e.  Tools and equipment: Do not use tools or equipment that produce harmful noise levels 

f.  Templates:  Obtain  and  distribute  to  the  parties  involved  templates  for  work  specified  to  be 

factory  prepared  and  field  installed.  Check  shop  drawings  of  other  work  to  confirm  that 
adequate  provisions  are  made  for  locating  and  installing  products  to  comply  with  indicated 
requirements 

g.  Anchors and fasteners: Provide anchors and fasteners as required to anchor each component 

securely in place, accurately located and aligned with other portions of the work 

h.  Mounting heights: Where mounting heights are not indicated, mount components at heights 

directed by the Engineer 

1.  Allow for building movement, including thermal expansion and Contraction 

2.  Coordinate installation of anchorages. Furnish setting drawings, templates, and directions 

for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with 
integral anchors, that are to be embedded in concrete or masonry. Deliver such items to 
project site in time for installation 

i.  Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, 

arrange joints for the best visual effect. Fit exposed connections together to form hairline joints 

j.  Hazardous  materials:  Use  products,  cleaners,  and  installation  materials  that  are  not 

considered hazardous. 

1.21.9 

Owner-installed Products 

The Contractor shall provide provision for the following owner-installed items: 

a.  Site access: Provide access to project site for owner's construction forces 

b.  Coordination:  Coordinate  construction  and  operations  of  the  work  with  work  performed  by 

owner's construction forces 

1.  Construction  schedule:  Inform  the  owner  of  the  Contractor's  preferred  construction 

schedule for owner's portion of the work. Adjust construction schedule based on a mutually 
agreeable timetable. Notify owner if changes to schedule are required due to differences in 
actual construction progress 

2.  Preinstallation  conferences:  Include  owner's  construction  forces  at  preinstallation 

conferences  covering  portions  of  the  work  that  are  to  receive  owner's  work.  Attend 
preinstallation conferences conducted by owner's construction forces if portions of the work 
depend on owner's construction.  

1.21.10 

Progress Cleaning 

Progress cleaning shall comply with the requirements stipulated in Section 1.22. 

1.21.11 

Starting and Adjusting  

The Contractor shall comply with the following: 

1.  Start  equipment  and  operating  components  to  confirm  proper  operation.  Remove 

malfunctioning units, replace with new units, and retest 

2.  Adjust operating components for proper operation without binding. Adjust equipment for proper 

operation 

3.  Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. 

Replace damaged and malfunctioning controls and equipment 

4.  Manufacturer's  field  service:  The  Contractor  shall  provide  a  factory-authorized  service 

representative  when  required  to  inspect  field-assembled  components  and  equipment 
installation. 

 

G

ENERAL 

R

 

 

 

1.21.12 

Protection of Installed Construction 

The Contractor shall comply with the following: 

1.  Provide final protection and maintain conditions that ensure installed work is without damage 

or deterioration at time of substantial completion 

2.  Comply with manufacturer's written instructions for temperature and relative humidity. 

1.21.13 

Correction of the Work 

The Contractor shall comply with the following: 

1.  Repair  or  remove  and  replace  defective  construction.  Restore  damaged  substrates  and 

finishes. Repairing includes replacing defective parts, refinishing damaged surfaces, touching 
up with matching materials, and properly adjusting operating equipment 

2.  Restore permanent facilities used during construction to their specified condition 

3.  Remove  and  replace  damaged  surfaces  that  are  exposed  to  view  if  surfaces  cannot  be 

repaired without visible evidence of repair 

4.  Repair components that do not operate properly. Remove and replace operating components 

that cannot be repaired 

5.  Remove and replace chipped, scratched, and broken glass or reflective surfaces.  

1.22 

Cleaning 

This section includes requirements for site cleaning, as follows: 

1.  Daily cleaning and disposal of waste materials, debris, and rubbish during construction 

2.  Weekly removal of debris from the project site 

1.22.1 

Equipment 

The Contractor shall comply with the following: 

1.  Provide covered containers and chutes for deposit of waste materials, debris, and rubbish and 

include in s site layout organization plan. 

2.  Cleaning materials for products to be cleaned shall be according to the manufacturer of the 

product and as approved. 

1.22.2 

Cleaning Execution 

The Contractor shall comply with the following requirements: 

1.  Maintain  areas,  floors  and  buildings  under  the  Contractor's  control  free  of  waste  materials, 

debris, and rubbish at all times. Maintain site in a clean and orderly condition 

2.  Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed 

or remote spaces, before closing the space 

3.  Clean interior work areas and all floors (this also includes site offices, Engineers facilities and 

laboratories) daily to provide suitable conditions for work 

4.  Broom clean interior areas before start of surface finishing, and continue cleaning on an as-

needed basis 

5.  Control cleaning operations so that dust and other particulates will not adhere to wet or newly 

coated surfaces 

6.  The Contractor must keep all working areas clear of obstructions, surplus materials, unused 

plant and debris that are unsightly, obstructive and/or hazardous to the safety of all persons 
expected to be on the premises at any time.  

