Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 6

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     4      5      6      7     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 6

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-47 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.12.6.3  Sample 

Prior  to  the  construction  of  the  pier,  wingwall,  retaining  walls,  and  abutment  rustication,  the 
Contractor shall submit to the Engineer for approval a full-size sample of a section of each type of 
rustication constructed of concrete. These samples 

shall be provided at the Contractor’s expense. 

21.12.6.4  Construction 

No  loads  shall  be  placed  on  the  concrete  architectural  rustication  in  piers,  abutments,  wingwalls, 
retaining Walls, at any time during or on completion of construction. 

Very tight (water-sealed) shutters  shall be used. A small mock-up with the approved mix shall be 
demonstrated before production. 

The Contractor shall submit his proposed construction method, complete with all details and written 
description,  to  the  Engineer  for  approval.  The  Contractor  shall  receive  written  approval  of  the 
Engineer of his proposed construction method prior to the start of construction. 

21.13 

Precast Concrete Structural Members 

Precast concrete structural members shall be constructed and placed in the work in conformance 
with  the  details  specified  in  the  Contract  documents,  as  specified  herein,  and  as  directed  by  the 
Engineer. 

If approved by the Engineer, the Contractor may use precasting methods for elements of the work 
that are otherwise indicated to be constructed by the cast-in-place method. When such precasting 
is  proposed,  the  Contractor  shall  submit  full  design  calculations  and  working  drawings  showing 
construction joint details and any other information required by the Engineer. 

21.13.1 

Quality Assurance 

21.13.1.1  Reference Codes and Standards 

Codes and standards shall be as specified herein and the Contract documents. 

1.  ACI 301-10 

“Specifications for Structural Concrete”; 

2.  ACI 318-08 

“Building Code Requirements for Structural Concrete and Commentary; 

3.  Precast Concrete Institute MNL-116-99, 

“Manual for Quality Control for plants and production 

of Structural 

Precast Concrete Products”; 

4.  Precast  Concrete  Institute  PCI  MNL-120-14, 

“PCI  Design  Handbook  –  Precast  and 

prestressed Concrete, 7

th

 Edition

”; 

5.  Precast Concrete Institute MNL 127-99

, “Erectors’ Manual: Standards and Guidelines for the 

Erection of Precast Concrete Products

”; 

6.  American Welding Society (AWS) - D1.1/D1.1M:2010, Structural Welding Code 

– Steel; and 

7.  American Welding Society (AWS) - D1.4/D1.4M:2011, Structural Welding Code 

– Reinforcing 

Steel. 

21.13.1.2  Qualifications of Precast Prestressed Concrete 

Subcontractor 

The  proposed  organization  for  the  performance  of  the  prestressed  concrete  works  under  these 
specifications  shall  be  certified  by  the  Precast/Prestressed  Concrete  Institute,  Plant  Certification 
Program, prior to start of production of works. 

21.13.1.3  Welder Qualifications 

Welders shall be qualified in accordance with AWS D1.1/D1.1M:2010 for all weld operations on the 
job. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-48 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.13.2 

Precast Concrete Submittals 

21.13.2.1  Working Drawings 

Whenever specified in the Contract documents 

— or requested by the Engineer — the Contractor 

shall  provide  working  drawings  for  precast  members.  Such  drawings  shall  include  all  details  not 
provided in the Contract documents for the construction and the erection of the members and shall 
be approved before any members are cast. Such approval shall not relieve the  Contractor of any 
responsibility under the Contract documents for the successful completion of the work. 

21.13.2.2  Shop Drawings 

All shop drawings shall be submitted for review and approval in accordance with the requirements 
specified in the Contract documents and these standard specifications. Prints of the final approved 
shop drawings shall be furnished by the Contractor for the Engineer's use and as many other prints 
shall be provided as may be needed by the Contractor to facilitate and expedite performance of the 
Works. 

All shop drawings shall show each member location, fabrication details, joint and openings details, 
identification  markings,  reinforcement,  connection  details,  dimensions,  embedded  items  and 
relationship  to  adjacent  materials  and  construction  in  sufficient  detail  to  facilitate  manufacture, 
handling, and erection. Identification markings shall include date of casting. 

Reinforcement  and  connection  designs  shall  be  accompanied  by  supporting  engineering  data, 
including all loading details, for review by the Engineer. 

The  shop  drawing  submittal  shall  include  erection  and  handling  procedure  and  sequence  for  all 
precast members. 

21.13.2.3  Samples 

Samples shall be submitted in the quantity as directed by the Engineer for the following: 

1.  Embedded items 
2.  Anchorages 
3.  Joint materials 

21.13.2.4  Full Size Sample 

After the Engineer has approved the shop drawings, the precast concrete Fabricator shall produce 
full-size  typical  members  for  inspection  by  the  Engineer  at  the  production  site.  If  approved, 
production  of  additional  members  may  proceed  and  the  approved  samples  may  be  used  in  the 
Project after the production of other such members. If the full-size samples are rejected, required 
corrections shall be performed or new full-size samples shall be produced until approval is obtained. 

All criteria covered by this article on submittals and approval shall also apply to any subcontractor 
conducting any of the respective precast prestressed concrete work. 

21.13.3 

Precast Concrete Materials and Manufacture 

Unless otherwise specified in the Contract documents, all concrete for precast structural members 
shall be Class C50/20 concrete, meeting the requirements of  Section 4.3 of  Chapter 4,  Concrete 
Works, of these Standard Specifications, and Section 21.3.4. Steel reinforcement shall comply with 
Section 21.3.5. Grout in precast works shall comply with Section 21.18.3. The construction of precast 
concrete fascia panels shall comply with the requirements of Section 21.16. 

Precast  concrete  shall  be  as  dense,  and  reach  the  compressive  strengths,  as  specified  herein. 
Material  gradations  and  proportions  may  be  varied,  subject  to  the  samples  submitted  by  the 
Contractor to the Engineer for its approval. All requirements of other articles in this chapter referring 
to materials and manufacturing processes for cast-in-situ and prestressed concrete shall apply to 
precast concrete, except those requirements that are modified or supplemented by the provisions 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-49 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

that  follow.  Additionally,  the  Contractor

’s  work  shall  satisfactorily  ensure  the  Engineer  that  the 

precast concrete units are not moved or loaded until they have attained the required strength. 

When  precast  members  are  manufactured  in  established  casting  yards,  the  Manufacturer  shall 
oversee the continuous monitoring of the quality of all materials and concrete strengths. Tests shall 
be performed in accordance with appropriate AASHTO or ASTM methods. All sampling and testing, 
and the results of all tests, shall be made available to the Engineer, which shall be allowed to observe 
sampling and testing procedures. 

Established precast concrete manufacturing plants shall be certified under the Precast/ Prestressed 
Concrete Institute (PCI) certification program 

— or an alternative equivalent program for the category 

of work being manufactured. 

Additionally,  plant  quality  control  (QC)  personnel  shall  be  certified  in  the  PCI  QC  personnel 
certification  program,  Level  II.  Plant  QC  managers  shall  be  certified  PCI,  Level  III.  These 
requirements may be met by alternative, equivalent experience and certification. 

Precast  members  shall  be  cast  on  rigid  beds  or  pallets.  When  casting  the  bearing  surfaces,  the 
Contractor  shall  use  special  care  to  ensure that they  will  join  properly  with  other  elements  of the 
structure. 

For prestressed precast units, several units may be cast in one continuous line and stressed at one 
time. Sufficient space shall be left between unit ends to permit access cutting of the tendons after 
the concrete has attained its required strength. 

The consistency of the concrete will be measured by the Engineer by the slump test in accordance 
with  ASTM  C143  /  C143M  -  10a  or  BS  EN  12350-2:2009.  The  slump  of  all  concrete  shall  be  as 
approved by mix design and as directed by the Engineer.  

As  soon  as  their  removal  shall  not  cause  distortion  of  the  concrete  surface,  the  Contractor  may 
remove  the  side  forms,  providing  that  curing  is  not  interrupted.  Members  shall  not  be  lifted  from 
casting beds until their strength will sufficiently prevent damage. 

When cast-in-place concrete will later be cast against the top surfaces of precast beams or girders, 
these surfaces shall be finished to a coarse texture by brooming with a stiff, coarse broom. Prior to 
shipment, such surfaces shall be cleaned of laitance or other foreign material by sandblasting, or 
another approved method. 

When precast members are designed to be abutted together in the finished work, each member shall 
be match-cast with its adjacent segments to ensure proper fit during erection. As the segments are 
match-cast,  they  shall  be  precisely  aligned  to  achieve  the  final  structure  geometry.  During  the 
alignment, the Contractor shall make adjustments to compensate for deflections. 

21.13.3.1  Formwork for Precast Prestressed Members 

Formwork for all precast, prestressed members shall comply with the requirements of Section 1.20 
of Chapter 01, General Requirements, of these Standard Specifications, and as specified herein. 

All  forms  shall  be  constructed  and  maintained  mortar-tight,  of  sufficient  strength  to  withstand 
pressures to maintain true to the shapes and dimensions indicated on the Contract plans to provide 
completed  members  of  shapes,  lines,  and  dimensions  indicated  within  fabrication  tolerances 
specified  herein. The  casting  bed shall  have  a  concrete  deck  to  which  the  bottom forms  shall  be 
adequately anchored. Bottom forms shall be placed to provide for camber and to allow for automatic 
cambering resulting from transfer of tendon prestress to the concrete, and shall be maintained in 
true  alignment  and  of  sufficient  stiffness  to  prevent  excessive  deflection  under  the  load  of  wet 
concrete. Self stressing moulds shall not be allowed. 

Forms  and  all  related  supports  shall  be  designed  to  anticipate  shortening  of  members  due  to 
concrete shrinkage and the transfer of pre-tensioning or post-tensioning force to the concrete. Forms 
shall be constructed to compensate for this shortening so that the centre-to-centre bearing distance 
of the completed beam under full dead load will be as indicated on the Contract plans. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-50 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Side forms shall be of steel and shall be supported without resort to ties or spreaders within the body 
of the member. They shall be braced and stiffened so that no undesirable deflection or curvature 
takes place under concrete pressure. They shall be so designed that proper cleaning of the forms 
between uses is facilitated. 

The ends and sides of adjacent sections of forms which are butt joined shall match smoothly and 
tightly  and  shall  result  in  proper  alignment. The side  forms  shall  be  cross-tied  above the finished 
surface of the member at sufficiently close spacing to maintain true cross-sectional dimensions. 

All  exposed  outside  edges  shall  be  beveled  or  chamfered  as  indicated  on  the  Contract  plans. 
Leakage of mortar will not be permitted. Joints between soffit, side forms, and bulkheads shall be 
tight and, if necessary, shall be gasketed with rubber. Rubber may also be used to provide the corner 
chamfers. Plugging of holes and slots in the forms shall be neatly done so that the finished members 
will have a workmanlike appearance acceptable to the Engineer. 

Before the concreting operations begin, the forms and casting bed shall be treated with a suitable 
form lacquer or oil to prevent bonding of the concrete. The form lacquer or oil shall be of such quality 
as  to  leave  no  stains  or  discoloration  on  the  member  faces.  Extreme  care  shall  be  exercised  to 
prevent the coating of strands and reinforcement steel with such material and any strands or bars 
so contaminated shall be satisfactorily cleaned or replaced. 

Forms  shall  be  free  from  paint  or  other  protective  substance  that  may  cling  to  the  surface  of  the 
finished precast members. Forms not thoroughly cleaned after prior use shall not be used. 

No form ties, spreaders, or forming facilities shall penetrate the body of the member, except those 
necessary to provide the ultimate openings as indicated on the Contract plans. Before any forms are 
removed, the concrete shall have attained sufficient strength to prevent injury due to such removal. 
No forms shall be removed without the approval of the Engineer. Proper care and precautions shall 
be exercised in removing forms so that no damage results to the finished surfaces. 

In the event that during the casting of members it becomes apparent that forms have deteriorated to 
the  degree  that  finished  precast  members  no  longer  can  be  constructed  without  approaching  or 
exceeding  the  dimensional  tolerance  limits,  the  Engineer  may  order  production  suspended  with 
respect  to  the  use  of  the  unsatisfactory  forms  and  until  they  have  been  completely  renovated  or 
replaced by the Contractor. 

Built-in  items  and  anchorages  shall  be  accurately  positioned  and  secured  to  form  work.  The 
Contractor  shall  locate  such  items  and  anchorages  where  they  do  not  affect  the  position  of main 
reinforcement or placing of concrete. Bearing plates shall not be relocated in units unless approved 
by the Engineer. 

All exposed corners of all precast concrete beams, columns, spandrels, and other members shall 
have a 12 mm minimum, 45 degree chamfer unless otherwise indicated on the Contract plans. The 
Contractor shall form all recesses, design bevels, and other requirements indicated on the Contract 
plans. 

