Air Operator Certification Manual - Helicopters (2017) - page 1

 

  Index      Manuals     Air Operator Certification Manual - Helicopters (2017)

 

Search            copyright infringement  

    

 

   

 

   

 

Content      ..      1       2         ..

 

 

 

Air Operator Certification Manual - Helicopters (2017) - page 1

 

 

CAP 3400
Air Operator
Certification Manual -
Helicopters
Approved by the Director General of Civil Aviation
Second Edition - 2017
Directorate General of Civil Aviation, India
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
TABLE OF CONTENTS
TABLE OF CONTENTS
i
FOREWORD
vi
RECORD OF REVISIONS
viii
LIST OF EFFECTIVE PAGES
ix
ABBREVIATIONS
x
CHAPTER 1 - INTRODUCTION
1
1. General
1
2. Applicable Rules and Requirements
1
3. Purpose of AOP/AOC
2
4. Air Operator’s Permit/ Certificate
4
5. Application for AOP/ AOC
5
6. Continued Compliance
5
7. Suspension/ Cancellation or Revocation of AOP/ AOC
5
CHAPTER 2 - BACKGROUND
1
1. Certification Process
1
2. Responsibility of the Applicant
2
3. Authorization for the issue of an Air Operator’s Permit/ Certificate
3
4. Schedule of Events
3
5. Statement of Compliance (Declaration of Conformance)
4
6. Operator’s Permit/ Certificate and Operations Specifications (Ops Spec)
4
CHAPTER 3 - INITIAL ISSUE OF AN AOP/ AOC
1
1. The Pre-Application phase
1
2. The Formal Application Phase
3
3.
The Document Evaluation Phase
6
[i]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
3.1 General
6
3.2 Lease Agreements
6
3.3 Manuals
6
3.4 Operations Manual
9
3.5 Rotorcraft Flight Manual
10
3.6 Route Manual/ Navigation Information
10
3.7
Training Manuals, Training Programmes and Training Personnel
10
3.8 Dangerous Goods Manual
11
3.9 Maintenance Control Manual(CAME)
12
3.10 Security Manual
13
3.11 Safety and Emergency Procedures
13
3.12 Ground Handling Procedures
13
3.13 Flight Safety Manual
13
3.14 Safety Management Systems Programme
13
3.15 Flight Safety Documents System
14
3.16 Passenger Safety Briefing Card
15
3.17 Minimum Equipment List
15
3.18 Statistical Returns
16
4. Permission to import helicopter
16
5. The Demonstration and Inspection Phase
16
5.1. General
16
5.2 Proving/ Validation Flights
17
5.3 Evacuation and Ditching Demonstration
18
6. Certification Phase
18
6.1 Final version of the Operation Specifications
18
[ii]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
6.2 Issue of an Air Operator Permit/ Air Operator Certificate
19
7. Renewal of Air Operator Permit/ Certificate
19
7.1 The Application for Renewal
19
7.2 Inspection for Renewal of AOP/ AOC
19
7.3 Lapsed AOP/ AOC
20
7.4 Amendment to AOP/ AOC/ Operations Specifications
20
CHAPTER 4 - CERTIFICATION PROCESS
1
1. Air Operator’s Certification Team
1
2. Pre-application Phase
3
3. Formal Application Phase
5
4. Document Evaluation Phase
8
5. Inspection and Demonstration Phase
12
6. Certification Phase
14
CHAPTER 5 - MANAGEMENT OF AIR OPERATOR PERMIT/ CERTFICATE
1
APPENDIX A - Application For Permission To Establish Air Transport Services In India 1
APPENDIX B - Schedule of Events
1
APPENDIX C - Statement of Compliance
1
APPENDIX D - Certification Check Lists
1
CHECKLIST 01 - Assessment of General Status
2
CHECKLIST 02 - Technical assessment for issue of Operations Specifications
3
CHECKLIST 03 - Assessment of Post Holders
5
CHECKLIST 04 - Assessment of Operations Manual
7
CHECKLIST 05 - Organizational Structure, Staffing and Administrative Facilities
9
CHECKLIST 06 - Assessment of Flight Manual and Cockpit Checklists
11
CHECKLIST 07 - Provision of Operational Information and Support to Crew
13
[3]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
CHECKLIST 08 - Arrangements for Maintenance of Documents/ Records
15
CHECKLIST 09 - Inspection of Loading and Load Control
19
CHECKLIST 10 - Inspection of Helicopter
21
CHECKLIST 11 - Inspection of Operational Bases and Passenger Handling
23
CHECKLIST - 11A - Inspection of Ground Handling Arrangements……………………26
CHECKLIST 12 - Inspection of Training Facilities
26
CHECKLIST 13 - Operational Control
29
CHECKLIST 14 - Flight Operations Inspectors Final Report
31
CHECKLIST 15 - Proving Flight
34
CHECKLIST - 20 - Maintenance Organizational Structure and Staffing
40
CHECKLIST - 21 - Maintenance Control Manual (CAME)
42
CHECKLIST - 22 - Technical Data
58
CHECKLIST - 23 - Fuelling of Helicopter
60
CHECKLIST - 24 - Maintenance Facilities
63
CHECKLIST - 25 - Weight & Balance Control
66
CHECKLIST - 26 - Helicopter Servicing, Spares Holding & Stores Control
68
CHECKLIST - 27 - Minimum Equipment List / Configuration Deviation List
70
CHECKLIST - 28 - Maintenance Release
72
CHECKLIST- 29 - Accomplishment, and Control of Mandatory Modifications/
Airworthiness Directives
74
CHECKLIST - 30 - Airworthiness Inspection of Helicopter
76
CHECKLIST - 31 - Inspection of Maintenance Systems
80
CHECKLIST - 32 - Time-In-Service and Maintenance Records
84
CHECKLIST - 33 - Contractual Arrangements
86
CHECKLIST - 34 - Assessment of Head of Maintenance
91
CHECKLIST - 35 - Inspection of Defect Reporting System
93
[4]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
CHECKLIST - 36 - Airworthiness Team Leader’s Final Report
94
APPENDIX E - Format of Air Operator’s Permit and Operations Specifications
1
APPENDIX G - Introducing a type of helicopter that is not already in service in India -
Special additional requirements
1
APPENDIX H - Recommended Qualifications for Nominated Post Holders
1
APPENDIX I - Pre Certification Facility Inspections
1
APPENDIX J - Checklist for the Issuance of an AOP/ AOC
1
APPENDIX K - Suggested Timelines for Completion of Certification Process including
time lines for completion of major events for induction of helicopter
1
Appendix K-1 Time Line for Completion of Certification Process for Grant Of AOP/ AOC 1
Appendix K-2 - Time Line for Completion of Major Events for Induction of Helicopter
3
Appendix L - Renewal of an AOP/ AOC
1
Appendix M - Application for Amendments to the Operations Specifications
1
Appendix N - Requirements for International Operations
1
Appendix O - Proving Flight Readiness Check
1
Appendix P- Review Check List - Reporting of Deficiencies……………………………...…1
[5]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
FOREWORD
In accordance with the provisions of Rule 134 of the Aircraft Rules, 1937 no persons
shall operate any scheduled air transport service from, to, in, or across India except
with the permission of the Central Government. In order to promote/ enhance Regional
Connectivity, the concept of Scheduled Commuter Air Transport Services has been
introduced under the National Civil Aviation Policy - 2016. Further, Rule 134A of the
Aircraft Rules, stipulates that no air transport service, other than a scheduled air
transport service, shall be operated by an Indian air transport undertaking unless it
holds a Non-Scheduled Operator’s Permit granted by the Central Government. The
authority to grant the permission has been delegated by the Government to DGCA.
Accordingly, Air Operator Certificates/ Permits for operating the following types of air
transport services are presently issued by DGCA to applicants who meet the laid down
requirements for the specific type of air transport service:
1. Scheduled Air Transport Service (Passenger)
2. Scheduled Air Transport Service (Cargo)
3. Scheduled Commuter Services
4. Non- Scheduled Air Transport Service (Passenger)
5. Non- Scheduled Air Transport Service (Cargo)
Operators undertaking Scheduled Commuter Services would be issued a Scheduled
Air Operator Certificate (Scheduled Commuter) while non-scheduled operators would
be issued Non- Scheduled Air Operators Permit (Passenger) or Non- Scheduled Air
Operators Permit (Cargo) as applicable. Such certificates are required to be granted
by ICAO member States in accordance with the provisions of Annex 6 Part III.
Certificates/ Permits are granted subject to the applicant showing satisfactory
capability to undertake the type of operations to the regulator. Hence certification of