 

G

ENERAL 

R

 

 

 

7.  The Contractor is advised that a clean and organized site is advantageous to his costs and 

timely progress. This reflects on his management efforts to minimize waste material, improve 
safety and achieve a smooth flow of labour and materials on site with minimum obstructions. 
General: Clean project site and work areas daily, including common areas Coordinate progress 
cleaning for joint-use areas where more than one installer has worked. Enforce requirements 
strictly. Dispose of materials lawfully.  

8.  Comply with requirements in NFPA 241 for removal of combustible waste materials and debris 

9.  Do not hold materials more than 7 days during normal weather or 3 days if the temperature is 

expected to rise above 27 deg C 

10.  Containerize hazardous and unsanitary waste materials separately from other waste. Mark 

containers appropriately and dispose of legally, according to regulations 

11.  Site: Maintain project site free of waste materials and debris 

12.  Work areas: Clean areas where work is in progress to the level of cleanliness necessary for 

proper execution of the work 

13.  Remove liquid spills promptly 

14.  Where dust would impair proper execution of the Work, broom-clean or vacuum the entire 

work area, as appropriate 

15.  Installed  work:  Keep  installed  work  clean.  Clean  installed  surfaces  according  to  written 

instructions  of  manufacturer  or  fabricator  of  product  installed,  using  only  cleaning  materials 
specifically recommended. If specific cleaning materials are not recommended, use cleaning 
materials  that  are  not  hazardous  to  health  or  property  and  that  will  not  damage  exposed 
surfaces 

16.  Concealed spaces: Remove debris from concealed spaces before enclosing the space 

17.  Exposed  surfaces  in  finished  areas:  Clean  exposed  surfaces  and  protect  as  necessary to 

ensure freedom from damage and deterioration at time of substantial completion 

18.  Waste disposal: Burying or burning waste materials on-site will not be permitted. Washing 

waste materials down storm and sanitary sewers or into other areas to be protected, will not 
be permitted 

19.  During  handling  and  installation,  clean  and  protect  construction  in  progress  and  adjoining 

materials already in place. Apply protective covering where required to ensure protection from 
damage or deterioration at substantial completion 

20.  Clean  and  provide  maintenance  on  completed  construction  as  frequently  as  necessary 

through the remainder of the construction period. Adjust and lubricate operable components 
to ensure operability without damaging effects 

21.  Limiting  exposures:  Supervise  construction  operations  to  assure  that  no  part  of  the 

construction,  completed  or  in  progress,  is  subject  to  harmful,  dangerous,  damaging  or 
otherwise deleterious exposure during the construction period 

1.22.3 

Disposal of Waste 

Disposal of waste shall comply with the following requirements: 

1.  Remove  waste  materials,  debris,  and  rubbish  from  the  island,  weekly  and  dispose  of  at 

approved disposal site 

2.  Comply with regulations of the authorities.  

 

G

ENERAL 

R

 

 

 

1.23 

Contract Close-out 

Contract close-out procedures shall be in compliance with the procedures as outlined in the 

Owner’s 

Construction  Contract  Administration  Procedures,  the  Construction  Supervision  Manual,  the 
Procurement and Contracts Manual, and the requirements described in this section. 

This section covers Contract close-out activities and includes, but is not limited to, the following:  

1.  Handing-over 

2.  Final inspection 

3.  Close-out procedures 

4.  Approvals by authorities 

5.  Final cleaning 

6.  Project documents 

7.  Operating and maintenance instructions 

8.  Guarantees, warranties and bonds. 

1.23.1 

General Requirements 

Preparation for final acceptance includes the following activities: 

1.  Submission of final application for payment 

2.  Turnover of facilities to Owner 

3.  Issue of Taking Over Certificates 

4.  Issue of Performance Certificate 

5.  Submission of signed Claim waiver 

1.23.2 

Prerequisites for Turnover 

In preparation for Contract close-out, the Contractor shall complete the following:  

