1.26.4 

Submittals 

Submittals for O&M data shall comply with the following requirements: 

a.  Informational: 

1.  Data outline: Submit two copies of a detailed outline of proposed organization and contents 

of final data before preparation of preliminary data 

2.  Preliminary data:  

i. 

Submit three copies for Engineer

’s review 

ii. 

If data meets conditions of the Contract:  

a)  One copy will be returned to the Contractor 

b)  One copy will be forwarded to the Owner 

c)  One copy will be retained in Engineer

’s file 

iii. 

If data does not meet conditions of the Contract:  

a)  All copies will be returned to the Contractor with Engineer

’s comments (on separate 

document) for revision 

b)  Engineer

’s comments will be retained in Engineer’s file 

c)  Resubmit three copies revised in accordance with Engineer

’s comments.  

3.  Final data:  

i. 

Submit two hardcopies of each manual in format specified herein 

ii. 

Submit  five  copies  of  each  CD  of  the  electronic  media  format  with  printed  labels 
identifying contents 

iii. 

Final electronic manual shall be organized in the same format as the hardcopy manual 

1.26.5 

Data for Equipment and Systems 

Data  for  equipment  and  systems  shall  meet  the  requirements  of  the  following  articles  under  this 
section. 

1.26.5.1 

Content for Each Unit (or Common Units) and System 

a.  Product data: 

1.  Include only those sheets that are pertinent to specific product 

2.  Clearly annotate each sheet to:  

i. 

Identify specific product or part installed 

ii. 

Identify data applicable to installation 

iii. 

Delete references to inapplicable information 

iv. 

Function, normal operating characteristics, and limiting conditions 

v. 

Performance curves, Engineering data, nameplate data, and tests 

vi. 

Complete nomenclature and commercial number of replaceable parts 

vii. 

Original manufacturer’s parts list, illustrations, detailed assembly drawings showing 
each  part  with  part  numbers  and  sequentially  numbered  parts  list,  and  diagrams 
required for maintenance 

viii. 

Spare parts ordering instructions 

 

G

ENERAL 

R

 

 

 

ix. 

Where applicable, identify installed spares and other provisions for future work (e.g., 
reserved panel space, unused components, wiring, and terminals) 

b.  As-installed, colour-coded piping diagrams 

c.  Charts of valve tag numbers, with the location and function of each valve 

d.  Drawings: Supplement product data with drawings as necessary to clearly illustrate:  

1.  Format: 

i. 

Provide reinforced, punched, binder tab; bind in with text 

ii. 

Reduced to A4 size, or A3 size folded to A4 size 

iii. 

Where reduction is impractical, fold and place in A4 envelopes bound in text 

iv. 

Identify specification section and product on drawings and envelopes 

2.  Relations of component parts of equipment and systems 

3.  Control and flow diagrams 

4.  Coordinate  drawings  with  project  record  documents  to  assure  correct  illustration  of 

completed installation 

e.  Instructions and procedures: Within text, as required to supplement product data.  

1.  Format: 

i. 

Organize in consistent format under separate heading for each different procedure 

ii. 

Provide logical sequence of instructions for each procedure 

iii. 

Provide information sheet for Owner

’s personnel, including:  

a)  Proper procedures in event of failure 

b)  Instances that might affect validity of guarantee or bond 

c)  Installation Instructions: Including alignment, adjusting, calibrating, and checking 

2.  Operating procedures: 

i. 

Start-up, break-in, routine, and normal operating instructions 

ii. 

Test procedures and results of factory tests where required 

iii. 

Regulation, control, stopping, and emergency instructions 

iv. 

Description of operation sequence by control manufacturer 

v. 

Shutdown instructions for both short and extended duration 

vi. 

Summer and winter operating instructions, as applicable 

vii. 

Safety precautions 

viii. 

Special operating instructions 

3.  Maintenance and overhaul procedures:  

i. 

Routine maintenance 

ii. 

Guide to troubleshooting 

iii. 

Disassembly, removal, repair, reinstallation, and reassembly 

f.  Safety: 

1.  Separate  safety  section  which  identities  specified  safety  hazards  associated  with 

maintenance of the equipment 

 

G

ENERAL 

R

 

 

 

2.  As  a  minimum  identity  elements  with  stored  energy  (springs,  compressed  gas,  large 

capacities etc.), confined space entries, tag out and lock out procedures 

g.  Guarantee and service agreements: In accordance with Section 1.24.2. 

