Главная Manuals FM 3-04.303 AIR TRAFFIC SERVICES FACILITY OPERATIONS, TRAINING, MAINTENANCE, AND STANDARDIZATION (DECEMBER 2003)
|
|
|
PHASE 1 - QUALIFICATION (Continued)
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
DA FORM 3479-13-R,, JUN 2003
Page 3 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Initial weather Certification (USAF)
2.
FTM Chapters 2-4
3.
FAAO 7110.65 Chapters 2-4
4.
AR 95-2 Chapters 2-5 & Current AIG Messages
5.
AR 40-8 and AR 40-501 Chapter 6
6.
Recognize and Implement ECM and ECCM
7.
Perform Assumption of Duty Requirements
8.
Flips, Charts, VFR and IFR Supplements
9.
Flight Data Procedures
10.
FTM Chapters 5-8
11.
A²C² (Facility and Mission Specific)
12.
Process Flight Progress Strips
13.
FTM Chapters 9 and 12
14.
FM 3-04.303 Chapters 1-3
15.
FM 3-04.303 Chapters 4, 5, and 7
16.
Flight Data Position Qualification
17.
Flight Following Procedures
18.
Request, Record and Disseminate PIREPS
19.
FAAO 7110.65 Chapters 7 and 10
20.
Provide Traffic Advisories
21.
Flight Following Position Qualification
22.
Pre-ATCS Exam
23.
FTM Chapter 13
24.
Provide Emergency Assistance
25.
26.
DA FORM 3479-13-R, JUN 2003
Page 4 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING (Continued)
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered into Section III of DA Form 3479-R.
NOTE 2: The ATCS Examination is required, but it is not annotated in section III as trained.
DA FORM 3479-13-R, JUN 2003
Page 5 of 8
USAPA V1.00
PHASE 1 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
FTM Chapter 1
2.
Operate/PMCS primary mover
3.
Operate/PMCS (primary power system)
Install/Operate/PMCS AN/TSC-61B (Includes all equipment and
4.
Sighting Requirements)
5.
Disassembly/Storage of AN/TSC-61B
6.
Install/Operate/PMCS AN/TRN-30(v)2 Beacon
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-13-R, JUN 2003
Page 6 of 8
USAPA V1.00
PHASE 2 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification (USAF)
2.
FTM Chapters 2-4
3.
FAAO 7110.65 Chapters 2-4
4.
AR 95-2 Chapters 2-5
5.
AR 40-8 and AR 40-501
6.
Flips, Charts, VFR and IFR Supplements
7.
FTM Chapters 5-8
8.
FTM Chapters 9 and 12
9.
FM 3-04.303 Chapters 1-3
10.
FM 3-04.303 Chapters 4, 5, and 7
11.
Flight Data Position Qualification
12.
FAAO 7110.65 Chapters 7 and 10
13.
Flight Following Position Qualification
14.
A²C² (Facility and Mission Specific)
15.
Pre-ATCS Exam
16.
ATCS Exam
17.
FTM Chapter 13
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-13-R, JUN 2003
Page 7 of 8
USAPA V1.00
ADDITIONAL ENTRIES
RECOMMENDED
TEST/TASK
DATE COMPLETED
COMPLETION DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered in Section III of DA Form 3479-R.
NOTE 2: Example comments required in Remarks column:
a. Type test given: test without remarks shall be understood as written.
(1) Written, (2) Oral, (3) Practical.
b. Agency administering exam:
(1) Motor Sergeant/Master Driver (Vehicle Licensing), (2) USAF (Weather Exam)
DA FORM 3479-13-R, JUN 2003
Page 8 of 8
USAPA V1.00
TACTICAL FACILITY TRAINING PROGRAM (FTP)
AN/TSQ-221 TACTICAL AIRSPACE INTEGRATION SYSTEM (TAIS)
For use of this form, see FM 3-04.303 the proponent agency is TRADOC.
1. NAME
2. RANK
3. OPERATING INITIALS
4. ATCS NUMBER
5. SECURITY CLEARANCE
6. FLIGHT PHYSICAL DUE
7. DATE ASSIGNED TO UNIT
8. TRAINING START DATE
9. PHASE I COMPLETE
10. PHASE 2 COMPLETE
11. This is a standardized tactical qualification and rating checklist that will be used to follow the
progress of a controller through the training program. All applicable items shall be entered in sections III
and IV of DA Form 3479-R.
