Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 4

 

  Главная      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     2      3      4      5     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 4

 

 

R

 

10.  AMCA: Air Moving & Conditioning Association
11.  AMRL: AASHTO Materials Reference Laboratory
12.  ANSI: American National Standards Institute
13.  ARI:  Air  Conditioning  &  Refrigeration  Institute  ASHRAE  American  Society  of  Heating,

Refrigerating and Air Conditioning Engineers 

14.  ASBI: American Segmental Bridge Institute
15.  ASCE: American Society of Civil Engineers
16.  ASNT: American Society for Nondestructive Testing
17.  ASTM: American Society for Testing & Materials (ASTM International)
18.  AWS: American Welding Society
19.  AWWA: American Water Works Association
20.  BS: British Standard
21.  BSCP: British Standard Code of Practice
22.  BSI: British Standards Institution
23.  CEE: International Commission on Rules for Approval of Electrical Equipment (Europe)
24.  CEN: European Committee for Standardization (also EN)
25.  CENELEC: European Committee for Electrotechnical Standardization
26.  CIRIA: Construction Industry Research and Information Association
27.  CRSI: Concrete Reinforcing Steel Institute
28.  CSI: Construction Specifications Institute
29.  DIN: Deutsche Institute for Normung
30.  DMS: Departmental Material Specification
31.  EN: European Standard (see CEN)
32.  ETSI: European Telecommunications standards Institute
33.  FHWA: Federal Highway Administration
34.  FS: Federal Specification (US)
35.  ICR: International Concrete Repair Institute
36.  IEC: International. Electrotechnical Commission
37.  IEE: Institute of Electrical Engineers of London
38.  IEEE: Institute of Electrical & Electronics Engineering
39.  IES: Illuminating Engineering Society
40.  ISO: International Organization for Standardization
41.  ITE: Institute of Transportation Engineers
42.  IWRC: Independent Wire Rope Core
43. 

MSS: Manufacturer’s Standardization Society of the Valves and Fittings Industries

44.  NACE: National Association of Corrosion Engineers
45.  NATM: New Austrian Tunnelling Method
46.  NBS: National Bureau of Standards
47.  NCMA: National Concrete Masonry Association
48.  NEC: National Electrical Code (NPFA No.70)
49.  NEMA: National Electrical Manufacturers Association
50.  NFC: National Fire Code
51.  NFPA: National Fire Protection Association
52.  NIST: National Institute of Standards and Technology
53.  NRMCA: National Ready Mixed Concrete Association
54.  NSBA: National Steel Bridge Alliance
55.  NWC: National Water Council (UK)

R

 

56.  OSHA: Occupational Safety & Health Administration (US)
57.  PCA: Portland Cement Association
58.  PCI: Precast/Prestressed Concrete Institute
59.  SMACNA: Sheet Metal & Air Conditioning Contractors National Association
60.  SSPC: The Society for Protective Coatings
61.  UL: Underwriters Laboratories
62.  UBC: Uniform Building Code
63.  UPC: Uniform Plumbing Code
64.  USACE: US Army Corps of Engineers
65.  USC: United States Code
66.  WRI: Wire Reinforcement Institute

Each of the above abbreviations, when followed by a number or letter designation, or combination 
of numbers and letters, designates a specification, test method, or other code or recommendation of 
the particular authority or organization shown. 

1.3.2.2 

Reference Standards and Codes Required in Chapter 1 

AASHTO LRFD  American Association of State Highway and Transportation Officials - Load and 

Resistance Factor Design, Bridge Design Specifications; 

AASHTO 

Guide Design Specifications for Bridge Temporary Works; 

ADQCC (TR-516) Road Structures Design Manual 

ADQCC (TR-511) Manual on Uniform Traffic Control Devices; 

ADQCC (WA-725) Irrigation Manual (Vol. 1, 2, 3, and 4) 

ADQCC (WA-726) Stormwater and subsoil drainage system (Vol. 1, 2, 3 and 4); 

ADQCC (TR-511) Manual on Uniform Traffic Control Devices 

ADQCC (TR-531) Work Zone Traffic Management Manual 

CGPM 

General Conference on Weights and Measures; 

DOT-C-04 

Abu Dhabi DOT - Construction Contract Administration Procedures; 

DOT-C-05 

Abu Dhabi DOT - Construction Supervision Manual; 

