AzSPU HSSE Document Management Procedure
Page 23 of 23
HSE Learning and Development Team Leader
Learning Operations Manager
(HSE L&D TL)
HSE Learning Coordinator
HSE L&OD Advisor
Asset H&S Team Leader
Operating Area H&S Team Leader
PU/Asset Environmental Team Leader
Compliance & Environmental Team Leader
(Offshore, Sangachal, Geo and Turkey Export)
and Az Export Environmental Team Leader
Environmental Monitoring Technical Advisor
Environmental Monitoring Specialist
Contract Accountable Manager (CAM)
Supply Performance Leader
-3
Planning Performance & Learning Manager
-
Ops, HSSE & Engineering Organisational
Capability Development Manager
-
Hazardous Materials Specialist/Technical
Authority
3 “-“ means that the position did not exist prior to June 1, 2010 re-organisation
Control Tier:
2-AzSPU
Revision Date: October 15, 2010
Document Number: AzSPU-HSSE-DOC-00025-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 1
F 48
AZSPU IMT
EMERGENCY RESPONSE RESOURCES QUIDE
Document Number:
AZSPU-HSSE-DOC-00104-2
Authority:
CCM&ER manager
Custodian:
AzSPU CCMER Advisor
Offshore/Onshore
Document
Scope:
AzSPU HSSE MS Document Coordinator
Operations
Administrator:
Issue Date:
21 May 2007
Issuing Dept:
CCMER
Revision Date:
December 01, 2010
Control Tier:
II
Next Review
December 01, 2011
Date:
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 2
F 48
AZERBAIJAN IMT EMERGENCY RESPONSE RESOURCES LIST
Contents
OSR EQUIPMENT STOCKPILES MAP
3
BRIGGS RESOURCES IN ASSETS:
5
OSR EQUIPMENT
5
CATERING AND SHELTERING
6
CATERING PROVIDERS
6
HOTELS, GUEST HOUSES
7
HEAVY EQUIPMENT
8
WASTE MANAGEMENT
9
PSCM TAGS, OSR AND WILDLIFE RESPONSE CONSULTANTS
12
PSCM TAGS
12
OSR EXPERTS/CONSULTANTS (OTHER THAN BP AND OSR CONTRACTORS)
12
WILDLIFE RESPONSE CONSULTANTS
13
HELICOPTERS
13
SPECIFICATION & CAPABILITY:
13
S76C +
13
OFFSHORE FLIGHT TIMES AND DISTANCES
14
TRANSLATION PROVIDER:
15
VESSELS FACT SHEET
16
BP MEDICAL RESOURCES & SECONDARY HEALTHCARE FACILITIES
33
PRIMARY HEALTHCARE FACILITIES (PIPELINES)
34
AZERBAIJAN REGION LAYOUT MAP
34
LOCAL AUTHORITIES AND GOVERNMENTAL AGENCIES CONTACT
36
HR RESOURCES
39
THIRD PARTY CONTRACTOR’S LIST (ATTACHED)
44
INCIDENT MANAGEMENT CENTRE
44
ALTERNATIVE INCIDENT MANAGEMENT CENTRE
45
BUSINESS SUPPORT CENTRE
46
AZERBAIJAN EVACUEE MANAGEMENT PLAN
47
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 3
F 48
OSR Equipment Stockpiles Map
Vessel at opportunity.
12 vessels can be promptly released from BP charter. The
vessels from state entities can also be obtained at request
OSR base
OSR base
West
East
OSR
ST
equipment
OSR
stockpile
16 tons of S25,
equipment
approved type
stockpile
of dispersant
Back up: 2 tons of S25 in
2 x (vessel with 4.4 tons of S25 dispersant
UK, 17 tons of another
and spraying capability) + 1 under
approved type C9527 in
consideration.
Singapore
Dispersant to oil ratio is approx 1:20
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 4
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 5
F 48
Briggs Resources in Assets:
C:\Documents and
C:\Documents and
Settings\mamer8\DesSettings\mamer8\Des
OSR Equipment
it has access to extensive facilities for responding to pollution incidents including trained staff and
equipment on a 24 hours a day, 365 days a year basis.
There is procedure approved by the order of the State Customs Committee, which facilitates
trans-boundary movement of equipment in case of emergency titled “Regulations on Customs
Legalization of Goods Carried Through the Customs Frontier of the Azerbaijan republic in
connection with Elimination of Consequences of Extraordinary Situations”
Note that only the Duty Incident Commander can sanction to MOBILISE the services of Oil Spill
Response. However, anyone in the Incident Management Team can NOTIFY Oil Spill Response .
For OSR equipment listing and equipment description refer to OSR back up folder located at
Incident Management centre.
If temporally storage for OSR equipment is requested there are two options
Primary: PSCM SYPPLY BASE (LSB)
Contact:
Fuad Rzayev, Supply Base Team Leader. Mob: (055) 255-0329
Secondary: BRIGGS OSR BASE
(contacts through normal IMT procedure)
PPE can be requested from following PPE supplier:
Name
Contact person
Telephone/Fax
web
Address
24/39A Y.
Web:
0412 490 38 95
Safarov str.
Debet Uniform
Emil Hamidov
Fax: 012 490 46 48
Baku,
Ltd..
Mob: (050) 349 77 03
Azerbaijan, AZ
emil@debet.az
1025
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 6
F 48
Catering and Sheltering
Catering Providers
Company
Comments
Contact person/ details
Name
(services capable to
provide)
Rafael Shirinov
Tel:
567 28 81; 514 22 67
REM Service
Catering
Mob: 210 58 05
Fax: 514- 21- 67
Email: rafail@azdata.net
Saadat Khanum
Tel: 955003
Super Service
Catering
Mob: 329 33 55
Fax: 955003
Anil Kumar
CDC
Catering
Mob: 213 92 38
amilkumar@cdc.az
Country Manager: Stephen Queen.
Tel
+994 12 43719 21/22/23
ESS
Catering
Fax
+994 12 43719 24
Mobile +994 50 206 07 16
stephen.queen@ess-global.com
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 7
F 48
Hotels, Guest Houses
Region, city
Name/type
Contact
Kurdamir
Kurdamir hotel
(070) 9036483 Sevil
Kurdamir
Debut
070 6674895 Seymur
Yevlakh
PSA2/Camp
235 86 05 Tamraz
Mingechvir
Riverside Hotel
055 745 2761 Jamil
Ganja
Ganja hotel
050 3963682 Sabir, Arif
Ramada plaza
022 590487 Khalida
Agstafa
Garb hotel
(050) 4935566 Makhmud
For the details please refer to
Artur
(055) 225-
BP Exports PU, BTC
Logistics Supervisor
814109
Gaziyev
8712
Elena
(055) 250-
BP Exports PU, BTC
Logistics Coordinator
814187
Chernetskaya
8094
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 8
F 48
Heavy Equipment
Equipment available at SPS base, which can be dispatched to the field
C:\Documents and
Settings\mamer8\Des
Mobile crane LTM 1055
1
55 t
SPS Ops Base
Mobile crane LTM 1030
1
30 t
SPS Ops Base
Mercedes Truck and trailer
8
40 t
SPS Ops Base
Ford truck and trailer
2
40 t
SPS Ops Base
Man truck and trailer
2
40 t
SPS Ops Base
Flatbed truck
1
10 t
SPS Ops Base
Road Tankers
4
36 t
SPS Ops Base
Material Handler
2
9.2 t
SPS Ops Base
Forklift/Hyster
1
30 ton
SPS Ops Base
Diesel
Excavator
1
Sangachal
Caterpillar Track
Forklift/Hitachi
1
15 ton
SPS Ops Base
Front Loader
Forklift/Hyster
2
7 ton
SPS Ops Base
Diesel
Forklift/Hyster
1
5 ton
SPS Ops Base
Diesel
Forklift/Hyster
1
3 ton
Main Warehouse
Electric
Reach Truck/Hyster
1
2 ton
Main Warehouse
Electric
Forklift/Hyster
1
12 ton
SPS Ops Base
Diesel
Road Roller/Boomag
1
SPS Ops Base
Diesel
Trucks/Mack
5
41 ton
SPS Ops Base
Tractor Unit
Trailers/Atlas
6
40 ton/40ft
SPS Ops Base
Oilfield Flatbed
Trailers/Atlas
2
30 ton/50ft
SPS Ops Base
Oilfield Flatbed
Certified Lifting
Containers
61
Various Sizes
SPS Ops Base
Assemblies
Certified Lifting
Half Heights
20
Various Sizes
SPS Ops Base
Assemblies
Certified Lifting
Waste Skips
44
SPS Ops Base
Assemblies
Certified Lifting
Bottle Racks
24
16-Cyl & 2-Cyl
SPS Ops Base
Assemblies
Certified Lifting
Cargo Baskets
12
SPS Ops Base
Assemblies
Certified Lifting
Fleet Tank
5
2000 liters capacity
SPS Ops Base
Assemblies
Sludge tanks
6
2000 liters capacity
SPS Ops Base
Coleman Diesel/Ingersol
Mobile Lighting Tower
4
Ops Base
Trailer Mounted
Rand
Sleeping Bags
14
Main Warehouse
Industrial Cleaning Unit
1
Main Warehouse
Forklift/Manitou
Certified Lifting
1
4 ton
SPS Ops Base
Telescopic(BP)
Assemblies
Certified Lifting
Forklift/Manitou(BP)
1
5 ton
SPS Ops Base
Assemblies
Certified Lifting
Forklift/Caterpillar(ASCO)
1
15 ton
SPS Ops Base
Assemblies
Certified Lifting
Forklift/Caterpillar(ASCO)
4
7 ton
SPS Ops Base
Assemblies
Reach
Certified Lifting
4
2.5 ton
SPS Ops Base
Truck/Caterpillar(ASCO
Assemblies
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 9
F 48
Certified Lifting
Forklift/Still(ASCO)
1
2.5 ton
SPS Ops Base
Assemblies
Mobile
Certified Lifting
1
SPS Ops Base
platform/NIFTY(ASCO)
Assemblies
Certified Lifting
Forklift/Hyster(BP)
1
SPS Ops Base
Assemblies
For the details please refer to
Eldar
Gaziyev
Logistics Manager
Hyatt Tower 2 3rd Floor
837401(437-6986)
(055) 225-0394
Waste Management
Please note that 90% of Waste Management facilities are located on Apsheron. All waste
management operations should be conducted with AzSPU approved Contractors
The list of contractors:
AzSPU Approved Waste Management Contractors AZSPU-HSSE-DOC-00069-2
C:\Documents and
Settings\mamer8\Des
Contractor
Waste Stream
Process
AA Services
Drill Cuttings
Bioremediation
Drill Cuttings, drilling muds & vessel tank
Indirect thermal
cleaning wastes1
desorption (ITD)
AA-Ekol JV operated
Sorting, separation &
BP owned Serenja
All excluding Drill Cuttings
repackaging of all
and CWAA facilities
wastes.
