Beads, lath, and accessories shall be properly fixed and accurately located before applying plaster. 
Any which are rusted, improperly set, or otherwise defective shall be replaced prior to plaster work. 

Additional specifications, as shown in Table 7-44, shall be referenced as applicable to the plaster 
work at hand 

Table 7-44: Reference specifications for plaster works 

Description 

Specification 

Waterproof building papers 

BS EN 1521 

Code of practice for external rendering 

BS EN 13914-1 

Code of practice for internal plastering 

PD CEN/TR 15123 

BS EN 13914-2 

BS 8481 

Specification for hydrated lime for masonry 

ASTM C207 

Test  methods  for  preconstruction  and 
construction evaluation of  mortars for plain 
and reinforced unit masonry 

ASTM C780 

Contractor shall sequence plaster application with installation and protection of other work so that 
neither will be damaged by installation of other. 

Plaster bases and substrates to receive direct application of plaster shall be cleaned and any loose 
material or substances that may impair the work removed. Projections and concrete fins shall be cut 
flush  to  the  surface.  Efflorescence,  laitance,  dirt  and  other  loose  material  shall  be  removed  by 
thoroughly dry brushing. All traces of mould oil, paint, grease, dirt and other materials incompatible 
with coating shall be removed by scrubbing with water containing detergent  and washing off with 
plenty of clean water. 

Ferrous surfaces shall be treated with rust-inhibitive paint where plaster will be in direct contact. 

Concrete surfaces shall be roughened thoroughly and evenly to a depth of 3 mm by sand blasting, 
bush  hammering,  or  abrasive  blasting.  Surfaces  shall  be  cleaned  by  washing  and  brushing. 
Roughened, or hacked, concrete masonry backgrounds shall be wetted immediately before applying 
coatings. 

Plaster  materials,  composition,  and  mixes  shall  be  applied  in  accordance  with  ASTM  C926. 
Excessive water shall not be used to mix and apply plaster materials. 

Plaster  shall  be  installed  with  a  finished  surface  to  a  true  plane  to  correct  line  and  level,  with  all 
angles and corners to a right angle unless otherwise specified and with walls and reveals plumb and 
square. Deviations from a plane surface shall be not more than ±3 mm in 3 m from a true plane in 
finished plaster surfaces, as measured by a 3-m straightedge placed at any location on surface.  

Plaster shall be installed flush with metal frames and other built-in metal items or accessories that 
act as a plaster ground, unless otherwise indicated. Where interior plaster is not terminated at metal 
frame by casing beads, the Contractor shall cut base coat free from metal frame before plaster sets 
and groove finish coat at junctures with metal. 

Internal  corners  and  angles  shall  be  square.  External  corners  shall  be  finished  flush  with  corner 
beads on interior work, square and true with plaster faces on exterior work. 

Curved surfaces, splayed surfaces and other irregular surfaces shall be true to profile and checked 
with accurate metal forms and templates. 

At frames, the Contractor shall bring plaster out flush with wood and metal frames and grounds and 
finish each coat with a small, neat V joint where plaster finishes against frames. 

At  vertical  surfaces,  plaster  shall  extend  full  height  from  floor  to  100  mm  above  the  soffit  of 
ceiling/structural soffit, unless otherwise indicated. 

On a suspended ceiling, plaster shall be finished flush with system bead or angle, or 75 mm above 
ceiling soffit where there is a perimeter bead or angle. 

Plaster bases and finish coats shall be moist-cured by the Contractor to comply with ASTM C926. 

Scratch coats shall be applied with sufficient force and cement slurry (1:1) to form a good key, and 
shall be cured for 3 days. 

Brown coat shall be applied and then the Contractor shall scratch the surface, cure for 3 days, and 
allow  to  dry  for  at  least  24  hours.  Contractor  shall  adjust  suction  by  wetting  immediately  before 
applying finish coat. 

Finish coats and finishes shall be applied with a steel trowel to a smooth, hard finish. Curing shall 
consist of a light fog spray of water for 4 days, commencing 12 hours after completion of application. 
Contractor shall protect against rapid drying until thoroughly cured. Final coats shall be left to dry for 
30 days after the curing period and before proceeding with paint application. 

Render plaster finishes shall be applied in accordance with the manufacturer’s recommendations. 

Defective  or  damaged  plaster  shall  be  corrected  by  the  Contractor  before  starting  decoration. 
Defective work may be cut or raked out, and the Contractor shall moisten backgrounds and fill with 
finish coat mixes and finish to match adjacent work.  Contractor shall repair, point, cut, and patch 
plaster  around  work  abutting,  setting  into,  or  extending  into  plastered  surfaces,  on  completion  of 
such work. Exposed block-work to receive paint finish shall be applied with cement mortar slurry and 
rubbed over block-work to fill joints. 