DOT-M-05 

Abu Dhabi DOT - Quality Assurance and Quality Control - Requirements for 
Road Projects; 

DOT-M-07 

Abu Dhabi DOT - Quality Assurance and Quality Control 

– Main Roads Division 

Quality Manual; 

DOT-M-08 

Abu Dhabi DOT - Environmental, Health and Safety Manual for Road Projects; 

ITE 

Equipment and Material Standards of the Institute of Transportation Engineers; 

NFPA 241 

Standard for Safeguarding Construction, Alteration, and Demolition Operations; 

U.S. DOT FHWA Department of Transportation Federal Highway Administration - Manual on 

Uniform Traffic Control Devices for Streets and Highways; 

Table 1-1 and Table 1-2 presents American Society for Testing and Materials (ASTM), British (BS), 
and  European  (BS  EN)  Standards  that  are  related  to  materials  of  this  chapter.  It  also  includes 
designations and titles. 

R

 

Table 1-1: Designations and titles for ASTM standards that apply to this chapter 

ASTM 

Designation 

Title 

ASTM E380 - 

2010 

Standard Practice for Use of the International System of Units (SI) (the 
Modernized Metric System).  

ASTM D4950 - 

08 

Standard Classification and Specification of Automotive Service Greases. 

ASTM E810 - 

03(2008) 

Standard Test Method for Coefficient of Retroreflective Sheeting Utilizing the 
Coplanar Geometry.  

ASTM D4956 - 

11a 

Standard Specification for Retroreflective Sheeting for Traffic Control. 

ASTM D523 - 

08 

Standard Test Method for Specular Gloss. 

ASTM G154 - 

06 

Standard Practice for Operating Fluorescent Light Apparatus for UV 
Exposure of Nonmetallic Materials.  

ASTM B209 - 

10 

Standard Specification for Aluminum and Aluminum Alloy Sheet and Plate. 

Table 1-2: Designations and titles for BS, and BS EN standards that apply to this chapter 

BS Designation 

BS EN 

Designation 

Title 

BS EN 933-
1:1997 

Tests for geometrical properties of aggregates. 
Determination of particle size distribution. sieving method. 

BS 812-

105.2:1990 

Testing aggregates. Method for determination of particle 
shape. Elongation index of coarse aggregate.  

1.3.3 

Equivalent Standards Acceptable 

References to standards are made throughout these specifications to establish a standard of quality 
required and a procedure to be followed. Reference to one particular standard is not intended to 
prohibit the use of any other internationally recognized standard, which achieves the same level of 
quality, or requirement as those specifically mentioned in this specification. 

1.3.4

         Codes  

All reference to codes, regulations, local and federal laws and regulations referred to in the Contract 
documents shall mean and are intended to be, the latest edition, amendment or revision of such 
reference in effect on the date of submission of the tender documents by the tendering party. 

1.3.5 

Governing Utility Departments and Agencies 

List of governing bodies contained in Section 1.8.2 is not intended to be exhaustive. The Contractor 
shall carry out all works in strict accordance with current codes, regulations, local and administrative 
orders, specifications, and standards of all government bodies, even when these standard 
specifications does not list such agencies.  

This Contract may include separate Contract Documents for constructing specific utility relocation or 
new installation work. These documents may include Contract plans, specifications and bills of 
quantities prepared by the responsibility utility agency and/or their consultant. The Contractor shall 
provide all necessary coordination with the utility agency and their consultant and meet all 

R

 

requirements  of  those  separate  Contract  Documents,  as  directed  or  approved  by  the  Engineer. 
Primary utility departments or agencies include: 

a.  Water and electrical services:

1.  Abu Dhabi Water and Electricity Authority (ADWEA), and subsidiaries:

i. 

Abu Dhabi Water and Electricity Company (ADWEC)

ii. 

Abu Dhabi transmission and Dispatch Company (TRANSCO)

iii. 

Abu Dhabi Distribution Company (ADDC)

iv. 

Al Ain distribution Company (AADC)

v. 

