Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
Table 10: Disbursement accounts and financing rules for IFAD grant
Disbursement Accounts by Financiers
Total
FINANCIER AND FINANCING %
(US$ Million)
Amount
NET OF TAXES
A. Civil works
9.97
IFAD 100%
B. Vehicles and Equipment
0.18
IFAD 100%
C. Training, technical assistance and studies
2.28
IFAD 100%
D. Other Recurrent Costs
0.37
IFAD 100%
E. Road Maintenance Costs
IFAD Financed Road Maintenance
0.15
IFAD 100%
Beneficiary Financed Road Maintenance
0.09
BENEFICIARY 100%
TOTAL
13.04
1 IFAD will finance 100% of the Road maintenance fund up to year 3 of the project and the beneficiaries would
finance 100% of year 4 of the project
99.
Retroactive financing is proposed to reimburse costs incurred during the design of the
project and intended to accelerate its effective start-up. This will cover the cost of the survey of Arab 6
- Es Soubagh - Husheib road, up to a maximum of USD 120 000 under the training, technical
assistance and studies category for the survey and design of the Arab 6 - Es Soubagh - Husheib road
and the cost for the prequalification of consultancy firms and contractors. The funds will be advanced
by the BDA against Government funding, and will be claimed once the RAP is effective based on
submission of supporting documentation. .
100.
Procurement. The procurement of works, goods and services will be in line with the IFAD
procurement guidelines. Moreover, IFAD, GoNU and other development partners (potentially the EU)
will jointly develop a governance framework for the road works with the aim of increasing
competitiveness, transparency and value for money in this sector. A detailed 18 month procurement
plan for the project was developed in working paper 3, and will be developed annually as part of the
AWPB. The thresholds for prior review and the procurement modalities were determined as follows:
Table 7: Prior review thresholds
Threshold For
Prior Review
Procurement Method
Procurement
Threshold
Method USD
NCB (Goods)
>
50 000
All contracts
Shopping (Goods)
<
50 000
None
NCB (Works)
>
50 000
All contracts
Shopping/Community
Participation (Works)
<
50 000
The first 5 contracts
ICB (Services)
>
50 000
All contracts
101.
Audit. The RAP will be subject to an annual audit by the General Auditor's Chamber, similar
to the audit provisions for the BIRDP. Both the accounts of the RAP and the CRF will be audited.
VII.
PROJECT RISKS AND SUSTAINABILITY (KSF 5)
A. Risk analysis
102.
The main risks and risk mitigation responses are summarized in table 12 hereafter.
23
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
Table 8: Critical Risks and Mitigation Measures
Risks
Risk
Risk Mitigation Measures
rating
Country Level:
M
The State of Gadaref committed to schedule the
Reduced support to traditional rainfed
Husheib-Gadaref road in the 2010 budget and to fund
agriculture either through reduced ARP
it from available resources for state development.
budget or reduced GoNU development
budget
Similarly in the State of Kassala, the construction of
the New halfa - Arab 6 road is under-way and the
construction of the New Halfa - Um Al Gora has been
contracted out and the works are set to start in
October 2009.
Entity Level:
M
- A qualified consultancy firm will be recruited to build
- The BDA has a limited implementation
BDA expertise in the road sector and to organize and
record to date, and no expertise in road
provide capacity building to the Road Departments in
construction and maintenance.
the MPPPUs and to the communities.
-
Non synchronized implementation
- BIRDP activity planning is being readjusted to ensure
between market rehabilitation under the
synchronization with RAP. Moreover, BIRDP and RAP
BIRDP and road improvement under RAP.
are directly supervised to allow an early identification
of performance problems and implementation of
appropriate corrective actions.
Project Level
M
A number of safeguards are put in place to ensure
- Mismanagement of procurement, or
efficiency and effectiveness of procurement for the
contract award or contract supervision.
road works:
- Prequalification of contractors with assessment
based on field visits and reference check;
- Prequalification of the consultancy firms that will be
providing the technical team in the BDA;
- IFAD will retain a road engineer to supervise the
progress of works and the compliance with technical
specifications.
- IFAD and GoNU will develop a governance
framework for the procurement of road works in
project year 1.
- Unwillingness of users to pay for the road
- A study to assess users' willingness to pay and the
maintenance.
feasibility of the CRF was carried out in June 2009 and
is provided in annex
7. On the basis of these
calculations, the road tolls and market fees should be
sufficient to cover the routine and periodic
maintenance costs.
- Administrative decree to levy road tolls and market
fees towards the maintenance of the road is schedued
to be endorsed in 2010.
Reporting/Auditing
M
A number of safeguards are built into the project
Weak M&E which does not generate
design to ensure adequate M&E (annex 6):
required data to carry out result
- division of roles and responsibilities for the collection
measurement of the project and
of different level indicators;
comparative analysis between spot
- selection of quantifiable and easily collected data;
improvement and conventional approaches
- reliance on known data collection techniques (road
for the construction of rural roads.
survey, traffic survey, RIMS survey)
Risk ratings: High Risk (H) - greater than 75 percent probability that the outcome/result will not be achieved;
Substantial Risk (S) -probability of 50 - 75 percent that the outcome/result will not be achieved; Modest Risk (M) -
probability of 25 - 50 percent that the outcome/result will not be achieved; Low or Negligible Risk (N) - probability of
less than 25 percent that the outcome/result will not be achieved.
24
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
B. Exit strategy and post-project sustainability
103.
The scenario adopted for project sustainability rests on the following elements:
-
The capacity of the Road Departments in the MPPPUs in Gadaref and Kassala is built up
thus enabling these departments to carry out satisfactory design works and supervision and
maintenance for the rural road network of the states. The design missions assessed that the
engineering staff in the State MPPPUs is young, academically well qualified but lacks
technical guidance and hands on experience. The project will provide the required technical
guidance (through technical backstopping, development of operational manuals, etc…) as
well as on-the-job training for the staff of the Road Departments.
-
The routine and periodic maintenance of the rural road is implemented and is financed from
the proceeds of the road tolls and market fees. The structure and operation of the Community
Road Fund were discussed with the communities, the localities and the Road Departments in
the MPPPUs of Gadaref and Kassala, thus validating in principle the model proposed.
Moreover a feasibility study of the CRF suggests that the proceeds from the road tolls and the
market fees would largely cover the maintenance costs.
-
The spot improvement and preventative maintenance approach is replicated at state and
federal level. The two key partners for the mainstreaming and replication of this approach are
the NHBA and the rural infrastructure working group of the ARP. Both organizations will be
involved in the monitoring and supervision of the project, its mid term review and its
completion assessment.
104.
The following indicators are taken as milestones for project sustainability:
At mid-term
At completion
- The Road Departments' technical capacity is
- The Road Department has presented satsifactory road
assessed as satisfactory.
design works and is carrying out supervision for new
road alignments.
- The CRF is set up and facilitating the
implementation of maintenance works.
- The CRF annual fund replenishment covers 100%
maintenance costs.
- M&E data indicates that spot improvement is more
adapted for rural roads than the conventional approach
- Spot improvement approach replicated on 200 km
to road construction.
rural roads and incorporated as part of the rural roads
programme in the ARP.
VIII.
INNOVATIVE FEATURES, LEARNING AND KNOWLEDGE MANAGEMENT (KSF 6)
A. Innovative features
105.
The main innovative feature in the RAP is the spot improvement approach to road
construction and the establishment of a Community Road Fund for the maintenance of the rural road.
This approach is deemed to be best suited for the environmentally sensitive rainfed areas given their
low population density, the seasonal trade activity, impassability of the roads during the relatively
short rainy season and the insufficient financial resources available to meet the great need for road
development. Provisions were included in the design of the project to develop the methodology for
spot improvement and road maintenance, as well as for its replication.
B. Project knowledge products and learning processes
106.
The knowledge products of the project consist of: (i) the operation manuals for the rural roads
design, construction, supervision and maintenance; (ii) the progress reports and assessment studies
on project effectiveness;
(iii) the comparative analysis between the project approach and more
conventional approaches to rural road construction and maintenance. The dissemination and use of
these products will be facilitated through annual stakeholder workshops. The stakeholder workshops
25
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
will bring together the representatives of the Ministry of Finance and National Economy, the rural
infrastructure working group of the ARP, the NHBA, the MPPPUs in Gadaref and Kassala States, the
BDA, the localities and community representatives. Donors financing road networks such as the
European Union will be invited to share experiences from the rural feeder road programme under
implementation in the states of South Kordofan and Blue Nile.
C. Regional knowledge networking
107.
The project will benefit from the IFAD technical advisory division efforts to establish best
practices in the area of rural transport, and to establish partnerships with the International Forum for
Rural Transport and Development and the Sub-Saharan Africa Transport Policy Program. Progress
and supervision reports will be shared with the Forum to promote learning.
IX.
NEXT STEPS
108.
The next steps include:
-
The validation of the design works proposed for the road. The MPPPU of Gadaref State is
expected to submit the revised design works by mid October 2009. The design works will be
validated in the field with NHBA, state, locality and community representatives.
-
Launch of the expression of interest for consultancy firms and contractors with a view to their
pre-qualification. The NHBA has shared with the design completion mission a list of qualified
firms. The process for the prequalification is explained in annex 8, start-up activities.
-
Negotiation of the grant agreement in time to present the project for approval to the Executive
Board in December 2009. IFAD will agree with the Government to add the following as
additional covenants: (i) the passing of the administrative decree on road tolls in 2010; (ii) the
development of a good governance framework for rural roads construction, supervision and
maintenance in 2010.
26
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - MAIN REPORT
ANNEXES
1.Contents of the Project Life File
2.Updated Result-based log frame
3.Key files
4.Summary of main cost tables
5.Organizational organigramme
6.Result-based M&E
7.CRF implementation arrangements
8.Start-up activities
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX I
ANNEX I: CONTENTS OF THE PROJECT LIFE FILE
All the documents of the Sudan Operations are available on IFAD Desk Site at the following link:
Country Programme Documents
1.
Result-Based COSOP for Sudan, April
2009.../../COUNTRY%20DOCUMENTS/RB%20COSOP%20BOARD%20DOCUMENTS/EB-2009-96-
2.
Sudan Country Programme Evaluation, OE, 2008
(../../Sudan%20Country%20Programme%20Evaluation%20CPE%20200708/Version%20Final%20CP
E%20report.doc
3.
Case Study for Sudan, Empowering Rural Poor in a volatile Policy Context, IFAD/IFPRI, 2005
Sudan Project Design Documents
1.
Gash Sustainable Livelihoods Regeneration Project, Appraisal report ../../GASH-
1263/GSLRP%20APRRAISAL%20REPORT/GSLRP%20APPRAISAL%20MAIN%20REP.%20WITH
2.
Butana Integrated Rural Development Project, Appraisal report ../../BIRDP-
1332/BIRDP%20APPRAISAL%20REPORT/BIRDP%20APPRAISAL%20REP.%20AND%20APPENDI
Lessons learned from similar projects
1.
Sudan, North Kordofan Rural Development Project, Completion Report, 2008 (../../NKRDP-
1045/Project%20Completion%20Report%20(PCR)/NKRDP-PCR.doc
2.
IFAD, Comprehensive Review of IFAD Rural Roads, Travel and Transport (RTT) Experiences,
1994-2007
3.
IFAD, Yemen, Pilot Community-Based Rural Infrastructure Project in Highland Areas - Loan
669-YE, Appraisal report
lItems.aspx)
1
ANNEX II: RESULT-BASED LOG FRAME
Narrative Summary
Verifiable Indicators
Means of Verification
Assumptions/Risks
Goal
COSOP Goal: contribute to empower the
•
Increase of rural incomes from USD 500/
UNICEF survey in the
- Sustained and increasing investments
rural poor to increase their food security,
capita to USD 800/ capita, in country
concerned states.
for social and productive services in
incomes and resilience to shocks
programme areas
drought and conflict affected areas.
RIMS survey at baseline and
•
Reduction in the prevalence of malnutrition in
completion
- Increased GoNU support to the
children under 5
rainfed agriculture sector.
•
No. of households with improvement in
household asset index
Purpose/Objective
Project objective: Improved access of
•
15 000 producers benefiting from market
Baseline survey, mid-term
the rural population in Central Butana to
access by project end.
and completion reports
- Increased agriculture surplus as a
markets and social services.
•
1700 additional women trading in the markets
Road traffic survey
result of production support received
served by rural feeder roads by project end.
from the BIRDP
BIRDP Progress reports
•
Decrease in transportation from 2 days at Es
- Increased producers’ gross margin by
Sadda to 1 hour during rainy season
80% as a combined effect between the
BIRDP and RAP;
•
Decrease in transportation tariff from approx
- Increase in sale prices for livestock by
15 SDG to 8 SDG/ trip
25% in rainy season
•
Increase in road traffic volume: from an
average of 71 vehicles/day to 96 by mid term
and to 124 by project end.
Results of the project
1) Rural roads upgraded in Central
• Number of km improved in Butana. Target:
Project progress report
Administrative decree for road toll and
Butana and regularly maintained
144 km by year 3 of project
market fee levies passed, complied
with by road users and enforced by
•
144 km of road maintained by project end
communities and localities.
2) Communities are trained to manage
• Tolls collected cover annual O&M costs.
Project progress report
road tolls and to engage in labor based
Target USD 95 000 as of project year 3
maintenance contracts.
• Number of labor days in labor based
contracts, by gender and by poverty group.
Target: 10 000 labour day aggregate by
project end, at least 50% women and 50%
below 30 years.
3) State capacity strengthened to plan,
• Performance of the Road Departments in
Project progress report
design, supervise, and maintain rural
MPPPU of Kassala and Gadaref rated
Consultancy firm assessment
feeder roads, using the spot improvement
satisfactory
of the performance of the
approach
• Lengths of new roads designed using the spot
Road Departments in
improvement approach: at least 200 km by
Gadaref and Kassala
project end
• Road network plan established by year 2.
• State budget allocation based on the road
network plan.
• Community Road Fund expanded to other
rural road networks in Kassala and Gadaref
by project end.
Activities of the project
1.1. Rehabilitation and construction of
• Number of kms constructed/ rehabilitated
Project progress reports
Competitive contracting to ensure cost
identified priority rural feeder roads in
annually
efficiency
Butana area
1.2. Implementation of conservation and
• Number of conservation and water control
Project progress reports
water control works around the roads
works implemented annually
selected for rehabilitation/ construction
1.3. Establishment of a community road
• Composition and by-laws of Community Road
Project progress reports
Willingness of communities to pay for
fund
Fund established by year 2 of project.
the maintenance of the road
2.2. Training of community on road
•
21 road committees established by year 3 of
Project progress report
maintenance and managing maintenance
project.
contracts
•
21 road committees with women in leadership
position by year 3 of project.
• About 400 community members trained by
project end, 50% women, 50% below 30
years
3.1. Capacity building of states through:
• Number of vehicles procured
Project progress report
Clear evidence of the advantages of
the proposed approach compared to
- establishment of rural roads
• Number of offices rehabilitated and equipped
the conventional approach,
management units in the Road
demonstrated by RAP to NHBA, the
Dept.MPPPUs
• Number of government staff trained by
MPPPUs and communities
gender
- training in selection and design of spot
improvements, supervision
• Types of training topics provided
- Training on improved road maintenance
- Planning, surveying and costing of
priority roads.
4.1. Project management through:
• Number of TA mobilized and duration
Project progress reports
- Selection of high calibre technical
team
- recruitment of consultancy firm
• Number of monitoring visits by NHBA
- Synchronised implementation
- validation of design and supervision of
• Marketing activities under BIRDP
between RAP and BIRDP
works by NHBA.
synchronized with RAP
- coordination with BIRDP.
ANNEX III: KEY FILE
Table 1: Rural Poverty and Agricultural/Rural Sector Issues
Priority Areas
Affected Group
Major Issues
Actions Needed
Weak and deteriorating road
Poor rural HHs living in
• Isolated areas during the rainy
• Improve accessibility for rural population during the rainy season
network due to limited budget,
Butana
seasons
• Improve road maintenance
engineering capacity and
Vehicle operators
• Higher cost of transportation
• Build public sector capacity in road construction planning and
limited
attention
to
Traders
• High vehicle operating costs
management.
preventative maintenance
• Poor maintenance of rural roads
High transport and transaction
Poor rural farmers
• High road tariffs applied on
• Reduce transport costs
costs in the movement of
roads during the rainy season
• Increase livestock sales
agricultural products during the
• High cost of livestock movement
• Increase agricultural productivity and access to higher farm gate
rainy season
in the rainy season
prices
• Low farm gate prices
• Improve access to agricultural and livestock markets
Women specific issues:
Women
Limited economic activities for
• Awareness campaign to promote girls’ education.