Oily Contaminated Materials With Little
Potential For Oil Recovery (Oily Rags,
Walnut Filters, Bag Filters, Ultra Filtration
Incineration
Filters, Filters, Other Materials
Contaminated with Oil)
Oily contaminated materials with the
potential for oil recovery
(Sludges and
AA-Ekol JV2
Process Residues, Solids from Brine and
Oily recovery and
PW treatment, Contaminated Soils and
Incineration
Sands, Guard Filter Waste )
Hydrocarbon based/contaminated wastes
Oil recovery and by
(Pigging Wax and Flexoil, Tank Bottom
products‟ disposal
Sludges, Used Oil and Diesel, Oily Water)
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 10
F 48
Contractor
Waste Stream
Process
Potentially biohazardous waste (Clinical
Incineration
waste, Animal and Bird Carcasses)
Solid hazardous waste management
(Asbestos, Batteries, Fluorescent tubes,
compact fluorescent lights (CFLs), Smoke
Disposal through
detectors, Wide range of waste chemicals
authorized sub-
not subject to reuse/recycle, Pyrotechnic
contractors
Devices)
BP dedicated cell at
Sumgayit Municipal
Domestic / General non hazardous solid
landfill (Standby only)
waste
Transportation from
VP, Khirdalan
Warehouse & TISA
ADES3
Segregated &
Wood
distributed to IDPs
Plastics
Recycle
Liquid hazardous wastes incl produced
Provison of tank
Azeco
water, brines
storage
Azeri MI (Swaco)
ITD Recovered oil
Reused
Baker Hughes Mud
Plant (AFF)
Sahil & Hovsani
Azersu
Sewage (onshore & vessels)
Municipal Sewage
Treatment Facilities
Hazardous Waste
Az Logistics
Hazardous Waste from all facilities
Transportation
BP - Sangachal
Used oil, diesel, ITD recovered oil & some
Reinjection to the
Terminal
chemicals subject to acceptance criteria2
pipeline
Containers/Cans / Drums / IBC containers
/ Sacks / Bags; Cooking oil; Electronic
Reuse recycle, receive
Equipment; Printer Cartridges,
in Babek site
Transformers, Wide Range of Chemicals;
Paint, Glass
Wood, Cable, Plastic, Metal, Rubber,
Karvan-L2
Reuse recycle, receive
Blasting Grit/Sand, Cement, Barite,
in Puta site
Bentonite
Recycle reuse through
Pressurised Containers
sub-contractor
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 11
F 48
Contractor
Waste Stream
Process
Recycle reuse through
Paper and Cardboard
sub-contractor
Real Gas3
Gas Bottles
Reuse bottle
PW waste, Completion brines, chemical
Treat, discharge and
effluent1, Mud (AA-Ekol JV is sub-
disposal/reuse
contracted for mud)
RT Services
Paper and card3
Recycle at paper mill
Transportation,
SOFAS (Pek Tel)
Ferrous Metal
Storage, Recycling
Reprocessing & reuse.
TMS MMC3
Electronic equipment
disposal
Landfill
Domestic / General non hazardous solid
waste
TT MMC
Transportation
ITD treated Cuttings
Landfill cover
1 Request specific advice from Waste Management Specialist prior to dispatch
2. Request specific advice from Waste Management Specialist as some of services not in place
yet
3. Short term solution until current contractor‟s mobilization
Consultancies
Service
WM Consultancy in Az
RSK
n/a
& Geo
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 12
F 48
PSCM tags, OSR and Wildlife Response Consultants
PSCM Tags
Area
PSCM tag
Contact No
OSR contracts_ information
Naima Rahimova
(055) 450-5108
Catering
Sabina Irzayeva
(055) 225 25 42
PSCM Supply Base
Nazar Bayramov
(055) 225 65 83
Waste Management
Farid Mustafayev
(055) 225 88 47
(Mayya Babayeva)
837285
Aviation
Ragima Badalbeyli
(012) 437 73 12
Marine
Farid Mustafayev
(055) 225 88 47
OSR Experts/Consultants (other than BP and OSR contractors)
The external OSR experts listed below are well aware about BP AzSPU Operations and recently
have been involved into OSR developments, assessments and exercises
Name
Contact No
+1 206 842 2951
Edwards H Owens
+1 206 369-3679
EHOWENS@POLARISAPPLIEDSCIENCES.COM
Tel +1 (858) 453-8688
David Dickins
Fax +1 (858) 453-6766
Email: info@dfdickins
+1 206 842-5667
Elliot Taylor
+1 206 780 0860 mob +1206 660 5753
eteams@prodigy.net
Office: +44 (0)1243 576459
Peter Taylor
Mobile: +44 (0)7733 107429
ptaylor@oilspilltraining.com]
Bernie Bennett
Mobile : +44(0)7901518904
morlichservices@googlemail.com
or
Bennett, Bernie (Morlich) in GAL
Virginia Nelson
virginia@neocosconsulting.com
or
Nelson, Virginia A in GAL
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 13
F 48
Wildlife Response Consultants
Name
Contact No
Activate:
+32 2 2788 744 (office)
Sea Alarm
+32 49 49 000 12 (mobile)
+32 49 96 247 72 (mobile)
IBRRC, Duty Manager
Tel:+1 707 207 0380 Fax:+1 707 207 0395
+1-508-744-2086 Office
Ian Robinson
+1-508-648-3367 Mobile
IFAW Emergency Relief Program Manager
irobinson@ifaw.org
+1-907-230-2492 AK Mobile
Barbara Callahan
+1-707-249-4871 Int'l Mobile
IFAW ER Manager Oiled Wildlife
Bcallahan.ibrrc@ifaw.org
vnelson@oilspilltraining.com
Virginia Nelson
mob: +44 (0) 7909683946
The Oil Spill Training Company Ltd
tel: +44 (0) 1463 250588
Helicopters
Fleet
Quantity
Mob time (call out - take off)
S76C+
2
Night time/Daytime 61 min
Call signs
C - GHRI and C-GHRE.
Specification & Capability:
C:\Documents and
C:\Documents and
Settings\mamer8\Des
Settings\mamer8\Des
S76C +
Seating
Up to 12 subject to weather conditions
Stretcher Capability - seats in
2 secured to folded seats
Stretcher Capability - seats out
3 secured to floor rails
Standard Fuel Tank Capacity
1820lbs
Auxiliary Fuel Tank Capacity
480 lbs - Allow 30 minutes to fit
Maximum Range - Standard Tanks
646kms
Maximum Range - Auxiliary Tanks
817kms
Best Speed
145kts
Fuel Consumption
680lbs/hr
Endurance
2hrs 40 mints
Endurance with Aux Tank
3hrs 12 mints
External Load Lifting Capacity
3300lbs
Winch Available
No
Crew
12 hour cover provided
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 14
F 48
The times and distances are based on still air conditions and each sortie will require a quantity of
reserve and diversion fuel which will ultimately reduce range.
The aircraft can be tasked during daylight operating hours only. There is no restriction on any
pipeline helipads that preclude the use of this aircraft type. Daytime call-out is 60 from initial call
to being airborne. The S61 is restricted to offshore decks less than 22.5m „D‟ this precludes the
aircraft from landing on the PLB, DSV and DBA.
Emergency Evacuation
There are landing sites are located as PSA-2 and Sangachal, Ganja International Airport. Due to
lighting and the lack of navigational aids these sites are restricted to daytime Visual Flight (VFR)
operations only.
Offshore Flight Times and Distances
Chilov Isl
ZABRAT
Oily Rocks
DDGG
DWG
Chirag
SD
EA
ST
Istiglal
WA
CA
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 15
F 48
From
To:
Distance
Time on S76
Zabrat
Istiglal
71km
17min
Zabrat
Sang. Terminal
65km
16min
Zabrat
Chilov isl.
78 /70km
19/17min
Zabrat
Oil Rocks
98 /90km
24/22min
Zabrat
Chirag
141 /129km
35/32min
Zabrat
Dada-Gorgud
132/120km
32/29min
Zabrat
East Azeri
159/147km
40/37 min
Zabrat
Central Azeri
155/143km
36/34min
Zabrat
West Azeri
149/137km
37/34min
Zabrat
Gunashly
135/123km
33/30 min
Zabrat
Shah Daniz
62km
15m
All distances represent the flight plan distances that are established by Azal‟s rules
(straight lines are for presentation purposes only)
Translation Provider:
Name
Contact
Telephone
web
Address
person
012 437 38 19
Mob:
LEXICON
Arzu Kasimov
lexicon.bp@gmail.com
Hyatt
055 796 60 92
tpazspu@bp.com
Tower
050 356 16 01
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 16
F 48
Vessels Fact Sheet
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 17
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 18
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 19
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 20
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 21
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 22
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 23
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 24
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 25
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 26
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 27
F 48
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 28
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 29
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 30
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 31
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 32
F 48
C:\Documents and
C:\Documents and C:\Documents and C:\Documents and C:\Documents and
Settings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\Des
C:\Documents and
C:\Documents and C:\Documents and C:\Documents and C:\Documents and
Settings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\Des
C:\Documents and
C:\Documents and C:\Documents and C:\Documents and C:\Documents and
Settings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\DesSettings\mamer8\Des
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 33
F 48
BP Medical Resources & Secondary Healthcare
Facilities
Name & Location
Mobile
Land line
fax
ISOS - for Offshore and
BP expatriate stuff
99450 212 69 21
99412 493 73 54
99412 493 96 44
Ganja Medi Club
99450 220 47 42
(022) 57 87 44 / 57 82 08
(022)
57 82 26
MediClub - for Onshore
and BP national stuff
99450 225 59 11
99412 497 09 11/12/13
99412 498 70 96
CLINIC/HOSPITAL
ADDRESS
CONTACTS
MediClub (SPS clinic)
Salyanskoe shosse, SPS,
Baku
0(50)2230452 / (99412) 4484911
Hajigabul (Gazi-
5 Bairam Ibrahimov Str.,
Magomed) Hospital
Haji-Gabul
0(50)3438665 0 (140)3690
Ali-Bayramly Central City
16, Agamirza Akhmedov
Hospital
Str.