1.26.5.2 

Content for Each Electric or Electronic Item or System 

a.  Description of unit and component parts: 

1.  Function, normal operating characteristics, and limiting conditions 

2.  Performance curves, Engineering data, nameplate data, and tests 

3.  Complete nomenclature and commercial number of replaceable parts 

4.  Interconnection wiring diagrams, including control and lighting systems 

b.  Circuit directories of panel boards: 

1.  Electrical service 

2.  Controls 

3.  Communications 

c.  List of electrical relay settings, and control and alarm contact settings 

d.  Electrical interconnection wiring diagram, including control and lighting systems 

e.  As-installed control diagrams by control manufacturer 

f.  Operating procedures: 

1.  Routine and normal operating instructions 

2.  Sequences required 

3.  Safety precautions 

4.  Special operating instructions 

g.  Maintenance procedures: 

1.  Routine maintenance 

2.  Guide to troubleshooting 

3.  Adjustment and checking 

4.  List of relay settings, control and alarm contact settings 

h. 

Manufacturer’s printed operating and maintenance instructions 

i. 

List of original manufacturer’s spare parts, manufacturer’s current prices, and recommended 
quantities to be maintained in storage 

1.26.5.3 

Maintenance Summary:  

a.  Compile individual maintenance summary for each applicable equipment item, respective unit 

or system, and for components or sub-units.  

b.  Format:  

1.  Each maintenance summary may take as many pages as required 

2.  Use only A4 size paper 

3.  Complete using typewriter or electronic printing 

c.  Include detailed lubrication instructions and diagrams showing points to be greased or oiled; 

recommend type, grade, and temperature range of lubricants and frequency of lubrication 

 

G

ENERAL 

R

 

 

 

d.  Recommended spare parts:  

1. 

Data  to  be  consistent  with  manufacturer’s  bill  of  materials/parts  list  furnished  in  O&M 
manuals 

2.  Unit is the unit of measure for ordering the part 

3.  Quantity is the number of units recommended 

4.  Unit Cost is the current purchase price 

1.26.5.4 

Guideline Outline Form 

Following outline is a guideline of the minimum required contents to be included in the O&M manuals:  

a.  Cover page: with name of project, date, language version (English), Contract number, and C

’s 

name 

b.  Table of contents: showing contents and sequential page numbering 

1.  List of tables (if any) 

2.  List of figures (if any) 

3.  List of pictures (if any) 

4.  List of sheets (if any) 

5.  List of abbreviations (if any) 

c.  Introduction:  showing  the  use  of  the  manual  and  the  appropriate  electrical/mechanical 

equipment or system general description 

d.  Detailed  description  of  the  facility:  General,  Inlet  and  sedimentation  chamber,  trash  racks, 

process facilities, storage reservoir, piping, valves, flow metering, instrumentation and control, 
etc.  

e.  Description  of  utilities  and  building  services:  general,  high  voltage  power  source,  power 

distribution, potable water, seal water system, ventilation, etc.  

f.  Operation of the facility 

g.  Operation  of  utilities  and  building  services:  high  voltage  power  source,  power  distribution, 

potable water, seal water system, ventilation, etc. 

h.  Maintenance: 

General, 

preventive 

maintenance 

system, 

corrective 

maintenance, 

housekeeping, maintenance stores, etc. 

i.  Safety:  Personal,  maintenance,  safety  hazards,  commitment  to  safety,  standard  safety 

procedures, safety programs, etc.  

j.  Records and record keeping: General, operation records, maintenance records, and operation 

costs records, etc. 

k.  Personals: General, personal organization chart, job descriptions, etc.  

l.  References 

m. Glossary of terms. 

1.26.6 

Data for Materials and Finishes 

Data for materials and finishes shall comply with the following requirements: 

a.  Content for architectural products, applied materials, and finishes:  

1. 

Manufacturer’s data, giving full information on products:  

i. 

Catalogue number, size, and composition 

 

G

ENERAL 

R

 

 

 

ii. 

Colour and texture designations 

iii. 

Information required for reordering special-manufactured products 

2.  Instructions for care and maintenance:  

i. 

Manufacturer’s recommendation for types of cleaning agents and methods 

ii. 

Cautions against cleaning agents and methods that are detrimental to product 

iii. 

Recommended schedule for cleaning and maintenance 

b.  Content for moisture protection and weather exposed products: 

1. 

Manufacturer’s data, giving full information on products:  

i. 

Applicable standards 

ii. 

Chemical composition 

iii. 

Details of installation 

2.  Instructions for inspection, maintenance, and repair. 

1.26.7 

Irrigation System and Landscaping 

Irrigation and landscaping submittals shall comply with the following items: 

a.  Content for irrigation system: 

1.  Site plan marked to show system layout and locations of all isolation valves, control valves, 

controllers, etc. 