Limited economic activity.
women.
• Improve access to primary health services and schools.
Poor access to basic health
Difficulty in accessing basic health
• Train women in vocational skills and income generating activities.
and education services (distance,
• Increase women access to market places
services and education
absence
of
means
of
• Reduce transport time and cost.
transportation).
•
•
Table 2: ORGANISATION CAPABILITIES MATRIX
Organisation
Strengths
Weaknesses
Opportunities/Threats
Remarks
Enablers
National Highways and
• National coverage:
7 regional
• NHBA can develop state
Bridges Authority (NHBA)
offices
- NHBA receives only 10% of the
technical capacity in road
Under Ministry of Roads
• Cumulates responsibilities of
tolls collected, the rest goes to
planning, design, supervision
and Bridges
studies, design, construction using
the Ministry of Finance
and maintenance.
its own equipment, supervision of
• NHBA can also act as a
works,
management
and
champion for the project
maintenance.
approach and its replication to
• Provide design and supervision
other states
services on demand to States
• Technical capacity is satisfactory.
• Toll collections constitute its main
revenues.
•
•
•
State Ministry of Physical
• Has a Road Dept. responsible for
• Very limited funds to attract
• The
Agriculture
Revival
• Limited
budgetary
Planning and Public
survey and supervision of road
qualified staff
Programme has allocated
allocation to ARP at
Utilities (MPPPU)
works.
• Limited design capacity
approx 7.5% of its total budget
national level
• Developing special packages for
• Weak technical capacity
to rural infrastructure inclusive of
• Policies for road sector
experienced engineers to draw
• Limited supervision capacity
agricultural roads. This is a good
exist only for national
them from the private sector
• Few
experienced
staff
opportunity to build needed
roads in terms of
capacity in this sector, as well
construction,
available;
as expand the network of
management
and
• Inadequate quality control
agricultural roads.
maintenance;
• Dependent on NHBA for
• Roads that are not of
feasibility and design study
national importance are
• Maintenance
is
not
delegated to the States
undertaken for State roads as
no maintenance dept. exists at
•
State or locality level
Agriculture
Revival
• Chaired by the Fed. Minister of
• Absence of a planning
• Opportunity: Potential for the
Programme
(ARP) Rural
Irrigation and Water Resources
framework
for
the
rural
infrastructure
working
Infrastructure
Working
and includes the NHBA;
identification, prioritization and
group to act as champion for a
group
• 25% of ARP programme allocated
maintenance of the rural road
planned
and
integrated
to rainfed agriculture and 7.5 % to
network in proposed states.
construction/
maintenance
rural
infrastructures
including
• The road programme under
approach to the rural road
roads;
ARP does not foresee
network.
• The construction of the ARP
capacity building of the
financed
roads
are
now
MPPPUs.
• Budgetary restrictions due to
supervised by NHBA
decreased oil prices may limit
funding of the ARP road
programme.
Butana Development
Recently established (in 2007)
- Organization is recently
Synchronize interventions in
Agency (BDA)
by Presidential decree
established.
market development with the
Coordinate inter-state
- absence of a rural road
activities of rural roads
development efforts and covers
engineer among its current staff.
improvement.
10 localities in 5 States
-
The BDA represents a good
Fund mobilization is part of its
organizational framework for
mandate, as well as
inter-state collaboration.
strengthening the stakeholders’
organizations for the regulated
access and use of natural
resources.
Familiar with IFAD and
Government financial and
procurement guidelines and
procedures.
Service Providers
Road contractors
• Wide range of national contractors
• Experienced road engineers
• Opportunity: Greater efficiency
prepared to undertake rural roads
mostly based in Khartoum and
in road construction thanks to
construction.
few of them available at state
funding availability
• NHBA has qualified 45 companies
level.
• Threat: Non competitive market
as grade A in terms of technical
• Increased
reliance
of
for the recruitment of contractors
and financial capacities.
contractors on self-financing
• Experienced
national
road
which increases the total cost
engineering staff available in the
of construction and limits state
private sector.
supervision.
•
•
•
•
Client Organisations
The Association for
the
• Federation of
31 community
• The executive board has
• Opportunity: the association can
• Communities
located
Development of Central
based organizations;
outlived its term;
play a role in community
along the proposed road
Butana
• Received technical support from
• No audit of account effected;
mobilization
for
road
alignment
have
UNDP;
• Infrequent general assembly
maintenance; and the process
community organizations
• Has capital and financial assets
meetings.
for
establishing the apex
and are member of this
• Put in place a entrepreneurial
organization can be adapted for
apex organization.
management approach
the establishment of the
• 4 members of the
community road fund.
executive board of the
• Contracts out work and services to
the private sector and member
community organization
community based organizations
are from the villages
situated along the road
alignment.
Table 3: COMPLEMENTARY DONOR INITIATIVE/PARTNERSHIP POTENTIAL
Complementarity/
Donor/Agency
Nature Of Project/Programme
Project/Programme Coverage
Status
Synergy Potential
IFAD
• Butana Integrated Rural
• The Butana rainy season grazing ground
• On-going
- Complements resources available under the
Development Project
which covers 10 localities in 5 states.
• Completion date:
marketing component of the BIRDP and
• BIRDP provides support to communities
30 September
increases resources dedicated to rural
to manage rangelands and water
2016
infrastructure in Butana.
sources in a sustainable manner; access
- Facilitates mobility during the wet season and
extension services and veterinary care;
this is expected to reflect positively on the trade
access markets on better terms; and
links between Butana. New Halfa and Gedaref,
engage in value adding activities
on livestock sales prices, and on better access
(example dairy activities); organize
to services (especially health and education).
collectively to manage productive
activities.
• BIRDP provides support to states and
localities in regulating access to
rangelands, in strategically planning
water resources, in facilitating outreach
to communities and in improving the
management of markets.
EU
• Sudan Productive Capacity
• South Kordofan State
• On-going
- Exchange of knowledge on : procurement;
Recovery Programme - Model
• Construction of the Kadugli-Talodi road
capacity building; road maintenance
project
arrangements; and community participation in
construction and maintenance works; M&E
system.
- Joint development of a governance framework.
EU
• Eastern Sudan Recovery and
• State of Red Sea, Kassala and Gadaref
• In start-up phase;
The Butana area is not covered by this project.
Development Project
• Supports the Eastern Sudan Peace
duration 3 years
However the project management team (Mott
Agreement with quick impact activities
McDonald) has experience in the spot
implemented by line ministries, localities
improvement approach and can be a good
and NGOs. Sectoral focus on:
source of knowledge.
agriculture, water, land development and
vocational training
Government of
• Agriculture Revival Programme
• States of Gedaref, Gezira, Sennar, Blue
• On-going
- Project assumes that the capital investments
National Unity
- rural infrastructure
Nile, White Nile, South Kordofan and
• Completion: 2011
for the state of Gedaref would take place
component
South Darfur
especially for roads currently under construction.
• Construction of new roads. Likely
- Project approach to be replicated by the
reliance on contractor pre-financing for
MPPPU to the prioritization, planning and
their execution which would increase
preventative maintenance of other state level
costs by 30%.
rural roads.
Table 4: TARGET GROUP PRIORITY NEEDS AND PROJECT PROPOSALS
Typology
Poverty Levels And Causes
Coping Actions
Priority Needs
Project Response
Poor Households with
- No ownership of livestock or ownership
- Reliance on ad hoc charity and
- Restocking.
Better access to markets esp. in
less than 10 heads of
does not exceed 10 heads of small
wage labour.
- Basic services, incl. water.
the rainy season.
small ruminants
ruminants.
- Benefit from community
Reduced transport cost.
- Receive livestock for herding or milking.
solidarity for access to water in
Improved water accessibility and
- Cultivate up to 5 feddans of sorghum
the dry season.
range carrying capacity.
because of labour limitations
Increase women mobility and
- Have no access to mechanized land
facilitate access to market
preparation
Facilitate access to services, in
- Rely on wage labour and charity from
particular health services an
kinship members.
schools.
- Women employed in milking small
ruminants, cultivation tasks when fields are
near, and income generating activities such
as mat weaving.
- No children enrolled in schools.
- Full time residents in Butana, and settled in
villages and farigs.
Average Households
- Seasonal wage labour for men.
- Water and basic services.
Better access to markets esp. in
with ownership of
- Cultivate up to 50 feddans of rainfed
- Move to better pastures in the
- Access to markets
the rainy season.
livestock about 30
sorghum with mechanized assistance for
rainy and dry season.
Reduced transport cost.
small ruminants and 10
initial ploughing.
- Sale of livestock.
Improved water accessibility and
heads of cattle/ camels
- Seasonal wage labour for men in nearby
range carrying capacity.
irrigated schemes or through migration to
Increase women mobility and
Saudi Arabia (where the men usually work
facilitate access to market
as herders).
Facilitate access to services, in
- Women involved in milking small
particular health services an
ruminants, processing milk into ghee and
schools.
yogurt, weeding and harvesting of crops
when fields near to the house.
- Bi-local residents with houses in the center
and periphery of Butana.
Well-off Households
- Cultivate approximately 250 fed of rainfed
- Access to low cost feed
Better access to markets esp. in
with ownership of large
agriculture. They have access to
resources.
the rainy season.
herds approximately
mechanization.
- Access to markets.
Reduced transport cost.
100 to 300 heads of
- Have access to irrigated and mechanized
Improved water accessibility and
small and large
farms that they cultivate through
range carrying capacity.
animals.
sharecropping.
Increase women mobility and
- Have access to trucks to transport animals
facilitate access to market
to better pastures and tankers to transport
Facilitate access to services, in
and sell water.
particular health services an
- Engage in trade activities.
schools.
- Either settled within Butana or
Improved value for money for
transhumants from outside Butana.
access to improved range, water
facilities and markets.
Table 5: STAKEHOLDER MATRIX/PROJECT ACTORS AND ROLES
Potential Contractors/
Other Possible
Component
Sub-Component
Coverage
Perennial Institutions Involved
Periodic Inputs
Partners in Execution
Physical rehabilitation
Rehabilitation and construction of
- Arab 6-Es Subagh
- State Ministry of Physical
Private contractors
Communities
and construction of
feeder roads in Butana area
- Es Subagh - Husheib
Planning and Public Utilities
organized in road
feeder roads
- Butana Development Agency
committees
Implementation of conservation and
- Arab 6-Es Subagh
- State Ministry of Physical
Private sector and the
water control works along selected
- Es Subagh - Husheib
Planning and Public Utilities
state ministry of
feeder roads
- BDA
agriculture
Community Road Fund
Communities serviced
BDA, localities, road
Private sector for
by Arab 6-Es Subagh -
committees, Road
maintenance works when
Husheib
Departments of the MPPPUs
applicable
Capacity Building and
Training of Communities on soil and
Communities serviced
BDA
Private consultancy firms
Institutional
water conservation and management
by Arab 6-Es Subagh -
and NGOs
Development
of labour based contracts
Husheib
Institution development and training
Gadaref and Kassala
- State Ministry of Physical
Private consultancy firms
NHBA
for the Road Dept of the MPPPUs in
States
Planning and Public Utilities
and NGOs for training,
Gadaref and Kassala States
- BDA
technical assistance and
studies
Project Management
- Recruitment of consultancy firm in
Butana
- Butana Development Agency
Private consultancy firms
ARP working group
BDA
- NHBA
and individual consultants
for rural infrastructure
- Set up and operation of the project
M&E
- Collaboration with the NHBA in
monitoring of project
- Coordination with BIRDP
ANNEX III: PROJECT COST TABLES
Summary Cost Table 1: Components Project Cost Summary
(SDP Million)
(US$ Million)
Components Project Cost Summary
%
% Total
%
% Total
Foreign Base
Foreign Base
Local Foreign Total Exchange Costs Local Foreign Total Exchange Costs
1. Physical Rehabilitation and Construction of Rural Roads /a
19.12
7.65
26.77
29
80
7.65
3.06
10.71
29
80
2. Capacity Building and Institutional Development
3.50
2.11
5.62
38
17
1.40
0.85
2.25
38
17
3. Project Management
0.96
0.05
1.00
5
3
0.38
0.02
0.40
4
3
Total BASELINE COSTS
23.58
9.80
33.38
29
100
9.43
3.92
13.35
29
100
Physical Contingencies
1.79
0.77
2.56
30
8
0.72
0.31
1.02
30
8
Price Contingencies
4.87
1.88
6.76
28
20
0.42
0.16
0.59
28
4
Total PROJECT COSTS
30.24
12.46
42.70
29
128
10.57
4.39
14.96
29
112
_________________________________
\a 10% Contingencies estimated for civil works
Summary Cost Table 2: Expenditures Accounts Project Cost Summary
%
% Total
Expenditure Accounts Project Cost Summary
(SDP Million)
(US$ Million)
Foreign
Base
Local
Foreign
Total
Local
Foreign
Total
Exchange
Costs
I. Investment Costs
A. Civil Works
17.93
7.68
25.61
7.17
3.07
10.24
30
77
B. Vehicles and Equipment
Vehicles
0.16
0.20
0.36
0.06
0.08
0.14
56
1
Materials and Equipment
0.06
0.32
0.38
0.02
0.13
0.15
85
1
Subtotal
0.21
0.52
0.74
0.09
0.21
0.29
71
2
C. Technical Assistance and Training
International Technical Assistance
-
1.43
1.43
-
0.57
0.57
100
4
National Technical Assistance
2.49
-
2.49
0.99
-
0.99
-
7
Training
0.86
-
0.86
0.35
-
0.35
-
3
Studies
0.63
-
0.63
0.25
-
0.25
-
2
Subtotal
3.98
1.43
5.41
1.59
0.57
2.16
26
16
Total Investment Costs
22.12
9.63
31.75
8.85
3.85
12.70
30
95
II. Recurrent Costs
A. Field Allowances
0.41
-
0.41
0.16
-
0.16
-
1
B. Operational Costs
0.40
0.17
0.57
0.16
0.07
0.23
30
2
C. Road Maintenance Fund
0.65
-
0.65
0.26
-
0.26
-
2
Total Recurrent Costs
1.46
0.17
1.63
0.58
0.07
0.65
10
5
Total BASELINE COSTS
23.58
9.80
33.38
9.43
3.92
13.35
29
100
Physical Contingencies
1.79
0.77
2.56
0.72
0.31
1.02
30
8
Price Contingencies
4.87
1.88
6.76
0.42
0.16
0.59
28
4
Total PROJECT COSTS
30.24
12.46
42.70
10.57
4.39
14.96
29
112
Summary Cost Table 3
Project Components by Year -- Base Costs
(US$ Million)
Base Cost
2010
2011
2012
2013
Total
1. Physical Rehabilitation and Construction of Rural Roads /a
1.60
6.33
2.68
0.10
10.71
2. Capacity Building and Institutional Development
0.88
0.69
0.45
0.22
2.25
3. Project Management
0.10
0.12
0.10
0.09
0.40
Total BASELINE COSTS
2.58
7.14
3.22
0.41
13.35
Physical Contingencies
0.15
0.62
0.26
-
1.02
Price Contingencies
Inflation
Local
0.09
0.88
0.71
0.17
1.86
Foreign
0.01
0.09
0.06
0.00
0.16
Subtotal Inflation
0.11
0.97
0.78
0.17
2.02
Devaluation
-0.07
-0.67
-0.55
-0.14
-1.43
Subtotal Price Contingencies
0.03
0.29
0.22
0.04
0.59
Total PROJECT COSTS
2.76
8.05
3.70
0.45
14.96
Taxes
0.34
1.08
0.48
0.03
1.92
Foreign Exchange
0.90
2.43
1.05
0.02
4.39
_________________________________
\a 10% Contingencies estimated for civil works
Summary Cost Table 4: Expenditure Accounts by Components - Base Costs
Physical
Expenditure Accounts by Components - Base Costs
Rehabilitation
Capacity
(US$ Million)
and
Building and
Physical
Construction
Institutional
Project
Contingencies
of Rural Roads
Development
Management
Total
%
Amount
I. Investment Costs
A. Civil Works
10.19
0.05
-
10.24
10.0
1.02
B. Vehicles and Equipment
Vehicles
-
0.14
-
0.14
-
-
Materials and Equipment
-
0.15
-
0.15
-
-
Subtotal
-
0.29
-
0.29
-
-
C. Technical Assistance and Training
International Technical Assistance
-
0.57
-
0.57
-
-
National Technical Assistance
-
0.71
0.28
0.99
-
-
Training
-
0.29
0.06
0.35
-
-
Studies
0.25
-
-
0.25
-
-
Subtotal
0.25
1.57
0.34
2.16
-
-
Total Investment Costs
10.44
1.92
0.34
12.70
8.1
1.02
II. Recurrent Costs
A. Field Allowances
-
0.16
-
0.16
-
-
B. Operational Costs
-
0.17
0.06
0.23
-
-
C. Road Maintenance Fund
0.26
-
-
0.26
-
-
Total Recurrent Costs
0.26
0.33
0.06
0.65
-
-
Total BASELINE COSTS
10.71
2.25
0.40
13.35
7.7
1.02
Physical Contingencies
1.02
0.01
-
1.02
-
-
Price Contingencies
Inflation
Local
1.49
0.28
0.09
1.86
-
-
Foreign
0.14
0.03
0.00
0.16
-
-
Subtotal Inflation
1.63
0.30
0.09
2.02
-
-
Devaluation
-1.15
-0.22
-0.07
-1.43
-
-
Subtotal Price Contingencies
0.48
0.09
0.02
0.59
7.1
0.04
Total PROJECT COSTS
12.21
2.34
0.42
14.96
7.1
1.07
Taxes
1.79
0.12
0.01
1.92
8.3
0.16
Foreign Exchange
3.50
0.87
0.02
4.39
7.3
0.32
Summary Cost Table 5: Components by Financiers
Components by Financiers
Local
(US$ Million)
The Government
IFAD
Beneficiaries
Total
For.