0(50)3196667 0(0197) 51010 / 58647
Salyan Central Regional
Qur-Qurakashla village
Hospital
0(50)3160006
0(163) 50621 / 52771
Kurdamir Central Regional
12 H.Islam-zade Str.
Hospital
0(50)3523806 0(145) 66424 / 53942 / 353942
Ujar Central Regional
90, Heydar Aliyev Str.
Hospital
050-355-63-07
0170-5-01-70 / 71/72/73
Yevlakh Central Regional
104, Jeyhun Mustafayev
Hospital
Str.
050-209-39-87
0166-6-03-50
0166-6-48-85
Mingechaur Central City
12, 20 January Str.
Hospital
050-210-67-93
0167-5-35-15
Goranboy Central
1 Haydar Aliyev Str.
Regional Hospital
050-318 90-13
0234-5-31-96
0234-5-13-91
Ganja MediClub Clinic
47, Mirza-Abbas Abbas-
zade Str.
050-220-47-42
022-57-87-44
022-56-99-11
Ganja First Medical Aid
216, Zardabi Ave.
050-323-11-31
022-56-87-55
022-56-63-
Hospital (N3)
72
022-56-16-43
Ganja Cardiological
Ganja, 294 Tebriz Ave.
050-363-06-08
022-54-79-95
022-54-75-
Dispanser
93
022-54-74-92
050-314-30-70
022- 55-34-34, 022- 55--55-10
Ganja Abbas Sahat
8 M. Halafov Str.
022-55-14-10
Hospital
Shamkir Central Regional
1, Shihali Kurbanov str.
(050) 3285317/3660160, (0241) 27729
Hospital
Tovuz Central Regional
38, Shahriyar str.
(050)2218255, (0231) 54158/53142
Hospital
Agstafa Central Regional
(050) 304 8244, (0244) 51589 / 52249 / 51663
Hospital
36, Azadlig str.
Gazakh Central Regional
(050) 5140010, (0279) 53302 /53301/ 53384
Hospital
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 34
F 48
Primary Healthcare Facilities (Pipelines)
IPA1 Kurdamir - MediClub ambulance and FA room; also medical post in Kurdamir Motel.
Tel. of duty doctor (24/7): (050) 225 08 50
PSA2 Yevlakh - MediClub ambulance and FA room.
Tel. of duty doctor (24/7): (050) 225 02 64
MediClub Baku clinic (24/7)
Contact numbers - Office: (99412) 497 09 11; (99412) 497 09 12; (99412) 497 09 13;
(99450) 220 48 11
MediClub Ganja Clinic - BP support clinic with ambulance purely designated for BP services.
Tel. of duty doctor (24/7): (050) 220 47 42; Office: (994 22) 56 99 11
Azerbaijan Region Layout Map
See next page for the list of contacts ˘
C:\Documents and
Settings\mamer8\My D
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 35
F 48
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 36
F 48
Local Authorities and Governmental Agencies Contact
Area code
øcra
Müavin
Polis
MTK
Yanğın
Torpaq
Ekologiya
Başçısı
şöbəsi
Governor
First Deputy
Police
Security
Fire Department
Land Department
Ecology Department
Garadag 012
Mikail
Hikmet
Intigam
Fariz Goyushev
Abulfat Kerimov
Chief on
Social Dept. of Ex
Suleymanov
Abbasov 012
Mirsalayev
012 4450800
012 4458565
Agricultural
Com Ecology
012 4455808
4453505
050
012 4450010
Issues ExCom
Advisor Elbrus
012 4458220
2750107
Deputy Matlab
Agayev
012 4453115
Ibragimov
012 4453114
012 4456050
Absheron012
Zakir Farajov
Alekper
Namig
Rauf
Abdulali Gulamov
Mubariz Veliyev
Chief of Absheron
012 4421100
Alekperzade
Ismailov
012
Mammadov
012 3493659
012 3422549
Regional Dept.
012 4421101
3420202
012 3420808/0
Firdovsi Hasanov
012 3422737
012 3421819
Hajigabul
Ahmad
Sahib Aslanov
Ramazan
Galib Guliyev
Ilgar Namazov
Mamed Gafarov
Shirvan Regional
0140
Mukhtarov
050 3653766
Kerimov 0140
140 41172
0140 43801
050
0140 44113
Ecology Dept. Chief
050 2006323
41151
050 2332655
3540152
051 8205761
- Sahavat Aliyev
050 7530333
0191 61835
050 4109055
Kurdamir
Faxraddin
Vasif
Rsaim Aliyev
Vahid
Hajibay Isayev
Gulbala Asadov
Goychay Regional
0145
Malikov
0145
Mammadov
0145 66202
Mammadov
050 5251442
050 2080488
Dept.
Adalet
66134
050 2080442
050 2119778
050 5305400
050 4844749
Mammadov
050 2003319
050 2504655
Agsu
0198
Enver Seidaliyev
Rasim
Hatam Hajiyev
Vacant / will be
Mahir Kerimov
Vacant / will be
Gabala Regional
0198 55000
Novruzov 0198
050 2335300
appointed
0198 53031
050
appointed
Dept. Chief - Shakir
54100
050
within a month
6754773
within a month
Ismailov
3374837
0178 51097
050 2085880
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 37
F 48
Ujar
0170
Yashar
Abil Mekhdiyev
Tahir Guliyev
Xudad
Mushvig
Rafig Hajiyev
Adalat Asgarov
Mammadov
0170 521958
0170 30030
Huseynov 0170
Mammadov
0170 50157
Goychay
0170 30311
050 3391050
050 2217737
32797
050
0170 31572
050 3333137
0167 53515
050 2248010
3257547
0170 33771
050 2504655
055 2533353
Agdash
Rafig Niftaliyev
Javid Osmanov
Telman
Vidadi
Mazahir
Shirin Humbatov
Aliabbas Nagiyev
0193
0193 55000
0193 55152
Agasiyev 0193
Gurbanov 0193
Shikhmamedov
0193 5141939
Barda
050 6350000
050 209 05 85
55026
55085
050
0193 55236
050
050 3783161
0110 54482
050 310 79 21
3178918
3369260
050 331 55 78
Yevlakh
Elmar Valiyev
Goja Samadov
Natig
Babak
Rasul Sadikhov
Maharet
Aliabbas Nagiyev
0166
0166 65030
0166 60100
Mashadiyev
Mammadov
0166 63341 050
Mustafayev
Barda
050 2115203
050 2090961
050 2105404
0166 64548
3597680
0166 60534
0110 54482
Fax: 0166 63792
050 2085022
050 2150055
050 331 55 78
Goranboy
Nizameddin
Baxish
Imran
Ali Isagov
Famil Ahmadov
Ziyad Ahmadov
Nariman Gulushov
0234
Guliyev 0234
Abdullayev
Hasanov 0234
0234 53100
0234 51312 050
0234
0234 53401
53161
050
0234 53022
53200
050
050 3140661
3490944
52533
050 2164646
2252746
050 2453070
300 57 76
050 3536813
055 3264646
Samukh
Vilyam Hajiyev
Tahir Qarayev
Mubariz
Ahmed Abbasov
Elnur
Fazil Tagiyev
Nariman Gulushov
0265
0265 61005
0265 51006
Guliyev
050
0265 51031
Khudaverdiyev
0265 61222
Goranboy
0265 51144
050 3930953
2000164
055 2113080
0265 51974 055
050 3453165
0234 53401
0265 61994
7829675
050 2164646
Fax 0265 61919
055 326 46 46
Shamkir
Nazim Veysov
Tariel
Shukur
Azad Gurbanov
Sahil Rzayev
Rustam
Nariman Hasanov
0241
0241 25511
Mammadov
Mehdiyev
0241 23003
0241 24401 050
Rustamov 0241
Gazakh
0241 27687
0241 25554
0241 23028
050 2060977
7064401 055
25413
070
0279 53984
050 3279199
050 2229409
0241
5123401
7180012
050 5030374
Fax: 0241 27673
27964(OD)
050 3627734
Tovuz 0231
Hamid Bagirov
Mahir Hasanov
Rashid
Musa
Eldar Ahmadov
Mahammad
Nariman Hasanov
0231 53534
050 2284774
Safarov 0231
Hagverdiyev
0231 55424 050
Ismayilov
Gazakh
0231 53868
50001
050
0231 50010
3047727 05)
0231 53951
0279 53984
050 2220839
2110818
050 3130277
6804303
050 3595811
050 5030374
Fax: 0231 53868
050 6260108
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 38
F 48
Agstafa
Elkhan Usubov
Ramiz Tatarov
Namig
Rovshan
Semen Mansurov
Ayyam
Nariman Hasanov
0244
0244 61295
0244
Hasanov 0244
Mamedov 0244
0244 52169 050
Huseynov 0244
Gazakh
050 2219303
62631
050
53707
050
51143
050
7656221
61361
050
0279 53984
Fax: 0244 61566
3339503
2113626
3113116
330 9506
050 5030374
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 39
F 48
HR Resources
HR Emergency Teams and contact numbers
HR IMT Duty Officers
IMT Duty Officer +994 50 221 48 74
Mobile Phone Number
Name
Dial +994 55 when calling outside of
Azerbaijan
Mehriban Eyubova
(055) 225 4550
Yelena Mirtagavi
(055) 225 1741
Baghir Akhundov
(055) 425 5967
Arzu Mammadova
(055) 318 1661
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 40
F 48
Sabina Ismayilova
(055) 225 2853
Anar Aliyev
(055) 450 1885
Ulviyya Jabbarly
(055) 223 4357
Saida Taghiyeva
(055) 425 0065
Fidan Farzaliyeva
(055) 425 8595
Irina Schukina
(055) 221 4702
Narmina Nabiyeva
(055) 205 0992
ESG: HR Leadership Team and/or Senior HR Ops person
Telephone Contact
Name/Title
Dial +994 55 when calling outside
of Azerbaijan
Sue Adlam-Hill, VP, Human Resources
(055) 4504759
Susan Gordon, HR Manager, Midstream
(055) 4503274
Petar Andrich, HR Manager, Functions
(055) 425 0336
Vugar Ibrahimov, Employee Relations Manager
(055) 4253273
Reykhan Hussein-zade, International Mobility Team