an air operator is a very vital role in the regulatory system. In order to assess the
competence of an Operator, the DGCA has to conduct an in-depth evaluation of the
proposed operation, which should at least cover organization, staffing, equipment &
facilities, proposed routes/ areas of operation, level and type of service and finances.
The issue of an Air Operator Permit would be dependent upon the applicant
demonstrating an adequate organization, method of control and supervision of flight
operations, training programmes as well as ground handling and maintenance
arrangements consistent with the nature and extent of the operation specified.
[6]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
May2018
The certification team of Inspectors of DGCA is responsible for conducting the required
evaluations to ensure the applicant’s capability of meeting the actual and potential
obligations in establishing and continuing to maintain safe operation of air services,
prior to issuance of the AOP/ AOC. Hence, all Inspectors involved in the certification
process of the issuance of an AOP/ AOC, shall be guided by the requirements
stipulated in this manual.
On compliance of the requirements by the applicant and after evaluation by DGCA,
the applicant would be issued a certificate/ permit, setting forth the operational
authorisation and limitations to carry out the specified commercial air transport
operations.
Subsequent to the issuance of an Air Operator Permit, DGCA would continue to
monitor the operations by a systematic procedure of surveillance and inspections.
CAP 3400 - Air Operator Certification Manual - Helicopters provides the guidance to
an applicant seeking such a Certificate for helicopter operations. The purpose of this
manual is to explain the administrative procedure involved, for the issue and renewal
of an Air Operator Permit and to indicate the requirements to be met by an applicant
for such a Permit. Every application is considered on its merits. Furthermore this
guidance is for DGCA Inspectors to certify operators for an issue of an AOP/ AOC. It
is expected that the applicant of an Air Operator Certificate/Permit will be benefited by
this manual as it explains the administrative procedures involved so that the process
would be independent and transparent. The list of guidance material issued by DGCA
as indicated in the manual needs to be referred to, in conjunction with this manual.
Prospective applicants may visit the DGCA official website at http://dgca.nic.in to
obtain further details.
(B. S. Bhullar)
Director General of Civil Aviation
(Approved vide F. No. AV. 22024/07/2017 dated 4th June 2018)
[7]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
RECORD OF REVISIONS
Flight Standards Directorate, DGCA, India is responsible to ensure that this manual
is updated as required and to maintain the contents of the manual current at all times.
Amendments to this manual are promulgated by means of revisions issued
whenever necessary to cover corrections and to add or modify the contents.
Any Revisions to the manual shall be shown with a vertical bar on the right side
of the revised data. The page number and the revision number of the effected
page must be changed accordingly. The list of effective pages and history of
revisions page must be amended accordingly.
All revisions to this manual shall have the approval of the approving authority of
this manual prior to publishing of the revisions.
REVISION NUMBER
DATE ENTERED
ENTERED BY
1st Edition
16th January 2017
CFOI, DGCA
2nd Edition
July 2017
CFOI, DGCA
Rev. 1
June 2018
CFOI, DGCA
[8]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 1
June 2018
LIST OF EFFECTIVE PAGES
Reference
Page No(s).
Revision No.
Effective Date
Chapter 0
1-11
Rev 1
June 2018
Chapter 1
1-5
Rev 0
July 2017
Chapter 2
1-5
Rev 0
July 2017
Chapter 3
1-21
Rev 0
July 2017
Chapter 4
1-16
Rev 0
July 2017
Chapter 5
1-2
Rev 0
July 2017
Appendix A
1-14
Rev 0
July 2017
Appendix B
1-8
Rev 0
July 2017
Appendix C
1-4
Rev 0
July 2017
Appendix D
1-94
Rev 1
June 2018
Appendix E
1-5
Rev 0
July 2017
Appendix F
1
Rev 0
July 2017
Appendix G
1-5
Rev 0
July 2017
Appendix H
1-4
Rev 0
July 2017
Appendix I
1-20
Rev 0
July 2017
Appendix J
1-4
Rev 0
July 2017
Appendix K
1-4
Rev 0
July 2017
Appendix L
1-6
Rev 0
July 2017
Appendix M
1
Rev 0
July 2017
Appendix N
1-2
Rev 0
July 2017
Appendix O
1
Rev 0
July 2017
Appendix P
1
Rev 1
June 2018
[9]
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 0
July 2017
ABBREVIATIONS
AIC
-
Aeronautical Information Circular
AIP
-
Aeronautical Information Publication
AIRAC
-
Aeronautical Information Regulation and Control
AMT
-
Aeromedical Transport
AOCMB
-
Air Operator Certificate Management Bureau
AOP/ AOC
-
Air Operator Permit/ Air Operator Certificate
APM
-
Airworthiness Procedures Manual
AWOP
-
All Weather Operations
CAME
-
Continuous Airworthiness Maintenance Exposition
CAR
-
Civil Aviation Requirements
CSI
-
Cabin Safety Inspector
C of A
-
Certificate of Airworthiness
C of R
-
Certificate of Registration
DGCA
-
Director General of Civil Aviation
DGR
-
Dangerous Goods Regulations
ELO
-
External Load Operations
FOI
-
Flight Operations Inspector
HEMS
-
Helicopter Emergency Medical Services
HHO
-
Helicopter Hoist Operations
ICAO
-
International Civil Aviation Organization
MEL
-
Minimum Equipment List
MMEL
-
Master Minimum Equipment List
NOTAM
-
Notice to Airmen
OM
-
Operations Manual
Ops Spec
-
Operations Specifications
PBN
-
Performance Based Navigation
RFM
-
Rotorcraft Flight Manual
RNAV
-
Area Navigation
RNP
-
Required Navigational Performance
SARPs
-
Standards and Recommended Practices
SOPs
-
Standard Operating Procedures
[1
CAP 3400
Air Operator
Certification Manual -
Chapter 0
Helicopters
Revision 0
July 2017
DEFINITIONS
“Noted”
This is a term to be used when completing the Declaration of
Conformance to indicate that the Operator has read and
understood the provisions made in the Regulations but it does
not require him to take any action to comply with the regulation.
“Noted &
This is a term to be used when completing the Declaration of
Complied”
Conformance to indicate that the Operator has read and
understood the provisions in the Regulations and action has
been taken to comply with it. When the operator states “Noted
and Complied” it is necessary to make necessary cross-
reference to the relevant documents of the operator which
describes action/step that he has taken for such conformance.
This may be done by quoting the applicable section and /or
paragraph numbers and the title of the Operator’s Manuals.
“Noted but
This is a term to be used when completing the Declaration of
Compliance
Conformance to indicate the Regulations which the operator
deferred”
has failed to comply with at the time of application.
[1
CAP 3400
Air Operator
Certification Manual -
Chapter 1
Helicopters
Revision 1
June 2018
CHAPTER 1 - INTRODUCTION
1. General
1.1
In accordance with Rule 134 of the Aircraft Rules, 1937 no persons shall
operate an air transport service to, from and within India without permission of
the Central Government. The authority to grant the permission has been
delegated by the government to DGCA which is granted in the form of an Air
Operator Certificate (AOC). AOC specifies the nature and scope of operations
granted to an air operator together with the terms, conditions and limitations
applicable to such operations. An operator is required and expected to ensure
that all operations undertaken are well within the requirements specified in the
AOP/ AOC.
1.2
Accordingly, Air Operator’s Certificates/ Permits for operating the following
types of air transport services are presently issued by DGCA to applicants who
meet the laid down requirements for the specific type of air transport service:
Scheduled Air Transport Service (Passenger)
Scheduled Air Transport Service (Cargo)
Scheduled Commuter Services
Non- Scheduled Air Transport Service (Passenger)
Non- Scheduled Air Transport Service (Cargo)
1.3