2.  P & ID type system drawing(s) that detail the system furnished and installed 

3. 

Manufacturers’ data sheets for each item installed in the system 

b.  Content for landscape: 

1.  Basic care instructions for each type of planting 

2.  Recommended watering program by irrigation circuit and controller for each season 

c.  Format: Format shall generally follow that for equipment and systems. 

 

 

 

G

ENERAL 

R

 

 

 

 

I

NDEX

 

abbreviations, 1-4 
Access, 1-23 
accidents. See health and safety 
adjoining construction plant and property, 1-

28 

adjustment of contract dates. See schedule 
agencies, 1-18 
agency representatives field offices. See 

engineer's field offices 

application of this document, 1-1 
approvals, 1-23 
archaeological finds, 1-77 
as-builts. See contract close-out 
bar chart. See schedule 
bus shelter, 1-3 
certificates and affidavits. See submittal 

procedures 

civil-engineering services. See field 

engineering 

cleaning, 1-161 
closeout submittals, 1-167 
codes. See regulatory requirements 
cofferdams, 1-123 
commissioning. See startup 
concentrated flow diversions, 1-137 
concrete slip-forms, 1-123 
confined spaces. See health and safety 
construction facilities and temporary controls, 

1-74 

construction layout. See execution 
construction work plan, 1-30 
content and format, 1-2 
contract close-out, 1-163 
Contractor’s responsibility. See work 

restrictions 

coordination, 1-29 
CQC manager. See quality control 

organization 

critical path method. See schedule 
daily report. See construction work plan 
defective work. See work plan 
definitions, 1-7, See submittal procedures 
detailed progress. See schedule 
detours. See traffic control 
disposal of waste. See cleaning 
drawings, 1-47 
endangered species, 1-77 
engineer’s field offices, 1-78 
environmental sediment and pollution control 

plan. See temporary controls 

equipment, 1-22 

equipment start-up. See utility coordinator 
examination. See execution, See field 

engineering 

excavation safety. See health and safety 
execution, 1-156 
existing property and utilities, 1-51 
explosives. See health and safety 
fabric fence, 1-133 
fall protection. See health and safety 
falsework and forms. See temporary works 
fibre rolls, 1-134 
field engineering, 1-24, See execution 
final conditions of work, 1-64 
final inspection. See contract close-out 
fire protection. See health and safety 
first aid. See health and safety 
formwork. See temporary works 
governing bodies. See agencies 
government bodies, 1-26 
gravel bags, 1-134 
health and safety, 1-52 
health and safety plan. See health and safety 
housekeeping, 1-63 
Lab equipment list A. See site laboratory 
lab equipment list B. See site laboratory 
labour, 1-22 
land provided for Contractor use, 1-23 
layin-out of the works. See field engineering 
Limits of the site, 1-23 
measurements, 1-20 
miscellaneous submissions. See submittal 

procedures 

narrative progress report. See schedule 
near misses. See health and safety 
no objection certificates. See regulatory 

requirements 

notice of intent. See regulatory requirements 
operations and maintenance manual. See 

submittal procedures 

owner-installed products, 1-160 
parking. See access roads 
Part 1, 1-2, 1-3 
Part 2, 1-2, 1-3 
Part 3, 1-2 
performance testing. See startup 
permits. See approvals 
personal protective equipment (PPE),. See 

health and safety 

pipe slope drains, 1-132 
plant. See equipment 
plant record. See work plan 

 

G

ENERAL 

R

 

 

 

pollution controls, 1-129 
preservation of existing vegetation and 

topsoil, 1-135 

product data. See submittal procedures 
product options, 1-142 
products. See product options 
program of works, 1-21 
progress documentation, 1-31 
progress of the work. See schedule 
progress quantity charts. See schedule 
progress schedule. See schedule 
project management, 1-27 
project manager. See supervisory staff 
project schedule, 1-22, See progress 

documentation 

project signs, 1-88 
protective fencing, 1-128 
quality assurance, 1-24 
quality certifications. See quality control 

testing 

quality control, 1-64 
quality control documentation, 1-70 
quality control meetings. See quality control 
quality control organization. See quality 

control 

quality control program requirements. See 

quality control 

quality control requirements. See quality 

control 

quality control testing, 1-69 
record drawings. See drawings 
reference standards, 1-15 
regulatory requirements, 1-49 
safety check list. See health and safety 
safety inspections. See health and safety 
safety representative. See health and safety 
sample. See submittal procedures 
sccess roads, 1-89 
schedule, 1-32 
schedule acceptance, 1-37 
schedule notifications. See working hours 
sediment and pollution control, 1-128 
sediment controls, 1-128 
sediment trapping, 1-138 

