C6, FM 10-564/TO AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING FUEL DRUMS (December 1981) - page 1

 

  Главная      Manuals     C6, FM 10-564/TO AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING FUEL DRUMS (December 1981)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..      1       2         ..

 

 

 

C6, FM 10-564/TO AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING FUEL DRUMS (December 1981) - page 1

 

 

C6, FM 10-564/TO 13C7-37-1
*FM 10-564/TO 13C7-37-1
FIELD MANUAL
HEADQUARTERS
NO 10-564
DEPARTMENTS OF THE ARMY
TECHNICAL ORDER
AND THE AIR FORCE
NO 13C7-37-1
Washington, DC, 16 April 1979
AIRDROP OF SUPPLIES AND EQUIPMENT:
RIGGING FUEL DRUMS
TABLE OF CONTENTS
Paragraph
Page
PREFACE
ix
CHAPTER 1
INTRODUCTION
Description of Items
1-1
1-1
Special Considerations
1-2
1-1
CHAPTER 2
RIGGING DRUMS FOR LOW-VELOCITY
AIRDROP ON TYPE II PLATFORM
Section I
RIGGING TWO DRUMS WITH PUMPING ASSEMBLY
Description of Load
2-1
2-1
Preparing Platform
2-2
2-1
Preparing Pumping Assembly
2-3
2-1
Lashing Container
2-4
2-2
Securing Plywood Protectors
2-5
2-2
Attaching Suspension Slings
2-6
2-2
Lashing Drums
2-7
2-2
Stowing Cargo Parachutes
2-8
2-2
Installing Extraction System
2-9
2-2
Installing Release System
2-10
2-2
Positioning Extraction Parachute
2-11
2-2
Marking Rigged Load
2-12
2-3
Equipment Required
2-13
2-3
Section II
RIGGING ONE DRUM WITH PUMPING ASSEMBLY
Description of Load
2-14
2-16
Preparing Platform
2-15
2-16
Stowing Pumping Assembly
2-16
2-16
DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.
* This manual supersedes FM 10-564/TO 13C7-37-1, 30 May 1975.
i
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Lashing Drum
2-17
2-16
Stowing Cargo Parachutes
2-18
2-16
Installing Extraction System
2-19
2-16
Installing Release System
2-20
2-16
Safetying Suspension Slings
2-21
2-17
Positioning Extraction Parachute
2-22
2-17
Marking Rigged Load
2-23
2-17
Equipment Required
2-24
2-17
Section III
RIGGING TWO DRUMS WITHOUT PUMPING ASSEMBLY
Description of Load
2-25
2-28
Preparing Platform
2-26
2-28
Attaching Suspension Slings
2-27
2-28
Lashing Drums
2-28
2-28
Attaching Deadman's Tie
2-29
2-30
Stowing Cargo Parachutes
2-30
2-31
Installing Extraction System
2-31
2-31
Installing Release System
2-32
2-31
Positioning Extraction Parachute
2-33
2-31
Marking Rigged Load
2-34
2-31
Equipment Required
2-35
2-31
Section IV
RIGGING THREE DRUMS WITHOUT PUMPING ASSEMBLY
Description of Load
2-36
2-36
Preparing Platform
2-37
2-36
Preparing and Placing Honeycomb
2-38
2-37
Attaching Suspension Slings
2-39
2-38
Lashing Drums
2-40
2-38
Attaching Deadman's Tie
2-41
2-40
Stowing Cargo Parachutes
2-42
2-41
Installing Extraction System
2-43
2-44
Installing Release System
2-44
2-44
Positioning Extraction Parachute
2-45
2-44
Marking Rigged Load
2-46
2-44
Equipment Required
2-47
2-44
CHAPTER 3
RIGGING DRUMS FOR LAPE AIRDROP
Section I
RIGGING TWO DRUMS
Description of Load
3-1
3-1
Preparing Platform
3-2
3-1
Lashing Drums
3-3
3-1
Lashing Attitude Control Bar
3-4
3-1
Installing Extraction System
3-5
3-1
Placing Extraction Parachute
3-6
3-1
Marking Rigged Load
3-7
3-1
Equipment Required
3-8
3-1
ii
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Section II
RIGGING THREE DRUMS
Description of Load
3-9
3-10
Preparing Platform
3-10
3-10
Lashing Drums
3-11
3-10
Lashing Attitude Control Bar
3-12
3-10
Installing Extraction System
3-13
3-10
Placing Extraction Parachutes
3-14
3-10
Marking Rigged Load
3-15
3-10
Equipment Required
3-16
3-10
Section III
RIGGING FOUR DRUMS
Description of Load
3-17
3-18
Preparing Platform
3-18
3-18
Lashing Drums
3-19
3-18
Lashing Attitude Control Bar
3-20
3-18
Installing Extraction System
3-21
3-18
Placing Extraction Parachutes
3-22
3-18
Marking Rigged Load
3-23
3-18
Equipment Required
3-24
3-18
Section IV
RIGGING FIVE DRUMS
Description of Load
3-25
3-29
Preparing Platform
3-26
3-29
Lashing Drums
3-27
3-29
Lashing Attitude Control Bar
3-28
3-30
Installing Extraction System
3-29
3-30
Placing Extraction Parachutes
3-30
3-30
Marking Rigged Load
3-31
3-30
Equipment Required
3-32
3-30
Section V
RIGGING PUMP AND FILTER
General
3-33
3-39
Preparing Pump and Filter
3-34
3-39
Lashing Pump
3-35
3-39
Lashing Filter
3-36
3-39
Marking Rigged Load
3-37
3-39
Equipment Required
3-38
3-39
CHAPTER 4
RIGGING DRUMS FOR LOW-VELOCITY AIRDROP
ON A TYPE V PLATFORM
Section I
RIGGING TWO DRUMS WITHOUT PUMPING ASSEMBLY