These AOCs/ AOPs are granted in compliance with the provisions of Annex 6
Part III.
2. Applicable Rules and Requirements
2.1
In discharge of its responsibilities for regulating air transportation and ensuring
safety of helicopter operations, DGCA has laid down detailed rules, regulations
and procedures under the provisions of Aircraft Act, 1934. The main
responsibility for the safe conduct of the operations and for compliance with
the laws, rules, regulations and directions issued from time to time is that of
the operator. These laws and regulations cannot in themselves provide the
operator with comprehensive and detailed instructions on which to base his
operations. The operator should, therefore, develop his own detailed operating
procedures necessary for safety, regularity and efficiency of operations within
the frame work of the laws, rules, regulations, and directions issued by DGCA
from time to time.
2.2
While requirements on various aspects relating to air transport services are laid
Page 1 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 1
Helicopters
Revision 0
July 2017
down in the Aircraft Rules, 1937, Civil Aviation requirements and ICAO
Annexes, the following documents stipulate the specific requirements for grant
of permit to operate air transport services.
I.
Schedule XI and Rule 134A of the Aircraft Rules, 1937 - Requirements
for Grant of Air Operator’s Certificate/ Permit for Scheduled/ Non-
Scheduled Operations.
II.
Civil Aviation Requirement, Section 3, Series 'C' Part Ill - Minimum
Requirements for Grant of Permission and to operate Non-Scheduled Air
Transport Services (Passenger).
III.
Civil Aviation Requirement, Section 3, Series 'C' Part IV - Minimum
Requirements for Grant of Permission and operation of Air Transport
Services (Cargo).
IV. Civil Aviation Requirement, Section 3, Series 'C' Part X - Minimum
requirements for undertaking aircraft operations with aircraft owned by
State Governments/ Public Sector Undertakings of Central/ State
Governments.
V. Civil Aviation Requirement, Section 3, Series 'C' Part XII - Minimum
requirements for Grant of Permission and to operate Scheduled
Commuter Air Transport Services.
3. Purpose of AOP/AOC
3.1
The purpose of an AOP/ AOC is to certify that specified commercial air transport
operations are authorized by DGCA and are to be conducted in compliance
with applicable regulations and rules.
3.2
The DGCA is empowered to issue the AOP/ AOC in two parts, the AOP/ AOC
itself and the associated operations specifications (Ops Spec) that specifies the
nature and scope of operations authorised together with relevant conditions and
limitations (eg. HEMS, PBN, RNP etc).
3.3
The DGCA is authorized to suspend or cancel an AOP/ AOC, if one or more of
the conditions stipulated therein is breached or not maintained to the same level
as demonstrated at the initial certification.
3.4
Prior to issuing an AOP/ AOC, the DGCA needs to be satisfied that the operator
conforms to all the requirements of relevant rules, requirements and associated
guidance published by the DGCA and in that:
(i)
the helicopter shall meet the appropriate standards of airworthiness and
operational requirements, and thereby be equipped with all mandatory items for
Page 2 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 1
Helicopters
Revision 0
July 2017
communication, navigation, surveillance and safety and emergency equipment
in accordance with the applicable Civil Aviation Requirements published by the
DGCA, for safe, secure, efficient and regular operations of proposed services;
(ii)
the operator has provided for adequate servicing and maintenance of the
helicopter and established an effective system of maintenance control for this
purpose;
(iii)
the operator has provided for an effective means of operational control of the
helicopter that he intends to operate. This should include the policies and
procedures covering the type of operations, the pre-departure functions, the
dispatch functions, flight following, dual responsibility if any, continuation of
flight, termination or en-route diversion of flight;
(iv)
the organizational structure, staffing and administrative facilities in the areas
such as operations, maintenance and/or all other associated areas of the
operator is appropriate and the nominees for the Designated Post Holders have
adequate experience and required qualifications and are acceptable to and
approved by the DGCA as in Appendix H in this manual;
(v)
detailed procedures, techniques and guidance are included in Operator’s
Manuals giving specific instructions / information as to how the operator’s
personnel are required to carry out their duties and functions and such manuals
shall receive approval from the DGCA;
(vi)
flight & cabin crew and all other personnel required for operation of helicopter
(e.g. dispatchers or ground handling staff), who are qualified and trained as per
published requirements and are available in sufficient numbers to carry out
operations;
(vii)
the operator shall have a FDTL Scheme approved as per the limitations for
flight time, flight duty periods, duty periods and rest periods for fatigue
management of flight & cabin crewmembers as given in the relevant CARs;
(viii)
all required training and checking programmes, Examiners/ Instructors/ Check
pilot and training infrastructure including training/ checking facilities (local, in-
house outsource and abroad) simulators, and any other synthetic devices have
the approval of DGCA, where applicable;
(ix)
type(s) of helicopter are approved for the proposed operations and are suitable
for the proposed operations and they are available in sufficient numbers;
(x)
facilities and ancillary services required for the proposed operations have been
organized to ensure safe, secure, efficient and regular operation;
(xi)
potential and actual liabilities of the operator in respect of helicopter, crew,
Page 3 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 1
Helicopters
Revision 0
July 2017
passengers, cargo and third party are covered with an insurance policy;
(Carriage by Air Act, 1972);
(xii)
an effective safety management system is in place;
(xiii) flight safety documents system is in place;
(xiv) flight data analysis programme & system of preservation of data, if applicable,
is in place;
(xv) air operator makes available to flight crew and operational personnel, adequate
navigation information contained in the AIP, AIRAC, AIC, pre-flight aeronautical
information etc, for the safety, regularity and efficiency of air navigation;
(xvi) an accident victim relief programme has been drawn up as per guidance of
ICAO CIR- 285/AN/166;
(xvii) operational requirements in relation to Ground handling, Passenger handling &
public safety, provision of operational information including dissemination of
weather data and NOTAMS to crew, arrangements of proposed fuel policy,
flight and cabin crew scheduling, operations support services, operational
loading and load control, take off & landing minima of the operator are in place;
(xviii) installations, equipment and staff facilities associated with main and operational
base stations is adequate for the proposed operation;
(xix) compliance with requirements related to transportation of Dangerous Goods by
air are adhered and documented;
(xx) maintenance requirements in relation to technical data, fuelling, maintenance
facilities, weight and balance, helicopter servicing, spares holding/ stores
control, MEL, CDL, maintenance release, accomplishment/ control of
airworthiness directives, maintenance systems, time-in-service/ maintenance
records, maintenance contractual agreements and Defects reporting system of
the operator are adhered and documented;
(xxi) any other element identified as a requirement during the certification process is
in place and is sufficient to ensure the conduct of operation with the type(s) of
helicopter to be operated.
4. Air Operator’s Permit/ Certificate
4.1
The AOP/ AOC and the associated Operations Specifications specify the nature