Leader
(055) 4250630
Narmina Nabiyeva HR Manager Operations
(055) 2050992
UK based HR
Amelia Hills, HR manager
+44 (0) 7810 852459 (mobile)
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 41
F 48
Relative Responders Team Contact List
Name
Mobile
LandLine
Com m ents
Anar Aliyev
(055 ) 4 5 0 1 8 8 5
4 92 65 65
(a)IM T m e m b e r
Arzu M am m adova
(055 ) 3 1 8 1 6 6 1
4 34 62 46
IM T m em ber
Aygun Rahimova
(055 ) 2 5 5 3 6 8 4
5 10 00 28
(a)
Aygun Akhmadbeyli
(055 ) 4 5 0 -0 5 8 1
(a)
Bagir Akhundov
(055 ) 2 2 5 -5 9 6 7
5 41 29 49
IM T m em ber
Dilara Jabiyeva
(055 ) 2 2 5 9 3 7 6
4 54 81 70
(a)
Dim a Kirillov
(055 ) 2 5 0 1 3 8 8
5 96 31 83
Elnara Alizade
(055 ) 4 3 5 -1 3 6 9
(a)
Elnara M am m adova
(055 ) 4 5 5 -0 5 6 2
Em ina Ibrahim ova
(055 ) 2 2 5 -1 5 7 8
(a)
Fahrin Hasanov
(055 ) 2 2 5 8 8 5 2
4 40 08 08
(a)
Fakhri Gurbanov
(055 )4 2 5 0 2 3 1
Farida Ism ayilova
(055 )4 3 5 -5 7 7 5
Fidan Farzaliyeva
(055 ) 4 2 5 8 5 9 5
-
(a)
Gultekin Agayeva
(055 ) 2 5 0 -6 2 7 8
Gulnar Aydam irova
(055 ) 2 5 0 3 0 4 6
4 98 05 24
(a)
Gunay Bagirova
(055 ) 2 2 5 -0 2 4 9
(a)
Ilaha Akhm edova
(055 ) 4 5 0 -2 0 3 4
Ilham Hajiyev
(055 ) 2 2 5 4 8 5 4
-
(a)
Irina Ibrahim ova
(055 ) 2 5 0 5 9 6 3
4 97 78 07
Irina Schukina
(055 ) 2 2 1 4 7 0 2
4 47 36 01
Jam ilya Agazade
(055 ) 3 1 9 1 7 9 9
4 38 22 94
(a)
Julia Alizade
(055 ) 4 5 5 -7 5 9 9
Khadija Islam ova
(055 ) 2 5 0 -7 9 0 7
(a)
Lala Nabiyeva
(055 ) 2 2 5 -4 3 2 4
(a)
Leyla Abbasova
(055 ) 2 5 0 9 5 4 9
4 39 33 23
(a)
Leyla Mammadova
(055 ) 2 5 0 5 2 1 6
5 10 70 72
(a)
Leyla Mahmudova
(055 ) 2 4 5 -1 6 4 7
(a)
Leyla Sharifova
(055 ) 2 2 5 0 5 5 1
4 92 84 51
Mekhriban Shikhzamanov
(055 ) 2 5 0 4 1 8 4
4 95 75 17
(a)
Narm ina Nabiyeva
(055 ) 2 0 5 0 9 9 2
4 90 17 83
IM T m em ber
Nasim i Babayev
(055 ) 2 2 5 -4 5 4 8
(a)
Natalya Voronina
(055 ) 2 2 5 5 9 5 0
-
Nigar Aliyeva
(055 ) 2 5 0 5 6 6 5
4 94 85 46
(a)
Nigar Agabeyli
(055 ) 4 2 5 -0 2 2 6
Nigar M am m adova
(055 ) 2 5 0 -8 7 9 1
(a)
Orkhan Im anov
(055 ) 4 2 5 -0 2 3 3
(a)
Parviz Bakirov
(055 ) 4 2 5 -0 2 3 3
(a)
Riana M am edova
(055 ) 2 5 0 1 8 6 3
4 28 19 97
Saida Taghiyeva
(055 ) 4 2 5 0 0 6 5
(a)IM T m e m b e r
Sabina Ism aylova
(055 ) 2 2 5 2 8 5 3
4 97 93 12
IM T m em ber
Sabina Surguladze
(055 )2 4 5 -1 6 7 2
Shafag Garayeva
(055 ) 2 2 5 -6 7 6 5
Susan Gordon
(055 ) 4 5 0 3 2 7 4
4 97 73 94
IM T m em ber
Tahira Verdiyeva
(055 )4 0 0 -7 9 7 7
Tarana Bunyatova
(055 ) 3 1 8 7 6 1 8
4 36 95 12
Vugar Ibrahim ov
(055 ) 2 2 5 3 2 7 3
4 90 23 10
(a)
Zibeyda Aslanova
Ulviyya Jabbarly
(050 ) 2 2 3 -4 3 5 7
IM T m em ber
Nino M eladze
(995 99 ) 5 5 3 3 8 8
Georgia
Eka Khvichia
(995 99 ) 1 3 2 4 0 7
(995 32 ) 7 7 4 7 5 7
Georgia
Inazi Tskhvitaria
(995 99 ) 1 3 2 4 0 5
(995 32 ) 6 3 7 7 9 5
Georgia
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 42
F 48
Recorder
Telephone Contact
Dial +994 55 when calling outside of
Name/Title
Azerbaijan
Vadim Osadchiy
(055) 255-3695
Aygun Rahimova
(055) 255 3684
HR Representatives at Reception Centres
(Evacuation Centres/Hospital/Mortuary)
Telephone Contact
Dial +994 55 when calling outside of
Name/Title
Azerbaijan
Lala Nabieva
(055) 2254324
Vugar Ibrahimov
(055) 425 3273
Baghir Akhundov
(055) 425 5967
Mehriban Eyubova
(055) 2254550
Sabina Ismaylova
(055) 225 2853
Ulviyya Jabbarly
(055) 2234357
Susan Gordon
(055) 450 3274
Sue Adlam-Hill
(055) 4504759
Contractor Liaison Officer
Telephone Contact
Dial +994 55 when calling outside of
Name/Title
Azerbaijan
Vugar Ibrahimov
(055) 425 3273
Fahrin Hasanov
(055) 225 8852
Elnara Mammadova
(055) 255 05 62
Ulviyya Jabbarly
(055) 2234357
City lines Contacts
RRT ROOM(HR Divanhana Room)
Dial +994 12 when calling outside of
extensions
Azerbaijan
836910
4377310
836455
4377497
836457
4377498
837085
4377499
836704
4978204
837046
4376912
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 43
F 48
837047
4376913
837127
4978449
Embassies Located in Azerbaijan
Telephone Contact Number(s)
Embassy Name
Dial +994 12 when calling from outside of
Azerbaijan
Belarus
4360728
Bulgaria
4414381; 4414138
China
4986257; 4981951
Egypt
4987906
France
4931286; 4937180
Georgia
4974560
Germany
4654100
Greece
4920175; 4920119
India
5646354/44
Iran
4928006; 4924407
Israel
4907881;4907882
Italy
4975133; 4975135
Kazakhstan
4656248; 4656521
Netherland Consulate
4302424; 4482424
Norway
4974325/26
Pakistan
4360839/40
Poland
4920114; 4975281
Romania
4620429; 4407700
Russian Federation
4986016; 4986083
Saudi Arabia
4972305; 4972312
Sweden Consulate
4300574
Thailand Consulate
4972142
Turkey
4988133/35
Ukraine
4494090; 4494095
United Kingdom
4975188/89;
Libya
4938548; 4932365
United States of America
4980335; 4980336
Uzbekistan
4972549; 4972548
Japan
4907818; 4907819
Latvia
4366778
South Korea
4135516
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 44
F 48
Third party contractor’s list (attached)
Incident Management Centre
2 Nefchilar avenue Villa Petrolea 187
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 45
F 48
Alternative Incident Management Centre
1033 Izmir street Hyatt Tower II/ 4th level
Main Conference Room
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 46
F 48
Business Support Centre
2 Nefchilar avenue Villa Petrolea 322
ALT Board Room
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 47
F 48
Azerbaijan Evacuee Management Plan
INITIAL RECEPTION POINTS
¾ Zabrat Airport
¾ Baku Sea Port
¾ SPS Yard Quayside
¾ Sangachal Terminal (in the event of an incident at or near to the terminal)
¾ Hospitals and Mortuary will also be called Initial Reception Points
EVACUATION RECEPTION POINTS
¾ Crescent Beach Hotel
¾ Park-In Hotel
¾ Holiday-Inn Hotel
¾ TISA (fall back location)
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
PUII
TEE
ER
EN
Y
PO
E
SOUR
S Q
II
E
A
E 48
F 48
Revision/Review Log
Revision Date
Authority
Custodian
Revision Details
21 May 2007
McNulty Alan
Namig Gandilov
Initial Issue
Oct 2008
Hassanov Anar
Namig Gandilov
All section Updated
June 16,2009
Hassanov Anar
Namig Gandilov
All section Updated
December 01,
Hassanov Anar
Rustam
All sections updated
2010
Mamedov
Control Tier:
<<2>>
Revision Date: <<1 Dec 2010>>
Document Number: << AZSPU-HSSE-DOC-00104-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 1 of 123
Azerbaijan SPU
Incident Management System
Manual
Document Number: AzSPU-HSSE-DOC-00107-2
This document incorporates the following documents which were turned into
Obsolete:
AzSPU Incident Management System (IMS) Manual
AZSPU-HSSE-DOC-00087-2
AZERBAIJAN SPU Business Support Plan
AZSPU-HSSE-DOC-00151-2
AZERBAIJAN SPU Incident Management Plan
AZSPU-HSSE-DOC-00150-2
Azerbaijan Business Continuity Plan
AZSPU-HSSE-DOC-00024-2
AzSPU Pandemic Response Plan
AZSPU-HSSE-DOC-00099-2
Philosophy and Strategy for ER&CM
AZSPU-HSSE-DOC-00019-2
Incident Management Team Resourcing Strategy
AZSPU-HSSE-DOC-00133-2
BP Azerbaijan SPU Upstream Oil Spill Response Plan
AZSPU-HSSE-DOC-00105-2
Activation of OSR contractors Baku IMT SOP
AZSPU-HSSE-DOC-00261-2
Authority:
Mike Barnes
Custodian:
Anar Hassanov
HSE & Engineering
Vice President
CCM & ER Manager
Scope:
AzSPU
Document
Administrator:
HSE System Administrator
Issue Date:
3 August, 2009
Issuing Dept:
HSE/Crisis, Continuity Management
and Emergency Response Team
(CCM&ER)
Review Date:
Dec 3, 2009
Control Tier:
2
Revision Date:
September 24, 2010
Next Review
Dec 3, 2010
Date:
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 2 of 123
DISTRIBUTION LIST
Copy
Name
Position
Electronic Copy
Hard
No.