ON AN 8-FOOT PLATFORM
Description of Load
4-1
4-1
Preparing Platform
4-2
4-1
Preparing and Positioning Honeycomb Stacks
4-3
4-3
Installing Lifting Slings
4-4
4-4
iii
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Positioning and Lashing Drums
4-5
4-5
Installing and Safetying Suspension Slings
4-6
4-8
Installing Cargo Parachutes
4-7
4-9
Installing Extraction System
4-8
4-10
Installing Parachute Release
4-9
4-11
Placing Extraction Parachute
4-10
4-12
Installing Provisions for Emergency Restraints
4-11
4-12
Marking Rigged Load
4-12
4-12
Equipment Required
4-13
4-12
Section II
RIGGING THREE DRUMS WITHOUT PUMPING
ASSEMBLY ON A 12-FOOT PLATFORM
Description of Load
4-14
4-16
Preparing Platform
4-15
4-16
Preparing and Positioning Honeycomb Stacks
4-16
4-18
Installing Lifting Slings and Positioning Drums
4-17
4-19
Lashing Drums
4-18
4-20
Installing and Safetying Suspension Slings
4-19
4-22
Building and Lashing Parachute Stowage Platform
4-20
4-23
Installing Cargo Parachutes
4-21
4-24
Installing Parachute Release
4-22
4-25
Installing Extraction System
4-23
4-26
Installing Provisions for Emergency Restraints
4-24
4-27
Placing Extraction Parachute
4-25
4-27
Marking Rigged Load
4-26
4-27
Equipment Required
4-27
4-27
Section III
RIGGING THREE DRUMS WITH PUMPING
ASSEMBLY ON A 12-FOOT PLATFORM
Description of Load
4-28
4-31
Preparing Platform
4-29
4-31
Preparing and Positioning Honeycomb Stacks
4-30
4-33
Installing Lifting Slings and Positioning Drums
4-31
4-33
Lashing Drums
4-32
4-33
Preparing Pump Assembly
4-33
4-35
Lashing Pump Assembly to Platform
4-34
4-35
Installing and Safetying Suspension Slings
4-35
4-38
Building and Lashing Parachute Stowage Platform
4-36
4-38
Installing Cargo Parachutes
4-37
4-38
Installing Parachute Release
4-38
4-38
Installing Extraction System
4-39
4-38
Installing Provisions for Emergency Restraints
4-40
4-38
Placing Extraction Parachute
4-41
4-38
Marking Rigged Load
4-42
4-38
Equipment Required
4-43
4-38
iv
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Section IV
RIGGING FOUR DRUMS WITHOUT PUMPING
ASSEMBLY ON A 20-FOOT PLATFORM
Description of Load
4-44
4-42
Preparing Platform
4-45
4-42
Preparing and Positioning Honeycomb Stacks
4-46
4-44
Installing Lifting Slings and Positioning Drums
4-47
4-45
Lashing Drums
4-48
4-45
Installing and Safetying Suspension Slings
4-49
4-47
Building and Lashing Parachute Stowage Platform
4-50
4-48
Installing Cargo Parachutes
4-51
4-49
Installing Parachute Release
4-52
4-50
Installing Extraction System
4-53
4-51
Installing Provisions for Emergency Restraints
4-54
4-52
Placing Extraction Parachute
4-55
4-52
Marking Rigged Load
4-56
4-52
Equipment Required
4-57
4-52
Section V
RIGGING FIVE DRUMS WITHOUT PUMPING
ASSEMBLY ON A 20-FOOT PLATFORM
Description of Load
4-58
4-56
Preparing Platform
4-59
4-56
Preparing and Positioning Honeycomb Stacks
4-60
4-58
Installing Lifting Slings and Positioning Drums
4-61
4-59
Lashing Drums
4-62
4-60
Installing and Safetying Suspension Slings
4-63
4-63
Building and Lashing Parachute Stowage Platform
4-64
4-65
Installing Cargo Parachutes
4-65
4-67
Installing Parachute Release
4-66
4-68
Installing Extraction System
4-67
4-69
Installing Provisions for Emergency Restraints
4-68
4-70
Placing Extraction Parachute
4-69
4-70
Marking Rigged Load
4-70
4-70
Equipment Required
4-71
4-70
Section VI
RIGGING SIX DRUMS WITHOUT PUMPING
ASSEMBLY ON A 24-FOOT PLATFORM
Description of Load
4-72
4-75
Preparing Platform
4-73
4-75
Preparing and Positioning Honeycomb Stacks
4-74
4-77
Installing Lifting Slings and Positioning Drums
4-75
4-78
Lashing Drums
4-76
4-79
Installing and Safetying Suspension Slings
4-77
4-82
Building and Lashing Parachute Stowage Platform
4-78
4-85
v
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Installing Cargo Parachutes
4-79
4-87
Installing Parachute Release
4-80
4-88
Installing Extraction System
4-81
4-89
Installing Provisions for Emergency Restraints
4-82
4-90
Placing Extraction Parachute
4-83
4-90
Marking Rigged Load
4-84
4-90
Equipment Required
4-85
4-90
Section VII
RIGGING SIX DRUMS WITH PUMPING
ASSEMBLY ON A 24-FOOT PLATFORM
Description of Load
4-86
4-95
Preparing Platform
4-87
4-95
Preparing and Positioning Honeycomb Stacks
4-88
4-97
Installing Lifting Slings and Positioning Drums
4-89
4-97
Lashing Drums
4-90
4-97
Preparing Pump Assembly
4-91
4-101
Lashing Pump Assembly to Platform
