First Edition -January 2018
Painting system shall consist of all coating system materials, including primers, intermediate or top
coats, and other materials applied as surface treatment of concrete.
24.7.1
General Requirements for Concrete Painting
All materials shall be from a specialized manufacturer whose products have proven to be highly
satisfactory in similar works. The concrete protection system shall have a valid British Board of
Agreement (BBA) Certificate (or equally recognized certification).
The paint system shall be recommended by the manufacturer for the specific use intended and it
shall be applied in full accordance with the manufacturer's instructions.
The paint manufacturer shall provide evidence, in the form of relevant, independent test certification
prior to approval, that proposed coatings are sufficiently durable against temperature, humidity,
ultraviolet (UV) light, and salt exposure. The manufacturer shall retest the coats to verify durability if
found necessary and requested by the Engineer.
The concrete protection system shall have a minimum 10 year warranty for both the coating and its
application provided to the satisfaction of the Engineer.
The Contractor, when submitting for approval of the Paint proposed to be used, shall enclose also a
list of works, executed in the Gulf Region, in which the same make of paint was successfully used.
Consequently the following Specifications are meant to give the necessary information which shall
enable the Contractor to identify the works to be carried out and the material and equipment to be
proposed for the Engineer's approval.
The paint shall be applied by an applicator approved by the manufacturer. The Contractor shall
submit to the Engineer for approval the name of the proposed paint applicator and evidence that the
applicator has successfully completed similar structural painting and coating projects over the
preceding five years. The applicator shall verify this experience by citing at least two projects
comparable to the Project that have been successfully accomplished. The approved applicator shall
prepare a method statement for substrate preparation, including covering materials and methods,
coating application, quality assurance (QA), and quality control (QC). The material manufacturer
shall endorse this method statement.
The manufacturer or supplier shall provide technical representative as an expert supervisor of all
painting work undertaken.
Prior to applying the system in the works, trial applications shall be carried out on trial panels made
by the Contractor. The trials shall demonstrate the method proposed for applying the system,
coverage, coating thickness, colour and final appearance of the coating. Representatives of the
coating manufacturers shall be present at the trials and the surface preparation and application of
the coatings shall be carried out in accordance with their recommendations. The Contractor shall, at
his own expense, surface coat as many panels as required to satisfy the Engineer that the panel,
when accepted, will form the standard against which the corresponding coating in the works will be
judged. No application of the coating in the works shall be undertaken until trials have been
completed to the Engineer's satisfaction.
The Contractor shall not proceed with the surface finish or making good concrete surfaces until he
has received the Engineer's permission to do so and he shall not apply cement slurry or mortar or
any other coating to the concrete surfaces from which the shuttering has been struck until the
concrete has been inspected and approved by the Engineer.
The Contractor shall, on the written instruction of the Engineer, remove and reconstruct any such
portion of the work which, in the opinion of the Engineer, is unsatisfactory as regards quality of
concrete, incorrect dimension of the cast portion, badly placed or insufficient reinforcement,
honeycombing or other such cause as shall render the construction not up to the standard required
and which, in the opinion of the Engineer, may prejudicially affect the strength or durability of the
construction.