12. REFERENCES:
Applicable SOP's
Appropriate Equipment TM's
AR 40-8/AR 40-501/AR 95-2
ARTEP 1-425-MTP
FAAO 7110.65
FAAO 8200.1
FAAO 8260.3
Flips, Charts and IFR/VFR Supplements
FM 1-120 (3-04.120)
FM 3-04.303
FM 3-52
FTM
13. The training program consists of two phases: Phase 1 - Qualification, and Phase 2 - Position Training
and Rating.
a. Phase 1 consists of individual and team training on the installation, operation and maintenance
of all ATS equipment assigned to the Tactical Airspace Integration System (TAIS). The training program is
designed to ensure Phase 1 training is completed within 3 months (Army National Guard 2 AT's) of being
assigned to the training program. However, as soon as a controller demonstrates proficiency in all
applicable areas, phase completion may be achieved at an earlier date.
b. Phase 2 is dependent upon actual mission and the controller's ability to control "LIVE" traffic in
a tactical environment. Phase 2 has no set time limit.
14. REMEDIAL TRAINING: Upon completion of phase training or rating, should an individual fail to
maintain the required proficiency level, he/she will be placed on Remedial Training. If unable to
successfully complete the Remedial Training in time allowed, reclassification actions will be taken.
15. CONTROLLER'S SIGNATURE
16. FACILITY CHIEF'S SIGNATURE
Page 1 of 8
DA FORM 3479-14-R, JUN 2003
USAPA V1.00
PHASE 1 - QUALIFICATION
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Intro to AN/TSQ-221
2.
FTM Chapter 1
3.
Operate/PMCS Primary Mover
4.
Operate/PMCS primary power system
5.
Install/Operate/PMCS AN/TSQ-221
6.
AN/TSQ-221 Emergency shutdown
7.
Disassembly/Storage of AN/TSQ-221
8.
Install Antenna Farm
9.
Install/Operate/PMCS AN/TRN-30(v)2 Beacon or equivalent
10.
Operate COMSEC Equipment
11.
Operate GPS
12.
Operate Software
13.
Operate/PMCS Radios
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-14-R, JUN 2003
Page 2 of 8
USAPA V1.00
PHASE 1 - QUALIFICATION (Continued)
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
DA FORM 3479-14-R, JUN 2003
Page 3 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Initial weather Certification (USAF)
2.
Introduction to Airspace Control Order
3.
Introduction to FM 3-52
4.
FTM Chapters 2-4
5.
FAAO 7110.65 Chapters 2-4
6.
AR 95-2 Chapters 2-5 & Current AIG Messages
7.
AR 40-8 and AR 40-501 Chapter 6
8.
Recognize and Implement ECM and ECCM
9.
Perform Assumption of Duty Requirements
10.
Flips, Charts, VFR and IFR Supplements
11.
Flight Data Procedures
12.
FTM Chapters 5-8
13.
A²C² (Facility and Mission Specific)
14.
Process Flight Progress Strips
15.
FTM Chapters 9 and 12
16.
FM 3-04.303 Chapters 1-3
17.
FM 3-04.303 Chapters 4, 5, and 7
18.
Flight Data Position Qualification
19.
Flight Following Procedures
20.
Request, Record and Disseminate PIREPS
21.
FAAO 7110.65 Chapters 7 and 10
22.
Provide Emergency Assistance
23.
Provide Traffic Advisories
24.
Flight Following Position Qualification
25.
Pre-ATCS Exam
26.
FTM Chapter 13
DA FORM 3479-14-R, JUN 2003
Page 4 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING (Continued)
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered into Section III of DA Form 3479-R.
NOTE 2: The ATCS Examination is required, but it is not annotated in section III as trained.
DA FORM 3479-14-R, JUN 2003
Page 5 of 8
USAPA V1.00
PHASE 1 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
FTM Chapter 1
2.
Operate/PMCS primary mover
3.
Operate/PMCS (primary power system)
Install/Operate/PMCS AN/TSQ-221 (Includes all equipment training
4.
and Sighting Requirements)
5.
Disassembly/Storage of AN/TSQ-221
6.
Install/Operate/PMCS AN/TRN-30(v)2 Beacon
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-14-R, JUN 2003
Page 6 of 8
USAPA V1.00
PHASE 2 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification (USAF)
2.