See health and safety.   
shaded areas along with chilled potable 

drinking water supply. See health and 
safety 

shop drawing. See submittal procedures 
shoring, 1-124, See temporary works 
site laboratory, 1-78 
software. See schedule 
spare parts, 1-150 
sponsers. See supervisory staff 
startup, 1-147 
storage yards and buildings, 1-89 
storm drain inlet protection, 1-142 
submittal procedures, 1-39 
submittals. See progress documentation 
supervisory staff, 1-27, See project 

management 

survey work. See field engineering 
temporary connections, 1-149 
temporary controls, 1-88 
temporary fence, 1-134 
temporary roads. See access 
temporary traffic control devices. See traffic 

control 

temporary work, 1-29 
temporary works, 1-111 
testing of systems. See startup 
three phases of quality control, 1-68 
traffic control and detour schemes, 1-90 
training, 1-170 
unit prices, 1-19 
utility coordinator, 1-72 
utility coordinator’s required duties. See utility 

coordinator 

utility departments. See agencies 
Volume 1 

– Road Works. See content and 

format 

Volume 2 

– Bridge Works. See content and 

format, See content and format 

Volume 3 

– Maintenance. See content and 

format 

work plan. See construction work plan 
work restrictions, 1-20 
working hours, 1-28, See work plan 

 

 

 

 

 

 

 

STANDARD CONSTRUCTION SPECIFICATIONS 

PART 1 

ROADS 

 

CHAPTER 2 - EARTHWORKS 

 

 

 

 

 

 

 

DOCUMENT

 

NO:

 

TR-542-1 

SECOND

 

EDITION 

SEPTEMBER

 

2020

 

 

E

ARTHWORKS

 

 

 

 

CHAPTER 2: Earthworks

 

T

ABLE OF 

C

ONTENTS

 

Table of Contents............................................................................................................................. i

 

List of Tables .................................................................................................................................. iii

 

2

 

Earthworks ........................................................................................................................ 2-1

 

2.1

 

General .......................................................................................................................... 2-1

 

2.1.1

 

Description ................................................................................................................. 2-1

 

2.1.2

 

Reference Standards and Codes ............................................................................... 2-1

 

2.1.3

 

Contractor's Responsibility ......................................................................................... 2-4

 

2.1.3.1

 

Site Visit .......................................................................................................... 2-4

 

2.1.3.2

 

Boreholes ........................................................................................................ 2-4

 

2.2

 

Clearing and Grubbing ................................................................................................... 2-7

 

2.2.1

 

Description ................................................................................................................. 2-7

 

2.2.2

 

Construction Requirements ........................................................................................ 2-7

 

2.2.2.1

 

Areas to be Cleared, Grubbed, and Removed of Topsoil ................................. 2-7

 

2.2.2.2

 

Clearing ........................................................................................................... 2-8

 

2.2.2.3

 

Grubbing .......................................................................................................... 2-8

 

2.2.2.4

 

Conservation of Existing Topsoil, Vegetation, and Cutting of Trees ................. 2-8

 

2.2.2.5

 

Removal and Salvage of Topsoil ..................................................................... 2-8

 

2.2.2.6

 

Roadside Cleanup ........................................................................................... 2-8

 

2.2.2.7

 

Disposal of Material ......................................................................................... 2-9

 

2.3

 

Removal of Structures and Obstructions ........................................................................ 2-9

 

2.3.1

 

Description ................................................................................................................. 2-9

 

2.3.2

 

Construction Requirements ........................................................................................ 2-9

 

2.3.2.1

 

General ............................................................................................................ 2-9

 

2.3.2.2

 

Removal of Structures and Foundations .......................................................... 2-9

 

2.3.2.3

 

Removal of Bridges, Culverts, and Drainage Structures ................................ 2-10

 

2.3.2.4

 

Removal of Pavement, Barriers, Railings, Sidewalks, Kerbs, and Gutters ..... 2-10

 

2.3.2.5

 

Disposal of Materials ..................................................................................... 2-11

 

2.4

 

Roadway Excavation ................................................................................................... 2-11

 

2.4.1

 

Description ............................................................................................................... 2-11

 

2.4.2

 

Construction Requirements ...................................................................................... 2-12

 

2.4.2.1

 

Preparation for Roadway Excavation ............................................................. 2-12

 

2.4.2.2

 

Control of Excavation ..................................................................................... 2-12

 

2.4.2.3

 

Dewatering .................................................................................................... 2-12