4-92
4-101
Installing and Safetying Suspension Slings
4-93
4-104
Building and Lashing Parachute Stowage Platform
4-94
4-104
Installing Cargo Parachutes
4-95
4-106
Installing Parachute Release
4-96
4-107
Installing Extraction System
4-97
4-108
Installing Provisions for Emergency Restraints
4-98
4-108
Placing Extraction Parachute
4-99
4-108
Marking Rigged Load
4-100
4-108
Equipment Required
4-101
4-108
Section VIII
RIGGING SEVEN DRUMS WITHOUT PUMPING
ASSEMBLY ON A 28-FOOT PLATFORM
Description of Load
4-102
4-113
Preparing Platform
4-103
4-113
Preparing and Positioning Honeycomb Stacks
4-104
4-115
Installing Lifting Slings and Positioning Drums
4-105
4-116
Lashing Drums
4-106
4-117
Installing and Safetying Suspension Slings
4-107
4-120
Building and Lashing Parachute Stowage Platform
4-108
4-122
Installing Cargo Parachutes
4-109
4-124
Installing Parachute Release
4-110
4-125
Installing Extraction System
4-111
4-126
Installing Provisions for Emergency Restraints
4-112
4-127
Placing Extraction Parachute
4-113
4-127
Marking Rigged Load
4-114
4-127
Equipment Required
4-115
4-127
vi
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Section IX
RIGGING SEVEN DRUMS WITH PUMPING
ASSEMBLY ON A 28-FOOT PLATFORM
Description of Load
4-116
4-132
Preparing Platform
4-117
4-132
Preparing and Positioning Honeycomb Stacks
4-118
4-134
Installing Lifting Slings and Positioning Drums
4-119
4-135
Lashing Drums
4-120
4-136
Preparing Pump Assembly
4-121
4-139
Lashing Pump Assembly to Platform
4-122
4-139
Installing and Safetying Suspension Slings
4-123
4-142
Building and Lashing Parachute Stowage Platform
4-124
4-145
Installing Cargo Parachutes
4-125
4-146
Installing Parachute Release
4-126
4-147
Installing Extraction System
4-127
4-148
Installing Provisions for Emergency Restraints
4-128
4-148
Placing Extraction Parachute
4-129
4-148
Marking Rigged Load
4-130
4-148
Equipment Required
4-131
4-148
CHAPTER 5
RIGGING DRUMS FOR LAPE AIRDROP
ON A TYPE V PLATFORM
Section I
RIGGING TWO DRUMS ON A 12-FOOT PLATFORM
Description of Load
5-1
5-1
Preparing Platform
5-2
5-2
Preparing and Positioning Deck Lashings
5-3
5-3
Preparing and Positioning Honeycomb
5-4
5-5
Installing Lifting Slings
5-5
5-6
Positioning and Lashing Drums
5-6
5-6
Lashing Drums to the Platform
5-7
5-11
Installing Attitude Control Bar
5-8
5-13
Installing Extraction System
5-9
5-15
Placing Extraction Parachutes
5-10
5-17
Marking Rigged Load
5-11
5-17
Equipment Required
5-12
5-18
Section II
RIGGING THREE DRUMS ON A 16-FOOT PLATFORM
Description of Load
5-13
5-20
Preparing Platform
5-14
5-20
Preparing and Positioning Deck Lashings
5-15
5-22
Preparing and Positioning Honeycomb
5-16
5-23
Installing Lifting Slings
5-17
5-24
Positioning and Lashing Drums to Cargo Tie-down Rings
5-18
5-24
vii
C6, FM 10-564/TO 13C7-37-1
Paragraph
Page
Lashing Drums to the Platform
5-19
5-27
Installing Attitude Control Bar
5-20
5-33
Installing Extraction System
5-21
5-36
Placing Extraction Parachutes
5-22
5-39
Marking Rigged Load
5-23
5-39
Equipment Required
5-24
5-39
Section III
RIGGING FOUR DRUMS ON A 20-FOOT PLATFORM
Description of Load
5-25
5-41
Preparing Platform
5-26
5-41
Positioning and Lashing Drums on the Platform
5-27
5-43
Installing Attitude Control Bar
5-28
5-59
Installing Extraction System
5-29
5-62
Placing Extraction Parachutes
5-30
5-64
Marking Rigged Load
5-31
5-64
Equipment Required
5-32
5-65
Section IV
RIGGING FIVE DRUMS ON A 24-FOOT PLATFORM
Description of Load
5-33
5-66
Preparing Platform
5-34
5-66
Positioning and Lashing Drums on the Platform
5-35
5-68
Installing Attitude Control Bar
5-36
5-89
Installing Extraction System
5-37
5-92
Placing Extraction Parachutes
5-38
5-94
Marking Rigged Load
5-39
5-94
Equipment Required
5-40
5-95
APPENDIX A
Deleted in Change 4
APPENDIX B
EQUIPMENT REQUIRED
B-1
GLOSSARY
Glossary-1
REFERENCES
References-1
viii
C6, FM 10-564/TO 13C7-37-1
PREFACE
SCOPE
This manual tells and shows how to rig 500-gallon-capacity collapsible fabric drums (model 5-14-191-1)
with or without a 50-gallon-per-minute pumping assembly or a liquid fuel filter/ separator (filter) for low-
velocity airdrop on type II and type V platforms. Fuel drums are low-velocity airdropped from C-130, C-141,
C-5, and C-17 aircraft. This manual also tells and shows how to rig fuel drums for LAPE airdrop on metric
and type V platforms from C-130 aircraft.
USER INFORMATION