Contractor  shall  cut,  patch,  replace,  repair,  and  point  up  plaster,  as  necessary,  to  accommodate 
other work. Cracks and indented surfaces shall be repaired and the Contractor shall point-up finish 
plaster surfaces around items that are built into or penetrate plaster surfaces. Contractor shall repair 
or  replace  work  to  eliminate  blisters,  buckles,  check  cracking,  dry  outs,  efflorescence,  excessive 
pinholes, and as necessary to comply with required visual effects. 

Temporary covering and other provisions made to minimise spattering of plaster on other work shall 
be removed when plaster work is complete. Plaster shall be removed promptly from door frames, 
windows, and other surfaces not to be plastered. Surfaces stained, marred, or otherwise damaged 
during plastering work shall be repaired. When plastering work is completed, the  Contractor shall 
remove unused materials, containers, equipment, and plaster debris.  

Final protection shall be provided by the Contractor and conditions shall be maintained in a manner 
acceptable  to  manufacturer  and  installer  and  that  ensure  plaster  work  is  without  damage  or 
deterioration at the time of substantial completion. 

7.8.3 Integral Colour Plaster 

7.8.3.1 

Description 

This work includes the following: 

1.  Interior portland cement plasterwork on solid-plaster bases

2.  Exterior portland cement plasterwork on solid plaster bases

3.  Plaster ceilings

7.8.3.2 

General 

Contractor shall submit the following to the Engineer for approval: 

  Product data for each type of product indicated

  Shop  drawings  showing  locations  and  installation  of  control  and  expansion  joints,  including

drawings, elevations, sections, details of components, and attachments to other work 

  Samples for initial selection for each type of factory-prepared finish coat indicated

  Samples  for  verification  for  each  type  of  factory-prepared  coloured  textured  finish  coat

indicated. Samples shall measure 300 mm by 300 mm and be prepared on rigid backing 

For  portland  cement  plaster  assemblies  with  fire-resistance  ratings,  the  Contractor  shall  provide 
materials and construction identical to those tested in assembly indicated according to ASTM E119 
by the independent testing laboratory. 

Before plastering, the Contractor shall install test panels measuring at least 9 m

2

 in surface area to 

demonstrate  aesthetic  effects  and  set  quality  standards  for  materials  and  execution.  These  test 
panels shall include the following: 

  Install mock-ups for each type of finish indicated

  For interior plasterwork, simulate finished lighting conditions for review of mock-ups

  Incorporate approved test panels into the completed work if undisturbed at time of substantial

completion. A preinstallation conference shall be held by the Contractor at the worksite 

a.  Materials

Materials shall be stored by the Contractor inside or under cover and shall be kept dry and protected 
against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic, 
and other causes. 

Contractor  shall  comply  with  ASTM  C1063  and  coordinate  depth  of  trim  and  accessories  with 
thicknesses and number of plaster coats required. Accessories and miscellaneous materials shall 
meet the requirements of Table 7-45.  

Table 7-45: Requirements for accessories for integral colour plaster 

Material or accessory 

Requirement 

Galvanized accessories: 

Foundation weep screed 

Fabricated from hot-dipped galvanized steel sheet, 
ASTM A653M, Z180 zinc coating 

Cornerite 

Fabricated from metal lath with ASTM A653M, 
Z180, hot-dipped galvanized zinc coating 

External-corner reinforcement 

Fabricated from metal lath with ASTM A653M, 
Z180, hot-dipped galvanized zinc coating 

Corner-beads 

Small nose corner-bead with expanded 
flanges 

Small nose corner-bead with perforated 
flanges 

Small nose corner-bead with expanded 
flanges 

reinforced 

by 

perforated 

stiffening rib 

Bull nose corner-bead, radius 19.1-mm 
minimum, with expanded flanges 

Fabricated from zinc-coated galvanized steel 

Use unless otherwise indicated 

Use on curved corners 

Use on columns and for finishing masonry corners 

Use at locations indicated on Contract plans 

Casing beads 

Fabricated from zinc-coated galvanized steel 
square-edged style; with expanded flanges 

R

 

4.  Follow submittal procedures for shop drawings

d.  Samples:

1.  Physical examples illustrating materials, equipment, or workmanship

2.  Establish standards by which the work will be judged

e.  Manuals:

1. 

Manufacturer’s written installation, start-up, operating, maintenance and repair instructions

2.  Include parts lists, pictures, sketches and diagrams specific to the equipment supplied to

document the manufacturer’s requirements. 

1.11.2 

Submittal Procedure 

The Contractor shall comply with the following submittal procedures: 

a.  Only  the  Contractor  shall  make  submissions  to  the  Engineer.  All  data  and  correspondence

prepared by subcontractors and suppliers shall be submitted through the Contractor. 

b.  All submittals shall be in English.

c.  Make all corrections and changes to shop drawings and working drawings as required by the

Engineer and resubmit until approved. 

d.  Review submittals returned by the Engineer.

