tack 
coat, if required, has been applied in accordance with requirements of these specifications. 

5.  Compaction of the mix:  Mix temperature shall not be allowed to drop below 74° C prior to

initial breakdown rolling. Tapered edges against which no additional layer is to be placed, 
shall be carefully rolled along the entire length of the edges. 

a.  Testing and Acceptance of Asphalt Treated Subbase and Base Courses

All of the provisions of Paragraph 3 of Sub-article b of Article 3.3.2.5 shall be applicable to asphalt 
treated subject to the modifications and additions included herein. 

1.  Requirements for compaction of asphalt treated:  Minimum degree of compaction for asphalt

treated mixes shall be 95 % of the laboratory Marshall specimen prepared in accordance with 
the job mix formula. 

2.  Thickness requirements:

i.  Total constructed thickness of asphalt treated subbase or base course used for new

construction, reconstruction or roadway widening shall not vary more than 8 mm from 
the total thickness shown on the Contract plans.   

ii.  In the event the constructed thickness of the asphalt treated subbase or base course

is 8 mm more than the total thickness shown on the Contract plans, the area shall be 
corrected as directed by the Engineer by removing the excess material in an approved 
manner to provide the required thickness. 

iii.  In the event the constructed thickness of the asphalt treated subbase or base course

is 8 mm less than the total thickness indicated on the  Contract plans, the Contractor 
shall provide additional material in the next course (base course or wearing course).  In 
no case shall the deficiency of the subbase or base course exceed 25 mm. 

iv.  Asphalt  treated  subbase  or  base  course  shall  be  constructed  to  the  grade  level  as

shown on the Contract plans, as specified and as approved by the Engineer. 

wearing course be less than the total sum thickness of all courses as indicated on the 
Contract plans. 

3.  Requirements  for  evenness  of  surface  and  grade  level:    Final  surfaces  of  the  subbase  or

base  courses  shall  be  tested  by  means  of  a  5  m  long  straight  edge;  and  no  rises  or 
depressions in excess of 10 mm shall appear on the surface; otherwise such areas shall be 
stripped,  corrected  and  recompacted  to  comply  with  all  specification  requirements  and  as 
approved by the Engineer.  Further, the finished surface of the subbase or base course shall 
be constructed to within 12 mm of the grade levels shown on the Contract plans. 

b.  Equipment Used for Asphalt Treated Subbase and Base Courses

Provisions of 3.3.3.1, of shall be adhered to, subject to the following modifications and additions:

 

1.  Screens  for  asphalt  mixing  plants:    Asphalt  mixing  plant  shall  be  equipped  with  screens

suitable  for  screening  the  aggregate  into  sizes  such  that  they  may  be  recombined  into  a 
gradation meeting the  requirements  of  the job mix  formula.    However,  if the  nature  of  the 
aggregate, in the opinion of the Engineer, is such that no screening is required by reason of 
its satisfactory natural gradation, then the plant may be equipped with a scalping screen of a 
size suitable to remove oversize aggregates and other deleterious material. 

2.  Rollers:  Rolling equipment shall consist of steel-wheeled rollers and pneumatic-tired rollers

as specified in Sub-article c of Article 3.3.3.1.  A minimum of three rollers shall be required 
at  all  times:    one  self-propelled  pneumatic-tired  and  two  steel-wheeled  rollers.    As  many 
additional  rollers  shall  be  used  as  necessary  to  provide  the  specified  density  and  surface 
characteristics  in  any  orderly,  efficient  and  continuous  manner.    Tandem  steel-wheeled 
rollers shall be of such weight that, under working conditions, will develop contact pressure 
adequate to obtain the required density. 

3.  Unacceptable equipment:  Engineer will have the right to stop the use of any equipment or

plant which he deems to be inferior to the quality required and to instruct the removal of such 
equipment and to have it replaced by suitable equipment or to alter the method of operation 
at any time.  Contractor shall immediately comply with such instructions without being entitled 
to  any  indemnities  or  extensions  as  a  result  of  such  instructions.  Contractor  shall  not  be 
allowed to use any equipment or plant before obtaining the approval of the Engineer, and the 
Contractor  shall  undertake  to  follow  sound  technical  methods  of  operation  and  to  engage 
skilled and trained operators, mechanics and labor to carry out the works.  Engineer will have 
the  right  to  expel  any  operators,  mechanics  or  labor  and  to  instruct  suitable  replacement 
thereof at any time he deems such action is necessary. 

3.2.6 Lime Stabilized Subbase/Base 

3.2.6.1  Description  

Lime  stabilized  subbase/base  shall  consist  of  material  aggregate  uniformly  mixed  with  lime  and 
water, placed and compacted in one single layer on a prepared granular subbase in conformity with 
the Contract plans and this specifications or as established by the Engineer.  Thickness and width 
of the lime stabilized subbase/ base layer shall be as shown on the Contract plans. 

3.2.6.2  Materials 

Furnish  uncontaminated  materials  of  uniform  quality  that  meet  the requirements  of  the  plans  and 
specifications.  Notify  the  Engineer  of  the  proposed  material  sources  and  of  changes  to  material 
sources.  Obtain  verification  from  the  Engineer  that  the  specification  requirements  are  met  before 
using  the  sources.  The  Engineer  may  sample  and  test  project  materials  at  any  time  before 
compaction. 