and scope of the authorizations in relation to the technical competency of the
operator for safe, secure, efficient and regular operation of air services.
Page 4 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 1
Helicopters
Revision 0
July 2017
5. Application for AOP/ AOC
The application for the issue of an AOP/ AOC must be prepared in accordance with the
requirements prescribed in Appendix A of this manual.
6. Continued Compliance
6.1
Once certified, the operator is responsible for the continued compliance with
the initial conditions of certification and applicable legislative requirements and
DGCA’s requirements promulgated from time to time. The DGCA will maintain
regular surveillance on the operator’s activities to ensure continued compliance,
in addition to conducting formal and detailed audits where the operator’s actual
operations are checked against approved procedures in the operator’s
documents.
7. Suspension/ Cancellation or Revocation of AOP/ AOC
7.1
Failure on the part of the operator to comply with the applicable requirements
may result in either the imposing of administrative penalties or suspension/
cancellation or revocation of the AOP/ AOC.
7.2
An operator should note that in the event of a suspension/ cancellation or
revocation of an AOP/ AOC, the operator needs to be recertified, with a process
as determined by the DGCA, based on the reason for the suspension/
cancellation.
7.3
An operator should note that even if an enforcement action was not taken by
the DGCA, and operations are conducted in breach of a condition or conditions
of the AOP/ AOC, such operations are construed to be unauthorised and the
operator is liable for enforcement action by the DGCA, on detection of such
occurrences even belatedly.
7.4
The guidance for enforcement is given in detail in the Enforcement Policy &
Procedures Manual.
Page 5 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 2
Helicopters
Revision 1
June 2018
CHAPTER 2 - BACKGROUND
1.
Certification Process
1.1
The certification process requires the DGCA to ascertain through a systematic
process whether or not a prospective applicant has both the required ability and
resources to comply with the applicable legislative requirements and to fulfill
the applicant’s actual and potential obligations for operation of safe, secure,
efficient and regular air transport services as proposed. This process involves
five distinct phases as stated below:
a.
Pre-application. During this phase, the applicant conducts initial studies,
prepares plans, makes inquiries from the DGCA in regard to the
opportunities available under the existing air services agreements and
seeks advice as to the validity of different proposals. The prospective
applicant at this stage is required to submit a statement of intent to the
DGCA outlining the proposal and apply to the Ministry of Civil Aviation for
issuance of NOC (assessment concerning the financial, economic and legal
aspects). On the issuance of an NOC and the request of the proposed
operator thereafter, the DGCA arranges for a pre-application meeting.
However, a pre-application meeting can also be conducted for an applicant
who does not have an NOC and needs to be guided on the process. In such
cases the NOC will have to be submitted by the applicant prior to initiating
the formal application stage. Receipt of NOC in such cases will constitute
the completion of the pre-application stage.
b.
Formal application. On completion of pre-application phase, if the
applicant desires to proceed further, then the applicant is required to submit
the complete application (Appendix A) to the DGCA together with the fees
and relevant documents to support the intended operation and this will
constitute initiation of the formal application phase. In case no FOI / AWI
is trained on type, for effective supervision the operator will proposed
training of Inspector on type in such a manner so that the certification
process can be supervised. The DGCA will then make a formal
assessment of the completeness of the applicant’s proposal and invite the
applicant for a Formal Application meeting where the details relating to the
certification process would be formally discussed.
c.
Document evaluation. During this phase, the DGCA will undertake a
detailed scrutiny of the applicant’s manuals and other documents, which
accompanied the formal application. The documentation must be complete,
accurate and current to satisfy the DGCA’s requirements. Qualifications and
experience of the nominees for designated post holders will be evaluated
and the designated post holders will be interviewed. Approval/ Acceptance
for the same will be granted. There will be series of discussions between
the DGCA and the approved/ accepted post holders of the applicant at this
Page 1 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 2
Helicopters
Revision 0
July 2017
stage in regard to establishing the validity/ acceptability of the applicant’s
proposals. It should be noted that the documents shall reflect precisely the
mode and manner in which the applicant intends conducting the proposed
operations and once approved, they shall form a part of the understanding
between the DGCA and the operator in regard to future functioning of the
operator.
d.
Demonstration and Inspection prior to certification. During this phase,
the applicant needs to demonstrate to the DGCA that the applicant is in a
position to conduct the proposed operations in accordance with the
procedures detailed in the documents/ manuals reviewed during the
previous phase utilizing the personnel/ facilities/ equipment identified in the
formal application. Helicopter, maintenance facilities and arrangements will
be inspected. Training facilities, programmes and training personnel will be
evaluated. Company’s organizational structure, channels of communication,
delegation of powers, financial strength and sources of funding will be
subjected to detailed scrutiny to ensure that the company has sufficient
resources, effective arrangement and control to satisfy its obligations.
Facilities for flight operations, ground handling, facilities and services for
passenger, baggage and cargo handling including dangerous goods and
security arrangements would be evaluated. Flight, cabin and technical crew,
operations and maintenance staff, flight operations officers, examiners/
flight engineers and load/ trim personnel, as applicable, will also be
assessed. If the DGCA is satisfied with the above arrangements, proving
flight(s) will be conducted to one or more destinations of intended
operations, as determined by the DGCA. This phase may reveal the need
for some operational changes, which in turn may require the applicant to
make amendments to the documents originally submitted. All elements must
be satisfactorily completed before proceeding to the certification phase.
During this phase, administrative action to formally approve the helicopters,
facilities and procedures specified in the OM, CAME, Training & Checking
organization will also be undertaken.
e.
Certification. When all the previous phases have been satisfactorily
completed, the DGCA will issue the Air Operator’s Certificate/ Permit and
the associated Operations Specifications.
2.
Responsibility of the Applicant
2.1
A major objective of the air operator certification is to ensure that an applicant
for an AOP/ AOC is fully aware and has clearly understood at the very outset
about the actual & potential obligations arising out of the proposed operations
(especially the legal & social responsibilities) and the financial commitments
required to sustain the proposed operations in conformity with the published
civil aviation requirements relating to safety, efficiency and regularity of air
Page 2 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 2
Helicopters
Revision 0
July 2017
transportation.
2.2
Accordingly, an Air Operator Permit/ Certificate will not be issued until the
DGCA is fully convinced and satisfied beyond any doubt that all requirements
