Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 12

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     10      11      12      13     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 12

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-2 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

At least 28 days before beginning surface preparation, the Contractor shall submit a written plan for 
acceptance  that  details  the measures to  be  used for  protecting  the  environment,  public,  adjacent 
property, and workers. The Contactor shall include in the plan the following: 

a.  Manufacturer's  material  safety  data  sheets  and  product  data  sheets  for  all  cleaning  and 

painting products. 

b.  A detailed containment plan for removed material, cleaning products, and paint debris. The 

Contractor shall include details of attachment that do not require welding or drilling holes in 
the existing structure. Connections with clamps or other approved devices shall be made. 

c.  A detailed disposal plan for removed material, cleaning products, and paint debris. 
d.  The Contractor shall include specific safety measures to protect workers from site hazards 

including falls, fumes, fires, or explosions. 

e.  If paint being removed is a hazardous material, the Contractor shall include specific safety 

measures to comply with 29 CFR 1926.62, 40 CFR 50.6, 40 CFR 50.12, and other 40 CFR 
Parts 260-268. 

f.  Emergency spill procedures. 
g.  To  perform  quality  control  functions,  the  Contractor  shall  provide  a  competent  person  as 

defined in SSPC-QP 2 with the following: 

1.  An  SSPC  Competent  Person  Certificate  or  equivalent  subject  to  the  E

ngineer’s 

approval; 

2.  A  certificate  of  completion  of  29  CFR  1926.62  Lead  in  Construction  training  or 

equivalent subject to the Engineer’s approval; 

3.  Minimum of 2 years industrial field painting experience; 
4.  Minimum of 90 days of field supervisory or management experience in paint removal 

projects; and 

5. 

Documentation  of  the  individual’s  qualifications  including  records  of  training  and 
experience. 

The Contractor shall perform work according to the accepted plan. If the measures fail to perform as 
intended, the Contractor shall immediately stop work and take corrective action. The Contractor shall 
collect and properly dispose of all material including waste water that is used in preparing, cleaning, 
or painting. 

24.1.3 

Protection of Work 

Adjacent surfaces that are not to be painted shall be protected by using tarps, screens, paper, cloth, 
or other suitable means. The Contractor shall prevent contamination of freshly-painted surfaces by 
dust, oil, grease, or other harmful or deleterious material. Additionally, the Contractor shall protect 
all parts of work under construction against disfigurement by splatters, splashes, and smirches of 
paint materials. 

Surfaces  that  are  marred  or  damaged  as  a  result  painting  operations  shall  be  repaired  by  the 
Contractor, at its expense, with materials and to a condition equal to that of the coating specified 
herein. 

If  traffic  causes  an  objectionable  amount  of  dust  to  collect  where  the  Contractor  is  conducting 
painting operations, the Engineer may require the Contractor to sprinkle the adjacent roadbed and 
shoulders with water or a dust palliative. 

Upon completion of all painting operations, and of any other work that deposits dust, grease, or other 
foreign materials on painted surfaces,  the Contractor shall thoroughly clean the  painted surfaces. 
When structures are opened to public traffic, the Contractor shall have completed all painting and 
surfaces shall be undamaged and clean. 

24.1.4 

Qualification Samples and Tests 

The manufacturer shall supply, to an independent test laboratory and to the Owner, samples of the 
paint system for evaluation. Prior to approval and use, the manufacturer shall submit a certification 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-3 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

of the independent laboratory, together with results of all tests, stating that these materials meet the 
requirements  as  set  forth  herein.  The  certified  test  report 

shall  state  lots  tested,  manufacturer’s 

name, product names, and dates of manufacture. New certified test results and samples for testing 
by the Owner shall be submitted any time the manufacturing process or paint formulation is changed. 
All costs of testing, other than tests conducted by the Owner, shall be borne by the manufacturer. 

24.1.5 

General Requirements for Surface Preparation 

The surface preparation and application procedures shall be in accordance with instructions by the 
paint manufacturer. The Contractor shall submit complete instructions by the paint manufacturer for 
the preparation of all surfaces and the application of all final paint materials to the Engineer. The 
Contractor shall also submit materials content data for each paint and performance data indicating 
expected durability in the Abu Dhabi climate. 

The  Contractor  shall  notify  the  Engineer  in  writing  at  least  7  days  before  beginning  operations. 
Immediately before painting, the Contractor shall prepare the surface according to the following: 

a.  Clean the surface to the specified cleanliness level. 
b.  Remove dirt, dust, and other contaminants from the surface using methods recommended 

by the paint manufacturer. 

c.  Thoroughly dry the surface. 
d.  Determine that the surface temperature is between 10

o

C and 32

o

C. 

e.  Determine  that  the  humidity  is  85  percent  or  less,  unless  specified  otherwise  on  the 

manufacturer's product data sheet. 

Suitable engineering controls such as enclosures and dehumidification may be used to provide the 
conditions required above. Subject to the approval of the Engineer, the Contractor may provide a 
suitable  enclosure  to  permit  painting  during  inclement  weather.  Such  provisions  shall  artificially 
control atmospheric conditions inside an enclosure within limits suitable for painting throughout the 
painting operation. 

Surfaces painted under cover in damp or cold weather shall remain under cover at no additional cost 
until the paint dries or weather conditions permit open exposure.  

All  blast  cleaning,  except  that  performed  within  enclosed  structures,  and  all  painting  shall  be 
performed during daylight hours unless the Contract documents specify otherwise. 

24.1.6 

General Requirements for Paint Application 

The  Contractor  shall  use  safe  handling  practices  that  conform  to  the  manufacturer's  safety  data 
sheet and instructions. Paint shall be mixed and applied according to the product instructions. Paint 
shall be mixed with mechanical mixers for a sufficient length of time to thoroughly blend the pigment 
and vehicle together. Mixing shall be continued during application. The Contractor shall not thin paint 
that is formulated ready for application. 

The Contractor shall paint in a neat and workmanlike manner that does not produce excessive paint 
build-up, runs, sags, skips, holidays, or thin areas in the paint film. The wet film thickness shall be 
measured during application and the application rate shall be adjusted such that, after curing, the 
desired dry film thickness (DFT) is obtained. Paint shall be applied by brush, spray, roller, or any 
combination thereof if permitted by the manufacturer's product data sheet. 

The Contractor shall use brushes that have sufficient bristle body and length to spread the paint in 
a uniform film.  

Airless or conventional spray equipment shall be used with suitable traps, filters, or separators to 
exclude oil and water from the compressed air. The Contractor shall use compressed air that does 
not show black or wet spots when tested according to ASTM D4285 - 83(2012). Spray gun tip sizes 
and pressures recommended by the manufacturer shall be used. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-4 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

The Contractor shall use rollers only on flat, even surfaces. Rollers that leave a stippled texture in 
the paint film shall not be used. 

The Contractor shall use sheepskin daubers, bottle brushes, or other acceptable methods to paint 
surfaces that are inaccessible for painting by regular means. 

Each  coat  of  paint  shall  be  cured  by  the  contractor  according  to  the  manufacturer's 
recommendations. The Contractor shall correct all thin areas, skips, holidays, and other deficiencies 
before the next application of paint. Succeeding applications of paint shall be tinted to contrast with 
the paint being covered. The Owner shall approve the color for the finish coat before application. 

Surfaces that will be inaccessible after erection shall be coated with the full number of undercoats 
required before erection. After erection,  the Contractor shall thoroughly clean all areas where the 
undercoating is damaged or deteriorated, and shall spot coat these with the specified undercoats to 
the required thickness before applying the final coat. 

24.2 

Reference Standards and Codes 

All  painting  materials for  which  the  Contract  documents  do  not  define  specific  requirements  shall 
comply with the requirements for applicable materials that are outlined in this section. 

Standards  and  codes  for  painting  shall  be  as  specified  in  these  specifications,  in  the  Contract 
documents, if any, and the following, in their latest edition: 

AASHTO LRFD 

American Association of State Highway and Transportation Officials - 
Load  and  Resistance  Factor  Design,  Bridge  Construction 
Specifications; 

AASHTO LRFD 

American Association of State Highway and Transportation Officials - 
Load and Resistance Factor Design, Bridge Design Specifications; 

AASHTO 

Standard Specifications for Transportation Materials and Methods of 
Sampling and Testing; 

AAMA   

 

 

American Architectural Manufacturers Association; 

AAMA 2605-05 

Voluntary  Specification,  Performance  Requirements  and  Test 
Procedures  for  Superior  Performing  Organic  Coatings  on  Aluminum 
Extrusions and Panels; 

AAMA 620-02 

Voluntary  Specifications  for  High  Performance  Organic  Coatings  on 
Coil Coated Architectural Aluminum Substrates Specifications and test 
methods used to evaluate coil coatings on aluminium; 

ADQCC (TR-516) 

 

Road Structures Design Manual; 

AISC   

 

 

American Institute of Steel Construction; 

AISC-420-10/ 

Certification  Standard  for  Shop  Application  of  Complex  Protective 
Coating 

SPE-QP3 

 

 

Systems; 

APAS   

 

 

Australian Paint Approval Scheme; 

ASTM   

 

 

American Society for Testing and Materials; 

FED-STD-595B 

 

Federal Standard 595B - Colors Used In Government Procurement; 

FSS 

 

 

 

Federal Specifications and Standards; 

MIL-DTL-53022D 

Detail Specification: Primer, Epoxy Coating, Corrosion Inhibiting Lead 
and Chromate Free; 

MIL-DTL-53039D 

Detail  Specification:  Coating,  Aliphatic  Polyurethane,  Single 
Component,   Chemical Agent Resistant; 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-5 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

MIL-P-24441/1B 

 

Military Specification Formula - Paint, Epoxy-Polyamide Green Primer,  

Formula 150 Type 1; 

NIST   

 

 

National Institute of Standards and Technology; 

OSHA   

 

 

Occupational Safety and Health Administration; 

SSPC   

 

 

Steel Structures Painting Council; 

SSPC-PA  

 

 

Guide to Safety and Health Requirements; 

Guide 10 

SSPC-PA 1 

 

 

Shop, Field, and Maintenance Painting of Steel; 

SSPC-PA 2 

Procedure  for  Determining  Conformance  to  Dry  Coating  Thickness 
Requirements; 

SSPC-PS 28.02 

Three  Coat  Moisture  Cured  Polyurethane  Coating  System, 
Performance Based; 

SSPC-SP 1 

 

 

Solvent Cleaning; 

SSPC-SP 2 

 

 

Hand Tool Cleaning; 

SSPC-SP 3 

 

 

Power Tool Cleaning; 

SSPC-SP 5 

 

 

White Metal Blast Cleaning; 

SSPC-SP 6 

 

 

Commercial Blast Cleaning; 

SSPC-SP 10/   

 

Near-White Blast Cleaning; 

NACE No. 2 

SSPC-Paint 16 

 

Coal Tar Epoxy-Polyamide Black (or Dark Red); 

SSPC-Paint 20 

 

Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic); 

SSPC-Paint 21 

 

White or Colored Silicone Alkyd Paint; 

SSPC Paint 22 

 

Epoxy Polyamide Paints (Primer, Intermediate, and Topcoat); 

SSPC-Paint 23 

 

Latex Primer for Steel Surfaces; 

SSPC-Paint 24 

 

Latex Semigloss Exterior Topcoat; 

SSPC-Paint 27 

 

Basic Zinc Chromate-Vinyl Butyral Wash Primer; 

SSPC-Paint 31 

Single-Package  Waterborne  Alkyd  Primer  for  Steel  Surfaces, 
Performance-Based; 

SSPC-Paint 36   

 

Two-Component Weatherable Aliphatic Polyurethane Topcoat,  

 

 

 

 

Performance-Based; 

SSPC-Paint 38 

 

Single-Component Moisture-Cure Weatherable, A; 

SSPC-Paint 40 

 

Zinc-Rich Moisture-Cure Polyurethane Primer, P; 

SSPC-Paint 41 

 

Moisture-Cured Polyurethane Primer; 

SSPC-Paint 104 

 

White or Tinted Alkyd Paint; 

SSPC QP2 

 

 

Certification Program (Field Removal of Hazardous Coatings); 

SSPC-AB 3 

 

 

Ferrous Metallic Abrasive; 

TT-P-645B 

 

 

Federal Specification - Primer, Paint, Zinc-Molybdate, Alkyd Type; 

NACE RP0178- 

 

Standard Recommended Practice - Fabrication Details, Surface Finish  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-6 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

2003 (21002) 

Requirements  and  Proper  Design  Considerations  for  Tanks  and 
Vessels to be  Lined for Immersion Service. 