The proponent of this publication is HQ TRADOC. You are encouraged to report any errors or omissions and
to suggest ways of making this a better manual.
Army personnel, send your comments on DA Form 2028 directly to:
Director
Aerial Delivery and Field Services Department
USA Quartermaster Center and School
1010 Shop Road
Fort Lee, Virginia 23801-1502
Air Force personnel, send your reports on AFTO Form 22 through:
Headquarters
Air Mobility Command (AMC/DOKT)
402 Scott Drive, Unit 3AI
Scott AFB, Illinois 62225-5302
Air Force personnel in Special Operations Command, send your reports on
AFTO Form 22 through:
HQ AFSOC/DOXT
100 Bartley Street, Suite 260
Hurlburt Field, FL 32544-5273
to:
Director
Aerial Delivery and Field Services Department
USA Quartermaster Center and School
1010 Shop Road
Fort Lee, Virginia 23801-1502
Also send an information copy of AFTO Form 22 to:
SA-ALC/TILDP
485 Quentin Roosevelt Road
Kelly AFB, Texas 78241-5000
ix
C6, FM 10-564/TO 13C7-37-1
CHAPTER 1
INTRODUCTION
1-1. Description of Items
1-2. Special Considerations
The 500-gallon-capacity collapsible fabric fuel
CAUTION
drums can be dropped with or without the 50-
There must be no more than 432 gallons of
gallon-per-minute pumping assembly or liquid
liquid in each drum when the drum is rigged for
fuel filter/separator (filter) in the following
low-velocity and LAPE airdrops.
configurations:
a. These loads may contain hazardous materi-
a. One or two drums with a pumping assem-
als- gasoline, JP-4 fuel, or diesel fuel. Hazardous
bly on a type II airdrop platform for low-veloc-
materials in these loads must be packaged, marked,
ity airdrop from a C-130 or C-141 aircraft.
and labeled in compliance with AFJMAN 24-204/
TM 38-250.
b. Two or three drums without a pumping
assembly on a type II airdrop platform for low-
b. Gasoline, JP-4 fuel, or diesel fuel may be
velocity airdrop from C-130 and C-141 aircraft.
airdropped using these procedures. Each drum
Two to seven drums without a pumping assem-
must be weighed to learn its exact weight. For
bly are rigged on a type V airdrop platform for
computing liquid weight per US gallon, use 6
low-velocity airdrop from C-130, C-141, C-5,
pounds for gasoline, 6.6 pounds for JP-4 fuel, and
and C-17 aircraft.
6.68 pounds for diesel fuel.
c. Three, six, or seven drums with a pump-
c. The drum is flexible, and will rebound on
ing assembly on a type V airdrop platform for
impact. The lashings may break and cause the drum
low-velocity airdrop from C-130, C-141, C-5,
to roll off the platform and create a possible hazard
and C-17 aircraft.
in the area.
d. Two to five drums with or without a
d. A copy of this manual must be available to
pumping assembly or a liquid fuel separator
the joint airdrop inspectors during the before- and
(filter) on a LAPES airdrop platform for LAPE
after- loading inspections.
airdrop from a C-130 aircraft.
WARNING
e. Two to five drums without a pumping
Do not add air to drums. Changes in
assembly on a type V airdrop platform for
pressurization can cause leaking or bursting.
LAPE airdrop from a C-130 aircraft.
Failure to comply endangers mission, aircraft,
1-1
C6, FM 10-564/TO 13C7-37-1
Table 4-1. Equipment required for rigging two drums without pumping assembly on an 8-foot,
type V airdrop platform for low-velocity airdrop (continued)
National Stock
Number
Item
Quantity
7510-00-266-5016
Tape, adhesive, 2-in
As required
1670-00-937-0271
Tiedown assembly, 15-ft
18
Webbing:
8305-00-268-2411
Cotton, 1/4-in, type I
As required
Nylon:
8305-00-082-5752
Tubular, 1/2-in, 1,000-lb, natural
As required
8305-00-263-3591
Type VIII, 3,600-lb
As required
4-15
C6, FM 10-564/TO 13C7-37-1
Section II
RIGGING THREE DRUMS WITHOUT PUMPING ASSEMBLY
ON A 12-FOOT PLATFORM
4-14. Description of Load
4-15. Preparing Platform
Three drums are rigged on a 12-foot, type V
platform. Filled with 432 gallons of gasoline,
Prepare a 12-foot, type V airdrop platform using
each drum weighs 2,842 pounds and is 62
four tandem links and 20 clevises as shown in
inches long and 53 inches in diameter. An
Figure 4-11.
empty drum weighs 250 pounds.
Notes: 1. The nose bumper may or may not
be installed.
Note: Fill drums with no more than
2. Measurements given in this section
432 gallons of fuel. If the drums are
are from the front edge of the
filled with a fuel other than gasoline,
platform, NOT from the front edge