for issue of an Air Operator’s Permit/ Certificate have been complied with, prior
to commencement of the proposed operations and that the operator has both
the required aptitude and resources to maintain proposed services without
compromising any of the initial conditions of certification.
2.3
The type of aircraft proposed may require the applicant to provide the DGCA
staff with type specific training if the DGCA does not have type qualified
inspectors on its strength. The applicant will be responsible for the cost of
training of a maximum of two Flight Operations Inspectors and two
Airworthiness Inspectors as also any other officer(s) of the Certification Team
as specified during the certification process. It should be noted that type
endorsement training for the FOIs would involve ground and flight/ simulator
time. The inspectors(s) must have completed their training either before any
member of the operator commences their training or at the same time that the
first crew members of the prospective operator receives their training.
2.4
In the event, the holder of an AOP/ AOC inducts or replaces any of their aircraft
with a new type of aircraft or an aircraft for which type qualified inspectors are
not available with DGCA at the time in service, the AOP/ AOC holder shall incur
the same responsibilities and expenses as outlined in paragraph 2.3 above.
3.
Authorization for the issue of an Air Operator’s Permit/ Certificate
3.1
Initial issue of an AOP/ AOC together with the Operations Specification, which
is required for the intended operations, will be issued once the certification team
makes the required recommendations and the Project Manager submits the
completed and signed checklists to the Project Coordinator in the Air Transport
Directorate.
4.
Schedule of Events
4.1
This is a written statement to be provided by the applicant in a form as specified
in Appendix B, containing a list of items, documents, manuals, activities,
helicopter, and/or facility acquisition or procurements which the applicant must
accomplish or make ready, including the dates on which they will be submitted
to the DGCA for approval or will be ready for the DGCA inspection. The
Schedule of Events shall be pre-coordinated with the Project Manager in charge
of the certification process. Revision to timelines is mandatory in the event the
Project Manager forsees the inability of the applicant or certification team to
perform given task as per original schedule.
Page 3 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 2
Helicopters
Revision 0
July 2017
5.
Statement of Compliance (Declaration of Conformance)
5.1
Statement of compliance is a declaration by an applicant that the applicant is
aware of and has a plan that is approved by DGCA to satisfy all pertinent
regulations and applicable safety standards promulgated by the DGCA. The
statement is in the form of a detailed list of CARs and Advisory Circulars that
will be applicable to the proposed operations. The applicant is required to
provide a brief narrative, describing the intended method of compliance, which
shall be achieved against each item of the regulatory requirements. The format
of the compliance statement to be completed by an applicant is found in
Appendix C.
5.2
Where the operator does not or cannot comply with the normal requirements
and seeks a concession in lieu, the Compliance Statement should reflect that a
particular concession has been sought. Under these conditions, approval of the
Compliance Statement is contingent on approval of each requested
concession.
5.3
Operators, after receiving the formal authorization for flight operations through
an AOP/ AOC and associated Operations Specification, shall ensure
compliance with all changes to DGCA regulations as issued from time to time
and provide an update to the respective inspector.
6.
Operator’s Permit/ Certificate and Operations Specifications (Ops Spec)
6.1
The format of Air Operator’s Permit/ Certificate and Operations Specifications
is placed at Appendix E.
7.
Certification Team
7.1
The DGCA will appoint a team for the certification process. A certification team
is a group of DGCA Inspectors appointed to carry out the document reviews,
inspections and assessments required prior to certifying an applicant as
suitable to hold an AOP/AOC. The size of the team will vary according to the
size and complexity of the task(s) involved. The team will be headed by a
Project Manager who shall be responsible for managing the overall certification
process and in particular, the coordination of the activities of operations and
airworthiness teams.
7.2
The certification team may comprise of the following directorates/ divisions of
the DGCA:
a. Air Transport
b. Flight Standards
Page 4 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 2
Helicopters
Revision 0
July 2017
c. Airworthiness
d. Cabin Safety
e. Dangerous Goods
f. Air Safety and any other department member as deemed appropriate for
the type of operations.
NOTE: The DGCA Inspectors will be using the relevant checklists to evaluate the
applicant’s arrangements for the proposed operations during the Documentation
Evaluation Phase and Demonstration and Inspection phase prior to Certification
Phase. These checklists are in Appendix D.
7.3
Inspectors of each discipline are further guided by the requirements published
in their respective Inspector Manual for the issuance of an AOP/ AOC, and will
use the relevant checklists in the Manual for any additional requirement, when
conducting Inspections for the above purpose.
7.4
Checklist for the issuance of an AOP/ AOC is in Appendix J.
7.5
The applicant is expected to meet the inspectors of the DGCA with prior
appointment to discuss the process involved with each discipline of the
Certification. A “Work Sheet” (Appendix F) will be filled by the applicant and
the inspector pertaining to each meeting to record the progress made in the
process.
7.6
The DGCA, if satisfied beyond any doubt that the applicant is capable of
meeting the requirements of the Aircraft Act and rules made there under, for
operations of air services as proposed, an AOP/ AOC and Operations
Specifications will be issued.
Page 5 of 5
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
CHAPTER 3 - INITIAL ISSUE OF AN AOP/ AOC
Detailed process followed by DGCA is given in Chapter 4 of this manual. An applicant
is free to make contact with the DGCA without making a commitment to determine the
feasibility of a proposal. An applicant will formally notify the DGCA in the form of a
Statement of intent once decided to proceed with obtaining an AOP/ AOC.
1. The Pre-Application phase
There are three distinct activities, which are conducted during this phase.
1.1
Pre- Application - Statement of Intent
1.1.1 The applicant is required to provide a Statement of Intent, which should contain
the following:
a. The type of operation;
b. The type(s) of helicopter;
c. Helicopter owned or leased;
Note: details relating to leased helicopter operations is found in the CAP 3200:
Aircraft Leasing Manual
d. Type and duration of the lease agreement;
e. The helicopter registration;
f. The areas(s) of operation and route(s) proposed;
g. Operational control mechanism planned;
h. The nature of helicopter and/ or simulator training and operational facilities;
i.
Location of administrative, maintenance and operational facilities;
j.
The qualifications of Nominated Post Holders
k. The planned company trading name; and
l.
The approximate date of commencement.
Note : The statement of Intent may not have all or some portion of the above
information. Individual or an operation may seek a pre-application meeting for
Page 1 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
guidance on the certification process.
1.1.2
The applicant is also required to apply to the Ministry of Civil Aviation for
issuance of NOC (assessment concerning the financial, economic and legal
aspects). On the issuance of an NOC and the request of the proposed operator