FTM Chapters 2-4
3.
FAAO 7110.65 Chapters 2-4
4.
AR 95-2 Chapters 2-5
5.
AR 40-8 and AR 40-501
6.
Flips, Charts, VFR and IFR Supplements
7.
FTM Chapters 5-8
8.
FTM Chapters 9 and 12
9.
FM 3-04.303 Chapters 1-3
10.
FM 3-04.303 Chapters 4, 5, and 7
11.
Flight Data Position Qualification
12.
FAAO 7110.65 Chapters 7 and 10
13.
Flight Following Position Qualification
14.
Pre-ATCS Exam
15.
ATCS Exam
16.
FTM Chapter 13
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-14-R, JUN 2003
Page 7 of 8
USAPA V1.00
ADDITIONAL ENTRIES
RECOMMENDED
TEST/TASK
DATE COMPLETED
COMPLETION DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered in Section III of DA Form 3479-R.
NOTE 2: Example comments required in Remarks column:
a. Type test given: test without remarks shall be understood as written.
(1) Written, (2) Oral, (3) Practical.
b. Agency administering exam:
(1) Motor Sergeant/Master Driver (Vehicle Licensing), (2) USAF (Weather Exam)
DA FORM 3479-14-R, JUN 2003
Page 8 of 8
USAPA V1.00
TACTICAL FACILITY TRAINING PROGRAM (FTP)
AN/TSW-7A AIR TRAFFIC CONTROL CENTRAL
For use of this form, see FM 3-04.303 the proponent agency is TRADOC.
1. NAME
2. RANK
3. OPERATING INITIALS
4. ATCS NUMBER
5. SECURITY CLEARANCE
6. FLIGHT PHYSICAL DUE
7. DATE ASSIGNED TO UNIT
8. TRAINING START DATE
9. PHASE I COMPLETE
10. PHASE 2 COMPLETE
11. This is a standardized tactical qualification and rating checklist that will be used to follow the
progress of a controller through the training program. All applicable items shall be entered in sections III
and IV of DA Form 3479-R.
12. REFERENCES:
Applicable SOP's
Appropriate Equipment TM's
AR 40-8/AR 40-501/AR 95-2
ARTEP 1-425-MTP
FAAO 7110.65
FAAO 8200.1
FAAO 8260.3
Flips, Charts and IFR/VFR Supplements
FM 1-120 (3-04.120)
FM 3-04.303
FM 3-52
FTM
13. The training program consists of two phases: Phase 1 - Qualification, and Phase 2 - Position Training
and Rating.
a. Phase 1 consists of individual and team training on the installation, operation and maintenance
of all ATS equipment assigned to the Tactical Tower Section. The training program is designed to ensure
Phase 1 training is completed within 3 months (Army National Guard 2 AT's) of being assigned to the
training program. However, as soon as a controller demonstrates proficiency in all applicable areas, phase
completion may be achieved at an earlier date.
b. Phase 2 is dependent upon actual mission and the controller's ability to control "LIVE" traffic in
a tactical environment. Phase 2 has no set time limit.
14. REMEDIAL TRAINING: Upon completion of phase training or rating, should an individual fail to
maintain the required proficiency level, he/she will be placed on Remedial Training. If unable to
successfully complete the Remedial Training in time allowed, reclassification actions will be taken.
15. CONTROLLER'S SIGNATURE
16. FACILITY CHIEF'S SIGNATURE
Page 1 of 8
DA FORM 3479-15-R, JUN 2003
USAPA V1.00
PHASE 1 - QUALIFICATION
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Intro to AN/TSW-7A
2.
FTM Chapter 1
3.
Operate/PMCS Primary Mover
4.
Operate/PMCS primary power system
5.
Install/Operate/PMCS AN/TSW-7A
6.
Disassembly/Storage of AN/TSW-7A
7.
Install/Operate/PMCS ECUs
Install/Operate/PMCS AN/TRN-30(v)1 Beacon (Remarks: 15' & 30'
8.
Modes)
9.
Operate COMSEC Equipment
10.
Operate GPS
11.
Operate/Maintain NVD
12.