Table 24-1 and  

 

 

Table 24-2 presents American Association of State Highway and Transportation Officials (AASHTO), 
American Society for Testing and Materials (ASTM), British (BS), European (BS EN), and German 
(DIN) Standards that are related to materials for painting works. It also includes designations and 
titles. 

Table 24-1: Designations and titles for AASHTO and ASTM standards that apply to painting 

works 

AASHTO 
Designation 

ASTM 
Designation 

Title 

AASHTO T 277-
07 (2011) 

ASTM C1202 - 
12 

Standard Test Method for Electrical Indication of 
Concrete's Ability to Resist Chloride Ion Penetration 

 

ASTM D4541 - 
09e1 

Standard Test Method for Pull-Off Strength of Coatings 
Using Portable Adhesion Testers 

 

ASTM D4060 - 
10 

Standard Test Method for Abrasion Resistance of Organic 
Coatings by the Taber Abraser 

 

ASTM D3960 - 
05 

Standard Practice for Determining Volatile Organic 
Compound (VOC) Content of Paints and Related Coatings 

 

ASTM C642 - 
06 

Standard Test Method for Density, Absorption, and Voids 
in Hardened Concrete 

 

ASTM D2697 - 
03(2008) 

Standard Test Method for Volume Nonvolatile Matter in 
Clear or Pigmented Coatings 

AASHTO M 
300-03 (2012) 

 

Standard Specification for Inorganic Zinc-Rich Primer 

 

ASTM D520 - 
00(2011) 

Standard Specification for Zinc Dust Pigment 

 

ASTM D609 - 
00(2012) 

Standard Practice for Preparation of Cold-Rolled Steel 
Panels for Testing Paint, Varnish, Conversion Coatings, 
and Related Coating Products 

 

ASTM G7 / 
G7M - 13 

Standard Practice for Atmospheric Environmental 
Exposure Testing of Nonmetallic Materials 

 

ASTM G152 - 
13 

Standard Practice for Operating Open Flame Carbon Arc 
Light Apparatus for Exposure of Nonmetallic Materials 

 

ASTM G153 - 
13 

Standard Practice for Operating Enclosed Carbon Arc Light 
Apparatus for Exposure of Nonmetallic Materials 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-7 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

AASHTO 
Designation 

ASTM 
Designation 

Title 

 

ASTM G154 - 
12a 

Standard Practice for Operating Fluorescent Ultraviolet 
(UV) Lamp Apparatus for Exposure of Nonmetallic 
Materials 

 

ASTM B117 - 
11 

Standard Practice for Operating Salt Spray (Fog) 
Apparatus 

 

ASTM D3359 - 
09e2 

Standard Test Methods for Measuring Adhesion by Tape 
Test 

 

ASTM D4285 - 
83(2012) 

Standard Test Method for Indicating Oil or Water in 
Compressed Air 

 

ASTM D4417 - 
11 

Standard Test Methods for Field Measurement of Surface 
Profile of Blast Cleaned Steel 

 

ASTM A36 / 
A36M - 12 

Standard Specification for Carbon Structural Steel 

 

ASTM D1654 - 
08 

Standard Test Method for Evaluation of Painted or Coated 
Specimens Subjected to Corrosive Environments 

 

ASTM A325M - 
13 

Standard Specification for Structural Bolts, Steel, Heat 
Treated 830 MPa Minimum Tensile Strength (Metric) 

 

ASTM A490M - 
12 

Standard Specification for High-Strength Steel Bolts, 
Classes 10.9 and 10.9.3, for Structural Steel Joints (Metric) 

 

ASTM D823 - 
95(2012)e1 

Standard Practices for Producing Films of Uniform 
Thickness of Paint, Varnish, and Related Products on Test 
Panels 

 

ASTM D2805 - 
11 

Standard Test Method for Hiding Power of Paints by 
Reflectometry 

 

ASTM D1730 - 
09 

Standard Practices for Preparation of Aluminum and 
Aluminum-Alloy Surfaces for Painting 

AASHTO R 31-
09  

 

Standard Practice for Evaluation of Coating Systems for 
Structural Steel 

 

ASTM D5894 - 
10 

Standard Practice for Cyclic Salt Fog/UV Exposure of 
Painted Metal, (Alternating Exposures in a Fog/Dry Cabinet 
and a UV/Condensation Cabinet) 

 

ASTM A123 / 
A123M - 12 

Standard Specification for Zinc (Hot-Dip Galvanized) 
Coatings on Iron and Steel Products 

 

ASTM B330-12 

Standard Test Methods for Estimating Average Particle 
Size of Metal Powders and Related Compounds Using Air 
Permeability 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-8 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

AASHTO 
Designation 

ASTM 
Designation 

Title 

 

ASTM D2794 - 
93(2010) 

Standard Test Method for Resistance of Organic Coatings 
to the Effects of Rapid Deformation (Impact) 

 

ASTM D522 - 
93a(2008) 

Standard Test Methods for Mandrel Bend Test of Attached 
Organic Coatings 

 

ASTM D610 - 
08(2012) 

Standard Practice for Evaluating Degree of Rusting on 
Painted Steel Surfaces 

 

ASTM D714 - 
02(2009) 

Standard Test Method for Evaluating Degree of Blistering 
of Paints 

 

ASTM D2244 - 
11 

Standard Practice for Calculation of Color Tolerances and 
Color Differences from Instrumentally Measured Color 
Coordinates 

 

ASTM D523 - 
08 

Standard Test Method for Specular Gloss 

 

ASTM D543 - 
06 

Standard Practices for Evaluating the Resistance of 
Plastics to Chemical Reagents 

 

ASTM D638 - 
10 

Standard Test Method for Tensile Properties of Plastics 

 

ASTM D1894 - 
11e1 

Standard Test Method for Static and Kinetic Coefficients of 
Friction of Plastic Film and Sheeting 

 

ASTM D149 - 
09(2013) 

Standard Test Method for Dielectric Breakdown Voltage 
and Dielectric Strength of Solid Electrical Insulating 
Materials at Commercial Power Frequencies 

 

ASTM D2240 - 
05(2010) 

Standard Test Method for Rubber Property

—Durometer 

Hardness 

 

ASTM D5796 - 
10 

Standard Test Method for Measurement of Dry Film 
Thickness of Thin Film Coil-Coated Systems by Destructive 
Means Using a Boring Device 

 

ASTM D624 - 
00(2012) 

Standard Test Method for Tear Strength of Conventional 
Vulcanized Rubber and Thermoplastic Elastomers 

 

ASTM C672 / 
C672M - 12 

Standard Test Method for Scaling Resistance of Concrete 
Surfaces Exposed to Deicing Chemicals 

 

ASTM D412 - 
06a(2013) 

Standard Test Methods for Vulcanized Rubber and 
Thermoplastic Elastomers

—Tension 

 

ASTM D4263 - 
83(2012) 

Standard Test Method for Indicating Moisture in Concrete 
by the Plastic Sheet Method  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-9 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

 

 

 

Table 24-2: Designations and titles for BS, and BS EN, and DIN standards that apply to 

painting works 

BS & BS EN 

Designation 

DIN 
Designation 

Title 

BS 1881-122:2011 

 

Testing  concrete  Method  for  determination  of  water 
absorption 

BS 1881-124:1988 

 

Testing  concrete  Methods  for  analysis  of  hardened 
concrete 

BS 3177:1959 

 

Method for determining the permeability to water vapour of 
flexible sheet materials used for packaging 

BS 

EN 

12390-

8:2009 

 

Testing hardened concrete. Depth of penetration of water 
under pressure  

 

DIN  53122-1 
(2001-08)

 

Determination  of  the  water  vapour  transmission  rate  of 
plastic film, rubber sheeting, paper, board and other sheet 
materials by gravimetry 

BS EN ISO 
2808:2007, BS 
3900-C5:2007 

 

Paints and varnishes. Determination of film thickness 

ISO 19840:2012 

 

Paints  and  varnishes  -  Corrosion  protection  of  steel 
structures  by  protective  paint  systems  -  Measurement  of, 
and  acceptance  criteria  for,  the  thickness  of  dry  films  on 
rough surfaces 

BS EN 1504-
9:2008 

 

Products  and  systems  for  the  protection  and  repair  of 
concrete  structures.  Definitions,  requirements,  quality 
control and evaluation of conformity - General principles for 
use of products and systems  

24.3 

Painting Structural Iron and Steel Surfaces 

24.3.1 

General 

All painting work shall consist of preparing the surfaces, furnishing and applying paint to all iron and 
steel surfaces of structures or portions thereof that are designated to be painted unless otherwise 
indicated on the Contract plans. The Contractor shall include the protection from paint spatter and 
disfigurement  of  adjacent  or  nearby  structures,  and  final  cleanup,  all  in  accordance  with  these 
standard specifications and requirements of Contract documents. 

All  paint  materials  applied  to  structural  iron  and  steel  works  shall  comply  with  the  following 
requirements unless otherwise specified herein, indicated on the Contract plans, or specified in the 
Particular Specifications. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-10 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

1.  All coating systems shall be stored, thinned, handled, mixed and applied in accordance with 

SSPC-PA 1, Shop, Field and Maintenance Painting of Steel, and the recommendations on 
the Manufacturer’s product data sheets. 

2.  All paint furnished shall be shipped in strong, substantial containers, plainly marked with the 

following: 

  Trade name or trade mark; 

  Paint type, color, formulation, lot number, and date of manufacture; 

  Net mass; 

  Volume including the percent of solids and the percent of volatile organic compound (VOC); 

  Storage requirements; 

  Mixing instructions and equipment cleanup instructions; and 

  Name and address of the manufacturer. 

3.  The paint shall not show excessive settling in a freshly-opened full can, and shall easily be 

re-dispersed  with  a  paddle  to  a  smooth,  homogeneous  state.  The  paint  shall  show  no 
curdling, livering, caking or color separation, and shall be free from lumps and skins.  

4.  The  paint  as  received  shall  brush  easily,  possess  good  leveling  properties,  and  show  no 

running or sagging tendencies when applied to smooth steel vertical surfaces.  

5.  The paint shall not skin within 48 hours in a three-quarters-filled closed container.  
6.  The paint shall dry to a smooth uniform finish, free from roughness, grit, unevenness, and 

other surface imperfections. The paint shall show no streaking or separation when flowed on 
clean glass.  

7.  The paint shall show no thickening, curdling, gelling, or hard caking after six months storage 

in a full, tightly-covered container at a temperature of 21°C. 

24.3.1.1 

Compatibility 

Each coating in the paint system shall be supplied by the same paint manufacturer. 

24.3.1.2 

Toxicity 

Each coating shall contain less than 0.01 percent lead in the dry film and no more than trace amounts 
of hexavalent chromium, cadmium, mercury or other toxic heavy metals. 

24.3.1.3 

Volatile Organics 

The volatile organic compounds (VOC) content shall conform to the following VOC limits for both 
shop and field painting: 

a.  Clear (unpigmented) coatings 1.68 kg per gallon max. 
b.  Other coatings 1.31 kg per gallon max. 

More stringent limits shall be applied if required by SSPC-PA Guide 10, OSHA or local regulations. 

24.3.1.4 

Color 

The  Contractor  shall furnish  a  contrasting  color for  each  coat  of  paint. The finish  coat color  shall 
conform to FED-STD-595B or Classic RAL System as approved by the Owner. The Contractor shall 
provide color chips from the paint supplier. 