thereafter, the DGCA will peruse the details provided by the applicant and
arrange for a pre-application meeting.
1.2
Pre-Application Meeting
1.2.1
The purpose of this meeting is to ensure that the applicant has a clear
understanding of the certification process and to provide a firm basis on which
the DGCA can start planning allocation of resources for the issue of an AOP/
AOC.
1.2.2
As a minimum, the following points will be discussed during this meeting:
a)
The specific requirements particular to the proposed operation, and
relevant regulatory requirements (CARs, circulars, etc)
b)
The qualifications and experience required for the nominated post
holders.
c)
The certification process - The applicant must closely liaise with the
DGCA certification team.
d)
The required form and content of the Formal Application and its
attachment - The formal application and its attachments must be
submitted at least 90 working days before the date of intended revenue
operation. Ninety (90) working days will only provide adequate time to
handle the application if all aspects are correct and complete at the time
of submission. This does not mean that the DGCA will be able to
complete the certification process within this time span. The completion
of the certification process would not only depend on the completeness
of the application, and the willingness of the applicant to satisfy the
DGCA requirements but also the workload already undertaken by the
DGCA inspectors under its annual work programme.
e)
It is imperative that the applicant understands that no revenue operations
shall be permitted until the AOP/ AOC and Operations Specifications are
issued.
f)
The fee which shall accompany the formal application will not be
refunded. If certification has not been completed within the validity of
the initial NOC due to either a lapse or a delay on the part of the
Page 2 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
applicant, the application may be deemed to have expired. The following
are examples of situations that can result in delays of certification;
i) Not meeting the schedule of events;
ii) Not providing lease agreements or other documentation as required
by DGCA;
iii) Unreasonable timing in the schedule of events or failing to provide
adequate buffers to cover possible delays;
iv) Submission of incomplete or unacceptable material or other required
documents that must be returned for correction;
v) Nomination of unacceptable personnel as Nominated Post Holders,
lack/ inadequacy of proficiency of crewmembers or maintenance
personnel;
vi) Unsatisfactory standards as revealed by inspections and/ or
demonstrations, e.g. proving flights, conformity checks, etc;
vii) Untimely or unsatisfactory development of the maintenance
programs and/ or delays in obtaining a conformity inspection for the
helicopter;
viii) Non availability of applicable manuals, records and other documents
which are required to be completed / approved or accepted prior to
certification. These should be drafted and completed prior to the
submission of the formal application;
x) Special additional requirements, where an applicant is introducing a
type of helicopter not already in service in India (See Appendix G).
1.3
Post Pre-Application Meeting
1.3.1
Following the pre-application meeting, and if the applicant decides to proceed
the applicant will inform the DGCA of the same and also submit a copy of the
NOC as obtained from MoCA(if not submitted earlier). The DGCA will advise
the operator (in writing) to prepare and submit the formal application along with
requisite fees associated with the certification process.
2. The Formal Application Phase
2.1
General
2.1.1 The formal application phase commences when the applicant forwards the
formal application as per Appendix A with its accompanying documentation,
Page 3 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
together with the fees. The application should be signed by either the owner
(when applying as an individual) or all members of the Board of Directors when
applying as a company.
2.1.2
When the formal application is received, the DGCA will arrange a formal
application meeting, subject to DGCA certification team confirming the
documents submitted are in order.
2.1.3
The formal application must be submitted at least ninety (90) working days
before date of intended revenue operations. A brief description, applicable
attachments and a detailed check-list of items to be covered in the formal
application are placed at Appendix A.
2.2
The Schedule of Events
2.2.1
This is a list of items, activities, helicopter, and/ or facility acquisitions which
must be accomplished or made ready, including the dates on which they will be
ready for the DGCA to inspect. It is important that the schedule be realistic and
contains sufficient flexibility to allow for unforeseen contingencies. A factor
which must be considered when the schedule of events is forwarded is whether
the DGCA has operations and airworthiness inspectors already trained on the
proposed helicopter type and if not, how long will it take to train them. If the
DGCA does not have sufficient number of already trained and qualified
inspectors on the type of helicopter to be operated, the applicant will be required
to absorb the cost of type specific training for at least two operations inspectors
and two airworthiness inspectors and any other officer of DGCA as specified,
as outlined in the previous chapter.
2.3
Manuals/ Information to be produced with the formal application
2.3.1
The manuals as given in Item 9 of Appendix A (2 copies each) must accompany
the application,
2.3.2
Detail on the contents of the various manuals is provided in the section related
to the document evaluation phase. In addition the applicant is required to
provide details of the planned organization, general policies, duties and
responsibilities of personnel, channels of communication (hierarchy),
airworthiness control policy, operational control policy and procedures. Such
matters are usually provided in Operations Manual and in Maintenance Control
Manual/ CAME.
2.4
Statement of Compliance
2.4.1. The compliance statement (Appendix C) should be in the form of a detailed
listing of CARs and Circulars that will be applicable to the proposed operation
with a brief narrative description of compliance.
Page 4 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
2.4.2. If the method of compliance has not been fully developed, a statement of intent
should be provided indicating the intent to comply. At this stage of the
certification process, the applicant is expected to have considered the proposal
in details and there should be a few areas, if any, in which precise compliance
information is not available. Documents that may be referred to in the
compliance statement includes the manuals indicated in para 2.3.1.
2.5
Nominated Post Holders
2.5.1
The duties and responsibilities and authorities shall be clearly defined and clear
delineation of functional tasks and lines of reporting shall be established and
documented and in this regard the operator shall have following persons
responsible for the following posts that should be approved by DGCA:
a) Accountable Manager
b) Director Flight Operations
c) Director Engineering & Maintenance
d) Director Quality Assurance
e) Director Safety Management System
f) Director Flight Safety
g) Director Training
h) Director Security
i) Director Cabin Safety - if applicable
j) Director of Ground Operations
k) Chief Pilots of each fleet
NOTE: Some of the above positions may be combined depending on the size and
complexity of the operation, if the management structure is acceptable
to DGCA. However, the Director Flight Safety shall be an independent
functionary reporting directly to the Accountable Manager only.
2.5.2 The guide to the qualifications expected of the nominated post holders is given
in Appendix H. Resumes should be provided containing information on the
