W

ORKS

 

 

Second Edition -SEP 2020 

 

4.4.4.3 

Bonded Construction Joint 

Epoxy resins specially designed for bonding old concrete to new shall be used at construction joints 
where so specified and shown in the Contract plans. This epoxy shall consist of a 2-component liquid 
polysulphide polymer epoxy resin concrete adhesive.  

Preparation of the construction joint surface and the application of the epoxy resin shall be strictly in 
accordance with the manufacturer's recommendations and the Engineer's instructions. Brand and 
type of resin used shall be subject to the Engineer's approval. 

The epoxy resin shall be applied strictly in accordance with the manufacturer’s recommendations to 
avoid premature setting and forming a de-bonding film. 

Bonded construction joints shall be made using the following procedures, unless otherwise specified: 

1.  After the concrete  has  hardened  so that the  header  board  or  form  can  be  removed  without 

damage to the concrete, it shall be removed and the cement paste removed from the surface 
by  washing  with  water  under  pressure  or  by  sandblasting  to  expose  clean,  well-bonded 
aggregate. 

2.  To facilitate the removal of the cement paste, the surface of the header board or form that shall 

be  in  contact  with  the  first  pour  may  be  thoroughly  covered  with  a  retarder  consisting  of  a 
ready-to-use  liquid  compound  that  delays  the  set  of  the  surface  concrete  approved  by  the 
Engineer  prior  to  beginning  the  work.  Retarder  shall  produce  results  satisfactory  to  the 
Engineer  and  shall  be  evaluated  on  the  basis  of  the  manufacturer's  data  and 
recommendations.  When  the  retarder  is  used,  washing  with  water  under  pressure  shall  be 
used to expose clean, well-bonded aggregate. 

3.  Prepared surface of the concrete shall be kept saturated with water until the new concrete is 

placed, or it shall be saturated for a period of 4 hours before placing the new concrete.  

4.  Immediately  prior  to  placing  the  new  concrete,  the  forms  shall  be  drawn  tight  against  the 

concrete already in place and the surface shall be covered with a thin coat of Class M6 mortar. 

5.  After the header board or form is removed and the concrete has cured, the second pour shall 

be bonded to the first pour by the applying to the concrete joint surface a 2-component liquid 
polysulphide polymer epoxy resin concrete adhesive. 

6.  Surface on which the adhesive is to be applied shall be free of oil, dirt, and loose concrete. 

Unsound concrete shall be removed until a base of strong, undamaged concrete is exposed 
on  which  to  apply  the  adhesive.  Deposits  of  dirt  or  oil  products  shall  be  removed  by  wire 
brushing or sandblasting. Surfaces shall be free of moisture and dry before application of the 
adhesive, which shall not be applied to newly placed concrete before the normal curing period 
has elapsed. 

7.  Immediately  before  application,  the  two  adhesive  components  shall  be  combined  in  the 

proportions specified by the adhesive manufacturer. Components shall be intimately blended 
by hand or with a slow speed motor drive mixing device. Next, the mixture shall be thinned by 
adding and blending the solvent into the adhesive. Adhesives amounts mixed at one time shall 
be limited to the quantity that can be conveniently applied within the pot life of the adhesive. 

8.  Two components and solvent shall not be mixed more than 30 minutes prior to use.   

9.  Adhesive shall be brushed onto the concrete in a layer 1 mm to 2 mm thick.  

10.  After the adhesive has been applied, concrete shall not be placed against it until the solvent 

has evaporated: 30 min to 60 min, depending on weather conditions.  

11.  Adhesives shall be tacky and not dry at the time of concrete application. If an area becomes 

dry, it shall be recoated before placing the concrete. 

Because of toxicity of the materials, including the solvents, safety and health hazards exist in the 
handling and use of the materials, and may cause serious rash in persons sensitive to the materials. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Further, in the use of solvents as cleaning aids there exists a fire and flash hazard. Contractor shall 
obtain from the material formulator complete instructions for safety, health, and handling precautions 
with respect to the materials in use, and as to the procedure that shall be followed in the event that 
workmen come in contact with the material. Before they are permitted to proceed with the work, the 
workers shall be instructed as to the hazards to which they shall be exposed, the necessary safety 
precautions and the procedure to be followed in the event of accidental contact with the materials. 

4.4.4.4 

Unbonded Construction Joints 

Unbonded construction joints shall be made by forcing or striking off the previously placed concrete 
to a true and even surface and allowing it to set. After the concrete has set, a bond breaker material 
(refer to Article 4.3.15.7) shall be placed and secured on the old concrete. New concrete shall be 
placed and thoroughly compacted to secure a close contact between the old and new concrete at all 
points, separated only by the bond breaker material, with no attempt to secure a bonding of the new 
concrete to the old work. 

4.4.4.5 

Expansion Joints 

Expansion joints shall be located and formed as detailed in the Contract plans and specified herein. 
Expansion joints shall be installed per the Contract plans or the Particular Specifications. Materials 
meeting the requirements in Section 4.3.15 may be used, unless otherwise specified.  

Expansion joints shall incorporate adequate protection against the entry of debris or other material 
that may interfere with the closing of the joints in their construction.  

Joint filler shall be cut to the same shape as that of the surfaces being jointed and shall be firmly 
fixed against the surface of the concrete already in place in such a manner that it will not be displaced 
when concrete is deposited against it. Immediately after form removal, the expansion joints shall be 
carefully inspected, and any concrete or mortar that has sealed across the joint shall be neatly cut 
and removed. 

Application of approved sealers per Section 4.3.15 shall be in accordance with the manufacturer's 
instructions. 

Care shall be taken to prevent application of curing compound to locations where joint sealer is to 
be placed. 

Open joints shall be formed with a template made of wood, metal, or other suitable material. Insertion 
and  removal  of  the  template  shall  be  done  without  chipping  or  breaking  the  edges  or  otherwise 
injuring the concrete. 

Any part of an expansion joint running parallel to the direction of expansion shall provide a clearance 
of at least 12 mm, produced by inserting and removing a spacer strip, between the two surfaces. To 
prevent any wedging from expansion and Contraction, the Contractor shall ensure that the surfaces 
are precisely parallel. 