21.13.3.2  Precast Prestressed Concrete Deck Panels 

The fabrication, handling, storing, transporting and erecting of the precast prestressed concrete deck 
panels  shall  be  as  indicated  on  the  Contract  plans,  as  specified  herein  and  as  directed  by  the 
Engineer. 

The Contractor shall provide and install the deck panels, complete, furnishing all materials, labor and 
equipment and performing all required work as indicated on the Contract plans, as specified herein, 
and as directed by the Engineer. 

The precast prestressed concrete deck panel work shall include,  but not by  way of  limitation, the 
furnishing and installing of the deck panels, the steel shims, the preformed filler strips, the adhesive, 
the grout and all appurtenances. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-51 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

a.

 

Materials for Deck Panels 

Concrete  materials  used  in  the  fabrication  of  the  precast  deck  panels  shall  comply  with  the 
requirements of this chapter and the following requirements: 

  Concrete shall consist of Class C50/20 concrete that shall meet the requirements of Section 

4.3  of  Chapter  4,  Concrete  Works,  of  these  Standard  Specifications

 

— 

unless  otherwise 

indicated on the Contract drawings. 

  Aggregates for the concrete shall be graded as shown in Table 21-8: 

Table 21-8: Concrete aggregate size for deck panels 

Sieve Size (mm) 

Percent Passing (%) 

12.5 

100 

9.5 

95 

– 100 

4.75 

30 

– 60 

– 15 

1.18 

– 5 

  Steel shims shall be constructed of ASTM A36 / A36M - 08 Steel. 

  Preformed filler strips shall be suitable, compressible material 

— as approved. 

  Grout  shall  consist  of  an  approved,  flowable,  non-shrink,  non-metallic  grout  containing 

sulphate-resistant cement. It shall have a minimum compressive strength of 20.6 MPa at an 
age of 24 hours, when tested using applicable portions of ASTM C109 / C109M - 11b. Grout 
temperature shall be 

≤ 30

o

 C. 

  Grouts shall show no expansion after final set takes place, when tested in accordance with 

ASTM C827 / C827M - 10. It shall have an initial setting time of not less than 45 minutes. 

  Embedded,  threaded  inserts  shall  be  manufactured  from  round  or  hexagonal,  Type  304, 

stainless-steel  bar  that  complies  with  SAE  AMS-QQ-S-763;  or  Type  304,  stainless-steel 
schedule-40 pipe. 

a.

 

Fabrication of Deck Panels 

The  fabrication  of  the  deck  panels  shall  comply  with  the  applicable  requirements  as  specified  in 
Section 21.13.3 and shall be as approved by the Engineer. 

b.

 

Tolerances for Deck Panels 

The maximum dimensional tolerances for the deck panels are listed in Table 21-9. It is intended that 
the dimensions of all deck panels shall be well within these tolerances and that the maximum values 
shall be permitted to be approached or equalled only occasionally. Equipment and methods which 
permit an undue proportion of dimensions approaching the tolerance limits shall not be used. Deck 
panels having dimensions outside the tolerance limits will be rejected by the Engineer. 

Table 21-9: Maximum dimensional tolerances for deck panels 

Dimension 

Tolerance 

Panel depth (thickness) 

+ 9.5 mm, -3.2 mm 

Panel length (parallel to strands) 

± 25.4 mm 

Panel width 

+ 3.2 mm, - 12.7 mm 

Position of strands (vertical)   

± 3.2 mm 

Position of strands (horizontal) 

 

± 12.7 mm 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-52 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.13.4 

Sampling and Testing of Precast Concrete Structural 
Members 

Sampling and testing shall be in general compliance with this chapter and the provisions of PCI MNL-
117-77. The Contractor shall employ the services of an independent testing laboratory approved by 
the  Owner  to  test  the  cement  and  aggregates,  design  the  concrete  mixes,  and  make  all  tests  of 
concrete,  reinforcing  steel,  and  prestressing  steel  and  such  other  materials  as  directed  by  the 
Engineer. The laboratory shall have at least five years’ experience in performing the specified tests. 

21.13.5 

Curing Precast Concrete 

Unless otherwise permitted, precast members shall be cured by the water, waterproof cover, or the 
steam or radiant-heat methods. Using insulated blankets shall be permitted with the waterproof cover 
method. When the waterproof cover method is used, the air temperature beneath the cover shall not 
be  less  than  10  degrees  Celsius  and  live  steam  or  radiant  heat  may  be  used  to  maintain  the 
temperature above the minimum value; the maximum concrete temperature during the curing cycle 
shall  not  exceed  71  degrees  Celsius;  and,  the  waterproof  cover  shall  remain  in  place  until  the 
concrete’s compressive strength reaches the strength specified for de-tensioning or stripping. 

The  ends  of  prestressed  concrete  members  shall  be  treated  with  a  glass-reinforced  plastic  lining 
(GRP) to protect the strand ends from corrosion. The Contractor shall submit a method statement 
for the application of the liner for the Engineer’s approval. 

21.13.6 

Precast Concrete Storage and Handling 

The handling of precast prestressed concrete members from the time of placing of concrete in the 
forms until they are in place in the structure shall be in accordance with the standard specifications. 
Failure to comply with these specifications may result in damage or destruction of the member by 
the internal stresses. Any member damaged during handling, storing, transporting, or erecting shall 
be replaced by the Contractor at his expense. 

When handling and moving precast, prestressed concrete members, the Contractor shall exercise 
extreme care. Girders shall be maintained and handled in an upright, or vertical, position at all times; 
and, the directions of the reactions 

— with respect to the member — shall be as in the final position. 

Support  points  during  transportation  and  storage  shall  be  located  within  750  mm  of  their  final 
position;  otherwise,  their  location  shall  be  as  shown  on  the  shop  drawings.  During  lifting,  the 
Contractor shall support the girders only by the inserts provided for that purpose.  

Proposed methods for handling, lifting, and erecting precast concrete elements; and the details of 
any inserts required to be cast into the girders for such purposes shall be included in the 

Contractor’s 

working drawings 

— as required by Article 21.13.2.1.  

During transportation, the ends of the girders shall not extend a distance of more than the depth of 
the girder and in no case more than 1 m beyond the bolsters or other supports on the transporting 
vehicle. Deck beam ends shall not extend a distance of more than 1.5 times their depth and in no 
case more than 1 m beyond the supports. Precast girders shall be braced laterally to prevent buckling 
during transportation and erection. This bracing shall be securely attached to the top flange of the 
girders and shall be of sufficient stiffness to prevent lateral deflection of the top flange during handling 
for transportation and erection. 

During  storage,  the  supports  shall  maintain  the  girders  in  a  level  position  and  without  twisting. 
Stacking girders  while in storage will be permitted only with the approval of the Engineer.  If such 
permission is granted, the supports of all girders shall be in the same vertical planes and shall be of 
adequate thickness to prevent damage to the lifting devices. 

Prestressed concrete members shall not be shipped until tests on concrete cubes, manufactured of 
the same concrete and cured under the same conditions as the girders, indicate that the concrete of 
the  particular  member  has  attained  a  compressive  strength  equal  to  the  specified  28-day 
compressive strength 

— except when otherwise specified or approved by the Engineer.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-53 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Precast units shall be so stored, hoisted, transported, and fixed that they shall not be overstressed 
at any time or suffer any cracking or damage. Units damaged by improper storage or handling shall 
be replaced at the Contractor's expense. 

21.13.7 

Precast Concrete Erection 

During all stages of construction, the Contractor shall ensure the structural integrity of the precast 
members.  Lifting  devices  shall  be  used  in  a  manner  that  does  not  cause  damaging,  bending,  or 
tensional  forces.  After  a  member  has  been  erected,  but  until  it  is  secured  to  the  structure,  the 
Contractor  shall  provide  temporary  braces  to  resist  wind  or  other  loads  and  to  ensure  proper 
alignment and safety. If accidental loading is imparted on the precast member, the Contractor shall 
prepare  an  evaluation  of  the  accidental  loading  effects,  and  shall  share  this  evaluation  with  the 
Engineer  to  ensure  that  the  member  has  not  been  damaged.  Elements  shall  be  rejected  by  the 
Engineer if the analysis is not conclusive.  

When  erecting  girders,  the  Contractor  shall  take  care  to  keep  bridge  seats  and  tops  of  bearing 
devices free of foreign materials. Any shifting of girders shall be done while they are held free of the 
foundation. 

Placement of, or the use of, erecting equipment supported on the girders or the bridge deck shall 
not be permitted by the Engineer. 

Precast  concrete  members  shall  be  erected  level,  plumb,  square  and  true  within  the  allowable 
tolerances.  They  must  be  positioned  so  that  cumulative  dimensional  error  does  not  occur.  Joints 
shall be correctly aligned and uniform joint width shall be maintained as erection progresses. Each 
member  shall  be  securely  fastened  in  place  as  indicated  on  the  approved  shop  drawings. 
Adjustments or changes in connections, which could involve additional stresses in the products or 
connections, will not be permitted without approval by the Engineer. 

Precast concrete members shall be lifted and supported during erection operations only at the lifting 
or  supporting  points,  or  both,  as  shown  on  the  approved  shop  drawings.  After  erection,  exposed 
locations shall be patched to match adjacent surfaces. 

Unless otherwise specified in the Contract plans, installation tolerances of the erected members shall 
not exceed following tolerance limits specified in  PCI MNL 127-99, 

“Standards and Guidelines for 

the Erection of Precast Concrete Products

.” 

  Variances from Plumb: 6 mm in 6.00 m run or story height; 12 mm total in 12.00 m or longer 

run. 

  Variations from level or elevation: 6 mm in 6.00 m run; 10 mm in 12.00 m run; 

 12.00 mm 

maximum. 

  Variation from position in plan

:

 

12 mm maximum. 

  Offsets in alignment or adjacent members at Joint: 6 mm in 3.0 m run; 10 mm maximum. 

The Contractor shall be responsible for chipping, spalling, cracking or other damage to the members 
until  they  are  erected  at  the  job  site.  After  installation  is  completed,  any  further  damage  is  the 
responsibility of the Contractor. 

No stresses, except for the allowed adjustment in connections indicated above, shall be introduced 
into precast members or their connections in order to make connections fit. 

The  Contractor  shall  protect  members  from  damage  by  field  welding  operations  and  provide 
noncombustible shields as necessary during these operations. 

Structural welds shall be made by certified welders in accordance with the erection drawings which 
shall clearly specify type, extent, sequence and location of welds. A fire extinguisher of an approved 
type and in operating condition shall be located within reach of welding operations at all times. 

All work and materials of other trades shall be adequately protected by the erector at all times. 

After precast concrete members have been set in place, the work shall be inspected by the Engineer. 
Members  found  to  be  slightly  damaged  may  be  authorized  for  repair  at  this  time.  Repairs  shall 
conform  to the  Engineer's requirements  and  shall  be  structurally  sound. Members  that  cannot  be 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-54 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

satisfactorily repaired, or that are off-colour in the opinion of the Engineer shall be replaced with new, 
undamaged units at no additional cost to the Owner. 

Exposed faces shall be cleaned as necessary to remove dirt and stains that may be on the members 
after erection. The precast units shall be cleaned only after all installation procedures are completed. 
The  exposed  surfaces  shall  be  cleaned  in  accordance  with  the  precast  Manufacturer's 
recommendations. 

21.13.7.1  Precast Prestressed Concrete Girders 

The Contractor shall verify building structures, anchors, devices, and openings are ready to receive 
work of this section. 

The  Contractor  shall  check  both  line  and  grade  in  sufficient  time  before  erection  is  scheduled  to 
permit  any  necessary  corrections.  Corrections,  if  any,  shall  be  made  by  the  Contractor  before 
erection begins. Proposed corrections should be submitted to the Engineer for approval. 

The  Contractor  shall  submit  his  proposed  method  of  handling,  lifting,  erecting  and  details  of  any 
inserts required to be cast into the members for such purpose shall be included in the shop drawings 
required by Section 21.13.2. 

Each member shall have proper identification as to number, position in the structure, and date of 
casting painted on its top and on one end. Members shall not be shipped to the job site before the 
28-day compressive strength data are available except as otherwise specified or approved by the 
Engineer. 

21.13.7.2  Precast Prestressed Concrete Deck Panels 

Precast deck form panels shall be erected and placed so that the fit of mating surfaces shall  not 
create excessive grout leakage. If such a fit is not provided, joints shall be dry-packed or sealed with 
an acceptable caulking compound prior to placing the cast-in-place concrete. End panels for skewed 
structures may be sawed to fit the skew. 

Deck panels shall be fabricated and placed in such a manner that they will extend approximately 
100 mm over the girders. They shall be installed by the Contractor in the following sequence: 

  Shims  shall  be  placed  at  1.5  m  on  centres  along  girder  flanges.  Their  thickness  shall  be 

determined by the Contractor with survey equipment. These thicknesses shall vary within the 
spans of the deck panels to accommodate the girder camber and the roadway profile while 
maintaining the depth of the cast-in-place slab.  