(Excl. Duties &
Amount
% Amount
% Amount
% Amount
% Exch. Taxes) Taxes
1. Physical Rehabilitation and Construction of Rural Roads /a
1.79
14.7
10.33
84.6
0.09
0.7
12.21
81.6
3.50
6.91
1.79
2. Capacity Building and Institutional Development
0.12
5.2
2.22
94.8
-
-
2.34
15.6
0.87
1.34
0.12
3. Project Management
0.01
2.3
0.41
97.7
-
-
0.42
2.8
0.02
0.39
0.01
Total PROJECT COSTS
1.92
12.9
12.95
86.6
0.09
0.6
14.96
100.0
4.39
8.65
1.92
_________________________________
\a 10% Contingencies estimated for civil works
Summary Cost Table 6: Procurement Arrangements
Rural Access Project
Procurement Method
Procurement Arrangements
Community
(US$ Million)
International
National
Consulting
Participation
Competitive Competitive
Services:
Local
Direct
in
Bidding
Bidding
QCBS
Shopping
Contracting
Procurement
N.B.F.
Total
A. Civil Works /a
-
11.7
-
-
-
-
-
11.7
(10.0)
(10.0)
B. Vehicles, equipment and materials
0.3
-
-
-
-
-
-
0.3
(0.2)
(0.2)
C. Technical Assistance and Training
0.6
-
1.1
-
0.6
-
-
2.3
(0.6)
(1.1)
(0.6)
(2.3)
D. Maintenance Fund
-
-
-
-
-
0.3
-
0.3
(0.1)
(0.1)
E. Recurrent Costs
-
-
-
0.4
-
-
-
0.4
(0.4)
(0.4)
Total
0.8
11.7
1.1
0.4
0.6
0.3
-
15.0
(0.8)
(10.0)
(1.1)
(0.4)
(0.6)
(0.1)
-
(13.0)
_________________________________
Note: Figures in parenthesis are the respective amounts financed by IFAD
\a Encouraged to form ventures with international consulting firms
Summary Cost Table 7
Disbursements by Semesters and Government Cash Flow
Costs to
be
(U
Financing Available
Financed e Government
IFAD
Beneficiaries
Project
Cash Cumulative
Amount
Amount
Total
Costs
Flow
Cash Flow
1
1.21
-
1.21
1.38
-0.17
-0.17
2
1.21
-
1.21
1.38
-0.17
-0.34
3
3.48
-
3.48
4.02
-0.54
-0.88
4
3.48
-
3.48
4.02
-0.54
-1.42
5
1.61
-
1.61
1.85
-0.24
-1.66
6
1.61
-
1.61
1.85
-0.24
-1.90
7
0.17
0.04
0.21
0.22
-0.01
-1.91
8
0.17
0.04
0.21
0.22
-0.01
-1.92
Total
12.95
0.09
13.04
14.96
-1.92
-1.92
Summary Cost Table 8: Expenditure Accounts by Financier
Expenditure Accounts by Financiers
Local
(US$ Million)
The Government
IFAD
Beneficiaries
Total
For.
(Excl.
Duties &
Amount
%
Amount
%
Amount
%
Amount
%
Exch.
Taxes)
Taxes
I. Investment Costs
A. Civil Works
1.76
15.0
9.97
85.0
-
-
11.73
78.4
3.52
6.45
1.76
B. Vehicles and Equipment
Vehicles
0.06
44.0
0.08
56.0
-
-
0.15
1.0
0.08
-
0.06
Materials and Equipment
0.02
15.0
0.13
85.0
-
-
0.15
1.0
0.13
-
0.02
Subtotal
0.09
29.1
0.21
70.9
-
-
0.30
2.0
0.21
-
0.09
C. Technical Assistance and Training
International Technical Assistance
-
-
0.59
100.0
-
-
0.59
4.0
0.59
-
-
National Technical Assistance
-
-
1.04
100.0
-
-
1.04
7.0
-
1.04
-
Training
-
-
0.36
100.0
-
-
0.36
2.4
-
0.36
-
Studies
-
-
0.26
100.0
-
-
0.26
1.7
-
0.26
-
Subtotal
-
-
2.25
100.0
-
-
2.25
15.0
0.59
1.66
-
Total Investment Costs
1.85
12.9
12.43
87.1
-
-
14.27
95.4
4.32
8.11
1.85
II. Recurrent Costs
A. Field Allowances
-
-
0.17
100.0
-
-
0.17
1.2
-
0.17
-
B. Operational Costs
0.04
15.0
0.20
85.0
-
-
0.24
1.6
0.07
0.13
0.04
C. Road Maintenance Fund
0.04
15.0
0.15
53.4
0.09
31.6
0.28
1.9
-
0.24
0.04
Total Recurrent Costs
0.08
11.2
0.52
76.0
0.09
12.8
0.69
4.6
0.07
0.54
0.08
Total PROJECT COSTS
1.92
12.9
12.95
86.6
0.09
0.6
14.96
100.0
4.39
8.65
1.92
Summary Cost Table 9: Disbursement Accounts by Financiers
Disbursement Accounts by Financiers
Local
(US$ Million)
e Government
IFAD
Beneficiaries
Total
For.
(Excl.
Duties &
Amount
% Amount
% Amount
% Amount
% Exch. Taxes) Taxes
A. Civil works
1.76
15.0
9.97
85.0
-
-
11.73
78.4
3.52
6.45
1.76
B. Vehicles and Equipment
0.08
31.4
0.18
68.6
-
-
0.26
1.7
0.18
-
0.08
C. Training, technical assistance and studies
0.01
0.3
2.28
99.7
-
-
2.29
15.3
0.63
1.66
0.01
D. Other Recurrent Costs
0.04
8.7
0.37
91.3
-
-
0.41
2.7
0.07
0.30
0.04
E. Road Maintenance Costs
IFAD Financed Road Maintenance
0.03
15.0
0.15
85.0
-
-
0.18
1.2
-
0.15
0.03
Beneficiary Financed Road Maintenance
0.02
15.0
-
-
0.09
85.0
0.10
0.7
-
0.09
0.02
Subtotal
0.04
15.0
0.15
53.4
0.09
31.6
0.28
1.9
-
0.24
0.04
Total PROJECT COSTS
1.92
12.9
12.95
86.6
0.09
0.6
14.96
100.0
4.39
8.65
1.92
Detailed Cost Table: Component 1
Detailed Costs
(US$)
Quantities
Base Cost ('000)
Unit
2010
2011
2012
2013
Total
Unit Cost
2010
2011
2012
2013
Total
I. Investment Costs
A. Civil Works - Road Development
1. Arab 6 to Es Subagh
a. Road Formation
Arab 6 Village to Es Sadda (a) /a
Lumpsum
-
0.7
0.3
-
1
2.378.088,0
-
1 665
713
-
2 378
Arab 6 village to Es Sadda (b) /b
Lumpsum
-
1
-
-
1
702.626,0
-
703
-
-
703
Es Sadda to Es Subagh
Lumpsum
0.2
0.55
0.25
-
1
1.171.044,0
234
644
293
-
1 171
Subtotal
234
3 011
1 006
-
4 252
b. Grading and Drainage /c
Arab 6 village to Es Sadda (b) /d
Lumpsum
-
1
-
-
1
58.909,0
-
59
-
-
59
Es Sadda to Es Subagh
Lumpsum
0.2
0.55
0.25
-
1
98.182,0
20
54
25
-
98
Subtotal
20
113
25
-
157
c. Structures - culverts - routine
Arab 6 Village to Es Sadda (a) /e
Lumpsum
0.25
0.45
0.3
-
1
660.000,0
165
297
198
-
660
Arab 6 village to Es Sadda (b) /f
Lumpsum
-
1
-
-
1
360.000,0
-
360
-
-
360
Es Sadda to Es Subagh
Lumpsum
0.2
0.45
0.35
-
1
600.000,0
120
270
210
-
600
Subtotal
285
927
408
-
1 620
d. Structures - Special
Bridge at El Saada
Lumpsum
0.25
0.45
0.3
-
1
330.000,0
83
149
99
-
330
Wash at #16 - 15 metres wide
Lumpsum
1
-
-
-
1
18.000,0
18
-
-
-
18
Wash at # 52 - 30 metres wide
Lumpsum
1
-
-
-
1
72.000,0
72
-
-
-
72
Wash at #56 - 25 metres wide
Lumpsum
1
-
-
-
1
45.000,0
45
-
-
-
45
Subtotal
218
149
99
-
465
Subtotal
756
4 200
1 538
-
6 494
2. Es Subagh to Husheib
Formation of road
Lumpsum
0.2
0.5
0.3
-
1
1.756.566,0
351
878
527
-
1 757
Grading of road and drainage /g
Lumpsum
0.2
0.5
0.3
-
1
147.273,0
29
74
44
-
147
Structures - culverts - routine
Lumpsum
0.25
0.45
0.3
-
1
900.000,0
225
405
270
-
900
Structures special
Lumpsum
0.3
0.7
-
-
1
216.000,0
65
151
-
-
216
Subtotal
671
1 508
841
-
3 020
Subtotal
1 427
5 708
2 379
-
9 514
Detailed Costs
(US$)
Quantities
Base Cost ('000)
Unit
2010
2011
2012
2013
Total
Unit Cost
2010
2011
2012
2013
Total
B. Conservation and Water Control Works /h
Arab 6 to Es Subagh
Lumpsum
-
0.7
0.3
-
1
350.000,0
-
245
105
-
350
Es Soubagh to Husheib
Lumpsum
-
0.7
0.3
-
1
330.000,0
-
231
99
-
330
Subtotal
-
476
204
-
680
C. Studies
1. Studies
To support field activities for roads /i
Per annum
0.6
0.25
-
-
0.85
295.000,0
177
74
-
-
251
Total Investment Costs
1 604
6 258
2 583
-
10 444
Table 1. Physical Rehabilitation and Construction of Rural Roads
II. Recurrent Costs
A. Road Maintenance
Road maintenance /j
Lumpsum
-
71
95
95
262
Total Recurrent Costs
-
71
95
95
262
Total
1 604
6 329
2 678
95
10 706
_________________________________
\a Road Category d.3 see working paper 1
\b Road Category e.2 see working paper 1
\c For unsurfaced %
\d Road Category e.2 see working paper 2
\e Road Category d.3 see working paper 1
\f Road Category e.2 see working paper 1
\g For unsurfaced %
\h All catchments draining towards road structures will be treated using soil & water conservation measures
This is an income generating activity for the community
\i Provision of detailed studies
Yr. 1 includes retroactive financing for survey and design and pre-qualification of contractors and consultancy firms
\j Routine maintenance estimated at 1%% of road development from Yr 2
Component 2 Detailed Cost Table 2
Table 2. Capacity Building and Institutional Development
Detailed Costs
(US$)
Quantities
Base Cost ('000)
Unit
2010
2011
2012
2013
Total
Unit Cost
2010
2011
2012
2013
Total
I. Investment Costs
A. Civil Works Road Office
Rehabilitation of Roads and Works Building /a
number
1
-
-
-
1
50.000,0
50
-
-
-
50
B. Vehicles and Equipment Roads and Bridges
Office equipment /b
Lumpsum
1
-
-
-
1
110.500,0
111
-
-
-
111
4 WD double cabin pick-up /c
number
4
-
-
-
4
36.000,0
144
-
-
-
144
Subtotal
255
-
-
-
255
C. Training, Technical Assistance and Studies
1. Technical Assistance
a. Contracted Services /d
Team Leader /e
Per annum
0.33
0.47
0.2
-
1
572.000,0
189
269
114
-
572
Local Consulting Core Team /f
Per annum
0.35
0.37
0.27
0.01
1
262.600,0
92
97
71
3
263
Subtotal
281
366
185
3
835
b. Government Support Staff /g
Top up salaries and allowances
Per annum
0.25
0.25
0.25
0.25
1
452.000,0
113
113
113
113
452
Subtotal
394
479
298
116
1 287
2. Training
a. Training Material
Preparation/Revision of Training Modules Roads
Lumpsum
0.67
-
-
0.33
1
20.000,0
13
-
-
7
20
Preparation/Revision of Training Modules SWC
Lumpsum
0.34
0.66
-
-
1
20.000,0
7
13
-
-
20
Subtotal
20
13
-
7
40
b. Training for the Rural Roads /h
English Language /i
number
1
1
-
-
2
6.400,0
6
6
-
-
13
CAD and use of specialized software /j
number
1
1
-
-
2
4.260,0
4
4
-
-
9
Surveying /k
number
1
1
-
-
2
6.400,0
6
6
-
-
13
Construction Management and Supervision /l
number
1
1
-
-
2
6.400,0
6
6
-
-
13
Specifications and Procurement /m
number
-
1
1
-
2
6.400,0
-
6
6
-
13
Road design /n
number
1
1
-
-
2
6.400,0
6
6
-
-
13
Planning and Implementation of road maintenance /o
number
-
1
1
-
2
6.400,0
-
6
6
-
13
Subtotal
30
43
13
-
85
Table 2. Capacity Building and Institutional Development
Detailed Costs
(US$)
Quantities
Base Cost ('000)
Unit
2010
2011
2012
2013
Total
Unit Cost
2010
2011
2012
2013
Total
c. Training - Conservation and Water
Training of trainers /p
number
1
1
-
-
2
8.500,0
9
9
-
-
17
Conservation measures and water control structures /q
number
1
1
-
-
2
7.000,0
7
7
-
-
14
Implementation of labour based works TOT
number
1
1
-
-
2
7.000,0
7
7
-
-
14
Training of locality staff and CBOs
number
1
1
-
-
2
7.000,0
7
7
-
-
14
Community training
number
1
1
1
-
3
7.000,0
7
7
7
-
21
Subtotal
37
37
7
-
80
d. Workshops, Seminars, exchange in-country
National/Regional workshops and seminars
Lumpsum
-
10
-
10
20
Stakeholders workshops/seminars
Lumpsum
5
5
5
5
20
Inter-site community visits
Lumpsum
5
5
5
5
20
Study tours in-country
Lumpsum
5
5
5
-
15
Subtotal
15
25
15
20
75
e. Overseas training
Short course in Road planning, design & construction /r
number
-
1
2
-
3
15.000,0
-
15
30
-
45
Subtotal
102
132
65
27
325
Subtotal
495
611
363
142
1 612
Total Investment Costs
800
611
363
142
1 916
II. Recurrent Costs
A. Allowances
Field Allowances Senior Officials /s
Person days
360
360
360
360
1 440
10,0
4
4
4
4
14
Field allowances other staff /t
Person days
4 680
4 680
4 680
4 680
18 720
8,0
37
37
37
37
150
Subtotal
41
41
41
41
164
B. Operational Costs
Vehicle operation and maintenance /u
Lumpsum
36
36
36
36
144
Equipment maintenance /v
Lumpsum
6
6
6
6
22
Subtotal
42
42
42
42
166
Total Recurrent Costs
83
83
83
83
330
Total
882
694
446
225
2 247
Table 2. Capacity Building and Institutional Development
Detailed Costs
_________________________________
\a Gedareff
\b See working paper 1: Equipment to be provided to Department of Roads and Bridges
$71 000 Gedaref and $39 500 New Halfa
\c 3 Gedaref and 1 New Halfa
\d 30% overhead provided for in annual costs of consultants - both International and National
\e 2.5 year input based in Gedaref as part of core consulting team
\f Core team based in Gedaref see Calculation Tables - Full time Deputy Team Leader with other short term inputs from various specialists
\g See working paper 1: Department of Roads and Bridges; Road Maintenance units Gedaref and New Halfa
BDA Soil and Water Conservation Butana and Artbara
\h Includes training for contractors
\i 6 days for 15 people in Gedariff
\j 6 days for 10 people
\k 6 days for 15 people in Gedariff
\l 6 days for 15 people in Gedariff
\m 6 days for 15 people in Gedariff
\n 6 days for 15 people in Gedariff
\o 6 days for 15 people in Gedariff
\p Gedarif6 days x 20 persons
\q 15 persons x 6 days - includes cost of transportation from Gedariff of 1 vehicle
\r 3 month courses
\s 4 senior management at 10 days per month x 9 months
\t 26 days x 20 persons x 9 months - includes allowances for field staff and drivers
\u 25% of capital cost
\v 5 % of capital cost
Detailed Cost Table 3: Component 3
Table 3. Project Management
Detailed Costs
(US$)
Quantities
Base Cost ('000)
Unit
2010
2011
2012
2013
Total
Unit Cost
2010
2011
2012
2013
Total
I. Investment Costs
A. Technical Assistance
1. Monitoring and Evaluation
CCU Contract
Per annum
-
15
10
5
30
Road and traffic survey
Study
1
-
1
-
2
15.000,0
15
-
15
-
30
Annual assessment
assessment
1
1
1
1
4
10.000,0
10
10
10
10
40
Planning workshops
event
1
1
1
1
4
5.000,0
5
5
5
5
20
Audit
Per annum
5
5
5
5
20
Mid-term Review
Lumpsum
-
20
-
-
20
Project Completion Report
Lumpsum
-
-
-
10
10
Subtotal
35
55
45
35
170
2. Monitoring by NHBA
Monitoring Missions
missions
3
3
3
3
12
5.000,0
15
15
15
15
60
Subtotal
50
70
60
50
230
B. Contracted Staff BDA
BDA staff overtime
Per annum
30
30
25
25
110
Total Investment Costs
80
100
85
75
340
II. Recurrent Costs
A. Operational Costs
Equipment maintenance
Per annum
15
15
15
15
60
Total Recurrent Costs
15
15
15
15
60
Total
95
115
100
90
400
ANNEX IV: ORGANIZATIONAL ORGANIGRAMME
General Manager Ministry of Planning and Public Utilities
General Manager Ministry of Planning and Public
(MPPPU) - GEDAREF STATE
Utilities
(MPPPU) KASSALA STATE
Links with Butana Development
Department of
Water
Department
Water
Authority for Natural Resources
Department
Department
Electricity
Dept. of
Dept. of
Elect.
