Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 20

 

 

 

No water shall be pumped into an existing or new drainage system, or to a environmentally sensitive 
area (as defined by the environmental authority or by the Engineer) unless discharge is equipped 
with a suitable sediment trap, filter or sedimentation tank, as approved by the Engineer. 

Where necessary, the Contractor shall divert natural and artificial waterways encountered at the site, 
until the works have been completed.  

Route of the dewatering discharge main shall be approved by the Engineer. 

g.  Removal of Dewatering Systems

No  dewatering  system  shall  be  removed  without  the  approval  of  the  Engineer.    Release  of 
groundwater back to its static level shall be performed in a manner to prevent disturbance of natural 
foundation  soils,  compacted  fill  or  backfill  and  to  prevent  flotation  or  movement  of  structures, 
pipelines and sewers. 

Equipment shall only be removed when no longer required. Monitoring and settlement measurement 
systems shall be maintained in operation as required by the Engineer. 

If approved by the Engineer, well-points and like items may be abandoned in place. 

Drainage provisions: 

1. 

Drainage  ditches,  diversions  and  temporary  pipes  shall  be  constructed  as  required  to
maintain proper drainage in the work areas 

2. 

Drainage ditches shall be constructed with cross-sectional area and gradient at least equal
to that of the intercepted watercourses or as approved by the Engineer 

3. 

Berms shall be provided to prevent surface water from draining into excavations

4. 

Earth banks shall be suitably protected from erosion during excavation work.

2.4.2.4 

Rock Cuts 

Contractor  shall  excavate  rock  cuts  to  150 mm  below  subgrade  level  within  the  roadbed  limits, 
backfill  to  the  subgrade  with  embankment  materials  that  meet  the  requirements  of  Section 
2.5.2.2 and compact the materials in accordance with Section 2.6. 

Rock excavation using blasting shall meet the following requirements: 

a.  Rock Blasting

1. Description

Rock  blasting  consists  of  fracturing  rock  and  constructing  stable  final  rock-cut  faces  using 
controlled and production blasting techniques. 

Controlled  blasting  uses  explosives to form  a  shear  plane  in  the  rock  along  a  specified  back 
slope. Controlled blasting includes pre-splitting and cushion blasting. 

Production blasting uses explosives to fracture rock. 

Contractor shall be able to demonstrate suitable past experience and qualifications in the art of 
construction  blasting.    Otherwise,  a  qualified  Subcontractor  shall  be  used.    Experience  and 
qualifications, whether of the Contractor or a Subcontractor shall be submitted to the Engineer 
for  review  and  acceptance.    No  blasting  work  shall  be  started  until  written  approval  of  the 
Contractor’s qualifications and method statements have been approved by the Engineer. 

2. Materials

Explosives and initiating devices less than one year old shall be used by the Contractor. These 
include,  but  are  not  limited  to,  dynamite  and  other  high  explosives,  slurries,  water  gels, 
emulsions, blasting agents, initiating explosives, detonators, and detonating cord. 

 

E

ARTHWORKS

 

 

 

3. Construction Requirements 

I.  Regulations

.

 Furnish copies or other proof of all applicable permits and licenses that comply 

with  the  requirements  of  the  relevant  government  ministries.  Upon  Owner  approval,  the 
Contractor shall comply with any additional requirements. 

II.  Safety and health. Comply with the requirements of Section 1.16.7 of Chapter 1, General 

Requirements, and when required by the Engineer OSHA, Standard No. 1926, Subpart U. 

III.  Storage,  security,  and  accountability.  Provide  proper  buildings  or  magazines  in  suitable 

locations for storage of explosives, in a manner as approved by the Engineer. All storage 
shall  be  secure  with  locked  access  and  guarded  by  security  personnel  24  hours  a  day. 
Provide for a detailed method of controlling and inventorying of all explosive materials, as 
approved by the Engineer. All unused explosive materials shall be disposed of in a manner 
approved by the Engineer and the approving governmental Owner. 

IV.  Blaster-in-charge. Designate, in writing, a blaster-in-charge, and submit evidence that the 

blaster-in-

charge has specific and related experience, as well as a valid blaster’s license 

issued by a recognized licensing body for the type of blasting required. 

V.  Blasting plans. Blasting plans are for quality control and record-keeping purposes, and are 

to be signed by the blaster-in-charge. Review and acceptance of blasting plans does not 
relieve the Contractor of the responsibility for using existing drilling and blasting technology, 
and  for  obtaining  the  required  results.  Do  not  deliver  explosives  to  the  project  until  the 
general blasting plan is accepted. 

  General  blasting  plan.

 

Submit  a  general  blasting  plan  for  acceptance  before  drilling 

operations  begin,  which  includes,  at  a  minimum,  the  following  safety  and  procedural 
details: 

  Working  procedures  and  safety  precautions  for  storing,  transporting,  handling,  and 

detonating explosives 

 

Proposed product selection for both dry and wet holes and furnished manufacturer’s 
material  safety  data  sheets  for  all  explosives,  primers,  initiators,  and  other  blasting 
devices 

  Typical plan and section views for both production and controlled blasting, including 

maximum length of the shot, burden, hole spacing, hole inclination, hole depth, hole 
diameter, subdrill depth, and powder factor 

  Proposed initiation and delay methods and times 

  Proposed format for providing all the required information for the site-specific blasting 

plans 

  Site-specific blasting plans. After the general blasting plan is accepted, the Contractor 

shall  submit  site-specific  blasting  plans  for  acceptance  before  drilling  operations 
begin. The plan shall include the following information: 

  Site drawings showing a scaled map of the blast area and cross-sectional views that 

indicate beginning and ending stations; free-face locations; hole spacing, diameter, 
depth,  burden,  and  inclination;  and  subdrill  depth.  Include  any  significant  joints  or 
bedding  planes  within  the  blast  zone  and  incorporate  this  geology  into  the  blast 
design. 