24.3.1.5 

Performance Requirements 

Unless otherwise specified in this chapter, the Contractor shall prepare and submit to the Owner four 
composite and four flat-scribed test panels in accordance with AASHTO R 31-09. In addition, the 
Contractor shall submit 1 liter wet samples of each component of each coating incorporated in the 
system being evaluated. Panels shall subject to outdoor exposure testing in accordance with ASTM 
G7 / G7M - 13.  

All coatings, regardless of color, shall meet the requirements below as shown in Table 24-3. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-11 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Table 24-3: Performance requirements of coatings 

Laboratory Testing 

Property 

Test Method 

Requirement 

Slip Coefficient 

AASHTO R 31-09 

Min. Class B (primer only) 

Salt 

Fog 

Resistance 

AASHTO R 31-09 

Blister Size = 10 

Average  Rust  Creep  at  the 
Scribe ≤ 2.5 mm 

Cyclic  Weathering 
Resistance 

AASHTO R 31-09 

Blister Size = 10 

Average  Rust  Creep  at  the 
Scribe ≤ 5.0 mm 

Color Retention ΔE ≤ 8, 

Gloss loss less than 30 units 

Abrasion 
Resistance 

AASHTO R 31-09 

Wear Index ≤ 2.7 mg/cycle 

Adhesion 

AASHTO R 31-09 

Avg.  system  tensile  strength  ≥ 
5.52 MPa 

Freeze 

Thaw 

Stability 

AASHTO R 31-09 

Avg. tensile strength ≥ 5.52 MPa 

Coatings 
Identification 

Fourier 

Transform 

Infrared 

Spectroscopy 

IR  scan (2.5  to  15  um) for  each 
base, 

catalyst, 

and 

mixed 

coating. 

Impact Resistance 

ASTM D2794 - 93(2010) 

Greater  than  1400  mm/kg

,  1/2” 

impact, intrusion 

Flexibility 

AASHTO  R  31-09,  ASTM  D522  - 
93a(2008), 25 mm cylindrical mandrel 

No cracking 

Outdoor Testing 

 

 

 

Rusting 

ASTM D610 -08(2012) 

ASTM D1654 - 08 (scribed) 

ASTM D1654 - 08 (un-scribed) 

≥ 9 after 5 years 

 

≥ 9 after 5 years 

 

≥ 9 after 5 years 

Blistering 

ASTM D714 - 02(2009) 

10 after 5 years 

Adhesion 

ASTM D4541 - 09e1; annex A4 

≥  5.52  MPa  (un-scribed  area) 
after 5 years 

Color Retention 

ASTM D2244 - 11 

ΔE ≤ 8 after 2 years 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-12 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Laboratory Testing 

Property 

Test Method 

Requirement 

Gloss 

ASTM D523 - 08 

≤ 30 gloss units after 2 years 

24.3.2 

Paint Systems for New External Visible Surfaces or Surfaces 
with All Existing Paint Removed 

All structural iron and steel shall be painted with one of the following systems as shown in  Table 
24-4.
  The  required  system  or  choice  of  systems  shall  be  shown  on  the  Contract  plans  or  in  the 
Particular Specifications. 

If not indicated on the Contract plans or specified in the Particular Specifications, the paint system 
applied to all structural iron and steel surfaces shall be System No. 2, Zinc Rich Epoxy System. 

Table 24-4: Structural iron and steel coating systems for new surfaces and surfaces with all 

existing paint removed 

Coat 

Paint System

Aggressive 

Environments 

Aggressive 

Environments 

Aggressive 

Environments 

Less 
Aggressive 

Environments 

Less 
Aggressive 

Environments 

Primer   

Inorganic  zinc 
Silicate 

4-5 mils DFT 

Zinc-rich 
epoxy 

4-5 mils DFT 

Aromatic 
Moisture-
cured 

Polyurethane 

3-4 mils DFT 

Acrylic latex 

2-3 mils DFT 

Low 

VOC 

alkyd 

3-4 mils DFT 

Intermediate   

Epoxy 
Polyamide 

3-5 mils DFT 

Epoxy 
Polyamide 

3-5 mils DFT 

Aromatic 
Moisture-
cured 

Polyurethane 

3-5 mils DFT 

Acrylic latex 

2-3 mils DFT 

Low 

VOC 

alkyd 

3-4 mils DFT 

Top Coat   

Aliphatic 
Polyurethane 
Acrylic 

2-3 mils DFT 

Aliphatic 
polyurethane 
Acrylic 

2-3 mils DFT 

Aliphatic 
Moisture-
cured 

Polyurethane 

2-3 mils DFT 

Acrylic latex 

2-3 mils DFT 

Low 

VOC 

silicone-alkyd 

2-3 mils DFT 

Total 
Thickness

2

   

9-13 mils DFT 

9-13 mils DFT 

8-12 mils DFT  6-9 mils DFT 

8-11 mils DFT 

Note 1: System 1, 2, or 3 is for the corrosion protection of iron and steel in aggressively corrosive 
atmospheric environments such as marine, coastal, or industrial. System 4 or 5 is for use in those 
environments with less humidity and free from high concentrations of salts or pollutants that cause 
aggressive corrosion environments. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-13 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Note 2: Dry Film Thickness (DFT). 

24.3.2.1 

Paint System No. 1 - Inorganic Zinc Silicate System 

Paint System No. 1 shall consist of the following:  

1.  Primer  coat  on  bare  steel  (not  galvanized):

  Inorganic  zinc  silicate  paint  shall  be  a two-

component self-curing type conforming to SSPC-Paint 20, Type I, which, when mixed, cures 
without the use of a separate curing solution, and shall have the properties described herein.  

Pigment:

 The zinc pigment component shall comply with the requirements of ASTM D520 - 00(2011) 

for Type II. The average particle size of the zinc powder shall not exceed 10 microns as determined 
by the Fisher Sub-sieve Sizer and in accordance with ASTM B330-12.  

Vehicle:

 The vehicle component shall consist primarily of an alkyd silicate in an appropriate alcohol 

solvent. Total solids, by content shall be determined by drying the sample to a constant weight at 
100°C. 

Mixed paint shall comply with the following requirements:  

i. 

The  zinc  portion  shall  be  at  least  75  percent  by  weight  of  the  total  solids  of  the  dried 
coating. 

ii. 

The total solids, when heated at 100°C for 3 hours, shall be not less than 72 percent by 
weight. 

iii. 

The paint shall tolerate up to one percent water contamination without gellation.  

iv. 

The usable pot life of the mixed paint shall be not less than 12 hours at 25°C. There shall 
be no hard settling which cannot be easily re-dispersed during this period.  

v. 

The inorganic zinc coating shall be so formulated as to produce a distinct contrast in color 
with the blast cleaned iron and steel surfaces and with the topcoat.  

Tests:

 Test panels of the iron and steel, meeting the requirements of ASTM D609 - 00(2012) having 

dimensions of 5 cm x 13 cm x 3 mm, shall be prepared by thoroughly cleaning all surfaces. A 3-4 
mils coating (DFT) shall then be applied to the test panels in accordance with the manufacturer's 
current printed instruction. The coating shall be cured as recommended by the manufacturer. Each 
of  the  following  tests  shall  be  performed  on  a  minimum  of  three  panels.  The  material  will  not  be 
accepted if any individual test panel fails any of the following tests:  

i. 

Fresh Water Resistance: Panels shall be scribed down to base metal with an X of at least 
5 cm legs and shall be immersed in fresh tap water at 24°C + 2°C. The panels shall show 
no rusting, blistering, or softening when examined after 30 days.  

ii. 

Salt Water Resistance: Panels shall be scribed down to base metal with an X of at least 5 
cm legs and immersed in 5 percent sodium chloride at 24°C + 2°C at 7, 14 and 30 days. 
The sodium chloride solution shall be replaced with fresh solution after each examination.  

iii. 

Weathering Resistance: Panels shall be tested in accordance with ASTM G152 

– 13 and 

ASTM G153 - 13, Type D. The panels shall be placed on test at the beginning of the wet 
cycle. After 1,000 hours continuous exposure, the coating shall show no rusting, loss of 
adhesion to the steel test panel, or blistering.  

iv. 

Weather  and  Salt  Fog  Resistance:  Panels  shall  be  tested  in  the  weatherometer  as 
specified in (iii) for 300 hours. After this period the panels shall be removed and scribed 
with an X of at least 5 cm legs down to base metal. The test panels shall then be tested in 
accordance with ASTM B117 - 11. After 1,000 hours of continuous exposure, the coating 
shall show no loss of bond, nor shall it show rusting or blistering beyond 2 mm from the 
center of the scribe mark.  

v. 

Resistance to Elevated Temperatures and Thermal Shock: Panels shall be exposed to a 
temperature  of  260°C  for  one  hour,  then  quenched  immediately  in  18°C  +  2°C  water. 
Panels subjected to this test shall show no blistering or flaking of the coating.  

vi. 

Adhesion panels shall be tested in accordance with ASTM D3359 - 09e2 and shall attain 
a rating of 3 or greater.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-14 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

vii. 

Mud Cracking Resistance: The coating when applied to test panels as above to a 5 to 6 
mils DFT shall show no mud cracking when viewed under 10-X magnification.  

The manufacturer and Brand Name Approval for Inorganic Zinc Primer: Prior to approval and use of 
inorganic zinc, the Contractor shall submit in triplicate to the Engineer a certified test report from an 
approved independent testing laboratory showing specific test results complying with all quantitative 
and resistance test requirements specified. The certified test report shall also contain the exact ratio, 
by weight, of the pigment component to the vehicle component of the paint used for the tests, the lot 
tested, the manufacturer's name, brand name of paint, and date of manufacture. 

New  certified  test  results  shall  be  submitted  whenever  the  manufacturing  process  or  the  paint 
formulation is changed, and may be required by the Engineer when sampling and testing of material 
offered for use indicates noncompliance with any of the requirements herein specified. 

2.  Intermediate Coat:

 On surfaces prepared with primer as specified in Paragraph 1 of Article 

24.3.2.1, an intermediate coat of high-build epoxy polyamide conforming to SSPC Paint 22 
shall  be  applied  as  recommended  by  the  manufacturer  in  a  single  application  employing 
multiple spray passes. The color of the intermediate coat shall contrast with both the primer 
and top coat. The intermediate coat shall comply with MIL-P-24441/1B, Formula 150.  

3.  Top Coat:

 Top coat shall be an aliphatic polyurethane acrylic, conforming to SSPC-Paint 36, 

applied  as  recommended  by  the  manufacturer  in  a  single  application  employing  multiple 
spray  passes.  The  aliphatic  polyurethane  acrylic  shall  comply  with  the  following  minimum 
requirements:  
Solids   

 

 

 

45.0% by volume 

Pigment 

 

 

 

19.7% by weight 

Non-volatile vehicle   

 

36.4% by weight  

(Acrylic resin - 25.8% by weight) 
(Polyurethane resin - 8.3% by weight) 
(Additives - 2.3% by weight)  
The Contractor shall submit top coat color chips for selection of color by the Engineer. 

24.3.2.2 

Paint System No. 2 

– Zinc Rich Epoxy System 

Paint System No. 2 shall consist of the following:  

1.  Primer  coat  on  bare  steel  (not  galvanized):

  Zinc-rich  epoxy  paint  shall  be  a  two-

component, high solid zinc-rich, (part A + part B) epoxy primer, conforming to composition 
and performance requirements of SSPC-Paint 20 standard. It shall comply with the following 
minimum requirements:  
Solids   

 

 

 

 

62+2% by volume 

Gloss at 60ºC   

 

 

 

Matt. 

Recommended thinner 

 

 

4-100  

All  materials  shall  be  applied  in  accordance  with  the  manufacturer's  directions.  The 
Contractor shall prepare the surface to achieve a 30-50 microns profile. The Contractor shall 
stir  well  before  application  and  while  painting.  Zinc-rich  epoxy  primer  shall  not  be  applied 
when temperature falls below 10ºC. 