the drum weight must be computed.
of the nose bumper.
WARNING
Do not add air to drums. Pressurization
changes will cause leaking or bursting.
4-16
C6, FM 10-564/TO 13C7-37-1
CLEVISES 10A THROUGH 1A
TIE-DOWN RINGS
TIE-DOWN RINGS
D
B
C
LEFT
A
B
A
REAR
FRONT
RIGHT
CLEVISES 10 THROUGH 1
Step:
1. Inspect, or assemble and inspect, the platform as outlined in TM 10-1670-268-20&P/
TO 13C7-52-22.
2. Install a tandem link on the front of each platform side rail using holes 1, 2, and 3. Install a
tandem link on the rear of each platform side rail using holes 22, 23, and 24.
3. Bolt a clevis on bushings 1 and 3 of each front tandem link, and on bushings 2 and 4 of each
rear tandem link.
4. Starting at the front of the platform, install clevises on each platform side rail using the
bushings bolted on holes 5, 10, 12, 13, 19 and 21.
5. Starting at the front of the platform, number the clevises bolted to the right side 1 through
10, and those bolted to the left side 1A through 10A.
6. Label the tiedown rings according to FM 10-500-2/TO 13C7-1-5.
Figure 4-11. Platform prepared
4-17
C6, FM 10-564/TO 13C7-37-1
4-16. Preparing and Positioning Honeycomb
Stacks
Prepare and position the honeycomb stacks as
shown in Figure 4-12.
1
1
2
1
Use eight 36- by 60-inch pieces of honeycomb to make a two-layer stack 60- by 144 inches.
Center the stack on the platform.
2
Glue eight 60- by 30-inch pieces of honeycomb flush together. Center this stack on the base
layer.
Figure 4-12. Honeycomb stacks positioned
4-18
C6, FM 10-564/TO 13C7-37-1
4-17. Installing Lifting Slings and Positioning
Drums
Lift the drums and position them on the honey-
comb as shown in Figure 4-13.
5
4
1
2
2
3
1
Attach a 9-foot (2-loop), type XXVI nylon webbing sling to the upper shackle on each side of
the drum with a platform clevis.
2
Lift a drum onto the front and rear of the honeycomb base as shown.
3
Lash the inside shackles of the two drums together on each side with a 15-foot tiedown
assembly.
4
Glue a 60- by 34-inch piece of honeycomb centered on the stack. Glue a 60- by 36-inch piece
of honeycomb centered over the piece placed previously.
5
Lift and position a drum onto the honeycomb stack.
Figure 4-13. Fuel drums positioned
4-19
C6, FM 10-564/TO 13C7-37-1
4-18. Lashing Drums
Use twenty 15-foot tie-down assemblies to lash
the fuel drums to the platform as shown in
Figure 4-14 and according to FM 10-500-2/TO
13C7-1-5.
5
7
1
3
2
1
5
3
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
1
1
Through right front shackle of front drum.
2
1A
Through left front shackle of front drum.
3
2
Through right front shackle of center drum.
4
2A
Through left front shackle of center drum.
5
3
Through right front shackle of center drum.
6
3A
Through left front shackle of center drum.
7
5
Through right rear shackle of front drum.
8
5A
Through left rear shackle of front drum.
Figure 4-14. Fuel drums lashed to platform
4-20
C6, FM 10-564/TO 13C7-37-1
13
11
15
9
10
9
8
6
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
9
6
Through right front shackle of rear drum.
10
6A
Through left front shackle of rear drum.
11
8
Through right rear shackle of center drum.
12
8A
Through left rear shackle of center drum.
13
9
Through right rear shackle of center drum.
14
9A
Through left rear shackle of center drum.
15
10
Through right rear shackle of rear drum.
16
10A
Through left rear shackle of rear drum.
Figure 4-14. Fuel drums lashed to platform (continued)
4-21
C6, FM 10-564/TO 13C7-37-1
4-19. Installing and Safetying Suspension
Slings
Install and safety four 12-foot (2-loop), type
XXVI nylon webbing slings to the tandem links
as shown in Figure 4-15.
2
1
1
1
Place the end loop of a 12-foot (2-loop), type XXVI nylon webbing sling in the bell portion
of a large clevis. Bolt the clevis to a tandem link. Repeat for the other three tandem links.
2
Raise the slings and install the deadman's tie according to FM 10-500-2/TO 13C7-1-5.
Figure 4-15. Suspension slings installed and safetied
4-22
C6, FM 10-564/TO 13C7-37-1
4-20. Building and Lashing Parachute
Stowage Platform
Build the parachute stowage platform and lash it
to the load with four 15-foot lashings as shown
in Figure 4-16.
Notes: 1. This drawing is not to scale.
1
2. All dimensions are given in
inches.
PLYWOOD
3. Use eightpenny nails.
3/4 x 48 x 96
LUMBER
2 x 6 x 48
2 3/4
2 3/4
LUMBER
2-in diam holes
2 x 6 x 85
2
3
4
4
7
1