Consultants
Roads and
Supply
of Roads and
Supply
& Soil and Water Conservation
of Design
of Projects
Authority
Design
Projects
Auth.
Bridges (DRB)
Authority
Bridges
Auth.
Works
- Team Leader/
International
Construction/Management
National
- Design Engineer
Rural Roads
Urban Roads
Buildings
Rural Roads
Urban Roads
Buildings
- Structures
Support to Butana Development
Authority Roads Programme
- Hydrologist
- Training
Rural Road
- Procurement
Rural Road Maintenance
Construction
Construction
Maintenance
Links with State Ministry of
- Soil and Water
Conservation
Agriculture Irrigation
Other
Other
Other
Butana
Other Gedaref
Butana
Butana
Butana
Gedaref
Kassala
Kassala
Roads
Roads
Roads
Roads
Roads
Roads
Roads
Roads
Engineer (1)
Engineer (1)
Surveyor (1)
Surveyor (1)
Arab 6 to
Arab 6 to Es
Other Butana
Es
Other Butana
IFAD Rural Access Project
Subagh to
Roads
Subagh
Roads
Husheib Roads
Road
Construction Engineer (1)
Design Engineer (1) - from design section
Surveyors (2)
Site Supervisors (2)
Notes:
1. Support to Roads and Bridges at Locality level is handled centrally by the State Roads and Bridges Department
2. At Locality level Water, Buildings, Electricity and Mechanical sections are all combined into one unit.
3. In Gedaref State, full support is being provided to DRB as most of the rural roads in Butana are in Gedaref State and also the DRB will be assisting and working with BRDP on their rural roads programme
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VI
ANNEX VI: RESULTS-BASED M&E
Introduction
1. This annex on Monitoring and Evaluation aims to provide an overall framework for the
implementation of the project monitoring. The M&E will be based on the principles of monitoring
the project results and impact. Project monitoring would form an integral part of the project
management system and would focus on project performance in terms of the inputs and outputs,
as well as project results in terms of impact and sustainability.
Implementation of the M&E
2.
The BDA M&E Officer will be in charge of monitoring the RAP implementation. The M&E
system will be in line with the requirements of IFAD Results and Impact Management System (RIMS)
and the 1st and 2nd level indicators will be aligned to the extent possible. Unfortunately, it is worth
mentioning that in the RIMS, the performance of rural transport and travel activities funded by IFAD
are recorded only through the traditional single quantitative indicators mostly limited to the number of
kilometers of roads constructed or improved. Additional indicators will be included to monitor the
outcomes of the project in terms of quality, effectiveness and sustainability.
3.
Result and Impact Management System (RIMS): IFAD has established a sample reporting
format to report on the 1st and 2nd level indicators associated with RIMS which will be part of the
project periodic reporting. First-level results correspond to the project activities. A sample reporting
format for reporting on first-level indicators is given in appendix 2. Second-level results will look at the
short and medium term changes (outcomes) caused by the implementation of the project activities
and outputs, and third level result will look at the long term effects of the project. The second-level
results are reported after mid-term review and are updated on an annual basis. In recognition of
IFAD’s commitment to the Millennium Development Goals (MDGs), the RIMS framework normally
includes two mandatory impact indicators: child malnutrition and household assets. The period
covered should be the same as in the AWP&B.
4. Lessons learnt on project M&E. Lessons learnt from closed and ongoing projects in Sudan can
be summarized as follows:
• Cross-cutting and thematic surveys/studies, especially those carried out in collaboration with
universities, have been a cost-effective and practical way to fill M&E information gaps and should
be replicated in the ongoing and future projects;
• The projects do not make effective use of the participatory M&E arrangements with respect to
data collection and reporting. Ongoing monitoring should be delegated to the beneficiaries as part
of a participatory M&E during the training of community organizations. To that effect, a data base
of the project beneficiaries should be established to facilitate ongoing monitoring and impact
studies. The community development committees would provide the required inputs for the data
base.
• It was noted that the project M&E systems lack standardized formats/forms for data collection and
reporting; Moreover, there is a top heavy organizational structure and unclear accountability for
M&E; and the implementation of the M&E system components is slow. It is therefore proposed
that start-up activities and the first year supervision allocate attention to the set-up of the M&E
system.
• The financial monitoring sub-system is not linked with the physical monitoring system at the
output level. This deficiency should be resolved by ensuring that inputs recorded in the system
are linked to output reporting so as to allow the project management to track project efficiency.
5. Based on the lessons learned stated above, the RAP M&E system will be geared to entrusting
data collection, reporting and analysis to the road committees at village level, the BDA
Development Team at locality level, the Roads Department of the MPPPU. The M&E officer in the
29
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VI
BDA will play the role of backstopping to these entities and will make ensure that the M&E for
both RAP and BIRDP are harmonized and consistent.
Input Monitoring
6.
Key M&E activities will comprise the Project Implementation Manual, the baseline survey at
start-up stage, the AWPB, half-yearly data collection and reporting of activity and output targets and
achievements; annual impact assessment and evaluation, a mid-term review, and a Project
completion report. The activities will be guided by a number of fundamental considerations:
(a)
Data will be disaggregated by gender and youth, when applicable.
(b)
Each implementing or partner agency will have clear M&E responsibilities with specific
reporting deadlines and a forum for presenting and discussing the findings of the
monitoring exercise.
(c)
M&E will be linked to the project rationale, log frame, annual work plans and budgets and
the beneficiary assessments. The findings of the M&E will be used to take corrective or
enhancing measures at the level of project management.
7.
In the case of the roads, the choice of results-based monitoring and evaluation indicators
should be very objective. There are two levels of monitoring and evaluation. There is on one hand the
immediate monitoring for efficient management of the road construction and on the other hand the
monitoring of the project performance and implementation progress. Indicators for efficient
management would concentrate on the quality of material and structures, on the length of road
completed according to specifications, on the time spent and the remaining period for completion of
works, the number and quality of the machinery on site, the number of teams working on the road, the
availability of material on site, the number and proficiency of the engineers in charge of the teams and
the quality of the camping facilities of the contractor as well as the welfare of the task workforce. This
will be reported upon by the BDA technical team in charge of the supervision of road works.
8.
Indicators for performance monitoring. These indicators measure the extent the project
results and objectives are achieved. The socio-economic survey completed in July 2009 enabled the
design completion mission to set the performance benchmarks and targets as follows:
Indicators
Baseline
Target by project completion
Increased producers’ marketing margin
SDG 16/ sheep - gross
SDG 45/ sheep - gross margin
margin in rainy season
in rainy season
Increase in number of women trading in the
Approx 260 women6
1700 women
markets served by rural feeder roads.
Number of producers benefiting from improved
12 000 producers trade in
15 000 producers
market access; (RIMS).
town markets7
Increase in sale prices for livestock in rainy
SDG 130 to 175/ small
SDG
150 to
220
/ small
season
ruminant in Es Soubagh
ruminant in Gadaref and
and Rattaja
(accessible
Tamboul markets(thanks to
markets)
better access)
Decrease in transportation time in rainy season
2 days at Es Sadda
1 hour at Es Sadda crossing
crossing
Decrease in transportation tariff in rainy season
10 to
20 SDG/ trip Es
8 SDG/ trip Es Soubagh-New
Soubagh-New Halfa
Halfa
Increase in road traffic
(number and type of
140 vehicles on the Es
20% increase in traffic during
vehicles) in rainy season (July-Sep).
Soubagh - Es Sadda road
rainy
season on both
50 vehicles on the Es
alignments
Soubagh - Husheib road
Community road fund annual disbursements
Not existing
USD 95 000 to cover 100% of
maintenance costs
Infrastructure development plans exist at state
Not existing
Rural roads plan available
6 The figure is derived from 4 women traders by village for 26 villages, and approx 150 women in Es Soubagh
market in rainy season and 10 women in the Arab 6.
7 This is an extrapolation of the result obtained in the CCI study of 2006 whereby 78% of communities in Butana
sell their produce and buy their household needs at town markets.
30
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VI
level.
State budget allocation for infrastructure based
Ad hoc
Budgetary allocation in line
on the development plan.
with plan
Spot improvement approach mainstreamed in
Technical specifications
Technical specifications for
the ARP
for gravel and paved
spot improvement adopted
roads
Capacity building of MPPPUs mainstreamed in
No training allocation in
Training budget provided to
ARP
ARP for the MPPPUs
MPPPUs.
Community Road Fund expanded to other rural
None in existence
Geographic scope of the CRF
road networks in Kassala and Gadaref.
expanded to new localities
9.
Participatory Monitoring and Evaluation. The project will establish procedures to enable
the communities to participate in the planning and maintenance of the rural roads and to provide
feedback from the project beneficiaries on the relevance and effectiveness of the project activities.
The BDA will organize - through the locality development teams - this participatory assessment on an
annual basis, as part of the review of the annual achievements of the community development plans
and of the planning for the following year. The results of this participatory M&E will inform the planning
and organization of the road maintenance works.
Management Information System (MIS)
10.
A strong project management information system (MIS) is required to keep records and
capture physical progress made by the project. It will be developed to incorporate the monitoring
requirements and integrate data collected.
11.
The above mentioned 2nd level indicators will be measured as a result of traffic and road
surveys.
12.
The management information system (MIS) developed for the RAP will allow generating the
following reports:
•
Annual work plan and budgets (AWPBs), where the establishment of performance
benchmarks relies on AWPB targets. The AWPB for the RAP will indicate the
areas of synchronizaton and synergy with the BIRDP;
•
Six-monthly physical progress reporting, against output targets. The progress
report will also indicate how the implementation of the RAP is actually
synchronised with the marketing activities of BIRDP.
•
Six-monthly financial reporting against expenditure forecasts and regular financial
statements by the BDA.;
•
RIMS year-end report.
Impact Evaluation
13.
In conformity with the RIMS requirements, the design of the evaluation system will focus on
analysing the impact of the improved road accessibility on the wellbeing and living standards of the
poor, in line with the MDG objectives, and is based on both quantitative and qualitative information.
Particular emphasis will be given to assessing the impact of the project on women. The evaluation
design will cover the key anchor indicators established under the RIMS system for all projects,
namely:
-
Number of households with improvements in households assets ownership index;
-
Reduction in prevalence of child malnutrition under 5
14.
Evaluation of the project’s impact will comprise among other things:
•
RIMS Survey
•
Baseline Survey.
31
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VI
•
Mid-term review.
•
Project Completion Report (PCR).
15.
Baseline Studies: The scope of work of the RAP baseline study needs to take into
consideration the scope of work for the BIRDP baseline study which covers production and marketing
issues. Based on data currently available from the socio-economic survey completed in July 2009 for
the RAP design completion mission, data on the following indicators is required as they are deemed
necessary to establish the reference levels for the investments planned in terms of rural access
roads:
• the level of accessibility in the project area such as the measurement of road density in terms of
population (km/ 1,000 people) or land area (km/1,000 km2).
• the travel time on existing road network.
• the % of road network in good and fair condition.
• the vehicle operating costs in the dry and rainy season.
• the present crop and livestock production around each road link, particularly with regards crop
and dairy production (livestock production and sale was already included in the socio-economic
survey).
16.
A consultancy firm with experience in this domain will be recruited to carry out the traffic
survey as well as the socio-economic and anthropometric survey, at baseline, mid-term and
completion of the project. As the baseline and anthropometric surveys have not yet started for BIRDP,
it is proposed that the scope of work of the BIRDP baseline study be adjusted to incorporate the
indicators mentioned above. The results of the baseline survey will need to be disaggregated by
geographic area so that baseline information is provided for the RAP project area.
17.
Mid-term review. The mid-term review is scheduled at the end of the second year of project
implementation, at which time the construction of the rural road should be nearly completed. The mid-
term review will assess project effectiveness and efficiency, synergy and synchronization with BIRDP,
and whether the project has achieved the milestones for sustainability. The MTR will carry out a
comparative analysis of the conventional and spot improvement approaches to road construction. The
results of the mid-term review will be used to guide decisions about project continuation and about
adjustments to implementation in order to increase project effectiveness and sustainability.
18.
Project completion report. The BDA will prepare a project completion report to be submitted
by the project completion date. The project completion report will rely on 3 studies, the RIMS survey,
the traffic survey and the project impact study, to assess project effectiveness and sustainability as
well as its replicability. These socio-economic surveys should give special attention to poverty status
of targeted communities and they should also examine the effectiveness of the road committees, the
community road fund (CRF) and the role of women in these social structures. The project innovation
with regards the community road fund will be documented in terms of the procedures followed, the
results achieved and the lessons learned, as well as its replication to new road alignments within the
two states or within other states. The project completion report will also have a dedicated section to
the comparative analysis between the conventional and spot improvement approach to road
construction and the replicability of the spot improvement approach.