Install Landing "Y" / NATO "T"
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-15-R, JUN 2003
Page 2 of 8
USAPA V1.00
PHASE 1 - QUALIFICATION (Continued)
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
DA FORM 3479-15-R, JUN 2003
Page 3 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Initial weather Certification (USAF)
2.
Intro to Development of TAPS for NDB
3.
FTM Chapters 2-4
4.
FAAO 7110.65 Chapters 2-4
5.
AR 95-2 Chapters 2-5 & Current AIG Messages
6.
AR 40-8 and AR 40-501 Chapter 6
7.
Recognize and Implement ECM & ECCM
8.
Perform Assumption of Duty Requirements
9.
Flips, Charts, VFR and IFR Supplements
10.
Flight Data Procedures
11.
FTM Chapters 5-8
12.
A²C² (Facility and Mission Specific)
13.
Process Flight Progress Strips
14.
FTM Chapters 9 and 12
15.
FM 3-04.303 Chapters 1-3
16.
FM 3-04.303 Chapters 4, 5, and 7
17.
Flight Data Position Qualification
18.
Ground Control Procedures
19.
FAAO 7110.65 Chapters 7 and 10
20.
Provide Emergency Assistance
21.
Light Gun Procedures
22.
Ground Control Position Qualification
23.
Local Control Procedures
24.
Flight Following Procedures
25.
Local Control Position Qualification
26.
Pre-ATCS Exam
27.
FTM Chapter 13
DA FORM 3479-15-R, JUN 2003
Page 4 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING (Continued)
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered into Section III of DA Form 3479-R.
NOTE 2: The ATCS Examination is required, but it is not annotated in section III as trained.
DA FORM 3479-15-R, JUN 2003
Page 5 of 8
USAPA V1.00
PHASE 1 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
FTM Chapter 1
2.
Operate/PMCS primary mover
3.
Operate/PMCS (primary power system)
Install/Operate/PMCS AN/TSW-7A (Includes all equipment training
4.
and Sighting Requirements)
5.
Disassembly/Storage of AN/TSW-7A
Install/Operate/PMCS AN/TRN-30(v)1 Beacon (Remarks: 15' and 30'
6.
Modes)
Develop Airfield Setup (Includes Determine Landing Direction and
7.
Emplacement of Landing "Y" / NATO "T")
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-15-R, JUN 2003
Page 6 of 8
USAPA V1.00
PHASE 2 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification (USAF)
2.
Development of TAPS for NDB
3.
FTM Chapters 2-4
4.
FAAO 7110.65 Chapters 2-4
5.
AR 95-2 Chapters 2-5
6.
AR 40-8 and AR 40-501 Chapter 6
7.
A²C² (Facility and Mission Specific)
8.
Flips, Charts, VFR and IFR Supplements
9.
FTM Chapters 5-8
10.
FTM Chapters 9 and 12
11.
FM 3-04.303 Chapters 1-3
12.
FM 3-04.303 Chapters 4, 5, and 7
13.
Flight Data Position Qualification
14.
FAAO 7110.65 Chapters 7 and 10
15.
Ground Control Position Qualification
16.
Local Control Position Qualification
17.
Pre-ATCS Exam
18.
ATCS Exam
19.
FTM Chapter 13
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-15-R, JUN 2003
Page 7 of 8
USAPA V1.00
TACTICAL FACILITY TRAINING PROGRAM (FTP)
AN/TSQ-71B LANDING CONTROL CENTRAL
For use of this form, see FM 3-04.303 the proponent agency is TRADOC.
1. NAME
2. RANK
3. OPERATING INITIALS
4. ATCS NUMBER
5. SECURITY CLEARANCE
6. FLIGHT PHYSICAL DUE
7. DATE ASSIGNED TO UNIT
8. TRAINING START DATE
9. PHASE I COMPLETE
10. PHASE 2 COMPLETE
11. This is a standardized tactical qualification and rating checklist that will be used to follow the
progress of a controller through the training program. All applicable items shall be entered in sections III
and IV of DA Form 3479-R.
