Index Manuals Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)
|
|
S TANDARD C ONSTRUCTION SPECIFICATIONS
PART 2
–
R OAD S TRUCTURES
Page 22-36 C HAPTER 22:
P RESTRESSING S YSTEMS
First Edition -January 2018
b. Vent ends shall be removed at least 25 mm below the concrete surface after the grout has set. c. Voids shall be filled with epoxy grout. All miscellaneous material used for sealing grout caps shall be removed before carrying out further work to protect end anchorages. 22.8.8.9 Protection of End Anchorages Permanent grout caps constructed from either stainless steel or fibre-reinforced polymer shall be The following requirements apply: a. Within seven days upon completion of the grouting, the anchorage of post-tensioning bars and tendons shall be protected, as indicated in the Contract documents. The application of b. All laitance, grease, curing compounds, surface treatments, coatings, and oils shall be removed by grit or water blasting, using a minimum 70 MPa nozzle pressure. The surface c. Epoxy shall be mixed and applied as per the manufacturer's current standard technical guidelines. All pour-backs shall be in leak-proof forms, creating neat lines. Epoxy grout d. Exposed pour-back or group cap surfaces, except on transverse tendons, shall be coated with an elastomeric coating system having a thickness of 760 μm to 1,140 μm. Concrete, grout caps, or other substrates shall be structurally sound, clean, and dry. Concrete shall be e. A 0.6 m by 1.2 m concrete test block shall be constructed with a similar surface texture to the coated surfaces and a vertical face shall be coated with the elastomeric coating system μm to 1,140 μm, without runs and drips, the Contractor shall have to determine the number of coats needed. Elastomeric coatings 22.8.8.10 Construction Traffic and Operations Causing Vibrations For the designated period of time after grouting of a tendon begins, vibrations from all sources — such as moving vehicles, jackhammers, compressors, and generators — that are operating within the affected bridge superstructure shall be eliminated and pile-driving and soil compaction within 90 |