Build the parachute stowage platform as shown. Nail the 2- by 6-inch pieces of lumber to the
edges of the plywood and drill 2-inch holes for the lashings.
2
Center a piece of honeycomb 48 inches wide and 26 inches long over the rear drum.
3
Place the parachute stowage platform over the honeycomb and the rear drum. Lash the front
holes to clevises 4 and 4A.
4
Lash the center and rear holes to clevises 7 and 7A.
Figure 4-16. Parachute stowage platform built and lashed
4-23
C6, FM 10-564/TO 13C7-37-1
4-21. Installing Cargo Parachutes
Install three G-11 cargo parachutes as shown in
Figure 4-17 and according to FM 10-500-2/TO
13C7-1-5.
4
1
3
2
1
Cluster three G-11 cargo parachutes on the parachute stowage platform.
2
Pass the rear restraint strap through the rear holes in the parachute stowage platform, and tie
the ends to the first bushing on the rear tandem links.
3
Pass the front restraint strap through the center holes in the parachute stowage platform, and
tie the ends to the 17th bushing on each side of the platform.
4
Install the parachute release knives according to FM 10-500-2/TO 13C7-1-5.
Figure 4-17. G-11 cargo parachutes installed
4-24
C6, FM 10-564/TO 13C7-37-1
4-22. Installing Parachute Release
Prepare and install an M-1 cargo parachute
release as shown in Figure 4-18 and according
to FM 10-500-2/TO 13C7-1-5.
2
1
2
3
3
1
Center a 36 -by 36-inch piece of honeycomb over the upper drum. Secure the honeycomb to
the drum shackles with type III nylon cord.
2
Attach the suspension slings and riser extensions to the M-1 release according to FM 10-500-
2/TO 13C7-1-5. Secure the release to the shackles on the lower drums with type III nylon
cord.
3
S-fold the suspension slings and tie the folds with type I, 1/4-inch cotton webbing.
Figure 4-18. M-1 release installed
4-25
C6, FM 10-564/TO 13C7-37-1
4-23. Installing Extraction System
Prepare and install the EFTC extraction system
according to FM 10-500-2/TO 13C7-1-5 and as
shown in Figure 4-19.
2
1
5
D6
4
3
1
Install the actuator mounting brackets to the front holes on the left platform rail.
2
Install a 12-foot cable to the actuator. Install the actuator to the brackets.
3
Attach the latch assembly to the extraction bracket. Attach the cable to the latch assembly.
4
Safety the cable to tiedown ring D6 with type I, 1/4-inch cotton webbing.
5
Install a 9-foot (2-loop), type XXVI nylon webbing sling as the deployment line. S-fold and
tie the excess in two places with type I, 1/4-inch cotton webbing.
Figure 4-19. EFTC installed
4-26
C6, FM 10-564/TO 13C7-37-1
4-24. Installing Provisions for Emergency
4-26. Marking Rigged Load
Restraints
Mark the rigged load according to FM 10-500-
Select and install provisions for emergency
2/TO 13C7-1-5 and as shown in Figure 4-20.
restraints according to the emergency aft re-
straint requirements table in FM 10-500-2/
TO 13C7-1-5.
CAUTION
4-25. Placing Extraction Parachute
The load weight may vary from the one
shown, depending upon the fuel rigged. Be
sure that the load is weighed, and the para-
Select the extraction parachute and extraction
line needed using the extraction line require-
chute requirements, CB, and tip-off curve
recomputed.
ments table in FM 10-500-2/TO 13C7-1-5.
Place the extraction parachute and extraction
line on the load for installation in the aircraft.
4-27. Equipment Required
Use the equipment listed in Table 4-2 to rig this
load.
4-27
C6, FM 10-564/TO 13C7-37-1
CAUTION
Make the final rigger inspection required by FM 10-500-2/TO 13C7-1-5
before the load leaves the rigging site.
CB
Rigged Load Data
Weight: Estimated, with gasoline
10,960 pounds
Maximum (as shown)
13,940 pounds
Height
86.5 inches
Width
108 inches
Length
144 inches
Overhang Front
5 inches
Rear
17 inches
CB (from front edge of platform)
75 inches
Extraction System (adds 18 inches to length of platform)
EFTC
Figure 4-20. Three drums without pumping assembly rigged on a 12-foot, type V airdrop platform
for low-velocity airdrop
4-28
C6, FM 10-564/TO 13C7-37-1
Table 4-2. Equipment required for rigging three drums without pumping assembly on a 12-foot,
type V airdrop platform for low-velocity airdrop
National Stock
Number
Item
Quantity
8040-00-273-8713
Adhesive, paste, 1-gal
As required
4030-00-678-8562
Clevis, suspension, 3/4-in (medium)
4
4030-00-090-5354
Clevis, suspension, 1-in (large)
5
4020-00-240-2146
Cord, nylon, type III, 550-lb
