Index Manuals Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)
|
|
S TANDARD C ONSTRUCTION SPECIFICATIONS
PART 2
–
R OAD S TRUCTURES
Page 21-79 C HAPTER 21:
C ONCRETE S TRUCTURES
First Edition -January 2018
• Details and locations of all other items to be embedded in the segments, such as inserts, lifting devices, and post-tensioning hardware, shall be shown. • Prestressing details shall include sizes and properties of tendons, anchorages, plates, assemblies, and stressing equipment — as well as details of the stressing procedure and stressing sequence, details and locations of all couplers, and additional reinforcement • A table giving jacking sequence, jacking forces, and initial elongation of each tendon at each stage of erection for all post-tensioning. • A table showing elevations and geometry to be used in positioning the forms for the next segment to be cast. • Graphs, charts, or tables showing the theoretical location of each segment, as erected or placed, shall be furnished to the Engineer for use in checking the erection of the • Details of tie-down tendons and temporary and permanent bearing assemblies as required. • Details of grouting equipment, grout mix design, method of mixing, and placing grout shall be provided. 21.20.4 Forms Shop drawings shall be submitted for forms and form travellers, as required by the Contract In addition to the requirements of the Contract documents, the forms used to cast the concrete • Match-casting for precast segmental construction. • Producing the segments within the tolerances permitted. • Accommodating block outs, openings, and protrusions. • Adjusting to changes in segment geometry as shown in the Contract documents, or for correcting previous minor casting errors to prevent accumulations. • Stripping without damage to the concrete. • Providing a tight, leak-proof joining to the previous segment. Bulkheads must be capable of connecting the ducts in a manner to hold their position and prevent Where sections of forms are to be joined on the exterior face of the segment, an offset in excess of Forms shall not be removed until the concrete has attained the release strength specified in the 21.20.4.1 Forms for Precast Segmental Construction All side, bottom, inside, and header forms for precast segmental construction shall be constructed Forms shall be of sufficient thickness, with adequate external bracing and stiffeners, and shall be Form grades and alignments shall be checked each time they are set and shall be maintained during |