  Where blasting may affect nearby structures or utilities, the Contractor shall provide 

the method of monitoring and controlling blast vibrations. 

  Provide a loading pattern diagram showing the location and amount of each type of 

explosive to be used in the holes, including primer and initiators and the location, type, 
and depth of stemming, column heights, and overall powder factor for each type of 
loading. 

 

E

ARTHWORKS

 

 

 

  Provide a delay and initiation diagram showing the delay pattern, sequence, and delay 

times. 

  Preblast condition survey and vibration monitoring and control. When blasting near 

buildings, structures, or utilities that may be subject  to damage from  ground or  air-
blast vibrations, the Contractor shall provide a blast vibration specialist with at least 
five consecutive years of experience in vibration monitoring for at least three projects. 
Fourteen days before blasting, the Contractor shall submit to the Engineer the name 
and qualifications of the blast vibration specialist including the following information: 

  Project names, locations, and services performed 

  Name  and  phone  number  of  an  owner  or  agency  contact  who  can  verify  the 

experience of the specialist 

  Relevant qualifications and licences 

Before  blasting,  the  Contractor  shall  arrange  for  a  pre-blast  condition  survey  of  nearby 
buildings, structures, or utilities that may be at risk from blasting damage, and shall use a 
survey method acceptable to its insurance company. Damage resulting from blasting is the 
Contractor’s responsibility. All pre-blast condition survey records shall be made available to 
the Engineer and the Contractor shall notify the Engineer and occupants of nearby buildings 
at least 24 hours before blasting. 

Vibrations  shall  be  controlled  by  a  blast  vibration  specialist  using  properly  designed  delay 
sequences and allowable charge weights per delay when blasting near buildings, structures, 
or utilities that may be subject to damage from blast-induced vibrations. Trial blasts shall be 
conducted to measure vibration levels and base allowable charge weights per delay. Test 
blasts  shall  be  conducted  with  blast  plan  modifications  that  limit  ground  and  air-blast 
vibrations to a level that will not cause damage to nearby buildings, structures, or utilities, as 
determined by the blast vibration specialist. 

When  vibration  damage  to  buildings,  structures,  or  utilities  is  possible,  the  blast  vibration 
specialist  shall  monitor  each  blast  with  approved  seismographs  and  air-blast  monitoring 
equipment  located  at  acceptable  locations.  Seismographs  capable  of  recording  particle 
velocity for three mutually  perpendicular  components  of  vibration shall  be  used.  The  blast 
vibration specialist shall interpret the seismograph and air-blast records to ensure that the 
data is effectively used in the control of blasting operations. 

VI.  Test  Blasting.  Before  full-scale  drilling  and  blasting,  the  Contractor  shall  drill,  blast,  and 

excavate one or more test sections as proposed in the blasting plan. Test blasts may be 
made away from or at the final slope line. 

For the cushion, or trim, method of controlled blasting, the Contractor shall space blast holes 
no more than 1.5 m apart for the initial test blast. For the pre-splitting method of controlled 
blasting, the Contractor shall space blast holes no more than 750 mm apart for the initial 
test  blast.  Spacing  shall  be  adjusted  as  approved.  Contractor  shall  use  the  approved 
spacing in the full-scale blasting or subsequent test blasts. 

A test blast is unacceptable when it results in fragmentation beyond the final rock face, fly 
rock, excessive vibration, air blast, over break, damage to the final rock face, or overhang. 
When a test blast is unacceptable, the Contractor shall revise the blasting plan and make 
an additional test blast. 

VII.  Blasting. 

a.  General. Drill and blast according to the blasting plan. 

Before drilling, the Contractor shall remove overburdened soil and loose rock along 
the top of the excavation for at least 10 m beyond the hole drilling limits, or to the end 
of the cut. 

 

All holes shall be capped to prevent unwanted backfill. Place a stake next to each 
hole that numbers each hole and displays the total depth drilled. 

Use the types of explosives and blasting accessories necessary to obtain the required 
results. A bottom charge may be larger than the line charges if no over break results. 

After blasting, the hole shall be free of obstructions for its entire depth. Charges shall 
be placed without caving the blast hole walls. The upper portion of all blast holes shall 
be stemmed with dry sand or other granular material passing the 9.5-mm sieve. Do 
not stem the hole with drill cuttings. 

Following a blast, the Contractor shall stop work in the entire blast area and check for 
misfires before allowing workers to excavate the rock. 

Workers shall remove or stabilise all cut face rock that is loose, hanging, or potentially 
dangerous.  They  shall  scale  by  hand  or  machine  methods,  as  approved  by  the 
Engineer. Minor irregularities or surface variations shall be left in place, if they do not 
create  a  hazard.  Drill  the  next  lift  only  after  the  cleanup  and  stabilisation  work  is 
complete. 

If blasting operations trigger fracturing of the final rock face, the Contractor shall repair 
or stabilise it in an approved manner at no cost to the Owner. Repairs or stabilisation 
may include removal, rock bolting, rock dowels, or other techniques. 

When  any  of  the  following  occur,  the  Contractor  shall  halt  blasting  operations  to 
perform additional test blasts: 

  Slopes are unstable

  Slopes exceed tolerances or overhangs are created

  Back slope damage occurs

  Safety of the public is jeopardized

  Property or natural features are endangered

  Fly rock is generated

  Excessive  ground  or  air-blast  vibrations  occur  in an  area  where  damage to

buildings, structures, or utilities is possible 

b.  Drill logs. Drill logs submitted by the Contractor shall include the following:

  A blast plan map showing designated hole numbers

  Individual hole logs completed and signed by the driller that show total depth

drilled; depths and descriptions of significant conditions encountered during 
drilling that may affect loading, such as water or voids; and the date drilled 

c.  Controlled  blasting.  When  test  blasts  indicate  the  need  for  controlled  blasting,  the

Contractor shall use controlled blasting methods to form the final rock cut faces when the 
rock height is more than 3 m above ditch grade and the staked slope has a ratio of 2:1 or 
steeper. 