Al Mirfa Power Company (AMPC)

b.  Sewerage services:

1.  Abu Dhabi Sewerage Services Company (ADSSC) a subsidiary of ADWEA

c.  Irrigation and drainage (includes underground pumping permits) services:

1.  Abu Dhabi City Municipality

d.  District cooling services:

1.  Tabreed Abu Dhabi

e.  Gas services and oil/gas pipelines:

1.  Abu Dhabi National Oil Company (ADNOC)

f.  Telephone services:

1.  Etisalat

2.  Du

The Contractor, if approved by the relevant utility department, shall perform all work related to the 
installation of the proposed utility. If the Contractor is not approved by the relevant utility department 
to do such work, the Contractor will be required to employ a subcontractor who is approved by the 
relevant utility department and included on their current list of certified Contractors. A subcontractor 
so approved shall perform all work related to the complete installation of the system. 

1.4 

Unit Prices 

A  unit  price  is  an  amount  proposed  by  bidders,  stated  on  the  tender  form  as  a  price  per  unit  of 
measurement  for  materials  or  services  to  be  added  to  or  deducted  from  the  Contract  amount  by 
Variation Order. It allows for the estimated quantities of work to be increased or decreased. 

1.4.1 

Procedures for Unit Prices 

Contractors shall provide unit prices in compliance with the procedures as outlined in the 

Owner’s 

Construction  Contract  Administration  Procedures,  the  Construction  Supervision  Manual,  the 
Procurement and Contracts Manual, and the following requirements: 

1.  Unit  prices  include  all  necessary  labour  materials,  equipment  cost  for  delivery,  installation,

insurance,  overhead,  profit,  applicable  taxes  and  all  obligations,  and  liabilities  of  every  kind 
arising under the Contract. 

2.  Measurement  and  payment:  Refer  to  individual  specification  sections  for work  that requires

establishment  of  unit  prices.  Methods  of  measurement  and  payment  for  unit  prices  are 
specified in the bills of quantities. 

3.  Owner reserves the right to reject the Contractor's measurement of work-in-place that involves

use of established unit prices, and to have this work measured, at the Owner

’s expense, by an 

independent surveyor acceptable to the Contractor. 

R

 

4.  Refer to the tender documents, bills of quantities.

1.5 

Metric Measurements 

Owner  construction  projects  use  metric  units  of  measurements  in  accordance  with  ASTM  E380. 
Metric units used are the International System of Units (SI) developed and maintained by the General 
Conference  on  Weights  and  Measures  (CGPM).  Name  International  System  of  Units  and  the 
international abbreviation SI were adopted by the 11th CGPM in 1960. In some cases both metric 
SI  units  and  English  inch-pound  (I-P)  units  are  included  in  a  section  of  the  specifications;  the 
measurements used in any particular case have been determined by the circumstances involved. 
Specifications  requiring  metric  measurements  may  contain  requirements  for  equipment  (for 
example,  printers  and  HVAC  systems)  described  in  I-P  units;  in  which  case  equivalent  metric 
substitution will be allowed. Specifications requiring metric measurements may include references 
to related non-metric industry and/or government standards in which case the requirements of the 
standard govern. 

1.5.1 

Use of Measurements 

Measurements shall comply with the following requirements: 

1.  Measurements  shall  be  in  SI  units  unless  otherwise  authorized.  The  Contractor  shall  be

responsible for all associated labour and materials when authorized to substitute one system 
of units for SI units and for the final assembly and performance of the specified work and/or 
products. 

2.  Hard  metric:  A  hard  metric  measurement  is  indicated  by  an  SI  value  with  no  expressed

correlation to an I-P value (e.g., 38 mm). Products are considered to be hard metric when they 
are manufactured to metric dimensions or have an industry recognized metric designation. 

3.  Soft metric: A soft metric measurement is indicated by an I-P value which is a mathematical

approximate  of  the  SI  value  shown  in  parentheses  (e.g.,  1-1/2  inches  (38.1  mm)).  Metric 
measurements shall govern while the I-P value is provided for information. 

4.  Neutral: A neutral measurement is indicated by an identifier which has no expressed relation

to either an SI or an I-P value (e.g., American Wire Gage (AWG) which indicates thickness but 
in itself is neither SI nor I-P). 

1.5.2 

Coordination of Measurements 

Discrepancies,  such as mismatches or product unavailability, arising from use of both metric and 
non-metric measurements and discrepancies between the measurements in the specifications and 
the  measurements  in  the  Contract  plans  shall  be  brought  to  the  attention  of  the  Engineer  for 
resolution. 

1.5.3 

Relationship of Measurements to Submittals 

Submittals for Engineer approval or for information only shall cover the SI products actually being 
furnished. The Contractor shall submit the required drawings and calculations in the same units used 
in  the  Contract  documents  describing  the  product  or  requirement  unless  otherwise  instructed  or 
approved. The Contractor shall use ASTM E380 as the basis for establishing metric measurements 
required to be used in submittals. 

