3.  All costs associated with utilities shall be borne by the Contractor and deemed to have been

included in the bid. 

4.  The Contractor shall be responsible for providing worker accommodations or camps.

5.  The Contractor shall be responsible for all transportation to and from the work site each day of

all workers.  The Contractor shall consider that specific movement periods may be enforced 
and thus the Contractor shall manage traffic flow workers to appropriate periods. All cost for 
the worker’s accommodation or camp and transportation shall be included in the price bid. 

1.6.7 

Excavated Materials and Debris 

The  Contractor  shall  recycle  all  excavated  materials  and  debris  and  provide  the  Owner  with 
Certificates as a part of Abu Dhabi Emirate

’s  Environmental Sustainability Vision. 

It is required for the Contractor to use suitable fill material excavated from within the Right-of-Way 
for purposes of filling load bearing areas such as, but not limited to, embankments, subgrade, trench 
backfill, other backfilling purposes, etc. prior to sourcing material from external borrow sites, subject 
to approval of the Engineer. The Engineer will consider excavation material unsuitable if it contains 
deposits of saturated or unsaturated soil mixtures or high salt content (to be reviewed and agreed 
with the Department) or organic matter unacceptable for  filling material in load bearing areas. As 
directed by the Department, the Contractor is to dispose of any unsuitable excavated material as 
waste  at  locations  directed  by  the  Department.  All  suitable  excavated  material  excavated  at  site, 
which cannot be accommodated within the Right-of-Way, shall be disposed of as surplus materials, 
subject to approval of and at locations directed by the Engineer and the Department. 

All materials excavated on site with a potential for recycling such as, but not limited to, old concrete 
structures,  pavers,  boulders  and  rock,  asphalt,  construction  and  demolition  waste,  etc.  shall  be 
delivered to Tadweer’s Al Dhafra Recycling Plant. 

1.7 

Field Engineering 

This section specifies Contr

actor’s administrative and procedural requirements for field Engineering 

services including, but not limited to, the following: 

1.  Land survey work

2.  Civil-Engineering services

3.  Damage surveys

4.  Geotechnical monitoring

1.7.1 

Submittals 

The Contractor submittals shall meet the following requirements. 

1.  Certificates: Submit a certificate signed by the 

Contractor’s supervisory person in charge of his

surveying operations that certifies the location and elevation of improvements 

2.  Final property survey: submit a signed copy in electronic format, plus 5 paper  copies of the

final property survey 

3.  Project  record  documents:  Submit  a  record  of  work  performed  and  record  survey  data  as

required under the provisions of Section 1.24. 

1.7.2 

Quality Assurance 

The Contractor shall meet the following quality assurance requirements. 

1.  Surveyor qualifications: Engage a land surveyor registered in the UAE and/or recognized as a

qualified  land  surveyor  having  specific  working  experience  in  his  profession  in  the  UAE,  to 
perform required land-surveying services. 

R

 

2.  Engineer qualifications: Engage an Engineer of the discipline required, registered in the UAE

and/or recognized as a qualified Engineer having specific working experience in his profession 
in the UAE, to perform required Engineering services.  

1.7.3 

Examination 

The Contractor shall meet the following requirements: 

1.  Engineer will identify existing control points and property line corner stakes.

2.  Verify layout information shown on the Contract plans, in relation to the property survey and

existing  benchmarks,  before  proceeding  to  set-out  the  work.  Locate  and  protect  existing 
benchmarks and control points. Preserve permanent reference points during construction.  

3.  Do  not  change  or  relocate  benchmarks  or  control  points  without  prior  written  approval.

Promptly report lost or destroyed reference points or requirements to relocate reference points 
because of necessary changes in grades or locations.  

4.  Promptly replace lost or destroyed project control points. Base replacements on the original

survey control points. 

5.  Establish and maintain a minimum of 2 permanent benchmarks on the site, referenced to data

established by survey control points. 

6.  Record benchmark locations, with horizontal and vertical data, on the site plan drawing and on

the project record documents. 