1.  Complete submittals in accordance with Section 1.231.24.  

2.  Submit  final  application  for  payment,  complete  with  associated  releases,  consents  and 

supporting documents to the Engineer 

3.  Submit final manufacturer certifications, guarantees, warranties, and similar documents 

4.  Submit  clearance  certificates  and  approvals  from  government  authorities  as  necessary  to 

connect to the permanent power supply 

5.  Submit  occupancy  permits,  operating  certificates,  final  inspection  and  test  certificates  and 

similar releases enabling full and unrestricted use of the facilities and services 

6.  Submit record  drawings,  final,  damage  or  settlement  surveys,  property surveys,  and  similar 

physical items 

7.  Make final changeover of locks and deliver keys to the Engineer 

8.  Complete  testing  of  systems,  and  training  of  the  Owner

’s  operations  and  maintenance 

personnel  

9.  Dismantle  and  remove  temporary  facilities  and  services  from  the  project  site.  This  includes 

utilities, construction tools, buildings and facilities, mock-ups, and similar elements 

10.  Complete final cleaning 

11.  Complete all demonstrations and training per Section 1.25 

 

G

ENERAL 

R

 

 

 

12.  Repair and restore exposed finishes which have been marred or otherwise damaged 

13.  Submit all spare parts, and tools 

14.  Submit an itemized list of all deviations and non-conformances to the Contract requirements. 

Include a detailed plan to correct each deviation and non-conformance 

Notify the Engineer that facilities and completed work items are ready for the taking-over inspection. 
Include the itemized list of deviations and non-conformances in the notification letter. 

1.23.3 

Prerequisites for Final Inspection 

To prepare for final inspection, the Contractor shall complete the following:  

1.  Submit last outstanding list of deviations and non-conformances complete with associated or 

corrected  submittals.  State  that  each  item  has  been  corrected  or  otherwise  resolved  for 
acceptance 

2.  Submit  the  Engineer

’s  and  the  Contractor’s  list  of  deficiencies  from  the  handing-over 

inspection. State how each item has been corrected or otherwise resolved for acceptance. 

3.  Submit final meter readings for all utilities, a measured record of stored fuel and chemicals, 

and similar data as of the time of final completion 

4.  Submit complete listing of  all consumable stores and spare parts used by the  Contractor to 

service the electro-mechanical works throughout the maintenance period 

5.  Complete submittal of record documents 

Notify the Engineer that a part of the works or the whole of the works are ready for the final inspection. 
Include the itemized list of deviations and non-conformances in the notification letter 

1.23.4 

Project Close-out Procedure 

Close-out procedure will be as follows: 

a.  Comply with specified and Contract

ual procedures necessary for issuance of the “Taking-Over 

Ce

rtificate” and “Taking Over Certificates” for part of the works 

b.  When the Contractor considers work or part of the works has reached final completion, submit 

the following:  

1.  Certificate that:  

i. 

Contract documents have been reviewed 

ii. 

Work has been inspected 

iii. 

Work is complete and meets the requirements of the Contract documents 

2.  Provide all submittals required by governing authorities 

3.  Submit  an  application  for  payment  providing  total  adjusted  Contract  sum,  previous 

payments, approved change orders and the sum remaining due. 

1.23.5 

Approvals from Public Authorities 

The Contractor shall comply with the following items: 

1.  Obtain  all  clearance  certificates  and  approvals  required  as  a  prerequisite  to  connecting  the 

works to the permanent power supply. 

2.  Coordinate  with  the  Engineer  to  obtain  the  necessary  documents  from  ADWEA  regarding 

connection to the permanent power supply. 

1.23.6 

Final Cleaning 

The Contractor shall perform a final cleaning per the following requirements: 

 

G

ENERAL 

R

 

 

 

a.  Execute before final inspection: 

1.  Remove all debris and left-over work materials from the site 

2.  Sweep and vacuum clean all pavement surfaces of debris, sediments, dust and sand 

3.  Clean all interior and exterior surfaces of office facilities exposed to view. Avoid disturbing 

natural weathering of exterior surfaces 

4.  Remove temporary labels, stains, and foreign substances 

5.  Polish transparent and glossy surfaces 

6.  Clean or replace all filters for mechanical equipment 

7.  Clean roofs, gutters, downspouts, and drainage systems 

8.  Remove debris and surface dust from limited access spaces 

9.  Clean concrete floors in unoccupied spaces broom clean 

10. 

Clean light fixtures and lamps so they operate at maximum efficiency 

11. 

Clean the parking areas and areas located within the right-of-way 

i. 

Sweep paved areas and rake all other surfaces 

ii. 

Remove litter and foreign substances 

iii. 