Copy
1
Rashid Javanshir
SPU Leader
x
2
Paul Clyne
Vice President Resource
x
3
Mark Thomas
Vice President Operations
x
Vice President Drilling and
4
Gary Christman
x
Completions
5
Mike Barnes
Vice President HSE & Engineering
x
6
Bruce Luberski
Vice President Developments
x
7
David Quellhorst
Chief Financial Officer (CFO)
x
8
Kemp Copeland
Vice President Midstream
x
Vice President Shah Deniz Full Field
9
Alastair Cook
x
Development
10
Sue Adlam-Hill
Vice President Human Resources
x
11
Seymur Khalilov
Vice President C&EA and Security
x
12
David Grant
Legal Counsel
x
13
Neil Dunn
General Manager Georgia
x
14
Djan Suphi
Vice President Turkey
x
15
Anar Hassanov
CCM&ER Manager
x
16
Narmina Sadikhova
Sr. CM&BCP Advisor
x
17
Namig Gandilov
CCM&ER Team Lead
x
18
Rustam Mamedov
CCM&ER Advisor
x
19
Sevinj Alifkhanova
CCM&ER Advisor
x
20
Afat Turabova
CCM&ER Technical Assistant
x
BP Group Crisis & Continuity
21
Norbert Venz
x
Management Senior Advisor
22
Pridon Niguriani
Georgia ER Coordinator
x
23
Melih Tumer
BTC Turkey HS&ER Manager
x
Property Services & Housing Manager
24
Chingiz Mekhtiyev
x
(BCP/Office Space Continuity Plan Owner)
IT&S Senior Operations Manager
25
Rovshan Akhmedov
x
(BCP IT&S SPA)
Email to the list of SPA‟s according
26
BCP SPAs
x
Appendix B3
Incident
Email According the Duty Roster List
27
x
Management Team
Business Support
Email to the BST List
28
x
Team
(e-mail through the
29
Tier II Contractors
HSE Specialist)
30
BST, Baku
Business Support Center
x
31
IMT, Baku
Incident Management Center
x
32
Alternate IMC
Hyatt Tower 2, 4th floor IMC room
x
GLOSSARY
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 3 of 123
It is important in BP's integrated programme that a common vocabulary be adopted. This section
defines some important terms associated with BP's integrated three-tier crisis management
programme.
Business Continuity Plan
A documented collection of procedures and information that is developed, compiled and
maintained in readiness for use in an incident to ensure continuity of business activities
Business Support Team
The personnel identified to staff the organisational structure identified in a Business Support Plan
to manage the actual or potential business impacts resulting from an incident.
Civil Crisis Plan (CCP)
The Civil Crisis Plan provides for the safety and well being of all AzSPU expatriate employees,
family dependants, direct contractors and BP sponsored visitors in the event of civil crisis. This
includes provision for providing safe refuge within all areas of AzSPU regional responsibility and for
the evacuation of expatriates to a safe overseas location.
Country Support Plan (CSP)
A document to define the role of Country Leadership (i.e. Head of Country, Segment Leadership
and Functional Leadership) during an actual or potential incident that could create a crisis for the
BP Group. It addresses incidents that are National in scale and from BP Business and/or from
external events not of BP‟s making (i.e. terrorism, Pandemic).
Country Support Team (CST)
A team convened by the Head of Country, comprising relevant Segment and Function
representatives. The Country Support Team addresses country-wide issues during a crisis.
Crisis
Any incident, series of events, or set of circumstances that threatens to fundamentally affect or
alter the way BP chooses to do business.
Crisis Management
Those measures taken to prevent, prepare for, respond to, and recover from a potential crisis.
These activities can include tactical response and incident management at the scene, and
management of business consequences that may arise from an emergency or other
circumstances.
Executive Support Team (EST)
That group of BP executives charged with developing and implementing crisis management efforts
and strategies to minimise the impact of a crisis on the Group.
Emergency
An unforeseen combination of circumstances that disrupts normal operating conditions and poses
an actual or potential threat to human life, health, property or the environment if not controlled,
contained, or eliminated immediately.
Incident
An event, series of events or set of circumstances that interrupts normal operating procedures and
has the potential to precipitate an emergency or crisis.
Incident Command System (ICS)
A formal type of command and control system designed to manage response to an incident using
the combination of facilities, equipment, personnel, procedures and communications. This
organisation operates within a common organisational structure, with clearly defined roles and
responsibilities, and with responsibility for the management of resources assigned to response
operations.
Incident Management Team (IMT)
The personnel identified to staff the organisational structure identified in an Incident Management
Plan to manage response plan implementation.
Non-represented Business
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 4 of 123
A Business Unit (BU) that conducts commercial activity in a country where no representation of the
BU exists whatsoever.
Non-resident Business
A Business Unit (BU) that conducts commercial activity in a country where the core BU is not
located. Non-resident businesses usually have some form of representation in-country.
Pandemic Response Plan
Each BP site must be included in the scope of a site Pandemic Response Plan (PRP). PRP scope
covers people, facilities, systems, and the value chain. PRP response details the organisation,
communication, and strategy to support the critical processes identified in the value chain.
Preparedness
Those activities involving identifying existing dangers and concerns, defining management and
response roles and requirements, and achieving and maintaining the capability to perform those
roles and requirements.
Prevention
For BP, the most important of the four phases of an emergency or crisis management program. It
is those activities designed to eliminate the possibility of human or technological systems failure.
Response
That phase of emergency or crisis management that involves performing planned actions to
contain an incident and protect life and property.