4.4.4.6 

Installation of Fixed-joint Seals 

Sealers  shall  be  installed  by  the  Contractor  using  suitable  hand  or machine  tools  and thoroughly 
secured in place with an approved adhesive that shall cover both sides of the sealer over the full 
area in contact with the sides of the joint. Adhesive may be applied to the sides of the joint or the 
sealer or both. Sealers shall be installed in a compressed condition and shall at all times be below 
the level of the surface by approximately the amount shown on the Contract plans. Sealers shall be 
in one continuous piece for the full width of transverse joint prior to being installed in the joint and 
shall have not more than 1 butt splice within its length, which shall be a manufacturer's splice. If this 
splice  is  torn  or  damaged  it  shall  be  repaired,  prior  to  installation,  using  the  manufacturer's 
recommended adhesive. In longitudinal joints the sealer shall be in practical lengths. Any joints in 
the sealer material shall be adequately sealed with additional adhesive.  

Any leakage of the joint shall be cause for rejection.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

Sealers shall be installed by the Contractor immediately after the removal of the curing cover, using 
an  adhesive  that  is  compatible  with  the  sealer  and  the  material  of  which  the  joint  surfaces  are 
composed. Temperature limitations of the adhesive, as guaranteed by the manufacturer, shall be 
observed. Joints shall be clean and free of foreign material immediately prior to the installation of the 
sealer.  

No  shipment  of  materials  shall  be  accepted  for  use  unless  the  material  complies  with  the 
requirements of Article 4.3.154.3.15.1.  

Materials shall not be used until the Contractor has been notified by the Engineer that they meet the 
requirements of these specifications. 

4.4.5 

Waterstops 

Waterstops shall be furnished and installed in accordance with the details indicated on the Contract 
plans, the provisions of Section 21.9.1.6 and Section 21.9.2.4 of Chapter 21, Concrete Structures, 
of theses standard specifications, and as directed by the Engineer. 

4.4.6 

Concrete Protection Coating 

All  exposed  items  or  surfaces  not  in  contact  with  soil  throughout  concrete  structures,  except  as 
otherwise  indicated  on  the  Contract  plans,  shall  be  painted  in  accordance  with  Section  24.7  of 
Chapter 24, Painting, of these standard specifications. 

All  exposed surfaces for  concrete  structures  indicated  on  the  Contract  plans  not  to  be  painted  or 
waterproofed shall be sealed as per the requirements of Section 29.6 of Chapter 29, Miscellaneous 
Items for Structures, of these standard specifications. 

4.4.7 

Reinforcing 

Fabrication  and  installation  of  concrete  reinforcement  shall  meet  the  applicable  requirements  of 
Chapter 5, Reinforcing steel. 

4.4.8 

Concrete for Precast Elements 

Precast  concrete  work  shall  be  as  indicated  on  the  Contract  plans,  as  specified  herein,  and  as 
directed by the Engineer. Tilt-up wall construction is allowed if so shown in the Contract plans and 
shop drawings and approved by the Engineer. 

All  precast  units  shall  be  manufactured  of  diverse  sizes  with  materials  as  specified  in  these 
specifications and the  Contractor shall be responsible for transporting the same to the site of the 
works.  

Manufacturing plant for precast concrete units shall be inspected and approved by the Engineer for 
the  type  of  precast  member  to  be  produced  prior  to  the  start  of  production.  This  inspection  and 
approval shall be renewed annually during production, and the Engineer reserves the right to inspect 
the plant at any time. 

Quality control (QC) inspections shall be done by the Contractor while the Engineer shall perform 
quality assurance (QA) inspections to facilitate the work and verify its quality. QA inspection shall 
not relieve the Contractor of any responsibility for identifying and replacing defective material and 
workmanship.  

Contractor shall notify the Engineer prior to precasting concrete units.  Contractor shall provide the 
Engineer with the opportunity to inspect the precast forms and units before, during, and after casting.  
Prior to the start of production of the precast concrete units, the Contractor shall advise the Engineer 
of  the  production  schedule  and  shall  give  the  Engineer  safe  and  free  access  to  the  work.  If  the 
inspector  observes  any  non-specification  work  or  unacceptable  QC  practices,  the  Engineer  shall 
advise the plant manager. If the corrective action is not acceptable to the Engineer, the units will be 
rejected. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Self-compacting concrete (SCC) may be used for precast concrete barriers and drainage items. If 
the Engineer has approved the use of SCC, the consistency requirements in Section 4.3.11 shall not 
apply. SCC is concrete that can flow under its own weight and completely fill the formwork, even in 
the  presence  of  dense  reinforcement,  without  any  vibration,  while  maintaining  homogeneity.  For 
SCC, the following modified testing procedures for air content and compressive strength shall apply:  

1.

  Moulds shall be filled completely in 1 continuous lift without any rodding, vibration, tamping, or 

other consolidation methods other than lightly taping around the exterior of the mould with a 
rubber mallet to allow entrapped air bubbles to escape 

2.

 

Fabricators’ QC testing shall include slump flow test results that demonstrate no segregation 

3.

  Plant approval for use of SCC shall require the plant fabricator to cast 1 barrier or drainage 

item and then sawed it in half for examination by the Engineer to determine that segregation 
has not occurred. 

4.4.8.1 

Shop Drawings 

Before precasting, the Contractor shall submit shop drawings for approval by the Engineer. These 
shop drawings shall show complete details of the methods, materials, and equipment the Contractor 
proposes to use in precasting work. Shop drawings shall follow the design conditions shown in the 
Contract plans unless otherwise approved by the Engineer. 

Shop drawings shall contain as a minimum: 

1.  Unit shapes, including elevations and sections, and dimensions 

2.  Finishes and method of constructing the finish, such as forming or rolling 

3.  Reinforcing, joint, and connection details 

4.  Lifting, bracing, and erection inserts 

5.  Locations and details of hardware attached to the structure 

6.  Relationship to adjacent material 

Approval of these shop drawings shall not relieve the Contractor of responsibility for accuracy of the 
drawings or conformity with the Contract. Approval shall not indicate a check on dimensions. 