1.6 

Work Restrictions 

In  addition  to  all  responsibilities  that  are  specifically  described  in  the  Contract  documents,  the 
Contractor  shall  have  all  responsibilities  specified  throughout  these  standard  specifications. 
Wherever a Contract or Contractual documents stipulate that an item or work or special conditions 
require the approval of the Engineer, such approval by the Engineer shall not relieve the Contractor 
of his duties or responsibilities under the Contract. 

 

G

ENERAL 

R

 

 

 

1.6.1 

&RQWUDFWRU¶VResponsibility 

The Contractor shall be deemed to have visited the site prior to submitting his Tender and to have 
made all necessary inspections and investigations and allowed in his Tender for the following: 

1.  Means of access and working space 

2.  Nature of the ground and sub-soils 

3.  Presence of existing foundations or other hidden obstructions 

4.  Level of the water table 

5.  Extent of rock 

6.  Support to neighbouring properties and structures  

7.  All other factors affecting the work  

Any information made available to the Contractor, either in these documents or by any other source, 
will not relieve the Contractor of his responsibility to decide for himself the nature and extent of the 
work, nor will it guarantee that similar conditions will apply on other parts of the site. 

The Contractor shall be deemed to have contacted the relevant authorities to establish the presence 
of any existing, live or redundant services, adjacent to or passing through the area of work and shall 
be deemed to have allowed in his Tender for their location, diversion, demolition or removal 

Borehole logs and related information depict subsurface conditions only at the specific locations and 
at  the  particular  time  designated  on  the  logs.    Soil  conditions  at  other  locations  may  differ  from 
conditions  occurring  at  the  borehole  locations.    Passage  of  time  may  result  in  a  change  of  the 
subsurface  conditions  or  water  levels  at  the  borehole  locations.    Owner  does  not  guarantee  any 
statements, opinions, or conclusions contained in the soil report. 

The Contractor shall assume all responsibilities for:  

1.  Deductions and conclusions made by him regarding the nature of the soil to be dewatered and 

excavated 

2.  Difficulties involved 

3.  Maintaining the dewatering at required elevations 

4.  Carrying out his own investigation to satisfy himself of the validity of any subsoil information  

1.6.2 

Program of Works 

The  program  of  works  shall  be  a  project  master  program  resource  loaded  submitted  by  the 
Contractor to the Engineer in accordance with the Department of Transport Conditions of Contract 
and  Schedule  of  Further  Requirements.  The  program  of  works  shall  also  include  Manpower 
Histogram, Cash flow, S-

Curve and KPI’s. The program shall be prepared utilising the Precedence 

Diagram Method (PDM) of CPM scheduling technique, which shall contain the following: 

1.  Interim,  milestone  completion  dates.  Phasing  and  staging  of  the  work  as  specified  shall  be 

prominently identified; 

2.  Mitigations of delay; 

3.  Procurement, fabrication, delivery installation and testing of major materials and equipment; 

4.  Submittals and Engineer/Own

er’s review of material samples based on priority list as for work 

progress; 

5. 

Submittals and Engineer/Owner’s review of shop drawings; 

6.  Interfacing,  coordination  and  dependencies  with  preceding,  concurrent  and  follow  on 

Contractors; 

7.  Restrictions for manpower, material and/or equipment, if any; 

R

 

8.  Delivery of Owner furnished equipment, if any;

9.  Work to be performed by other agencies which affect the schedule;

10.  Maintenance  of  accesses  to  all  the  residential,  recreational,  business  and  institutional

premises affected by the works; 

11.  Traffic detour planning and phasing;

12.  Any restrains and restrictions imposed by service authorities or the Police;

13.  Construction activities exceeding 14 days in duration shall be subdivided to an appropriate

level, if required; 

14.  Schedule of activities shall be sufficiently described to include what is to be accomplished

and which work areas. Activity duration shall be expressed in whole days (8hr/day) and the 
activity duration to be consistent with Production rate and Quantity as per proposed resources. 
Work that is to be performed by the subcontract shall be clearly defined; 

15.  The schedule diagram shall indicate a clearly defined critical path (not more than one), which

shall be prominently distinguished; 

16.  The schedule should not contain more than 15% of the schedule activities on the critical path;

17.  Program shall be resource loaded and schedule should show the proposed production rate

and quantity of each activity; 

18. 