Examples include:
Protecting people, the environment, property and business interests
Mobilising personnel and equipment
Notifying government authorities
Fighting fires, putting booms in place and closing leaking valves
Anticipating the potential implications of an incident for other BP operations, its customers,
the community, and environment as well as for the Group as a whole
Protecting the corporate reputation in accordance with BP‟s Core Values
DISTRIBUTION LIST
GLOSSARY
TABLE OF CONTENTS
1 INTRODUCTION__________________________________________________________ 7
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 5 of 123
1.1 Crisis Management Framework_______________________________________________7
1.2 Purpose________________________________________________________________ 7
1.3 Scope__________________________________________________________________7
1.4 Policy and Expectations____________________________________________________ 8
1.4.1 Policy____________________________________________________________ 8
1.4.2 Expectations_______________________________________________________8
1.4.3 IMS Custodian_____________________________________________________ 9
1.5 Testing and exercising_____________________________________________________ 9
1.6 Plan Maintenance_________________________________________________________9
1.7 Linked Plans____________________________________________________________10
2 ORGANISATION AND STRUCTURE
2.1 Business Response Framework____________________________________________11
2.1.1 Site Response Team (SRT)__________________________________________ 14
2.1.2 Incident Management Team (IMT)_____________________________________ 14
2.1.3 Business Support Team (BST)________________________________________17
2.1.4 Executive Support Team (EST)________________________________________18
2.2 Country Support Structure_________________________________________________ 19
2.3 Business Continuity Structure_______________________________________________19
2.4 IMT-BST Liaison_________________________________________________________20
2.5 Post-Crisis Review_______________________________________________________ 20
3 ROLES & RESPONSIBILITIES
3.1 Business Support Team (BST)______________________________________________22
3.1.1 Business Support Team Manager______________________________________22
3.1.2 Deputy Business Support Team Manager________________________________22
3.1.3 Situation Unit/Administrative Assistant__________________________________ 23
3.1.4 Legal Advisor_____________________________________________________ 23
3.1.5 HR Advisor_______________________________________________________24
3.1.6 Communications & External Affairs (C&EA) Advisor________________________24
3.1.7 HSE Advisor______________________________________________________25
3.1.8 Finance Advisor___________________________________________________ 25
3.1.9 Emergency Response Coordinator_____________________________________25
3.2 Incident Management Team (IMT)___________________________________________ 26
3.2.1 On-duty IMT roles__________________________________________________26
3.2.1.1 Incident Commander_______________________________________________ 26
3.2.1.2 Operations Section Chief____________________________________________ 27
3.2.1.3 Planning Section Chief______________________________________________28
3.2.1.4 Environmental Section Chief__________________________________________29
3.2.1.5 Logistics Section Chief______________________________________________30
3.2.1.6 Medical Section Chief_______________________________________________31
3.2.1.7 HR Section Chief__________________________________________________ 31
3.2.1.8 Liaison Section Chief_______________________________________________ 32
3.2.1.9 Public Information Section Chief_______________________________________32
3.2.1.10 Emergency Response Coordinator____________________________________ 33
3.2.1.11 Geographic Information System (GIS) Officer____________________________ 33
3.2.2
Non-duty IMT roles____________________________________________________34
3.2.2.1 Situation Unit/Administrative Assistant__________________________________34
3.2.2.2 Safety Section Chief________________________________________________34
3.2.2.3 Finance Section Chief______________________________________________35
3.3 Site Response Team (SRT)________________________________________________ 36
3.4 Switchboard Operator (Baku Office)__________________________________________ 36
3.5 Country Support Team - Refer to Appendix A1
3.6 Business Continuity Team - Refer to Appendix A2
4 NOTIFICATION/COMMUNICATION STRUCTURE
4.1 Incident of BP Origin_____________________________________________________37
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 6 of 123
4.2 Incident of Non-BP Origin_________________________________________________38
5 ACTIVATION PROCEDURE
5.1 Switchboard Operator_____________________________________________________40
5.2 Notification and Callout Procedures in AzSPU__________________________________ 40
5.3 Notification and Callout Procedures in Georgia__________________________________41
5.4 Notification and Callout Procedures in Turkey (Pipeline Operations Incidents)__________ 41
5.5 Mutual Response Team___________________________________________________42
5.6 Medical Emergency Response Plans_________________________________________42
5.7 Security Contingency Planning_____________________________________________ 42
APPENDIXES:
Appendix A:
Associated Plans
Appendix A1
Azerbaijan Country Support Plan_____________________________44
Appendix A2
Business Continuity Plan___________________________________48
Appendix A3
Pandemic Response Plan__________________________________ 54
Appendix A4
Oil Spill Response Framework_______________________________70
Appendix B
Contacts
Appendix B1
BST/IMT Contacts________________________________________93
Appendix B2
BP Country Support Team Contacts __________________________93
Appendix B3
BCP Contacts___________________________________________ 94
Appendix B4
BP Executive Support Team Contacts_________________________95
Appendix B5
International SOS Medical Emergencies_______________________ 95
Appendix B6
JV Contacts_____________________________________________95
Appendix B7
Contractors‟ Contacts_____________________________________ 95
Appendix B8
Non-BP Contacts ________________________________________ 94
Appendix B9
External Contacts________________________________________ 95
Appendix C:
Incident Notification Matrix_______________________________ 96
Appendix D:
Training and Exercises Guidelines_________________________ 97
Appendix E:
Forms and Procedures___________________________________98
Appendix E1
BST Response Forms_____________________________________98
Appendix E2
IMT Response Forms_____________________________________106
Appendix E3
IMT Dispensation Proforma________________________________ 113
Appendix E4
Standard Operating Procedures (SOPs)______________________ 115
Appendix E5
BCP Tools ____________________________________________ 119
Appendix F:
IMT Resourcing Strategy_________________________________120
Appendix G:
Guidelines for Time out meetings_________________________ 122
1
INTRODUCTION
1.1
Crisis Management Framework
Crisis Management Framework sets out a management system for Crisis, Continuity Management
and Emergency Response (CCM&ER) in BP and the recommended good practice for each stage
in the process. This plan is aligned to the CCM&ER Framework and adapted to AzSPU Crisis,
Continuity Management and Emergency Response structure and experience
1.2
Purpose
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 7 of 123
This document describes the BP Azerbaijan Strategic Performance Unit‟s
(AzSPU) Incident
Management System, includes BP‟s Corporate Guidance and Expectations and applies across BP
AzSPU assets in Azerbaijan, Georgia and Turkey. The document is intended to be a “high level”
document which gives an overview of the AzSPU‟s Crisis, Continuity Management and Emergency
Response organisation and process. It is expected that there will be hierarchy of procedural
documents
“below” this one produced for relevant areas of the response and for each
facility/operation as appropriate in order to adequately implement the AzSPU Philosophy and
Strategy for Crisis and Continuity Management.
The philosophy of AzSPU aligns to Group requirements for CCM&ER:
(i)
over-react
(ii)
assess situation
(iii)
respond accordingly
(iv)
stand-down
The system applies:
- wholly and directly to the AzSPU managed operations
- to AzSPU projects
- to operating contractors.
- for support in managing the incidents from other BP businesses
1.3
Scope
The AzSPU area of responsibility covers the three countries of operation: Azerbaijan and Georgia
directly, and Turkey through the government and BOTAS International Ltd (BIL).
The geographic area is illustrated in the map below.
1.4
Policy and Expectations
1.4.1 Policy
At BP, we strive to create a working environment within Azerbaijan, Georgia and Turkey, where
accidents will not occur and in which employees, customers, contractors and the public will not be
exposed to unacceptable health hazards. Prevention through the implementation of our HSE Policy
and Expectations is the key to this commitment.
However, should an emergency occur, BP will be prepared to respond quickly and effectively. Our
goal is to mitigate the incident as rapidly as possible while minimizing the impact on people, the
environment, property and our reputation.
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 8 of 123
To assure a consistent and effective response, BP AzSPU will be prepared on three levels:
1. Each of our facilities, operations, and projects will have and maintain appropriate site-
specific emergency response plans. These plans will address response procedures and
needed resources for all reasonably anticipated emergencies. Personnel with assigned
duties in the plan will be trained and maintain abilities to carry out their responsibilities.
We will effectively over respond to emergencies in an effort to minimize consequences.
2. We will rely on the BP Incident Management Team (IMT) for support to co-ordinate
company-wide resources and supplement the facility-based teams.
3. We will rely on the BP Business Support Team (BST) and BP Executive Support Team for
policy direction and executive assistance when activated.
Emergency response exercises and training will be an essential element in determining BP level of
preparedness and process for continuous improvement (Refer to Appendix D - Training and
Exercises Guidelines). The Health, Safety and Environment Department is responsible for
reviewing and revising this policy and the response plans, as necessary.
1.4.2 Expectations
Emergency planning and preparedness are essential to ensure that, in the event of an accident, all
necessary actions are taken for the protection of the BP personnel, the public, environment and
assets.
To that extent, the following are expectations of this Incident Management System Manual:
Incident Management System Manual is written, accessible, practical, and clearly
communicated for all BP operations within the Strategic Performance Unit
The incident management systems include:
- organizational structure, responsibilities and authorities
- internal and external communications procedures
- procedures for accessing personnel and equipment resources
- procedures for interfacing with other BP and community emergency response
organizations
- a process for periodic review and updates
Equipment, facilities and trained personnel needed for responding to emergencies are
defined and readily available.
A system is in place to recognize and communicate with Azerbaijani, Georgian and
Turkish organizations, which have incident management roles to meet company and
governments expectations.
A system for providing simulations, drills and exercises is in place, which includes
consideration and involvement of external resources and necessary communication.
1.4.3 IMS Custodian
The Manager, Crisis, Continuity Management and Emergency Response is responsible for:
Implementing the company Incident Management System established here, including
the co-ordination and evaluation of company response preparedness at all levels of
emergency.
Maintaining and updating this incident management system.
Disseminating information on emergency preparedness issues, technologies, and
techniques to affected operations within the Strategic Performance Unit (SPU).
Co-ordination with contractors to ensure compliance and consistency with BP
response plans.
1.5
Testing and exercising
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 9 of 123
The full IMS will be revised at least once per year or as needed.
Training exercises of each unit within the IMS should be undertaken at more frequent
intervals during the year as appropriate in preparation for the main annual exercise.
Notification exercises will be undertaken at least once per year. These involve
unannounced checks on the communication systems and contacting of key staff.
When appropriate, Incident Management Team training exercises should be carried
out with links to site operations. In addition, training with links into the Business
Support Team should also be held.
The partial activation exercises are in addition to the main exercise, which is based
solely on ensuring that the objectives and roles of the Incident Management Team are
fully exercised and that focused staff training is achieved.
The Table-top exercises will be conducted on weekly basis during IMT Hand-over
meetings.
1.6
Plan Maintenance
The plans attached to Incident Management System should be regularly validated through
exercises to measure their effectiveness and to provide training for the response organisation.
Plan Maintenance
Weekly
Monthly
6 months
Annually
As Relevant
Duty Rota
X
X
Contact Amendments
X
X
Resource Review*
X
X
Plan Review
X
X
Plan change due to
X
operations/ structure
*Resource includes internal and external manpower, facilities
1.7
Linked Plans
All mentioned plans will have clear linkages with each other to ensure that - in each case - roles
and responsibilities are delineated inside the three levels and in the support functions:
Describes the specific procedures
Civil Crisis Plan
to be followed in the event of civil
unrest or expatriate evacuation.
This document provides guidance
on the process to be followed
Evacuation
should we have to evacuate a part
Management Plan
of our business due to operational
or emergency situations
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 10 of 123
Emergency
Describes what process shall be
followed if alarm sounds and how
Evacuation Plan
people should leave the building to
for Baku Offices
proceed to relevant Muster Point.
Describes the following:
- Notification of Spill
Oil Spill Response
- Activation of Response Team
Plans
- Management of Spill and related
issues
Azerbaijan
Group
Describes the process of
Incident
Medical Response
emergency medical
Executive
Management
Plans
evacuation.
Support
System
Plan
Manual
Provide the details of the
Stakeholders/
stakeholders/ contractors
Contractors
emergency response arrangements
Emergency Plans
and the interface with BP
emergency procedures
Mutual
Industry/National assistance
Aide
schemes
Schemes
It describes the actions
Facilities/assets
that an Asset will take
ERPs
in response to various
emergency events
2 ORGANISATION AND STRUCTURE
2.1
Business Response Framework
Crisis, Continuity Management and Emergency preparedness are essential to ensure that, in the
event of an accident or incident involving health, safety, environment or security, all necessary
actions are taken for the protection of the company personnel, public, environment, and assets.
This Incident Management System (IMS) provides the basis for effective management support and
response to emergencies occurring in the SPU activities, and also ensures that the ongoing
business activities are maintained. BP has adopted the ICS (Incident Command System) style of
incident management.