Controlled blasting includes only those holes drilled on the row furthest from the free-face 
and that are drilled on the design slope. 

Down-hole angles or fan drill blast holes shall be used for pioneering the tops of rock cuts 
or preparing a working platform for controlled blasting. Use the diameter of the blast hole 
and spacing established for controlled blasting during the test blasts. 

Drill controlled blast holes no larger than 100 mm in diameter along the final rock face 
line;  within  75  mm  of  the  proposed  surface  location;  and  at  least  10  m  beyond  the 
production holes to be detonated or to the end of the cut. 

 

Drilling  equipment  with  mechanical  or  electrical-mechanical  devices  that  accurately 
control the angle the drill enters the rock shall be used. Select a lift height and conduct 
drilling operations so the blast hole spacing and down-hole alignment does not vary more 
than 225 mm from the proposed spacing and alignment. When more than 5 percent of 
the holes exceed the variance, reduce the lift height and modify the drilling operations 
until the blast holes are within the allowable variance. The maximum lift height is 15 m. 

A 600 mm offset is allowed for a working bench at the bottom of each lift for drilling the 
next lower controlled blasting hole pattern. Adjust the drill inclination angle or the initial 
drill collar location so the required ditch cross-section is obtained when the bench is used. 

Drilling 500 mm below the ditch bottom is allowed for removing the toe. 

Do not use bulk ammonium nitrate and fuel oil for controlled blasting. 

Pre-splitting delays the nearest production blast row at least 25 milliseconds after blasting 
the presplit line. Pre-split a minimum of 10 m ahead of the production blasting zone. 

Cushion,  or  trim,  blasting  can  delay  the  cushion  blast  row  from  25  milliseconds  to  75 
milliseconds after blasting the nearest production row. 

d.  Production blasting. Drill the row of production blast holes closest to the controlled blast

line  parallel  and  no  closer  than  2 m  to the  controlled  blast  line.  Do  not  drill  production 
blast holes lower than the bottom of the controlled blast holes. 

Detonate production holes on a delay sequence toward a free-face. 

VIII.  After blast reports.

Within  three  days  after  a  blast  and  before  the  next  blast,  the  Contractor  shall  submit  an 
after-blast report that includes the following: 

a.  Results of the blast and whether or not blasting objectives were met. If blasting objectives

were  not  met,  the  Contractor  shall  submit  proposed  changes  to  future  site-specific 
blasting plans that shall produce acceptable results and proposed repair or stabilisation 
plans for unstable or blast-damaged back slopes. 

b.  Blasting logs that include the following:

i. 

All actual dimensions of the shot, including blast hole depths, hole diameter, burden,
spacing, subdrilling, stemming, powder loads, and timing 

ii. 

A drawing or sketch showing the direction of the face, or faces, and the physical
shot layout 

iii. 

If a seismograph was used, the Contractor shall provide the following:

(1) 

Identification of instrument used

(2) 

Name of qualified observer and interpreter

(3) 

Distance and direction of recording station from blast area

(4) 

Type of ground recording station and material on which the instrument is sitting

(5) 

Maximum particle velocity in each direction

(6) 

A dated and signed copy of the seismograph readings

(7) 

Post-blast condition survey

(8) 

Results of air-blast monitoring

(9) 

Results of the post-blast condition survey

2.4.2.5 

Subexcavation 

Unsuitable  material,  including  soft,  muck,  or  vegetative  material,  shall  be  excavated  by  the 
Contractor  to the  limits designated  by the  Engineer.  Cross-sections shall  be  taken  in  accordance 

 

with  Section  2.1.  Prevent  unsuitable  material  from  becoming  mixed  with  the  backfill.  Unsuitable 
material  shall  be  disposed  of  in  accordance  with  Section 2.4.2.7  Sub-excavated  limits  shall  be 
backfilled with suitable load bearing material in accordance with Section 2.5.3. 

When water fills an area after the removal of unsuitable materials, the Contractor shall drain the site 
so  that  any  backfill  may  be  compacted.  If  drainage  is  not  possible,  the  Contractor  shall  use  free 
drainage material which can be hydraulically compacted for backfilling in water.  Backfill method and 
materials shall be approved by the Engineer, and shall be carried out on the Contractor’s expense.  

2.4.2.6 

Slope Treatment 

Earth slopes shall be finished to reasonably smooth surfaces and shall be free of all debris and loose 
material. All shattered or loosened material shall be removed from rock cut slopes. 

Tops  of  all  roadway  cut  slopes,  except  solid  rock  cuts,  shall  be  rounded  in  accordance  with  the 
Contract plans. 

Surfaces of earth slopes shall be left in a uniform and smooth condition, trimmed, and graded to no 
more  than  ±50  mm  of  the  neat  lines  shown  on  the  Contract  plans.  Where  the  slopes  of  earth 
excavations are to be covered with topsoil or other agricultural planting soil, the excavated surface 
shall be caterpillar tread-walked in a vertical direction, or similar measure, to roughen the surface 
and help hold the upper topsoil layers. 

If a layer of earth covers a rock cut, the slope shall be rounded above the rock as if it were an earth 
slope. All work required to complete slope treatment, including excavation, haul, and slope rounding, 
shall be included in the unit price for roadway excavation. 

2.4.2.7 

Disposal of Unsuitable or Excess Material 

Unsuitable  or  excess  material  shall  be  disposed  of  off-site  at  disposal  sites  furnished  by  the 
Contractor and approved by the Engineer. Waste material shall be shaped and compacted in its final 
location. 