19.
The socio-economic surveys and the statistical data should be used for comparative analysis
of the before and after road construction. Reporting should be very regular in timing and care should
be taken to compare the status of households (same households, if possible) with and without road
improvements.
M&E Organization and Staffing
20.
Organization. The M&E system of the RAP will have 3 main levels as follows:
The community level,
- The road committees will be responsible for community participation in the
supervision of design works, supervision of maintenance works and
implementation of maintenance works as well as raising the awareness of
32
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VI
community members about payments of road tolls and market fees. The road
committees will be responsible for the collection of community specific data
particularly with regards the training and labor days for soil and water
conservation and maintenance works and submission of this data to the BDA
development team based at locality level.
The locality level,
-
The 2 locality based BDA development teams that cover Butana and River
Atbara localities are a multi-disciplinary team responsible for community
mobilization, organization, training in natural resources management,
agriculture, soil and water conservation, livestock husbandry and veterinary care
as well as other productive skills. The development teams will be responsible for
consolidating the data from the road committees, monitoring higher level
indicators related to the project outcomes. The development team will submit
their monitoring reports to the M&E officer of the BDA.
-
The localities will report on the share of proceeds from the road tolls and market
fees paid to the CRF.
The state level,
-
The 2 Road Department of the MPPPUs in Gadaref and Kassala States will be
responsible for monitoring and reporting on the physical progress of the road
and on the activities and results under the capacity building activities. The Road
Departments will submit their reports to the M&E Officer of the BDA through the
Director Generals of the MPPPUs.
-
The M&E Officer of the BDA will be responsible for setting up the data collection/
analysis/ reporting system at community, locality and state levels and ensuring
that the teams at all levels are well trained to carry out project monitoring. The
M&E Officer of the BDA will be responsible for monitoring the impact
achievement of the project as well as its replication potential.
21.
Staffing. The road committee will assign one of its members to report on the activities of the
road committee and on the benefits accruing to the communities from road upgrading. The
development team will assign the community development officer to collect the required data and
prepare the progress report accordingly. The locality will assign its finance manager to report on
proceeds from road tolls and market fees and the share paid to the CRF. The Directors of the road
Departments will be responsible for compiling the data and reporting on the progress of the rural road
construction and on the progress in training their staff. The Senior M&E Officer and his/ her assistant
in the BDA will be responsible for setting up the RAP M&E system, training the various partners on
their roles and reporting duties, and conducting the impact assessments with the assistance of
consultancy firms namely for carrying out the traffic survey.
22.
Budget. Budget provisions were made for the baseline survey, annual assessments, periodic
traffic surveys, the mid term review and the completion assessment. The monitoring missions carried
out by the NHBA were also budgeted.
23.
Planning. The development of the annual work plan and budget of the RAP will be a
collaborative endeavour involving the M&E officers of the BDA, the Directors of the Road Department
of the MPPPUs in Kassala and Gadaref and the localities. The annual work plan will specify the
length of roads to be improved and maintained, the mobilization of maintenance funds in the CRF and
the training efforts required during the year. The AWPB will be submitted to the BDA Board of
Directors for endorsement then submitted to IFAD for no objection. The AWPB will address
shortcomings and build on achievements reported by the project M&E.
33
APPENDIX 1: Draft Matrix for Results Monitoring and Evaluation
Impact Indicators
Baseline
Data Collection and Reporting
PY
PY
PY
PY
Frequency and Reports
Data Collection
Responsibility for
1
2
3
4
data collection
Reduction in the prevalence of
TBD RIMS
Project Completion Report
Anthropometric Survey
BDA
malnutrition in children under 5
survey
to be prepared in year 4
No. of households with
TBD RIMS
15
As above
Household asset index
BDA
improvement in household asset
survey
000
questionnaire
index
Increase of rural incomes from
TBD BIRDP
800
As above
Impact survey
BDA
500_/ capita to USD 800/ capita
baseline
•
survey
Outcome Indicators
Data Collection and Reporting
Baseline
PY
PY
PY
PY 4
Frequency and
Data Collection
Responsibility for
1
2
3
Reports
Instruments
Data Collection
Increased producers’ gross
16
SDG/
X
45
Project progress reports,
Annual assessment
BDA Development
margins from livestock and dairy
head
of
MTR and PCR
team
sale in rainy season
sheep (to be
confirmed by
BIRDP
baseline)
Increased number of women
approx
260
1700
Project progress reports,
Annual assessment
BDA Development
trading in markets
women
MTR and PCR
Team
Number of km improved
MPPPU
20
90
34
Project progress reports,
Annual assessments
Road Dept of MPPPU
physical
MTR and PCR
survey
Number of producers benefiting
TBD BIRDP
15000
Project progress reports,
Annual assessment
BDA Development
from improved market access
baseline
MTR and PCR
team
and
road
committees
Outcome Indicators
Data Collection and Reporting
Baseline
PY
PY
PY
PY 4
Frequency and
Data Collection
Responsibility for
1
2
3
Reports
Instruments
Data Collection
Increase in sale price of
130-175/
150-
Project
progress
Annual assessment
BDA Development
livestock in rainy season
head, small
220
reports, MTR and PCR
team and road
ruminant
committee
Decrease in transport time
2 days at
1
Project
progress
Annual assessment
BDA Development
and tariff in rainy season
Es Sadda
hour
reports, MTR and PCR
team and road
committee
Increase in road traffic
140 vehicles
20%
PCR
Traffic survey
BDA - M&E Officer
on the Es
increa-
Soubagh - Es
se
Sadda road
50 vehicles on
the Es
Soubagh -
Husheib road
Number of km maintained
None
20
110
144
Project
progress
Annual assessment
CRF and Road
reports, MTR and PCR
Dept of MPPPU
Community Road Fund
NA
71
95
95
Project
progress
Financial statements and
CRF
established and disbursing (in
reports, MTR and PCR
audit reports
‘000 USD)
CRF expanded to other rural
NA
One
Project
progress
Annual assessment
BDA - M&E officer
more
road networks in Kassala and
reports, MTR and PCR
establi
Gadaref
-shed
Number of labour days by
Nil
10 000 total aggregate by
Project
progress
Annual assessment
Road committees
project end
gender and poverty group
reports, MTR and PCR
and
BDA
50% women, and 50% less
development
than 30 years
teams
Infrastructure
development plan
NA
1
Project progress reports,
Annual assessment
Road Dept of MPPPU
exists at state level and budgetary
MTR and PCR
allocation aligned with the plan
Outcome Indicators
Data Collection and Reporting
Baseline
PY
PY
PY
PY 4
Frequency and
Data Collection
Responsibility for
1
2
3
Reports
Instruments
Data Collection
Spot
improvement
approach
NA
Posi
at
Project progress reports,
Annual assessment
Road Dept of MPPPU
replicated
tive
least
MTR and PCR
BDA - M&E Officer
eva-
200
lua-
Km
tion
Activity Indicators for Each
Baseline
PY
PY
PY
PY
Frequency and Reports
Data Collection
Responsibility for
Component
1
2
3
4
Instruments
Data Collection
Component 1
Number of km constructed/
Desin works
20
90
34
Progress reports, MTR, PCR
Annual assessment
Road Dept of MPPPU
rehabilitated
Number of conservation and
Design
To be determined
Progress reports, MTR, PCR
Annual assessment
Road committees
water control works
works
BDA Development
team
Component 2
Number of road committees
7
14
Progress reports, MTR, PCR
Annual assessment
BDA Development
trained
team
Number of committees with
7
14
Progress reports, MTR, PCR
Annual assessment
BDA Development
women in leadership position
team
Number of members of road
To be assessed
Progress reports, MTR, PCR
Annual assessment
Road committees
committees by gender
annually
Number of community members
400 by project end, 50%
Progress reports, MTR, PCR
Annual assessment
Road committees
trained by gender
women and 50% below
30 years
Number of contracts established
NA
To be assessed
Progress reports, MTR, PCR
Annual assessment
CRF
with community groups
annually
Number of vehicles procured
4
Progress reports, MTR, PCR
Annual assessment
Road Dept of MPPPU
Number of offices rehabilitated
2
Progress reports, MTR, PCR
Annual assessment
Road Dept of MPPPU
and equipped
Number of government staff
16
16
16
16
Progress reports, MTR, PCR
Annual assessment
Road Dept of MPPPU
deployed and trained
Component 3
Number of NHBA monitoring
3
3
3
3
Progress reports, MTR, PCR
Annual assessment
BDA - M&E Officer
visits
Marketing activities under BIRDP
Markets
Progress reports, MTR, PCR
Annual assessment
BDA - M&E Officer
synchronized with RAP
rehabilitat
ed and
Market
info
system
establishe
d
APPENDIX 2: RIMS FORM
FIRST LEVEL RESULTS
Period ending
31-Mar
Cumulative
Results
Unit
AWP&B Actual
% of AWPB Appraisal Actual % of Appraisal
Total Outreach
Households receiving project services
Number
#DIV/0!
15 000
0%
People receiving project services
Male
#DIV/0!
TBD
#VALUE!
People receiving project services
Female
#DIV/0!
TBD
#VALUE!
Component
Sub Component
Component Name
Sub Component Name
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
1. Rural roads
Roads constructed
KM
#DIV/0!
153
0%
2. Capacity Building
Rural Roads Committees Groups managing infrastructure formed/strengthened
Number
#DIV/0!
#DIV/0!
Groups managing infrastructure with women in leadership position
Number
#DIV/0!
#DIV/0!
People in groups managing infrastructure formed/strengthened
Male
#DIV/0!
#DIV/0!
People in groups managing infrastructure formed/strengthened
Female
#DIV/0!
#DIV/0!
3. Project Management
Government officials and staff trained
#DIV/0!
#DIV/0!
People trained in infrastructure management
#DIV/0!
#DIV/0!
Staff of service providers trained
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
FIRST LEVEL RESULTS
Period ending
31-Mar
Cumulative
Results
Unit
AWP&B Actual
% of AWPB Appraisal Actual % of Appraisal
Total Outreach
Households receiving project services
Number
#DIV/0!
15 000
0%
People receiving project services
Male
#DIV/0!
TBD
#VALUE!
People receiving project services
Female
#DIV/0!
TBD
#VALUE!
Component
Sub Component
Component Name
Sub Component Name
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
1. Rural roads
Roads constructed
KM
#DIV/0!
153
0%
2. Capacity Building
Rural Roads Committees Groups managing infrastructure formed/strengthened
Number
#DIV/0!
#DIV/0!
Groups managing infrastructure with women in leadership position
Number
#DIV/0!
#DIV/0!
People in groups managing infrastructure formed/strengthened
Male
#DIV/0!
#DIV/0!
People in groups managing infrastructure formed/strengthened
Female
#DIV/0!
#DIV/0!
3. Project Management
Government officials and staff trained
#DIV/0!
#DIV/0!
People trained in infrastructure management
#DIV/0!
#DIV/0!
SUDAN: RURAL ACCESS PROJECT (RAP)
PROJECT DESIGN REPORT - ANNEX VI
40
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
ANNEX VII: COMMUNITY ROAD FUND: THE OPERATING MODEL
I. Introduction
1.
The RAP mission reviewed the performance of the rural and agricultural road sector.
Whereas the maintenance of the national road system is the responsibility of the National Highway
and Bridges Authority (NHBA), the responsibility for the maintenance of the rural and agricultural road
system lies with the State and locality governments. Indeed historically the opening of roads after the
end of the rainy season was the responsibility of the localities, although the financial allocations were
normally transferred from the national budget. Localities were allowed to collect local taxes, especially
from agricultural produce (known as Gibana and Ushur) though there were no road tolls per se. Over
time this responsibility was completely eroded and in most cases localities rarely give priority to the
maintenance activity during or after the rainy season. The localities especially in the heavy savannah
and black cotton zone (these soils correspond to those found in the RAP project area) used to own
heavy road machinery for spot repair and grading of roads. Only very recently did the State of
Gadaref arrange for the procurement of a limited number of road equipment and machinery for this
task. Kassala State depends primarily on heavy machinery under the control of the Ministry of
Irrigation and Water Resources and the Gash Agricultural Scheme.
2.
Currently the Ministries of Physical Planning and Public Utilities (MPPPU) are in principle
responsible for both construction and maintenance of all state roads, whether rural, agricultural or
intercity roads. The general strategy of these ministries is to construct roads with higher standards,
essentially paved tarmac roads; to reduce the immediate and the future cost of maintenance of roads
and to meet the high political demand for paved roads. In reality, much of the roads were found to be
substandard because of the lack of expertise in road specifications, low quality of construction of
structures, lack of monitoring and supervision.
3.
Under these conditions the RAP design completion mission concluded that new
arrangements need to be sought for the maintenance of the rural roads. In developing these new
arrangements, the design mission was guided by the existing set up for the management and
maintenance of water facilities in Butana. Indeed, the communities in Butana have experience with
the management and maintenance of drinking water facilities and historically these communities
operated a sophisticated system whereby the use of range resources was regulated through
investments in water points.
4.
The main elements of the management and maintenance of water facilities that can be of use
to the road maintenance are: fees are set based on users’ willingness to pay and on the opportunity
cost of the service; the levy of fees is under the management of the communities; there is a clear
division of roles between the communities and the localities; the communities pay the localities a
share of proceeds in exchange of which the locality carries out the large repair works.
5.
The maintenance arrangements proposed in this annex were developed jointly with the
locality executive staff and in consultation with the communities, vehicle operators and market agents.
The design completion mission is proposing here a process that can be fine tuned based on the level
of the locality and community participation.
II. Conceptual Framework
6.
Financing maintenance works. The main sources of financing for the maintenance will be
the road tolls with toll stations established in strategic locations along the improved road, and market
fees levied from the main markets serviced by the road i.e. Um Al Gora, New Halfa, Es Soubagh,
Gadaref, and Tamboul.
7.
The socio-economic survey completed in July 2009 ran scenarios for the levy of road tolls and
market fees and concluded that the proceeds would largely cover the annual maintenance
requirements of the road estimated at USD 95 000 or SDG 238 000 at full completion of the road. The
results of the simulations are as follows:
41
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
Table 1: Total Expected Revenue for Maintenance, in SDG
Revenue
Revenue
Revenue
from
Years
from
toll
from sale
of
Total
vehicles
at
stations
livestock
markets
2009
0
0
0
0
2010
0
0
0
0
2011
0
0
0
0
2012
0
0
0
0
2013
318360
150701.6
254769
723830.6
2014
397950
158236.7
267507
823694.1
2015
497438
166148.5
280883
944469.3
2016
512361
174455.9
294927
981743.9
2017
527732
183178.7
309673
1020584
2018
543564
192337.7
325157
1061059
2019
559870
201954.5
341415
1103239
2020
576666
212052.3
358486
1147204
2021
593967
222654.9
376410
1193032
2022
611785
233787.6
395230
1240803
2023
630138
245477
414992
1290607
2024
649043
257750.8
435741
1342535
2025
668515
270638.4
457529
1396682
2026
688570
284170.3
480405
1453145
2027
709227
298378.8
504425
1512031
8.
The assumptions for these calculations are based on users’ willingness to pay as well as the
expected road traffic and livestock trade as follows:
• The suggested fees on transport vehicles are 7 SDG for heavy truck, 7 SDG for lorry, 6 SDG
for minibus and 5 SDG for pickups.
• Collection of fees from animals sold at official markets. The recommended animal rates are 1
SDG for sheep and goats, 2 SDG for cattle, horse and donkey, 3 SDG for camel. This is over
and above the animal sale tax already charged on animals sold in the market8.
Collection of fees from all vehicles entering the markets at Es-Soubagh, Halfa and Um Al
Gora. The suggested fee is 10 SDG for heavy truck, 7 SDG for lorry, 6 SDG for half-trucks
and minibus and 5 SDG for pickups.
Users of the road will only be willing to pay the fees once the road construction is completed
and improved accessibility is satisfactory.
Future Demand will increase by 5% per year. with the road. The base figures are 140 vehicles
on Es Soubagh-Es Sadda road and 50 vehicles on the Es Soubagh-Husheib road.
Future passenger movement will increase by 6% with the road.
