C6, FM 10-564/TO 13C7-37-1
4-35. Installing and Safetying Suspension
4-40. Installing Provisions for Emergency
Slings
Restraints
Install and safety four 12-foot (2-loop), type
Select and install provisions for emergency
XXVI nylon webbing slings to the tandem links
restraints according to the emergency aft re-
as shown in Figure 4-15.
straint requirements table in FM 10-500-2/
TO 13C7-1-5.
4-36. Building and Lashing Parachute
Stowage Platform
4-41. Placing Extraction Parachute
Build the parachute stowage platform and lash it
Select the extraction parachute and extraction
to the load as shown in Figure 4-16.
line needed using the extraction line require-
ments table in FM 10-500-2/TO 13C7-1-5.
4-37. Installing Cargo Parachutes
Place the extraction parachute and extraction
line on the load for installation in the aircraft.
Install three G-11 cargo parachutes as shown in
Figure 4-17 and according to FM 10-500-2/TO
4-42. Marking Rigged Load
13C7-1-5.
Mark the rigged load according to FM 10-500-2/
TO 13C7-1-5 and as shown in Figure 4-26.
4-38. Installing Parachute Release
Prepare and install an M-1 cargo parachute
CAUTION
release as shown in Figure 4-18 and according
The load weight may vary from the one shown,
to FM 10-500-2/TO 13C7-1-5.
depending upon the fuel rigged. Be sure that
the load is weighed, and the parachute require-
4-39. Installing Extraction System
ments, CB, and tip-off curve recomputed.
Prepare and install the EFTC extraction system
as shown in Figure 4-19 and according to
4-43. Equipment Required
FM 10-500-2/TO 13C7-1-5.
Use the equipment listed in Table 4-3 to rig this
load.
4-38
C6, FM 10-564/TO 13C7-37-1
CAUTION
Make the final rigger inspection required by FM 10-500-2/TO 13C7-1-5
before the load leaves the rigging site.
CB
Rigged Load Data
Weight: Estimated, with gasoline
11,200 pounds
Maximum (as shown)
14,180 pounds
Height
86.5 inches
Width
108 inches
Length
144 inches
Overhang Front
5 inches
Rear
17 inches
CB (from front edge of platform)
74 inches
Extraction System (adds 18 inches to length of platform)
EFTC
Figure 4-26. Three drums with pumping assembly rigged on a 12-foot, type V airdrop platform for
low-velocity airdrop.
4-39
C6, FM 10-564/TO 13C7-37-1
Table 4-3. Equipment required for rigging three drums with pumping assembly on a 12-foot,
type V airdrop platform for low-velocity airdrop
National Stock
Number
Item
Quantity
8040-00-273-8713
Adhesive, paste, 1-gal
As required
4030-00-678-8562
Clevis, suspension, 3/4-in (medium)
4
4030-00-090-5354
Clevis, suspension, 1-in (large)
5
4020-00-240-2146
Cord, nylon, type III, 550-lb
As required
1670-00-434-5783
Coupling, airdrop, extraction force transfer with cable, 12-ft
1
Cover:
1670-00-360-0328
Clevis, large
1
1670-00-360-0329
Link, type IV
7
1670-01-183-2678
Leaf, extraction line (line bag)
2
Line, drogue (for C-17)
1670-01-062-6316
60-ft (3-loop), type XXVI
1
Line, extraction:
1670-01-062-6316
60-ft (3-loop), type XXVI (for C-130)(Use w/ 140-ft for
1
C-5)
1670-01-107-7651
140-ft (3-loop), type XXVI (for C-141B,C-5, or C-17)
1
Link assembly:
1670-00-783-5988
Type IV
7
Two-point:
5306-00-435-8994
Bolt, 1-in diam, 4-in long
2
5310-00-232-5165
Nut, 1-in, hexagonal
2
1670-00-003-1953
Plate, side, 3 3/4-in
2
5365-00-007-3414
Spacer, large
2
Lumber:
5510-00-220-6146
2- by 4- by:
41 1/2-in
2
25 1/2-in
2
5510-00-220-6148
2- by 6- by:
85-in
2
48-in
2
5315-00-010-4659
Nail, steel wire, 8d
As required
4-40
C6, FM 10-564/TO 13C7-37-1
Table 4-3. Equipment required for rigging three drums with pumping assembly on a 12-foot,
type V airdrop platform for low-velocity airdrop (continued)