If  the  Contractor  or  Engineer  finds  any  evidence  of  petroleum  or  other  hazardous  products 
contamination  of  any  excavated  material  by  visual,  olfactory,  or  other  means,  the  potentially 
contaminated  material  shall  be  stockpiled  separately  and  sampled  and  analysed  to  determine 
disposal options. 

Material that is excavated and deemed unsuitable or as excess material shall be placed in a covered 
transport  and  hauled  to  the  disposal  site.  Excavated  material  shall  not  spill,  overflow,  or  release 
during transport to the disposal site. 

Soil  that  is  designated  for  landfill  disposal  and  contains  free  water  shall  be  stabilised  using  lime, 
cement, or fly ash, where required by the disposal facility. 

Soil shall not be transported off-site in containers with water draining from the container. 

2.4.2.8 

Wasting Material 

If  the  Contractor  wastes  excavated  material  needed  for  the  embankment  or  other  fill,  it  shall  be 
replaced at no expense to the Owner with material the Engineer approves. 

2.4.2.9 

Roadway Ditch and Pond Excavation 

a.  Description

This work consists of excavating permanent open ditches and ponds to the required lines, grades, 
and  cross-sections  as  shown  on  the  Contract  plans.  It  also  includes  disposing  of  all  excavated 
material regardless of its nature or type; unless excavated material is approved as borrow material. 

 

E

ARTHWORKS

 

 

 

b.  Construction requirements 

Before excavating any open ditch or pond, the Contractor shall clear and grub the area in accordance 
with Section 2.2. 

Where  the  excavated  ditch  or  pond  material  is  approved  for  use  as  embankment  material  in 
accordance  with  the requirements  of  Section 2.5.2.2,  the  material  shall  be  used  to  build  dikes  or 
berms  as  shown  on  the  plans.  Dikes  and  berms  shall  be  constructed  in  accordance  with  the 
requirements for roadway embankment compaction in Section 2.5.3. 

Excess excavated material may be disposed of by dressing or spreading above the back slopes of 
ditches and outside of dikes and berms, as approved by the Engineer.  Otherwise, the Contractor 
shall dispose of excess excavation material in accordance with Section 2.4.2.7. 

At  each  transition  from  cut  to  fill,  the  Contractor  shall  divert  any  roadway  ditch  away  from  the 
embankment in natural ground. Ditches shall never permit water to flow into or upon embankment 
material. 

2.4.2.10 

Borrow Excavation 

All suitable roadway excavation shall be used by the Contractor in embankment construction, and 
borrow excavation shall not be used when it results in excess roadway fill material. 

Borrow sources shall be preapproved by the concerned authorities and the Engineer. Approval shall 
be based on the Contractor’s submittal of location, sample testing, estimation of quantities, written 
approval of the borrow source owner and/or regulating authority, and restoration of borrow source 
upon completion as shown on the shop drawings. For borrow sources to be accepted, the material 
shall  meet  the  requirements  for  the  applicable  load-bearing  or  non-load-bearing  material 
requirements in Section 2.5.2. 

Develop and restore borrow sources in accordance with the Engineer-approved methods. Do not 
excavate  beyond  the  established  limits.  When  applicable,  the  Contractor  shall  shape  the  borrow 
source to permit accurate measurements when excavation is complete. Borrow sources shall be left 
in a manner that is pleasing to the eye, with excavated slopes and surfaces left in a smooth and 
uniform shape at geotechnical stable angles.   No extra payment will be made for restoration and 
final grading of the borrow source. 

2.4.2.11 

Structural Excavation 

a.  General 

Contractor shall include all operations necessary to excavate, as required for the construction of the 
structures, and as indicated on the Contract plans. 

This  work  shall  consist of  the  necessary  excavation for  construction  of minor  structures  including 
storm  drain  and  utility  structures  and  wall  items  as  otherwise  specified  in  these  general 
specifications. Contractor will not be paid for excavation of any minor structures or portions of minor 
structures  that  are  constructed  within  the  volume  of  the  roadway  embankment  excavation  or  fill 
prism.  This  work  shall  include  necessary  dewatering,  sheeting,  bracing, construction  of  cribs  and 
cofferdams, furnishing materials, and the subsequent removal of cribs and cofferdams. 

Excavation to remove and replace unsuitable material encountered below the structure foundation 
elevation  shall  meet  the  requirements  of  Section  2.4.2.5.  Depending  on  conditions,  the  Engineer 
may require the use of alternative materials as replacement fill for sufficient foundation strength. This 
may include one of the following materials: 

1.  Load-bearing embankment material meeting the requirements of Section 2.5.2.2 

2.  Structural backfill material meeting the requirements of Section 2.5.2.4 

3.  Pervious backfill material meeting the requirements of Section 2.5.2.5 

4.  Controlled density fill meeting the requirements of Section 4.3.10.3 of Chapter 4, Concrete 

Works, of these Standards Specification. 

 

b.  Excavation Support

All excavations measuring 1.5 m or more in depth, trench or otherwise, shall be laid back to a stable 
slope or supported. Excavation support systems are subject to the approval of the Engineer. Prior to 
commencing any structure excavation work 1.5 m or more in depth, the Contractor shall design and 
submit detailed shop drawings of the structure excavation support systems and proposed methods 
to  the  Engineer.  These  submissions  shall  show  support  member  materials,  sizes,  spacing,  and 
Engineering  calculations  to  validate  the  design  of  the  above,  including  the  maximum  theoretical 
deflections of the support members. 

Support systems shall be designed in such a manner that no sheeting, struts, or any other support 
members extend through surfaces exposed in the finished construction, and no shoring or bracing 
is placed under permanent structures. 