Remove stains, chemical spills, and other foreign deposits 

b.  Comply with safety standards and governing regulations for cleaning operations 

1.  Do not burn waste materials at the site 

2.  Do not bury debris or excess material on the property 

3.  Do  not  discharge  volatile  or  other  harmful  or  dangerous  materials  into  the  drainage  or 

sewerage systems 

4.  Remove all waste materials from the site and dispose of properly. 

1.23.7 

Project Record Documents (As-builts) 

Project record documents shall comply with the following requirements: 

a.  The  Contractor  shall  provide  all  necessary  details  and  at  least  the  following  information  as 

work  proceeds  in  a  form  approved  by  the  Engineer  to  enable  the  Engineer  to  prepare  a 
complete set of the record drawings for all civil Engineering works: 

1.  Position and extent of all support construction left in any excavation 

2.  Precise location of all services encountered 

3.  Soils encountered during all excavation work 

4.  Amendments to approved working drawings as a consequence of construction 

5.  Measured depths of construction 

6.  Measured  horizontal  and  vertical  locations  of  underground  utilities  and  appurtenances, 

referenced to permanent surface improvements 

7.  Measured  locations  of  internal  utilities  and  appurtenances  concealed  in  construction, 

referenced to visible and accessible features of the work 

8.  Field changes of dimension and detail 

9.  Details not on original Contract plans 

b.  Keep documents current 

throughout the construction period. Do not conceal work until “As-

Built” information has been recorded 

 

G

ENERAL 

R

 

 

 

c.  Store documents separate from those used for construction.  

1.  Protect from deterioration and loss 

2.  Store in a secure, fire resistive location 

d.  For  all  mechanical  and  electrical  works,  the  Contractor  or  his  specialist  subcontractor  shall 

prepare a complete set of record drawings of the work as constructed and as erected 

e.  Format: 

1.  Maintain a blue line or black line set of prints of all Contract plans and shop drawings 

2.  Keep the Contract plans and drawings clean and undamaged 

3.  Mark  up  drawings  to  show  actual  installation  if  that  differs  from  what  is  shown  on  the 

Contract plans 

i. 

Mark up changes using a red erasable pencil 

ii. 

Show “as built” condition fully and accurately 

4.  Mark up drawings to show new information of importance which was not shown on either 

the Contract plans or the shop drawings. Give particular attention to concealed work that 
will be difficult to measure or record at a later date 

5.  Note related Variation Order numbers, as applicable, next to the mark up 

f.  Submit documents with transmittal letter containing date, project title,  the Contractor

’s name 

and  address,  itemized  list  of  documents,  and  the  Contractor

’s  signature  in  the  following 

formats: 

1. 

2 CD’s of CAD drawings 

2.  A1 size negative/reproducible in film paper with hanging strips (one) set 

3.  A1 size hard copies paper print 

– 3 sets 

4.  A3 size hard copies with spiral binding 

– 1 set. 

1.23.8 

Equipment Operating Data 

Provide  operating  data  for  all  motor  operated  equipment  specified.  Provide  the  operating  data 
identified below for each motor operated equipment item in the specifications. 

a.  Data  shall  be  obtained  with  the  equipment  operating  under  design  conditions  and  while 

handling the process fluid or material specified 

b.  No readings shall be taken until the equipment has operated as specified for at least one hour 

1.  Description of material handled 

2.  Material or fluid delivery rate 

3.  System operating temperature and pressure 

4.  Motor operating speed 

5.  Motor current draw under normal operation and under starting conditions 

6.  Bearing operating temperatures. 

1.23.9 

Guarantees, Warranties, and Bonds 

The Contractor shall comply with the following: 

a.  Provide  in  duplicate,  original  stamped  copies  of  all  specified  guarantees,  warranties,  and 

bonds including those required of manufacturers, suppliers and sub-Contractors 

1.  Assemble documents in a binder with a durable plastic cover 

 

G

ENERAL 

R

 

 

 

2.  Provide table of contents 

b.  Start of warranty period shall be:  

1.  Date  when  equipment  is  placed  into  full  time  operation  for  the  Owner

’s  benefit  with  the 

Owner

’s approval, or  

2.  Date of taking-over certificate 

c.  The  Contractor  may  be  required  to  maintain  installed  landscaping  for  an  extended  period 

beyond  the  landscaping  acceptance  date,  as  required  in  Chapter  13,  Landscaping  and 
irrigation, or in the Particular Specifications.  Where permanent irrigation is not available, the 
Contractor  shall  supply  and  warranty  that  the  necessary  irrigation  equipment  and  water  is 
available  and  will  be  supplied  as  necessary  to  maintain  the  landscaping  plants  during  the 
landscaping establishment and/or warranty periods. 

