Главная Manuals Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)
|
|
|
/lux Visibility of the road markings is reduced in wet conditions. e. Drying Time Thermoplastic material shall set to bear traffic in not more than 10 minutes when the air temperature 0 C. The manufacturer ’s recommendations shall be applied as approved by the Engineer. when the application temperature is within the range Setting / hardening time is 10 minutes at a surface temperature of 20 0 C and a light breeze. f. Material Sampling and Testing for Acceptance Sampling and testing shall be performed per AASHTO T 250 or EN 1871 or any other equivalent 1. Binder content 2. Glass bead content 3. Glass bead content, grading & roundness 4. Reflectance & yellowness index 5. Colour & luminance 6. Titanium dioxide 7. Lead chromate 8. Flowability (percent residue) 9. Low temperature stress resistance 10. Bond strength 11. Impact resistance 12. Softening point 13. Specific gravity 14. Heat Stability 15. Ultraviolet light and condensate exposure 16. Hardness 17. Flash point 8.2.2.6 Cold Applied Plastics Cold plastic is a double component road marking material. Unlike thermoplastic material, no C HAPTER 8 :
T RAFFIC M ARKINGS AND S IGNS |