The nature of the incident and its potential for escalation determine the level of response at each
tier. The rule is “over-react if there is doubt about the incident potential”
At each level of response the priorities are always:-
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 11 of 123
1st People:
Employees, contractors, suppliers, customers, and communities
2nd Environment:
Air, water, land, and areas of sensitivity
3rd Property:
BP, JV Contractors, communities and third party facilities and offices
4th Business:
Supply, production, and reputation
SPU Leader is accountable for ensuring that the system is in place for the adequate response for
the first two tiers of response to the emergencies within the organization.
SITE RESPONSE TEAM (SRT) - TACTICAL RESPONSE
o Size up the incident and its potential
o Establish rapid and effective communications with the IMT Operations Section Chief
o Develop tactical objectives
Ensure
TIER I
o Break the tactical objectives into manageable tasks
Field
o Ensure that tactical response operations include a method for systematically identifying
hazards, evaluating risks and specifying appropriate safeguards
Operations
o Secure and assign necessary tactical response resources
o Continuously assess the incident to determine the adequacy of site response operations
and the need for assistance from the IMT
INCIDENT MANAGEMENT TEAM (IMT) - TASK ORIENTATED
o Size up the incident, its potential, and the nature and status of operations
o Develop response objectives and response priorities
o Gather information on the nature and location of tactical response operations and the
resources being used to carry out the operations
o Continuously assess incident potential to determine an incidents capacity to develop into
Response
TIER II
a crisis situation
Management
o Work with the SRT(s) to determine incident potential describing field assignments for the
next operational period
o Develop a Strategy that scopes incident management from initial notification to the
completion of demobilisation
Contro
mber 24, 2010
o Secure the resources necessary to implement the Strategy
Docum
11
o Institute and enforce appropriate financial controls
PAPER
NTROLLED
VERSI
ms
AzSPU Incident Management System Manual
Page 12 of 123
BUSINESS SUPPORT TEAM (BST) - ISSUES ORIENTATED
o When activated, determine what, if anything, must be done to support the SRT and/or IMT
response efforts
Support IMT
o Size up the incident, its potential, and the nature and status of the incident management
and Business
operations
Continuity
o Identify, evaluate, and pro-actively address the crisis implications of the incident, its
potential, and any affect of incident management operations on the Group
o Avoid crisis situations whenever possible, and mitigate crisis situations that cannot be
avoided to the maximum extent possible
TIER III
EXECUTIVE SUPPORT TEAM (EST)
Group
o Form a Group response strategy and proactively manage such issues as BP‟s image,
Licence to Operate, and liabilities or loss potential that can threaten the Group as a whole
Strategic
o Identify how Group resources and personnel will be made available to support the BST and
Management
IMT organisations
o Review the Business response to the incident and be assured that Group concerns (e.g.
external media, governmental and shareholder issues) are considered and appropriately
managed
Azerbaijan Crisis, Continuity Management and Emergency Response Organization
Structure
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 13 of 123
Group EST
BST
Damage Assessment
and
Recovery Team
Chart Colors:
IMT
Incident Commander
Green
EST/BST
Blue
IMT 24 hrs duty staff
Grey
IMT non -duty staff
Red
Site responders
Emergency
SAFET
Orange
BST/IMT support
Response
SECTION
Coordinator
CHIE
F
FINANCE
SECTION
CHIE
SUBJECT
OP
PLANNING
MEDICAL
HR
EN
LOGISTICS
LIAISON
PUBLIC
MATTER
SECTION
SECTION
SECTION
SECTION
GIS
SECTION
SECTION
SECTION
OFFICE
SECTION
EXPERT
CHIE
CHIE
CHIE
CHIE
CHIE
CHIEF
CHIE
CHIE
Med. Serv.1
HR ESG
Marine
OSR tier II
Media
On-Scene
SIT.
Aviation
State
provider
Response
Admin
Transport
Agencies
Group
e
Commande
Support
Med. Serv.2
RRT
etc
OSR
IRPs
Burn
(Tier III)
PIER
Centers
webpage
SRT
ERPs
Wildlife
Response
2.1.1 Site Response Team (SRT)
Composed of specially trained and equipped personnel who can respond safely and rapidly to an
incident scene and mount and sustain tactical response operations.
Every manager of BP operation facility or project is responsible for:
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 14 of 123
1. Developing, reviewing and revising facility/operation specific response plans, utilizing a
comprehensive planning process, which address the response procedures and
resources needed to effectively mitigate all reasonable anticipated emergencies.
2. Developing and maintaining emergency response capability that properly reflects the
facility/operations‟ risks for all reasonably anticipated emergencies. This capability
includes equipment and personnel with skills consistent with BP standards.
3. Conducting and participating in emergency response training and exercises to assure
the readiness of plans, personnel and resources.
4. Responding to and managing emergencies affecting their facilities/operation utilizing
the facility/operation specific Emergency Response Plan and the SPU Incident
Management System.
5. Reporting all events, major emergencies and crisis, as required by this program.
2.1.2 Incident Management Team (IMT)
All BP facilities are to use the Incident Command System (ICS) for initial response. The IMT
organization structure is also based on ICS and is intended to be an expansion of the initial
response based on the size and magnitude of the event. The specific components of the
organization established for any given event would be tailored to the management needs of the
event. In all cases, the organization‟s staff builds from the top down with responsibility and
performance placed initially with the Incident Commander. As the need arises, separate sections
can be developed, each with several units that can be established if necessary.
The IMT in Baku is composed of personnel, specially trained in accordance with the AzSPU
CCM&ER Training Standard, who provide support to the SRT and interface with company
management, government agencies, media, and the public.
There is a fixed Incident Management Rota for the period of 15 months. The duty handover is
taking place on a weekly basis. Incident Commanders lead the handover process, which also
includes the tabletop exercises to ensure the competences of the duty team.
Incoming and ongoing duty team shall participate in the hand-over meetings. If any member of duty
team cannot make the meeting for any reason he/she must seek permission from the incoming
Incident Commander. Each member of IMT whilst on IMT duty shall:
Comply with the BP Substance Abuse Policy
Not leave the duty phone somewhere unattended or give it to any unauthorised person
Keep the phone charged all the time
Be able to be mobilized within 1 hour
Upon receipt test or emergency text message from switchboard call back to switchboard
to confirm the receipt of the text message within 5 minutes
The primary role of the Incident Management Team is to support the Site Response Team with:
mobilizing required internal and external resources, develop response strategy, notification of
government organizations and media and other issues related to the emergency. Members of the
Incident Management Team are responsible for:
1. Attendance at mandatory training in line with current AzSPU ER and CM Training
Standards - IMT Competency Matrix.
2. Attendance at Weekly handover meetings
(incoming and outgoing teams) including
participation in weekly tabletop exercises
3. Taking personal accountability for rota schedule i.e. once rota has been agreed and
issued, finding replacement for personal changes
4. Participation at Tier
2 and Tier
3 exercises that occur in their IMT duty week to
demonstrate ongoing competency and experience
5. Managing incidents and functioning in a predetermined position on the IMT.
The IMT in Tbilisi has the same responsibilities and response expectations as the Baku IMT and
will be activated to provide support for incidents occurring within Georgia. The Tbilisi IMT may be
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 15 of 123
mobilized in conjunction with the IMT in Baku who will provide support to the Georgian team as
required.
In Turkey BIL manages incidents that occur at the BTC Pipeline facilities, or in the field in relation
to Pipeline and Terminal Operation, and may involve BIL and BTC Co field personnel and /or any
of their contractors, including sub-contractors. The responsibility for managing the emergency
response shall remain with BIL, while BTC Co. may activate IMT in Turkey, in order to assist BIL in
managing and supporting emergency situations as required. Where incidents involve BTC Co
personnel and contractors, the responsibility for those personnel shall remain with the Turkey IMT
irrespective of whether the incident is managed by BIL or BTC. Co.
The Incident Commander is responsible for the overall management of the incident, carries the
overall accountability for the emergency, and will need to satisfy himself that the management and
response can be handled adequately. He/she reports to the AzSPU Business Support Manager.
Note: In case of an incident in a project operated by contractors the project’s representative will be
called out to stand in as an expert within the IMT Operations Section.
If outside resources are called, e.g. response management firms, environmental consultants,
specialists, etc., they will be assigned to a specific position within the IMT organization and will
follow the chain of command accordingly.
During a major event, the role of the Section Chiefs is to co-ordinate the activities within their
sections, while ensuring that there is support and information exchange across sections and units.
The Incident Commander is normally a Senior Manager who has full authority to lead the IMT while
on duty. It is essential that the Emergency Response Co-ordinator is always activated to facilitate
the Team processes on behalf of the Incident Commander.
The structure is based on the Incident Command System. The system expands and contracts
whilst ensuring that the critical incident management functions are addressed and that an
appropriate level of response can be provided to deal with the ever changing requirements of an
incident.
The response Teams build from the top down with responsibility and performance
placed initially with the Incident Commander and Business Support Team Manager.
The Incident Commander has full autonomy of operation and provides regular
briefings to the Business Support Manager who is responsible for assessing and
managing any repercussions arising that may impact the Business.
Regardless of size, scope or complexity the same format is used for all incidents
throughout the Group.
The team develops under the standard format and, as needed, separate „Sections‟ are
expanded with specialist functional „Units‟ established.
Not all of the skills will be needed at any one time and for the majority of incidents key
representatives will be able to manage and assess all the functional issues and
activities involved.
The Incident Command System chart should itself be used as a checklist to ensure
that all activities are covered.
Each unit should be allocated to a team member. By doing this any potentially
overlooked aspects of a response are covered. It prevents duplication of effort,
reduces confusion and ensures that a flexible, focused response is achieved with a
team that will vary in strength and size throughout the response.
The specific team members involved in any given incident will be based upon the
management needs of the incident. If one individual can simultaneously manage all
major functional areas, no further organisation is required. If one or more of the areas
requires independent management, an individual is named to be responsible for that
area.
Within each Section the specialist Units are empowered to carry out their particular
roles to achieve the objectives of Incident Commander or Business Support Manager.
The structure is expanded as the incident demands.
When working as part of the team it is critical that each functional „Section Chief'
understands the roles of the other Sections operating within the team. Without this
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 16 of 123
understanding and focusing of activities within each Section, duplication, confusion
and chaos can quickly result in a fast moving crisis situation.