4.4.8.2 

Casting 

Plant, quality checking and approving procedures, casting process, curing, finishing, shop drawings, 
and concrete mix shall be approved by the Engineer before the Contractor begins casting precast 
concrete units. Manufacturer shall keep and make available to the Engineer the complete records of 
all the concrete mixes and strength tests pertaining to each member cast. Contractor shall notify the 
Engineer which members are to be cast in advance of the casting dates so that arrangements for 
inspecting and testing the precast members can be made. 

Concrete shall meet the requirements of Section 4.3.11 for annual preapproval of the concrete mix 
design and slump.  

Precast units shall not be removed from forms until the concrete has attained sufficient strength so 
as not to sustain damage from the removal, typically a minimum compressive strength of 70 % of 
the specified design strength, as verified by rebound numbers determined in accordance with ASTM 
C 805M. 

Precast units shall not be moved until the concrete has reached the specified design strength as 
determined by testing cubes made from the same concrete as the precast units. Test cubes shall be 
made, prepared and tested in accordance with Article 4.3.12.3. 

Forms may be steel or plywood-faced, providing they impart the required finish to the concrete. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.4.8.3 

Curing 

Concrete in the precast units shall be cured by either moist or accelerated curing methods. Methods 
to be used shall be preapproved by the Engineer. 

1.  For moist curing, the surface of the concrete shall be kept covered or moist until such time as 

the compressive strength of the concrete reaches the strength specified for stripping. Exposed 
surfaces shall be kept continually moist by fogging, spraying, or covering with moist burlap or 
cotton  mats.  Moist  curing  shall  commence  as  soon  as  possible  following  the  completion  of 
surface finishing. 

2.  For  accelerated  curing,  heat  shall  be  applied  at  a  controlled  rate  following  the  initial  set  of 

concrete in combination with an effective method of supplying or retaining moisture. Moisture 
may be applied by a cover of moist burlap, cotton matting, or other effective means. Moisture 
may be retained by covering the unit with an impermeable sheet. 

Radiant, convection, conducted steam, or hot air may be used to heat the concrete to no more than 
37

C during the first 2 hours after pouring the concrete, and then increase by no more than 13° C 

per hour to a maximum of 79 

C. After curing is complete, the Contractor shall cool the concrete by 

no more than 13° C per hour to 37

C. Contractor shall maintain the concrete temperature above 16

C until the unit reaches stripping strength. 

Concrete temperature shall be monitored by means of a thermocouple embedded in the concrete 
that is linked with a thermometer accurate to ±3° C. A recording sensor, accurate to ±3° C, shall be 
arranged and calibrated to continuously record, date, and identify concrete temperature throughout 
the heating cycle. This temperature record shall be made available to the  Engineer for inspection 
and become part of the required documentation. 

Dry heat shall never be allowed to directly touch exposed unit surfaces at any point. 

For tilt-up wall panels, Contractor shall moist-cure the panels for a minimum of 6 calendar days after 
stripping the forms.   

4.4.8.4 

Contractor

’s Control Strength 

All  sections  referring  to  cast-in-situ  concrete  shall  apply  to  precast  concrete.  In  addition,  the 
Contractor shall satisfy the Engineer that the precast concrete units are not moved or loaded until 
they have attained the required strength. 

Concrete strength at stripping and the verification of design strength shall be determined by testing 
cubes made from the same concrete as the precast units. 

Concrete acceptance and testing shall meet the applicable requirements of Section 4.3.12. 

For accelerated cured units, concrete strength shall be measured on test cubes cast from the same 
concrete as that in the unit. These cubes shall be cured under time-temperature relationships and 
conditions that simulate those of the unit. If the forms are heated by steam or hot air, test cubes shall 
remain in the coolest zone throughout curing. If forms are heated another way, the Contractor shall 
provide  a  record  of  the  curing  time-temperature  relationship  for  the  cubes  for  each  unit  to  the 
Engineer. When 2 or more units are cast in a continuous line and in a continuous pour, a single set 
of test cubes may represent all units provided the Contractor demonstrates uniformity of casting and 
curing to the satisfaction of the Engineer. 

Enough  cubes  shall  be  moulded,  cured,  and  tested  by  the  Contractor  to  satisfy  specification 
requirements for measuring concrete strength. Contractor shall let cubes cool for at least 30 minutes 
before testing for release strength. 

Test cubes may be cured in a moist room or water tank in accordance with AASHTO T 23, after the 
unit concrete has obtained the required release strength. If the Contractor intends to ship the unit 
prior to the standard 28-day strength test, the design strength for shipping shall be determined from 
cubes placed with the unit and cured under the same conditions as the unit. These cubes may be 
placed in a non-insulated, moisture-proof envelope. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

To measure concrete strength in the precast unit, the Contractor shall randomly select 2 test cubes 
and average their compressive strengths. Compressive strength in either  cube  shall not fall more 
than 5 % below the specified strength. If these 2 cubes do not pass the test, 2 other cubes shall be 
selected and tested. 

All test results and certifications shall be kept at the fabricator’s facility for the duration of the works 
for review by the Engineer or the Owner. 

4.4.8.5 

Finishing and Marking 

On removal from the forms, the precast concrete units shall be examined and all surfaces that will 
be permanently visible shall have a smooth and dense finish or uniform texture free from holes, fins, 
and shutter staining. Any precast concrete unit that is found to be defective in any respect shall be 
rejected. 

For the purposes of identification, all members shall be marked with paint in neat lettering with the 
member number shown on the drawings or as agreed on and an identification number relating to the 
manufacturing records. 

4.4.8.6 

Tolerances 

Units shall be fabricated to the dimensions and tolerances shown in the drawings, and shall meet 
the dimensional tolerances listed in the latest edition of PCI-MNL-166, unless otherwise required by 
the Contract plans or Particular Specifications. 

4.4.8.7 

Handling and Storage 

Units shall be so stored, transported, and fixed to avoid overstressing or damage at any time. 

All units shall be lifted only by adequate devices at locations designated on the shop drawings.  