qualifications and expertise, including licenses and ratings of personnel
selected, for the above or equivalent positions.
Page 5 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
2.6
Helicopter Facilities and Services
2.6.1
The type of helicopter intended to be used for the operation shall receive prior
approval from DGCA. Evidence should be provided that the helicopter, facilities
and services will be available to conduct the proposed operations. Evidence
should be in the form of proof of purchase, formal contracts or financial lease
agreements.
2.6.2
The Operator should have at least one helicopter, which will be used for
intended operations, to be certified as an Operator. It shall be noted that the
validity of the AOP/AOC becomes null and void automatically in the event that
the operator does not have at least one helicopter in its fleet.
2.6.3
If the formal contracts/ financial lease agreements are not available at this
stage, letters showing the agreements will be satisfactory until the formal
documents are available. It will also be necessary to provide documents
showing details of the insurance for the helicopter, its occupants and third
parties. The insurance scheme should be in compliance with the applicable
convention(s) and / or local legislation.
3.
The Document Evaluation Phase
3.1
General
3.1.1
During this phase, the DGCA inspectors will inspect the documents provided in
support of the formal application. The documents must specifically relate to the
proposed operations.
3.2
Lease Agreements
3.2.1. Helicopter Leasing has been dealt in CAP 3200: Aircraft Leasing Manual.
3.3
Manuals
3.3.1 Manual Standards
Any Manual /Document prepared by an applicant for the approval of the DGCA
or to satisfy its regulatory requirements shall contain the following, in order to
ensure effective production, amendment, distribution and/or uniform use of, or
compliance with information relating to the company requirements.
(a) Reference Number used to identify the Document
This number shall be printed on top of the right hand corner of the front / cover
page and on each page of the Manual/Document.
(b)
Trade Mark / logo of the applicant
Page 6 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
This shall be printed on front / cover page and top of the left-hand corner on
each page of the Manual/Document.
(c)
Title of the Manual / Document
This shall be printed on front / cover page and immediate inner page after the
cover page.
(d)
Edition Number and Year of edition
This shall be printed on front / cover page.
(e)
Title of the person under whose authority the document is printed.
The title of the person who authorized the production of the Manual /
document should be written at the bottom of the cover / front page;
(f)
Control Number
In addition to whatever information the applicant may wish to print on the inner
page immediately after the cover page, it shall contain the control number
(which indicates the serial number) of the document;
(g)
Record of Revision
This shall contain three running columns to indicate the Revision Number, date
entered and name of the person making the revision;
(h)
List of effective pages
This shall contain three running columns to indicate the Page Number, last date
of revision and effective date;
(i)
History of Revision
A brief description in regard to each amendment introduced subsequent to the
initial issue.
(j)
Table of Contents
The table of contents shall be expanded to cover at least two sublevels with
page numbers.
(k)
Preamble/ Forward
This shall at least contain information relating to the purpose of the Manual in
brief, the level of compliance expected from the user. The preamble of all
Manuals/ documents shall be signed by the Accountable Manager;
Page 7 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
(l)
Abbreviations
All abbreviations and acronyms used in the Manual or documents should be
clearly explained in full;
(m) Definitions
All words, which has or requires a specific meaning in relation to the
matter being explained, shall be defined clearly in order to avoid
ambiguities. In the absence of a definition for a word or phrase, DGCA, India
will have the right to interpret such word or phrase with due regard to its
obligations for safety and security;
(n)
Separation of sections/ chapters
Manuals should be divided into chapters or sections based on topics
being dealt with. In view of the necessity of future updating requirements,
each new chapter or section shall start with a new page and such
sections/ chapters shall be identified with distinctive separators;
(o)
Header
There shall be a header for each page of a Manual or document and it shall
contain at least the applicant’s logo/ trade mark, name of the organization,
document name, document identification number (if any), volume number (if
any), revision number, chapter/ section number, subject of the chapter and
any other information the applicant may wish to display ;
(p)
Footer
There may be a footer for each page which should contain the page
number and any other information (than the header) which the applicant may
wish to display;
(q)
Index
There shall be an index to a Manual / document for ease of reference.
NOTE:
This Manual itself may be used as guidance for the development of
applicant’s Manual(s) in keeping with the aforesaid requirements.
The applicant shall also maintain a Master Distribution Record in relation to the
production and distribution of the Manual/ document and its subsequent
amendments.
All Manuals/ documents submitted by the applicant to the DGCA shall be in
duplicate so that one copy will be returned with the appropriate attestation, on
approval.
Page 8 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
The relevant page or pages of the original document which carries the DGCA
attestation shall be submitted, whenever an amendment is forwarded to the
DGCA for approval.
All Manuals / documents which contain information/ instructions which are
subject to change shall be compiled in a loose binder (ring binders) and any
manual/ document to be used in the flight deck shall be printed on papers of A5
size.
It is the responsibility of the Operator to update the Manuals submitted to the
DGCA from time to time to ensure the information contained therein is
complete, accurate, and up to date.
3.3.2 Use of language in Manuals / Documents
The applicant shall ensure that all Manuals/ Documents are written in the
English language and the following words are used to give the meaning as
indicated against such words.
“shall” or “must”
- compliance is mandatory.
“will” - the action referred to will not take place at the present moment but there
is a commitment to comply with the requirement.
“should” - compliance is recommended but not compulsory.
“may” - there is discretion for the applicant/ operator to apply alternate means
of compliance or to ignore the requirement.
Any specific instruction issued by the applicant to the operational staff shall be
given using the words “shall” or “must”.
3.4
Operations Manual
The Operations Manual is the means by which the applicant intends to control
all aspects of the intended operation. Through the Operations Manual the
operator shall ensure that all operations personnel are properly instructed in
their particular duties & responsibilities and the relationship of such duties to
the operation as a whole, especially all aspects of operational control including
the pre-departure functions, the dispatch functions, flight following, dual
responsibility if any, continuation of flight, termination or en-route diversion of
flight. The Operations Manuals shall contain information/ instructions relating to
the topics listed in the CAR Section 8 Series O Part VII as amended from time
to time. The Manual shall be compiled as per guidance in CAP 8100.
Page 9 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
3.5
Rotorcraft Flight Manual
3.5.1
The Rotorcraft Flight Manual is a document that is approved by the respective