National Stock
Number
Item
Quantity
1670-00-753-3928
Pad, energy-dissipating (honeycomb)
3- by 36- by 96-in
15 sheets
Parachute:
Cargo:
1670-01-016-7841
G-11B
3
Cargo extraction:
1
1670-01-063-3716
22-ft
Drogue (for C-17)
1
1670-01-063-3715
15-ft
Platform, airdrop, type V, 12-ft
1670-01-353-8425
Bracket assembly, coupling
(1)
1670-01-162-2372
Clevis assembly, type V
(26)
1670-01-162-2376
Extraction bracket assembly
(1)
1670-01-162-2381
Tandem link assembly (Multipurpose link)
(4)
5530-00-128-4981
Plywood, 3/4 -by 48- by 96-in
2 sheets
1670-01-097-8816
Release, cargo parachute, M-1
1
Sling, cargo, airdrop
For suspension:
1670-01-062-6303
12-ft (2-loop), type XXVI nylon webbing
For lifting:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
2
For deployment:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
1
For riser extension:
1670-01-062-6302
20-ft (2-loop), type XXVI nylon webbing
6
5340-00-040-8219
Strap, parachute release, multi-cut, comes w/ 3 knives
2
7510-00-266-5016
Tape, adhesive, 2-in
As required
1670-00-937-0271
Tie-down assembly, 15-foot
29
Webbing:
8305-00-268-2411
Cotton, 1/4-in, type I
As required
8305-00-082-5752
Nylon, tubular, 1/2-in
As required
8305-00-263-3591
Type VIII
As required
4-41
C6, FM 10-564/TO 13C7-37-1
Section IV
RIGGING FOUR DRUMS WITHOUT PUMPING ASSEMBLY
ON A 20-FOOT PLATFORM
4-45. Preparing Platform
4-44. Description of Load
Prepare a 20-foot, type V airdrop platform using
Four drums are rigged on a 20-foot, type V
two tandem links, four suspension links and 20
platform. Filled with 432 gallons of gasoline,
clevises as shown in Figure 4-27.
each drum weighs 2,842 pounds and is 62
inches long and 53 inches in diameter. An
empty drum weighs 250 pounds.
Notes: 1. The nose bumper may or may not
be installed.
Note: Fill drums with no more than 432
2. Measurements given in this section
gallons of fuel. If the drums are filled with a
are from the front edge of the
fuel other than gasoline, the drum weight
platform, NOT from the front edge
must be computed.
of the nose bumper.
WARNING
Do not add air to drums. Pressurization
changes will cause leaking or bursting.
4-42
C6, FM 10-564/TO 13C7-37-1
CLEVISES
10A THROUGH 1A
TIE-DOWN RINGS
TIE-DOWN
RINGS
D
B
C
LEFT
A
B
A
RIGHT
CLEVISES
10 THROUGH 1
Step:
1. Inspect, or assemble and inspect, the platform as outlined in TM 10-1670-268-20&P/
TO 13C7-52-22.
2. Install a suspension link on each platform side rail using holes 6, 7, and 8.
3. Install a tandem link on the front of each platform side rail using holes 1, 2, and 3.
4. Install a suspension link on each platform side rail using holes 33, 34, and 35.
5. Bolt a clevis on bushing 1 of each front tandem link, on bushing 4 of each first suspension
link, and on bushing 1 of each rear suspension link.
6. Starting at the front of the platform, install clevises on each platform side rail using the
bushings bolted on holes 14, 17, 25, 26, 30, 39, and 40.
7. Starting at the front of the platform, number the clevises bolted to the right side 1 through
10, and those bolted to the left side 1A through 10A.
8. Label the tiedown rings according to FM 10-500-2/TO 13C7-1-5.
Figure 4-27. Platform prepared
4-43
C6, FM 10-564/TO 13C7-37-1
4-46. Preparing and Positioning Honeycomb
Stack
Prepare and position the honeycomb stack as
shown in Figure 4-28.
HONEYCOMB
96" x 18"
HONEYCOMB
96" x 36"
1
Use 12 full sheets of honeycomb and two 18- by 96 inch pieces to form a two-layer stack
234 inches long and 96 inches wide. Center the stack on the platform 3 inches from the front
edge.
Note: Place the 18-inch section inside the stack.
