|
|
|
Fig. 23: Removing Coolant Pump Installing Installation is performed in the reverse sequence. Note the following: z Moisten new O-ring -3- with coolant. See Fig. 24 . z Install coolant pump -4-. Installation position: Coolant pump sealing plug faces downward. z Tighten securing bolts -5- to 15 N.m. z Tighten securing bolt -1- for rear toothed belt guard -2- on cylinder head to 20 N.m Fig. 24: Installing Coolant Pump Installing toothed belt and adjusting timing. See TOOTHED BELTS, REMOVING, INSTALLING
2003 Volkswagen New Beetle GLS 1998-2004 ENGINE Engine Cooling System - New Beetle, 2.0L (AEG, AVH, AXG, BDC BEV & BGD)
|