  Strips  of  preformed  filler  strips  shall  be  placed  along  the  edge  of  the  girder  flange  and 

preformed  filler  strips  shall  be  glued  to  the  tops  of  the  girder  flange  using  an  approved 
adhesive. Preformed joint filler  heights shall be between 5 percent and 10 percent greater 
than the height of the adjacent steel shims. Once installed, and after the deck panels have 
been lowered into position, the preformed filler strips shall form a mortar-tight seal. 

  Non-shrink  grout  shall  be  placed  around  and  between  the  steel  shims  and  along  the 

preformed filler strips in such a manner that there are no voids under the deck panels. Grout 
may be placed by the Contractor before or after the deck panels are lowered into position.  

If the grout is placed before the deck panels are lowered into position, then the height of the grout 
shall be slightly greater than the heights of the nearby steel shims to ensure that the placement of 
the deck panels will compact the mortar, thus forming a uniform bearing surface for the deck panels. 
During this placement method, the Contractor shall ensure that no grout is forced between any steel 
shims.  Grout  shall  be  mixed  and  placed  in  accordance  with  the  grout  Manufacturer

’s  written 

instructions. Rotating drum-type concrete mixers shall not be allowed for mixing the grout. 

  Deck panels shall be lowered into their final positions. If the Contractor chooses to apply the 

grout after the deck panels have been lowered,  grout shall be placed with a low-pressure 
pumping system until all voids under the deck panels have been filled with grout. After the 
deck  panels  have  been installed  and  prior  to  placing  the  cast-in-place  concrete  slabs,  the 
Contractor shall remove all laitance or flakes by water blasting, which shall be performed by 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-55 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

experienced  personnel  with  equipment  that  provides  a  pressure  adequate  to  ensure  the 
removal  of  all  laitance  and  other  deleterious  materials.  Prior  to  placing  the  cast-in-place 
concrete slabs, the precast deck panels shall be moistened for a period of time approved by 
the Engineer. 

21.13.8 

Precast Concrete Finish 

Upon removal from the forms, the precast concrete units shall be examined and all surfaces that will 
remain permanently visible shall have a smooth and dense finish or uniform texture that is free from 
holes, fins, and shutter staining. Any precast concrete unit found to be defective in any respect will 
be rejected. 

Surfaces that will be exposed in the completed structure other than architectural precast elements, 
will be given Class 1 "ordinary finish" consisting of the removal of fins, rough spots, stains, hardened 
mortar or grout, and form lines by rubbing with a No. 16 carborundum stone or an abrasive of equal 
quality  without  materially  changing  the  texture  of  the  surface.  The  rubbing  shall  be  continued 
sufficiently  to  remove  all  roughness  and  projections.  When  the  surface  of  concrete  that  will  be 
exposed to view shows a film of oil left from an excess of oil on the forms, or the concrete is oil-
stained, or is otherwise not of uniform colour, the Engineer shall require the Contractor to employ a 
satisfactory cleaning method. 

Depressions resulting from holes left by attachments to rod or bolt anchorages shall be carefully and 
neatly pointed with a non-shrinkage grout or mortar having equal or better strength than the concrete 
used. 

Air pockets or rough places larger than 13 mm diameter occurring in any surface shall be pointed as 
specified in the foregoing paragraph. Honeycombed areas shall be chipped out by the Contractor 
and inspected by the Engineer before being pointed. Pointed areas mentioned in this  article shall 
then be given an ordinary finish as herein specified. 

21.13.8.1  Concrete Fascia Elements 

All exposed surfaces of architectural precast fascia elements, shall have a finish equivalent to PCI 
finish No. 280 Acid Etched Light (AE-L), as specified in PCI (Precast/Prestressed Concrete Institute) 
“Architectural Precast Concrete - Color & Texture Selection Guide”, 2

nd

 Edition. 

21.13.8.2  Precast Prestressed Concrete Girders 

The top surface of beams and girders shall be finished initially  with a wooden hand float. Further 
finishing  shall  be  delayed  until  the  water  sheen appears, but  not to  the point  of rendering further 
manipulation ineffective. The surface then shall be finish

ed in accordance with the Manufacturer’s 

recommendations to receive the coating system and protection as approved by the Engineer. 

21.13.8.3  Precast Prestressed Concrete Deck Panels 

The top surface of each deck panel shall be given a rough finish. At approximately the time of initial 
set, all laitance shall be removed with a coarse wire brush or with metal tines not less than 3 mm 
deep to ensure proper bond with the concrete that will be placed onto the deck panels after the deck 
panels have been installed. 

21.13.9 

Precast Products 

All precast units shall be manufactured of diverse sizes by the Contractor with materials as specified 
in this chapter. These units shall be transported to the worksite by the Contractor’s own means of 
transportation. These materials shall be examined by the Contractor before shipping to ensure that 
they are of good quality and comply with these Standard Specifications. Any damage sustained by 
this  material  in  the  course  of  transportation,  or  on  the  worksite,  shall  be  the  responsibility  of  the 
Contractor,  including  its  prices  for  all  costs  of  labour,  haulage,  transportation,  on-site  offloading, 
waste, and everything necessary for this work. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-56 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.13.10  Epoxy-bonding Agents for Precast Segmental Box Girders 

21.13.10.1  Epoxy-bonding Agent Materials 

Epoxy-bonding  agents  for  match-cast  joints  shall  consist  of  thermosetting,  100  percent  solid 
compositions  that  do  not  contain  solvent  or  any  nonreactive  organic  ingredient 

—  except  for  the 

pigments  required  for  colouring.  Epoxy-bonding  agents  shall  consist  of  the  following  two 
components: a resin and a hardener. Each component shall be distinctly pigmented, so that mixing 
produces a third colour similar to the concrete in the segments to be joined, and shall be packaged 
in proportioned, labelled, ready-to-use containers.  

Epoxy-bonding agents shall be formulated to provide application temperature ranges that will permit 
erection  of  match-cast  segments  at  substrate  temperatures  from  4  degree  Celsius  to  46  degree 
Celsius. If two surfaces to be bonded have different substrate temperatures, the adhesive applicable 
at the lower temperature shall be used. 

Epoxy-bonding agents shall be insensitive to damp conditions during application and, after curing, 
shall  exhibit  high-bonding  strength  to  cured  concrete,  good  water  resistivity,  low  creep 
characteristics,  and  tensile  strength  greater  than  the  concrete.  Additionally,  the  epoxy-bonding 
agents  shall  function  as  a  lubricant  during  the  joining  of  the  match-cast  segments;  as  a  filler  to 
accurately match the surface of the segments being joined; and as a durable, watertight bond at the 
joint.  

To  determine  their  workability,  gel  and  open  time,  bond  and  compression  strength,  shear,  and 
working temperature range, the Contractor shall test the epoxy-bonding agents at frequencies stated 
in the Contract documents.  

Material samples shall  be furnished by the Contractor to the Engineer for quality assurance (QA) 
testing with a certification from a reputable independent laboratory that indicates that the material 
has passed the required tests. 

Specific properties of epoxy and the test procedures to be used to measure these properties shall 
be as described in the following sections. 

a.

 

Test 1: Sag Flow of Mixed Epoxy-bonding Agent 

The sag flow test for mixed epoxy-bonding agent is not directly measured. Table 1 of AASHTO M 
235M/M 235 specifies the properties for the various types, grades, and classes of bonding agents.  
Table 21-10 presents the testing method and related specification. 

Table 21-10: Sag flow test for mixed epoxy-bonding agent 

Testing 
Method: 

No testing is required. 

Specification:   Mixed epoxy-bonding agents must be an AASHTO M 235M/M 235 Type VI, Grade 

3 (non-sagging) consistency at the designated application temperature class for 
the bonding agents used. 

b.

 

Test 2: Gel Time of Mixed Epoxy-bonding Agent 

Test 2 shall determine gel time on samples mixed and as specified in the testing method. It provides 
a guide for the period of time the mixed bonding agent remains workable in the mixing container 
during its application to the match-cast joint surfaces. Table 21-11 presents the testing method and 
related specification. 

Table 21-11: Gel time test for epoxy-bonding agent 

Testing 
Method: 

ASTM D2471-99*, and 1-litre and 4-litre quantities shall be tested. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-57 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Specification: 

A  30-minute minimum  testing  shall  occur  on  1-litre  and  4-litre quantities at  the 
maximum  temperature of the designated application temperature range for gel 
time. Note: Gel time is not to be confused with the open time specified in Test 3. 

*It  is  the  responsibility  of  the  Contractor  to  establish  appropriate  safety  and  health  practices  and 
determine the applicability of regulatory limitations prior to use this standard. 

c.

 

Test 3: Open Time of Bonding Agent 

Open time of bonding agent test measures workability of the epoxy-bonding agent for the erection 
and  post-tensioning  operations.  As  tested  here,  open  time  is  defined  as  the  minimum  allowable 
period  of  elapsed  time  from  the  application  of  the  mixed  epoxy-bonding  agent  to  the  precast 
segments until the two segments have been assembled together and temporarily post-tensioned. 
Table 21-12 presents the testing method and related specification. 

Table 21-12: Open time test for epoxy-bonding agent 

Testing 
Method:  

Open time is determined  using test specimens, as detailed in Test 4, Three-Points 
Tensile  Bending  Test.  Epoxy-bonding  agent,  at  the  highest  specified  application 
temperature,  is  mixed  together  and  applied  as  instructed  in  Test  4  to  the  concrete 
prisms,  which  shall  also  be  at  the  highest  specified  application  temperature. 
Adhesive-coated prisms shall be maintained for 60 minutes at the highest specified 
application temperature with the adhesive-coated surface or surfaces exposed and 
uncovered before joining together. Assembled prisms shall then be cured and tested, 
as instructed in Test 4. 

The epoxy-bonding agent  shall be deemed acceptable for the specified application 
temperature only when  essentially total fracturing of concrete paste and aggregate 
occurs with no evidence of adhesive failure. 

Construction  situations  may  sometimes  require  application  of  the  epoxy-bonding 
agent  to  the  precast  section  prior  to  erecting,  positioning,  and  assembling.  This 
operation may require epoxy-bonding agents having prolonged open time. In general, 
where  the  erection  conditions  are  such  that  the  sections  to  be  bonded  are 
prepositioned  prior  to  epoxy  application,  the  epoxy-bonding  agent  shall  have  a 
minimum  open  time  of  60  minutes  within  the  temperature  range  specified  for  its 
application.  

d.

 

Test 4: Three-point Tensile Bending Test 

The three-point tensile bending test performed on a pair of concrete prisms bonded together with 
epoxy bonding agent, determines the bonding strength between the bonding agent and concrete. 
Bonded concrete prisms are compared to a reference test beam of concrete that measures 150 mm 
by 150 mm by 450 mm. Table 21-13 presents the testing method and related specification. 

Table 21-13: Three-point tensile bending test for epoxy-bonding agent 

Testing 
Method: 

ASTM  C192  /  C192M  -  07  150×150×225  mm  concrete  prisms  of  41.4  MPa 
compressive strength at 28 days shall be sandblasted on one 150 mm by 150 
mm side to remove mould release agents and laitance; and shall be submerged 
in clean water at the lower temperature of the specified application temperature 
range  for  72  hours.  Immediately  on  removing  the  concrete  prisms  from  the 
water,  the  sandblasted  surfaces  shall  be  air-dried  for  one  hour  at  the  same 
temperature  and  50  percent  relative  humidity  and  each  shall  be  coated  with 
approximately  a  1.5  mm  layer  of  the  mixed  bonding  agent.  The  adhesive-
coated  faces  of  two  prisms  shall  then  be  placed  together  and  held  with  a 
clamping force normal to the bonded interface of 0.35 MPa. Assemblies shall 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-58 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

then be wrapped in a damp cloth that is kept wet during the curing period of 24 
hours at the lower temperature of the specified application temperature range. 

After  the  24-hour  curing  period  at  the  lower  temperature  of  the  application 
temperature  range  specified  for  the  epoxy-bonding  agent,  the  bonded 
specimens  shall  be  unwrapped,  removed  from  the  clamping  assembly,  and 
immediately tested. Tests shall be conducted using the standard AASHTO T 
97-10  (ASTM  C78  /  C78M  -  10)  and  the  Contractor  shall  test  for  flexural 
strength with third-point loading and the standard MR unit. At the same time, 
the two prisms shall be prepared and cured and a companion test beam shall 
be  prepared  of  the  same  concrete,  cured  for  the  same  period,  and  tested 
following AASHTO T 97-10 (ASTM C78 / C78M - 10). 

Specification: 

Use of epoxy-bonding agent  shall be  acceptable if the load on the prisms at 
failure  is  greater  than  90  percent  of  the  load  on  the  reference  test  beam  at 
failure. 

e.

 

Test 5: Compression Strength of Cured Epoxy-bonding Agent 

Compression strength tests of the cured epoxy-bonding agent measures the compressive strength 
of the epoxy-bonding agent. Table 21-14 presents the testing method and related specification. 