Figure 4-28. Honeycomb stack positioned
4-44
C6, FM 10-564/TO 13C7-37-1
4-47. Installing Lifting Slings and Positioning
4-48. Lashing Drums
Drums
Use twenty 15-foot tie-down assemblies to lash
Lift the drums and position them on the honey-
the fuel drums as shown in Figure 4-30, and
comb as shown in Figure 4-29.
according to FM 10-500-2/TO 13C7-1-5.
2
3
1
Attach a 9-foot (2-loop), type XXVI nylon webbing sling to the upper shackle on each side of
the drum with a platform clevis as shown in Figure 4-13.
2
Lift the drums onto the honeycomb base as shown in Figure 4-13.
3
Lash the shackles of the drums together on each side with 15-foot tiedown assemblies.
Figure 4-29. Fuel drums positioned
4-45
C6, FM 10-564/TO 13C7-37-1
7
5
9
1
15
3
13
11
7
2
1
8
6
5
3
10
4
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
1
1
Through right front shackle of first drum.
2
1A
Through left front shackle of first drum.
3
2
Through right front shackle of second drum.
4
2A
Through left front shackle of second drum.
5
3
Through right rear shackle of first drum.
6
3A
Through left rear shackle of first drum.
7
4
Through right front shackle of third drum.
8
4A
Through left front shackle of third drum.
9
5
Through right rear shackle of second drum.
10
5A
Through left rear shackle of second drum.
11
6
Through right front shackle of fourth drum.
12
6A
Through left front shackle of fourth drum.
13
8
Through right rear shackle of third drum.
14
8A
Through left rear shackle of third drum.
15
10
Through right rear shackle of fourth drum.
16
10A
Through left rear shackle of fourth drum.
Figure 4-30. Fuel drums lashed to platform
4-46
C6, FM 10-564/TO 13C7-37-1
4-49. Installing and Safetying Suspension
Slings
Install and safety four 16-foot (4-loop), type
XXVI nylon webbing slings to the suspension
links as shown in Figure 4-31.
2
1
1
1
Place the end loop of a 16-foot (4-loop), type XXVI nylon webbing sling in the bell portion
of a large clevis. Bolt the clevis to a suspension link. Repeat for the other three suspension
links.
2
Raise the slings and install the deadman's tie according to FM 10-500-2/TO 13C7-1-5.
Figure 4-31. Suspension slings installed and safetied
4-47
C6, FM 10-564/TO 13C7-37-1
4-50. Building and Lashing Parachute Stow-
age Platform
Build the parachute stowage platform and lash it
to the load with four 15-foot lashings as shown
in Figure 4-32.
Notes: 1. This drawing is not to scale.
1
2. All dimensions are given in inches.
3. Use eightpenny nails.
PLYWOOD
3/4 x 48 x 96
LUMBER
2 x 6 x 48
2
2 3/4
2 3/4
LUMBER
2 in diam holes
3
2 x 6 x 85
4
9
7
1
Build the parachute stowage platform as shown. Nail the 2- by 6-inch pieces of lumber to the
edges of the plywood and drill 2-inch holes for the lashings.
2
Center a 36- by 85-inch piece of honeycomb over the rear drum. Place the parachute stowage
platform on the drum over the honeycomb.
3
Lash the two front holes in the parachute stowage platform to clevises 7 and 7A.
4
Lash the two rear holes in the parachute stowage platform to clevises 9 and 9A.
Figure 4-32. Parachute stowage platform built and lashed
4-48
C6, FM 10-564/TO 13C7-37-1
4-51. Installing Cargo Parachutes
Install four G-11 cargo parachutes as shown in
Figure 4-33 and according to FM 10-500-2/TO
13C7-1-5.
1
4
3
2
1
Cluster four G-11 cargo parachutes on the parachute stowage platform.
2
Pass the rear restraint strap through the rear holes in the parachute stowage platform, and tie
the ends to the 38th bushing on each side rail.
3
Pass the front restraint strap through the center holes in the parachute stowage platform, and
tie the ends to the second bushing on each rear suspension link.
4
Install the parachute release knives according to FM 10-500-2/TO 13C7-1-5.
Figure 4-33. G-11 cargo parachutes installed
4-49
C6, FM 10-564/TO 13C7-37-1
4-52. Installing Parachute Release
Prepare and install an M-2 cargo parachute
release as shown in Figure 4-34 and according
to FM 10-55-2/TO 13C7-1-5.
2
3
1
1
Center a 36- by 96-inch piece of honeycomb over the second and third drums. Secure the `
honeycomb to the platform with type III nylon cord.