As required
1670-00-434-5783
Coupling, airdrop, extraction force transfer with cable, 12-ft
1
Cover:
1670-00-360-0328
Clevis, large
1
1670-00-360-0329
Link, type IV
7
1670-01-183-2678
Leaf, extraction line (line bag)
2
Line, drogue (for C-17)
1670-01-062-6316
60-ft (3-loop), type XXVI
1
Line, extraction:
1670-01-062-6316
60-ft (3-loop), type XXVI (for C-130)(Use w/ 140-ft for
1
C-5)
1670-01-107-7651
140-ft (3-loop), type XXVI (for C-141B,C-5, or C-17)
1
Link assembly:
1670-00-783-5988
Type IV
7
Two-point:
5306-00-435-8994
Bolt, 1-in diam, 4-in long
2
5310-00-232-5165
Nut, 1-in, hexagonal
2
1670-00-003-1953
Plate, side, 3 3/4-in
2
5365-00-007-3414
Spacer, large
2
Lumber:
5510-00-220-6148
2- by 6- by 85-in
2
by 48-in
2
5315-00-010-4659
Nail, steel wire, 8d
As required
4-29
C6, FM 10-564/TO 13C7-37-1
Table 4-2. Equipment required for rigging three drums without pumping assembly on a 12-foot,
type V airdrop platform for low-velocity airdrop (continued)
National Stock
Number
Item
Quantity
1670-00-753-3928
Pad, energy-dissipating (honeycomb)
3- by 36- by 96-in
14 sheets
Parachute:
Cargo:
1670-01-016-7841
G-11B
3
Cargo extraction:
1
1670-01-063-3716
22-ft
Drogue (for C-17)
1
1670-01-063-3715
15-ft
Platform, airdrop, type V, 12-ft
1670-01-353-8425
Bracket assembly, coupling
(1)
1670-01-162-2372
Clevis assembly, type V
(20)
1670-01-162-2376
Extraction bracket assembly
(1)
1670-01-162-2381
Tandem link assembly (Multipurpose link)
(4)
5530-00-128-4981
Plywood, 3/4 -by 48- by 96-in
1 sheet
1670-01-097-8816
Release, cargo parachute, M-1
1
Sling, cargo, airdrop
For suspension:
1670-01-062-6303
12-ft (2-loop), type XXVI nylon webbing
For lifting:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
2
For deployment:
1670-01-062-6304
9-ft (2-loop), type XXVI nylon webbing
1
For riser extension:
1670-01-062-6302
20-ft (2-loop), type XXVI nylon webbing
6
5340-00-040-8219
Strap, parachute release, multi-cut, comes w/ 3 knives
2
7510-00-266-5016
Tape, adhesive, 2-in
As required
1670-00-937-0271
Tie-down assembly, 15-foot
18
Webbing:
8305-00-268-2411
Cotton, 1/4-in, type I
As required
8305-00-082-5752
Nylon, tubular, 1/2-in
As required
8305-00-263-3591
Type VIII
As required
4-30
C6, FM 10-564/TO 13C7-37-1
Section III
RIGGING THREE DRUMS WITH PUMPING ASSEMBLY
ON A 12-FOOT PLATFORM
4-28. Description of Load
4-29. Preparing Platform
Three drums are rigged with a pumping assem-
Prepare a 12-foot, type V airdrop platform using
bly on a 12-foot, type V platform. Filled with
four tandem links and 26 clevises as shown in
432 gallons of gasoline, each drum weighs
Figure 4-21.
2,842 pounds and is 62 inches long and 53
inches in diameter. An empty drum weighs 250
Notes: 1. The nose bumper may or may not
pounds.
be installed.
2. Measurements given in this section
Note: Fill drums with no more than
are from the front edge of the
432 gallons of fuel. If the drums are
filled with a fuel other than gasoline,
platform, NOT from the front edge
of the nose bumper.
the drum weight must be computed.
WARNING
Do not add air to drums. Pressurization
changes will cause leaking or bursting.
4-31
C6, FM 10-564/TO 13C7-37-1
CLEVISES 13A THROUGH 1A
TIE-DOWN RINGS
TIE-DOWN RINGS
D
B
C
LEFT
A
B
A
REAR
FRONT
RIGHT
CLEVISES 13 THROUGH 1
Step:
1. Inspect, or assemble and inspect, the platform as outlined in TM 10-1670-268-20&P/
TO 13C7-52-22.
2. Install a tandem link on the front of each platform side rail using holes 1, 2, and 3. Install a
tandem link on the rear of each platform side rail using holes 22, 23, and 24.
3. Bolt a clevis on bushings 1, 2 and 3 of each front tandem link, and on bushings 2 and 4 of
each rear tandem link.
4. Starting at the front of the platform, install clevises on each platform side rail using the
bushings bolted on holes 4, 5, 10, 12, 13, 15, 19 and 21.
5. Starting at the front of the platform, number the clevises bolted to the right side 1 through
13, and those bolted to the left side 1A through 13A.
6. Label the tiedown rings according to FM 1-500-2/TO 13C7-1-5.
Figure 4-21. Platform prepared
4-32
C6, FM 10-564/TO 13C7-37-1
4-30. Preparing and Positioning Honeycomb
4-32. Lashing Drums
Stacks
Prepare and position the honeycomb stacks as
Use twenty-six 15-foot tiedown assemblies to
shown in Figure 4-12.
lash the fuel drums to the platform as shown in
4-31. Installing Lifting Slings and Positioning