Table 21-14: Compression strength test for cured epoxy-bonding agent 

Testing 
Method:  

ASTM D695 - 10 

Specification: 

Compressive  strength  at  25  degrees  Celsius  shall  be  a minimum  of  14.0  MPa 
after 24 hours of curing at the minimum temperature of the designated application 
temperature range and 41.5 MPa at 48 hours. 

f.

 

Test 6: Temperature Deflection of Epoxy-bonding Agent 

Temperature  deflection  tests  of  epoxy-bonding  agents  determine  the  temperature  at  which  an 
arbitrary deflection occurs under arbitrary testing conditions in the cured epoxy-bonding agent. It is 
a screening test to establish performance of the bonding agent throughout the erection temperature 
range. Table 21-15 presents the testing method and related specification. 

Table 21-15: Temperature deflection test for epoxy-bonding agent 

Testing 
Method: 

ASTM D648 - 07 

Specification: 

A minimum deflection temperature of 50 degrees Celsius at fibre-stress loading 
of  1.8  MPa  is  required  on  test  specimens  cured  seven  days  at  25  degrees 
Celsius. 

g.

 

Test 7: Compression and Shear Strength of Cured Epoxy-bonding Agent 

Compression  and  shear  strength  test  of  the  cured  epoxy-bonding  agent  is  a  measure  of  the 
compressive and shear strengths of the epoxy-bonding agent compared to the concrete to which it 
bonds.  Slant  cylinder  specimens  with  the  epoxy-bonding  agent  are  compared  to  a reference test 
cylinder of concrete only. Table 21-16 presents the testing method and related specification. 

Table 21-16: Compression and shear strength test for cured epoxy-bonding agent 

Testing 
Method: 

A  test  specimen  of  concrete  is  prepared  in  a  standard  150-mm  by  300-mm 
cylinder mould to have a height at midpoint of 150 mm and an upper surface with 
a 30-degree slope from the vertical. Upper and lower  portions of the specimen 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-59 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

with the slant surfaces may be formed through the use of an elliptical insert or by 
sawing a full-sized 150-mm by 300-mm cylinder. If desired, 75-mm by 50-mm or 
100-mm  by  200-mm  specimens  may  be  used.  After  the  specimens  have  been 
moist cured for 14 days, the slant surfaces shall be prepared by light sandblasting, 
stoning, or acid etching; then by washing and drying the surfaces; and finally by 
coating one of the surfaces with a 0.25-mm thickness of the epoxy-bonding agent 
under test. Specimens shall then be pressed together and held in position for 24 
hours. Assemblies shall then be wrapped in a damp cloth that shall be kept wet 
during an additional curing period of 24 hours at the minimum temperature of the 
designated application temperature range. Specimens shall then be tested at 25 
degrees Celsius, following AASHTO T 22-10 (2011) (ASTM C39 / C39M - 12) or 
BS  EN  12390-3:2009  procedures.  At  the  same  time  as  the  slant  cylinder 
specimens are made and cured, a companion standard test cylinder of the same 
concrete shall be made, cured for the same period, and tested following AASHTO 
T 22-10 (2011) (ASTM C39 / C39M - 12) or BS EN 12390-3:2009. 

Specification: 

Use  of  epoxy-bonding  agent  is  acceptable  for  the  designated  application 
temperature range if the load on the slant cylinder specimen is greater than 90 
percent of the load on the companion cylinder. 

21.13.10.2  Mixing and Installation of Epoxy 

As general instructions contained herein cannot cover all situations, specific recommendations and 
instructions shall be obtained in each case from the Engineer in charge. 

Instructions furnished by the Supplier for the safe storage, mixing, and handling of the epoxy-bonding 
agent shall be followed. Epoxies shall be thoroughly mixed until they are of uniform colour. Use of a 
proper-sized  mechanical  mixer  operating  at  no  more  than  600  revolutions  per  minute,  or  as 
recommended by the Manufacturer, shall be required. Contents of damaged or previously opened 
containers shall not be used. 

Surfaces to which the epoxy material is to be applied shall be at least 4 degrees Celsius and shall 
be free from oil, laitance, form release agents, or any other material that prevents the epoxy from 
bonding  to  the  concrete  surface.  All  laitance  and  other  contaminants  shall  be  removed  by  light 
sandblasting or by high-pressure water blasting with a minimum pressure of 34 MPa. Wet surfaces 
shall be dried before applying epoxy-bonding agents and surfaces shall be at least the equivalent of 
saturated surface dry, with no visible water. 

Mixing shall not start until the segment is prepared for installation. Application of the mixed epoxy-
bonding agent shall be according to the Manufacturer's instructions using trowel, rubber glove, or 
brush on one or both surfaces to be joined. These coatings shall be smooth and uniform in thickness 
and shall cover the entire surface with a minimum thickness of 1.5 mm applied on both surfaces. A 
discernible bead line shall be observed on all exposed contact areas after temporary post-tensioning. 
Erection operations shall be coordinated and conducted so as to complete the operations of applying 
the epoxy-bonding agent to the segments, erection, assembling, and temporary post-tensioning of 
the  newly  joined  segment  within  70  percent  of  the  open  time  period  of  the  bonding  agent  as 
determined in Test 3. 

Epoxy material shall be applied to all surfaces to be joined within the first half of the gel time, as 
shown on the containers.  Segments shall be joined within 45  minutes after  application of the first 
epoxy  material  placed  and  a  minimum  average  temporary  prestress  of  0.3  MPa  over  the  cross 
section shall be applied within 70 percent of the open time of the epoxy material. At no point of the 
cross section shall the temporary prestress be less than 0.2 MPa.  

Joints shall be checked immediately after erection to verify uniform joint width and proper fit. Excess 
epoxy  from  the  joint  shall  be  removed,  where  accessible.  All  tendon  ducts  shall  be  swabbed 
immediately after stressing, while the epoxy is still in the non-gelled condition, to remove or smooth 
out any epoxy in the conduit and to seal any pockets or air bubble holes that have formed at the 
joint. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-60 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

If the jointing is not completed within 70 percent of the open time, the operation shall be terminated 
and  the  epoxy-bonding  agent  shall  be  completely  removed  from  the  surfaces.  Surfaces  must  be 
prepared again and fresh epoxy shall be applied to the surface before resuming jointing operations. 

21.14 

Pre-tensioned Concrete Works 

Pre-tensioned concrete members shall be constructed and placed in the work in conformance with 
the details specified in the Contract documents, as specified in Section 21.13, as specified herein, 
and as directed by the Engineer.  Concrete and steel materials shall comply with the requirements 
of Section 21.3.4 and Section 21.3.5.  

21.14.1 

Placing of Reinforcement Steel and Inserts 

The reinforcement steel bars shall be accurately cut and formed to the dimensions and shapes as 
indicated  on  the  approved  shop  drawings  and  bar  lists.  All  bars  shall  be  accurately  located  and 
securely anchored. The Contractor shall provide approved bolsters, chairs, supports, and wire, as 
required or directed by the Engineer. The bars shall be free of all loose mill scale, rust, mud, and 
other  materials  that  reduce  or  destroy  bonds  with  concrete.  Embed  reinforcing  steel,  anchors, 
inserts, plates, angels, and other cast-in items as indicated on approved shop drawings. 

Inserts in the concrete shall be accurately installed and secured in place. Where there is interference 
with pre-tensioning strands, inserts shall be relocated or modified as directed by the Engineer. In no 
case may imbedded inserts be attached to the prestressing strands and care shall be taken so as 
not to move the strands out of their designed positions. 

21.14.2 

Mixing and Placing Concrete 

The concrete shall be as specified in Section 21.3.4 and Section 21.13.3. The Contractor shall inform 
the Engineer of the tentative amounts of admixtures he proposes to use, and it being understood 
that the amounts of these will be adjusted during the progress of the work. The Contractor shall state 
the name, source, brand, or type, or otherwise identify each of the materials as per ASTM C494 / 
C494M - 12. 

The Contractor shall furnish, and have available for the use of the Engineer, approved equipment 
for slump and air-content determinations, and sufficient molds for making the specified number of 
test specimens. The cube moulds shall be steel and shall comply with the requirements of  ASTM 
C31 / C31M - 12. Moulds made of cardboard or other expendable material shall not be used. 

Tests  of  the  concrete  mixture  for  air  content  and  slump  shall  be  performed  on  each  batch  after 
delivery to the casting site and before the concrete is incorporated into the girders. The slump of the 
concrete shall be no greater than is necessary for proper placement and compaction and within the 
limits specified herein. 

A  minimum  of  six  test  specimens  shall  be  made  from  the  concrete  mixture  entering  into  each 
member.  The  test  specimens  shall  be  cast  from  samples  taken  from  batches  designated  by  the 
Engineer,  after  delivery  to  the  casting  site  and  as  the  concrete  mixture  is  being  discharged  for 
incorporation into the member. The test specimens shall be compacted by standard rodding, or they 
may  be  compacted  by  internal  vibration,  provided  the  Contractor  furnishes  suitable  vibratory 
equipment designed for that purpose and approved by the Engineer. 

The test specimens shall be placed with and cured in the same manner as the member. The position 
of  the  test  specimens  during  curing  shall  be  such  that  no  undue  advantage  is  given  to  them,  as 
compared  to  any  part  of  the  precast  members,  with  respect  to  environment  favorable  to  gain  in 
strength.  The  test  specimens  shall  remain  with  the  member  until  removed  for  testing  or  until  the 
prestress  forces  are  transferred  to  the  concrete  in  the  member.  Thereafter,  the  test  specimens 
reserved for the 28-day tests may be cured under standard moist room conditions, or they may be 
cured in sand, continuously kept moist, or immersed in water, and the curing temperature shall be 
maintained within the range of 18

o

 to 30°C. If immersed in water, a saturated lime solution shall be 

used. The Engineer will perform all testing in the testing laboratory. All quality decisions with respect 
to the concrete shall be based on the average strength of at least two specimens. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-61 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.14.3 

Placing and Compacting 

The  forms,  pre-tensioning  steel,  reinforcement  steel,  and  accessories  shall  be  inspected  and 
approved by the Engineer immediately prior to the Contractor placing the concrete. No concrete shall 
be  placed  until  such  inspection  has  been  made.  Approval  by  the  Engineer  shall  not  relieve  the 
Contractor of responsibility as to the results obtained. Concrete shall be placed in horizontal lifts and 
consolidated by internal vibration. Internal vibrators shall have a vibrating head not more than 32 
mm in diameter unless otherwise approved by the Engineer. At locations of relative massive concrete 
and away from the prestressing strands, where, with the exercise of ordinary care, the reinforcing 
steel will not be displaced, the Engineer may approve the use of larger vibrators. External vibration 
may be used in conjunction with the internal vibration, if approved by the Engineer. Vibration shall 
be  performed  with  care  to  avoid  the  displacement  of  reinforcement,  prestressing  steel,  and 
accessories, and to ensure satisfactory compaction. 

The concreting operations shall proceed at a rate sufficient to ensure that no seams or cold joints 
will exist. Vibration of each lift shall be sufficient to eliminate honeycomb and excess water and air 
pockets, and the vibrators shall be inserted completely through the lift and barely into the preceding 
lift to ensure proper unification at the junctures of all lifts. The vibrator shall be inserted and removed 
slowly but shall not be permitted to remain stationary in the concrete. It shall not be forced between 
strands. 

21.14.4 

Inspection of Completed Prestressed Members 

The completed prestressed members shall be inspected while they are still on the casting bed to 
determine their acceptability under the standard specification requirements. They shall be inspected 
again just prior to and after placement in the structure for possible damage during handling, storing, 
transporting, and erecting. 

Before the members are removed from the casting bed, all defects visible on the surface shall be 
observed,  dimensions  shall  be  measured  and  checked  against  the  shop  drawings,  and  all  other 
conditions that may have a bearing upon the acceptability of the members shall be noted. 

It is the intent of these standard specifications that the members will be cast without cracks or other 
defects and true to the dimensions indicated on the approved shop drawings. It is recognized that 
certain cracks and surface defects may not be detrimental from the standpoint of structural integrity 
and may be relatively harmless if remedied by proper repair as approved by the Engineer. Further 
deviations  in  dimensions from  those  indicated  on  the  approved  shop  drawings  and  within  certain 
limits as specified herein shall be subject to approval by the Engineer. 

The  Engineer  will  determine  the  kind,  type,  and  extent  of  cracks  and  surface  defects,  such  as 
honeycomb and chipped edges or corners, that will be tolerated. All such cracks and surface defects 
shall be repaired as directed by the Engineer. 

21.14.4.1  Tolerances 

Members shall be produced well within the specified acceptable range. The production process shall 
be corrected when members approach or equal a specified limit. If any members are out of tolerance, 
the  Contractor  shall  notify  the  Engineer  immediately.  Applicable  dimensional  tolerances  shall  be 
checked  before  casting  and  after  removal  from  the  forms.  Time-dependent  tolerances,  such  as 
length,  camber,  and  sweep,  shall  be  rechecked  within  three  days  before  shipment.  Camber  and 
sweep shall be checked at a time when thermal effects of sunlight are negligible such as on a cloudy 
day or early morning. Sweep is defined as the horizontal deviation from a straight line parallel to the 
centreline  of  the  member.  Camber  is  defined  as  upward  deflection  of  the  member  caused  by 
prestress. The Contractor shall check local smoothness with a 1.5 m straightedge. 