Precast units shall be stored off the ground on foundations suitable to prevent differential settlement 
or twisting. Stacked units shall be separated and supported by dunnage of uniform thickness capable 
of supporting the units. Dunnage shall be arranged in vertical planes. Upper units of a stacked tier 
shall not be used as storage areas for shorter units unless substantiated by Engineering analysis 
and approved by the Engineer. 

Tilt-up wall construction is allowed if so shown in the Contract plans and approved shop drawings.   

For tilt-up wall construction, the Contractor will erect the wall panels in place by tilting them up to 
their  permanent  location,  temporarily  bracing  the  panels  in  place,  completing  the  permanent 
connections required to secure the precast tilt-up panel, and finally removing the temporary supports.      

4.4.8.8 

Shipping 

Precast units shall not be shipped until the concrete has reached the specified design strength and 
the Engineer has reviewed the fabrication documentation for Contract compliance and stamped the 
pre

cast concrete units “approved for shipment”. Units shall be supported in such a manner that they 

shall not be overstressed or damaged during transport or by anticipated impact of their dead load. 
Sufficient padding material shall be provided between tie chains and cables to prevent chipping or 
spalling.  

4.4.8.9 

Erection 

When  the  precast  units  arrive  on  the  project,  the  Engineer  shall  confirm  that  they  are  stamped 
“Approved for shipment.” Precast units shall be evaluated by the Engineer for damage before they 
are accepted. 

All units shall be lifted by suitable devices at locations designated on the shop drawings. Temporary 
shoring or bracing shall be provided, if necessary. Units shall be properly aligned and levelled, as 
required  by  the  drawings.  Variations  between  adjacent  units  shall  be  levelled  out  by  a  method 
approved by the Engineer.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

Markings shall be so positioned as not to be visible when the structural member is placed in its final 
position in the completed structure. 

All precast members that have been chipped, cracked, warped, or otherwise damaged to the extent 
that  such  damage  will,  in  the  opinion  of  the  Engineer,  prejudice  the  appearance,  function,  or 
structural integrity of the members shall be rejected or, where so allowed, repaired to the satisfaction 
of the Engineer.  

4.4.9 

Waterproofing 

This  work  shall  consist of  applying  waterproofing  materials  to  cementitious  concrete  surfaces,  as 
required by the Contract plans and these Standard Specifications.  

All surfaces of concrete structures in contact with soil or backfill shall be  protected in accordance 
with Section 28.2 of Chapter 28, Waterproofing, of these standard specifications.   

All concrete structures that require water-tightness shall be waterproofed in accordance with Section 
28.3 of Chapter 28, Waterproofing, of these standard specifications.   

4.5 

Self-Consolidating Concrete (SCC) 

4.5.1 

Definitions 

a.  Self-Consolidating Concrete (SCC):  A  highly  flowable,  non-segregating  concrete  that  can 

spread into place, fill the formwork, and encapsulate the reinforcement without any mechanical 
consolidation. 

b.  Passing  Ability:  The  ability  of  SCC  to  flow  under  its  own  weight  (without  vibration)  and  fill 

completely all spaces within intricate formwork, containing obstacles, such as reinforcement. 

c.  J-Ring  Test:  Test  used to  determine the  passing  ability  of  SCC,  or the  degree  to  which  the 

passage of concrete through the bars of the J-Ring apparatus is restricted. 

d.  J-Ring Flow: The distance of lateral flow of concrete using the J-Ring in combination with a 

slump cone. 

e.  Slump Flow: Test method used to measure the unconfined flow and stability of SCC using a 

slump cone (upright or inverted). 

f.  Slump Flow Spread: The numerical value in mm of flow determined as the average diameter 

of the circular deposit of SCC at the conclusion of the slump test. 

g.  T

50

 Value: Time (in seconds) the edge of the concrete mass takes to reach 500 mm diameter 

from the time the mold is first raised in the slump flow test. 

h.  Stability:  The  ability  of  a  concrete  mixture  to  resist  segregation  of  the  paste  from  the 

aggregates. 

i.  Static Segregation (Segregation Factor): Segregation of the mortar from the coarse aggregate 

that occurs after placement while the concrete is still in a plastic state. 

j.  Visual Stability Index (VSI) Rating: An assessment of the homogeneity of concrete based on 

the visual inspection of the concrete sample at the end of the slump flow test. 

4.5.2 

Quality Assurance 

1.  In accordance with ACI 301M-10 for mixing, transportation and placing of concrete. 

2.  In accordance with ACI 305.1-06 for hot weather concrete placement and protection. 

3.  In accordance with ACI 308.1-11 for curing. 

4.  In accordance with ACI 301M-10 for concrete consolidation. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

5.  Testing  and  Inspection  Agency  Qualifications:  Independent  agency  conforming  to  the 

requirements of ASTM E329 - 13b. 

4.5.3 

Materials 

The materials shall be suitable for the intended use in concrete and not contain harmful ingredients 
in such quantities that may be detrimental to the quality or the durability of the concrete, or cause 
corrosion of the reinforcement. 

a.  Portland cement shall conform to ASTM C150 / C150M - 12, Type I, II, I/II, III, and V. 

b.  Fine and coarse aggregates shall conform to ASTM C33 / C33M - 13. 

c.  Water shall conform to ASTM C1602 / C1602M 

– 12. 

d.  Admixtures shall be furnished from one manufacturer: 

1.  Characteristics: Compatible with each other and free of intentionally-added chlorides. 

2.  Air-Entraining Admixture: Shall conform to ASTM C260 / C260M - 2010a. 

3.  Water-Reducing Admixture: Shall conform to ASTM C494 / C494M 

– 2011, Type A. 

4.  Mid-Range  Water-Reducing  Admixture:  Shall  conform  to  ASTM  C494  /  C494M 

–  2011, 

Type A. 

5.  High-Range  Water-Reducing  Admixture:  Shall  conform  to  ASTM  C494  /  C494M 

–  2011, 

Type F (or ASTM C1017 / C1017M 

– 07, Type I). 

6.  Accelerating Admixture: Shall conform to ASTM C494 / C494M 

– 2011, Type C or E. 

7.  Retarding Admixture: Shall conform to ASTM C494 / C494M 

– 2011, Type B or D. 