Figure 4-22 and according to FM 10-500-2/TO
Drums
13C7-1-5.
Lift the drums and position them on the honey-
comb as shown in Figure 4-13.
5
7
1
3
3
1
7
5
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
1
1
Through right front shackle of front drum.
2
1A
Through left front shackle of front drum.
3
3
Through right front shackle of center drum.
4
3A
Through left front shackle of center drum.
5
5
Through right front shackle of center drum.
6
5A
Through left front shackle of center drum.
7
7
Through right rear shackle of front drum.
8
7A
Through left rear shackle of front drum.
Figure 4-22. Fuel drums lashed to platform
4-33
C6, FM 10-564/TO 13C7-37-1
13
11
15
9
13
12
11
8
Tie-down
Lashing
Clevis
Instructions
Number
Number
Pass lashing:
9
8
Through right front shackle of rear drum.
10
8A
Through left front shackle of rear drum.
11
11
Through right rear shackle of center drum.
12
11A
Through left rear shackle of center drum.
13
12
Through right rear shackle of center drum.
14
12A
Through left rear shackle of center drum.
15
13
Through right rear shackle of rear drum.
16
13A
Through left rear shackle of rear drum.
Figure 4-22. Fuel drums lashed to platform (continued)
4-34
C6, FM 10-564/TO 13C7-37-1
4-33. Preparing Pump Assembly
4-34. Lashing Pump Assembly to Platform
Build the box for the pump assembly as shown
Place the pump assembly box on the load and
in Figure 4-23. Pack the pump, hoses, and
lash it to the platform as shown in Figure 4-25.
equipment in the box as shown in Figure 4-24.
Notes: 1. These drawings are not to scale.
LUMBER
2. Use 8d nails.
2 x 4 x 25 1/2
3. All dimensions are in inches.
41 1/2
3/4
BOTTOM
26
ENDS (2)
25 1/2
27
LUMBER
2 x 4 x 41 1/2
43
SIDES (2)
26
27
TOP
41 1/2
Step:
1. Cut the bottom of the box from 3/4-inch plywood 41 1/2 inches long and 25 1/2
inches wide. Nail a 41 1/2-inch length of 2- by 4-inch lumber flat side down and flush along
each long edge of the bottom. The top of the box is 43- by 27 inches.
2. Cut the sides of the box from 3/4-inch plywood 41 1/2 inches long and 26 inches high. Place
the sides flush with the bottom. Nail into the 2- by 4-inch pieces of lumber.
3. Cut the ends of the box from 3/4-inch plywood 27 inches wide and 26 inches high. Nail a
piece of 2- by 4-inch lumber flat side down, centered, and flush with the top edge of
each end piece. Nail the ends flush to the bottom and sides. Nail the sides to the 2- by 4-inch
pieces of lumber on the ends.
Figure 4-23. Pump assembly box built
4-35
C6, FM 10-564/TO 13C7-37-1
1
3
2
1
Place the pump, its hoses, a five-gallon can of fuel, and any other items needed by the unit in
the box. Pad the items with cellulose wadding. Nail the top to the box.
2
Place four D-rings onto a 15-foot lashing. Place the lashing around the box lengthwise, and
position two D-rings on each end of the box, six inches from each side. Tighten the lashing.
3
Pass two 15-foot lashings around the box and through the D-rings as shown. Tighten the
lashings.
Figure 4-24. Pump assembly box packed
4-36
C6, FM 10-564/TO 13C7-37-1
3
2
5
4
6
1
2
4
9
1
Cut two pieces of honeycomb the dimensions of the bottom and side of the box.
2
Lift the box onto the front drum using 1/2-inch tubular nylon webbing tied to the D-rings on
the ends of the box. Place the honeycomb cut in step 1 between the box and the front and
center drums. Secure the honeycomb in place with type III nylon cord.
3
Untie the 1/2-inch tubular nylon webbing placed in step 2 on one side. Retie the webbing
tightly between the D-rings on opposite ends of the box to hold the D-rings in position when
the box is lashed.
4
Pass a 15-foot lashing through clevis 4 and through its own D-ring. Pass a 15-foot lashing
through clevis 4A and through its own D-ring. Secure the two lashings with two D-rings and
a load binder on the left side of the load.
5
Pass a 15-foot lashing through clevis 2 and through the right front D-ring. Pass a 15-foot
lashing through clevis 2A and through the left front D-ring. Tighten the lashings at the same
time.
6
Pass a 15-foot lashing through clevis 9 and through the right rear D-ring. Pass a 15-foot
lashing through clevis 9A and through the left rear D-ring. Tighten the lashings at the same
time.
Figure 4-25. Pump assembly box lashed to platform
4-37

 

 

 

 

 

 

 

 

Content      ..      1       2         ..

 

 

///////////////////////////////////////