12. REFERENCES:
Applicable SOP's
Appropriate Equipment TM's
AR 40-8/AR 40-501/AR 95-2
ARTEP 1-425-MTP
FAAO 7110.65
FAAO 8200.1
FAAO 8260.3
Flips, Charts and IFR/VFR Supplements
FM 1-120 (3-04.120)
FM 3-04.303
FM 3-52
FTM
13. The training program consists of two phases: Phase 1 - Qualification, and Phase 2 - Position Training
and Rating.
a. Phase 1 consists of individual and team training on the installation, operation and maintenance
of all ATS equipment assigned to the Tactical Ground Control Approach (GCA). The training program is
designed to ensure Phase 1 training is completed within 3 months (Army National Guard 2 AT's) of being
assigned to the training program. However, as soon as a controller demonstrates proficiency in all
applicable areas, phase completion may be achieved at an earlier date.
b. Phase 2 is dependent upon actual mission and the controller's ability to control "LIVE" traffic in
a tactical environment. Phase 2 has no set time limit.
14. REMEDIAL TRAINING: Upon completion of phase training or rating, should an individual fail to
maintain the required proficiency level, he/she will be placed on Remedial Training. If unable to
successfully complete the Remedial Training in time allowed, reclassification actions will be taken.
15. CONTROLLER'S SIGNATURE
16. FACILITY CHIEF'S SIGNATURE
Page 1 of 8
DA FORM 3479-16-R, JUN 2003
USAPA V1.00
PHASE 1 - QUALIFICATION
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Intro to AN/TSQ-71B
2.
FTM Chapter1
3.
Operate/PMCS Primary Mover
4.
Operate/PMCS primary power system
5.
Install/Operate/PMCS PU-126
6.
Install/Operate/PMCS AN/TSQ-71B
7.
Emergency Shutdown Procedures
8.
Disassembly/Storage of AN/TSQ-71B
9.
Radiation Hazard Briefing
10.
Install/Operate/PMCS AN/TPX-44(IFF)
11.
Disassembly/Storage of AN/TPX-44
12.
Operate COMSEC Equipment
13.
Operate GPS
14.
SIte and Shelter Requirements
Develop Airfield Layout (Includes Reflector Emplacement Methods
15.
Develop Reflector layout Diagram)
16.
Determine Ground Angle
17.
Determine Dial Divisions
18.
Perform ASR/PAR Cursor Alignments
19.
Install/Operate Theodolite
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-16-R, JUN 2003
Page 2 of 8
USAPA V1.00
PHASE 1 - QUALIFICATION (Continued)
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
DA FORM 3479-16-R, JUN 2003
Page 3 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification
2.
Intro to Development of Instrument Approach Procedures (TERPS)
3.
Develop MVA Chart
4.
Recognize and Implement ECM & ECCM
5.
FTM Chapters 2-4
6.
FAAO 7110.65 Chapters 2 and 3
7.
AR 95-2 Chapters 2-5 & Current AIG Messages
8.
R 40-8 and AR 40-501 Chapter 6
9.
A²C² (Facility and Mission Specific)
10.
Flips, Charts, VFR and IFR Supplements
11.
FM 3-04.303 Chapters 1-3
12.
FM 3-04.303 Chapters 4, 5, and 7
13.
Perform Assumption of Duty Requirements
14.
Flight Data Procedures
15.
Provide Emergency Assistance
16.
Flight Check Procedures
17.
FTM Chapters 5-8
18.
Flight Data Position Qualification
19.
FTM Chapters 9 and 12
20.
FAAO 7110.65 Chapters 5
21.
FAAO 7110.65 Chapters 7 and 10
22.
ASR/PAR Procedures
23.
PAR Lower Safety Limits
24.
Operations in Simultaneous Mode
25.
ASR/PAR Position Qualification
26.
Pre-ATCS Exam
27.
FTM Chapter 13
DA FORM 3479-16-R, JUN 2003
Page 4 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING (Continued)
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered into Section III of DA Form 3479-R.
NOTE 2: The ATCS Examination is required, but it is not annotated in section III as trained.
DA FORM 3479-16-R, JUN 2003
Page 5 of 8
USAPA V1.00
PHASE 1 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
FTM Chapter 1
2.
Operate/PMCS primary mover
3.
Operate/PMCS (primary power system)
Install/Operate/PMCS AN/TSQ-71B System (Includes 71B, TPN-18A,
4.
TPX-44 w/power and Site and Shelter Requirements)
5.
Disassembly/Storage of AN/TSQ-71B
Airfield Layout (Includes Reflector Emplacement Methods, Develop
Reflector Layout Diagram, Determine Ground Angle, Determine Dial
6.