Tolerance  for  precast  prestressed  members  shall  be  as  described  in  PCI  MNL-120-

14  “Precast 

Concrete Institute (PCI) Design Handbook 7

th

 Edition (Precast and prestressed Concrete)

”, except 

as listed in Table 21-17. It is intended that the dimensions of all members shall be well within these 
tolerances  and  that  the  maximum  values  shall  be  permitted  to  be  approached  or  equaled  only 
occasionally. Equipment and methods which permit an undue proportion of dimensions approaching 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-62 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

the tolerance limits shall not be used. Members having dimensions outside the tolerance limits will 
be rejected. 

Table 21-17: Maximum allowable dimensional tolerances for precast prestressed concrete 

members (General) 

Dimension 

Tolerance 

Depth (flanges, web, and fillets) 

 



mm 

Depth (overall) 

 



mm 

Width (flanges and fillets) 

 



mm 

Width (web) 

 



mm 

Length 

 



mm 

Square Ends (deviation from square) 

 



mm 

Skew Ends (deviation from tangent offset) 

 



mm 

Side Insert (spacing between centres of inserts and from the centres 
of inserts to the ends of the beams) 

 



mm 

Bearing Plates (spacing between the centres of bearing plates) 

 



mm 

Bearing  Plate  (spacing  from  the  centres  of  bearing  plates  to  the 
ends of the beams) 

 



mm 

Bearing Plate or Bearing Area (variation from a true horizontal plane 
or from a plane surface when tested with a straightedge) 

 



mm 

Stirrup Bars (extension above top of the beam) 

+ 6 mm, -9 mm 

Stirrup Bars (longitudinal spacing, provided that there are not less 
than the required number in a given length) 

 



mm 

End Stirrup Bars 

not more than 50 mm from 
the end of the beam 

Horizontal  Alignment  (deviation  from  a  straight  line  parallel  to  the 
centreline of the beam) 

 



mm per



Max. ± 19 mm 

Position of blockouts 

 



mm of centreline 

Position of strands 

 



mm 

Position of deflection points for deflected strands 

 



mm 

Position of plates and inserts 

 



mm 

Position of handling devices 

 



mm 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-63 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

The prestress losses due to creep and shrinkage of concrete, relaxation of prestressing steel and 
elastic shortening shall be estimated with reference to Chapter 5 of AASHTO LRFD Bridge Design 
Specifications and Road Structures Design Manual (ADQCC TR-516). 

The Contractor shall comply with the maximum dimensional tolerances in Table 21-18 for AASHTO 
girders and bulb-tees, Table 21-19 for double-tees, Table 21-20 for prestressed piling, and  

Table 21-21 for prestressed deck panels. 

Table 21-18: Maximum dimensional tolerances for AASHTO girders and bulb-tees 

Dimension 

Tolerance 

Length 

(±0.8 mm/m, ±25 mm maximum) 

Width (overall) 

(+10 mm, -6 mm) 

Width(web) 

(+10 mm, -6 mm) 

Depth (overall) 

(+13 mm, -6 mm) 

Depth (flanges) 

(±6 mm) 

Sweep 

(1 mm/m) 

Variation from end squareness or skew 

(±16 mm/m, ±25 mm maximum) 

Camber variation from design camber

(±1 mm/m) 

For spans of 24 m or less 

(±13 mm maximum) 

For spans more than 24 m 

(±25 mm maximum) 

Differential camber between adjacent members 

(1 mm/m) 

Position of Strands: 

Individual 

Bundled 

Draped strand hold-down point 

 

(±6 mm) 

(±13 mm) 

(±0.5 m) 

Position of plates: 

Bearing plates 

Other plates 

 

(±16 mm) 

(±25 mm) 

Tipping and flushness of plates: 

Bearing plates 

Other plates 

 

(±0.5 percent, ±3 mm maximum) 

(±6 mm) 

Position of Inserts including diaphragm holes 

(±13 mm) 

Position of handling devices: 

Parallel to length 

Transverse to length 

 

(±150 mm) 

(±25 mm) 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-64 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Dimension 

Tolerance 

Position of stirrups: 

Longitudinal spacing 

Projection above top 

 

(±50 mm) 

(±19 mm) 

Local smoothness of any formed surface  

(±3 mm/1,500 mm) 

Note 1: To be used when a design camber is specified. 

Table 21-19: Maximum dimensional tolerances for double-tees 

Dimension 

Tolerance 

Length

 

(±0.8 mm/m, ±25 mm maximum)

 

Width (overall)

 

(±6 mm)

 

Width (webs)

 

(±3 mm)

 

Depth (overall)

 

(±6 mm)

 

Thickness (flanges)

 

(±6 mm, -3 mm)

 

Flange Overhang (flange edge to web edge)

 

(±6 mm)

 

Distance between Webs

 

(±6 mm)

 

Sweep

 

(1 mm/m)

 

Variation from end squareness or skew

 

(±10 mm/m, ±25 mm maximum)

 

Camber variation from design camber

1

 

(±1 mm/m, ±19 mm maximum)

 

Differential camber between adjacent members

 

(1 mm/m, 19 mm maximum)

 

Position of Strands:

 

Individual

 

Bundled

 

Draped strand hold-down point

 

 

(±6 mm)

 

(±13 mm)

 

(±300 mm)

 

Position of plates:

 

Bearing plates

 

Other plates

 

 

 

(±13 mm)

 

(±25 mm)

 

Tipping and flushness of plates:

 

Bearing plates

 

Other plates

 

 

(±0.5 percent, ±3 mm maximum)

 

(±6 mm)

 

Position of inserts including diaphragm holes 

(±13 mm) 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-65 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Dimension 

Tolerance 

Position of handling devices:

 

Parallel to length

 

Transverse to length

 

 

(±150 mm)

 

(±25 mm)

 

Position of stirrups:

 

Longitudinal spacing

 

Projection above top

 

 

(±50 mm)

 

(±19 mm)

 

Local smoothness of any formed surface

 

(±3 mm/1,500 mm)

 

Note 1: To be used when a design camber is specified. 

Table 21-20: Maximum dimensional tolerances for prestressed concrete piling 

Dimension 

Tolerance 

Length 

(±25 mm) 

Width or diameter 

(±10 mm) 

Variation from longitudinal axis (bow) 

(1 mm/m) 

Variation from end squareness or skew 

(±6 mm/300 mm, ±13 mm maximum) 

Position of individual strands 

(±6 mm) 

Position of handling devices 

(±150 mm) 

Longitudinal spacing of spiral reinforcement 

(±19 mm) 

Local smoothness of any formed surface 

(±3 mm/1,500 mm) 

 

Table 21-21: Maximum dimensional tolerances for prestressed concrete stay-in-place forms 

Dimension 

Tolerance 

Length (in direction of panel strands) 

(+18 mm, -6 mm) 

Width 

(+6 mm, -12 mm) 

Thickness 

(+6 mm, -3 mm) 

Variation from end squareness or skew 

(±6 mm) 

Camber, sweep, and warping

(±2 mm per meter of length) 

Position of individual strands: 

Vertically 

Horizontally 

 

(+0 mm, -6 mm) 

(±12 mm) 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-66 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Dimension 

Tolerance 

Position of handling devices: 

Parallel to length 

Transverse to length 

 

(±75 mm) 

(±50 mm) 

Local smoothness of any formed surface 

(±3 mm/1,500 mm) 

Note 1: When measuring panel camber, account for dead-load deflection. Stay-in-place (SIP) form 
deck panels are designed to have no camber, only dead-load deflection. 

The Contractor shall remedy out-of-tolerance members in one of the following ways: 

  Replacing the member at no additional cost to the Owner. 

  Correcting  the  member  tolerance  problem,  if  possible,  using  an  approved  correction 

procedure at no additional cost to the Owner. 

  If correction is not possible but the member is considered usable, the Contractor shall submit 

the  member  for  review  and  acceptance  at  a  reduced  price  acceptable  to  the  Owner.  A 
description of the problem and any proposed corrective action shall be included. Structural 
and  physical  evaluation  by  a  Professional  Engineer  shall  be  provided,  as  required.  If  the 
submittal is rejected, the member shall be replaced at no additional cost to the Owner. 

21.14.5 

Rejection of Prestressed Members 

Any prestressed member displaying one of the following defects shall be rejected and a new member 
shall be cast at the Contractor's own expense. 

1.  Strength requirement: Any member represented by cubes not meeting the specified strength. 
2.  Exposed prestressing steel: No prestressing strands shall be exposed. 
3.  Honeycombing: Honeycombing of the member to such an extent that chipping away of the 

honeycombed  concrete  results  in  the  condition  described  above,  "Exposed  prestressing 
steel." 
All  honeycombed  areas  in  a  member  shall  be  chipped  until  sound  concrete  is  detected. 
Sound concrete is defined as that point at which chipping causes fracture of the aggregates. 

4.  Stress cracks: Any member that has a stress crack in the area beginning 100 mm from the 

unit end to the centre line of the unit that is greater than 13 mm in depth and five hundredths 
(0.05) of a mm in width. 

21.15 

Post-tensioned Concrete Works 

Post-tensioned  concrete  work  shall  be  as  indicated  on  the  Contract  plans,  as  specified  herein, 
Chapter 22, Prestressing Systems, and/or in the Contract documents. This work includes, but not by 
way  of  limitation,  supplying  and  fixing  formwork,  falsework  and  temporary  works;  supplying  and 
placing prestressing steel, ducts and anchors; supplying concrete of the class as indicated on the 
Contract  plans  or  specified  herein  and  transporting  and  placing  it  in  prepared  forms;  tamping, 
vibrating, finishing and curing the concrete; pointing and jointing with cement mortar; post-tensioning 
prestressing steel; pressure grouting ducts; and supplying and installing all joint materials, other than 
fixed  and  neoprene  expansion  joints;  all  in  accordance  with  the  specifications  and  Contract 
documents. 

21.15.1 

Standards and Codes 

Standards and codes shall be as specified in Article 21.13.1.1, in the Contract documents, if any, 
and the following in their latest edition: 

  ASTM A421 / A421M 

– 10 

 

Standard  Specification  for  Uncoated  Stress-Relieved 

Steel Wire for Prestressed Concrete 

  FS MMM-G-650A 

 

 

Federal Specifications - Epoxy Bonding Agent 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-67 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

  FS SS-A-701   

 

 

Federal Specifications - Bituminous Protective Coating 

  CRD-C-566-64 

 

 

Grout Fluidifier 

21.15.2 

Submittals 

21.15.2.1  Shop Drawings 

Shop drawings shall be submitted to the Engineer for approval in accordance with Section 21.13.2 
and as specified herein. 

Supplementing the requirements for shop drawings specified in Section 21.13.2, the Contractor shall 
include a description of the equipment to be used and the proposed procedure for constructing post-
tensioned concrete work. The type and size of ducts and method of holding the ducts in position, 
tendon sizes, jack clearances and procedures, stressing sequences, grout connections and vents, 
anchorage details and bonding and grouting procedures shall also be indicated.  

In addition the Contractor shall submit to the Engineer for approval calculations of the immediate 
deflections and long term deflections for the different construction stages furnished with the required 
cambers. A tabulation of these deflections and cambers shall be included on the shop drawings. 

21.15.2.2  Certificates 

Certificates from the Manufacturers shall be furnished to the Engineer certifying that the materials 
and equipment to be provided comply with the requirements of these Standard Specifications. 

21.15.2.3  Test Reports 

The Contractor shall furnish to the Engineer six (6) copies of test reports and certificates as specified 
herein, unless otherwise directed by the Engineer. 

21.15.3 

Scheduling of Post-tensioned Concrete Works 

The scheduling of all post-tensioned concrete work shall be such that construction of each individual 
superstructure unit can be completed within a 90-day period commencing with the first concrete pour 
through completion of the post-tensioning and duct grouting operations unless otherwise indicated 
on the Contract plans, specified in the Contract documents, or directed by the Engineer. 

The  Contractor  shall  have  sufficient  materials  on  hand  prior  to  commencing  work  on  any  given 
superstructure unit to ensure completion of the unit within the specified 90-day period. 

After a minimum period of 30 days subsequent to the final stressing and grouting of the prestressing 
steel,  the  superstructure  ends  at  expansion  bearings  shall  be  raised  with  jacks,  as  specified  in 
Chapter 25, Bearings Devices, to relieve the shear strain in the bearings caused by shortening of 
the concrete superstructure due to post-tensioning, shrinkage, creep and temperature change. 