7.  Existing utilities and equipment: Existence and location of underground and other utilities and

construction indicated as existing are not guaranteed. Before beginning site work, investigate 
and verify the existence and location of underground utilities and other construction. 

8.  Provide written approval from the concerned authority.

1.7.4 

Laying-out of the Works 

The Contractor

’s work shall meet the following requirements: 

1.  Work  from  lines  and  levels  established  by  the  property  survey.  Establish  benchmarks  and

markers to set lines and levels at each story of construction and elsewhere as needed to locate 
each element of the project. Calculate and measure required dimensions within indicated or 
recognized tolerances. Do not scale Contract plans to determine dimensions.  

2.   Advise entities engaged in construction activities of marked lines and levels provided for their

use. 

3.  As construction proceeds, check every major element for line, level, and plumb.

4.  Surveyor's  log:  Maintain  a  surveyor's  log  of  control  and  other  survey  work.  Make  this  log

available for reference. 

5.  Record deviations from required lines and levels, and advise the  Engineer when deviations

that  exceed  indicated  or  recognized  tolerances  are  detected.  On  project  record  drawings, 
record deviations that are accepted and not corrected.  

6.  On completion of foundation walls, major site improvements, and other work requiring field-

Engineering services, prepare a certified survey showing dimensions, locations, angles, and 
elevations of construction and site work.  

7.  Site  improvements:  Locate  and  layout  site  improvements,  including  pavements,  stakes  for

grading, fill and topsoil placement, utility slopes, and invert elevations. 

8.  Building lines and levels: Locate and layout batter  boards or off-sets for structures, building

foundations, column grids and locations, floor levels, and control lines and levels required for 
mechanical and electrical work.  

R

 

9.  Existing utilities: Furnish information necessary to adjust, move, or relocate existing structures,

utility  poles,  lines,  services,  or  other  appurtenances  located  in  or  affected  by  construction. 
Coordinate with local authorities having jurisdiction. 

10.  Final  property  survey:  Prepare  a  final  property  survey  showing  significant  features  (real

property)  for  the  project.  Include  on  the  survey  a  certification,  signed  by  the  surveyor,  that 
principal metes, bounds, lines, and levels of the project are accurately positioned as shown on 
the survey.  

11.  The  Contractor  shall  provide  necessary  coordination,  survey  equipment,  personnel

(surveyor, chainman, rodman, etc.) and transportation for the Engineer to check the accuracy 
of the Contractor’s layout and quantity measurement surveys.  The Contractor shall include 
this provision as part of his quality control plan as required in Section 1.13. 

12.  Recording: At project taking-over, have the final property survey recorded by or  with local

governing authorities as the official "property survey." 

1.8 

Project Utility Sources 

This section covers standards and specifications of regulatory agencies which shall be used on this 
project including, but not limited to, those specified herein. 

1.8.1 

Building Codes 

All reference to codes, regulations, local and administrative orders of the government bodies, and 
other  regulatory  authorities  and  specifications  and  standards  referred  in  the  Contract  documents 
shall mean, and are intended to be, the latest edition, amendment or revision of such reference in 
effect as of the date of submission of the tender documents. Any items for which there are no relative 
codes, specifications or standards shall be of suitable quality or workmanship as determined by the 
Engineer. Details which qualify such items as being of acceptable quality shall be in accordance with 
Section 1.13.  

1.8.2 

Government Bodies 

The Contractor shall carry out all works in strict accordance with current codes, regulations, local 
and administrative orders, specifications, and standards of all government bodies, including but not 
limited to the following:  

a.  Water and electrical services:

1.  Abu Dhabi Water and Electricity Authority (ADWEA), and subsidiaries:

i. 

Abu Dhabi Water and Electricity Company (ADWEC)

ii. 

Abu Dhabi Transmission and Dispatch Company (TRANSCO)

iii. 

Abu Dhabi Distribution Company (ADDC)

iv. 

Al Ain distribution Company (AADC)

v. 