 

2.4.2.4

 

Rock Cuts ...................................................................................................... 2-15

 

2.4.2.5

 

Subexcavation ............................................................................................... 2-19

 

2.4.2.6

 

Slope Treatment ............................................................................................ 2-20

 

2.4.2.7

 

Disposal of Unsuitable or Excess Material ..................................................... 2-20

 

2.4.2.8

 

Wasting Material ............................................................................................ 2-20

 

2.4.2.9

 

Roadway Ditch and Pond Excavation ............................................................ 2-20

 

2.4.2.10

 

Borrow Excavation ......................................................................................... 2-21

 

2.4.2.11

 

Structural Excavation ..................................................................................... 2-21

 

2.4.2.12

 

Manual Excavation ........................................................................................ 2-22

 

2.4.2.13

 

Unclassified Excavation ................................................................................. 2-23

 

2.5

 

Embankments and Backfill ........................................................................................... 2-24

 

2.5.1

 

Description ............................................................................................................... 2-24

 

2.5.2

 

Materials .................................................................................................................. 2-24

 

2.5.2.1

 

Unsuitable Material ........................................................................................ 2-24

 

2.5.2.2

 

Embankment Material (Load-Bearing) ........................................................... 2-24

 

2.5.2.3

 

Rock Fill Material ........................................................................................... 2-25

 

2.5.2.4

 

Structural Backfill ........................................................................................... 2-25

 

 

2.5.2.5

 

Pervious Backfill ............................................................................................ 2-26

 

2.5.2.6

 

Material for Free-Draining Blankets................................................................ 2-27

 

2.5.2.7

 

Non-Load-Bearing Material ............................................................................ 2-27

 

2.5.2.8

 

Prefabricated Vertical Drains ......................................................................... 2-28

 

2.5.2.9

 

Construction Geotextile.................................................................................. 2-29

 

2.5.2.10

 

Surface Protection ......................................................................................... 2-32

 

2.5.2.11

 

Water ............................................................................................................. 2-32

 

2.5.3

 

Construction Requirements ...................................................................................... 2-32

 

2.5.3.1

 

Embankment Construction ............................................................................. 2-32

 

2.5.3.2

 

Structural Backfill ........................................................................................... 2-34

 

2.5.3.3

 

Non-Load-Bearing Fill Placement .................................................................. 2-34

 

2.5.3.4

 

Compacting Embankments ............................................................................ 2-34

 

2.5.3.5

 

Prefabricated Vertical Drains ......................................................................... 2-36

 

2.5.3.6

 

End Caps and Draw Lines for Ducts, Conduits, Pipe Sleeves and Culverts ... 2-37

 

2.6

 

Subgrade Preparation .................................................................................................. 2-37

 

2.6.1

 

Traffic Pavement ...................................................................................................... 2-37

 

2.6.2

 

Pedestrian Pavement ............................................................................................... 2-37

 

2.7

 

Geotextile Installation ................................................................................................... 2-37

 

2.7.1

 

Description ............................................................................................................... 2-37

 

2.7.2

 

Materials .................................................................................................................. 2-38

 

2.7.3

 

Construction Requirements ...................................................................................... 2-38

 

2.7.3.1

 

Subsurface Drainage and Soakaways ........................................................... 2-38

 

2.7.3.2

 

Permanent Erosion Control and Ditch Lining ................................................. 2-39

 

2.8

 

Trimming and Cleanup ................................................................................................. 2-39

 

2.8.1

 

Description ............................................................................................................... 2-39

 

2.8.2

 

Construction Requirements ...................................................................................... 2-39

 

Index 

………………………………………………………………………………………… ................ 2-41

 

 

L

IST OF 

T

ABLES

 

Table 2-1: Designations and titles for AASHTO and ASTM standards that apply to earthworks ... 2-2

 

Table 2-2: Designations and titles for BS and BS EN standards that apply to earthworks ............ 2-4

 

Table 2-3: Structural backfill gradation ....................................................................................... 2-25

 

Table 2-4: Pervious backfill gradation ........................................................................................ 2-26

 

Table 2-5 Pervious backfill material for use as drainage layer against soil retaining structures such 
as bridge abutments and retaining walls .................................................................................... 2-26

 

Table 2-6:  Gradation for free-draining blanket material ............................................................. 2-27

 

Table 2-7:  Vertical filter drain properties .................................................................................... 2-28

 

Table 2-8: Geotextile for underground drainage ......................................................................... 2-30

 

Table 2-9: Geotextile for underground filtration properties .......................................................... 2-30

 

Table 2-10: Geotextile for separation or soil stabilisation ........................................................... 2-30

 

Table 2-11: Geotextile properties for retaining walls and reinforced slopes ................................ 2-31

 

Table 2-12: Embankment material and compaction tests ........................................................... 2-35

 

 

EARTHWORKS 

2.1 

General 

2.1.1 

Description 

This section describes the general provisions under which earthworks shall be performed: 

1. 