1.  Determine  if  changes  requested  by  the  Engineer  will  result  in  extra  cost  or  will  affect

progress. 

2.  Notify  Engineer  in  writing  within  5  days  of  receiving  submittal  if  the  Contractor  believes

additional costs are incurred, or if progress will be impeded. 

3.  Failure of the Contractor to notify the Engineer of the extra costs or of progress implications

with the work waives the Contractor Claim for compensation. 

e.  The Contractor shall review and approve all shop drawings, working drawings, product data,

samples and manuals required by the Contract documents before submission. 

1.  Review and approval shall be for compliance with the Contract requirements.

2.  Approval  indicates  the  Contractor  has  verified  all  materials,  field  measurements,  field

construction criteria and similar items. 

3.  Approval also indicated the Contractor has co-ordinated information contained in submittal

with work requirements of other trades and with the Contract documents. 

f.  The  Contractor  reviews  and  submission  to  the  Engineer  shall  be  such  as  to  not  delay  the

works. 

g.  The Contractor shall prepare submittals in such a manner that no more than one resubmittal

is necessary to obtain the Engineer

’s approval. If more than one resubmittal is required, the 

Owner  reserves  the  right  to  deduct  the  cost  of  the  Engineer

’s  time  to  review  all  additional 

resubmittals (after the first resubmittal) from moneys due to the Contractor. 

h.  The Contractor shall not deliver materials or equipment to the site and shall not incorporate it

into the work until it has been approved or authorized in writing by the Engineer. 

i.  Submit shop drawings, working drawings, product data and samples in accordance with the

approved  submittal  schedule.  Allow  sufficient  time  for  the  Engineer

’s  review,  approval,  and 

transmittal back to the Contractor. 

j.  The Contractor shall detail items not completely described on the Contract plans in accordance

with standard Engineering practice. 

R

 

1.  Adjust dimensions shown on the Contract plans to reflect actual dimensions of equipment

provided. 

2.  Coordinate  dimensions  shown  on  the  Contract  plans  as  well  as  actual  equipment

dimensions with measurements of existing, adjacent, incorporated, and completed work to 
ensure all components fit into the space available.  

3.  Verify all dimensions before beginning any work depending on such data.

k.  Identify each and every deviation from the Contract documents to the Engineer either on the

shop drawing or in the letter of transmittal. 

1.  Explain reason for deviation

2.  Compare requested deviation with Contract requirement

3.  Explain why deviation is equal to or better than Contract requirement

4.  The  Contractor  shall  not  be  relieved  of  responsibility  for  executing  work  in  complete

conformance with Contract documents for submittals not identifying deviations, even though 
such submittals have been approved 

l.  Miscellaneous structural items such as catwalks, pipe supports, equipment supports, grating

supports,  etc.  shall  be  detailed  by  the  Contractor  once  associate  equipment  has  been 
approved. Such details shall be certified by a registered and qualified field Engineer. Submittal 
shall include all applicable calculations. 

m. Submit  shop  drawings,  working  drawings,  product  data  and  samples  for  related  equipment

items  and  integrated  system  components  at  the  same  time.  Partial  submissions  may  be 
returned to the Contractor without review. 

n.  The  Contractor  shall  direct  Engineer

’s  attention  either  in  writing  or  on  the  resubmitted

documents to each and every revision other than those requested by the Engineer on previous 
submittals. 

o.  Do not perform any work until shop drawings have been submitted to and approved by the

Engineer. Shop drawings are not to be prepared after work has started or is complete. 

p.  All  submittals  from  the  Contractor  shall  include  a  label  or  stamp  which  indicates  that  the

submittal has been reviewed and approved by the Contractor for conformance to the Contract 
requirements. Labels or stamp shall generally conform to the following: 

1.  SUBMITTAL NO. ______________

2.  PROJECT NO. _________________

3.  CONTRACTOR: ____________________________________

4.  REVIEWED  AND  APPROVED  for  conformance  with  the  Contract  documents

BY: 

_______________________________ 

DATE: 

______________ 

Signature of the Contractor 

5.  References:

i. 

CONTRACT PLANS NOS._______________________________________

ii. 

SPECIFICATION NOS. __________________________________

6.  A 10 character submittal identification and numbering system shall be used.

i. 

First character shall be either “D”, “S”, or “M” representing shop or working drawing
(D), sample (S), and operation/maintenance manual (M). 

ii. 

Next five digits shall be the applicable specification section number.

iii. 

Next three digits shall be the numbers 001 through 999 to sequentially number each
separate package submitted under each specific specification section number. 

 

G

ENERAL 

R

 

 

 

iv. 