Al Mirfa Power Company (AMPC)

b.  Sewerage services:

1.  Abu Dhabi Sewerage Services Company (ADSSC) a subsidiary of ADWEA

c.  Irrigation and drainage (includes underground pumping permits) services:

1.  Abu Dhabi City Municipality

d.  District cooling services:

1.  Tabreed Abu Dhabi

e.  Gas services and oil/gas pipelines:

R

 

1.  Abu Dhabi National Oil Company (ADNOC)

f.  Telephone services:

1.  Etisalat

2.  Du

g.  Environmental Agency, Abu Dhabi (EAD)

h.  UAE Armed Forces, GHQ

i.  General Directorate of Civil Defence

j.  Abu Dhabi Customs Administration (ADCA)

k.  Abu Dhabi Urban Planning Council (UPC)

l.  Municipality of Abu Dhabi City (ADM)

m. Al Ain City Municipality (AACM)

n.  Western Region Municipality (WRM)

o.  Department of Transport (DoT)

p.  General Civil Aviation Authority (GCAA)

q.  General directorate of Abu Dhabi Police (ADP)

r.  Health Authority 

– Abu Dhabi (HAAD)

s.  Ministry of Labour (MOL)

t.  Ministry of Presidential Affairs (MOPA)

u.  National Crisis and Emergency Management Authority

v.  National Transport Authority (NTA)

w. 

Ruler’s Representative Court of the Western Region (RRCWR)

x.  The General Secretariat of the Executive Council (GSEC)

y.  Western Region Development Council (WRDC)

1.9 

Project Management and Coordination 

This section outlines requirements for the Contractor

’s job-site operations and administration of the 

Contract. All work shall be performed under the observation of and in the presence of the Engineer. 

1.9.1 

Details of Contractor

¶VSupervisory Staff 

The Contractor

’s supervisory and office staff shall be in accordance with the Annexure of the Tender 

Document and shall meet the following requirements. 

1.  Supervisory staff as detailed in the tender shall be available for the execution of the work under

this Contract. 

2.  Each proposed Contractor key staff listed in the Contractor

’s tender is subject to approval by

the Engineer. 

3.  Approval of the Contractor

’s site staff does not waive the right of the Engineer to withdraw that

approval at any time thereafter as provided for by the Department of Transport Conditions of 
Contract and Schedule of Further Requirements.  

4.  It  is  pointed  out  that  the  provision  of  the  supervisory  staff  submitted  by  the  Contractor  as

detailed  in  his  tender,  does  not  relieve  him  in  any  way  of  his  liability  under  the  Contract  to 
provide all the staff necessary for the satisfactory completion, commissioning and maintenance 
of the works and within the dates stated in the Contract.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

4.3.10.3 

Controlled Density Fill (CDF) Concrete 

Controlled density fill (CDF) concrete is a self-compacting, cementitious, flowable material requiring 
no  subsequent  vibration  or  tamping  to  achieve  consolidation.  Mix  designs  shall  be  provided,  in 
writing, by the Contractor to the Engineer for approval with ACI 229 used as a guide to develop the 
CDF mix design. No CDF shall be placed until the Engineer has approved the mix design. CDF shall 
be designed to have a minimum 28-day strength of 0.35 MPa and a maximum 28-day strength of 
not more than 2.0 MPa. CDF consistency shall be flow-able with an approximate slump of 70 mm to 
250 mm.

 

To develop the CDF mix design, the Contractor shall use the following test methods: 

1.  For 28-day compressive strength 

– ASTM D4832 

2.  For unit weight, yield, and air content 

– ASTM D6023 

3.  For slump 

– AASHTO T 119M. 

Water-to-cement ratios shall be calculated on the total weight of cementitious material. Cementitious 
materials are Portland cement, fly ash, GGBS, and slurried microsilica fume. Water calculation shall 
account for the moisture content of the microsilica fume slurry.  