8.  Hydration Control Admixture: Shall conform to ASTM C494/C494M

–2011, Type B or D. 

9.  Workability-Retaining Admixture: 

i.  Shall retain concrete workability without affecting time of setting or early age strength 

development. 

ii.  Shall conform to ASTM C494 / C494M 

– 2011, Type S. 

10. 

Permeability-Reducing Admixture: 

i.  Shall be an integral crystalline capillary waterproofing admixture for concrete. 

ii.  Shall  satisfy  the  following  requirements,  when  used  at  the 

manufacturer’s 

recommended dosage: 

  Reduction in capillary absorption: Not less than 40 percent relative to a companion 

untreated concrete mixture, when tested in accordance with ASTM C 1585 - 13. 

  Reduction  in  water  penetration:  Not  less than  40  percent  relative to  a  companion 

untreated concrete mixture, when tested in accordance with DIN 1048-5. 

  The admixture shall not affect the setting time, strength or durability properties of 

concrete. 

11. 

Viscosity-Modifying Admixture: 

Shall conform to ASTM 

C494 

C494M 

– 

 

2011, Type S. 

12. 

Corrosion-Inhibiting Admixture: Shall be a nominal 30% solution of  calcium nitrite 

 

or an amine/ester 

– based organic corrosion – inhibiting admixture. 

13. 

Shrinkage-Reducing  Admixture:  Shall  conform  to  ASTM  C494  /  C494M 

–  2011, 

 

Type S. 

14. 

Alkali-Silica Reaction Inhibiting Admixture: 

W

ORKS

 

 

Second Edition -SEP 2020 

 

i.  Shall contain a nominal lithium nitrate content of 30 percent. 

ii.  Shall conform to ASTM C494 / C494M 

– 2011, Type S. 

15. 

Other admixtures shall be approved by the Engineer. 

e.  Supplementary Cementitious Materials (SCM): 

1.  The substitution of supplementary cementitious materials for cement shall be made on the 

basis of mass. 

2.  Fly Ash: Shall conform to ASTM C618 - 2008. 

3.  Slag Cement: Shall conform to ASTM C989 / C989M - 12a. 

4.  Silica Fume: Shall conform to ASTM C1240 - 12. 

5.  Metakaolin: Shall conform to ASTM C618 - 2008, Class N. 

f.  Fibers: 

1.  Microsynthetic Fibers: 

i.  Shall conform to ASTM C1116 / C1116M - 10a. 

ii.  Shall provide a minimum crack reduction ratio (CRR) of 40% when tested in accordance 

with ASTM C1579 - 13. 

2.  Macrosynthetic Fibers: 

i.  Shall conform to ASTM C1116 / C1116M - 10a. 

ii.  Shall have an equivalent flexural strength ratio as recommended by the manufacturer 

and approved by the Engineer, and tested in accordance with ASTM C1609 / 
C1609M - 12. Or 

iii.  Shall have toughness as recommended by the manufacturer and approved by the 

Engineer, and tested in accordance with ASTM C1550 - 12a. 

3.  Steel Fibers: 

i.  Shall conform to ASTM A820 / A820M - 11. 

ii.  Shall have an equivalent flexural strength ratio as recommended by the manufacturer 

and approved by the Engineer, and tested in accordance with ASTM C1609 / 
C1609M - 12. Or 

iii.  Shall have toughness as recommended by the manufacturer and approved by the 

Engineer, and tested in accordance with ASTM C1550 - 12a. 

Dosage of fibers for composite steel decks shall not be less than 2.4 kg/m3 for 
macrosynthetic fibers and 14.8 kg/m3 for steel fibers, as recommended in ANSI/SDI 

– 2011. 

g.  Evaporation Reducer: 

16. 

Shall be a monomolecular film-forming liquid for application to fresh concrete 

to 

prevent rapid drying of the surface. 

17. 

Evaporation reducer shall not be used as a finishing aid. 

4.5.4 

Concrete Mixtures 

The Contractor shall furnish to the Engineer a mixture proportion for the SCC to be used. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

  Proportion  mixture  shall  be  in  accordance  with  the  particular  specifications  (Compressive 

Strength, Air Content, Slump Flow, T50, VSI, J-Ring Value and Segregation Factor). 

  The Contractor shall use the same components in the trial batches as that to be used in the 

Project including coarse and fine aggregates, inert non-cementitious fillers, water, source and 
type  of  cement,  supplementary  cementitious  materials  and  admixtures  including  any  site-
added admixtures intended to be used. 

4.5.4.1 

Mixture Specifications 

  Water-to-cementitious materials ratio shall not exceed 0.45 by mass. 

  Supplementary Cementitious Materials: Fly ash or other pozzolans and silica fume shall not 

constitute  more  than  25  and  10  percent,  respectively,  of  the  total  mass  of  cementitious 
material. 

4.5.4.2 

Slump Flow 

  Slump flow shall be measured in accordance with ASTM C1611 / C1611M - 09be1. 

  Typical ranges of slump flow are outlined in Table 4-31.  

  The  design  slump  flow  of  the  SCC  mixture  shall  be  established  after  consideration  of  the 

Project requirements. 

  The slump flow of SCC used on the Project shall be the design slump flow plus or minus 50 

mm. 

 

Table 4-31: Typical ranges of slump flow

 

Type of Construction

 

Range of Slump Flow Values

 

mm

 

Slabs

 

500-750

 

Architectural members

 

600-750

 

Wall, lightly reinforced

 

500-750

 

Column or wall, densely reinforced

 

600-750

 

Drilled Shafts

 

500-600

 

4.5.4.3 

Visual Stability Index (VSI) 

VSI Rating (in accordance with ASTM C1611 / C1611M - 09be1) shall not exceed 1. 

4.5.4.4 

J-Ring Flow 

Difference between slump flow and J-Ring flow (as measured by  ASTM  C1621  /  C1621M  -  09b) 
shall not be more than 50 mm. 