Engineering  calculations  shall  be  in  English  and  shall  show  lateral  earth  pressures  for  the  full 
excavation  depths;  forces  at  various  stages  of  support  during  installation,  removal,  and  concrete 
placement;  anticipated  equipment  loads;  surcharge  loads  of  any  description;  and  the  maximum 
design loads carried by various members of the support system and strut pre-load forces. 

In  the  event  the  proposed  structure  excavation  support  system  includes  tieback  anchors,  the 
Contractor's  submittal  drawings  shall  show  the  profile  of  the  soil  in  which  each  anchor  is  to  be 
installed,  the  design  load  for  the  full  depth  of  excavation,  the  maximum  design  and  proof  loads, 
surcharge  loads  of  any  description,  equipment  loads,  forces  at  various  stages  of  support  during 
installation and removal, and the criteria proposed for deformations under proof loads. 

Where a proposed system of tieback anchors projects beyond the vertical projection of the Contract 
limit lines indicated on the Contract plans onto the adjoining property, the Contractor shall obtain the 
permission of the owner in writing, and submit such permission to the Engineer at the time the shop 
drawings of the support system are submitted. 

c.  Excavation Limits

So that cross-sectional elevations and measurements may be taken of the undisturbed ground, the 
Contractor  shall  notify  the  Engineer  sufficiently  in  advance  of  any  structure  excavation.  Natural 
ground adjacent to the structure shall not be disturbed without the Engineer’s permission. 

Structures shall be excavated to the lines and grades or elevations indicated on the Contract plans, 
or as described in the bill of quantities. Excavations shall be of sufficient size to permit the placing of 
structures or structure footings of the full width and length indicated. 

Unless otherwise specified, the excavation limits for structural excavation shall be from the bottom 
level (formation level) of the roadway excavation which falls within the roadway excavation width. 

Boulders,  rocks,  and  any  other  objectionable  material  encountered  during  excavation  shall  be 
removed. 

After  each  excavation  is  completed, the  Contractor  shall  notify  the  Engineer.  No  footing,  bedding 
material, or structure shall be placed until the Engineer has approved the depth of excavation and 
the character of the material on which the foundations shall bear. 

d.  Disposal of Excavated Materials

All excavated material at structures shall be loaded and hauled away to an approved disposal area 
in accordance with Section 2.4.2.7, unless the excavated materials are approved by the Engineer 
for use as borrow material meeting the applicable requirements of Section 2.5.2. 

2.4.2.12 

Manual Excavation 

a. 

General

All manual or hand excavation and other required work to locate existing utilities or services within 
the limits of the Contract or at off-site locations shall be performed by the Contractor in accordance 
with the requirements of these general specifications and as directed by the Engineer. 

 

E

ARTHWORKS

 

 

 

Existing utilities and services to be located by manual excavation shall include, but not be limited to, 
all  water  mains  and  electric  lines,  both  power  and  lighting;  telephone;  and  others  that  may  be 
encountered under the Contract or at off-site locations. 

b. 

Coordination with Utility Departments 

Purpose  of  manual  excavation  is  to  determine  the  existence  and  location,  including  depth,  size, 
shape, composition, and condition, of all existing utilities and services. Immediately after uncovering 
existing utilities, the Contractor shall coordinate with the respective utility departments and agencies 
to obtain their assistance, if necessary, for the accurate identification of each uncovered utility line. 

Information obtained during this process shall be recorded and shown on working or shop drawings 
that  the  Contractor  shall  submit to  the  Engineer and  the relevant  utility  agencies.  Utility  agencies 
shall require this information to finalise relocation or protection plans. 

c. 

Procedure 

Before  commencing  manual  excavation,  the  Contractor  shall  obtain  the  Enginee

r’s  approval  and 

obtain specific work permits from respective utility agencies for manual excavation in close proximity 
to  important  utility  lines  such  as,  but  not  limited  to,  11  kV,  33  kV  circuits,  132  kV  circuits,  water 
transmission and distribution main lines, and telephone and gas lines. 

Contractor shall furnish the Engineer with copies of all work permits, field notes, and shop drawings 
with  the  details  of  all  utilities  and  services  located  by  manual  excavation,  as  recorded  by  the 
Contractor. 

Width  of  manually  excavated  trenches  shall  be  such  that  a  workman  can  excavate  safely  and 
efficiently to a depth determined as reasonable by the Engineer in consideration of existing utilities 
information. 

Manual excavations shall be carried out in the presence of the Engineer, taking all precautions to 
prevent damages to services, properties, and persons. Any damage resulting from the negligence 
of the Contractor shall be repaired at the Contractor’s expense. This is in addition to any indemnities 
stipulated in these specifications dealing with public utilities and safety. 

Contractor  shall  provide  all  tools,  labour,  equipment,  and  accessories  required  to  complete  the 
manual  excavation.  Further, the  Contractor shall  provide  all the materials,  labour,  and  equipment 
necessary to protect the existing utilities, as well as any shoring, sheeting, dewatering, and any other 
means required for protection during manual excavation. 

All  materials  removed  shall  be  disposed  of  by  the  Contractor  in  accordance  with  Section 2.4.2.7, 
unless the excavated materials are approved by the Engineer  as material meeting the applicable 
requirements of Section 2.5.2. 

All  manually  excavated  trenches  within  traffic  and  pedestrian  pavement  areas,  other  structure 
foundation areas, and where necessary for adjacent structure or utility lateral and vertical bearing 
support  shall  be  backfilled  with  load-bearing  embankment  material  in  accordance  with  the 
requirements  of  Article  c  of  Section  2.5.3.1.  Trenches  within  non-load-bearing  areas  shall  be 
backfilled in accordance with Section 2.5.3.3. 

Contractor shall place and compact material with care so as not to damage existing utilities. 