8 There are two methods of animal sales tax collection: locality staff collect directly and deposit in the collection
account. This method has a high cost and risk associated with its management and safety of funds. Secondly,
the localities chose, through a competitive bidding process, a private contractor who pays a specific bid price,
sometimes paid monthly on an advance basis. The contractor profit is any money above the contract price. This
has less managerial worries and possibly less evasion, real or induced. Market information is very difficult to
obtain in this system. Contractors will be reluctant to take responsibility for the collection of fees unless it is a pro-
rata estimation on top of the contract price because they would not like to disclose data and information. Although
the contract period is one or two years, contractors usually win the contract continuously, year after year.
42
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
Agricultural productivity will increase by about 20% in the short term (1-2 years), 30% in the
medium term (3-6 years) and 50% in the long term (>6 years) through improved access to
markets.
9.
On the basis of the assumptions and the simulations of the revenues earned from the road
tolls and market fees, the costs of the periodic and routine maintenance would be largely covered
through this financing mechanism. Furthermore, it would appear that the fees imposed on vehicles on
the road and in the market will be the principal source of the revenues for maintenance. This
preliminary calculation is useful in assessing the feasibility of a toll and fee system for the
maintenance of the road. More detailed analysis is required to determine the toll system in more detail
and it is suggested that IFAD recruits a specialist in this domain in 2010.
10.
Institutional set up. The Community Road Fund (CRF) is designed as a mechanism to
finance the preventative maintenance of the road. Schematically, it will be composed of an account
replenished by the revenues from the road tolls and market fees and of a committee that will decide
on how these revenues will be used for maintenance works. The committee will be established under
the Butana Development Agency and will have the following scope of work:
• Involve state government, localities and communities in the maintenance of rural roads, an
essential step for future sustainability;
• Establish practical modalities for financing routine and periodic road maintenance;
• Account for funds received for road maintenance;
• Plan on an annual basis the maintenance works required and contract these works to
community based organizations through labor based contracts or to private contractors as
applicable given the nature of the maintenance works;
• Promote communities and localities’ awareness and compliance with the payment of road
tolls and market fees.
10.
The Community Road Fund will be composed of 4 main parties: the communities serviced by
the road; the localities namely the Butana and River Atbara localities; the Road Departments of the
MPPPUs in Gadaref and Kassala; the Butana Development Agency. It is proposed that the
Community Road Fund be chaired alternately by the Commissioners of the Butana and River Atbara
localities or their designates. The Director and the Financial Manager of the BDA will act as secretary
of the committee.
11.
The roles of each party are clarified as follows:
− The communities. Village development committees active in the communities
serviced by the road will establish road committees. The road committees will have
the following responsibilities:
(i) raising awareness about the importance of road
maintenance and community contribution towards it; (ii) for communities where toll
stations are located, they will certify the toll station receipts on a daily basis and
report accordingly to the locality and the BDA; (iii) identify the road sites where
maintenance works are required;
(iv) supervise the maintenance works;
(v)
implementing labor based contracts for the maintenance of the road; (vi) monitor the
number of labor days by gender and socio-economic group. It is worth noting here
that village development committees are established in all the communities serviced
by the road and are registered as legal entities under the voluntary association law.
− The localities. Localities are empowered to impose and levy fees by virtue of
administrative decrees approved by the local councils. Their role will be primarily to:
(i) issue administrative decrees to levy road tolls and market fees; (ii) staff the toll
stations and monitor their performance; (iii) agree with the road committees on the
certification of the receipts of the road tolls; (iv) transfer the proceeds of the road tolls
and market fees to the CRF account held by the BDA.
− The Road Departments of the MPPPUs. The Road Departments by virtue of their
mandate are responsible for the maintenance of state roads. Their role will primarily
consist in: (i) survey the road and identify sites requiring maintenance in consultation
43
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
with the road committees; (ii) plan the maintenance works and prepare bills of
quantities and technical specifications accordingly;
(iii) contract the maintenance
works to communities or contractors based on the nature of works to be completed
and decision of the CRF; (iv) supervise the maintenance works and train the road
committees as needed.
− The Butana Development Agency. The main role of the BDA will be to: (i) hold the
proceeds of the road tolls and market fees in a dedicated CRF account and report on
the fund use on a regular basis to the road committees, localities, MPPPUs and the
BDA Board of Directors; (ii) disburse funds based on certified receipts of works
completed to communities and contractors; (iii) monitor community participation and
benefit from maintenance contracts, as well as community satisfaction with the rod
construction and maintenance.
12.
Definition of maintenance. The term maintenance encompasses
3 main types of
maintenance, routine maintenance, periodic maintenance and preventative maintenance. Routine
maintenance comprises a range of small scale and simple activities usually carried out at least once
a year but widely dispersed. Typical activities include roadside verge clearing and cutting back
encroaching vegetation, cleaning of silted ditches and culverts, patching and pothole repair, and light
grading/reshaping of unsealed surfaces. This type of maintenance is suitable for unskilled/skilled
labour based methods supported by light equipment. Periodic maintenance occurs less frequently
usually after one to two years of operation, depending on the type and quality of road. Works can
include grading and reforming of longer lengths of road, regravelling, reshaping of drainage lines,
bunds and erosion control works and repairs to structures. It will require both equipment and skilled
resources/operators and also some activities similar to those under routine maintenance. Such works
can be undertaken by unskilled and skilled labour based methods supported by light equipment. Road
strengthening or reconstruction are normally not considered to be 'maintenance' and are often funded
separately under 'development' or 'capital' budgets. Preventative maintenance is largely small scale
water management. Water must be evacuated as quickly as possible from the road surface and
around the base of embankments before it softens the surface and does irreversible damage to the
road bed and foundation. This requires eliminating standing water by filling in of potholes and ruts on
level ground as well as preventing the formation of lateral and longitudinal gullies where the
destructive momentum of flowing water is particularly damaging. These works can also be undertaken
by skilled and unskilled labor supported by light equipment.
III. Implementation modalities
13.
There are four issues that are a prerequisite for the success of the CRF:
• A well conceived programme of community animation/mobilization and organization to
ensure that users of the road readily pay the road tolls and market fees. The Gender
and Community Development Officer and Development Teams of the BDA will run a
very rigorous programme in this regard.
• The concerned localities namely Butana and River Atbara as well as New Halfa locality
(where the New Halfa market is located) and the Central Gadaref locality (where the
Gadaref livestock market is located) should come to an agreement whereby road tolls
and market fees are levied with the purpose of financing the road maintenance but
without overtaxing producers, market agents and vehicle operators.
• There should be a strict supervision on the staff collecting the road tolls to enforce
discipline and transparency. 9
• The soil and water conservation works should be implemented satisfactorily in order to
ensure effective protection of the roads which in turn will help contain the maintenance
costs.
14.
The awareness campaign. The Gender and Community Development Officer of the BDA will
organize the awareness raising campaign with regards the set up for the maintenance of the road and
9 The localities are known to be starving for funds and they may violate the agreement and attempt to retain more
that prescribed by the agreements
44
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
the role of the communities in this regard. The Gender and Community Development Officer and the
BDA Development Teams will form in each community serviced by the road a road committee. The
road committee will receive training on the management of labor based contracts for the
implementation of maintenance works. The road committee would include at least
3 women
members. Indeed, women are likely to benefit from the road in the rainy season and from the
employment opportunities created by the maintenance works during the dry season. The awareness
campaign will also target markets in order to sensitize traders, producers and vehicle operators on the
importance of contributing to the maintenance of the road and on the maintenance arrangements
adopted.
15.
Agreement between the localities. The executive officers in the localities are aware of the
risk of overtaxation of road and market users through the imposition of road tolls. They are also very
aware of the risks of evasion. The executive officers and commissioners advanced the following
proposals: if the vehicle operator pays the road toll at one of the 6 toll stations mentioned below, then
he is exempted from payment at subsequent toll stations. The validity of this exemption (one day or
more) is still to be worked out during the forthcoming mission to design the rod toll system in 2010.
With regards the levy of market fees, the fees should be harmonized and set in a way that does not
increase the transaction costs for the producers. The contribution of each market to the maintenance
of the road needs also to be worked out based on the estimated market throughput supplied from the
Butana region (mainly livestock). The agreements will be developed based on experience and will
need to make room for annual adjustments based on the monitoring of the maintenance works. The
localities will pass the administrative decree for the levy of tolls and fees in 2010 in order for the
decree to enter into full application in 2011 when maintenance works will be required on the road.
16.
Fee collection. It is envisaged that there will be 6 stations where road tolls will be collected
and 5 markets where market fees will be paid. The 6 stations include Arab 6, Es Sadda, Es Soubagh,
Abu Gerad, Fuwal, and Husheib. Each of these stations will be manned by 2 persons working in shifts
(12 hours/ day to start with) and employed by the locality. The 5 markets from which fees will be
collected are Um Al Gora, New Halfa, Es Soubagh, Gadaref and Tamboul. The assumption is that the
users will only be willing to pay for the maintenance of the road once the improvement of the road is
fully completed. It is expected that the users will fully contribute to the road maintenance in project
year 4. Prior to this date, the payments are likely to be partial and insufficient to cover the full
maintenance costs warranting financial support from the project. Indeed, in the simulation of the CRF
(table 1 above), no revenues are planned from 2010 to 2012, which corresponds to the period of road
construction.
17.
Use of the proceeds. The road tolls and market fees are seen by the localities as income to
finance their recurrent costs and eventually their development costs. In order to avoid a situation
whereby the locality is reluctant to transfer the proceeds to the CRF, a formula for sharing the
proceeds needs to be worked out. Based on the simulations carried out in the socio-economic survey,
the proceeds from road tolls and market fees can be shared in the following ratio: in case of road tolls,
70% of the road tolls will be paid to the CRF and 30% to the localities (to cover the cost of collection);
in case of market fees, 100% of the incremental market fee - over and above the usual contract price
for the market management - will be paid towards the CRF. These ratios will be reviewed and
adjusted annually based on the collection performance. The CRF proceeds will be used exclusively to
finance road maintenance works, through labor based contracts and private sector contracting; as
well as remunerate the Road Department of the MPPPU for its supervision of the maintenance works.
18.
Soil and water conservation works. The soil and water conservation works will consist in
the construction of upslope cut-off/interceptor drains and diversion bunds, erosion control measures
and structures and turnout and relief drains. Similarly, downstream slope control structures and
checks will be needed along with vegetative measures to stabilise the gullies. These works will be
undertaken by contract with the communities in the vicinity of the road improvements. The
communities will be organised by road committees to implement the soil and water conservation
works. Master trainers will be trained among selected community members to acquire the necessary
competencies and transfer these skills to their peers. Members of the community will be hired as paid
labour under the contracts for both construction and follow up annual maintenance works. The project
will be providing training to these community members as trainers for the community and will also
provide technical guidance, technical information and construction materials. This will include such
45
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
items as construction tools (hoes; wheel barrows; etc), construction materials such as gabion baskets
and other materials for the check/slope control structures and the appropriate materials for vegetative
stabilisation (indigenous materials must be utilised wherever possible).
19.
Labor based contracts for maintenance works and for the soil and water conservation
works. The information in this section is largely inspired by the ILO manual on community contracts in
urban infrastructure works, dated 1998, and the on-going practice for community contracting as part
of the construction of educational, health and water facilities.
−
The funder will be the Butana Development Agency. The BDA will finance these
contracts from the revenues of the CRF; and will report to the CRF, localities and its
Board of Directors on the use of revenues and results of monitoring road construction
and maintenance. The BDA will make the payments based on certified receipts of
works completed issued by the Road Departments of the MPPPUs.
−
The contracting authority will be the localities of River Atbara and Butana
depending on the location of the maintenance works. The Director General of the
MPPPU will be the signatory of the contract.
−
The contractor will be the road committee. The road committee will be a sub-
committee under the already formed and registered community based organizations
that exist at the level of the villages serviced by the road.
−
The technical service provider for the contract will be the Road Department of the
MPPPU. This department is responsible for the design of works and for the
supervision of works included in the labor based contract.
−
Tendering of the works. Works that fall within the boundaries of a community and
that are determined by the Road Department as eligible for implementation through
labour intensive modalities will be contracted out to the road committee in the given
locality. This presumes that the Road Departments in the MPPPUs in Gadaref and
Kassala will establish a list of all maintenance works that are eligible for labour
intensive implementation. Community members, both women and men, will be trained
on the execution of such works.
−
Remuneration. The level of remuneration will take into consideration the prevailing
wage rates, the material benefits gained by the community from the implementation
of these works (particularly in the case of soil and water conservation where the land
can then be used for productive purposes), and an agreed profit margin
(the
acceptable norm is 10-15% for community contracting). The remuneration of the
technical service provider can either be part of the community contract and deducted
accordingly) or be paid separately by the BDA.
−
Payment schedule. The payment schedule will include an advance. Payments will
be made thereafter based on reaching specific milestones and as certified by the
maintenance team of the Road Department of the concerned MPPPU. Payment
requests will be submitted by the road committee to the locality and subsequently to
the certification of the payment, the locality will authorize the BDA to pay the rod
committee.
−
Special clauses. The contract will include special clauses about work safety and the
non employment of children.
−
Graduation. With the road committees that are achieving a satisfactory delivery of
the labour based contracts, the localities will award labour and material contracts for
the maintenance works for which local material is available. In case the labour and
material contracts are satisfactorily completed, the road committees can be
considered for applying to full contracts as part of local shopping procurement
46
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
modalities. This graduation process will be in line with the increased capacity of the
road committees and the competency of the labour force it will mobilize.
− Dispute resolution. Disputes will be resolved amicably through the customary and
local courts. If inconclusive, the case will be referred to the state court for arbitration.
− Contract documentation. The documentation of the contract will be adapted from
the on-going contracts for the construction of education/ health and water facilities
using community contracting. These contracts will be revised to include the
description of labour intensive works, the supervision modalities, and the reporting
requirements. A full set of contract documentation, progress reporting and
certification of works will be developed by the Road Department of the MPPPUs with
support from the BDA technical team of road engineers.
20.
Audit of the CRF. The CRF will be audited as part of the overall audit of the BDA. The audit
findings will be submitted to the CRF and to the Board of Directors of the BDA for review and
corrective actions to be implemented by the BDA management.
21.
Accountability framework. In order to promote the accountability and transparency of the
financing and implementation of the maintenance works, the BDA will issue as part of its progress
report, a short report (2 pages) in Arabic detailing the CRF revenues, the use of funds, the audit
findings and the results of project monitoring (focus will be on user satisfaction, time and costs saved,
rediction in transport costs, increase of producer prices, and number of labor days generated). The
information will also be disseminated through radio. Grievances and complaints will be reported to the
localities and to the BDA development teams, who will then transmit them to the Gender and
Community Development Officer and the BDA Director for further action.
22.
Start of implementation. The mobilization and organization of road committees will already
start in the first year of implementation of the project with particular focus on the communities where
road tolls are likely to be established. The CRF will be formalized in project year 2 and will start
disbursing maintenance funds provided by the project budget.
IV. Risks and Risk Mitigation
23.
User unwillingness to pay the road tolls and the market fees. A number of variables
affect collection such as users’ expectation as to the construction and quality of the road that reflect
on the vehicle performance, time saved and reduction in vehicle maintenance costs, the revenue
flows and build up to meet any emergency situation as well as transparency and diligence in the
management of funds by the CRF committee. The project will mitigate this risk through awareness
campaigns, release of monitoring findings with regards road passability, traffic frequency, reduction in
operating costs and benefit from higher market prices. Transparency in the use of collected funds will
be enhanced through communication campaigns on the budget and expenditures of the CRF, and the
audit findings. This communication will be primarily carried out by the road committees and the BDA.
24.
Inflation and currency devaluation threaten the future viability of the CRF. Hence a
legitimate question arises: How to dissuade the impact of inflation and the paradox (issue) of
decreased purchasing power. This risk will be mitigated through the following: (i) the collection of fees
should be kept ahead of the expected maintenance works; (ii) an examination of flow of benefits in
table 1 reveals that revenues exceed estimated costs by a wide margin; (iii) the RAP funds that will be
used to finance the road maintenance in its early stages will be kept in foreign currency and will
constitute a hedge against the anticipated devaluation of the currency and of inflation. The road fees
will be modified from time to time to reduce the impact of decreasing purchasing power of the CRF.
25.
