G ENERAL R
e. Tools and equipment: Do not use tools or equipment that produce harmful noise levels f. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check shop drawings of other work to confirm that g. Anchors and fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the work h. Mounting heights: Where mounting heights are not indicated, mount components at heights directed by the Engineer 1. Allow for building movement, including thermal expansion and Contraction 2. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with i. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints j. Hazardous materials: Use products, cleaners, and installation materials that are not considered hazardous. 1.21.9 Owner-installed Products The Contractor shall provide provision for the following owner-installed items: a. Site access: Provide access to project site for owner's construction forces b. Coordination: Coordinate construction and operations of the work with work performed by owner's construction forces 1. Construction schedule: Inform the owner of the Contractor's preferred construction schedule for owner's portion of the work. Adjust construction schedule based on a mutually 2. Preinstallation conferences: Include owner's construction forces at preinstallation conferences covering portions of the work that are to receive owner's work. Attend 1.21.10 Progress Cleaning Progress cleaning shall comply with the requirements stipulated in Section 1.22. 1.21.11 Starting and Adjusting The Contractor shall comply with the following: 1. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest 2. Adjust operating components for proper operation without binding. Adjust equipment for proper operation 3. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment 4. Manufacturer's field service: The Contractor shall provide a factory-authorized service representative when required to inspect field-assembled components and equipment |