2
Attach the suspension slings and the riser extensions to the M-2 release according to FM 10-
500-2/TO 13C7-1-5. Secure the release to the platform with type III nylon cord.
3
S-fold the suspension slings and tie the folds with type I, 1/4-inch cotton webbing.
Figure 4-34. M-2 release installed
4-50
C6, FM 10-564/TO 13C7-37-1
4-53. Installing Extraction System
Prepare and install the EFTC extraction system
as shown in Figure 4-35 and as shown in FM
10-500-2/TO 13C7-1-5.
2
1
5
4
3
1
Install the actuator mounting brackets to the front holes on the left platform rail.
2
Install a 20-foot cable to the actuator. Install the actuator to the brackets.
3
Attach the latch assembly to the extraction bracket. Attach the cable to the latch assembly.
4
Safety the cable to tiedown ring D10 with type I, 1/4inch cotton webbing.
5
Install a 9-foot (2-loop), type XXVI nylon webbing sling as the deployment line. S-fold and
tie the excess in two places with type I, 1/4-inch cotton webbing.
Figure 4-35. EFTC installed
4-51
C6, FM 10-564/TO 13C7-37-1
4-54. Installing Provisions for Emergency
4-56. Marking Rigged Load
Restraints
Mark the rigged load according to FM 10-500-2/
Select and install provisions for emergency
TO 13C7-1-5 and as shown in Figure 4-36.
restraint according to the emergency aft restraint
requirements table in FM 10-500-2/
CAUTION
TO 13C7-1-5.
The load weight may vary from the one shown,
depending upon the fuel rigged. Be sure that
4-55. Placing Extraction Parachute
the load is weighed, and the parachute require-
ments, CB, and tip-off curve recomputed.
Select the extraction parachute and extraction
line needed using the extraction line require-
ments table in FM 10-500-2/TO 13C7-1-5.
4-57. Equipment Required
Place the extraction parachute and extraction
line on the load for installation in the aircraft.
Use the equipment listed in Table 4-4 to rig this
load.
4-52
C6, FM 10-564/TO 13C7-37-1
CAUTION
Make the final rigger inspection required by FM 10-500-2/TO 13C7-1-5
before the load leaves the rigging site.
CB
Rigged Load Data
Weight: Estimated, with gasoline
14,426 pounds
Maximum (as shown)
18,400 pounds
Height
90.5 inches
Width
108 inches
Length
240 inches
Overhang Front
5 inches
Rear
17 inches
CB (from front edge of platform)
125 inches
Extraction System (adds 18 inches to length of platform)
EFTC
Figure 4-36. Four drums rigged on a 20-foot, type V airdrop platform for low-velocity airdrop
4-53
C6, FM 10-564/TO 13C7-37-1
Table 4-4. Equipment required for rigging four drums without pumping assembly on a 20-foot, type
V airdrop platform for low-velocity airdrop
National Stock
Number
Item
Quantity
8040-00-273-8713
Adhesive, paste, 1-gal
As required
4030-00-678-8562
Clevis, suspension, 3/4-in (medium)
6
4030-00-090-5354
Clevis, suspension, 1-in (large)
5
4020-00-240-2146
Cord, nylon, type III, 550-lb
As required
1670-00-434-5787
Coupling, airdrop, extraction force transfer with cable, 20-ft
1
Cover:
1670-00-360-0328
Clevis, large
1
1670-00-360-0329
Link, type IV
9
1670-01-183-2678
Leaf, extraction line (line bag)
2
Line, drogue (for C-17)
1670-01-062-6316
60-ft (3-loop), type XXVI
1
Line, extraction:
1670-01-062-6316
60-ft (3-loop), type XXVI (for C-130)(Use w/ 140-ft for
1
C-5)
1670-01-107-7651
140-ft (3-loop), type XXVI (for C-141B,C-5, or C-17)
1
Link assembly:
1670-00-783-5988
Type IV
9
Two-point:
5306-00-435-8994
Bolt, 1-in diam, 4-in long
2
5310-00-232-5165
Nut, 1-in, hexagonal
2
1670-00-003-1954
Plate, side, 5 1/2-in
2
5365-00-007-3414
Spacer, large
2
5510-00-220-6148
Lumber:
2- by 6- by:
85-in
2
48-in
2
5315-00-010-4659
Nail, steel wire, 8d
As required
4-54
C6, FM 10-564/TO 13C7-37-1