Quality of the road maintenance may be less than optimal given the scarcity of
47
Sudan: Rural Access Project (RAP)
PROJECT DESIGN REPORT - ANNEX VII
qualified engineers. The project is hedging against this risk by investing in the training of the staff of
the Road Department, the establishment of a road maintenance team within the Road Department
and training of the communities on related maintenance works
(particularly soil and water
conservation) and the management of labor based contracts.
48
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VII
49
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VII
ANNEX VII: START-UP ACTIVITIES OF THE RURAL ACCESS PROJECT
1.
This annex summarizes the start up activities for the Rural Access Project. The start-up
activities described hereafter are intended to speed up the implementation of the project and to
ensure the transparency of the procurement process, and that the selected contractors and
consultancy firms will provide good value for money. The start-up activities extend from September
2009 to March 2010.
2.
The verification and validation of the design works for the proposed road alignment
Husheib-Es Soubagh- Arab 6. The State Ministry of Physical Planning and Public Utilities of Gadaref
State will submit the revised design works for the proposed alignment by mid October 2009. A field
mission will take place to verify the appropriateness of the design, especially the suitability of the
proposed technical specifications with soil conditions, hydrology, and the fact that the alignment is
free from land disputes. The verification and validation will involve representatives from the NHBA,
MPPPUs of Gadaref and Kassala, localities of River Atbara and Butana, and the communities located
along the road. This exercise will take place during November 2009, by which time the final technical
specifications and bills of quantities of the road will be developed and endorsed.
3.
The prequalification of consultancy firms and contractors. The project has two major
contracts to procure: the construction of the road and the hiring of the consultancy firm that will carry
out the supervision of the road construction and the capacity building for the Road Departments of the
MPPPUs and the communities.
4.
The procurement modality for the contractors will follow national competitive bidding
procedures. The prequalification of the contractor firms for the road works will be carried out by the
BDA with support from the Central Coordination Unit for the IFAD co-financed projects (CCU). The
announcement for the prequalification will be issued in October 2009 and will be valid for two weeks.
The qualification of eligible contractors will be done thereafter and is estimated to last 4 weeks. The
criteria for selecting eligible contractors includes: (i) contractors already pre-qualified by the NHBA; (ii)
track record in completion of works in a timely manner and within budget; (iii) availability of necessary
machinery and equipment; (iv) expertise of the contractors’ engineering staff. Field visits and
reference checks will be carried out by the NHBA, the CCU and IFAD to qualify eligible contractors.
The reference checks will consist of due diligence checks on the financial background,
shareholder/registration information, etc of applicant firms.
5.
Once eligible contractors are qualified, they will be invited to submit a financial and technical
proposal. The proposals will be reviewed and the evaluation committee will rank them. The evaluation
committee will be chaired by the State Ministry of Physical Planning and Public Utilities of Gadaref
State and co-chaired by the State Ministry of Physical Planning and Public Utlities of the Kassala
State, with membership from the CCU, the NHBA, MOFNE, the representatives of the Road
Departments in the MPPPUs, the representatives from the serviced communities, and the BDA. The
CCU will act as the secretariat for this evaluation committee given its long experience in procurement
procedures and knowledge of IFAD procurement guidelines.
6.
In case of the consultancy firms, the procurement will follow international competitive bidding
procedures. An expression of interest will be issued in October 2009 and published in international
magazines and in UN sites. The shortlisting of eligible firms will be done along the following criteria: (i)
track record in carrying out similar assignments with particular reference to supervision and training
on the spot improvement approach and preventative maintenance; (ii) joint venture with Sudanese
firm; (iii) client satisfaction with work rendered. A reference check will be conducted systematically.
Again, the reference check will consist in a due diligence check on the financial background,
shareholder/registration information, etc of applicant firms. Shortlisted firms will be invited to submit a
technical and financial proposal. The evaluation committee evaluating the proposals of the
consultancy firms will be chaired by the BDA, with membership from the representatives of the
MPPPUs, the NHBA, the MOFNE and the CCU. The CCU will act as the secretariat of this evaluation
committee. The evaluation committee will be required to organize face to face interviews with the
Team Leader and Deputy Team Leader as part of the assessment of their competencies and
suitability for the job.
50
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VII
7.
IFAD will attend the technical and financial evaluation of contractors’ bids and consultancy
proposals as an observer and will hire a specialist to carry out this task on its behalf. The specialist
will report to IFAD and MOFNE on adherence to the criteria, and that due diligence was followed in
ranking the various bids/ proposals.
8.
The contract award for the road works and the consultancy services will be subject to the
approval of the RAP by the Executive Board of IFAD in December 2009, entry into force of the project
and no objection from IFAD on the evaluation report. The 18 month procurement plan for the RAP
illustrates the timeline for this process (appendix 1).
9.
Synchronizing the implementation of the BIRDP livestock and market development
activities and RAP. The BDA is set to present its AWPB 2010 for the BIRDP to MOFNE in
September 2009, to its Board of Directors for approval in October 2009 and to IFAD for no objection
in November 2009. The BDA and IFAD need to ensure that the following issues are incorporated in
the BIRDP AWPB 2010: (i) enrolment of the 21 communities along the road in the BIRDP ; (ii)
implementation of the market rehabilitation and market information system; (iii) design works for the
crossings budgeted under BIRDP; (iv) a separate section in the AWPB is dedicated to the 2010
activities and budget under RAP. The BDA should also proceed with the selection of the soil and
water conservation specialist from the State Ministries of Agriculture to join the development teams in
the localities of Butana and River Atbara.
10.
Supervision of the RAP. In December 2009, the MOFNE, NHBA, BDA and IFAD will
develop a joint supervision plan for the project period to ensure that construction works are regularly
supervised and effectively monitored. IFAD will retain a specialized international road engineer for the
full period to supervise the project and provide an independent assessment of the progress of works,
cost efficiency and effectiveness of the project in achieving its physical and institutional results. In
2010, IFAD will also a hire an economist to design the toll system with the Butana and River Atbara
localities. From 2011 to 2013, IFAD will also retain a specialist in labour based works and community
contracting to ensure that systems are developed for the labour based contracts for soil and water
conservation and maintenance works. Supervision missions for this project will take place twice a
year during the project duration.
11.
Start-up workshop for the RAP. It is proposed that the start-up workshop of the RAP be
implemented in March 2010 by which time the contractor and consultancy firm are selected. The start-
up workshop will emphasize the physical and institutional objectives of the project; the supervision
and monitoring arrangements; the arrangements for community participation. The start-up workshop
will dedicate time to: (i) the reporting requirements expected from the contractor, the consultancy firm,
the BDA and supervision and audit teams; (ii) the disclosure of information on the progress of works
and performance of the contractors and consultancy firm; (iii) orientation on promoting greater
transparency in the execution of the works and services contracts and practical measures to ensure
this. In this regard, the IFAD and Government anti-corruption policies and reporting measures will be
presented and discussed and the reporting contact details for IFAD and Government will be made
available. .
51
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VII
Table 1. Schedule of start-up activities
What
When
Who
How much
The validation of the
November 2009
IFAD, NHBA,
USD 10 000
design works
MPPPUs
The prequalification of
October 2009
Led by BDA and
USD 20 000 (eligible
consultancy firms and
CCU
for retroactive
contractors.
financing)
Evaluation of bids and
November to
proposals
December 2009
IFAD as observer
Synchronizing the
September to
Led by BDA
implementation of the
November 2009
BIRDP livestock and
market development
activities and RAP
Start-up workshop
March 2010
Led by BDA
Part of the RAP
budget (under
planning workshops,
component 3)
12.
Adoption of the Project Anti-Corruption System (PACS) in RAP. The PACS is an
integrated and comprehensive system designed by Transparency International to assist in the
prevention of corruption and the promotion of transparency and efficiency on construction projects.
The design team proposes to adapt the PACS principles to the purpose of the project as follows:
-
Independent assessment. The project will be audited annually and supervised at least twice
a year by a joint IFAD/NHBA/MOFNE team. The audit and the supervision are considered as
independent assessments.
-
Pre-contract disclosure information. The expressions of interest for the qualification of
contractors and consultancy firms will require the provision of information on principal
shareholders, officers, financial status, agents, joint venture partners, major sub-contractors,
and any event of criminal convictions and debarment. The applicants will be systematically
reference checked. In the case of prequalifying contractors, site visits will be carried out by a
team composed of the NHBA/BDA (represented by the CCU)/ IFAD.
-
Contractual anti-corruption commitments and enforcement. As per IFAD general
conditions, all contracts need now to stipulate anti-corruption commitments. The contract for
works and services will include this clause, as well as penalties in case of a breach of
contract. By signing the financing agreement, the Government commits to implement these
General Conditions.
-
Transparency. The progress reports of the project, the findings of the audit and supervision
missions will be systematically translated into Arabic and made available to the implementing
partners as well as to the road committees and other civil society organizations active in the
project area. These documents will also be posted on the CCU web site.
-
Reporting on corruption or mismanagement of procurement. During the awareness
raising campaigns at community level, road committees will be responsible for the supervision
of construction and maintenance works. Irregularities will be reported to the locality
development teams and subsequently to the BDA Director and Gender and Community
Development Officer. Corrective actions will be taken accordingly.
-
Developing a good governance framework. Within 12 months after Board approval, IFAD
and GoNU together with other interested partners such as the EU would prepare a
52
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VII
comprehensive good governance framework that would address concerns about empowering
beneficiaries (with particular attention to transparency, participation, and third party
monitoring) and include adequate measures to address concerns about misprocurement,
underperformance during contract implementation, etc… The good governance framework
will be geared to the road construction and maintenance works.
53
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
ANNEX VIII: THE ENVIRONMENTAL AND SOCIAL REVIEW - SUMMARY OF THE
PRELIMINARY FINDINGS
I.
Brief description of the project
The Rural Access Project invests in rural roads in a way that complements the transport,
production and marketing infrastructure supported in the IFAD co-financed Butana Integrated
Rural Development Project (BIRDP, SD-717) and the Government supported Agricultural
Revival Programme (ARP).
The approach adopted for the construction of rural roads will consist of spot improvements in
the form of the establishment of wadi crossings, spot repairs and treatment of gulley erosion.
The access road selected is the Arab 6 - Es Soubagh - Husheib alignment, a 144 km long
road servicing 5 main markets.
The project area covers two localities (Butana in Gadaref State, River Atbara in Kassala
State). The area is characterized by silty clay and black cotton soils where relatively poor
drainage characteristics combined with flat topography results in prolonged periods of
inundation during the rainy season especially in depressions and flat plain areas. Throughout
the rainy season, general access to and from the main external markets is very difficult for
vehicular access, livestock and people especially across seasonal streams.
The total number of direct beneficiaries is expected to be 130 000 persons equivalent to
about 15 000 producer households. It is also expected that there will be 1700 additional
women trading in the main markets serviced by the road. Another 136 000 persons composed
of the population of the River Atbara with business and kinship ties to the Butana area are
estimated to be indirect beneficiaries. Poor households constitute 80% of the rural population
in Butana.
The project will contribute to the COSOP 2009-2012 goal of empowering the rural poor to
increase their food security, incomes and resilience to shocks. The main project objective is to
improve the socio-economic conditions of the rural population through increased access of
the rural poor to productive services and markets. Four key results are expected from the
project:
- Rural roads upgraded in Central Butana and regularly maintained.
- Communities are trained to manage road tolls and to engage in labor based maintenance
contracts;
- State capacity is strengthened to plan, design, supervise, and maintain rural feeder roads
using the spot improvement approach.
The project has 3 main components:
− Physical rehabilitation and construction of rural roads which consist in the
improvement of the Arab 6 - Es Soubagh - Husheib road, implementing
conservation works to protect the road from dendricular erosion; and
establishing the Community Road Fund which will act as the principal
financing mechanism for the routine, periodic and preventative maintenance
of the road.
− Capacity building and institutional development that would target the Road
Departments of the State Ministries of Physical Planning and Public Utilities
(MPPPUs) with formal and on-site training as well as office support; in
addition to training of communities on soil and water conservation works to
protect the road from gulley erosion and on the management of the labour
based contracts for road maintenance. Road committees will be established
to organize and implement the conservation and maintenance works.
− Project management. The Butana Development Agency (BDA) will be the
lead agency for this project and will be responsible for the coordination and
financial management of project activities.
54
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
II.
Major site characteristics, potential social and environmental impacts and risks
For the purpose of this report, the proposed road is divided into two routes to ease description
and tracking. Moreover, each route is divided into sectors based mainly on natural features.
these are :
− Route No. (1) Es-Subagh - New Halfa Town which is composed of the
following sectors: Sector (A) Es-Subagh - Es-Sadda village and Es-Sadda
seasonal stream (khor); Sector (B) Es-Sadda Village and Es-Sadda Seasonal
Stream (khor) - Khor Al-Musran (seasonal stream), Sector (C) Khor Al-
Musran (seasonal stream) - Arab 6 village and New Halfa Irrigated Scheme
Main Drainage Canal.
− Route No. (2) Es-Subagh -Husheib village which is divided into the following
sectors: Sector (D) Es-Subagh -Al-Fuwal Village; Sector (E) Al-Fuwal Village
- Surooj Manana Village,
− Sector (F) Surooj Manana Village -Husheib.
Herefollows is a description of the environmental characteristics in each sector.
Sector (A) Es-Subagh - Es-Sadda Village and As-Sadda Seasonal stream (khor). This
portion of the route is characterized by an apparent lack of cultivation activities. This might be
attributed to the non-existence of human settlements close to both sides of the proposed
route. The area is generally used for grazing grounds by both nomadic and sedentary peoples
as typically the soil is light clay covered with gravels and stones that ease the movement of
animals in the wet season. In addition, the area is endowed with nutritive plants, relatively
good water supply in the dry season. Es Subagh market is active in the rainy season.
The extensive herbaceous cover with dominance of only one species (Ipomoea spp.) is
considered as a sign of deterioration as historically the area is characterized by a mosaic
cover of plants including grasses like Aristida funiculata and Schoenfoldia gracilis (locally
known as Gaw and Dambalab respectively). However such condition calls for more practical
measures to improve the grazing resources. Many interventions could be introduced like
reseeding through using water harvesting techniques and this will require larger involvement
of native administration and Pastoralist Union to secure sustainability with clear legislations
that maintain appropriate land use. From another perspective, the improved marketing
facilities and incentives combined with better accessibility will contribute to alleviating
pressure on natural grazing resources in this sector and the subsequent ones.
A few shallow and narrow water courses are reported over this sector with relatively pure
stand of Acacia tortillis subspecies radiana (Salam) in pockets along with a wide spread of a
mixtures of Acacia mellifera (Kitir), Acacia nubica (laaot) and Acacia tortillis (Seyal) .These
stands are left intact with no sign of cutting or lobbing and/or substantial gully erosion and
with a tree density varying from about 30 trees/ha to 5,000 trees /ha. .Good conservation of
the existing resources coupled with minimum intervention through regeneration using seed
broadcasting will reverse or arrest any type of erosion. Apart from these stands which are
found in association with water courses it is hard to observe any type of tree.
This part of the route is not crossing a water stream that has essential impact on recharge of
water sources which are almost non-existent at the nearby environs.
The Es-Sadda seasonal stream (khor) is characterized by substantial bank erosion as clearly
indicated by the excessive sand sedimentation at the curves/bends. Also, uprooted trees
were noticed along the khor due to the erosive power of the torrential rain water during the
last month of July 2009. Erection of any structure on the khor will need tremendous effort to
avoid further bank erosion or flooding. Thus, effort is required to enrich the forest cover by
transplanting or seed broadcasting as well as by appropriate technologies to reduce the
negative impact of any cultivation which is currently practiced in a patchy manner by the local
55
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
population along the flooded area of the stream. Also, the existing water sources (hafirs)
which are close to the stream or further new ones require more attention in design and
management to avoid overflow, subsidence or collapse. For instance, good watershed
management through vegetative regeneration, green fencing of hafir as well as consequent
de-silting and embankment compaction are imperative.
Sector (B) Es-Sadda village and Es-Sadda seasonal stream (khor) - Khor Al-Musran
(seasonal stream). This portion is traversing a rangeland with a minimum cultivation activity,
which maybe encouraged following the improvement of road, due to its close location to
settlements lying west to Halfa town. The area is also characterised by existence of abundant
water along Khors Al-Musran and As-Sadda which are enough to sustain animals for a
period of time during the wet season even when intermittent rain is reported and long dry
spells .Thus, this characteristic coupled with the accessibility to Ar-Rataga and Es-Subagh
livestock markets are the factors attracting pastoralists to graze in this area for a couple of
weeks during the rainy season. The presence of good browsing tree species along the two
khors is another benefit that attracts herders. Generally the range condition is fair and will
require conservation and improvement as well as measures to prevent the acceleration of
bank erosion.