21.15.4 

Material 

21.15.4.1  Concrete 

Concrete for post-tensioned works shall be Class C40/20 (unless otherwise indicated on the Contract 
plans or in the Contract documents) as specified in Section 4.3 of Chapter 4, Concrete Works, of 
these standard specifications, and in compliance with Section 21.3.4. 

21.15.4.2  Post-tensioning Systems 

Post-tensioning system including strands, ducts, anchorages, couplers, grouting, assemblies, etc. 
shall be in compliance with the requirements of Chapter 22, Prestressing Systems.  

Epoxy bonding agent shall comply with F.S. MMM-G-650A. 

Bituminous protective coating shall comply with F.S. SS-A-701. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-68 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.15.4.3  Reinforcement Steel 

Reinforcement  steel  shall  comply  with  the  requirements  of  Section  21.3.5,  and  Chapter  5, 
Reinforcing Steel, of these standard specifications. 

21.15.4.4  Built-in Materials 

The Contractor shall furnish and install all built-in materials and items as indicated on the Contract 
plans, as specified herein and as directed by the Engineer. 

Built-in materials shall include, but not by way of limitations, all inserts, hardware or similar items as 
indicated on the Contract plans or specified in the Contract documents. 

21.15.5 

Formwork 

Formwork, shoring, and removal of forms shall be as specified in Section 1.20 of Chapter 01, General 
Requirements, of these Standard Specifications, and as further specified herein and in the Contract 
documents. 

The  deck  slab  forms  and  all  related  formwork  for  concrete  box  girder  construction,  including  all 
supporting falsework, shall be designed and constructed in order to facilitate removal of all formwork 
materials from within the cells of the concrete box girders. The deck forms may be of 18 mm thick 
marine plywood and shall be suspended from the girder stems which shall be stripped of all forms 
prior  to  placing  the  deck  forms.  The  deck  slab  forms  shall  in  no  way  interfere  with  the  required 
concrete bond between the deck slab and the girder stems. 

Stay-in-place  deck  forms  will  be  permitted  for  the  deck  slab  of  concrete  box  girder  construction, 
provided  they  are  galvanized  steel  or  other  noncombustible  material  acceptable  to  the  Engineer 
which will not deteriorate in any way. Further, such stay-in-place deck forms shall not increase the 
volume of concrete, the depth of the deck slab or reduce the dimension of concrete coverage over 
the reinforcement steel. The Contractor shall submit samples of the proposed form material and all 
details and design for the use of stay-in-place deck forms. The decision of the Engineer shall be final 
for acceptance or rejection of stay-in-place forms. 

A  30  mm  slip  joint  shall  be  placed  transversely  in  the  deck  forming  between  each  diaphragm  to 
eliminate resistance of the deck forms to deck shortening during prestressing. 

The Contractor shall submit shop drawings and design calculations for the forms to the Engineer for 
approval prior to commencing work. 

Falsework and forms shall be set to provide the structural camber indicated in the Contract plans for 
long term deflection, and shall comply with the required lines and grades. 

Where indicated on the Contract plans, the Contractor shall include all formwork required to produce 
the  concrete  surface  ornamental  pattern  on  the  vertical  surface  of  the  box  section  of  the  post-
tensioned concrete works as indicated on the Contract plans, as specified herein and as approved 
by the Engineer. The plywood forms supporting the bottom slab of the box girder shall be arranged 
in a regular brick pattern as approved by the Engineer. 

The  Contractor  shall  include  in  his  shop  drawing  submittal  all  details  and  a  full  description  of  all 
formwork proposed by the Contractor to produce the concrete surface ornamental pattern. All details 
and proposed methods and formwork material shall be subject to approval by the Engineer.  

The construction of all formwork required to produce the concrete surface ornamental pattern shall 
comply with the applicable requirements of Section 1.20 of Chapter 01, General Requirements, of 
these Standard Specifications, and as specified herein. All formwork shall produce a smooth, even 
surface with clean, straight, true and unbroken lines at the concrete surface ornamental pattern. 

21.15.6 

Placing Post-tensioning Systems 

Anchorage  devices,  ducts,  tendons  and  other  appurtenant  post-tensioning  equipment  and 
accessories shall be placed by the Contractor in compliance with the requirements of Chapter 22, 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-69 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Prestressing  Systems.  They shall be accurately positioned in the forms and secured in place as 
indicated  on  the  Contract  plans  and  approved  shop  drawings.  Installation  of  the  post-tensioning 
system shall be coordinated with the placement of reinforcing steel and embedded items as specified 
elsewhere in these Standard Specifications. Care shall be exercised to keep ducts and tendons free 
of form coating compounds and other substances which might break or reduce the concrete bond. 

Field measurements of vertical locations of centers of gravity of the tendons shall not vary from the 
dimensions  indicated  on  the  Contract  plans  by  more  than  the  tolerance  given  in  Table  22-6  of 
Chapter 22, Prestressing Systems. 

21.15.7 

Mixing and Placing Concrete 

Concrete work for box girder superstructure construction shall comply with the applicable provisions 
of  this  chapter,  Sections  4.3  and  4.4  of  Chapter  04,  Concrete  Works,  of  these  Standard 
Specifications, and with the Contract documents. 

Prior  to  placing  concrete,  tendon  profiles  shall  be  rechecked  to  ensure  that  proper  location  and 
concrete cover will be maintained. Any ducts found to be damaged shall be repaired or replaced as 
directed by the Engineer. 

Prior to placing forms for box girder deck slabs, the Contractor shall demonstrate, to the satisfaction 
of the Engineer, that either the prestressing steel is free and unbonded in the duct or, in the event 
prestressing steel has not yet been placed, that all ducts are unobstructed. 

The  Contractor  shall  exercise  care  during  concrete  placement  to  prevent  concrete  from  entering 
anchorage  hardware.  Concrete  shall  be  placed  in  such  a  manner  that  tendon  alignment  and 
reinforcement positions are maintained, and concrete shall be vibrated with particular attention at 
tendon anchorage locations to ensure optimum compaction and penetration at these points. 

Placing sequence of concrete for box girders shall be in accordance with Article 21.7.1.2. 

Curing  of  concrete  shall  be  in  accordance  with  the  applicable  provisions  of  Section  21.11,  and 
Section 4.4.2 of Chapter 4, Concrete Works, of these Standard Specification. 

The Contractor shall keep a record showing the date and time of placement of cast-in-place, post-
tensioned concrete in each portion of the structure. This record shall be available for examination at 
all  times  by  the  Engineer.  Upon completion  of  construction  of  each  structure, two  copies  of  such 
records shall be submitted to the Engineer. 

21.15.8 

Stressing Operations 

Post-tensioning of cast-in-place concrete shall be performed as soon as the last placed concrete has 
attained  a  cube  compressive  strength  of  40  MPa,  or  as  specified  on the  Contract  plans,  or  more 
based on the results of two cube tests. 

Stressing  operations  shall  comply  with  the  requirements  of  Section  22.8.4  of  Chapter  22, 
Prestressing Systems. The Contractor shall employ, at no additional cost to the Owner, a technician 
who  is  skilled  in  the  post-tensioning  method  to  give  such  aid  and  instruction  in  the  use  of  the 
prestressing equipment and installation of the prestressing steel as may be necessary to obtain the 
specified results. 

Prestressing tendons in continuous span post-tensioned structures shall be tensioned by jacking at 
each end of the tendon or at one end of tendons as indicated on the Contract plans. Prestressing 
tendons in single span post-tensioned structures may be tensioned by jacking from one end only as 
directed by the Engineer. 

All post-tensioning shall be by means of hydraulic jacks equipped with accurate reading calibrated 
hydraulic pressure gauges to permit the stress in the prestressing steel to be computed at any time. 
A  certified  calibration  curve  shall  be  furnished  with  each  jack.  In  the  event  inconsistencies  occur 
between the measured elongation and the jack gauge reading, the jack gauge shall immediately be 
recalibrated.  In  the  event  still  further  discrepancies  occur,  the  cause  shall  be  determined  and 
reported to the Engineer. An agreement within five percent shall be satisfactory. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-70 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

The Contract plans shall indicate jacking locations of the tendons. Proper allowance shall be made 
for  friction  losses  and  one  tendon  shall  be  checked  for  friction  loss  at  the  very  start  of  the  post-
tensioning. In case the friction losses in tests exceed the computed losses, all wires shall be relieved 
and lubricated with water soluble oil and re-tensioned. Each tendon shall be stressed until either the 
required elongation or the maximum force is reached. Elongation is the preferred method of stress 
determination  wherever  possible.  The  tendons  shall  be  tensioned  by  jacking  to  the  total  forces 
indicated on the shop drawings. 

The post-

tensioned prestressing steel shall be anchored at an “initial stress” that will result in the 

ultimate  retention  of  working  forces  or  stresses  of  not  less  than  those  indicated  on  the  Contract 
drawings, but in no case shall the prestressing steel be tensioned above 80 percent of the ultimate 
tensile strength of the wire or strands. 

Prior  to  post-tensioning  any  member,  the  Contractor  shall  demonstrate  to  the  satisfaction  of  the 
Engineer that the prestressing steel is free and unbonded in the duct. 

The Contractor shall keep records of the elongation and tension applied to each tendon, and this 
record shall be submitted to the Engineer promptly upon the completion of stressing of each member. 
At the time of stressing the first member, the stresses in the individual tendons shall be checked to 
establish a procedure for ensuring uniform results. At any later time, a recheck may be ordered by 
the Engineer if it appears that the design stresses are not being obtained. The Contractor shall have 
written permission from the Engineer before capping any prestressing anchorage. 

The effective prestress force “P

f

” indicated on the Contract plans represents the force required after 

all losses of prestress have occurred. The prestress losses due to creep and shrinkage of concrete, 
and relaxation of prestressing steel and elastic shortening shall be estimated as per AASHTO LRFD 
Bridge  Design  Specifications  and  Road  Structures  Design  Manual  (ADQCC  TR-516).  Unless 
specified otherwise, friction  shall be  accounted for  using wobble and curvature coefficients of k = 
0.00066 per meter of tendon 

and μ = 0.23. The magnitude of the anchorage set, in case a grip type 

anchorage is used, shall be the greater of that required to control the stress in the prestressing steel 
at transfer or that recommended by the Manufacturer of the anchorage.  The magnitude of the set 
assumed for the design and used for set loss calculation shall be shown in the Contract documents 
and verified during construction. 

21.15.9 

Grouting of Tendons 

After the tensioning of all tendons has been completed and the total retained stress is equal to or 
exceeds that indicated on the Contract plans, for each member, and the steel strands or wires have 
been anchored, the annular space between the conduit and the tendons shall be grouted. 

Grouting, grout mixture, grouting equipment, mixing of grout, and injection of grout shall comply with 
the requirements of Sections 22.7.2 and 22.8.8 of Chapter 22, Prestressing Systems. 

21.15.10  Protection of End Anchorages 

As soon as possible after tensioning and grouting is completed, the Contractor shall clean exposed 
end anchorages, wires and other metal accessories of rust, displaced mortar, grout and other such 
materials, then shall apply to all such dry metal surfaces a heavy, unbroken coating of epoxy bonding 
agent. 

The Contractor shall install tight-fitting forms and hold in place securely against the previously placed 
concrete. 

After applying epoxy bonding agent, the Contractor shall apply a patching mortar prepared by mixing 
one part type V, portland cement to three parts of clean sand (ASTM C33 / C33M - 11a) measured 
by volume, and sufficient water to provide a stiff but workable consistency. The Contractor shall apply 
the patching mortar, and manipulate, finish and cure as specified in this chapter. After mortar patches 
have  cured,  the  Contractor  shall  apply  two  heavy  brush  coats  of  bituminous  protective  coating 
material, applied as recommended by the Manufacturer, including the recommended thickness. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-71 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.15.11  Access Doors 

Access  doors  shall  be  installed  in  post-tensioned  box  girders  as  located  and  as  detailed  on  the 
Contract  plans.  All  access  doors  shall  be  fabricated  of  steel  shapes,  plates  and  accessories 
complying  with  Section  30.5  of  Chapter  30,  Miscellaneous  Metal.  All  steel  shall  be  galvanized  in 
accordance with Section 23.4.10 of Chapter 23, Steel Structures. 

21.15.12  Vent Pipes 

The Contractor shall include the unplasticized polyvinylchloride (uPVC) vent pipes in the cells of the 
concrete box girders as indicated on the Contract plans. 

The vent pipes shall be of the size as indicated on the Contract plans and shall be uPVC extruded 
from  one  hundred  percent  virgin  materials.  The  pipe  material  shall  be  new  and  homogeneous 
throughout and free from visible cracks, holes, foreign materials, blisters, wrinkles and dents. 

All vent pipes shall be anchored in an approved manner so as to prevent displacement or movement 
during the placement of concrete. 