Divisions and Install/Operate Theodolite)
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-16-R, JUN 2003
Page 6 of 8
USAPA V1.00
PHASE 2 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification
Intro to TERPS (Includes Develop Instrument Approach Procedures
2.
and Develop MVA Chart)
3.
FTM Chapters 2-4
4.
FAAO 7110.65 Chapters 2 and 3
5.
AR 95-2
6.
AR 40-8 and AR 40-501
7.
Flips, Charts, VFR and IFR Supplements
8.
FM 3-04.303 Chapters 1-3
9.
FM 3-04.303 Chapters 4, 5, and 7
10.
FTM Chapters 5-8
11.
Flight Data Position Qualification Exam
12.
FTM Chapters 9 and 12
13.
FAAO 7110.65 Chapters 5
14.
FAAO 7110.65 Chapters 7 and 10
15.
ASR/PAR Position Qualification
16.
A²C² (Facility and Mission Specific)
17.
Pre-ATCS Exam
18.
ATCS Exam
19.
FTM Chapter 13
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-16-R, JUN 2003
Page 7 of 8
USAPA V1.00
ADDITIONAL ENTRIES
RECOMMENDED
TEST/TASK
DATE COMPLETED
COMPLETION DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered in Section III of DA Form 3479-R.
NOTE 2: Example comments required in Remarks column:
a. Type test given: test without remarks shall be understood as written.
(1) Written, (2) Oral, (3) Practical.
b. Agency administering exam:
(1) Motor Sergeant/Master Driver (Vehicle Licensing), (2) USAF (Weather Exam)
DA FORM 3479-16-R, JUN 2003
Page 8 of 8
USAPA V1.00
ADDITIONAL ENTRIES
RECOMMENDED
TEST/TASK
DATE COMPLETED
COMPLETION DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered in Section III of DA Form 3479-R.
NOTE 2: Example comments required in Remarks column:
a. Type test given: test without remarks shall be understood as written.
(1) Written, (2) Oral, (3) Practical.
b. Agency administering exam:
(1) Motor Sergeant/Master Driver (Vehicle Licensing), (2) USAF (Weather Exam)
DA FORM 3479-15-R, JUN 2003
Page 8 of 8
USAPA V1.00
TACTICAL FACILITY TRAINING PROGRAM (FTP)
AN/TSQ-71B LANDING CONTROL CENTRAL
For use of this form, see FM 3-04.303 the proponent agency is TRADOC.
1. NAME
2. RANK
3. OPERATING INITIALS
4. ATCS NUMBER
5. SECURITY CLEARANCE
6. FLIGHT PHYSICAL DUE
7. DATE ASSIGNED TO UNIT
8. TRAINING START DATE
9. PHASE I COMPLETE
10. PHASE 2 COMPLETE
11. This is a standardized tactical qualification and rating checklist that will be used to follow the
progress of a controller through the training program. All applicable items shall be entered in sections III
and IV of DA Form 3479-R.
12. REFERENCES:
Applicable SOP's
Appropriate Equipment TM's
AR 40-8/AR 40-501/AR 95-2
ARTEP 1-425-MTP
FAAO 7110.65
FAAO 8200.1
FAAO 8260.3
Flips, Charts and IFR/VFR Supplements
FM 1-120 (3-04.120)
FM 3-04.303
FM 3-52
FTM
13. The training program consists of two phases: Phase 1 - Qualification, and Phase 2 - Position Training
and Rating.
a. Phase 1 consists of individual and team training on the installation, operation and maintenance
of all ATS equipment assigned to the Tactical Ground Control Approach (GCA). The training program is
designed to ensure Phase 1 training is completed within 3 months (Army National Guard 2 AT's) of being
assigned to the training program. However, as soon as a controller demonstrates proficiency in all
applicable areas, phase completion may be achieved at an earlier date.
b. Phase 2 is dependent upon actual mission and the controller's ability to control "LIVE" traffic in
a tactical environment. Phase 2 has no set time limit.
14. REMEDIAL TRAINING: Upon completion of phase training or rating, should an individual fail to
maintain the required proficiency level, he/she will be placed on Remedial Training. If unable to
successfully complete the Remedial Training in time allowed, reclassification actions will be taken.