Admixtures used in CDF shall meet the requirements of Section 4.3.6. Foaming agents, if used, shall 
meet  the  requirements  of  ASTM  C869M.  Admixtures  shall  be  used  in  accordance  with  the 
manufacturer’s  recommendations  and  non-chloride  accelerating  admixtures  may  be  used  to 
accelerate the hardening of CDF. 

CDF shall meet the requirements of Article 4.3.12.2 and shall be accepted based on a certificate of 
compliance  provided  by  the  Contractor  for  each  truckload  of  CDF,  in  accordance  with  Article 
4.3.12.1.  

4.3.10.4 

Mortar and Grout 

Grout  shall  be  a  pumpable  mixture  of  cement,  sand,  admixtures,  and  water,  with  constituent 
materials that meet the following requirements:  

1.  Portland  cement,  water,  and  admixtures  shall  meet  the  requirements  of  their  respective 

subsections of Section 4.3  

2.  Ground granulated blast furnace slag shall not be used 

3.  Sand  shall  conform  to  ASTM  C144  and  have  a  gradation  and  colouring  suitable  for  the 

intended use 

4.  Minimum compressive strengths shall meet the requirements of Table 4-19, as determined per 

AASHTO T 106M 

5.  Grout for masonry shall conform to the requirements of ASTM C476.  Aggregate for masonry 

grout shall meet the requirements of ASTM C404 with a maximum coarse aggregate size of 
9.5 mm 

Grout shall be a workable mix with flowability suitable for the intended application.  Grout cube testing 
shall be required for permanent ground anchor installations if admixtures are used or irregularities 
occur in anchor testing. 

Table 4-19: Minimum required grout strengths

 

Application

 

Minimum Required Strength (MPa) per AASHTO T 106

 

3 days

 

7 days

 

28 days

 

Soil nails

 

10.5 

 

 

21 

 

Ground anchors

 

 

27.6 

 

 

Masonry grout

*

 

 

 

17.5 

 

W

ORKS

 

 

Second Edition -SEP 2020 

 

*Masonry grout shall be tested for strength in accordance with ASTM C1019.

 

Grout mix shall be proportioned by weight per Table 4-20, or as directed by the Engineer or shown 
in the Contract plans.   

Table 4-20: Nominal grout mix proportions by weight

 

Class 

Cement

Sand 

Pulverised fuel ash 

(PFA)*

 

G1 

G2 

 

G3 

G4 

10 

G5 

10 

G6 

G7 

½ 

*Sulphate-resisting cement shall not be a constituent of grouts containing PFA. 

Grout and mortar shall be mixed to the required proportions using the minimum quantity of water to 
ensure the necessary fluidity and to render it capable of penetrating the work. Any work constructed 
with improperly mixed material shall be removed and reconstructed at the Contractor

’s expense. To 

mix properly, the Contractor shall:  

a.  Thoroughly mix ingredients in quantities needed for immediate use 

b.  Use mechanical mixers 

c.  Maintain sand uniformly damp immediately before the mixing process 

d.  Provide uniformity of mix and colouration 

e.  Re-temper only within 2 hours of mixing if water is lost to evaporation  

f.  Not re-temper more than 2 hours after mixing 

g.  Not use anti-freeze compounds 

h.  Never mix in contact with the ground. 

Grout shall be used within one hour of mixing, unless it contains a retardant admixture.  

Sampling requirement for mortar and grout shall be 2 strength samples for each 460 m

2

 of masonry 

wall surface for each type of grout or mortar placed each day.  Contractor shall also submit to the 
Engineer for approval 2 samples to illustrate colour range.  

Grout sampling and testing shall be carried out in accordance with ASTM C 1019.  During the first 
48 hours, samples shall be protected from loss of moisture by covering with wet cloth and keeping 
moist.    Contractor  shall  record  maximum  and  minimum  temperatures  by  using  a  max/min 
thermometer.  After 48 hours, samples shall be transported to laboratory for testing. Samples shall 
be protected from vibration, freezing, and moisture loss during transportation. Compressive strength 
shall be the average of the 2 samples.   