1.23.10 

Spare Parts and Maintenance Materials  

The  Contractor  shall  provide  spare  parts  and  maintenance  materials  in  conformance  with  the 
following and as otherwise stipulated in these specifications. 

a.  Provide  products,  spare  parts,  and  maintenance  materials  as  specified  in  the  technical 

sections of this specification 

1.  Include itemized list of all items furnished, describing each item and citing the appropriate 

specification section and paragraph 

2.  Package each item for long term storage 

3.  Mark or tag each item for easy identification 

b.  Deliver items to the project site. Inventory items with the Engineer, and obtain a receipt before 

final payment 

c.  Provide  complete  listing  of  all  consumable  stores  and  spare  parts  used  by  the  Contractor 

during the maintenance period.  

1.24 

Closeout Submittals 

This section includes requirements for the following closeout submittals: 

1.  Substantial completion 

2.  Closeout submittals 

3.  Statement of adjustment of accounts 

4.  The Contractor's obligations 

5.  Warranties 

6.  Spare parts and maintenance materials 

1.24.1 

Closeout Submittal  

The Contractor shall comply with the following: 

a.  Substantial completion:  

1.  When the Contractor considers work is substantially complete, submit written notice with 

list of items to be completed or corrected 

2.  Should  Engineer  inspection  find  Work  is  not  substantially  complete,  he  will  notify  the 

Contractor in writing, listing observed deficiencies 

3.  The Contractor shall remedy all deficiencies and send a second written notice of substantial 

completion 

 

G

ENERAL 

R

 

 

 

4.  The Contractor shall carry out Tests on Completion in accordance with applicable clauses 

of  the  Department  of  Transport  Conditions  of  Contract  and  Schedule  of  Further 
Requirements. The  Contractor shall give to the Engineer  not less than 21 calendar days 
notice of the date after which the Contractor will be ready to carry out each of the tests on 
completion. Unless otherwise agreed, Tests on Completion shall be carried out within 14 
calendar days after this date as directed by the Engineer. 

5.  When  Engineer  finds  work  is  substantially  complete  and  all  Tests  on  Completion  are 

successful  he  will  prepare  a  certificate  of  substantial  completion  in  accordance  with  the 
applicable clauses of the Department of Transport Conditions of Contract and Schedule of 
Further Requirements. 

b.  Closeout submittals: 

1.  Evidence of compliance with requirements of governing authorities, and as requested by 

the Engineer 

2.  Project record documents: Submit in accordance with Section 1.23.7   

3.  Operation and maintenance data: Under provisions of Section 1.26 

4.  As-built drawings: Submit in accordance with Section 1.11  

5.  Spare parts and maintenance materials 

6.  Keys and keying schedule 

7.  Evidence of payment: In accordance with conditions of the Contract 

8.  Certificates  of  insurance  for  products  and  completed  operations:  In  accordance  with 

Department of Transport Conditions of Contract and Schedule of Further Requirements 

c.  Statement of adjustment of accounts: 

1.  Submit final statement reflecting adjustments to Contract Sum indicating:  

i. 

Original Contract sum 

ii. 

Previous variations 

iii. 

Deductions for uncorrected work 

iv. 

Deductions against advance payment if any 

v. 

Deductions for delays penalties 

vi. 

Deductions for Engineer's fees 

vii. 

Other adjustments to Contract sum 

viii. 

Total Contract sum as adjusted 

ix. 

Previous payments 

x. 

Sum remaining due 

2.  Engineer  will  issue  final  variation  reflecting  approved  adjustments  to  Contract  sum  not 

previously made by variations, for Owner authorization 

1.24.2 

Warranties 

The Contractor shall comply with the following: 

a.  Form of submittals:  

1.  Bind  in  commercial  quality  210  X  297  mm  (A4)  four-ring  side  binders,  with  hardback, 

cleanable, plastic covers 

 

G

ENERAL 

R

 

 

 

2.  Label cover of each binder with typed or printed title WARRANTIES AND BONDS, with title 

of project; name, address and telephone number of the Contractor; and name of responsible 
principal 

3.  Table  of  contents:  Neatly  typed,  in  the  sequence  of  the  table  of  contents  of  the  project 

manual, with each item identified with the number and title of the specification section in 
which specified, and the name of product or work item. 