15. CONTROLLER'S SIGNATURE
16. FACILITY CHIEF'S SIGNATURE
Page 1 of 8
DA FORM 3479-16-R, JUN 2003
USAPA V1.00
PHASE 1 - QUALIFICATION
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Intro to AN/TSQ-71B
2.
FTM Chapter1
3.
Operate/PMCS Primary Mover
4.
Operate/PMCS primary power system
5.
Install/Operate/PMCS PU-126
6.
Install/Operate/PMCS AN/TSQ-71B
7.
Emergency Shutdown Procedures
8.
Disassembly/Storage of AN/TSQ-71B
9.
Radiation Hazard Briefing
10.
Install/Operate/PMCS AN/TPX-44(IFF)
11.
Disassembly/Storage of AN/TPX-44
12.
Operate COMSEC Equipment
13.
Operate GPS
14.
SIte and Shelter Requirements
Develop Airfield Layout (Includes Reflector Emplacement Methods
15.
Develop Reflector layout Diagram)
16.
Determine Ground Angle
17.
Determine Dial Divisions
18.
Perform ASR/PAR Cursor Alignments
19.
Install/Operate Theodolite
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-16-R, JUN 2003
Page 2 of 8
USAPA V1.00
PHASE 1 - QUALIFICATION (Continued)
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
DA FORM 3479-16-R, JUN 2003
Page 3 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification
2.
Intro to Development of Instrument Approach Procedures (TERPS)
3.
Develop MVA Chart
4.
Recognize and Implement ECM & ECCM
5.
FTM Chapters 2-4
6.
FAAO 7110.65 Chapters 2 and 3
7.
AR 95-2 Chapters 2-5 & Current AIG Messages
8.
R 40-8 and AR 40-501 Chapter 6
9.
A²C² (Facility and Mission Specific)
10.
Flips, Charts, VFR and IFR Supplements
11.
FM 3-04.303 Chapters 1-3
12.
FM 3-04.303 Chapters 4, 5, and 7
13.
Perform Assumption of Duty Requirements
14.
Flight Data Procedures
15.
Provide Emergency Assistance
16.
Flight Check Procedures
17.
FTM Chapters 5-8
18.
Flight Data Position Qualification
19.
FTM Chapters 9 and 12
20.
FAAO 7110.65 Chapters 5
21.
FAAO 7110.65 Chapters 7 and 10
22.
ASR/PAR Procedures
23.
PAR Lower Safety Limits
24.
Operations in Simultaneous Mode
25.
ASR/PAR Position Qualification
26.
Pre-ATCS Exam
27.
FTM Chapter 13
DA FORM 3479-16-R, JUN 2003
Page 4 of 8
USAPA V1.00
PHASE 2 - POSITION TRAINING AND RATING (Continued)
TRAINING STARTED DATE
PHASE 2 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered into Section III of DA Form 3479-R.
NOTE 2: The ATCS Examination is required, but it is not annotated in section III as trained.
DA FORM 3479-16-R, JUN 2003
Page 5 of 8
USAPA V1.00
PHASE 1 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
FTM Chapter 1
2.
Operate/PMCS primary mover
3.
Operate/PMCS (primary power system)
Install/Operate/PMCS AN/TSQ-71B System (Includes 71B, TPN-18A,
4.
TPX-44 w/power and Site and Shelter Requirements)
5.
Disassembly/Storage of AN/TSQ-71B
Airfield Layout (Includes Reflector Emplacement Methods, Develop
Reflector Layout Diagram, Determine Ground Angle, Determine Dial
6.
Divisions and Install/Operate Theodolite)
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-16-R, JUN 2003
Page 6 of 8
USAPA V1.00
PHASE 2 - SECTION IV ENTRIES
RECOMMENDED
TEST
DATE COMPLETED
COMPLETION DATE
1.
Initial Weather Certification
Intro to TERPS (Includes Develop Instrument Approach Procedures
2.
and Develop MVA Chart)
3.
FTM Chapters 2-4
4.
FAAO 7110.65 Chapters 2 and 3
5.
AR 95-2
6.
AR 40-8 and AR 40-501
7.
Flips, Charts, VFR and IFR Supplements
8.
FM 3-04.303 Chapters 1-3
9.
FM 3-04.303 Chapters 4, 5, and 7
10.
FTM Chapters 5-8
11.
Flight Data Position Qualification Exam
12.
FTM Chapters 9 and 12
13.
FAAO 7110.65 Chapters 5
14.