Coarse grout shall be used when grout space is equal to or greater than 100 mm in both directions. 
Fine grout shall be used when grout space is smaller than 100 mm in any dimension. Air-entrainment 
admixtures shall not be used.  

Grout for anchor bolts shall be either:  

1.  A pre-packaged grout, mixed, placed, cured as recommended by the manufacturer;  or 

W

ORKS

 

 

Second Edition -SEP 2020 

 

2.  Produced using Type I or II Portland cement, fine aggregate Class 1 or Class 2, and water, in 

accordance with these Specifications. 

For grout for anchor bolts, the Contractor shall submit to the Engineer laboratory test data from an 
independent testing laboratory for approval with the request for approval of material as well as:  

  A material sample, if using a pre-packaged grout.   

  Mix proportions, if using a cement-aggregate-admixtures grout. 

Field grout samples shall be made for either pre-packaged grout or a Contractor provided mix when 
requested by the Engineer, but not less than 1 per day. 

Before placing grout, the concrete on which it is to be placed shall be thoroughly cleaned, roughened, 
and wetted with water to ensure proper bonding. Grout pad shall be cured as recommended by the 
manufacturer  or  kept  continuously  wet  with  water  for  3  days.  Grout  pad  may  be  loaded  when  a 
minimum of 27.6 MPa compressive strength is attained. 

Latex-Portland cement grout shall meet the requirements of ANSI A 118.6 for materials.  Factory-
prepared,  dry-grout  mixture  shall  consist  of  Portland  cement;  dry,  redispersible,  ethylene  vinyl 
acetate additive; and ingredients necessary to produce: 

1.  Unsanded grout mixture for joints 3.2 mm and narrower. 

2.  Sanded grout mixture for joints 3.2 mm and wider. 

Dry-set grout shall comply with ANSI A 118.6 for materials for joints 3.2 mm and narrower, and the 
latex additive shall be acrylic resin. 

Mortar strength tests shall be conducted as followings:  

a.  Spread mortar on the masonry units 12 mm to 16 mm thick 

b.  Allow mortar to stand for one minute 

c.  Remove mortar and place in a 50 mm by 100 mm cylinder in 2 layers, compressing the mortar 

into the cylinder using a flat-end stick or fingers. Lightly tap mould on opposite sides, level off 
and immediately cover molds and keep them damp. 

d.  After 48 hours' set, have remove molds and place specimens in the fog room until tested in 

damp condition 

e.  Compressive strength shall be at least 13.8 MPa at 28 days, in accordance with ASTM C1019 

f.  Slump shall be 200 mm to 250 mm, taken in accordance with ASTM C143M.  

Mortar mix shall be designed in accordance with the proportion specification of ASTM C270, Types 
M or S only, and required environmental conditions. The Contractor shall submit to the Engineer:  

1.  Test results demonstrating conformance to the proportion specification of ASTM C270, Type 

M or Type S   

2.  Test and evaluation reports per ASTM C780 

3.  M

manufacturer’s certificate that products meet or exceed specified requirements 

Portland cement shall be Type I or Type II meeting the requirements of Section 4.3.1 and shall be 
gray  in  colour.  Fly  ash,  GGBS,  and  pozzolans  shall  not  be  permitted  as  substitutes  for  Portland 
cement. Masonry cement shall meet the requirements of ASTM C91.   

Mortar aggregate shall meet the requirements of ASTM C144 for standard masonry type.  Sand for 
mortar and ready-to-use retarded mortar shall comply with the relevant provisions of BS EN 998-1. 
Aggregate  shall  be  kept  clean,  dry,  protected  against  dampness  and  contamination  by  foreign 
matter.  Contractor  shall  store  sand  for  mortar  on  plastic  sheeting  to  prevent  contamination  by 
extraneous chemicals in earth beneath. 

Mortar and grout shall not contain admixtures or other chemicals with any of the following:   

 

 

 

 

 

 

 