2.4.2.13 

Unclassified Excavation 

Unclassified excavation shall include any and all materials encountered during the construction of 
the Work. This classification shall not apply to any material, which has been classified and bid upon 
under any of the foregoing classifications, "Borrow Excavation", "Rock Cut", "Structure Excavation" 
or “Manual Excavation”. 

 

 

2.5 

Embankments and Backfill 

2.5.1 

Description 

Embankment  and  backfill  requirements  shall  apply  to  the  construction  of  roadway  embankments, 
including  the  widening  of  embankment  sections  and  the  preparation  of  the  areas  upon  which 
embankment  material  is  to  be  placed;  the  construction  of  dikes  and  berms;  the  placing  and 
compacting of material where unsuitable material has been removed; backfill for structures and the 
placing of non-load-bearing, topsoil and sweet sand materials in landscaping areas; and other areas 
not under roadway and pedestrian pavements. 

Before the start of construction, the Contractor shall submit plans showing the proposed method of 
work, the selection of materials, the method of compaction, and any other matter that may affect the 
construction of the embankment or sequence of operations. 

2.5.2 

Materials 

2.5.2.1 

Unsuitable Material 

Unsuitable material includes but not limited to 

  Topsoil,

  Organic soils,

  Vegetative material,

  Trash,

  Contaminated soil,

  Soluble material such as gypsum and salt, very fine sand, non-cohesive silt, organic clay

and highly dispersive soils. 

Dispersivity potential of soil shall be determined by test ASTM D4647. Any material classified other 
than ND1 or ND2 (non dispersive) will be considered as unsuitable.  

Materials with soluble substances more than 3% (by test method ASTM D4542) and organic content 
more  than  5%  (by  test  method  ASTM  D2974)  by  weight  of  dry  material  are  all  considered  as 
unsuitable and shall not be used for construction of embankment.  

Collapsible soils are also considered as unsuitable material and shall be treated before construction 
of embankment. Collapse index is determined according to ASTM D5333.  

2.5.2.2 

Embankment Material (Load-Bearing) 

Load-bearing  embankment  material  shall  consist  of  suitable  material  taken  from  the  roadway 
excavation  or  the  borrow  source.  Load-bearing  embankment  material  shall  consist  of  granular 
material free of excess moisture and other unsuitable material conforming to the following: 

1.  Maximum particle size: not to exceed one-third of placement layer thickness

2.  Materials shall be classified according to AASHTO M 145. In general, suitable materials shall

meet soil classification: A-1, A-3, or A-2-4. 

3.  Material that can be compacted to 95 percent of the maximum density as required in Article

of Section 2.5.3.4 

4.  Material shall have a maximum plasticity index of  6 and a soaked CBR after 4 days soaking

is not less than 20% when compacted to 95% of MDD. 

Suitability tests including material gradation, plasticity and CBR tests shall be done in accordance 
with Table 2-12.  All suitability testing will be done with one test each per 1000 m

3

 of embankment 

material. 

 

Embankment  material  placed  adjacent  to  bridge  abutments,  retaining  and  wing  walls,  and  other 
minor structures, as shown on the Contract plans or as directed by the Engineer, shall be classified 
as structure backfill and shall conform to the requirements in Section 2.5.2.4, except for drainage 
layer backfills when shown on the Contract plans, which shall conform to the requirements of Section 
2.5.2.5 for pervious backfill. 

2.5.2.3 

Rock Fill Material 

Rock fill material shall be made of strong, hard, durable, and clean pieces of sound rock, having the 
following requirements:  

1.  Point load strength index (I

s50

) (per ASTM D5731) greater than 1 mPa

2.  Maximum wet/dry strength variation of 35 %

3.  Maximum and minimum dimensions are determined based on the application, however the

maximum dimension for embankment construction shall be 600 mm. 

Rock fill material borrow source(s) shall be pre-identified and submitted with samples and test results 
meeting  the  above  requirements  for  review  and  approval  by  the  Engineer  prior  to  delivery  of  the 
material to the site.   

Typically, rock fill material excavated from within the roadway excavation prism will be incorporated 
within  the  embankment  fill,  if  meeting  the  requirements  as  specified  herein.    Otherwise  it  will  be 
disposed of by the Contractor at the sites and locations as approved by the Engineer. 

2.5.2.4 

Structural Backfill 

Structural backfill shall be a uniform mixture of gravel and/or stone fragments with sand, silt and clay, 
conforming to the following requirements: 

1.  A maximum particle size of 53 mm

2.  Material gradation meeting the requirements in Table 2-3

3.  Liquid limit: 25  maximum

4.  Uniformity coefficient: >10

5.  Plasticity index:  4 maximum

6.  Sand equivalent (AASHTO T 176): 25 Minimum

7.  Loss by abrasion (AASHTO T 96):  40 Maximum

8.  Material that can be compacted to 95 percent of the maximum density as required in Article

of Section 2.5.3.4 with a maximum dry density:  minimum 20 kN/m

3

 

9.  Minimum  soaked  CBR  (remoulded  sample  after  4-days  soaking,  AASHTO  T193:  60%

minimum at 95% compaction 

Material gradation, liquid limit and plasticity tests shall be done in accordance with Table 2-12.  All 
suitability  testing  will  be  done  with  three  tests  each  per  1000  m3  of  select  material  except  for 
gradation testing which shall be one test per 1000 m

3

Table 2-3: Structural backfill gradation

 

Sieve size 

Percent by mass passing designated sieve 

(AASHTO T 27 and T 11) 

53 mm 

100 

37.5 mm 

75-100

 

E

ARTHWORKS

 

 

 

Sieve size 

Percent by mass passing designated sieve 

(AASHTO T 27 and T 11) 