Prior to the start of earthwork, the Contractor shall perform all control surveying in accordance
with Section 1.2.6. And submit to the Engineer for review and approval. Limits of areas to be 
protected shall be surveyed and protective fenced installed. Excavation and backfill control 
staking shall be surveyed and placed. 

2. 

Prior to start of earthwork, the Contractor shall take cross-sections of existing ground every
25 m jointly with the Engineer, in accordance with the requirements of Section 1.7 of Chapter 
1,  General  Requirements,  and  as  agreed  to  by  the  Engineer.  Cross-sections  shall  have 
supplemental  additional  topographic  information,  including  locations  of  all  existing  surface 
features in the plan to include structures, fences, utility risers and markers, utility chambers, 
drainage structures, areas of vegetation and trees,  etc., all located to x and y coordinates 
and labelled with surface elevations, as per the Engineer’s instructions. 

3. 

Use  all  necessary  precautionary  and  protective  measures  required  to  maintain  existing
utilities,  services,  and  appurtenances  that  must  be  kept  in  operation.  In  particular,  the 
Contractor  shall  take  adequate  measures  to  prevent  undermining  of  utilities  and  services 
presently in service. 

4. 

Earthwork shall be constructed to the lines, grades, elevations, slopes, and cross-sections
indicated on the Contract plans. 

5. 

All excavation and backfilling shall be performed in dry condition, sunless otherwise directed
by the Engineer. 

6. 

All excavation and backfill work, including the associated work performed in accordance with
these  specifications,  Contract  plans,  and  particular  specifications,  and  as  instructed  or 
approved by the Engineer. 

7. 

Contractor shall ensure the removal and diversion of underground and surface water from all
excavations and finished surfaces. 

8. 

Contractor to finish the work with final trimming and grading of all surfaces and removal of
any remaining construction debris and waste materials 

2.1.2 

Reference Standards and Codes 

Standards  and  codes  for  earthworks  shall  be as  specified  in these specifications,  in the  Contract 
documents, if any, and the following, in their latest edition: 

AASHTO LRFD 

American Association of State Highway and Transportation Officials - Load and 
Resistance Factor Design, Bridge Construction Specifications; 

AASHTO LRFD 

American Association of State Highway and Transportation Officials - Load and 
Resistance Factor Design, Bridge Design Specifications; 

AASHTO 

Standard  Specifications for  Transportation  Materials  and  Methods  of  Sampling 
and Testing; 

ASTM 

American Society for Testing and Materials; 

AD EHSMS RF 

Abu Dhabi Environment, Health and Safety Management System Regulatory 
Framework Manual; 

 

ADM EHS 

Municipality of Abu Dhabi City - Guide Lines for Developing EHS Plan for 
Building and Construction Sector; 

ADQCC (TR-516) Abu Dhabi Road Structures Design Manual; 

BS 

British Standards; 

BS EN

 

European Standards; 

DOT-M-08 

Environmental, Health and Safety Manual for Road Projects; 

OSHA 

Occupational Safety and Health Administration. 

Table  2-1  and  Table  2-2  presents  American  Association  of  State  Highway  and  Transportation 
Officials (AASHTO), American Society for Testing and Materials (ASTM), British (BS), and European 
(BS EN) Standards that are related to materials for  earthworks. It also includes designations and 
titles. 

Table 2-1: Designations and titles for AASHTO and ASTM standards that apply to 

earthworks 

AASHTO 

Designation 

ASTM Designation 

Title 

ASTM E380 - 2010 

Standard Practice for Use of the International System 
of Units (SI) (the Modernized Metric System).  

ASTM D1452 - 09 

Standard Practice for Soil Exploration and Sampling by 
Auger Borings.  

ASTM D2113 - 08 

Standard Practice for Rock Core Drilling and Sampling 
of Rock for Site Investigation.  

ASTM D4647 / 

D4647M - 13 

Standard Test Methods for Identification and 
Classification of Dispersive Clay Soils by the Pinhole 
Test 

ASTM D4542 - 07 

Standard Test Method for Pore Water Extraction and 
Determination of the Soluble Salt Content of Soils by 
Refractometer.  

ASTM D2974 - 07a 

Standard Test Methods for Moisture, Ash, and Organic 
Matter of Peat and Other Organic Soils.  