4.5.4.5 

Stability 

The stability of the concrete shall be determined in the laboratory prior to approval of the SCC mixture 
using  test  method  ASTM  C1610 /  C1610M  -  10.  Concrete mixtures  shall  have  a  maximum  static 
segregation (segregation factor) of 15 percent. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.5.4.6 

Air content  

Air  content  shall

 

be

 

less

 

than

 

3%,  as  recommended  by  the  manufacturer,  and  as  approved  by  the 

Engineer. 

4.5.4.7 

Maximum nominal size of coarse aggregate 

1.  Not larger than 1/5 the narrowest dimension between sides of forms. 

2.  Not larger than 1/3 the depth of slabs. 

3.  Not larger than ¾ of the minimum clear spacing between individual reinforcing bars or wires, 

bundles of bars, individual tendons, bundled tendons, or ducts. 

4.  Maximum size of aggregate shall be 20 mm. 

4.5.5 

Execution 

4.5.5.1 

Formwork 

Concrete formwork shall be in accordance with Section 4.6. Additional measures shall be taken to 
seal the formwork to prevent leakage of cement paste or mortar. 

4.5.5.2 

Batching 

Materials shall be batched in accordance with ASTM C94 / C94M - 13a and ASTM C1116 / C1116M 
- 10a. 

In addition to the use of a moisture probe, the moisture content of the aggregates shall be determined 
once a day prior to batching in accordance with ASTM C70 

– 13 or ASTM C566 - 13. Aggregate 

samples shall be taken as close as possible to the area where moisture probe is located. Use of 
microwave oven or hot plate to dry the aggregates is permitted in addition to using an oven. 

Volume of concrete batched shall be such that no spillage occurs during transport. 

4.5.5.3 

Transporting 

Concrete  shall  be  transported  in  accordance  with  ASTM  C94  /  C94M  -  13a  and  ASTM  C1116  / 
C1116M - 10a. 

4.5.5.4 

Hot Weather Concreting 

Concrete shall be placed and protected in accordance with ACI 305.1-06. 

4.5.5.5 

Field Quality Control 

The Contractor shall provide the following: 

1.  Provide adequate facilities for safe storage and proper curing of concrete test cylinders onsite 

for the first 24 hours or for additional time as may be required before transporting samples to 
the test lab. 

2.  Provide concrete for testing of slump flow, air content, density (unit weight) and temperature 

and, for making cylinders. 

3.  Water

 

shall

 

not

 

be

 

added

 

to

 

the

 

concrete

 

at

 

the

 

job

 

site. 

4.  Field addition of admixtures, if needed for logistics reasons, shall be approved by the Engineer. 

The Contractor shall consult with the admixture manufacturer in developing quality control operations 
appropriate to the Project. 

Field testing and inspection shall be performed in accordance with ACI 301M-10. 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Concrete  tests  shall  be  conducted  by  an  ACI  Concrete  Field  Testing  Technician  Grade  I,  or 
equivalent, knowledgeable in testing self-consolidating concrete. 

Tests shall be conducted on the first batch of the day and for each 110 m

3

 or fraction thereof, for 

each concrete mixture placed in any one day. 

The testing agency provided by the Contractor and approved by the Owner and the Engineer shall 
provide the following services: 

a.  Inspect concrete placement. 

b.  Sample the concrete in accordance with ASTM C172 / C172M - 10. 

c.  Test concrete slump flow in accordance with ASTM C1611 / C1611M - 09be1. Cone can either 

be used upright or inverted. Same procedure shall be followed throughout the Project. 

d.  Record the Visual Stability Index (VSI). 

e.  Test passing ability in accordance with ASTM C1621 / C1621M - 09b. Cone shall be used in 

the same way as in slump flow test. 

f.  Determine the air content of concrete sample for each strength test in accordance with ASTM 

C231 / C231M 

– 10 or ASTM C173 / C173M - 12, except that the concrete shall be filled in 

one lift and not consolidated. Light tamping of the sides of the air-meter is permitted. 

g.  Determine the density (unit weight) of concrete sample for each strength test in accordance 

with  ASTM  C138  /  C138M  -  13a,  except  that  the  concrete  shall  be  filled  in  one  lift  and  not 
consolidated. 

h.  Record the temperature of concrete for each strength test in accordance with ASTM C1064 / 

C1064M - 12. 

i.  Cast concrete specimens for compressive strength test as follows: 

Cast and cure at least three 150 mm by 300 mm cylinders or four 100 mm by 200 mm cylinders 
in accordance with ASTM C31 / C31M - 12, except that the concrete shall be placed in one lift 
and not consolidated. However, light tapping of the sides of the cylinders with an open hand is 
permitted.  Number  of  cylinders  to  be  cast  may  be  adjusted  if  strength  tests  at  other  than 
standard ages are required. 

j.  Record the fresh concrete data for each set. The datasheet shall include the following: 

1.  Mixture number 

2.  Specified 28-day strength 

3.  Date and time of batching 

4.  Time of testing 

5.  Location of placement 

6.  Truck number 

7.  Ticket number 

8.  Slump  flow,  VSI,  passing  ability,  air  content,  density  (unit  weight)  and  temperature  of 

concrete 

9.  Ambient temperature 

10. Names and quantities of admixtures added on site, and, name and title of the person who 

authorized the addition 

11. Set number, if more than one set of cylinders are cast on a single day 

12. Name of the testing agency 

13. Name and signature of the inspector who conducted the test, and 

W

ORKS

 

 

Second Edition -SEP 2020 

 

14. Any additional observations or comments. 

k.  Mark the cylinders and write the date of casting on each cylinder. 

l.  Store  and  protect  the  cylinders  at  the  job  site  immediately  after  casting  in  accordance  with 

ASTM C31 / C31M - 12. 

m. Transport the cylinders from job site to the laboratory in accordance with ASTM C31 / C31M 

– 

12 after the cylinders have attained acceptable strength. 

n.  Cure the cylinders in the laboratory in accordance with ASTM C31 / C31M - 12. 

o.  Test cylinders for compressive strength in accordance with ASTM C39 -C39M 2011. 

1.  Test  one  cylinder  at  7  days  for  information  and  at  least  two  cylinders  at  28  days  for 

acceptance when testing 150 mm by 300 mm cylinders unless otherwise specified. 