2.  Intermediate coat: 

an intermediate coat of high-build epoxy polyamide conforming to SSPC-

Paint 22 shall be applied as per Paragraph 2 of Article 24.3.2.1.

 

3.  Top coat: 

t

op coat of an aliphatic polyurethane acrylic conforming to SSPC-Paint 36 shall 

be applied as per Paragraph 3 of Article 24.3.2.1.

 

24.3.2.3 

Paint System No. 3 

– Moisture Cured Polyurethane System 

The  moisture  cured  polyurethane  paint  system  shall  consist  of  an  aromatic  moisture  cured 
polyurethane  primer,  an  aromatic  moisture  cured  polyurethane  intermediate  coat,  and  aliphatic 
moisture cured polyurethane top coats conforming to the performance requirements of SSPC-PS 
28.02. It is intended for field painting blast-cleaned existing structures. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-15 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

1.  Zinc - Rich moisture cured polyurethane Primer Requirements: 

i. 

The  material  shall  be  a  single  component  zinc-rich  aromatic  moisture  cured 
polyurethane primer conforming to the performance requirements of SSPC-Paint 40. 
It shall be suitable for topcoating with polyurethanes. 

ii. 

The zinc dust pigment shall be according to ASTM D520 - 00(2011), Type II. 

iii. 

The  organic  zinc  coating  shall  meet  a  Class  B  AASHTO  LRFD  Bridge  Design 
Specifications slip coefficient (0.50 or greater) for structural steel joints using ASTM 
A325M 

– 13 or ASTM A490M - 12 bolts. 

iv. 

The adhesion to an abrasively blasted steel substrate shall not be less than 6.2 MPa 
when tested according to ASTM D4541 - 09e1 Annex A4. 

2.  Intermediate Coat Requirements: 

i. 

The  material  shall  be  a  single  component  aromatic  moisture  cured  polyurethane 
conforming to SSPC-Paint  41. It shall be suitable as an intermediate coat  over the 
primer and compatible with the top coat. 

ii. 

The color of the intermediate coat shall provide a distinct contrast between the primer 
and the finish coat. 

3.  Polyurethane Top Coat Requirements: 

i. 

The  material  shall  be  a  single  component  aliphatic  moisture  cured  polyurethane 
conforming to SSPC-Paint 38. It shall be suitable as a topcoat over the intermediate 
coat. 

ii. 

The top coat color shall be as specified in the Contract documents and as approved 
by  the  Owner  conforming  to  FED-STD-595B  or  Classic  RAL  System.  The  color 
difference  shall  not  exceed  3.0  Hunter  Delta  E  Units.  Color  difference  shall  be 
measured by instrumental comparison of the designated standard to a minimum DFT 
of 3 mils (75 microns) of sample coating produced on a test panel according to ASTM 
D823  -  95(2012)e1,  Practice  E,  Hand

–Held,  Blade  Film  Application.  Color 

measurements  shall  be  determined  on  a  spectrophotometer  with  45  degrees 
circumferential/zero  degrees  geometry,  illuminant  C,  and  two  degrees  observer 
angle.  The  spectrophotometer  shall  measure  the  visible  spectrum  from  380-720 
nanometers with a wavelength interval and spectral bandpass of 10 nanometers.  

The contrast ratio of the finish coat at 3 mils  DFT shall not be less than 0.99 when tested 
according to ASTM D2805 - 11. 

iii. 

Test panels shall be aluminum alloy measuring 300 x 100 mm prepared according to 
ASTM D1730 

– 09 Type A, Method 1 Solvent Cleaning. A minimum dry film thickness 

of 3 mils of top coat shall be applied to three test panels according to ASTM D823 - 
95(2012)e1, Practice E, Hand Held Blade Film Application. The coated panels shall 
be  cured  at  least  30  days  and  not  more  than  45 days  at  25  °C ±  2  °C  and  65 ±  5 
percent relative humidity. The panels shall be subjected to 300 hours of accelerated 
weathering  using  the  light  and  water  exposure  apparatus  (fluorescent  UV  - 
condensation type) as specified in ASTM G154 - 12a (equipped with UVB-313 lamps). 
The cycle shall consist of eight hours UV exposure at 60 °C followed by four hours of 
condensation at 40 °C. After exposure, the panel shall be rinsed with clean water and 
allowed to dry at room temperature for one hour. The exposed panels shall not show 
a color change of more than 3 Hunter Delta E Units. 

4.  Test Panel Preparation: 

i. 

Test panels shall be ASTM A36 / A36M - 12, hot-rolled steel measuring 100 x 150 
mm.  Panels  shall  be  blast-cleaned  per  SSPC

–SP5  white  metal  condition  using 

recyclable metallic abrasive according to SSPC-AB3. The abrasive shall be a 60/40 
mix of shot and grit. The shot shall be an SAE shot number S230 and the grit an SAE 
number G40. Hardness of the shot and grit shall be Rockwell C45. The anchor profile 
shall be 1.5-2.5 mils measured according to ASTM D4417 - 11, Method C. 

ii. 

All coatings shall be spray applied at the manufacturer's recommended film thickness. 
The coated panels shall be cured at least 30 days and not more than 45 days at 25 
°C ± 2 °C and 65 ± 5 percent relative humidity. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-16 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

iii. 

The  test  panels  shall  be  scribed  according  to  ASTM  D1654 

–  08  with a  single “X” 

mark centered on the panel. The rectangular dimensions of the scribe shall have a 
top width of 50 mm and a height of 100 mm. The scribe cut shall expose the steel 
substrate as verified with a microscope. 

iv. 

All testing shall be performed on triplicate panels as per the testing requirements of 
Paragraph 5 of Article 24.3.2.3 

5.  Testing Requirements: 

i. 

For testing purposes, the color of the top coat shall match FED-STD-595B, color chip 
14062 (green), as approved by the Owner. 

ii. 

Salt  fog  when  tested  according  to  ASTM  B117 

–  11  and  evaluated  according  to 

AASHTO R 31-09, the paint system shall exhibit no spontaneous delamination and 
not exceed the following acceptance levels shown in Table 24-5 after 5,000 hours of 
salt fog exposure. 

Table 24-5: Acceptance levels for salt fog 

Salt Fog Acceptance Criteria (max.) 

Blister Conversion Value 

Rust Criteria 

After 4000 Hours 

Maximum Creep 

Average Creep 

10 

6 mm 

2 mm 

iii. 

Cyclic  exposure  when  tested  according  to  ASTM  D5894 

–  10  and  evaluated 

according  to  AASHTO  R  31-09,  the  paint  system  shall  exhibit  no  spontaneous 
delamination  and  not  exceed  the following  acceptance  levels  shown  in  Table 24-6 
after 5,040 hours of cyclic exposure. 

Table 24-6: Acceptance levels for cyclic exposure 

Cyclic Exposure Acceptance Criteria (max.) 

Blister Conversion Value 

Rust Criteria 

 

Maximum Creep 

Average Creep 

10 

13 mm 

7 mm 

iv. 

The adhesion to an abrasively blasted steel substrate shall not be less than 6.2 MPa 
when tested according to ASTM D4541 - 09e1 Annex A4. 

24.3.2.4 

Paint System No. 4 

– Acrylic Latex System 

Paint System No. 4 shall consist of the following:  

1.  Primer coat on bare steel (not galvanized):

 Acrylic latex primer, conforming to composition 

and performance requirements of SSPC-Paint 23 standard.

 

 Intermediate coat: 

an intermediate coat of acrylic latex conforming to SSPC Paint 24 shall 

be applied.

 

2.  Top coat: 

t

op coat of acrylic latex conforming to SSPC-Paint 24 shall be applied.

 

24.3.2.5 

Paint System No. 5 

– Low VOC Alkyd System 

Paint System No. 5 shall consist of the following:  

1.  Primer  coat  on  bare  steel  (not  galvanized):

  Low  VOC  Alkyd  primer,  conforming  to 

composition and performance requirements of SSPC-Paint 31 standard.

  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-17 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

2.  Intermediate coat: 

an intermediate coat of Low VOC alkyd conforming to SSPC- Paint 104 

shall be applied.

 

3.  Top  coat: 

t

op  coat  of  Low  VOC  silicone  alkyd  conforming  to  SSPC-Paint  21  shall  be 

applied.

 

24.3.3 

Paint Systems for Surfaces with Existing Sound Paint 

The Contractor shall furnish one of the paint systems shown in Table 24-7. The required system or 
choice of systems shall be shown on the Contract plans or in the Particular Specifications.  

If not indicated on the Contract plans or specified in the Particular Specifications, the paint system 
applied to all painted structural iron and steel surfaces shall be Paint System No. 6 Moisture-cured 
Polyurethane System. 

The Contractor shall confirm the selected paint system is compatible with the existing paint.  

At  least  14  days  before  ordering  paint,  the  Contractor  shall  verify  compatibility  of  the  proposed 
system with the existing system as follows: 

a.  Select a test area of at least 2.8 square meter in a condition representative of the condition 

of the structure. Perform the specified level of surface preparation, and apply the proposed 
system  to  the  existing  topcoat  and  to  the  existing  primer.  Observe  for  lifting,  bleeding, 
blistering, wrinkling, cracking, flaking, or other evidence of incompatibility. 

b.  Verify that no indication of incompatibility exists at least 14 days after the application of each 

product.  Perform  adhesion  tests  according  to  ASTM  D3359  -  09e2,  method  A.  Notify  the 
Owner  immediately  if  adhesion  testing  fails  at  the  interface  of  the  existing  system  and 
substrate  or  between  the  existing  finish  coat  and  primer.  An  adhesion  failure  indicates 
incompatibility. Choose a more compatible paint system. 

Table 24-7: Structural iron and steel coating systems for surfaces with existing sound paint 

Coat 

Paint System

Aggressive 

Environments 

Less 

Aggressive 

Environments 

 Less 

Aggressive 

Environments 

Primer   

Aromatic 

Moisture-cured 

Polyurethane 

2-3 mils DFT 

Low VOC alkyd  

2-3 mils DFT 

Low  viscosity  epoxy 
sealer 

1-2 mils DFT 

Intermediate   

Aromatic 

Moisture-cured 

Polyurethane 

2-3 mils DFT 

Low VOC alkyd 

2-3 mils DFT 

Epoxy 

3-4 mils DFT 

Top Coat   

Aliphatic 

Moisture-cured 

Polyurethane 

2-3 mils DFT 

Low 

VOC 

silicone-

alkyd 

2-3 mils DFT 

Aliphatic 

Polyurethane 

2-3 mils DFT 

Total 
Thickness

2

   

6-9 mils DFT 

6-9 mils DFT 

6-9 mils DFT 

Note  1:  System  6  is  for  the  corrosion  protection  of  iron  and  steel  in  aggressively  corrosive 
atmospheric environments such as marine, coastal, or industrial. System 7 or 8 is for use in those 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-18 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

environments with less humidity and free from high concentrations of salts or pollutants that cause 
aggressive corrosion environments. 

Note 2: Dry Film Thickness (DFT). 

24.3.3.1 

Paint System No. 6 

– Moisture Cured Polyurethane System 

The  moisture  cured  polyurethane  paint  system  No.  6  shall  consist  of an aromatic moisture cured 
polyurethane  primer,  an  aromatic  moisture  cured  polyurethane  intermediate  coat,  and  aliphatic 
moisture  cured  polyurethane  top  coats  conforming  to  the  requirements  of  Article  24.3.2.3.  It  is 
intended for field painting blast-cleaned existing structures. 

24.3.3.2 

Paint System No. 7 

– Low VOC Alkyd System 

The  low  VOC  alkyd  paint  system  No.  7  shall  consist  of  Low  VOC  Alkyd  primer,  Low  VOC  Alkyd 
intermediate coat, and a Low VOC silicone alkyd top coats conforming to the requirements of Article 
24.3.2.324.3.2.5.  