 

 

 

a.  Lime 

Furnish lime that meets the requirements of AASHTO M 216 for hydrated lime, or AASHTO T 27 
and AASHTO T 219 for quicklime. When furnishing quicklime, provide it in bulk. 

b.  Aggregate Material  

Furnish aggregate material that meets the requirements “granular base or subbase course” for the 
type and grade shown on the plans, before the addition of lime.  At least one sample from each stock 
pile every 1000 m3 shall be taken for abrasion, sand equivalent, plasticity index and grading 

c.  Water  

Water shall be clean and free from oil, alkali, vegetable matter, salt. Water shall be in sufficient supply 
for mixing and curing. 4-litre sample shall be obtained prior to use from each source and at least 
once a week during the production for quality. 

d.  Asphalt emulsion  

When  asphalt  emulsion  is  permitted  for  curing  purposes,  furnish  materials  that  meet  the 
requirements Bituminous Prime Coat, as shown on the plans or as directed. 

e.  Job Mix  

At least 30 days prior to the date the Contractor intends to begin construction of the lime stabilized 
base/subbase,  and  after  receiving  approval  of  the  aggregates  from  the  Engineer  and  after  the 
delivery on site of the lime specified for this work, the Contractor shall make written request for the 
approved job-mix formula from the Engineer.  Job-mix formula will be prepared by the Contractor, 
and will be tested by the Engineer. 

1.  Mix Design 

The steps for lime stabilization mix design are:  

  Add the appropriate target percentages of lime (generally starting with 1 percent by weight 

of the entire mixture and increasing in 1 percent increments to 4 percent), 

  Determine moisture density relationships for each aggregate-lime blend following either 

AASHTO T-99 or AASHTO T-180. 

  Determine CBR (AASHTO T193) of the lime-aggregate blends following curing for 7-days 

at 40°C.  CBR of the blind material shall not be less than 60% @ 98% MDD. 

f.  Storage and Handling of Materials  

Store quicklime and dry hydrated lime in closed, weatherproof containers. 

3.2.6.3  Equipment  

Equipment shall be according to the type and number outline in the Contractor’s detailed programme 
of works, as approved by the Engineer.  All equipment, tools, and machinery must be maintained in 
a satisfactory working condition. 

If the lime will be Road mixed, pulverization equipment should be used. Otherwise mixing plant and 
spreader equipment are used for plant mixed. 

a.  Pulverization Equipment 

Provide pulverization equipment that: 

  cuts and pulverizes material uniformly to the proper depth with cutters that plane to a uniform 

surface over the entire width of the cut, 

  provides a visible indication of the depth of cut at all times, and 

  Uniformly mixes the materials.

b.  Mixing Plant

Provide  a  stationary  pugmill  that  uniformly  mixes  lime,  water,  and  base  material  in  the  specified 
proportions. Obtain approval before providing weigh-batch or continuous mixers. Equip plants with 
automatic proportioning and metering devices. 

c.  Spreader Equipment

When shown on the plans, provide equipment that will spread the lime-treated mixture in a uniform 
layer in 1 pass. When shown on the plans, equip spreaders with electronic grade controls. 

3.2.6.4  Construction 

Construct each layer uniformly, free of loose or segregated areas, and with the required density and 
moisture content. Provide a smooth surface that conforms to the typical sections, lines, and grades 
shown on the plans or as directed. 

a.  Preparation of Subgrade

Top surface of subgrade ready to receive lime stabilized subbase, (immediately prior to spreading) 
shall conform to the compaction and elevation tolerance otherwise specified, and shall be free of 
loose or extraneous material. 

In hot weather, the top surface of subgrade shall be moistened before spreading of the lime stabilized 
subbase, in order to prevent evaporation. 

b.  Site Mixed

1.  Pulverization

Pulverize or scarify existing material after shaping so that 100% passes a 37.5 mm sieve. If 
the material cannot be uniformly processed to the required depth in a single pass, excavate 
and windrow the material to expose a secondary grade to achieve processing to plan depth. 

2.  Application of Lime

Uniformly apply lime using dry or slurry placement as shown on the plans or as directed. Add 
lime at the percentage determined “Mix Design.” Apply lime only on an area where mixing 
can be completed during the same working day. 

Minimize dust and scattering of lime by wind. Do not apply lime when wind conditions, in the 
opinion of the Engineer, cause blowing lime to become dangerous to traffic or objectionable 
to adjacent property owners. When pebble grade quicklime is placed dry, mix the material 
and lime thoroughly at the time of lime application. Use of quicklime can be dangerous. Inform 
users of the recommended precautions for handling and storage. 

Before  applying  lime,  bring  the  prepared  roadway  to  approximately  optimum  moisture 
content.  Distribute  the  required  quantity  of  hydrated  lime  or  pebble  grade  quicklime  with 
approved  equipment.  Only  hydrated  lime  may  be  distributed  by  bag.  Do  not  use  a  motor 
grader to spread hydrated lime. 

3.  Mixing

Begin mixing within 6 hours of application of lime. Hydrated lime exposed to the open air for 
6 hours or more between application and mixing will not be acceptable. 

Thoroughly mix the material and lime using approved equipment. Allow the mixture to mellow 
for 1 to 4 days, as directed. When pebble grade quicklime is used, allow the mixture to mellow 
for 2 to 4 days, as directed. Sprinkle the treated materials during the mixing and mellowing 

 

 

 

 

 

 

 