Table 4-4. Equipment required for rigging four drums without pumping assembly on a 20-foot, type
V airdrop platform for low-velocity airdrop (continued)
National Stock
Number
Item
Quantity
1670-00-753-3928
Pad, energy-dissipating (honeycomb)
3- by 36- by 96-in
15 sheets
Parachute:
Cargo:
1670-01-016-7841
G-11B
4
Cargo extraction:
1670-01-063-3716
22-ft (option for C-141 and C-5)
1
1670-00-040-8135
28-ft (for C-130 and C-17, option for C-141 and C-5)
1670-01-063-3715
Drogue (for C-17)
1
15-ft
Platform, airdrop, type V, 20-ft
1670-01-353-8425
Bracket assembly, coupling
(1)
1670-01-162-2372
Clevis assembly, type V
(20)
1670-01-162-2376
Extraction bracket assembly
(1)
1670-01-162-2381
Tandem link assembly (Multipurpose link)
(2)
1670-01-247-2389
Suspension link
(4)
5530-00-128-4981
Plywood, 3/4 -by 48- by 96-in
1 sheet
1670-01-097-8817
Release, cargo parachute, M-2
1
Sling, cargo, airdrop
For suspension:
1670-01-062-6308
16-ft (4-loop), type XXVI nylon webbing
4
For lifting:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
2
For deployment:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
1
For riser extension:
1670-01-062-6302
20-ft (2-loop), type XXVI nylon webbing
8
5340-00-040-8219
Strap, parachute release, multi-cut, comes w/ 3 knives
2
7510-00-266-5016
Tape, adhesive, 2-in
As required
1670-00-937-0271
Tie-down assembly, 15-foot
26
Webbing:
8305-00-268-2411
Cotton, 1/4-in, type I
As required
8305-00-082-5752
Nylon, tubular, 1/2-in
As required
8305-00-263-3591
Type VIII
As required
4-55
C6, FM 10-564/TO 13C7-37-1
Section V
RIGGING FIVE DRUMS WITHOUT PUMPING ASSEMBLY
ON A 20-FOOT PLATFORM
4-58. Description of Load
4-59. Preparing Platform
Five drums are rigged on a 20-foot, type V
Prepare a 20-foot, type V airdrop platform using
platform. Filled with 432 gallons of gasoline,
two tandem links, eight suspension links and 42
each drum weighs 2,842 pounds and is 62
clevises as shown in Figure 4-37.
inches long and 53 inches in diameter. An
empty drum weighs 250 pounds.
Notes: 1. The nose bumper may or may not
be installed.
Note: Fill drums with no more than 432
2. Measurements given in this section
gallons of fuel. If the drums are filled with a
are from the front edge of the
fuel other than gasoline, the drum weight
platform, NOT from the front edge
must be computed.
of the nose bumper.
CAUTION
WARNING
Do not add air to drums. Pressurization
changes will cause leaking or bursting.
4-56
C6, FM 10-564/TO 13C7-37-1
CLEVISES 19A THROUGH 1A
TIE-DOWN RINGS
D
TIE-DOWN RINGS
C
LEFT
B
B
A
A
REAR
FRONT
RIGHT
CLEVISES 19 THROUGH 1
Step:
1.
Inspect, or assemble and inspect, the platform as outlined in TM 10-1670-268-20&P/
TO 13C7-52-22.
2.
Install suspension links on each platform side rail using holes 17, 18, and 19, and holes 5, 6,
and 7.
3.
Install a tandem link on the front of each platform side rail using holes 1, 2, and 3.
4.
Install suspension links on each platform side rail using holes 22, 23, and 24, and holes 34,
35, and 36.
5.
Bolt clevises on bushings 1, 2, and 3 of each front tandem link, on bushing 1 of each second
suspension link, on bushings 1 and 4 of each third suspension link, and on bushings 3 and 4
of each rear suspension link.
6.
Install clevises on bushings 31 and 39 in an inverted position on each platform side rail.
Bolt two additional clevises to each inverted clevis.
7.
Starting at the front of the platform, install clevises on each platform side rail using the
bushings bolted on holes 9, 14, 15, 21, 28, 38, and 40.
8.
Starting at the front of the platform, number the clevises bolted to the right side 1 through
19, and those bolted to the left side 1A through 19A.
9.
Label the tiedown rings according to FM 10-500-2/TO 13C7-1-5.