ASTM D5333-03 

Standard Test Method for Measurement of Collapse 
Potential of Soils (Withdrawn 2012). 

AASHTO M 145 

Standard Specification for Classification of Soils and 
Soil-Aggregate Mixtures for Highway Construction 
Purposes.  

ASTM D5731 - 08 

Standard Test Method for Determination of the Point 
Load Strength Index of Rock and Application to Rock 
Strength Classifications.  

AASHTO T 176 

Standard Method of Test for Plastic Fines in Graded 
Aggregates and Soils by Use of the Sand Equivalent 
Test. 

AASHTO T 96 

Standard Method of Test for Resistance to Degradation 
of Small-Size Coarse Aggregate by Abrasion and 
Impact in the Los Angeles Machine.  

AASHTO T 27 

Sieve Analysis of Fine and Coarse Aggregate. 

 

E

ARTHWORKS

 

 

 

AASHTO 

Designation 

ASTM Designation 

Title 

AASHTO T 11 

 

Standard Method of Test for Materials Finer Than 75-
µm (No. 200) Sieve in Mineral Aggregates by Washing.  

AASHTO M 288 

 

Standard Specification for Geotextile Specification for 
Highway Applications.  

 

ASTM D5261 - 10 

Standard Test Method for Measuring Mass per Unit 
Area of Geotextiles. 

 

ASTM D4632 - 08 

Standard Test Method for Grab Breaking Load and 
Elongation of Geotextiles.  

 

ASTM D6241 - 

04(2009) 

Standard Test Method for the Static Puncture Strength 
of Geotextiles and Geotextile-Related Products Using a 
50-mm Probe.  

 

ASTM D4533 - 11 

Standard Test Method for Trapezoid Tearing Strength 
of Geotextiles.  

 

ASTM D4355 - 07 

Standard Test Method for Deterioration of Geotextiles 
by Exposure to Light, Moisture and Heat in a Xenon 
Arc Type Apparatus. 

 

ASTM D4751 - 04 

Standard Test Method for Determining Apparent 
Opening Size of a Geotextile.  

 

ASTM D4491 - 

99a(2009) 

Standard Test Methods for Water Permeability of 
Geotextiles by Permittivity. 

 

ASTM D5199 - 12 

Standard Test Method for Measuring the Nominal 
Thickness of Geosynthetics. 

AASHTO T 180 

 

Standard Method of Test for Moisture-Density 
Relations of Soils Using a 4.54-kg (10-lb) Rammer and 
a 457-mm (18-in.) Drop.  

AASHTO T 99 

 

Standard Method of Test for Moisture-Density 
Relations of Soils Using a 2.5-kg (5.5-lb) Rammer and 
a 305-mm (12-in.) Drop. 

AASHTO T238 

 

Standard Method of Test for Density of Soil and Soil-
Aggregate In-Place by Nuclear Methods (Shallow 
Depth). 

AASHTO T239 

 

Standard Method of Test for Moisture Content of Soil 
and Soil-Aggregate In-Place by Nuclear Methods 
(Shallow Depth). 

AASHTO T 2 

 

Standard Method of Test for Sampling of Aggregates. 

AASHTO T86 

 

Investigations and Sampling Soils and Rock for 
Engineering Purposes.  

AASHTO T 87 

 

Standard Method of Test for Dry Preparation of 
Disturbed Soil and Soil Aggregate Samples for Test.  

AASHTO T 88 

 

Standard Method of Test for Particle Size Analysis of 
Soils.  

AASHTO T 89 

 

Standard Method of Test for Determining the Liquid 
Limit of Soils.  

 

2. 

Contractor  must  also  provide  sufficient  backup  equipment  (including  pumps)  in  order  to
sustain the dewatering systems at all times 

3. 

Water from other construction activities shall be prevented from entering an excavation by
suitable means. 

4. 

All water must be removed in a manner to avoid damage to property and minimise nuisance
or menace to the public 

5. 

Contractor  shall  be  responsible  for  any  structures  subjected  to  hydrostatic  pressure  from
ground water during construction 

6. 

In  general,    all  dewatering  shall  be  performed  by  well-point  systems,  unless  otherwise
approved by the Engineer 

7. 

Contractor shall ensure that the static water level will be drawn down to a depth sufficient to
keep the bottom of the excavation dry (at least 300 mm below formation level) 

8. 

No excavation shall be allowed in wet conditions and no pipelaying or concrete activities shall
commence  until  the  Contractor  demonstrates  that  he  can  maintain  the  excavations  in  dry 
conditions, acceptable to the Engineer 

9. 