4.  Separate each warranty or bond with index tab sheets keyed to the table of contents listing. 

Provide  full  information,  using  separate  typed  sheets  as  necessary.  List  subcontractor, 
supplier,  and  manufacturer,  with  name,  address,  and  telephone  number  of  responsible 
principal 

b.  Preparation of submittals:  

1.  Obtain  warranties  and  bonds,  executed  in  duplicate  by  responsible  subcontractors, 

suppliers, and manufacturers, within fourteen days after completion of the applicable item 
of work. Except for items put into use with Owner's permission, leave date of beginning of 
time of warranty until the date of substantial completion is determined 

2.  Verify that documents are in proper form, contain full information 

3.  Co-execute submittals when required 

4.  Retain warranties and bonds until time specified for submittal 

c.  Time of submittals: 

1.  For equipment or component parts of equipment put into service during construction with 

Owner's permission, submit documents within fourteen days after acceptance 

2.  Make other submittals within fourteen days after date of substantial completion, before final 

application for payment 

3.  For  items  of  work  when  acceptance  is  delayed  beyond  date  of  substantial  completion, 

submit  within  fourteen  days  after  acceptance,  listing  the  date  of  acceptance  as  the 
beginning of the warranty period. 

1.24.3 

Spare Parts and Maintenance Materials  

The Contractor shall comply with the following requirements: 

a.  Products required: 

1.  Provide  quantities  of  products,  spare  parts,  special  tools,  and  maintenance  materials 

specified in individual sections to be provided to the Owner, in addition to that required for 
completion of work 

2.  Products: Identical to those installed in the work. Include quantities in original purchase from 

supplier or manufacturer to avoid variations in manufacture 

3. 

Provide manufacturers’ recommended spare parts for 2 years operation for each piece of 
equipment 

b.  Storage: 

1.  Store products with products to be installed in the work, under provisions of Section 1.18.2. 

2.  After delivery of products to site, maintain spare products in same space and condition as 

products to be installed in the work 

3.  When  adequate,  secure  storage  facilities  are  available  at  site,  capable  of  maintaining 

conditions  required  for  storage  and  not  required  for  Contract  work  or  storage,  spare 
products may be stored in available space 

4.  Maintain spare products in original containers with labels intact and legible, until delivery to 

the Owner 

 

G

ENERAL 

R

 

 

 

c.  Delivery:  

1.  Coordinate with the Owner 

2.  Deliver  and  unload  spare  products  to  the  Owner  at  project  site  and  obtain  receipt  from 

Engineer before final payment.  

1.25 

Demonstration and Training 

This section establishes the requirements for system demonstration, and operation and maintenance 
training after all construction, starting and testing of any part of the works. 

Training  required  by  this  section  is  in  addition  to,  and  not  a  replacement  for,  the  manufacturer’s 
equipment training required by the individual technical sections. 

1.25.1 

Training Requirements 

The Contractor shall meet the following training requirements: 

a.  Owner reserves the right to videotape and audiotape the instruction 

b.  Size of the class shall not exceed 15 people 

c.  The Contractor shall develop individual training courses for each major mechanical/electrical 

system identified on the Contract plans 

d.  Separate  training  sessions  shall  be  provided  for  operations,  maintenance,  and 

electrical/instrumentation personnel 

e.  The Contractor shall develop and submit the curriculum to the Engineer for approval 

1.  Establish curriculum level for high school graduates with journeyman qualifications 

2.  Perform  a  task  and  skills  analysis,  identifying  the  requirements  for  proper  operation, 

maintenance, and repair of the system and all of its components 

3.  Perform a training analysis identifying: 

i. 

Tasks requiring training 

ii. 

Logical order of presentation 

iii. 

Objectives of each training segment 

iv. 

Methods for measuring achievement of objectives for each segment 

v. 

Include tests with at least 15 questions on each outline topic 

f. 

Prepare an instructor’s manual, including notes to the instructor, for each training session 

1.  Manual shall address:  

i. 

Session objectives 

ii. 

Session outline 

iii. 

Session application 

iv. 

Instructor qualification and knowledge requirements 

v. 

List of tools and supplies required for instruction 

vi. 

Include safety and standby equipment 

vii. 

Student and course evaluation forms 

viii. 

Audio/visual resources or reproductions 

ix. 

Session tests and a grading guide 

 

G

ENERAL 

R

 

 

 

2.  References to the source of answers shall be provided in the course material, with additional 

notes  such  as  references,  review  questions,  demonstration  techniques,  class  exercises, 
coordination with other sessions and achievement measurements 

g.  Instruction times: 

1.  0730 hours to 1200 hours prevailing time 

2.  Sunday through Thursday except local legal holidays 

3.  Provide a 10 minute break after each hour of instruction 

h.  Minimum curriculum requirements: 

1. 