Figure 4-37. Platform prepared
4-57
C6, FM 10-564/TO 13C7-37-1
4-60. Preparing and Positioning Honeycomb
Stack
Prepare and position the honeycomb stack as
shown in Figure 4-38.
2
3
1
18-inch section
1
Use 12 sheets of honeycomb 36- by 60 inches and two pieces 18- by 96 inches to form a two-
layer stack 234 inches long and 60 inches wide. Center the stack on the platform 3 inches
from the front edge.
Note: Place the 18-inch section inside the stack.
2
Make two 8-layer stacks of honeycomb 60- by 30 inches. Center one stack on the base layer
62 1/2 inches from the front edge of the base.
3
Center the other stack on the base layers 55 1/2 inches to the rear of the stack placed in step 2
above.
Figure 4-38. Honeycomb stack positioned
4-58
C6, FM 10-564/TO 13C7-37-1
4-61. Installing Lifting Slings and Positioning
Drums
Lift the drums and position them on the honey-
comb as shown in Figure 4-39.
5
4
3
3
2
1
Attach a 9-foot (2-loop), type XXVI nylon webbing sling to the upper shackle on each side of
the drum with a platform clevis as shown in Figure 4-13.
2
Lift three drums onto the honeycomb base as shown in Figure 4-13.
3
Lash the shackles of the drums together on each side with 15-foot tiedown assemblies.
4
Glue a 60- by 34-inch piece of honeycomb centered on each stack. Glue a 60- by 36-inch
piece of honeycomb centered over the pieces placed previously.
5
Lift and position a drum onto each stack.
Figure 4-39. Fuel drums positioned
4-59
C6, FM 10-564/TO 13C7-37-1
4-62. Lashing Drums
Use thirty 15-foot tie-down assemblies to lash
the fuel drums as shown in Figure 4-40, and
according to FM 10-500-2/TO 13C7-1-5.
3
7
1
9
5
5
4
3
2
1
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
1
1
Through right front shackle of first drum.
2
1A
Through left front shackle of first drum.
3
2
Through right front shackle of second drum.
4
2A
Through left front shackle of second drum.
5
3
Through right front shackle of second drum.
6
3A
Through left front shackle of second drum.
7
4
Through right front shackle of third drum.
8
4A
Through left front shackle of third drum.
9
5
Through right rear shackle of first drum.
10
5A
Through left rear shackle of first drum.
Figure 4-40. Fuel drums lashed to platform
4-60
C6, FM 10-564/TO 13C7-37-1
19
11
13
17
15
10
9
7
8
6
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
11
6
Through right front shackle of fourth drum.
12
6A
Through left front shackle of fourth drum.
13
7
Through right front shackle of fourth drum.
14
7A
Through left front shackle of fourth drum.
15
8
Through right rear shackle of first drum.
16
8A
Through left rear shackle of first drum.
17
9
Through right rear shackle of second drum.
18
9A
Through left rear shackle of second drum.
19
10
Through right rear shackle of second drum.
20
10A
Through left rear shackle of second drum.
Figure 4-40. Fuel drums lashed to platform (continued)
4-61
C6, FM 10-564/TO 13C7-37-1
27
25
29
23
21
11
13
16
19
17
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
21
11
Through right rear shackle of third drum.
22
11A
Through left rear shackle of third drum.
23
13
Through right front shackle of fifth drum.
24
13A
Through left front shackle of fifth drum.
25
16
Through right rear shackle of fourth drum.
26
16A
Through left rear shackle of fourth drum.
27
17
Through right rear shackle of fourth drum.
28
17A
Through left rear shackle of fourth drum.
29
19
Through right rear shackle of fifth drum.
30
19A
Through left rear shackle of fifth drum.
Figure 4-40. Fuel drums lashed to platform (continued)
4-62
C6, FM 10-564/TO 13C7-37-1
4-63. Installing and Safetying
Suspension Slings
Install the components of the centerline suspen-
sion system according to FM 10-500-2/TO
13C7-1-5, and as shown in Figure 4-41. Safety
the suspension slings as shown in Figure 4-42.
3-FT SLING
3-FT SLING
5 1/2-IN
Notes:
2-POINT LINK
3-POINT LINK
1. This drawing is not to scale.
2. All slings are type XXVI nylon.
-12-FT SLING
3. Instructions are for one side.
Repeat for the other side of
the load.