2.  Test  one  cylinder  at  7  days  for  information  and  at  least  three  cylinders  at  28  days  for 

acceptance when testing 100 mm by 200 mm cylinders unless otherwise specified. 

Tests at other ages may be specified as necessary. 

p.  Base strength value on the average of at least two 150 mm by 300 mm cylinders or three 100 

mm by 200 mm cylinders tested at 28 days. 

q.  Test report shall include all the information in Item 10 above and compressive strength data, 

and shall be signed by the laboratory manager. 

r.  Strength of concrete shall be deemed satisfactory if both of the following requirements are met 

(ACI 318M -11): 

1.  Every  arithmetic  average  of  any  three  consecutive  compressive  strength  tests  equals  or 

exceeds the specified compressive strength, and 

2.  No compressive strength test falls below the specified compressive strength by more than 

3.5  MPa  when  the  specified  strength  is  35  MPa  or  less;  or  by  more  than  10  percent  of 
specified strength, when the specified strength is above 35 MPa. 

If  any  strength  test  of  laboratory-cured  cylinders  falls  below  the  specified  compressive 
strength  by more  than  the  values  specified  above,  remedial  measures shall  be  taken  as 
recommended by the Engineer. 

4.5.5.6 

Consolidation 

Consolidation  is  typically  not  necessary  for  SCC.  However,  the  Contractor  shall  have  internal 
vibrators as recommended in ACI 301M-10 on site in case internal vibration is needed due to delays 
in placement or the concrete has a lower than expected slump flow and has to be placed to prevent 
the formation of a cold joint. 

Prior approval by the Engineer shall be obtained if minimal vibration (external or internal) is required 
for proper consolidation due to congested reinforcement or space restrictions. 

4.5.5.7 

Finishing 

Concrete finishing shall be in accordance with Section 4.4.3 and Article 4.4.8.5. 

4.5.5.8 

Curing and Protection 

Curing and protection of concrete shall be in accordance with ACI 308.1-11. 

4.6 

Formwork 

Forms  are  temporary  works  that  shall  comply  with  the  requirements  of  Section  1.20,  Chapter  1, 
General  Requirements,  of  these  standard  specifications.  Materials  and  design  requirements  for 
forms  shall  be  in  accordance  with  Article  1.20.8.2  and  Article  1.20.8.4  of  Chapter  1,  General 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Requirements. Construction requirements for formworks shall be in accordance with Section 4.6.2, 
and removal of formwork shall be in accordance with the requirements of Section 4.6.3. 

Slip-form  formwork  shall  comply  with  the  requirements  of  Section  4.6.1  and  Article  4.6.2.5.  The 
Contractor shall receive Engineer’s approval of slip-form formwork prior to fabrication or bringing the 
slip-form equipment to the site of the works.  

4.6.1 

Slip-form Formwork 

4.6.1.1 

Timber Connections  

Timber connections shall be designed in accordance with the methods, stresses, and loads allowed 
in the Timber Construction Manual, Fifth Edition by the American Institute of Timber Construction 
(AITC), or equivalent as approved by the Engineer. Frictional resistance shall not be considered as 
contributing to the stability of any timber connection.  

4.6.1.2 

Bolted Connections 

Tabulated values in the 

AITC Timber Construction Manual-Fifth Edition 

are based on square posts. 

For a round post or pile, the main member thickness shall be the side of a square post having the 
same cross-sectional area as the round post used. 

Design values for bolts are typically given for load is applied either parallel or perpendicular to the 
direction of the wood grain. For load is applied at an angle to the grain, the design value for the main 
member shall be obtained from the Hankinson formula shown in the AITC manual. Design values in 
the AITC Table 6.20 apply only to 3-member joints (bolt in double shear) in which the side members 
are each ½ the thickness of the main member.  

Threaded rods and coil rods may be used in place of bolts of the same diameter with no reduction 
in the tabulated values. At openings for roadways and railroads, all connections shall be bolted using 
15mm diameter or larger through bolts. 

Bolt holes shall exceed the bolt diameter by 0.8 mm to 3 mm. A washer not less than a standard cut 
washer shall be installed between the wood and the bolt head and between the wood and the nut to 
distribute the bearing stress under the bolt head and nut and to avoid crushing the fibres. In lieu of 
standard cut washers, metal plates or straps with dimensions at least equal to that of a standard cut 
washer may be substituted. 

When steel bars or shapes are used as diagonal bracing, the tabulated design values shown in AITC

 

Table 6.20 for the main members loaded parallel to grain (P value) are increased 75 % for joints 
made with bolts 12 mm or less in diameter, 25 % for joints made with bolts 38 mm in diameter, and 
proportionally  for  intermediate  diameters.  No  increase  in  the  tabulated  values  is  allowed  for 
perpendicular-to-grain loading (Q value). 

Clearance  requirements  for  end,  edge,  and  bolt  spacing  distance  shall  be  as  shown  below.  All 
distances are measured from the end or side of the wood member to the center of the bolt hole. For 
members which are subject to load reversals the larger controlling distances shall be used for design. 
For parallel-to-grain loading, the minimum distances for full design load:  

  In tension, minimum end distance shall be 7 times the bolt diameter 

  In compression, minimum end distance shall be 4 times the bolt diameter 

  In tension or compression, the minimum edge distance shall be 1.5 times the bolt diameter. 

For perpendicular-to-grain loading, the minimum distance for full design load: 

1.  Minimum end distance shall be 4 times the bolt diameter 

2.  Edge distance toward which the load is acting shall be at least 4 times the bolt diameter 

3.  Distance on the opposite edge shall be at least 1.5 bolt diameters 

W

ORKS

 

 

Second Edition -SEP 2020 

 

Minimum  spacing  between  adjacent  bolts  in  a  row  shall  be  4  times  the  bolt  diameter,  measured 
centre-to-centre of the bolt holes. 

When  more  than  2  bolts  are  used  in  a  line  parallel  to  the  axis  of  the  side  member,  additional 
requirements shall be followed as shown in the AITC manual. 

a.  Lag Screw Connections 

Design  values  for  lag  screws  subject  to  withdrawal  loading  can  be  found  in  AITC

 

Table  6.27.  An 

equivalent standard may be used with the approval of the Engineer.  Maximum load on a given screw 
shall not exceed the allowable tensile strength of the screw at the root section. 