24.3.3.3 

Paint System No. 8 

– Low Viscosity Epoxy System 

Paint System No. 8 shall consist of the following:  

1.  Primer coat:

 Two-pack low viscosity epoxy sealer with a polyamide or similar curing agent 

conforming  to  the  manufacturer  recommendations  and  approved  to  APAS  Specification 
2971. It shall be physically and chemically compatible with the existing sound paint and later 
coatings in the system.  

2.  Intermediate coat: 

an intermediate coat of epoxy polyamide conforming to SSPC- Paint 22 

shall be applied.

 

3.  Top coat: 

t

op coat of an aliphatic polyurethane acrylic, conforming to SSPC-Paint 36 and 

Paragraph 3 of Article 24.3.2.1 shall be applied.

 

24.3.4 

Paint System No. 9 for New Internal Invisible Surfaces  

Paint System No. 9 shall consist of the following:  

1.  Primer coat: 

Inorganic zinc dust pigment shall be a minimum of Type II in accordance with 

ASTM  D520  -  00(2011).  Inorganic  zinc  rich  primer  shall  meet  the  requirements  of  SSPC-
Paint 20, Type I, Level 2.  

2.  Top Coat

: The top coat shall be one coat of white polyamide or cycloaliphatic amine epoxy 

coating. The performance requirements for gloss and color retention are not applicable. 

24.3.5 

Surface Preparation of Iron and Steel Surfaces 

All  exposed  structural  iron  and  steel  surfaces,  except  galvanised  or  metallised  surfaces,  shall  be 
cleaned and painted. 

The Contractor shall not remove sound paint of existing structures  unless specifically required by 
the Contract documents. 

24.3.5.1 

New surfaces or Surfaces with all Existing Paint Removed 

New surfaces of iron and steel to be painted, including galvanized surfaces and surfaces with paint 
removed, shall be thoroughly cleaned to the condition specified herein by removing rust, loose mill 
scale, welding slag, dirt, oil, grease, and other foreign substances.  

The Contractor shall remove all dirt, mill scale, rust, paint, and other foreign material from exposed 
surfaces by Blast Cleaning in accordance with Article 24.3.5.3, Method D, unless otherwise specified 
in the Contract documents or approved in writing by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-19 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

The Contractor shall use compressed air that is free from oil or moisture and does not show black 
or wet spots when tested according to D4285 - 83(2012). Unwashed sand or abrasives that contain 
salts, dirt, oil, or other foreign matter shall not be used. Before blast cleaning near machinery, the 
Contractor shall seal bearings, journals, motors, and moving parts against entry of abrasive dust. 

The Contractor shall blast clean with clean dry slag, mineral grit, steel shot, or steel grit. A suitable 
gradation shall be used to produce a dense, uniform anchor pattern. An anchor profile height of 1 to 
2 mils shall be produced, but not less than that recommended by the paint system manufacturer's 
product  data  sheet.  The  Contractor  shall  measure  anchor  profile  height  using  the  tape  method 
according to ASTM D4417 - 11. 

The same day cleaning is performed, the Contractor shall remove dirt, dust, and other debris from 
the surface by brushing, blowing with clean dry air, or vacuuming and shall apply the first coat of 
paint  to  the  blast  cleaned  surfaces.  If  the  cleaned  surfaces  rust  or  become  contaminated  before 
painting, the blast cleaning shall be repeated. 

24.3.5.2 

Surfaces with Existing Sound Paint 

All  areas  to  be  painted shall  be  washed  by  the Contractor  with  pressurized  water  to remove  dirt, 
surface chalking, loose rust, and contaminants such as chlorides. A wash water pressure of at least 
3.45 MPa shall be maintained. All wash water and removed waste shall be captured according to 
appropriate regulations. 

The Contractor shall clean surfaces having sound paint according to Method B (Hand Tool Cleaning), 
Method C (Power Tool Cleaning), or Method E (Commercial Blast Cleaning) of Article 24.3.5.3 to 
remove dirt, loose mill scale, loose rust, or paint that is not firmly bonded to the underlying surface. 
The Contractor shall clean small areas that show pinhole corrosion, stone damage from traffic, or 
minor scratches. At least 50mm shall be cleaned beyond the damaged areas. 

The Contractor shall feather edges of remaining old paint to achieve a reasonably smooth surface. 

The same day hand or power tool cleaning is performed, the Contractor shall remove dirt, dust, and 
other  contaminants from  the  surface  with  Method  A  (Solvent-cleaning)  in  accordance  with  Article 
24.3.5.3, and shall spot paint all bare steel areas with the first coat of paint. If the cleaned surfaces 
rust  or  become  contaminated  before  painting,  solvent  cleaning  shall  be  repeated.  All  damage  to 
sound paint shall be repaired by the Contractor by applying the entire system. 

24.3.5.3 

Cleaning Methods of Iron and Steel Surfaces 

Methods used for cleaning iron and steel surfaces shall conform to the specifications in this article. 

a. 

Method A: Solvent Cleaning 

It  is  intended  that  solvent  cleaning  shall  be  used  prior  to  the  application  of  paint,  and  with  other 
methods of surface cleaning. Method A of cleaning shall be performed in accordance with SSPC-SP 
1 and the following requirements: 

Soil, cement spatter, drawing compounds, salts, soluble welding flux residues, or other foreign matter 
(other than grease or oil) shall be removed by cleaning with solutions of alkaline cleaners, providing 
brushing  with  stiff fibre or  wire  brushes,  or  by  scraping,  or  by  cleaners followed  by  a  fresh  water 
rinse, or by a combination of these methods. 

Oil or grease shall be removed by any of the following methods:  

1.  Wiping or scrubbing the surface with rags or brushes wetted with solvent.  
2.  Spraying  of  the  surface  with  solvent.  The  final  spraying  shall  be  done  with  clean 

solvent. 

3.  Vapor degreasing, using stabilized chlorinated hydrocarbon solvents.  
4.  Complete immersion in a tank or tanks of solvent.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-20 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

5.  Emulsion cleaners or steam cleaning may be used in place of the methods above, 

provided that after treatment the surface shall be washed with hot water to remove 
detrimental residue. 

b.  Method B: Hand Tool Cleaning 

Method  B  of  cleaning  shall  be  performed  in  accordance  with  SSPC-SP  2  and  the  following 
requirements: 

After oil, grease, soluble welding flux residues, or salts are removed by methods prescribed under 
Method  A,  loose  mill  scale,  loose  rust,  and  other  detrimental  foreign  matter  shall  be  removed  by 
hand  brushing,  hand  sanding,  hand  scraping,  hand  chipping,  hand  hammering,  or  other  methods 
using hand impact tools, or by a combination of these methods.  

All  accessible  weld  flux  and  spatter  shall  be  removed  by  hand  scraping  or  by  hand  impact  tools 
followed by wirebrushing.  

Areas which will be inaccessible after assembly shall be cleaned before assembly.  

All bolts, welds, corners, joints, and openings shall be properly cleaned. The steel wires of the wire 
brushes shall have sufficient rigidity to clean the surface, shall be kept free of excess foreign matter, 
and shall be discarded when they are no longer effective. Hand scrapers shall be kept sharp enough 
to be effective. The tools shall be operated in such a manner that no burrs or sharp ridges are left 
on the surface and no sharp cuts made into the steel.  

After hand cleaning is completed, dust and other loose matter shall be removed from the surface. 
Detrimental amounts of grease or oil still present shall be spot cleaned with solvent. 

c.  Method C: Power Tool Cleaning 

Method  C  of  cleaning  shall  be  performed  in  accordance  with  SSPC-SP  3  and  the  following 
requirements: 

After  oil,  grease,  soluble  welding  flux  residues,  or  salts  are  removed  by  the  methods  prescribed 
under Method A, loose mill scale, loose rust, weld flux, and spatter shall be removed with power wire 
brushes,  power  impact  tools,  power  grinders,  power  sanders,  or  by  any  combination  of  these 
methods.  

Power  wire  brushes  shall  be  of  the  rotary  cup  type  of  suitable  size  for  entering  all  accessible 
openings, angles, joints, and corners. The steel wires of such brushes shall have sufficient rigidity to 
clean the surface, shall be kept free of excess foreign matter, and shall be discarded when they are 
no longer effective.  

Power impact tools shall include power-driven chipping or scaling hammers, rotary scalers, single or 
multiple piston scalers, or other similar impact cleaning tools. Cutting edges of all tools shall be kept 
in effective condition.  

Sanding  or  abrasive  materials  used  in  power  sanding  shall  be  discarded  when  they  become 
ineffective.  

Rivet heads, cracks, crevices, lap joints, fillet welds, and re-entrant angles shall be cleaned by the 
use of power wirebrushes, sharp chisels used in chipping, or scaling hammers, rotary grinders, or 
sanders, or by a combination of such tools. 

All tools shall be operated in such a manner that no burrs or sharp ridges are left on the surface and 
no sharp cuts are made into the steel. Areas inaccessible for cleaning by power tools but accessible 
for hand tool cleaning shall be cleaned by methods outlined under Method B.  

After these cleaning operations are completed, dust and other loose matter shall be removed from 
the surface. If detrimental amounts of grease or oil are still present, these areas shall be spot cleaned 
with solvent. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-21 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

d.  Method D: White Metal Blast Cleaning 

Method  D  of  cleaning  shall  be  performed  in  accordance  with  SSPC-SP  5  and  the  following 
requirements: 

After  heavy  deposits  of  oil,  grease,  soluble  welding  flux  residues,  or  salts  are  removed  by  the 
methods prescribed under Method A, loose mill scale, rust-scale, and other foreign matter shall be 
removed and the entire surface thoroughly cleaned by blasting except that excessive rust-scale shall, 
preferably, be removed by impact tools, as prescribed under Methods B and C. Any of the following 
blast cleaning methods may be used:  

1.  Dry sandblasting, using compressed air blast nozzles and dry sand.  
2.  Wet or water-vapor sandblasting, using compressed air blast nozzles and water and 

sand.  

3.  Grit-blasting, using compressed air blast nozzles and grit made of crushed cast iron, 

malleable iron, steel, or other metals.  

4.  Shot-blasting,  using  compressed  air  nozzles  and  cast-iron,  malleable-iron,  or  steel 

pellets.  

5.  Closed, recirculating nozzle-blasting using compressed air or vacuum with any of the 

above named abrasives.  

6.  Grit-blasting using centrifugal wheels and grit made of crushed cast iron, malleable 

iron, steel, or other metals.  

7.  Shot-blasting using centrifugal wheels and cast-iron, malleable-iron, or steel pellets.  

Blast cleaning shall be performed with SAE No. S-330 shot or smaller, SAE No. C-25 grit or smaller, 
or dry sand passing through No. 16 sieve (1.18 mm), U.S. Standard Sieve Series.  

The surface,  if  dry  blasted,  shall  be  brushed  with  clean  brushes made  of  hair,  bristle,  or fiber,  or 
blown off with compressed air (from which detrimental oil and water have been removed), or cleaned 
by vacuum, for the purpose of removing any traces of blast products from the surface, and also for 
the removal of abrasive from pockets and corners.  

The  surface,  if  wet  sandblasted,  shall  be  cleaned  by  rinsing  with  fresh  water  to  which  sufficient 
corrosion inhibitor has been added to prevent rusting, or with fresh water followed immediately by 
an inhibitive treatment. This cleaning shall be supplemented by brushing, if necessary, to remove 
any residue.  

The compressed air used for  nozzle blasting shall be free of detrimental amounts of water or oil. 
Adequate separators and traps shall be provided.  

Blast  cleaning  operations  shall  be  done  in  such a  manner  that  no  damage  is  done to  partially  or 
entirely completed portions of the work.  