16-FT SLING
(DOUBLED)
12-FT SLING
TWO LARGE
CLEVISES
3-FT SLINGS
LARGE CLEVISES
REAR
FRONT
Step:
1. Place the end loop of a 12-foot (4-loop) sling in the bell portion of a large clevis. Bolt the clevis
to the rear suspension link. Connect the free end of the 12-foot sling to a 3-foot (4-loop) sling
with a 5 1/2-inch two-point link.
2. Attach a 3-foot (4-loop) sling to each center suspension link with a large clevis. Place both 3-foot
slings in the bell portion of a large clevis. Pass a 16-foot (2-loop) sling through one spool of a
three-point link. Place both end loops of the 16-foot sling in the bolt of the large clevis.
3. Place the end loop of a 12-foot (4-loop) sling in the bell portion of a large clevis. Place the bolt
of the clevis in the bell of a second large clevis. Bolt the second clevis to the front suspension
link. Bolt the free end of the 12-foot sling to the three-point link on thecenter suspension sling.
Bolt a 3-foot (4-loop) sling to the remaining spool of the three-point link.
Figure 4-41. Suspension slings installed
4-63
C6, FM 10-564/TO 13C7-37-1
3
1
2
5
4
1
Pad the two-point links with felt taped in place.
2
Pad the three-point links with felt taped in place.
3
Attach the 3-foot slings from the two- and three-point links to the crane hook. Raise the
suspension slings.
4
Tie the rear suspension slings to each other 12 inches above the load with a double length of
1/2-inch tubular nylon webbing.
5
Tie the front suspension slings to each other in the same way.
Figure 4-42. Suspension slings safetied
4-64
C6, FM 10-564/TO 13C7-37-1
4-64. Building and Lashing Parachute Stow-
age Platform
Build the parachute stowage platform and its
supports as shown in Figure 4-43. Lash the
parachute stowage platform to the load with four
15-foot lashings as shown in Figure 4-44.
Notes: 1. This drawing is not to scale.
3
2. All dimensions are given in
inches.
3. Use eightpenny nails.
2
LUMBER
2 x 6 x 85
2 3/4
2 in diam holes
1
1
2 3/4
2 3/4
PLYWOOD
4
3/4 x 48 x 96
LUMBER
2 x 6 x 48
1
Make two 17 layer stacks of 8- by 8-inch honeycomb. Place one stack on each side flush
with the edge of the honeycomb supporting the rear drum and 29 inches from the rear edge of
the platform.
2
Make two 15 layer stacks of 12- by 12-inch honeycomb. Glue two 8- by 8-inch pieces of
honeycomb on top of each stack flush with the inside front corners. Place the stacks on each
side of the rear drum flush with the rear edge of the honeycomb base layer.
3
Center a 48- by 26-inch piece of honeycomb over the rear drum.
4
Build the parachute stowage platform as shown. Nail the 2- by 6-inch piece of lumber to the
edges of the plywood, and drill 2-inch holes for the lashings.
Figure 4-43. Supports placed and parachute stowage platform constructed
4-65
C6, FM 10-564/TO 13C7-37-1
1
3
2
12
18
1
Center the parachute stowage platform on the honeycomb placed in Figure 4-42.
2
Lash the two rear holes in the parachute stowage platform to clevises 18 and 18A.
3
Lash the two front holes in the parachute stowage platform to clevises 12 and 12A.
Figure 4-44. Parachute stowage platform lashed to platform rails
4-66
C6, FM 10-564/TO 13C7-37-1
4-65. Installing Cargo Parachutes
Install five G-11 cargo parachutes as shown in
Figure 4-45, and according to FM 10-500-2/TO
13C7-1-5.
1
4
3
2
15
14
1
Cluster five G-11 cargo parachutes on the parachute stowage platform.
2
Pass the rear restraint strap through the rear holes in the parachute stowage platform, and
tie the ends to clevises 15 and 15A.
3
Pass the front restraint strap through the center holes in the parachute stowage platform, and
tie the ends to clevises 14 and 14A.
4
Install the parachute release knives according to FM 10-500-2/TO 13C7-1-5.
Figure 4-45. G-11 cargo parachutes installed
4-67
C6, FM 10-564/TO 13C7-37-1
4-66. Installing Parachute Release
Prepare and install an M-2 cargo parachute
release as shown in Figure 4-46 and according
to FM 10-500-2/TO 13C7-1-5.
2
1
3
1
Center a 36- by 36-inch piece of honeycomb over the fourth drum. Secure the honeycomb to
the drum shackles with type III nylon cord.