21.15.13  Opening Bridges to Traffic 

No  equipment  or  vehicular  traffic  will  be  allowed  on  any  bridge  superstructure  until  the  post-
tensioning and grouting operation is completed, falsework has been removed, and all concrete has 
been  cured  for  the  time  required  in  these  Standard  Specifications,  or  as  further  directed  by  the 
Engineer. The Contractor shall carry out the required load tests on the bridge superstructure, as part 
of the acceptance process of the bridge, as per Chapter 35, Bridge and Underpass Load Testing, 
before opening the bridge to traffic. 

21.16 

Precast Concrete Fascia Panels 

This section contains the requirements for the precast concrete fascia panels and the materials and 
hardware for fastening the precast concrete fascia panels to the deck slab. 

The  Contractor  shall  be  responsible  for  the  construction  of  precast  concrete  fascia  panels  as 
included in the Contract documents and as shown on the Contract plans. 

The precast concrete fascia panels shall be constructed to the dimensions and details indicated on 
the Contract plans. The construction of the precast concrete fascia panel for the curved portions of 
the roadway shall be in curved sections. The curvature of the precast concrete panel shall match the 
curvature  of  the  roadway.  The  construction  of  the  precast  concrete  fascia  panel  for  the  straight 
portions of the roadway shall be in straight line segments. 

21.16.1 

Materials 

Unless  otherwise  specified  in  the  Contract  documents,  precast  concrete  fascia  panels  shall  be 
constructed of Class C40/20 concrete. Materials for concrete, preformed joint filler, and sealant shall 
comply with the requirements of the applicable provisions of this chapter and Section 4.3 of Chapter 
4, Concrete Works, of these Standard Specifications, and as described herein. 

The embedded sleeves and the steel plates and hardware for fastening the precast concrete panels 
to the cast-in-place bridge decks shall be manufactured of hot-dip galvanized ASTM A36 / A36M - 
08 steel. The steel galvanization shall conform to the requirements of Section 21.3.5. The setting 
grout and the grout cant shall meet the requirements of Section 21.18.3. 

21.16.2 

Moulds 

The precast concrete fascia panels shall be cast in mortar-tight metal or metal-lined special moulds 
that shall give a smooth, dense finish to the precast concrete parapets. The Contractor shall submit 
to the Engineer for approval shop drawings of his proposed moulds. The mould release oil shall be 
nonstaining. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-72 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.16.3 

Shop Drawings and Method Statement 

The Contractor shall submit complete shop drawings and method statement in accordance with the 
Contract documents and provisions of Section 21.13.2, detailing his proposed method of fabricating, 
transporting,  and  installing  the  precast  concrete  fascia  panels.  Further,  the  shop  drawings  shall 
include details of the dimensions and lifting inserts. The shop drawings shall contain a schedule of 
the quantities of each of the various types of precast concrete fascia panels. 

21.16.4 

Sample Panel 

The Contractor shall fabricate one complete full-sized precast concrete fascia panel in accordance 
with the Contract documents and provisions of Section 21.13.2, and as specified herein. This sample 
unit shall be constructed in a location directed by the Engineer, and shall be protected and properly 
stored  in  a  secure  place  for  reference.  The  sample  unit,  as  approved  by  the  Engineer,  may  be 
installed in the works later if so directed or approved by the Engineer. 

All precast concrete panels shall match the approved sample moulding panel in colour and quality. 
Any precast concrete fascia panel not matching the approved sample parapet in colour and quality 
or as rejected by the Engineer shall be replaced by the Contractor.  

21.16.5 

Fabrication 

The Contractor shall provide a roughcast texture where indicated on the Contract plans in order to 
provide a bond with the members to be constructed after the precast concrete fascia panels have 
been  installed.  The  dimensions  of  all  precast  concrete  fascia  panels  shall  be  verified  in  the  field 
before they are cast. 

The precast concrete fascia panels shall be constructed of a concrete mixture of cement, water, fine 
aggregate and coarse aggregate having a maximum size of 10 mm. The concrete mixture shall meet 
the requirements of Class C40/10 concrete as specified in Section 4.3 of Chapter 4, Concrete Works, 
of  these  Standard  Specifications.  The  Contractor  shall  submit  to  the  Engineer  for  approval,  a 
proposed  mix  design  proportioned  by  weight  and  based  on  trial  mixes  conducted  with  approved 
materials. The mix design shall be accompanied by all relevant data. 

The sand shall be specifically selected for colour and grading in order that the colour and texture of 
the precast concrete fascia panels shall match the colour and texture of the adjacent precast facing 
panels.  Only  sufficient  water  shall  be  used  in  mixing  to  permit  the  removal  of  the  precast  panel 
segments from the moulds as soon as practical. The precast concrete fascia panels shall be kept 
damp for a period of at least ten (10) days. During this period they shall be protected from the sun 
and from wind. Any segments that show checking, soft corners, or soft surfaces shall be rejected. 
The method of storage and handling shall be such as to preserve true and even edges and corners. 
Any precast concrete fascia panels that become chipped, marred, or cracked before or during the 
process of installation shall be rejected. 

21.16.6 

Surface Finish 

Finishes shall be to shapes, lines and level as shown on the Contract plans and as approved by the 
Engineer. Surface texture, smoothness or roughness and appearance shall be as approved by the 
Engineer and shall be achieved by: 

1.  Maximum aggregate size selection. 
2.  Regulating the grading and workability of the mix. 
3.  Aggregate type and colour. 
4.  Addition  of  standard  appropriate  polypropylene  fiber  reinforcement  at  a  rate  of  between 

700g/m

³

 - 1000g/m

³

5.  Use of special liners for patterned surface of type and motives approved by the Engineers 

proposals and trials. 

6.  Use of specialized textile shutter liners for smooth finish. 
7.  Application of suitable surface retarders approved by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-73 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

8.  Application  of  proper  surface  blasting,  hacking  grinding  etc.  techniques  approved  by  the 

Engineer. 

The surfaces shall be free from cracks, blowholes, honeycomb, blemishes and similar effects. No 
concrete surface repair system adversely affecting the quality and uniformity of the finish shall be 
allowed. No additives or surface applications affecting the quality of finish or integrity of subsequent 
coatings shall be used. A detailed concrete surface repair system including coatings (if any) shall be 
submitted to the Engineer for approval. The finish quality, texture and general final appearance shall 
be  approved  by  the  Engineer  based  on  sample  panels  of  other  suitable  pieces  which  shall  be 
inspected, approved and tagged by the Engineer. These tagged samples will serve as a reference 
to document the approved finish and for use in subsequent quality control works. 

21.16.7 

Installation 

The precast concrete fascia panels shall be installed after the bridge deck has been constructed. 
The precast concrete fascia panels shall not be placed on the superstructure (bridge deck) until the 
complete superstructure is in place and all post-tensioning works has been completed. The precast 
concrete  facing  panels  shall  be  installed  on  the  superstructure  in  accordance  with  the  details 
indicated  on  the  Contract  plans.  The  recessed  areas  at  the  lifting  inserts  shall  be  sealed  with 
approved  grout  after  the  installation  of  the  precast  concrete  panels  has  been  approved  by  the 
Engineer. 

21.17 

Cast-in-place Concrete Works for Bridge, Tunnel & 
Underpass Structures 

This section contains the cast-in-place concrete requirements for the following structural elements: 

  Bridge superstructure: diaphragms and slabs. 

  Bridge substructure: abutments, piers, wingwalls, retaining walls, and footings. 

  Tunnel and underpass structures: roof solid slab, roof voided slab, retaining walls, base slab, 

monolithic barriers and curbs. 

  Associated structures: Lift stations, storm water reservoirs, and generator rooms. 

21.17.1 

Materials 

Cast-in-place  bridge  superstructure  and  substructure,  tunnel  and  underpass  structures,  and 
associated structures shall be made of Class  C40/20 concrete. All materials shall comply with all 
applicable  requirements  of  this  chapter,  and  Section  4.3  of  Chapter  4,  Concrete  Works,  of  these 
Standard Specifications. 

21.17.2 

Shop Drawings 

The Contractor shall submit to the Engineer for approval shop drawings including all formwork, as 
required by the Contract documents. 

21.17.3 

Construction 

The  construction  of  cast-in-place  bridge  superstructure  and  substructure,  tunnel  and  underpass 
structures, and associated structures shall comply with the applicable requirements of this chapter 
and Section 4.4 of Chapter 4, Concrete Works, of these Standard Specifications, as specified herein, 
and as per the lines, shapes, dimensions and details indicated in the Contract plans. 

Junction boxes and electrical conduits shall be embedded as indicated in the Contract plans. 

21.17.4 

Formwork 

The Contractor shall include all special formwork required to produce curved and decorative walls 
and  elements  and  the  pattern  on  the  surfaces  of  the  cast-in-place  bridge  superstructure  and 
substructure,  tunnel  and  underpass  structures,  associated  structures,  and  other  surfaces,  as 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-74 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

indicated on the Contract plans, as specified in Section 1.20 of Chapter 01, General Requirements, 
of these Standard Specifications, and as approved by the Engineer. 

Tie rods used in the formworks for areas below the ground water table should incorporate special 
water-stops. Special water-stops shall be an accessory to the formwork. The Contractor shall show 
water-stop details in the shop drawings. 

21.17.5 

Expanded Polystyrene Board 

Tunnel  and  underpass  voided  slabs  shall  be  constructed  using  commercially  available  expanded 
polystyrene  board.  Expanded  polystyrene  shall  have  a  minimum  flexural  strength  of  240  kPa, 
determined  in  conformance  with  the  requirements  of  ASTM  C203  -  05a(2012),  and  compressive 
yield strength of ≥ 200 kPa, at 10% compression, as per ASTM D1621 - 10. Surfaces of expanded 
polystyrene  shall  be  faced  with  hardboard  or  similar  material.  The  facing  layer  shall  be  1.5mm 
minimum  thickness.  Expanded  polystyrene  shall  have  maximum  water  absorption  of  2%  after  24 
hour immersion, and maximum density of 25 kg/m³ as per ASTM D1622 - 08. Thermal conductivity 
at 10

o

 C mean temperature shall be 0.037 W/m² C maximum complying with ASTM E96/ E96M-10, 

and the dimensional stability at 80

o

 C shall be 0.5 maximum complying with BS 4370-2:1993. The 

water  vapour  transmission  at  38

o

  C  and  90%  relative  humidity,  maximum  per  50  mm  sample 

thickness, shall be 25 Mgm/m

2

/h, complying with BS 4370-2:1993. 

Boards shall be held in place by a combination of nails, straps, waterproof adhesive or other means 
approved by the Engineer. The expanded polystyrene shall be considered as an accessory to the 
formwork. 

Any special formwork and accessories for the formworks shall be 

at the Contractor’s expense. 

21.18 

Mortar and Grout 

This work makes and places mortar and grout for use in concrete structures and precast works other 
than in prestressing ducts. Such uses include mortar for filling under masonry plates and for filling 
keyways  between  precast members,  where  shown  in  the  Contract  documents; mortar  used to fill 
voids  and  repair  surface  defects; grout  used to fill  sleeves  for  anchor  bolts; grout for  sealing  bolt 
pockets and the insides of the coil anchors; and mortar and grout for other such uses, where required 
or approved. 

21.18.1 

Mortar and Grout Materials and Mixing 

Materials for mortar and grout shall conform to the requirements of Section 21.3, Materials Used for 
Concrete Structures. Grading of sand for use in grout or for use in mortar, when the width or depth 
of the void to be filled is less than 20 mm, shall be modified so that all material passes the No. 8, 
2.36-mm sieve. 

Unless  otherwise  specified  in  the  Contract  documents,  or  later  in  this  section,  or  ordered  by  the 
Engineer, the proportion of portland cement to sand for mortar shall be one-to-two and for grout shall 
be one-to-one. Proportioning shall be by loose volume. 

When non-shrink mortar or grout is specified, either a non-shrink admixture, or expansive hydraulic 
cement conforming to ASTM C845 - 04 of a type approved by the Engineer, shall be used. 

Only  sufficient  water shall  be  used to  permit  placing  and  packing.  For  mortar,  only  enough  water 
shall be used so that the mortar will form a ball when squeezed gently in the hand. 

Mixing shall be done by either hand methods or with rotating paddle-type mixing machines and shall 
be continued until all ingredients are thoroughly mixed. Once mixed, mortar or grout shall not be re-
tempered by the addition of water and shall be placed within one hour. 

Alternatively, proprietory, nonshrinkable, prepacked, flowable grout material having strength greater 
than 1.5 times characteristic strength of surrounding concrete and with slant shear greater than or 
equal  25  percent  of  its  compressive  strength  may  be  used,  provided  the  colour  and  texture  are 
approved by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-75 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.18.2 

Placing and Curing of Mortar and Grout 

Concrete  areas  to  be  in  contact  with  the  mortar  or  grout  shall  be  cleaned  of  all  loose  or  foreign 
material that would in any way prevent bond, and the concrete surfaces shall be flushed with water 
and allowed to dry to a surface-dry condition immediately prior to placing the mortar or grout. 