The blast-cleaned surface shall be examined for any traces of oil, grease, or smudges deposited in 
the cleaning operations. If present, they shall be removed as outlined under Method A. The Engineer 
will assure that surfaces have been cleaned prior to painting. 

e.  Method E: Commercial Blast Cleaning 

Method  E  of  cleaning  shall  be  performed  in  accordance  with  SSPC-SP  6  and  the  following 
requirements: 

Commercial blast cleaned surface, when viewed without magnification, shall be free of all visible oil, 
grease,  dust,  dirt,  mill  scale,  rust,  coating,  oxides,  corrosion  products,  and  other  foreign  matter, 
except for staining as noted. Random staining shall be limited to no more than 33 percent of each 
unit area of surface, which shall be 75 mm x 75 mm, and may consist of light shadows, slight streaks, 
or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied 
coating. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-22 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24.3.6 

Sampling and Testing 

Unless otherwise specified, sampling shall be performed by the Engineer in accordance with FSS 
141 method 1021, and the testing of the paint properties will be according to the procedures and 
methods listed in FSS 141, and as shown in  

Table 24-8: 

Table 24-8: Methods of testing Paint properties 

Test 

Method 

Percentage of pigment 

4021 

Isolation of vehicle 

4032 

Non-volatile in vehicle 

4053

Ahthalic anhydride 

7021 

Uncombined water 

4081 or 4082 

Consistency: Krebs-Stormer 

4281 

Coarse particles and skins 

4091 

Weight per gallon 

4184 

Set to touch time 

4061 

Condition in container 

3011 

Brushing properties 

2141, 4321 

Skinning 

4141 

Rosin and resin derivatives 

5031

Storage stability 

4142 

Dry through time 

4061 

Fineness of grind 

4411 

Note  1:  A  gravity  convection  oven  may  be  used  to  determine  the  non-volatile  content  of  the 
supercentrifuged vehicle if the procedure outlined in FSS 141 method 4041 is modified as follows: 
Weigh accurately from 0.8 to 1.2 g. of sample (by difference), heat for one hour, cool and weigh. Use 
the lower value to calculate the percentage of non-volatile matter. 

Note 2: Make the test on a portion of the isolated vehicle. 

24.3.7 

Time of Application 

The prime coat of paint, or pretreatment when specified, shall be applied as soon as possible after 
the  surface  has  been  cleaned  and  before  deterioration  of the  surface  occurs.  Surfaces that  have 
been cleaned with power tool or blast cleaning shall be prime coated within 8 hours after cleaning 
before visible or detrimental rusting occurs. Any oil, grease, soil, dust, or foreign matter deposited 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-23 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

on the surface after the surface preparation is completed shall be removed prior to painting. In the 
event  that  rusting  occurs  after  completion  of the  surface  preparation, the  surfaces  shall  be  again 
cleaned.  

Particular  care  shall  be  taken  to  prevent  the  contamination  of  cleaned  surfaces  with  salts,  acids, 
alkali, or other corrosive chemicals before the prime coat is applied and between applications of the 
remaining  coats  of  paint.  Such  contaminants  shall  be  removed  from  the  surface.  Under  these 
circumstances, the pretreatments or, in the absence of a pretreatment, the prime coat of paint shall 
be applied immediately after the surface has been cleaned. 

24.3.8 

Storage of Paint and Thinner 

All paint and thinner should preferably be stored in a separate building or room that is well ventilated 
and  free  from  excessive  heat,  sparks,  flame,  or  the  direct  rays  of  the  sun.  Paints  susceptible  to 
damage  from  excessive  heat  shall  be  kept  in  a  cooled  storage  space  when  necessary.  The 
Contractor shall take all mitigation measures to minimize fire hazard, e.g. the storage of cloths or 
cotton waste in metal containers or destroyed on daily basis. 

All containers of paint  shall remain unopened until required for use. Containers which have been 
opened shall be used first.  

Paint  which  has  livered,  gelled,  or  otherwise  deteriorated  during  storage  shall  not  be  used. 
Thixotropic materials which may be stirred to attain normal consistency are satisfactory. 

24.3.9 

Mixing and Thinning 

All ingredients in any container of paint shall be thoroughly mixed before use and shall be agitated 
often enough during application to keep the pigment in suspension.  

Paint mixed in the original container shall not be transferred until all settled pigment is incorporated 
into  the  vehicle.  This  does  not  imply  that  part  of  the  vehicle  cannot  be  poured  off  temporarily  to 
simplify the mixing.  

Mixing shall be by mechanical methods, except that hand mixing will be permitted for containers up 
to 20 liters in size.  

Mixing in open containers shall be done in a well ventilated area away from sparks or flames.  

Paint shall not be mixed or kept in suspension by means of an air stream bubbling under the paint 
surface.  

Where a skin has formed in the container, the skin shall be cut loose from the sides of the container, 
removed, and discarded. If such skins are thick enough to have a practical effect on the composition 
and quality of the paint, the paint shall not be used.  

The paint shall be mixed in a manner which will ensure breaking up of all lumps, complete dispersion 
of settled pigment, and a uniform composition. If mixing is done by hand, most of the vehicle shall 
be poured off into a clean container. The pigment in the paint shall be lifted from the bottom of the 
container with a broad, flat paddle, lumps shall be broken up, and the pigment thoroughly mixed with 
the vehicle. The poured-off vehicle shall be returned to the paint with simultaneous stirring, or pouring 
repeatedly  from  one  container  to  another  until  the  composition  is  uniform.  The  bottom  of  the 
container shall be inspected for unmixed pigment.  

Tinting  pastes  or  colors  shall  be  wetted  with  a  small  amount  of  thinner,  vehicle,  or  paint  and 
thoroughly mixed. The thinned mixture shall then be added to the large container of paint and mixed 
until the color is uniform. 

Paint which does not have a limited pot life, or does not deteriorate on standing, may be mixed at 
any time before using, but if settling has occurred it must be remixed immediately before using. Paint 
shall not remain in spray pots, painters' buckets, or similar containers overnight, but shall be gathered 
into a container and remixed before use.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-24 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

No thinner shall be added to the paint unless necessary for proper application. In no case shall more 
than 0.5 liter of thinner be added per 4 liters unless the paint is intentionally formulated for greater 
thinning.  

The type of thinner shall comply with the paint specification.  

When the use of thinner is permissible, thinner shall be added to paint during the mixing process. 
Painters shall not add thinner to paint after it has been thinned to the correct consistency.  

All thinning shall be done under supervision of one acquainted with the correct amount and type of 
thinner to be added to the paint. Coating materials shall be stirred at all times when adding thinner. 

24.3.10 

Application of Paint 

24.3.10.1  General 

The  Contractor  shall  apply  each  coat  to  the  wet  film  thickness  as  recommended  by  the  paint 
manufacturer to obtain the specified dry film thickness. The application rate of each coat shall be 
verified by the Contractor with a wet film paint thickness gauge immediately after applying paint to 
the surface. The application rate shall be confirmed by measuring the dry film thickness after the 
solvent has evaporated from the surface. 

The oldest of each kind of paint shall be used first. Paint shall be applied by brushing or spraying or 
a  combination  of  these  methods.  Daubers  or  sheepskins  may  be  used  when  no  other  method  is 
practicable for proper application in places of difficult access. Dipping, roller coating, or flow coating 
shall be used only when specifically authorized by the Engineer.  

Open seams at contact surfaces of built-up members which would retain moisture shall be caulked 
with red lead paste or other approved material before the second undercoat of paint is applied.  

Paint shall not be applied when the surrounding air temperature and surface temperature is below 
10°C. Paint shall not be applied when the temperature is expected to drop to 0°C before the paint 
has dried. Paint shall not be applied to iron and steel at a temperature over 32°C unless the paint is 
specifically formulated for application at the proposed temperature, nor shall paint be applied to iron 
and  steel  which  is  at  a  temperature  that  will  cause  blistering  or  porosity  or  otherwise  will  be 
detrimental to the life of the paint.  

Paint shall not be applied in fog or mist, or when it is raining or when the relative humidity exceeds 
85 percent. Paint shall not be applied to wet or damp surfaces.  

Any applied paint exposed to excess humidity, rain, or condensation shall first be permitted to dry. 
The damaged areas of paint shall be removed, the surface again prepared and then repainted with 
the same number of coats of paint of the same kind as the undamaged areas.  

If stripe painting is stipulated or if the Contractor chooses to do so at his option, all edges, corners, 
crevices, rivets, bolts, welds, and sharp edges shall be painted with the priming paint by brush before 
the steel receives its first full prime coat of paint. Such striping shall extend for at least 25 mm from 
the edge. When practicable, this stripe coat shall be permitted to dry before the prime coat is applied; 
otherwise, the stripe coat shall set to touch before the full prime coat is applied. However, the stripe 
coat shall not be permitted to dry for a period long enough to allow rusting of the unprimed steel. 
When desired, the stripe coat may be applied after a complete prime coat.  

To the maximum extent practical, each coat of paint shall be applied as a continuous film of uniform 
thickness, free of pores. Any thin spots or areas missed in the application shall be repainted and 
permitted to dry before the next coat of paint is applied.  

Each  coat  of  paint  shall  be  in  a  proper  state  of  cure  or  dryness  before  the  application  of  the 
succeeding coat. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-25 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24.3.10.2  Brush Application 

Brush application should always be undertaken using an appropriately sized, good quality synthetic 
or  natural  fibre  brush  compatible  with  the  product  being  applied  and  acceptable  to  the  paint 
manufacturer.  This  application  technique  shall  be  generally  used  for  coating  small  areas  with 
decorative  paints  and  for  surface  priming,  where  good  penetration  of  rusty  steel  substrates  is 
required. It is particularly suitable for the application of stripe coats and for coating complex areas 
where the use of spray methods would lead to considerable losses due to overspray and associated 
dry spray problems. 

The Contractor shall use brushes that have sufficient bristle body and length to spread the paint in 
a uniform film. Round, oval shaped brushes, or flat brushes no wider than 115mm shall be used. 
The Contractor shall evenly spread and thoroughly brush out the paint as it is applied. 

Paint shall be worked into all crevices and corners where possible and surfaces not accessible to 
brushes shall be painted by spray, daubers, or sheepskins. All runs or sags shall be brushed out. 
There shall be a minimum of brush marks left in the applied paint. 

Brush application shall require considerable care when applying non-convertible coatings over one 
another, e.g. vinyl on top of vinyl. In these cases, the solvents in the wet coat readily redissolve the 
previously dry bottom coat. Even a mild degree of the brushing out normally given to topcoats will 
cause pick-up of the previous coat and result in a very poor finish. Even, light strokes shall be used 
in these circumstances, covering a particular area with one or two brush strokes, and on no account 
working the bristles into the previous coat. 

24.3.10.3  Spray Application of Paint 

The equipment used for spray application of paint shall be suitable for the intended purpose, shall 
be capable of properly atomizing the paint to be applied, and shall be equipped with suitable pressure 
regulators  and  gages.  The  air  caps,  nozzles,  and  needles  shall  be  those  recommended  by  the 
manufacturer  of  the  equipment  for  the  material  being  sprayed.  The  equipment  shall  be  kept  in 
satisfactory  condition  to  permit  proper  paint  application.  In  closed  or  recirculating  paint  spray 
systems, where gas under pressure is used over the liquid, the gas shall be an inert one, such as 
nitrogen.  

Traps or separators shall be provided to remove oil and water from the compressed air. These traps 
or separators shall be of adequate size and shall be drained periodically during operations. The air 
from the spray gun impinging against the surface shall show no water or oil.  

Paint ingredients shall be kept properly mixed in the spray pots or containers during paint application 
either by continuous mechanical agitation or by intermittent agitation as frequently as necessary.  

The  pressure  on  the material  in  the  pot  and  of the  air  at  the guns  shall  be  adjusted for  optimum 
spraying effectiveness. The pressure on the material in the pot shall be adjusted when necessary 
for changes in elevation of the gun above the pot. The atomizing air pressure at the gun shall be 
high enough to atomize the paint properly but not so high as to cause excessive fogging of paint, 
excessive evaporation of solvent, or loss by overspray.  

Spray equipment shall be kept sufficiently clean so that dirt, dried paint, and other foreign materials 
are not deposited in the paint film. Any solvents left in the equipment shall be completely removed 
before applying paint to the surface being painted.  