Fully Expanded IMT Structure to deal with the incidents
The following roles and responsibilities for IMT members are designed to cover most issues and
incidents that have the potential to impact the Business, however, users should be aware that
some emergencies of significant potential may require additional roles within the IMT which are not
specifically identified in this Plan.
Colors:
INCIDENT
COMMANDER
Green IMT 24 hrs Duty staff
Grey IMT non- Duty staff
Red
Site responders
EMERGENCY
PUBLIC INFO
RESPONSE
SECTION CHIEF
COORDINATOR
HR
LIAISON
SECTION CHIEF
SECTION CHIEF
OPS
PLANNING
ENV
MEDICAL
LOGISTICS
FINANCE
SAFETY
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
CHIEF
ON-SCENE
GIS
SIT. UNIT.
COMMANDER
OFFICER
/ ADMIN
& SITE
SUPPORT
RESPONSE
TEAM
2.1.3 Business Support Team (BST)
The BST is composed of senior management personnel who provide support to the IMT and
analyze the implications of an incident and response operations on the company‟s viability,
operability, and credibility. There is only one BST in AzSPU which covers three countries
-
Azerbaijan, Georgia and Turkey.
The BST will be led by the Business Support Team Manager (AzSPU Leader or his/her delegate).
The BST‟s responsibilities are to:
1. Provide support to the Incident Management Team
2. Address issues that are related to the incident, but fall outside the IMTs‟ responsibility
3. Ensure effective communications with the Incident Management Teams, BP corporate
head office, and the BP Executive Support Team (if formed).
4. Manage business impacts, including invocation of business continuity plans.
5. Implement any strategic decisions taken by the Executive Support Team.
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 17 of 123
The Vice President whose operational area or business activities are impacted by an incident will
be the member of the BST and may assume the Deputy BST Manager role upon the BST
Manager‟s decision.
Senior Management of unaffected businesses will serve as advisors; their involvement in this
capacity is vital to ensuring that BST strategy properly reflects the interests of the entire company.
In addition, they may be called upon to supplement the affected business‟ capabilities with
personnel and equipment from within their own organization. These resources may be needed
either to support the Business Support Team or to assist in maintaining the affected units ongoing
business.
It is important to note that the BST does not give response direction to the IMT. However, it is the
responsibility of the BST Leader to ensure that the Incident Commander has the necessary
competencies for leading the IMT, and if appropriate to designate a better qualified Incident
Manager to lead the IMT.
It is essential that an Emergency Co-ordinator is always activated to facilitate the Team processes
on behalf of the BST Manager.
A distinction is drawn between “Core BST“ and “Support BST” members. “Core BST“ members are
those that are usually mobilised when the BST is activated. Based upon the severity of the
incident or its potential, the Deputy BST Manager may, at any time, also activate “Support BST”
members. “Support BST” members will be drawn from those BP AzSPU personnel available who
have the necessary skills and experience relevant to the needs defined by incident requirements.
Structure of the Business Support Team
Business
Support Team
Manager
Emergency
Sit. Unit. / Admin
Response
Support
Coordinator
Deputy Business
Support Team
Manager
Finance
HSE
HR
Legal
Communications
Advisor
Advisor
Advisor
Advisor
and External Affairs
Advisor
2.1
Su
T)
The EST has direct responsibility for managing any issues arising from the incident that could have
Group-wide implications. These high level concerns include the protection of the Group‟s
reputation, operability, viability and earning power. The team generally comprises the senior
executive from each segment and function. The EST does not give tactical commands to the IMT
or the BST. However, strategic actions that are decided by the EST are implemented at the BST
and/or CST Level.
Attributes of the EST are:
Members are selected as appropriate to the situation and the team may be quite small in
number
It can work as a virtual team or it can meet and work from the Lead Senior Executive (SE)
office location or use the SJS Group Crisis Centre.
There is only one EST. It is based at the Group‟s headquarters in London, though team
members may be located at other locations around the world and dial in remotely.
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 18 of 123
It is activated when the Lead SE, after reviewing the situation with other senior leaders,
decides the situation requires the support of the EST.
It convenes, reviews the situation and determines a strategic action plan for others to
implement, then stands-down. This cycle continues until the crisis is resolved.
It does not give tactical commands to the IMT or the BST.
Strategic actions that are decided by the EST are implemented at the BST and/or CST
Level.
It supports the BST and CST, and considers Group-wide implications, considering “worst
case scenarios” and thinking “outside-the-box”.
The Lead SE will consider activating an EST at times when an incident has the potential to
impact one or several countries and which requires a greater degree of co-ordination. The
Lead SE may lead the team themselves, or, delegate responsibility to an appropriate
Segment or Function senior leader. The Lead SE may select a Head of Country (HoC)
from one of the impacted countries to take the lead using the resources of their own CST.
The graphic below provides an example structure of an Executive Support Team
Segment
C&CM
Executive
Director
Segment
Press
Human
Representative
Office
Resources
S&O
Support in SJS
Executive
Admin
Assistants
Support
C&CM
SJS
Advisor
Security
2.2
Country Support Structure
The Country Support Plan will be activated when an incident is considered to be of sufficient
magnitude where multiple businesses in country/out of country and BP‟s operations as a whole
may be impacted, the Head of Country will convene the Country Support Team.
Azerbaijan Country Support Team structure will be the same as the AzSPU Business Support
Team with some additional roles brought into the team and certain expansions in roles and
responsibilities. Georgia and Turkey has their own Country Support Team (please refer to the
Georgia and Turkey Country Support Plans). The additions in roles and responsibilities for
Azerbaijan Country Support Plan and also some specific information can be found in Appendix A1.
2.3
Business Continuity Structure
Business continuity plan (BCP) is fundamental to the wellbeing of AzSPU. It provides for continuity
of business operations in the face of unforeseen disruption. The purpose is to ensure that business
activities can continue, or resume as soon as possible following an occurrence of catastrophic
event or a declared disaster. The detailed information on the Business Continuity Plan can be
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 19 of 123
found in Appendix A2. Georgia and Turkey has their own Business Continuity Plans (please refer
to the Georgia and Turkey business continuity plans).
Pandemic Event
In the event of a pandemic a specific Azerbaijan Pandemic Response Plan has been developed
which clarifies the notification and activation processes and procedures as well as providing
additional responsibilities for each team. The pandemic response information can be found in
Appendix A3. Georgia and Turkey has their own Pandemic Response Plans (please refer to the
Georgia and Turkey pandemic response plans).
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUNF AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
AzSPU Incident Management System Manual
Page 20 of 123
2.4
IMT-BST Liaison
The BST Business Support Center serves as a central communications point for the IMT. The BST
keeps requests for information from the IMT Incident Management Center to a minimum; most
communication is initiated from the IMT to the BST, and falls into three categories:
regular updates
requests for assistance
consultation
Regular updates on a speakerphone or person at the Business Support Center provide a structural
means of exchanging information between the BST and IMT. These discussions must be held
timely e.g., every 2-4 hours, comprehensive, and concise. Intervals are determined at the initial BST
meeting, and may coincide with its own task meeting schedule or the IMT Incident Commander is
expected to initiate this call or designate a qualified alternate. The BST keeps a running list of
questions to cover each update call. Updates from the IMT are confined to matters of immediate
relevance to the site. The Business Support Team Manager who may, at his discretion, request
privacy chairs update calls.
The main mean of the communication between the IMT & BST is done through the Planning
Section Chief using Incident Status Report (these forms can be found in Appendix E).
Informal consultation between IMT and BST, counterparts are generally “off-line” and should not be
inhibited. Consultation on questions that may have policy implications should involve the Business
Support Team Manager. Documentation of these communications focuses on events, decisions,
and actions as opposed to deliberations.
2.5
Post-Crisis Review
Review of crisis management effectiveness will take place following an incident:
Post-crisis review includes, but not limited by, the following general topics, as well as others specific
to the event:
1. What happened?
2. How did we respond?
3. Where did we succeed?
4. Where can we improve?
5. How does the actual impact compare with our predictions?
6. Did we adequately address external impacts?
7. Were our actions consistent with industry standards and Company policies?
8. Did the various crisis management organizations perform as expected? Were they
properly integrated?
9. Were there any specific errors in strategy or tactics?
10. What would we do differently if the same incident occurred today?
11. Acknowledge involvement of external and internal resources
12. Develop an Action Plan for improvement, if necessary.
The goal of these reviews is not to find fault with individual performance, but to assess the overall
system and to identify actions that can be taken to improve future performance.
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE
CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUNF AT
AzSPU Incident Management System Manual
Page 21 of 123
3
ROLES & RESPONSIBILITIES
3.1
Business Support Team (BST)
3.1.1
Business Support Team Manager
3.1.2
Deputy Business Support Team Manager
3.1.3
Situation Unit/Administrative Assistant
3.1.4
Legal Advisor
3.1.5
HR Advisor
3.1.6
Communications & External Affairs (C&EA) Advisor
3.1.7
HSE Advisor
3.1.8
Finance Advisor
3.1.9
Emergency Response Coordinator
3.2
Incident Management Team (IMT)
3.2.1
On-duty IMT roles
3.2.1.1
Incident Commander
3.2.1.2
Operations Section Chief
3.2.1.3
Planning Section Chief
3.2.1.4
Environmental Section Chief
3.2.1.5
Logistics Section Chief
3.2.1.6
Medical Section Chief
3.2.1.7
HR Section Chief
3.2.1.8
Liaison Section Chief
3.2.1.9
Public Information Section Chief
3.2.1.10
Emergency Response Coordinator
3.2.1.11
Geographic Information System (GIS) Officer
3.2.2
Non-duty IMT roles
3.2.2.1
Situation Unit/Administrative Assistant
3.2.2.2
Safety Section Chief
3.2.2.3
Finance Section Chief
3.3
Site Response Team (SRT)
3.4
Switchboard Operator (Baku Office)
3.5
Country Support Team - Refer to Appendix A1
3.6
Business Continuity Team - Refer to Appendix A2
Control Tier:
2-AzSPU
Revision Date: September 24, 2010
Document Number: AZSPU-HSSE-DOC-00107-2
Print Date: 01.02.2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE
CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUNF AT
|
||
|
|
|