If subjection of lag screws to end-grain withdrawal loading cannot be avoided, the design value shall 
be 75 % of the corresponding value for withdrawal from the side grain. 

When  the  load  is  applied  at  an  angle  to  the  grain,  the  design  value  shall  be  obtained  from  the 
Hankinson formula shown in the AITC manual. When lag screws are subjected to a combined lateral 
and withdrawal loading, as would be the case with longitudinal bracing when the falsework bents are 
skewed, the effect of the lateral and withdrawal forces shall be determined separately. Withdrawal 
component of the applied load shall not exceed the allowable value in withdrawal. Lateral component 
of the applied load shall not exceed the allowable lateral load value. Lag screws shall be inserted in 
lead holes as follows: 

1.  Clearance hole for the shank shall have the same diameter as the shank, and the same depth 

of penetration as the length of unthreaded shank 

2.  Lead hole for the threaded portion shall have a diameter equal to 60 % to 75 % of the shank 

diameter and a length equal to at least the length of the threaded portion. Larger percentile 
figure  in  each  range  shall  apply  to  screws  of  the  greater  diameters  used  in  Group  II  wood 
species 

3.  Threaded portion of the screw shall be inserted in its lead hole by turning with a wrench, not 

by driving with a hammer  

4.  To facilitate insertion, soap or other lubricant shall be used on the screws or in the lead hole. 

b.  Drift Pin and Drift Bolt Connections 

When drift pins or drift bolts are used, the required length and penetration shall be determined using 
the following criteria. Lateral load-carrying capacity of drift pins and drift bolts driven into the side 
grain of a wood member shall be limited to 75% of the design values for a common bolt of the same 
diameter  and  length  in  the  main  member.  For  drift  pin  connections,  the  pin  penetration  into  the 
connected members shall be increased to compensate for the absence of a bolt head and nut. For 
drift bolts or pins driven into the end grain of a member, the lateral load-carrying capacity shall be 
limited to 60 % of the allowable side grain load (perpendicular to grain value) for an equal diameter 
bolt with nut. To develop this allowable load, the drift bolt or pin shall penetrate at least 12 diameters 
into the end grain. To fully develop the allowable load of the drift bolts or pins, they shall be driven 
into predrilled holes, 1.5mm less in diameter than the drift pin or bolt diameter. 

Criteria shown in the AITC Timber Construction Manual-Fifth Edition shall apply to drift bolt or pin 
connection allowable loads for the following conditions: 

1.  Withdrawal resistance; and 

2.  When there are more than 2 drift bolts or pins in a joint, allowable loads shall be further reduced 

by applying applicable modification factors shown in the AITC Table 6.3. 

4.6.1.3 

Nailed and Spiked Joints 

Joints using nails or spikes shall conform to the provisions of AITC. End grain withdrawal shall not 
be used. Diameters listed in the tables apply to fasteners before application of any protective coating.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

When more than 1 nail or spike is used in a joint, the total design value for the joint in withdrawal or 
lateral resistance shall be the sum of the design values for the individual nails or spikes. 

Tabulated  design  values  for  lateral  loads  are  maximum  values  for  the  type  and  size  of  fastener 
shown. Tabulated values shall not be increased even if the actual penetration is exceeded. When 
main member penetration is less than required, the design value shall be determined by straight-line 
interpolation between zero and the tabulated load, except that penetration shall not be less than 1/3 
of that specified. 

Double-headed or duplex nails used in formwork construction are shorter than common wire nails or 
box  nails  of  the  same  size  designation.  They  have  less  penetration  into  the  main  member  and 
therefore their load-carrying capacity shall be adjusted accordingly. 

Nail and spike minimum spacing in timber connections shall be as follows: 

a.  Average center-to-center distance between adjacent nails, measured in any direction, shall not 

be less than the required penetration into the main member for the size of nail being used 

b.  Minimum end distance in the side member, and the minimum edge distance in both the side 

member and the main member, shall not be less than ½ of the required penetration 

Allowable values for withdrawal and lateral load resistance are reduced when toe nails are used in 
accordance with the following: 

1.  For  withdrawal  loading,  the  design  load  shall  not  exceed  2/3  of  the  value  shown  in  the 

applicable design table 

2.  For lateral loading, the design load shall not exceed 5/6 of the value shown in the applicable 

design table 

Toe nails are recommended to be driven at an approximate angle of 30-degrees with the piece and 
started approximately 1/3 of the length of the nail from the end or side of the piece. 

4.6.1.4 

Timber Connection Adjustment for Duration of Load 

Tabulated values for timber fasteners are for normal duration of load and may be increased for short 
duration loading, except for connections used in formwork for staged construction sequences.  

Duration  of  load  adjustment  for  timber  connections  shall  not  be  allowed  for  staged  construction 
sequences  where  delayed  and/or  staged  loading  occurs  for  any  type  of  concrete  structure. 
Adjustment for duration of load as described in this section applies only to design values for timber 
connectors,  such  as  nails,  bolts,  and  lag  screws,  not  for  timber  and  structural  steel  components. 
Tabulated values for nails, bolts, and lag screws may be adjusted by the following duration-of-load 
factors: 

  1.25 for falsework design governed by the minimum design horizontal load or greater (3 % or 

greater of the dead load) 

  1.33 for falsework design governed by wind load  

  2.00 for falsework design governed by impact loading 

4.6.1.5 

Face Lumber, Studs, Wales, and Metal Forms 

Elements of this section shall be designed for the required loads, deflections, and conditions.  Forms 
battered or inclined above the concrete shall have positive anchorage or counterweights designed 
to resist uplift as concrete is placed.  Anchorages shall be shown in the formwork drawings.  

Where the concrete pouring sequence causes fresh concrete to be significantly higher along one 
side of tied forms than the opposite side, a positive form anchorage system capable of resisting the 
imbalance of horizontal thrust, and preventing the dislocation and sliding of the entire form unit, shall 
be designed and installed.  

 

 

 

 

 

 

 