Theory of operation and control, which includes both classroom and “hands on” training 

2.  How to use the operation and maintenance manual including the location of information 

3.  System layout 

4.  Wiring, instrumentation and controls 

5.  Control sequence and logic 

6.  Normal and emergency operating procedures 

7.  Basic and advanced operation and maintenance 

8.  Equipment/instrument adjustment and calibration 

9.  Site walk through to locate and identify equipment 

10. 

Preventive maintenance 

11. 

Major maintenance 

12. 

Safety 

13. 

Trouble shooting 

14. 

How to use special tools 

15. 

Operation and maintenance supplies 

16. 

Spare parts. 

1.25.2 

Submittals  

Submittals shall be made per the following requirements: 

a.  All submittals shall be as specified in Section 1.11. 

b.  Submit the following for approval:  

1.  Curriculum development document 

2. 

Instructor’s manual 

i. 

Provide one copy for review 

ii. 

After  acceptance  (and  before  training)  provide  one  copy  and  one  camera  ready 
original 

3.  Complete schedule of training activities. Include the following:  

i. 

Schedule of submittals 

ii. 

Schedule of classes 

iii. 

Coordinate with start-up and activities specified in Section 1.20 

4.  Training plan: 

i. 

Course outline 

 

G

ENERAL 

R

 

 

 

ii. 

Time allocation for each training segment 

iii. 

Instructor qualifications 

5.  Presentation materials - Two reproducible copies 

6.  Manuals and class handouts: 

i. 

One reproducible copy for review 

ii. 

One copy for each student at least 5 working days before class. 

1.25.3 

Quality Assurance 

The Contractor shall comply with the following: 

a.  Instructor: 

1.  Submit qualifications for approval 

2.  Minimum experience:  

i. 

3 years actually operating and maintaining equipment 

ii. 

Academic or factory training 

iii. 

Combination of training and experience 

3.  Engineer 

reserves the right to reject instructor’s lacking experience and education required 

to conduct the training 

b.  Pre-training conference: 

1.  Schedule conference not less than 7 calendar days before training 

2.  The Owner, the Engineer, the Contractor, training instructors, and other responsible parties 

to attend 

3.  Submit an agenda 5 working days before conference. Include:  

i. 

Training schedule 

ii. 

Examination of training facilities 

iii. 

Problem identification and resolution. 

1.25.4 

Training Area 

Training area to be provided by the Contractor: 

a.  Minimum requirements:  

1.  Located outside of construction work area 

2.  Air conditioned 

3.  Seating for 15 students 

4.  Tables suitable for students to write and lay out class materials 

5.  All equipment required for audio/visual presentations 

b.  Owner may make existing training room available if not scheduled for use 

1.  The Contractor shall coordinate availability 

2.  Owner makes no guarantees that the Contractor will be able to use their facilities 

 

G

ENERAL 

R

 

 

 

1.25.5 

Sequencing and Scheduling  

The Contractor shall comply with the following items: 

a.  Conduct classroom training before in field training 

b.  Conduct hands-on training before system demonstration 

c.  Schedule training not less than 7 calendar days before desired training date 

d.  Training delays: 

1.  The Contractor: 

i. 

Notify Engineer at least 3 days in advance of scheduled training 

ii. 

Failure  to  provide  required  notice  shall  make  the  Contractor  responsible  for  costs 
incurred by the Owner for Owner

’s personnel 

2.  The Owner/Engineer: 

i. 

May delay scheduled training by up to 5 calendar days for personnel time conflicts 

ii. 

Will  notify the Contractor of delay at least 3 days in advance of scheduled training 

1.25.6 

Training Materials 

The Contractor shall provide the following items: 

1.  Provide  all  materials  and  supplies  (including  consumables)  necessary  for  training  and 

demonstrations 

2.  Provide special tools required for training and demonstrations 

3.  Provide safety equipment required by instructors 

1.26 

Operation and Maintenance Data 

This  section  outlines  requirements  for  detailed  information  for  the  preparation,  submission,  and 
Engineer

’s review of operations and maintenance (O&M) data, as required by individual specification 

sections. 

1.26.1 

Definitions 

Key terms used in this specification are defined as follows: 

1.  Preliminary data: Initial and subsequent submissions for Engineer

’s review 

2.  Final data: Engineer-accepted data, submitted as specified herein 

3.  Maintenance operation: As used on maintenance summary form is defined to mean any routine 

operation required to ensure satisfactory performance and longevity of equipment. Examples 
of typical maintenance operations are lubrication, belt tensioning, adjustment of pump packing 
glands, and routine adjustments 

1.26.2 

Sequencing and Scheduling 

 The Contractor shall comply with the following: 

a.  Equipment and system data:  

1.  Preliminary data: 

i. 

Do not submit until shop drawing for equipment or system has been reviewed and 
approved by Engineer 

ii. 