Contractor must maintain dewatering at all times during construction so that no groundwater
comes into contact with any reinforcement or unprotected concrete surfaces 

10. 

All dewatering discharge shall have suitable sediment traps, filters or settling tanks to avoid
discharge of any sands and sediments where discharging to an existing storm drain, ditch or 
area that has been declared a sensitive or protected area by the environmental agency or 
the Engineer  

11. 

Failure to comply with the above shall entitle the Engineer to condemn the section of work
affected and demand complete removal and replacement, at the 

Contractor’s expense. 

b.  Qualified Personnel

Contractor must provide experienced, qualified personnel to perform the dewatering operations 

If approved by the Engineer, the Contractor may furnish the services of an experienced, qualified 
and  properly  equipped  dewatering  Subcontractor  to  design  and  operate  the  dewatering  and 
groundwater recharging systems required for the work. 

c.  Monitoring

Where  required  to  do  so  by  the  Engineer,  the  Contractor  shall  establish  a  specified  number  of 
groundwater level monitoring stations at each site, which will be observed during the work.  These 
shall be located as directed by the Engineer and consist of acceptable open tube piezometers 

If required by the Engineer, settlement gauges shall be provided as designated by the Engineer, to 
monitor settlement existing structures and facilities 

d.  Construction Requirements

1. 

Well  point  systems:    All  well-point  systems  shall  conform  to  the  following  requirements,
unless otherwise approved by the Engineer: 

a.  Well-point  system  shall  be  placed  on  both  sides  of  a  trench  or  completely  around

isolated excavations 

b.  Maximum allowable drawdown for a single stage system shall be 4.0 meters

c.  Multi-stage well-point systems shall be used for excavations requiring a draw-down

of more than 4 meters 

d.  Well-points at all levels of multi-stage systems shall be installed on both sides of a

trench or completely around isolated excavations 

e.  Maximum spacing of well-points shall be 1.0 m

 

f.  Well-points shall be placed by jetting methods

g.  If necessary, auger boring shall be used in hard soils

h.  Well-points set in bored holes shall be backfilled with coarse sand

i.  All well-

points shall have a suitable valve for “trimming” the system to obtain maximum

draw-down 

j.  Vacuum assisted pumps of suitable size and quantity shall be used to maintain the

system 

2. 

Sump  pumping:    Sump  pumps  may  not  be  used,  unless  approved  by  the  Engineer.  If
approved, sump pumping shall comply with the following requirements: 

a.  At least two sumps shall be placed in each excavation (preferably in opposite corners)

b.  For long trenches, sumps shall be placed on each side of the trench

c.  Each sump shall be provided with a separate pump, suction hose and discharge line

d.  Sumps  shall  be  large  enough  to  hold  sufficient  water  for  priming,  pumping  and

maintaining the excavation floor in a relatively dry condition 

e.  All sumps shall be fitted with a suitably sized cage for graded filter material

f.  Drains leading to the sump must be so arranged as to allow drainage of the entire

excavation  and  given  sufficient  fall  to  prevent  silting  up,  unless  steps  are  taken  to 
keep them cleared out 

g.  Ditches  shall  be  sufficiently  wide  to  allow  a  water  velocity  low  enough  to  prevent

erosion 

h.  Maximum  water  service  elevation  in  the  sump  shall  be  at  least  300mm  below

formation level 

i.  Maximum draw down shall be 5-6 m

j.  For greater draw downs, use pumps at lower levels or use suspended submersible

pumps 

k.  If  excavation  faces  become  unstable,  the  sump  shall  be  abandoned  and  other

methods of dewatering shall be utilized 

e.  Maintenance of Existing Water Table Level

Dewatering  systems  shall  be  installed  and  operated  so  that  the  groundwater  level  outside  the 
excavation  is  not  reduced  to  the  extent  that  would  damage  or  endanger  adjacent  structures  or 
property. 

If necessary, a water injection recharging system shall be maintained to replenish the groundwater 
supply as required to maintain the water table, including pumps, piping, well-points, standby units, 
other required equipment and a source of water sufficient to meet the recharge requirements, should 
supply of water from dewatering operations be interrupted or become inadequate. 

Contractor shall repair all damage or settlement to foundations, structures, existing facilities, or works 
due to failure of excavation protection, operations of dewatering or recharging system, or failure to 
maintain the existing ground water outside the dewatering area.  

Contractor shall check discharge pipes at regular  intervals, to ensure that the pumping system is 
functioning properly. 

f.  Disposal of Water

Water not injected back into the ground shall be disposed of lawfully without damage to new and 