Paint shall be applied in a uniform layer, with overlapping at the edge of the spray pattern. The spray 
pattern shall be adjusted so that the paint is deposited uniformly. During application, the gun shall 
be held perpendicular to the surface and at a distance which will ensure that a wet layer of paint is 
deposited on the surface. The trigger of the gun shall be released at the end of each stroke.  

All runs and sags shall be brushed out immediately or the paint shall be removed and the surface 
repainted.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-26 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Areas inaccessible to the spray gun shall be painted by brush. If not accessible by brush, daubers 
or sheepskins shall be used. Brushes shall be used to work paint into cracks, crevices, and blind 
spots which are not adequately painted by spray. 

24.3.10.4  Shop Painting 

Shop  painting  shall  be  done  after  fabrication  and  before  any  damage  to  the  surface  occurs  from 
weather or other exposure, and shall be applied in accordance with the procedures of AISC-420-
10/SPE-QP3 and SSPC-PA 1. The surface preparation shall be in accordance with SSPC-SP 10/ 
NACE No. 2. 

Shop  coats  consisting  of  the  prime  coat,  intermediate  and  finish  coats  shall  be  applied  in  the 
manufacturer’s plant unless otherwise specified in the Contract documents. The prime Coat shall be 
applied in the shop promptly after blast cleaning, but in no case shall the prime coat be applied more 
than 8 hours after blast cleaning or after visible or detrimental rusting occurs. Only Nylon web slings 
or padded lifting points shall be used to move shop primed steel to prevent damage to the coating. 

Surfaces damaged during shipment and handling shall be repaired using the same paint system as 
applied in the shop except that the primer coat shall be repaired using an Organic Zinc Primer when 
the primer Coat is repaired in the field. No paint shall be applied to areas to be welded in the field. 
No Vinyl paint (wash or finish coat) shall be applied to any faying surfaces. 

The  manufacturer  and  or  Contractor  shall  be  required  to  guarantee  his  work  against  defective 
workmanship or the use of defective materials for a period of ten years from the completion of works. 

A shop coat of paint shall have a minimum dry film thickness of 38 microns. Shop contact surfaces 
shall not be painted unless specified.  

Unless otherwise specified, surfaces to be in contact only after field erection shall be painted except 
where the paint will interfere with assembly.  

Surfaces not to be in contact but will be inaccessible after assembly shall receive either the full paint 
coats specified or three shop coats of the specified primer before assembly.  

The  areas  of  iron  and  steel  surfaces  to  be  in  contact  with  concrete  shall  not  be  painted.  Unless 
otherwise indicated on the Contract plans, the areas of iron and steel surfaces to be in contact with 
wood shall receive either the full paint coats specified or three shop coats of the specified primer.  

If the paint would be harmful to a welding operator or would be detrimental to the welding operation 
or the finished welds, the iron and steel shall not be painted within a suitable distance from the edges 
to be welded. Welding through inorganic zinc paint systems will not be permitted unless approved 
by the Engineer. 

Antiweld spatter coatings shall be removed before painting. Weld slag and flux shall be removed by 
methods at least as effective as those specified for the cleaning.  

Machine-finished or similar surfaces that are not to be painted, but do require protection, shall be 
protected with a coating of rust inhibitive petroleum, or other coatings which may be more suitable 
for special conditions.  

Erection marks and weight marks shall be copied on areas that have been previously painted with 
the shop coats. 

24.3.10.5  Field Painting 

Iron and steel structures shall be painted in accordance with SSPC-PA 1 as soon as practicable after 
erection.  

The  applicator  shall  stir,  strain,  and  keep  coating  materials  at  a  uniform  consistency  during 
application. Where the Engineer permits thinning, the applicator shall not reduce the coating material 
more than is necessary to obtain the proper application characteristics and to obtain the specified 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-27 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

dry  film  thickness.  The  applicator  shall  not  exceed  the  maximum  thinning  rate  allowed  by  the 
manufacturer. Coating materials shall be stirred at all times when adding thinner. 

Where  measurement  of  the  dry  film  thickness  may  become  difficult  or  dangerous  unless  the 
Contractor  maintains  or  provides  suitable  means  of  access,  wet  film  measurement  may  be 
authorized. In such cases the Engineer will pre-determine and notify the Contractor of the required 
wet film thickness, for each type of paint, to comply with the minimum dry film thickness specified.  

Iron and steel which has been shop coated shall be touched up with the same type of paint as the 
shop coat. This touch up shall include cleaning and painting of field connections, welds, rivets, and 
all damaged or defective paint and rusted areas. The Contractor may at his option apply an overall 
coat of primer in place of touch up or spot painting.  

Surfaces (other than contact surfaces) which are accessible before erection but which will not be 
accessible after erection shall receive all field coats of paint before erection.  

If possible, the final coat of paint shall not be applied until all concrete work is finished. If concreting 
or  other  operations  damage  any  paint,  the surface  shall  be  cleaned  and  repainted.  All  cement  or 
concrete spatter and drippings shall be removed before any paint is applied.  

Wet paint  shall  be  protected  against  damage from  dust  or  other  detrimental foreign  matter to the 
extent practicable. 

24.3.10.6  Drying of Painted Iron and Steel 

The maximum practicable time shall be allowed for  paint to dry before recoating or exposure. No 
drier shall be added to paint on the job unless specifically called for in the specification for the paint. 
No painted iron and steel shall be subjected to immersion before the paint is dried through. Paint 
shall  be  protected  from  rain,  condensation,  and  contamination,  until  dry,  to  the  fullest  extent 
practicable.  

24.3.10.7  Handling of Painted Iron and Steel 

Painted iron and steel shall not be handled until the paint has dried, except for necessary handling 
in turning for painting or stacking for drying.  

Paint which is damaged in handling shall be scraped off and touched up with the same number of 
coats and kinds of paint as were previously applied to the iron and steel.  

Painted iron and steel shall not be loaded for shipment or shipped until it is dry.  

Precautions shall be taken to minimize damage to paint films resulting from stacking members.  

24.3.10.8  Measurement of Dry Film Thickness (DFT) of Paints 

When a coating is applied to an iron or steel substrate, previously blast cleaned with abrasive grit or 
shot, the measurement of its dry film thickness is more complicated than that of a coating applied to 
a  smooth  steel  substrate.  The  measurement  results  are  influenced  by  the  profile  of  the  abrasive 
blasted surfaces which changes from point to point, instrumentation, and dry film thicknesses to be 
measured. The DFT shall be measured using a non-destructive magnetic gauge, which shall give a 
value measured from the surface of the coating to the magnetic plane within the surface profile. The 
magnetic plane shall be the theoretical point within the surface profile that the DFT gauge sees as 
being the average position of the substrate. 

a. 

Instrumentation 

Dry  film  thickness  (DFT)  shall  be  measured  using  Pull-Off  (Type  1)  or  Fixed-  Probe  (Type  2) 
Magnetic Gages. Type 1 Gages include Tinsley, Elcometer, Microtest, and Inspector models. Type 
2  Gages  include  Elcometic,  Ninitector, General  Electric,  Verimeter,  and  Accuderm models.  Other 
types of non-destructive electronic devices may be used if approved by the Engineer. 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-28 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

DFT gauges shall be calibrated on smooth or blasted steel panels and a correction factor for surface 
profile shall be considered. BS EN ISO 2808:2007, BS 3900-C5:2007, ISO 19840:2012 and SSPC-
PA 2 are accepted standards for measuring DFT. 

b.  Calibration 

i. 

Type  1  (Pull-off)  Magnetic  Gages  measure  the  coating  thickness  on  a  series  of 
reliable  standards  covering the  expected range  of paint  thickness. The  Contractor 
shall  record  the  calibration  correction  either  +  or  -  required  at  each  standard 
thickness.  To  guard  against  gage  drift  during  use,  the  Contractor  shall  re-check 
occasionally with one or more of the standards.  

When the gage adjustment has drifted so far that  large corrections are needed,  the Contractor  is 
advised to re-adjust closer to the standard values and recalibrate.  

For Type 1 gages, the preferred basic standards are small, chrome-plated steel panels that may be 
available from the National Institute of Standards and Technology (NIST) in coating thicknesses from 
13 to 203 microns.  

Plastic shims of certified thicknesses in the appropriate ranges may also be  used to calibrate the 
gages.  The  gage  is  held  firmly  enough  to  press  the  shim  tightly  against  the  steel  surface.  The 
Contractor shall record the calibration correction as above.  

ii. 

Type 2 (Fixed Probe) Magnetic Gages. Shims of plastic or of non-magnetic metals 
laid  on  the  appropriate  steel  base  (at  least  8  x  8  x  0.32  cm)  are  suitable  working 
standards. These gages are held firmly enough to press the shim tightly against the 
steel surface. The Contractor shall avoid excessive pressure that might indent the 
plastic  or,  on  a  blast  cleaned  surface,  might  impress  the  steel  peaks  into  the 
undersurface of the plastic.  

As per the National Institute of Standards and Technology (NIST), standard panels shall not be used 
to calibrate Type 2 gauges.  

c.  Measurement Procedures 

To determine the effect of the substrate surface condition on the gauge readings, access is required 
to some unpainted areas.  

Repeated gage readings, even at points close together, may differ considerably due to small surface 
irregularities. Three gage readings should therefore be made for each spot measurement of either 
the substrate or the paint. The Contractor shall move the probe a short distance for each new gage 
reading.  The  Contractor  shall  discard  any  unusually  high  or  low  gage  reading  that  cannot  be 
repeated  consistently.  The  average  of  the  three  gage  readings  shall  be  taken  at  the  spot 
measurement.  

i. 

Measurement with Type 1 (Pull-Off) Gage. The Contractor shall: 

  Measure (A), the bare substrate, at a number of spots to obtain a representative 

average value.  

  Measure (B), the dry paint film, at the specified number of spots.  

  Correct the (A) and (B) gage readings or averages as determined by calibration of 

the gage. Subtract the corrected readings (A) from (B) to obtain the thickness of 
the paint above the peaks of the surface.  

ii. 

Measurement with Type 2 (Fixed Probe) Gage. The Contractor shall: 

  Place a standard shim of the expected paint thickness on the bare substrate that 

is to be painted. Adjust the gage in place on the shim so that it indicates the known 
thickness of the shim.  

  Confirm the gage setting by measuring the shim at several other areas of the bare 

substrate.  Re-adjust  the  gage  as  needed  to  obtain  an  average  setting 
representative of the substrate.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-29 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

  With the gage adjusted as above, measure the dry point film at three points. The 

gage  readings  indicate  the  paint  film  thickness  at  the  three  points.  The  gage 
readings indicate the paint thickness above the peaks of the surface profile. 

  Re-check  the  gage  setting  at  frequent  intervals  during  a  long  series  of 

measurements.  

  Make five separate spot measurements spaced evenly over  each section of the 

structure, 9.25 square meters in area, or of other area as may be directed by the 
Engineer. The average of five spot measurements for each such section shall be 
not  less  than  the  specified  thickness.  No  single  spot  measurement  (average  of 
three  readings,  in  any  section)  shall  be  less  than  80  percent  of  the  specified 
thickness.  

  Since  paint  thickness  is  usually  specified  (or  implied)  as  a  minimum,  greater 

thickness that does not cause defects of appearance of functions, such as mud 
cracking, wrinkling, etc., is permitted unless otherwise specified.  

d.  Special Notes  

i. 

All  of  the  above  magnetic  gages,  if  properly  adjusted  and  in  good  condition,  are 
inherently accurate to within +15 percent of the true thickness of the coating.  

ii. 

Much larger, external errors may be caused by variations in method of use of the 
gages or by unevenness of the surface of the substrate or of the coating. Also, any 
other films present on the steel (rust or mill scale or even a blast cleaned profile zone) 
will add to the apparent thickness of the applied paint film.  

iii. 

The surface of the paint and the probe of the gage must be free from dust, grease 
and other foreign matter in order to obtain close contact of the probe with the paint 
and also to avoid adhesion of the magnet. The accuracy of the measurement may 
be affected if the coating is tacky or excessively soft.  

iv. 