Mortar or grout shall completely fill and shall be tightly packed into recesses and holes, on surfaces, 
under structural members, and at other locations specified. After placing, all surfaces of mortar or 
grout shall be cured by the water method as provided in Section 21.11, Curing Concrete, for a period 
of not less than three days. 

Keyways, spaces between structural members, holes, spaces under structural members, and other 
locations where mortar could escape shall be mortar-tight before placing mortar. 

No  load  shall  be  allowed  on  mortar  that  has  been  in  place  less  than  72  hours,  unless  otherwise 
permitted by the Engineer. 

All improperly cured or otherwise defective mortar or grout shall be removed and replaced by the 
Contractor at the Contractor's expense. 

21.18.3 

Grout in Precast Works 

The grout for sealing bolt pockets and the insides of the coil anchors, the grout cant, and the setting 
grout for the precast members shall be a nonmetallic, nonshrink grout containing a mixture of sulfate 
resistant cement and sand approximately in the proportions of one part of cement to two and one-
half parts of sand. The sand shall be specifically selected for colour and grading in order that the 
colour and texture of the grout shall match the colour and texture of the precast members. The sand 
shall  be  sieved  through a  screen  having  3.715 mm  square  meshes.  All  over-sized  sand  particles 
shall  be  discarded.  The  grout  shall  show  no  expansion  after  final  set  takes  place  when  tested  in 
accordance with ASTM C827 / C827M - 10. It shall have an initial setting time of not less than 45 
minutes. 

The grouting shall be performed in accordance with the recommendations of the American Concrete 
Institute and with the grout Manufacturer's published literature for site preparation, product mixing, 
and placing. An adequate number of metal shims shall be placed before the grout is placed. 

The Contractor shall furnish, from an Owner’s approved independent laboratory, test results verifying 
that the grout shows no shrinkage from the time of placement and no expansion after set, has a one-
day compressive strength of not less than 20 MPa, and has an initial set time of not less than 45 
minutes. 

21.19 

Application of Loads 

Loads shall not be applied to concrete structures until the concrete has attained sufficient strength 
and, when applicable, sufficient prestressing has been completed, so that damage shall not occur. 

21.19.1 

Earth Loads 

Whenever possible, the sequence of placing backfill around structures shall be such that overturning 
or  sliding forces are minimized. When the placement of backfill will cause flexural stresses in the 
concrete, and unless otherwise permitted by the Engineer, the placement shall not begin until the 
concrete has reached not less than 80 percent of its specified strength. 

21.19.2 

Construction Loads 

Light materials and equipment may be carried on bridge decks only after the concrete has been in 
place at least 24 hours, providing curing is not interfered with and the surface texture is not damaged. 
Vehicles needed for construction activities and having a mass between 450 kg and 1,800 kg, and 
comparable materials and equipment loads, shall be allowed on any span only after the last-placed 
deck concrete has attained a compressive strength of at least 20 MPa. Loads in excess of the above 
shall  not  be  carried  on  bridge  decks  until  the  deck  concrete  has  reached  its  specified  strength. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-76 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Additionally, for post-tensioned structures, vehicles weighing more than 2,000 kg, and comparable 
materials and equipment loads, shall not be allowed on any span until the prestressing steel for that 
span has been tensioned. 

Precast concrete or steel girders shall not be placed on substructure elements until the substructure 
concrete has attained 70 percent of its specified strength. 

Otherwise,  loads  imposed  on  existing,  new,  or  partially  completed  portions  of  structures  due  to 
construction  operations  shall  not  exceed  the  load  carrying  capacity  of  the  structure,  or  portion  of 
structure, as determined by the Strength II Load Combination in Table 3.4.1-1 of the 

AASHTO Load 

and  Resistance  Factor  Design  (LRFD)  Bridge  Design  Specifications

.  Compressive  strengths  of 

concrete (

fc'

) to be used in computing the load-carrying capacity shall be the smaller of the actual 

compressive strength at the time of loading or the specified compressive strength of the concrete. 

21.19.3 

Traffic Loads 

Unless  otherwise  provided  in  the  Contract  documents,  traffic  shall  not  be  permitted  on  concrete 
decks until at least 14 days after the last placement of deck concrete and until such concrete has 
attained its specified strength. 

21.20 

Special Requirements for Segmental Bridges 

21.20.1 

Geometry Control 

21.20.1.1  Deflection and Camber Data 

Deflection or camber data shall be submitted by the Contractor for each stage of construction, as 
required to construct the structure to its final grade. Procedures used shall account for the effect of 
the time-dependent prestress losses and creep that will occur during the construction phase. Data 
for the entire bridge, based on the Contractor's proposed erection sequence, method, and schedule, 
shall be submitted to the Engineer for review prior to commencing pier shaft construction. 

Structure  cambers  will  be  monitored  by  the  Contractor  at  each  stage  and  corrective  actions,  as 
approved  by  the  Engineer,  shall  be  performed  by  the  Contractor  to  assure  proper  erection  of the 
structure to its final grade. 

21.20.1.2  Geometry Control 

A geometric control plan that indicates, in detail, how the survey is to be performed shall be submitted 
by the Contractor for the Engineer’s approval. These proposed actions shall assure proper erection 
of the structure to the final grade shown in the working drawings. This plan shall provide for regular 
monitoring  of  the  superstructure  deflections  beginning  with  the  addition  of  the  first  cantilever 
segments  and  concluding  with  the  last  cantilever  segment.  It  shall  also  include  the  adjusting 
procedure to be utilized,  shall the cantilever, as erected, deviate from the predicted alignment by 
more than 25 mm. 

Elevations  and  alignments  of  the  structure  shall  be  checked  by  the  Contractor  at  every  stage  of 
construction and the Contractor must maintain a record of all these checks and of all adjustments 
and corrections made. All surveying shall be performed at a time that will minimize the influence of 
temperature. Corrections by shimming shall be done only when approved by the Engineer. 

For precast segmental construction using short-line forming techniques, the Contractor shall provide 
precision surveying systems so that levels and horizontal alignment during precasting are measured 
to  an  accuracy  of  ±0.3  mm.  For  all  other  types  of  segmental  construction  and  for  erection  of 
segmental bridges, surveying shall be provided to an accuracy of ±3 mm. 

For  precast  segmental  construction  using  match-cast  segments,  careful  checks  of  both 
measurements  and  computations  of  geometry  shall  be  made  by  the  Contractor  before  moving 
segments from their casting position. Computed coordinates of all sections cast shall be completed 
before casting a new segment. In addition to the computed as-built casting curves for vertical and 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-77 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

horizontal deflections, a cumulative twist curve shall be computed using the measured cross slopes 
of the individual units as a check on the extrapolated deflections. In computing set-up elevations in 
the match-cast process, priority shall be given to correcting twist errors by proper counter rotation. 
Segments in the match-cast position shall not be subjected to a stress-inducing twist. 

21.20.2 

Segmental Bridge Tolerances 

Unless  otherwise  specified,  reinforcement  shall  be  fabricated  and  placed  within  the  tolerances 
specified herein as recommended by the Concrete Reinforcing Steel Institute [CRSI] 1990. 

  For  specified  effective  depth  (d)  and  the  minimum  clear  concrete  protection  in  flexural 

members,  walls,  and  compression  members,  Table  21-22  illustrates  the  admissible 
tolerances. 

Table 21-22: Tolerances on effective depth and minimum cover 

Effective depth d 

Tolerance on d 

Tolerance on 
minimum mover 

200 mm or less 

±10 mm 

-10 mm 

More than 200 mm 

±12 mm 

-12 mm 

  However, tolerances on the clear distance to formed soffits shall be -6 mm, and in no case 

shall the tolerance on cover exceed minimum one-third of the minimum cover stipulated on 
the structural drawings or in the specifications. 

  For longitudinal location of bends and ends of bars: ±50 mm, except at discontinuous ends 

of members where tolerance shall be ± 12 mm. 

  As long as the total number of bars specified is maintained, a reasonable tolerance in spacing 

individual  bars  is  ±25  mm,  except  where  openings,  inserts,  and  embedded  items  might 
require some additional shifting of bars. 

Embedded ducts for all types of segmental bridge construction shall be positioned to tolerances as 
specified in Chapter 22, Prestressing Systems, Article 22.8.4.2, Placement of Ducts. 

Tolerances for completed segments shall be taken, as shown in Table 21-23. For bridges without an 
overlay, the flatness of the top slab shall be 3 mm in 3 m in the direction of traffic. 

Dimensions from segment-to-segment shall be adjusted to compensate for any deviations within a 
single  segment  so  that  the  overall  alignment  of  the  completed  structure  will  conform  to  the 
dimensions shown in the Contract documents. 

When cantilever construction is used, the tolerances for the alignment of the opposing cantilevers in 
a span shall be stated in the Contract documents. Forces up and down that can be placed on the 
end of the cantilever shall also be stated on the design drawings and shall consider the allowable 
tensile stresses for construction load combinations, as stated in Table 5.14.2.3.3-1 of the 

AASHTO 

LRFD Bridge Design Specifications

After  erection,  final  post-tensioning,  final  corrections,  and  adjustments  are  complete  and  the 
structure has been placed on its permanent bearings, the superstructure shall conform to the grade 
and alignment shown in the Contract drawings, with due consideration of creep and superimposed 
dead-load deflections within tolerances as specified in the Contract documents. 

Finished segment tolerances shall not exceed those listed in Table 21-23. 

Table 21-23: Completed segment tolerance for segmental box girder bridge construction 

Dimension 

Tolerance 

Length  of  Match-Cast  Segment  (Not  Cumulative)  (10 
mm/m +25 mm max) 

±10 mm /m 

Length of Cast-in-Place Segment 

±12.5  mm  but  not  greater  than  +50 
mm per span 

Web Thickness 

±9.5 mm 

Depth of Bottom Slab 

±9.5 mm 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-78 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Dimension 

Tolerance 

Depth of Top Slab 

±9.5 mm 

Overall Top Slab Width 

±5 mm/m, ± 25 mm. max. 

Diaphragm Thickness 

±12.5mm 

Grade of Form Edge and Soffit 

±3 mm in 3 m 

Tendon Hole Location 

±3 mm 

Position of Shear Keys 

±6 mm 

21.20.3 

Shop Drawings and Design Calculation for Construction 
Procedures 

Sufficiently in advance of the start of superstructure field construction operations, so as to allow the 
Engineer  not  less  than  a  30  day-review  period,  the  Contractor  shall  submit  complete  details  and 
information  concerning  the  method,  materials,  equipment,  and  procedures  it  proposes  to  use  in 
constructing that portion of the superstructure for which the information is furnished. This submittal 
shall include step-by-step erection procedures. 

More than one method or technique of erection may be permitted in the overall scope of work. Any 
subsequent deviation from the approved materials or details shall not be permitted unless details are 
submitted by the Contractor and approved by the Engineer in advance of use. 

Submittals  for  approval  shall  include  calculations,  drawings,  and  information  outlined  in  Article 
21.20.3.1, Design Calculations for Construction Procedures, and Article 21.20.3.2, Shop Drawings. 
Two sets of all required drawings and calculations shall be submitted and resubmitted until approved 
by the Engineer. A specified number of distribution copies shall be furnished after approval. 

21.20.3.1  Design Calculation for Construction Procedures 

Design calculations shall be submitted for falsework, erection devices, formwork, or other temporary 
construction that may be required and that will be subject to calculated stresses. 

Design of the falsework or erection devices for all superstructure concrete shall be done under the 
direction of and sealed by a specialty engineer. Calculations shall also be submitted to substantiate 
the system and method of stressing proposed by the Contractor. Such calculations shall include the 
required  jacking  force  and  elongation  of  tendons  at  the  time  of  tensioning,  tendon  stress  level  at 
stressing  ends  after  seating,  stresses  in  anchorage  zones  and  distribution  plates,  stress-strain 
curves typical of the prestressing steel to be furnished, seating losses, temporary overstresses, and 
reinforcement required to resist anchor block stresses. 

In addition to the above, computations shall be submitted for approval for the following: 

  Computations of deflections and required camber due to dead loads, post-tensioning forces, 

creep, and shrinkage. A tabulation of deflections and camber dimensions shall be included 
on the shop drawings. 

  Computations of jacking forces required at joints during temporary post-tensioning.  

21.20.3.2  Shop Drawings 

Detailed  shop  drawings shall  be  submitted  by the  Contractor for  approval  in  accordance  with the 
Contract documents. These drawings shall include, but not necessarily be limited to, the following 
information: 

  Fully and accurately dimensioned views showing the geometry of the segments, including all 

projections, recesses, notches, openings, block outs, and other pertinent details. 

  Details of non-prestressed steel reinforcing shall be clearly shown as to size, spacing, and 

location 

— including any special reinforcing required but not shown in the Contract plans. 

  Size and type of ducts for all post-tensioning tendons and their horizontal and vertical profiles 

shall  be  clearly  detailed.  Duct  supports,  grout  tubes,  vents,  and  drains  shall  be  shown 

— 

including size, type, and locations. 

 

 

 

 

 

 

 