25.0 mm 

55 -85 

19.0 mm 

50 - 80 

9.5 mm 

40 - 70 

4.75 mm 

30 - 60 

2.0 mm 

20 - 50 

425 µm 

10 - 30 

75 µm 

5 - 15 

2.5.2.5 

Pervious Backfill 

Pervious  backfill  material  shall  be  clean,  hard,  durable  sand,  gravel  or  crushed  stone  free  from 
organic material, clay balls or other deleterious substances conforming to the gradation requirements 
in Table 2-4 Pervious backfill material used as a drainage layer against soil retaining structures (such 
as bridge abutments and cut or fill retaining walls) shall meet the gradation requirements of  Table 
2-5 

Table 2-4: Pervious backfill gradation  

Sieve size 

Percent by mass passing designated 

sieve (AASHTO T 27 and T 11) 

53 mm 

100 

37.5 mm 

95 - 100 

19 mm 

50 to 100 

9.5 mm 

15 - 55 

2.36 mm 

0 - 5 

75 µm 

0 - 3 

Table 2-5 Pervious backfill material for use as drainage layer against soil retaining 

structures such as bridge abutments and retaining walls 

Sieve size 

Percent by mass passing designated sieve 

(AASHTO T 27 and T 11) 

75 mm 

100 

53 mm 

90 - 100 

37.5 mm 

35 - 70 

25.0 mm 

0 - 15 

 

E

ARTHWORKS

 

 

 

Sieve size 

Percent by mass passing designated sieve 

(AASHTO T 27 and T 11) 

12.5 mm 

0 - 5 

2.5.2.6 

Material for Free-Draining Blankets 

Material  for  free  draining  blankets,  used  for  constructing  vertical  drains  or  as  a  base  layer  for 
embankments constructed over soft foundations, shall consist of either a clean processed aggregate 
material  meeting  the  gradation  requirements  of  Table  2-6  or  natural  dune  sand  obtained  from  a 
clean, uniformly open graded and non-contaminated source. 

Table 2-6:  Gradation for free-draining blanket material 

Sieve size 

Percent by mass passing designated 

sieve (AASHTO T 27 and T 11) 

75 mm 

100 

19 mm 

95 - 100 

4.75 mm 

50 - 100 

1.18 mm 

20 - 85 

0.3 mm 

3 -30 

0.15 mm 

0 - 7 

0.075 mm 

0 - 3 

2.5.2.7 

Non-Load-Bearing Material 

Non-load-bearing  material  shall  include  topsoil  and  sweet  sand  material  in  accordance  with  the 
requirements of Article a of Section 2.5.2.7 

Non-load-bearing  material  shall  also  consist  of  roadway  excavation  or  other  borrow  material 
approved by the Engineer and deemed suitable for use as fill material for raising existing areas not 
located  under  roadway  pavements,  roadway  embankments,  pedestrian  pavements,  or  other 
structures, and to grades shown on the Contract plans. This material may also fill low-lying natural 
areas to grades suitable for placing upper topsoil or sweet sand courses within landscaped areas, 
in accordance with the Contract plans or as directed by the Engineer. 

Material shall be reasonably free from salts, refuse, roots, heavy or stiff clay, stones or rocks larger 
than 30 mm in size, sticks, brush, litter, or other deleterious materials or substances. 

a. 

Topsoil and Sweet Sand Material 

Topsoil shall consist of the material excavated and stockpiled in accordance with Section 2.2.2.5. 

Sweet sand shall consist of borrow material supplied from sources approved by the Engineer, which 
has been analysed by the Contractor as being suitable for agricultural purposes. Sweet sand shall 
be obtained from well-drained inland dunes and shall be reasonably free from salts, refuse, roots, 
heavy or  stiff clay,  stones or  rocks larger than 30 mm in size,  noxious seeds,  sticks, brush, litter, 
debris, or other deleterious materials or substances. 

Topsoil  and  sweet  sand  borrow  material  destined  for  placement  on  the  surface  of  vegetated 
landscape areas and existing soil surfaces to remain in place within project constructed vegetated 
landscape areas shall be tested and amended, as necessary, to  comply with the requirements of 

 

planting  soil  described  in  Section  13.1.2.1  of  Chapter  13,  Landscaping  and  Irrigation  of  these 
Standard Specifications. 

2.5.2.8 

Prefabricated Vertical Drains 

Prefabricated vertical drains (PVD) for embankment foundation water pressure relief shall consist of 
a continuous plastic drainage core wrapped in a non-woven geotextile material, as approved by the 
Engineer.   

PVDs shall be of newly manufactured materials from an approved manufacturer, and shall comply 
with the requirements as indicated in Table 2-7.  For each type of drain to be used, the manufactured 
PVD to be used on site shall be subjected to all the tests in the table.  The types of PVD to be used 
at site shall be approved by the Engineer. 

Geotextile  shall  be  capable  of  resisting  all  bending,  puncturing  and  tensioning  subjected  during 
installation and design life of the drain.  Core shall be made of continuous plastic material fabricated 
to facilitate drainage along the axis of the vertical drain.  Core shall be a profiled strip with or without 
perforation or a profiled mat with an open or closed structure.  

Contractor shall indicate the proposed source of the materials prior to delivery to site.  Contractor 
shall  also  submit  samples 

and  manufacturer’s  certificates  to  verify  the  physical,  mechanical  and 

hydraulic properties of the drain to be used for the Engineer’s approval. 

Prior to installation and at the discretion of the Engineer, an individual test sample shall be cut from 
at least one roll selected at random to represent each batch or every 100,000 meters, whichever is 
less.  Individual sample shall be not less than 3 m in length and shall be full width.  Samples shall 
be  tested  for  the  properties  listed  in  the  following  table.    Should  any  individual  sample  randomly 
selected  fail  to  meet the  specification,  then  that roll  shall  be  rejected  and  two  additional  samples 
taken at random from two other rolls.  If either of these two additional samples fail, then the entire 
batch of vertical drains represented by the samples will be rejected by the Engineer. 