Submit before shipment date 

2.  Final data:  

 

G

ENERAL 

R

 

 

 

i. 

Submit instructional manual formatted data not less than 30 days before equipment 
or system field functional testing 

ii. 

Submit  compilation  formatted  and  electronic  media  formatted  data  before 
substantial completion of project 

b.  Materials and finishes data: 

1.  Preliminary data: Submit at least 21 calendar days before request for final inspection 

2.  Final data: Submit within 10 days after final inspection 

1.26.3 

Data Format 

The Contractor supplied data shall meet the following requirements: 

a.  Prepare preliminary data in the form of an instructional manual. Prepare final data on electronic 

media 

b.  Instructional manual format:  

1.  Binder: Commercial quality, permanent, four-ring or four-post binders with durable plastic 

cover 

2.  Size: A4, minimum 

3. 

Cover:  Identify  manual  with  typed  or  printed  title  “OPERATION  AND  MAINTENANCE 
DATA” and list:  

i. 

Project title 

ii. 

Designate applicable system, equipment, material, or finish 

iii. 

Identity of separate structure as applicable 

iv. 

Identity of equipment number and Specification section 

4.  Title age:  

i. 

The Contractor name, address, and telephone number 

ii. 

Subcontractor,  supplier,  installer,  or  maintenance  Contractor

’s  name,  address,  and 

telephone number, as appropriate 

a)  Identify area of responsibility of each 

b)  Provide  name  and  telephone  number  of  local  source  of  supply  for  parts  and 

replacement 

5.  Table of contents: 

i. 

Neatly typewritten and arranged in systematic order with consecutive page numbers 

ii. 

Identify each product by product name and other identifying numbers or symbols as 
set forth in Contract documents 

6.  Paper: 9 kg. minimum, white for typed pages 

7. 

Text: Manufacturer’s printed data, or neatly typewritten 

8.  Four-hole punch data for binding and composition; arrange printing so that punched holes 

do not obliterate data 

9.  Material shall be suitable for reproduction, with quality equal to original. Photocopying of 

material will be acceptable, except for material containing photographs 

10. 

Large format drawings that cannot be reduced to A3 shall be folded and inserted in 

heavy plastic folders attached into the binder 

c.  Data compilation format:  

 

G

ENERAL 

R

 

 

 

1.  Compile all Engineer-accepted preliminary O&M data into a hard-copy, hardbound set 

2.  Each set shall consist of the following:  

i. 

Binder:  Commercial  quality,  permanent,  four-ring  or  four-post  binders  with  durable 
plastic cover 

ii. 

Cover:  Identify  each  volume  with  typed  or  printed  title  “OPERATION  AND 
MAINTENAN

CE DATA, VOLUME NO. ___ OF ___”, and list:  

a)  Project title 

b)  The Contractor

’s name, address, and telephone number 

c)  If entire volume covers equipment or system provided by one supplier include the 

following:  

1)  Identity of general subject matter covered in manual 

2)  Identity of equipment number and specification section 

3)  Provide  each  volume  with  title  page  and  typed  table  of  contents  with 

consecutive page numbers. Place contents of entire set, identified by volume 
number, in each binder 

iii. 

Table of contents neatly typewritten, arranged in a systematic order: 

a)  Include list of each product, indexed to content of each volume 

b)  Designate system or equipment for which it is intended 

c)  Identify each product by product name and other identifying numbers or symbols 

as set forth in Contract documents 

iv. 

Section dividers:  

a)  Heavy, 80 pound cover weight, tabbed with numbered plastic index tabs 

b)  Fly-leaf:  

1)  For each separate product, or each piece of operating equipment, with typed 

description of product and major component parts of equipment 

2)  List with each product: 

x

  Name, address, and telephone number of subcontractor 

x

  Supplier, installer, and maintenance Contractor, as appropriate 

x

  Identify area of responsibility of each 

x

  Provide local source of supply for parts and replacement 

x

  Identity of separate structure as applicable 

3.  Assemble and bind material, as much as possible, in same order as specified in the Contract 

documents 

d.  Electronic media format: 

1.  Portable document format (PDF): 

i. 

After  all  preliminary  data  has  been  found  to  be  acceptable  to  Engineer,  submit 
operation and maintenance data in PDF format on CD 

ii. 

Files  to  be  exact  duplicates  of  Engineer-accepted  preliminary  data.  Arrange  by 
specification number and name 

iii. 

Files to be fully functional and viewable in most recent version of Adobe Acrobat 

2. 

Manufacturers’ standard electronic format. 

 

 

 

 

 

 

 