2
Attach the suspension slings and the riser extensions to the M-2 release according to FM 10-
500-2/TO 13C7-1-5. Secure the release to the platform with type III nylon cord.
3
S-fold the suspension slings and tie the folds with type I, 1/4-inch cotton webbing.
Figure 4-46. M-2 release installed
4-68
C6, FM 10-564/TO 13C7-37-1
4-67. Installing Extraction System
Prepare and install the EFTC extraction system
as shown in Figure 4-47 and as shown in FM
10-500-2/TO 13C7-1-5.
2
1
5
4
3
1
Install the actuator mounting brackets to the rear holes on the left platform rail.
2
Install a 20-foot cable to the actuator. Install the actuator to the brackets.
3
Attach the latch assembly to the extraction bracket. Attach the cable to the latch assembly.
4
Safety the cable to tiedown ring C10 with type I, 1/4inch cotton webbing.
5
Install a 9-foot (2-loop), type XXVI nylon webbing sling as the deployment line. S-fold and
tie the excess in two places with type I, 1/4-inch cotton webbing.
Figure 4-47. EFTC installed
4-69
C6, FM 10-564/TO 13C7-37-1
4-68. Installing Provisions for Emergency
4-70. Marking Rigged Load
Restraints
Mark the rigged load according to FM 10-500-
Select and install provisions for emergency
2/TO 13C7-1-5 and as shown in Figure 4-48.
restraints according to the emergency aft re-
straint requirements table in FM 10-500-2/
CAUTION
TO 13C7-1-5.
The load weight may vary from the one
4-69. Placing Extraction Parachute
shown, depending upon the fuel rigged. Be
sure that the load is weighed, and the para-
Select the extraction parachute and extraction
chute requirements, CB and tip-off curve
line needed using the extraction line require-
recomputed.re
ments table in FM 10-500-2/TO 13C7-1-5.
Place the extraction parachute and extraction
4-71. Equipment Required
line on the load for installation in the aircraft.
2-71
Use the equipment listed in Table 4-5 to rig this
load.
4-70
C6, FM 10-564/TO 13C7-37-1
CAUTION
Make the final rigger inspection required by FM 10-500-2/
TO 13C7-1-5 before the load leaves the rigging site.
CB
Rigged Load Data
Weight: Estimated, with gasoline
18,492 pounds
Maximum (as shown)
23,460 pounds
Height
84 3/4 inches
Width
108 inches
Length
240 inches
Overhang Front
5 inches
Rear
17 inches
CB (from front edge of platform)
126 inches
Extraction System (adds 18 inches to length of platform)
EFTC
Figure 4-48. Five drums rigged on a 20-foot, type V airdrop platform for low-velocity airdrop
4-71
C6, FM 10-564/TO 13C7-37-1
Table 4-5. Equipment required for rigging five drums without pumping assembly on a 20-foot,
type V airdrop platform for low-velocity airdrop.
National Stock
Number
Item
Quantity
8040-00-273-8713
Adhesive, paste, 1-gal
As required
4030-00-678-8562
Clevis, suspension, 3/4-in (medium)
6
4030-00-090-5354
Clevis, suspension, 1-in (large)
16
4020-00-240-2146
Cord, nylon, type III, 550-lb
As required
1670-00-434-5787
Coupling, airdrop, extraction force transfer with cable, 20-ft
1
Cover:
1670-00-360-0328
Clevis, large
1
1670-00-360-0329
Link, type IV
6
8305-00-958-3685
Felt, 1/2-in thick
As required
1670-01-183-2678
Leaf, extraction line (line bag)
2
Line, drogue (for C-17)
1670-01-062-6316
60-ft (3-loop), type XXVI
1
Line, extraction:
1670-01-062-6316
60-ft (3-loop), type XXVI (for C-130)(Use w/ 140-ft for
1
C-5)
1670-01-107-7651
140-ft (3-loop), type XXVI (for C-141B,C-5, or C-17)
1
Link assembly:
1670-00-783-5988
Type IV
6
1670-01-307-0155
Three-point
2
Two-point:
5306-00-435-8994
Bolt, 1-in diam, 4-in long
6
5310-00-232-5165
Nut, 1-in, hexagonal
6
1670-00-003-1954
Plate, side, 5 1/2-in
6
5365-00-007-3414
Spacer, large
6
5510-00-220-6148
Lumber, 2- by 6- by:
85-in
2
48-in
2
4-72

 

 

 

 

 

 

 