Table 2-7:  Vertical filter drain properties 

Properties 

Required value 

Test 

designation 

Drain properties 

Width (mm) 

100 ± 2 

Thickness (mm) 

3 to 4 

Discharge capacity for straight drain at hydraulic gradient 
i = 0.1 and 250 kPa* (m

3

/s) 

≥ 50x10

-6

 

ASTM D4716 

Discharge capacity for buckled drain at hydraulic gradient 
I = 0.1 and 150 kPa* (m

3

/s) 

≥ 15 x10

-6

 

ASTM D4716 

Tensile strength (kN) 

1.5 @ 10 % 

strain 

ASTM D4595 

Elongation at break (%) 

≥ 2 

Elongation at 0.5 kN (%) 

≤ 10 

ASTM D4362 

Geotextile (Class 1 as per AASHTO M 288)

 

Grab tensile strength (N) 

> 950

ASTM D4632 

 

E

ARTHWORKS

 

 

 

Properties 

Required value 

Test 

designation 

Elongation at break  

>70 % 

ASTM D4632 

Trapezoidal tear strength (N) 

375 

ASTM D4533 

Puncture resistance (N) 

> 2000 

ASTM D6241 

Burst strength (kN/m

2

> 900 

ASTM D3786 

Permeability at 100 mm head (m/s) 

≥ 1x10

-4

 

ASTM D4491 

Permitivity (s

-1

> 0.4 

ASTM D4491 

Apparent pore size, O

90

 (micron)** 

> 80 

ASTM D4751 

Fabric Weight (g/m

2

180 

Manufacturer 

*If (drain depth + 2 x fill height ) > 25 m but < 50 m, pressure shall be 500 kPa for straight drain 
and 350 kPa for buckled drain. 

**Alternatively, O

95

 shall be < 90 micron 

Drains shall be free of defects, rips, holes, or flaws. During shipment and storage, drains shall be 
wrapped in a heavy-duty protective covering, and the storage area shall protect the drain material 
from sunlight, mud, dirt, dust, debris, and detrimental substances. 

2.5.2.9 

Construction Geotextile 

Geotextile fabrics shall consist only of long-chain polymeric fibers or yarns formed into a non-woven, 
needle-punched  stable  network  such  that  the  fibers  or  yarns  retain  their  position  relative  to  each 
other  during  handling,  placement,  and  design  service  life.  At  least  95% by  weight  of  the material 
shall be polypropylene, polyolefin or polyesters. These materials shall be free from defects or tears. 
Materials  shall  also  be  free  of  any  treatment  or coating  that  might  adversely  alter  its  hydraulic  or 
physical properties after installation. 

Thread  used  for  sewing  geotextile  shall  consist  of  high-strength  polypropylene,  polyester,  or 
polyamide.  Nylon  threads  shall  not  be  allowed.  Thread  used  to  sew  permanent  erosion-control 
geotextile,  and  to  sew  geotextile  seams  in  exposed  faces  of  temporary  or  permanent  geotextile 
retaining  walls,  shall  also  be  resistant  to  ultraviolet  (UV)  radiation.  Thread  shall  be  of  contrasting 
colour to that of the geotextile itself. 

Geotextile shall meet the application requirements of AASHTO M 288 and the specific requirements 
included in Table 2-8 through Table 2-12, in accordance with its intended use. 

All geotextiles used in construction which are to receive an overlying layer of rock fill such as, but 
not limited to, pervious backfill, rip rap, boulders or other similar covering material shall be protected 
from damage due to the rock fill by placement of 50 mm thick layer of natural screened sand with a 
nominal size between 3 mm and 5 mm, as approved by the Engineer.    

Contractor shall submit the following information regarding each geotextile 

material’s proposed use 

to the Engineer: 

1. 

Manufacturer’s name and current address 

2.  Full product name 

3.  Geotextile structure, including fiber or yarn type 

4.  Geotextile polymer types 

 

5.  Proposed Geotextile uses

6.  Certified test results for minimum average roll values

Table 2-8: Geotextile for underground drainage 

Geotextile property 

ASTM 

test method 

Geotextile property 

requirements 

Non-woven 

Fabric weight 

D5261 

180 g/m

2

 minimum 

Grab tensile strength, in 
machine and x-machine 
direction 

D4632 

700 N minimum 

Grab failure strain, in 
machine and x-machine 
direction 

D4632 

≥ 50 percent 

Puncture resistance 

D6241 

1375 N minimum 

Tear strength, in machine 
and x-machine direction 

D4533 

250 N minimum 

UV radiation stability 

D4355 

50 percent strength retained 

minimum, after 500 hours in a 

xenon arc device 

Table 2-9: Geotextile for underground drainage-opening size properties 

Geotextile 

property 

ASTM test 

method 

Geotextile property requirements 

Percent in situ Soil Passing 0.075 mm 

 <15 

 15 to 50 

>50

AOS 

D4751 

 < 425 µm 

 < 212 µm 

standard sieve 

 < 150 µm 

Water 

permittivity 

D4491 

0.5 sec

-1

 

minimum 

 0.2 sec

-1

 

minimum 

 0.1 sec

-1

 minimum 

Table 2-10: Geotextile for separation or soil stabilization 

Geotextile property 

ASTM test method 

Geotextile property requirements 

Separation 

Soil stabilization 

Weight 

D5261 

180 g/m

minimum 

 200 g/m

minimum 

Thickness 

D5199 

1.7 mm minimum 

1.7 mm minimum 

AOS 

D4751 

Standard sieve  212 

µm max. 

Standard sieve 212 

µm max. 

Water permittivity 

D4491 

0.02 sec

-1

 minimum 

 0.05 sec

-1

 minimum 

 

 

 

 

 

 

 