A  written  narrative  shall  accompany  the  schedule  submittal  describing  the  Contractor’s

approach  and  method  of  completion  of  the  work.  The  narrative  shall  be  adequate  for  the 
Engineer/Owner to understand the schedule and cross referenced to the requirement of Base 
line schedule check list. Also a schematic drawing showing the resources movement in the 
Project and the work methodology. 

19.  A calendar time scaled CPM network diagram schedule covering the complete Project shall

be submitted. The schedule shall conform to the work-hours and constraints as outline in the 
Contract documents. 

20.  The Contractor  shall maintain a project scheduler qualified in CPM scheduling techniques

and  familiar  with  the  latest  version  of  Primavera/MS  Project-Project  Planner  Scheduling 
Software. The scheduler shall have the primary responsibility for monitoring status, updating 
progress and revising the program to reflect current contract status. The Contractor shall verify 
qualification  of  the  scheduler  by  providing  a  description  of  construction  project  to  which 
successful CPM network analysis has been applied. Submit a resume of a proposed scheduler 
for the approval of the Engineer/Owner. 

1.6.3 

Site Logistics Plan 

The Contractor shall submit a Site Logistics Plan for review and approval of the Owner and Engineer. 

1.6.4 

Plant, Equipment and Labour 

Contractor’s supply of plants, equipment, and labour shall comply with the following requirements: 

1.  The Contractor shall submit with his project schedule a detailed list of plant, equipment and

labour  which  he  undertakes  to  provide  onsite  to  carry  out  the  works.  This  list  shall  be  as 
complete as possible and shall satisfy the Engineer as to its compatibility with the program of 
works. List shall include for each item of plant and equipment the type, manufacturer, model, 
identification number and year of manufacture. List shall include for labour the classifications 
and number for each classification. 

2.  The  Contractor  shall  bring  on  the  site  of  the  works  all  of  the  items  listed  and  such  other

equipment as may be required to expedite and complete the works and in no case thereafter 
shall the Contractor remove from the site any item of plant or equipment, or portions thereof, 
without the written consent of the Engineer. 

R

 

3.  All plant and equipment necessary for the construction of any type or section of the works must

be  on  site  and  inspected  and  approved  by  the  Engineer  before  the  commencement  of  that 
particular  type  or  section  of  the  works.  Any  plant  or  equipment  or  portion  thereof  which 
becomes worn or defective shall be immediately repaired or replaced to the satisfaction of the 
Engineer. 

1.6.5 

Limits and Access to and Use of Site 

Contractor

’s responsibilities regarding any site access and use limitations: 

1.  Limits of the site shall be the limits of the areas defined on the Contract plans.

2.  Access to the site is generally available as indicated on the Contract plans; the Contractor shall

obtain such land as may be required and construct, maintain and remove such access roads 
as  may  be  required  for  his  construction  operations  and  as  directed  by  the  Engineer.  Such 
access or temporary roads constructed by the Contractor for his use shall not be constructed 
for use as public detours. No separate payment will be made by the Owner for such access or 
temporary roads.  

3.  Preparation, construction and maintenance of temporary roads within the site area shall be the

Contractor's responsibility. 

4.  The Contractor shall take such measures as are necessary and as are directed by the Engineer

to reduce and control any dust, sediment and pollution within the site as required in Section, 
1.15.9. 

5.  The Contractor shall not disturb, damage or pull down any hedge, tree or building either within

or outside the site areas without the written consent of the Engineer unless otherwise indicated 
on the Contract plans or specified in the Contract documents.  

6.  As may be prescribed in the Contract or directed by the Owner, the extent of portions of the

site that the Contractor is to be given possession of and the order in which such portions shall 
be made available to him are subject to any requirements in the Contract and as to the order 
in which the works shall be executed. Owner will, with a written order to commence the works, 
give  to  the  Contractor  possession  of  so much  of  the  site  as may  be  required  to  enable the 
Contractor to commence and proceed with the construction of the works. The Contractor shall 
submit  a  written  notice and  request to the  Owner  to make  available  to  the  Contractor  such 
further portions of the site as may be required to enable the  Contractor to proceed with the 
construction of the works with due dispatch in accordance with the Work program.  