Sector (C) Khor Al-Musran (seasonal stream)- Arab 6 and New Halfa Irrigated Scheme
Main Drainage Canal . This sector is comparatively characterized by intensive cultivation
using terraces to improve soil moisture. Although the land is relatively flat with a gentle slope,
the sign of water erosion is clear. The improved road is expected to add pressure on the land
by triggering cultivation in this area as this sector is close to highly populated areas. The
effects of horizontal expansion of cultivation can be mitigated through improving the quality of
the terraces and improved tillage techniques. Promoting appropriate land use calls for
genuine cooperation between the government institutions like the Land Use and
Desertification Unit of the Ministry of Agriculture of Kassala State, the Farmers Union and the
Native Administration in order to regulate the use of land and limit horizontal expansion .The
BIRDP should lead such effort and explore more viable technologies to address the
deteriorating condition in this sector. Already the project is piloting technological packages
that may prove suitable for these conditions: the development team in River Atbara locality
has implemented, on a pilot basis, a technological package focussing on terrace cultivation in
similar areas neighbouring the sector under discussion. In that exercise the communities have
welcomed and accepted the idea of broadcasting tree seed of Acacia seyal (Talih) along
terraces to build shelterbelts that can generate multipurpose outputs for the benefit of both
the farming households and the land fertility. Also, this idea is highly appreciated by women
who constitute a considerable portion of farming labour in addition to their domestic use of the
wood. This year, new communities have approached the BDA for the provision of an
additional amount of seeds. Intervention in afforestation is highly required in the area around
this sector. In this regard, the experience of the Farmers Union in distributing bottled gas and
cookers should be supported and encouraged to alleviate pressure on tree cover as the main
source of energy in cooking.
The range condition along this sector is poor in term of quantity and quality. The plant cover is
dominated by one herb (Ipomoea spp.) with very sparse distribution of trees. So far no conflict
over livestock routes as far as these routes are used only as corridors for drinking water in
irrigation canals or trekking animals to the neighbouring markets at New Halfa town or
Rataga. The mission noted that the farmers are cultivating close to the corridors, and proper
arrangements with all stakeholders should be undertaken to guarantee a buffer zone around
the proposed road for easy access of the animals to water sources and markets. This idea is
supported by the fact that all these sources and places are roughly lying at the eastern
terminal of the proposed road.
Sector (D) Es-Subagh -Al-Fuwal Village. This portion is characterised by numerous small
water courses with sparse distribution of trees, mainly of Acacia tortillas (Seyal ) and Acacia
nubica (Laaot) . Generally the herbaceous and arboraceous covers are better than those
reported under the above mentioned sectors. For instance, trees are located in association
with relatively diversified herbs and grasses including namely Ipomoea spp. (Tabar and
Lablab) Aristida funiculata (Gaw) and Schoenfoldia gracilis (Dambalab), outside the water
56
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
courses. Roughly the tree densities were estimated at 50 to 400 trees/ha. However, as this
portion is endowed with better range condition and minimum cultivation activity, it is heavily
visited by pastoralists. The concentration of pastoralists is encouraged by relative availability
of drinking water especially in five semi- natural water ponds clustered midway between Es-
Subagh and Al Fuwal. However to keep the utilization of such grazing resources at a fair
balance, distribution of water sources through excavation of small hafirs of limited capacity is
important. It is worthy to mention that, despite the uncontrolled use of these semi- natural
water ponds as no barbed wire fence is there or had been erected; there is vigorous growth of
Acacia nilotica (Sunut). As this tree species is classified as a water loving plant, its presence
strongly indicates the sustainability of such water ponds. Experience from the construction of
other roads such as the New Halfa - Gadaref road, shows that the borrow pits excavated for
the construction of the road were completely colonized by such species (at the upstream end
of the road). Such colonization assists in providing wind break as well as preventing overflow
that may lead to road damage or causing water logging that may hamper movement along the
sideway of the road by other users like pedestrians or trekked animals . In the case of the
alignment Es Subagh-Al Fuwal, this natural regeneration could be strengthened by seed
broadcasting in borrow pits, seasonal hafirs and other low lying lands. Also, improvement
activities in rangeland should be pursued by reseeding.
The mission would like to also caution against the use of borrow pits for the purpose of
commercial sale of water. Indeed this practice is reported in River Nile State in the Northern
part of the Butana, where commercial tankers collect water from natural ponds and sell to
villages affected by water shortages in the dry season. This has led to the complete depletion
of such ponds and to high competition over grazing resources with subsequent friction and
land degradation. Although the state has valid and effective legislations that prohibit the
collection of water by commercial tankers from Hafirs
(constructed earth tanks), such
legislation do not cover natural water ponds. Accordingly, the mission recommends that such
safe legislation be instituted in the Kassala and Gadaref states to prevent commercial
exploitation of water accumulating in the borrow pits used for the construction of the road.
Sector (E) Al-Fuwal Village - Surooj Manana Village. This sector is well known for its vast
and low lying land with frequent steep slopes and to some extent patchy tillage using different
tractor mounted-implements. Although the improvement in road may not have substantial
negative environmental impact on this sector, the main environmental risk is caused by
inappropriate tillage practised parallel to the slope, and signs of gulley erosion are apparent.
The mission recommends the introduction of technological packages for improved tillage,
introduction of soil moisture conservation techniques and planting of leguminous crop. The
improved accessibility of the area would facilitate the availability of agricultural services like
tractors which movement at the moment is restricted by water courses. The mission also
suggests to support research on the optimum time for ploughing and sowing that takes into
account the environmental and socioeconomic impact as well as yield per unit of land area
and could prevent the horizontal expansion of cultivation in view of the increased availability
of mechanization.
The range condition in this sector is fair as heterogeneous cover of range plants is reported
People are reported to come from Es-Subagh to this area to harvest dry natural forage and
grasses to thatch the roofs of the houses. This is usually done either by traditional tool or by
hand pulling, leaving the land bare and entirely without standing hay or debris for protection
against wind and water erosion. This practice may be further encouraged by improved
accessibility and therefore corrective measures will be needed. These measures would
include awareness & training package for the local communities; orienting the population to
cut grass above the ground (5 centimetres) and to use appropriate tools like sickle for cutting.
Also cutting could be done in patchy pattern or along strips in alternating manner to make
shelter for protection against wind and water. Also, proper devices for cutting could be
explored by modelling new prototypes. In conclusion, the Cut and Carry System could be
supported by improved road and could generate improved husbandry of forage crops and
grasses and institution of appropriate regulations to protect against erosion and deterioration
of vegetative cover.
Sector (F) Surooj Manana Village --Husheib Village. This sector is relatively characterized
57
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
by numerous and wider water courses in addition to depressions locally known as “mayaa”.
The massive gulley erosion is apparent along these courses. Despite this, the sector
represents a good ecological niche for the growing of Acacia mellifera (kitter) in addition to
Ziziphus spina-christi (sidir) and Acacia tortillis (seyal). The tree cover density is varying from
30 trees to 2,000 trees/ha. This cover gives peculiarity to the area as a good rangeland,
although this is hampered by the difficult movement over muddy terrain in the rainy season
and relative scarcity of drinking water during the dry season. The main cluster of Husheib,
lying at about 5 kilometres east to the proposed road, has the only available water source in
the dry season. About 10,000 heads of camels, 1,500 cattle and 6,000 small ruminants are
visiting this source on a daily basis. The water is provided by about 40 open wells through
using pulleys with a limited use of motorized devices in drawing out water. Although the water
table and yield is improving following the construction of a water dyke by the federal
government under the Agricultural Revival Programme, the availability of drinking water is a
cause of concern to the livestock owners and herders. Therefore, borrow pits should be done
in such a way to improve water availability. This idea is usually favoured by the dominance of
non porous soil layers which are more probable in this sector.
Improved accessibility may encourage trading in fuel wood and charcoal in this area as
generally the communities are poor and rely on charcoal making and sale for their livelihood.
Incentive measures are needed to encourage the local communities to assume their roles
over conservation and enriching of the existing tree cover in addition to formulation of
alternative income generating activities to support decent livelihoods.
In addition to the description of the flora, as done above, the mission also noted the following
fauna: the Grasshopper Hawk; Egyptian Vulture; Nubian Vulture; Pied Crow; Nubian Bustard;
Abdim’s Stork; Little Egret; Grey Heron; Open Bill Stork; Caramine Bee Eater; Green Bee
Eater; Black Headed Plover; Mourning Dove; Macqaue Dove; Crested Lark; Quela Quela;
Sand Grouse; House Sparrow; Black Sparrow; Rabbits; Cobras and Puff Adders;
Grasshoppers and centipedes are in good numbers. There are no sightings or reports of any
other animal taxa; not even Jackals, squirrels, Jerboas, or rodents. There are no known bird
migration flyways, nesting or breeding sites.
III.
Environmental and social issues
As described in the previous section, the Butana is affected by environmental deterioration as
a result of an array of practices related to farming, herding and mining of the vegetative cover.
By increasing the accessibility of the Butana, the negative impacts of farming and mining the
vegetative cover are likely to be exacerbated. The main environmental issues related to the
construction of the road and increased accessibility to Butana are as follows:
The competition over scarce water resources in the dry season. The camp location and
water source for the construction works will need to be carefully selected in order to avoid
competition over drinking water with the population. It is recommended to truck water during
the first season of the road construction. Thereafter, the contractor will construct water
harvesting sites from which water can be made available locally. Reliable water sources are
certain to attract farmers and herders. Moreover, the location of the water sources should, as
far as possible, be related to the range carrying capacity. That is to say, decisions should not
be taken on engineering merits only and this consideration should feature prominently in the
construction contracts.
The location and construction of burrow pits. The burrow pits are likely to later become
natural water ponds and to facilitate the generation of trees. To the extent possible the burrow
pits should be located to facilitate animal drinking and grazing along the stock route corridors
into Butana, as well as to protect against the commercial exploitation of the collected water
through appropriate administrative decrees and community awareness. Siting of lined
engineered burrow pits during road construction should be carefully considered using
topographic satellite imagery maps, soil type, drainage and local relief. The raised
embankment of the road could be used to train and direct water into storage structure and
decrease erosion due to uncontrolled runoff. This could work in low lying terrain (such as
mayaas or depressions).
58
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
The management of waste material from the construction sites. The construction
contract should stipulate that the contractor will store the waste safely and remove it upon
completion of works. The contractor could also be mandated to restore the site upon
completion of works.
The horizontal expansion of cultivation. The increased accessibility resulting from the road
construction is likely to encourage farmers to expand cultivation and to increase demand on
mechanization. Given the erratic rainfall and the principal attribute of the Butana area as
grazing land given the ecological constraints, the horizontal expansion of cultivation should be
controlled. This would be promoted through appropriate technical packages favouring soil and
water conservation and afforestation techniques, promoted under the on-going Butana
Integrated Rural Development Project.
Land disputes. The alignment selected should be free from land disputes and this should be
validated with the local population. Alternatively the road alignment should be changed or
compensated ensured by the local government.
IV.
Potential social and environmental impacts and risks
The potential social and environmental impacts and risks are summarized below along with
the proposed mitigation measures:
Potential Negative Impacts
Mitigating Measures
Direct impacts during construction
− Erosion from fresh road cuts and fills and
−
Limitation of earth moving to dry season.
temporary sedimentation of natural drainage
−
Protection of drainage channels.
ways.
−
Installation of sedimentation basins, seeding
− Ground and water contamination by oil,
or planting of erodable surfaces promptly.
grease and fuel in equipment yards.
−
Collection and recycling of luricants
− Creation of stagnant water bodies in burrow
−
Employment of improved landscaping, filling
pits, quarries etc suited to mosquito breeding
or drainage to avoid creating habitats.
and other disease vectors.
−
Careful siting, construcion and management
− Environmental and social disruption by
of constructin camps.
construction camps.
−
Check alternative alignment; negotiate the
− Dispute over land.
public utlity of the road; and compensation
payment if required by local government.
Direct: Permanent
− Destruction of buildings, vegetation and soil
−
Alternative alignment.
in the right of way burrow pit sites, and
−
Compenstion given to property owners.
equipment yards,
−
Restoration of sites.
− Erosion below the roadbed receiving outflow
−
Increse in number of drain outlets.
carried by drains.
−
Drain outlets placed so as to avoid cascade
− Increased suspended sedimet in streams
effect.
afected by road cut erosion, decline in water
−
Lining of receiving surface with stones or
quality
and increased sedimentaton
concrete.
downstream.
−
Establishment of vegetative cover on
− Health hazard and interference of plant
erodable surfaces as soon as possible.
growth adjacent to road by dust raised and
−
Establishment of retention ponds to reduce
blown by vehicles.
sediment load before water enters streams.
− Contamination of ground and surface water
−
Dust control by application of water in
by herbicides for vegetation control and
sensitive areas.
chemicals for dust control.
− Creation of a new pathway for disease
vectors affecting humans and animals.
The mitigation measures outlined above particularly with regards drainage, soil and water
59
Sudan: Rural Access Project (RAP)
PROGRAMME/PROJECT DESIGN REPORT - ANNEX VIII
conservation works and establishment of vegetative cover to protect against soil and water
erosion are provided for in the technical specifications of the road construction (please refer to
working paper 1 on the engineering aspects). It was also observed that for civil works
contracts issued by Gadaref State, clauses are included that refer to environmental
conservation. In the case of the RAP, this can be replicated to specify the siting of the
contractors’ camp, the burrow pits, and the management of the waste.
V.
Environmental category
Siting of a road is the most critical decision in road construction. It will largely determine the
type and magnitude of environmental and social impacts that will result from road
construction. The mission is of the opinion that the present siting of the road is excellent. It
avoided many mayas (depressions where water accumulates) and khors while fulfilling its
primary objective
(improving accessibility during the rainy season). Given the risks, the
mitigation response and the responses included in the design of the Rural Access Project and
the Butana Integrated Development Project, the environmental classification of the project is
category B. This means that the project does not merit a full-fledged Environmental and
Social Impact Assessment. In this case, the Environmental Screening and Scoping report
should be adequate. It is also worth mentioning that the Sudanese Environmental Act of 2001
does not specify or categorize projects. It does not have by-laws addressing such issues.
VI.
Further information required to complete screening and scoping
The present environmental assessment has highlighted the need for:
-
a land use plan to control the expansion of crop cultivation and safeguard
the grazing areas;
-
the need for a master plan for the development of water resources in
Butana. This would be based on an inventory of the water sources, locating
key water structures taking into account upstream/ downstream uses and
carrying capacity of the range, as well as optimal management measures.
Such studies can be completed within the BIRDP budget for carrying out a resource inventory
and monitoring biodiversity.
VII.
Recommended features of project design and monitoring to improve natural
resources management and to mitigate environmental concerns
The environmental issues identified above will be addressed by the Butana Development
Agency through its two projects, the Butana Integrated Rural Development Project and the
Rural Access Project.
The main mitigation measures fall within the scope of the Butana Integrated Rural
Development Project (BIRDP). Indeed, the BIRDP aims to improve in a sustainable manner
the livelihoods and resilience to drought of the poor rural households. The specific objectives
of the project include: (i) establishing a coherent and cost effective governance framework
that ensures a regulated access to land and water resources of the Butana; (ii) improving the
access and bargaining position of women and men in the marketing of livestock;
(iii)
developing the capacity of community-based organizations to engage in environmentally
sound, socially and gender equitable development initiatives. The mitigation measures for the
horizontal expansion of cultivation are included in the range of activities of the agriculture,
range and water development component. The main outputs of the component would include:
improved on-farm water use and efficiency, improved carrying capacity and biodiversity of the
range, improved water accessibility and affordability.
The following technological packages are proposed under the BIRDP and respond to the
mitigation measures recommended in the section above: (i) the key techniques for rangeland
development and improvement are reseeding, resting and deferred grazing, fire line, and
water management; (ii) modification of traditional terrace cultivation through the introduction
of chisel plowing in lieu of the current destructive disc plowing, use of early maturing varieties
60
|
||
|
|
|