The magnetic gages are sensitive to geometrical discontinuities of the iron and steel, 
as  at  holes,  corners  or  edges.  The  sensitivity  to  edge  effects  and  discontinuities 
varies from gage to gage. Measurements closer than 25mm from the discontinuity 
may not be valid unless the gage is calibrated specifically for that location.  

v. 

Magnetic gage readings also may be affected by proximity to another mass of  iron 
and steel close to the body of the gage, by surface curvature, and by presence of 
other magnetic fields.  

vi. 

All of the magnets or probes must be held perpendicular to the painted surface to 
produce valid measurements.  

vii. 

Cleanup. Upon completion, and before final acceptance, the Contractor shall leave 
the work site and adjacent areas in a neat and presentable condition satisfactory to 
the Engineer. 

24.4 

Painting Galvanized Surfaces 

The Contractor shall remove all oil, grease, or other contaminants on the surface by washing with a 
mineral  spirit  solvent  according  to  SSPC-SP  1.  Unless  otherwise  specified  in  the  Contract 
documents, the Contractor shall apply one of the coating systems shown in Table 24-9,  as selected 
and approved by the Engineer. 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-30 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Table 24-9: Galvanized surface coating systems 

Coat 

Paint System

 

10 

11 

 

Aggressive Environment 

Less Aggressive Environment 

Primer   

Polyamide-cured, Rust-inhibitive Epoxy 

3-4 mils DFT 

Vinyl Wash Primer 

 1-2 mils DFT 

Intermediate   

Epoxy Polyamide 

2-3 mils DFT 

Exterior acrylic latex 

1-2 mils DFT 

Top Coat   

Aliphatic Polyurethane Acrylic 

2-3 mils DFT 

Exterior acrylic latex 

1-2 mils DFT 

Total 
Thickness

1

   

7-10 mils DFT 

3-6 mils DFT 

Note 1: Dry Film Thickness (DFT). 

Test panels shall be galvanized in accordance with ASTM A123 / A123M 

– 12 prior to application of 

subsequent coatings. 

24.4.1 

Paint System No. 10 

– Polyamide Cured Rust Inhibitive 

Epoxy System 

Paint System No. 10 shall consist of the following:  

1. 

Primer  coat  on  galvanized  surfaces:

  Polyamide-cured,  rust-inhibitive  epoxy  primer 

shall comply with the following minimum requirements:  
 

Solids   

 

 

 

 

47% by volume 

Rust-inhibitive pigment 

 

 

44% by weight 

Non-volatile vehicle (epoxy resin) 

 

20.7% by weight  

 
All materials shall be applied in accordance with the manufacturer's directions. All surfaces 
shall be thoroughly cleaned to remove any oil, soap or other deleterious material which may 
affect the bond of the primer to the galvanized surfaces. 
 

2.  Intermediate coat: 

an intermediate coat of epoxy polyamide conforming to SSPC Paint 

22 shall be applied.

 

3.  Top coat: 

t

op coat of an aliphatic polyurethane acrylic, conforming to SSPC-Paint 36 

and Paragraph 3 of Article 24.3.2.1 shall be applied.

 

24.4.2 

Paint System No. 11 

– Vinyl Wash System 

Paint System No. 11 shall consist of the following:  

1.  Primer coat on galvanized surfaces:

 Vinyl Wash primer, conforming to composition and 

performance requirements of SSPC-Paint 27 standard. 

  

2.  Intermediate coat: 

an intermediate coat of acrylic latex conforming to SSPC-Paint 24 shall 

be applied.

 

3.  Top coat: 

t

op coat of acrylic latex conforming to SSPC Paint 24 shall be applied.

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-31 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24.5 

Painting  Steel  Sheet,  H,  Pipe  Pilings,  and  other 
Surfaces 

Unless otherwise specified in the Contract documents, steel sheet, H and Pipe pilings that will be 
installed in new fill, disturbed materials or fluctuating water tables shall be painted with amine-cured 
coal tar epoxy coating. The H-piles and sheet piling shall be painted 76 mm above the stabilization 
slab and to a 1.5 meter minimum below new fill material, disturbed soil or the lowest  elevation of 
fluctuating water tables. Steel piles exposed in water shall be coated the full height exposed to water 
plus  a  1.5  meter  embedment  length.  The  final  painting  requirements  shall  be  approved  by  the 
Engineer. 

This  work  shall  also  include  other  metal  and  concrete  surfaces  specified  in  the  particular 
specifications or indicated in the Contract plans to be painted with tar epoxy coating. 

Steel surfaces to be painted shall be coated with a minimum of 470 microns  DFT of amine-cured 
coal tar epoxy. The paint shall be applied in two coats. The first coat of coal tar epoxy shall be applied 
to a dry film thickness of 65 microns. The Contractor shall thin this first coat in accordance with the 
manufacturer's  recommendations.  The  covered  surface  shall  be  lightly  sand  blasted  to  achieve 
proper penetration before the application of first coat. The second coat of coal tar epoxy shall be 
applied to a dry minimum film thickness of 405 microns. The performance of the amine-cured coal 
tar epoxy coating shall be equivalent to SSPC-Paint 16. 

The heavy-duty, high solid, amine-cured, two component coal tar epoxy coating shall be shipped in 
two parts that must be mixed together before use.  

Amine-cured coal tar epoxy is a solvent borne paint and care must be taken to avoid inhalation of 
spray mist or vapour as well as contact between the wet paint and exposed skin or eyes. 

24.5.1 

Surface Preparation 

The  Contractor  shall  remove  weld  spatter,  protrusions,  and  laminations  in  steel.  Welds  shall  be 
grinded smooth in accordance with NACE RP0178-2003 (21002). All surface contaminants, oil and 
grease shall be removed in accordance with SSPC-SP 1. 

The  Contractor  shall  abrasive  blast  with  angular  abrasive  to  an  SSPC-SP  10/  NACE  No.  2 
cleanliness or higher. A surface profile of 2.0-4.0 mils shall be achieved. 

24.5.2 

Application Requirements 

The manufacturer shall furnish to the Engineer a notarized statement that verifies that each individual 
performance test has been completed and the results have met or exceeded the required standards. 
All testing for approval of coatings shall be paid for by the Contractor. 

The  Contractor  shall  take  all  possible  precaution  measures  to  protect  the  coating  from  damage 
during the driving operation. Coating repair strategies during installation shall be submitted by the 
Contractor for the Engineer’s approval.Table 24-10 shows the required characteristics of coal tar 
epoxy coating. 

Table 24-10: Characteristics of coal tar epoxy coating  

Component A 

Minimum 

Maximum 

Weight (kilograms per litre) 

1.46 kg/litre 

1.50 kg/litre 

Pigment (percentage by weight) 

42% 

47% 

Non-volatile content (percentage by weight) 

82.7% 

86.2% 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-32 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Component A 

Minimum 

Maximum 

Component B 

Minimum 

Maximum 

Weight (kilograms per litre) 

0.960 kg/litre 

1.000 kg/litre 

Non-volatile content (percentage by weight) 

82.7% 

86.7% 

Mixed components 

Value 

Total solids (percentage by volume, in accordance with ASTM 
D2697 - 03(2008)) 

70% 

Flash point (SETA) 

54

o

 C 

Appearance low sheen 

Black, smooth 

Mixing rate of 19 parts component A to 1 part Component B.  

For field application and capable of being applied at a 405 microns DFT in one coat.  

Pot life at 25°C and 80% relative humidity: 4 hours minimum.  

Drying or curing time at 25°C: Dry to touch after 6 1/2 hours. 

Shelf life: Six months from date of shipment, without livering or more than one third increase in 
viscosity with restoration to original viscosity by not more than 10% addition of thinner. 

24.6 

Painting Aluminium Surfaces 

24.6.1 

Surface Preparation 

The  preparation  of  aluminium  and  aluminium  alloy  surfaces  for  painting  shall  be  performed  in 
accordance  with  the  procedures  of  ASTM  D1730 

–  09.  The  type  of  treatment  shall  be  one  or  a 

combination of the following types, as indicated in the Contract plans or specified in the particular 
specifications, or approved by the Engineer. 

A.  Type A - Solvent Cleaning. 
B.  Type B - Chemical Treatments. 
C.  Type C - Anodic Treatments. 
D.  Type D - Mechanical Treatments.  

24.6.2 

Paint Systems for Aluminium Surfaces 

All aluminium shall be painted with one of the following systems. The required system or choice of 
systems shall be shown on the Contract plans or in the Particular Specifications. 

If not indicated on the Contract plans or specified in the Particular Specifications, the paint system 
applied to all aluminium surfaces shall be Paint System No. 11 Polyvinylidene Difluoride System. 

The Contractor shall specify the coating film thickness especially along cut ends and sharp 90 degree 
bends that shall be sufficient to prevent the ingress of moisture. The paint manufacturer shall provide 
the minimum acceptable dry film thickness on the product data sheet. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-33 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24.6.2.1 

Paint System No. 11 - Polyvinylidene Difluoride Coating 

The  Contractor  shall  apply  a  polyvinylidene  difluoride  (PVDF)  coating  to  sheet  aluminium  and 
extrusions to provide protection and a decorative organic coating in accordance with the following 
requirements and test procedures of AAMA 2605-05 and AAMA 620-02. 

Table 24-11: Polyvinylidene difluoride (PVDF) requirements 

Thickness 

20-30 Mils DFT

 

Chemical Resistance (ASTM D543 - 06) 

Excellent 

Abrasion Resistance (ASTM D4060 - 10) 

Excellent 

Tensile Strength at Break (ASTM D638 - 10) 

45 MPa 

Coefficient of Friction (ASTM D1894 - 11e1) 

0.4 Static, 0.3 Dynamic 

Dielectric Strength (ASTM D149 - 09(2013)) 

260 Volts per mil 

Hardness (ASTM D2240 - 05(2010)) 

80 (shore D) 

24.6.2.2 

Paint System No. 12 - Epoxy 

The Contractor shall apply an epoxy primer corrosion inhibiting lead and chromate free conforming 
to MIL-P-53022D followed by a chemical agent resistant coatings (CARC), Aliphatic Polyurethane, 
Single Component, Chemical Agent Resistant Coating in accordance with MIL-C-53039D. 

The epoxy primer shall be sprayed to a dry film thickness between 1.0 and 2.0 mils, and the chemical 
agent resistant coating shall be applied to a minimum dry film thickness of 2.0 mils. 

24.6.3 

Aluminium in Contact with Dissimilar Metals 

Where aluminium will contact dissimilar metals, the Contractor shall protect against galvanic action 
by painting contact surfaces as follows, unless otherwise indicated in the Contract plans or specifies 
in the particular specifications. 

1.  Where  aluminium  members  are  in  contact  with  steel,  prime  both  aluminium  and  steel 

members with one coat of paint meeting Federal Specification TT-P-645B. Paint aluminium 
with an additional coat of varnish containing 1 kg of aluminium pigment per gallon. 

2.  Where aluminium members are in contact with porous materials, masonry or concrete, apply 

to the contact surfaces of the aluminium members a heavy coat of alkali resistant bituminous 
paint. 

3.  Where  aluminium  members  are  embedded  in  concrete  containing  admixtures  which  are 

corrosive to aluminium, or in concrete subjected to highly corrosive environments, prime the 
aluminium with one coat of paint meeting Federal Specification TT-P-645B.  

24.7 

Painting Exposed Surfaces of Concrete Structures 

Except  where  waterproofing  or  ceramic tiling  is specified  in  the  Contract  documents,  all  concrete 
surfaces shall be protected by a painting system as specified here below. 

Painting works shall include all exposed items or surfaces throughout the concrete structure, except 
as  otherwise  indicated  on  the  Contract  plans.  Such  surfaces  shall  include  bridge  deck 
superstructures, including barriers/railings; all exposed surfaces of underpasses, tunnel walls, and 
retaining walls, including barriers/railings or other structural elements; and internal surfaces where 
specified on the Contract plans. Extent of this painting shall be as indicated in the Contract plans, as 
directed by the Engineer, and as specified herein. 

 

 

 

 

 

 

 