FAAO 7110.65 Chapters 7 and 10
15.
ASR/PAR Position Qualification
16.
A²C² (Facility and Mission Specific)
17.
Pre-ATCS Exam
18.
ATCS Exam
19.
FTM Chapter 13
20.
21.
22.
23.
24.
25.
26.
27.
DA FORM 3479-16-R, JUN 2003
Page 7 of 8
USAPA V1.00
ADDITIONAL ENTRIES
RECOMMENDED
TEST/TASK
DATE COMPLETED
COMPLETION DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
NOTE 1: Those items listed above which do not apply to your unit do not need to be completed. However, as they
become relevant, they shall be entered in Section III of DA Form 3479-R.
NOTE 2: Example comments required in Remarks column:
a. Type test given: test without remarks shall be understood as written.
(1) Written, (2) Oral, (3) Practical.
b. Agency administering exam:
(1) Motor Sergeant/Master Driver (Vehicle Licensing), (2) USAF (Weather Exam)
DA FORM 3479-16-R, JUN 2003
Page 8 of 8
USAPA V1.00
TACTICAL FACILITY TRAINING PROGRAM (FTP)
AN/TPN-31 AIR TRAFFIC NAVIGATION INTEGRATION AND COORDINATION SYSTEM (ATNAVICS)
For use of this form, see FM 3-04.303 the proponent agency is TRADOC.
1. NAME
2. RANK
3. OPERATING INITIALS
4. ATCS NUMBER
5. SECURITY CLEARANCE
6. FLIGHT PHYSICAL DUE
7. DATE ASSIGNED TO UNIT
8. TRAINING START DATE
9. PHASE I COMPLETE
10. PHASE 2 COMPLETE
11. This is a standardized tactical qualification and rating checklist that will be used to follow the
progress of a controller through the training program. All applicable items shall be entered in sections III
and IV of DA Form 3479-R.
12. REFERENCES:
Applicable SOP's
Appropriate Equipment TM's
AR 40-8/AR 40-501/AR 95-2
ARTEP 1-425-MTP
FAAO 7110.65
FAAO 8200.1
FAAO 8260.3
Flips, Charts and IFR/VFR Supplements
FM 1-120 (3-04.120)
FM 3-04.303
FM 3-52
FTM
13. The training program consists of two phases: Phase 1 - Qualification, and Phase 2 - Position Training
and Rating.
a. Phase 1 consists of individual and team training on the installation, operation and maintenance
of all ATS equipment assigned to the Tactical Ground Control Approach (GCA). The training program is
designed to ensure Phase 1 training is completed within 3 months (Army National Guard 2 AT's) of being
assigned to the training program. However, as soon as a controller demonstrates proficiency in all
applicable areas, phase completion may be achieved at an earlier date.
b. Phase 2 is dependent upon actual mission and the controller's ability to control "LIVE" traffic in
a tactical environment. Phase 2 has no set time limit.
14. REMEDIAL TRAINING: Upon completion of phase training or rating, should an individual fail to
maintain the required proficiency level, he/she will be placed on Remedial Training. If unable to
successfully complete the Remedial Training in time allowed, reclassification actions will be taken.
15. CONTROLLER'S SIGNATURE
16. FACILITY CHIEF'S SIGNATURE
Page 1 of 8
DA FORM 3479-17-R, JUN 2003
USAPA V1.00
PHASE 1 - QUALIFICATION
TRAINING STARTED DATE
PHASE 1 RECOMMENDED COMPLETION DATE
RECOMMENDED
TASK
DATE COMPLETED
COMPLETION DATE
1.
Intro to AN/TPN-31 (ATNAVICS)
2.
FTM Chapter 1
3.
Operate/PMCS Primary Mover
4.
Operate/PMCS power system
5.
Operate/PMCSTrailer
6.
Operate/PMCS Satellite Navigation Set GPS
7.
Operate PMCS Theodolite
8.
Operate PMCS Communications Equipment
9.
Collect Pre-deployment Survey Data
10.
Install/Operate/PMCS AN/TPN-31
11.
AN/TPN-31 Emergency shutdown
12.
Disassembly/Storage of AN/TPN-31
13.
Operate COMSEC Equipment
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
DA FORM 3479-17-R, JUN 2003
Page 2 of 8
USAPA V1.00
|
|