Last character shall be the letter “A” through “Z” indicating whether the submittal is 
the first submission (A) or a resubmission (B through Z). 

v. 

An example of a submittal number is D-4.1.3-008-B which indicates: 

a)  D - Shop Drawing 

b)  4.1.3 - Specification for concrete 

c)  008 - Eighth separate submittal under this section. 

d)  B - Second submission (first resubmittal) of that particular information.  

q.  Engineer

’s review: 

1.  Engineer

’s review is for general conformance with the Contract requirements only; all work 

is still subject to the detailed requirements of the Contract documents.  

2.  Engineer

’s review is to help the Contractor by discovering errors and omissions.  

3.  Engineer

’s review does not relieve the Contractor of the obligation and responsibility to co-

ordinate and plan the details of the works and fulfil the intent and purpose of the Contract. 

4.  Engineer

’s review shall not relieve the Contractor of the responsibility for accuracy, proper 

fit, or proper functioning and performance of the work. 

r.  Engineer  reserves  the  right  to  require  written  confirmation  from  the  Contractor  that  the 

comment

s placed on submittals stamped “Approved as Noted” will actually be implemented.  

s.  Engineer  will  make  every  reasonable  effort  to  process  and  return  each  submittal  within  14 

calendar days after its receipt in the Engineer

’s office. If additional time is needed, the Engineer 

will advise the Contractor in writing before the 14 day period has elapsed.  

1.  Large or multiple submittals may require additional time. 

2.  The Contractor may prioritize submittals and  Engineer will review and return them in the 

order of the highest priority.  

3.  If  requested  by  the  Contractor,  individual  drawings  from  large  submittals  with  numerous 

drawings may be returned as they are reviewed rather than waiting for the entire review to 
be completed.  

4.  Need for resubmissions or delays in obtaining the Engineer

’s review or approval shall not 

entitle the Contractor to a time extension for Contract completion. 

t.  Categories used by the Engineer to evaluate submittals are defined below: 

1.  Approved:  

i. 

No discrepancies have been identified 

ii. 

Approved As Noted 

iii. 

Submittal is acceptable subject to incorporation of the comments listed 

2.  Not approved (disapproved) 

i. 

Submittal is unacceptable for the reasons cited 

ii. 

Item Incorrect:  

a)  Submittal is being returned without review 

b)  Insufficient information has been provided or the submittal does not comply with 

the Contract requirements 

3.  Comments noted:  

i. 

Submittal is not required by the Contract documents 

ii. 

Engineer will include it in the project files for information only 

R

 

4.  Revise and resubmit:

i. 

Submittal must be revised, corrected and resubmitted to the Engineer.

5.  Approval not required: Submittal to the Engineer for the item concerned is not a requirement

of the Contract. 

6.  Submit specified Item:

i. 

Engineer

’s initial review indicates the item or detail submitted is not the specified item;

therefore further review is aborted. 

u.  Incomplete submittals including those not correctly transmitted, incorrectly titled and identified,

or not bearing the Contractor

’s review and approval stamp may be returned to the Contractor 

without review. 

v.  Minimum copies for Engineer

’s review:

1.  One  (1)  reproducible  copies  plus  three  (3)  photocopies  or  blue  line  prints  for  each  shop

drawing in A3, A1 or A0 size format as appropriate. 

2.  Three (3) copies of all product data and manuals.

3.  Engineer will return one (1) reproducible and one photocopy or blue line print of each shop

drawing and one (1) copies of product data or manuals to the Contractor. 

w. Engineer may require additional copies of all submittals by notifying the Contractor in writing

and such additional copies will be at no extra cost. 

1.11.3 

Product Data Submittals 

The Contractor shall comply with the following requirements when submitting product data: 

1.  Shall be explicit with regard to details of the actual products being furnished

2.  Provide sufficient information to for the Engineer

’s approval to determine that the products

submitted conform to the specification requirements including, but not limited to, recent third 
party test reports. 

3.  Submittals with more than one style, size, capacity, etc. of a product on a page shall clearly

indicate which product type is being submitted for approval. Failure to do this shall be cause 
for disapproval 

4.  Present information on A4 size paper whenever possible

5.  Include the name of the product manufacturer on all catalogue data

1.11.4 

Shop Drawing Submittals 

The Contractor shall comply with the following requirements when submitting shop drawings: 

a.  Provide detailed drawings and written descriptions of both the assembly and all components

b.  Drawings shall indicate proposed installation of work as well as materials and equipment being

furnished 

c.  Information shown on shop drawings shall be complete and sufficient for Engineer to review

for  compliance  with  Contract  requirements.  Information  shall  include  but  not  necessarily  be 
limited to the following:  

1.  Layout dimensions and component sizes including bases, foundations, anchors, and similar

items 

2.  Design criteria

3.  Materials of construction

4.  Component and assembly weights

 

 

 

 

 

 

 