7.  The  Contractor  shall  provide  and  maintain  proper  and  safe  passages  across  all  open

excavations at all necessary places on the site and wherever directed by the Engineer. In case 
of private or public lands, the Owner will provide a right-of-way along which the works are to 
be carried out and the  Contractor shall confine the whole of the works' materials, plant and 
workmen to such right-of-way. 

8.  Relocation  of  utilities  shall  be  extended  beyond  the  limits  of  the  site  where  required  for

completion of the works and as directed by the Engineer or as shown on the Contract plans. 

1.6.6 

Land for Contractor

¶VUse 

Land provided for the Contractor use: 

1.  The Contractor shall be provided an area on which to situate his site offices and an additional

area for laydown.  It shall be the Cont

ractor’s responsibility to obtain all necessary approvals 

and permits for use of property for his site purposes. 

2.  The Contractor shall be responsible for furnishing all utilities including but not limited to water,

electricity,  sewage  disposal  and  telephone.  The  Contractor  shall  note  that  potable  water, 
electricity and sewage disposal is not available from the public utility systems on island and 
that the Owner makes no guarantees of the availability of telephone service.  

W

ORKS

 

 

Second Edition -SEP 2020 

 

Table 4-18

: Contractor’s mix design submittal requirements

 

Names  of  Contract,  Contractor,  and  the  individual  submitting  mix 
design

 

For each cementitious material: 

 

 

Mass per cubic metre

 

 

Proposed source

 

 

Type, class, or grade

 

 

Specific gravity

 

 

Material certification 

 

Date of submittal

 

Contract number

 

Unique identification for each mix design

 

Description of use for the particular mix design on the specific project

 

Concrete class

 

For each admixture: 

 

 

Manufacturer

 

 

Product name

 

 

Type

 

 

Estimated range (ml/m3)

 

 

Material certification

 

Concrete supplier, plant location, and plant number

 

Gradation of aggregate

 

Maximum water-to-cement ratio 

 

Mass of mixing water per cubic metre of concrete

 

Indication of use of recycled or reclaimed water

 

Mix design density (kg/m

3

)

 

For each aggregate component: 

 

 

Pit number

 

 

ASR results

 

 

Grading

 

 

Percent of total aggregate

 

 

Specific gravity

 

 

Saturated surface dry 
mass per cubic metre

 

 

Material certification

 

Test  results  and  the  calculated  average  for  28-day  compressive 
strength (MPa)

 

Test  results  and  the  calculated  average  for  14-day  flexural  strength 
(MPa)

 

Fineness modulus

 

Proposed ASR mitigation method 

 

Required  average  28-day  compressive  strength  shall  be  selected  per  the  American  Concrete 
Institute  (ACI)  318M,  Chapter  5,  Section  5.3.2.  In  addition  to  the  requirements  set  out  in  these 
specifications, ACI 211.1 and ACI 318M shall be consulted to determine proportions. Fine, coarse, 
and combined aggregate shall conform to the applicable requirements of Section 4.3.7.  

All  preliminary  trial  batches  and  testing  necessary  to  substantiate  the  proposed  mix  designs  and 
demonstrate that the mix design conforms to specification requirements shall be performed by the 
Contractor. All trial batches and testing shall incorporate admixtures per the concrete mix design. 
Concrete  place-ability,  workability,  and  strength  shall  be  the  responsibility  of  the  Contractor. 
Contractor shall notify the Engineer in writing of any proposed mix design modifications. No concrete 
of  the  revised  mix  design  shall  be  placed  until  the  Engineer  has  reviewed  and  provided  written 
approval of the revised mix design to the Contractor. Any delay due to such changes shall be entirely 
the responsibility of the Contractor and no Claims for delay or compensation shall be considered, 
except as follows: 

1.  When coloured concrete is required, the  Contractor shall submit preliminary samples of the 

coloured concrete. 

2.  Samples shall be a 1 m by 1 m by 100 mm panel for each mix to be coloured. 

3.  Panels shall be finished and cured in the same manner as the concrete in the works. 

Concrete may be sampled at any time during the work by the Engineer to check compliance with the 
approved mix design. 

4.3.10.1 

Proportioning of Materials 

Proportioning  of  materials  in  the  concrete  mix  shall  be  selected  by  the  Contractor  based  on  the 
specified  performance  criteria.    Cementitious  material  and  other  additive  quantities  used  in  the 

 

 

 

 

 

 

 

Content      ..     2      3      4      5     ..