civil aviation authority of the State of manufacturer. There is usually no
requirement for this manual to be approved by the DGCA unless there have
been substantial modifications to the helicopter by other than a means
approved by the State of manufacturer. The operator shall ensure that the flight
manual is updated by implementing changes made mandatory or approved by
the State of Manufacturer as per guidance given in applicable CAR. The manual
shall be in English or if it’s a translation it shall be signed by the State of the
manufacturer as a true translation. The RFM should contain information and
instructions relating to the following.
a) The identification of the helicopter;
b) The operating procedures and limitations of the helicopter;
c) The performances and loading of the helicopter; and
d) Special/ Optional equipment, if any.
3.6
Route Manual/ Navigation Information
3.6.1
An operator may have a route manual to ensure that it contains information
relating to communication facilities, navigation aids, heliports, instrument
approaches, instrument arrivals and instrument departures, as applicable, for
the operation, and such other information as the air operator may deem
necessary for the proper conduct of flight operations. Alternately the operator
shall demonstrate availability of adequate maps and charts or alternate means
(e.g. approved GPS) to enable safe and efficient air navigation for the entire
intended area of operations.
3.7
Training Manuals, Training Programmes and Training Personnel
3.7.1
The training information and arrangements shall be included in the operator’s
Operations Manual Part D. The training arrangements are subjected to DGCA
approval and must address all aspects of training pertaining to flight and cabin
crew, operational personnel and any other personnel involved in helicopter
operations. The applicants are advised to liaise with the Flight Standards
Directorate of DGCA in developing the required training programme for flight
crew and flight operations officer/ dispatchers. All training programmes for
personnel who are involved with flight operations and dispatching of company
helicopter must be approved by DGCA. The company may include additional
materials for guidance and information for company personnel over and above
the information required by the DGCA.
Page 10 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
3.7.2
The training manuals must cover syllabus, equipment and facilities intended to
be used, including the place where the training is to be conducted. In case the
operator intends to undertake training in-house, the qualification of instructors,
evaluation method, record keeping etc shall also be covered. All training that is
required must be included in the operations manual and shall have the
appropriate training programme. If any portion of the training programme is to
be conducted by any other entity external to the operator, relevant information
concerning this shall be included. An operator may use a training programme
that has already received approval for the use of another operator with the prior
approval of the DGCA.
3.7.3
All training organisations that are intended to conduct training for operations
personnel shall have the approval of DGCA/ ICAO Contracting State and such
organisations shall conduct training as per the approved training programmes.
3.7.4
Safety and Emergency Procedures training programmes/ information for
persons other than the flight crew (e.g. Cabin Crew) shall be compiled as per
the DGCA laid down requirements in the form of a Manual.
3.7.5
All instructors and simulator facilities pertaining to helicopter flight operations
shall have prior approval of the DGCA.
3.7.6
Operator’s arrangements for checking of the competence of the flight crew shall
be in conformity with the procedures specified in the relevant CAR issued by
the DGCA.
3.7.7
It is essential that the operator shall organize not only initial training for its
operational staff but also recurrent training programmes at regular intervals,
transition (conversion), requalification, upgrade, recent experience,
familiarisation, differences, safety management and other specialised training
as applicable & as required by the DGCA(refer relevant CARs). Details of all
such training programmes and facilities shall be included in the Operations
Manual and shall have prior approval of the DGCA.
3.8
Dangerous Goods Manual
3.8.1
The operator shall be guided by the requirements stipulated in IATA guidelines
when intending to carry dangerous goods. Following are the requirements that
the operator needs to fulfill prior to issuance of an AOP/AOC.
a)
Commercial operators are required to provide a dangerous goods
manual/ requisite information in the Ops Manual for the use of
information and guidance of company operational personnel. Such
Manual shall form a part of the operations manual even if it is issued as
a separate volume. When the manual has been approved, it should be
distributed to relevant persons associated with the operations and
Page 11 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
DGCA. Suitable amendment and distribution procedures must also be in
place.
b)
Operators are required to provide training programmes for all personnel
involved with handling or transport of dangerous goods by air.
Arrangements for training must be produced to cover this requirement
and required information shall form part of the operations manual.
c)
The operator shall have procedures for reporting of occurrences
involving carriage of dangerous goods and to handle any emergency
arising out of dangerous goods. All operational staff should be educated
of these procedures and it shall be the duty of the operator to notify
forthwith the relevant State agency which is in charge of investigation if
any of helicopter carrying dangerous goods, meets with an accident.
3.8.2
Where an operator does not intend to carry dangerous goods, the following
requirements shall apply:
a)
the operator shall provide information in his operations manual about this
policy of the operator. The operator shall also give specific written
instructions/ guidance to its technical and operational staff in this regard.
b)
Operators are required to provide applicable dangerous goods training
to allow the identification of dangerous goods for personnel involved in
the handling of passengers and cargo, crew members and security staff
in order to prevent the inadvertent carriage of such goods either in the
cabin or cargo hold of helicopter operated by the operator. Accordingly,
a suitable section of the Operations Manual must be devoted to this
subject. The training arrangements for these personnel must be included
in the Operations Manual, and must be approved by the DGCA.
3.9
Maintenance Control Manual(CAME)
3.9.1
The maintenance control manual shall describe the operator’s procedures
necessary to ensure the continuing airworthiness of the operator’s helicopter.
A maintenance control manual must be submitted for approval by the DGCA.
3.9.2
This document shall be titled as Continuous Airworthiness Management
Exposition (CAME). The manual should be arranged into general information
and specific helicopter maintenance systems. Separate volumes may be
utilized for the purpose of separation of topics. Copies of the CAME must be
provided for the following-
a.
All locations where maintenance is performed; and
b.
Maintenance and inspection personnel who need the manual in the
Page 12 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 1
June 2018
execution of their duties.
3.10 Security Manual
3.10.1 security manual is developed and approved by BCAS.
3.11 Safety and Emergency Procedures
3.11.1 The operator shall ensure that all personnel involved in flight operations are in
possession of a copy of the approved Safety and Emergency Procedures.
The procedures shall form a part of the Operations Manual and shall have
acceptance of the DGCA.
3.12 Ground Handling Procedures
3.12.1 An operator shall stipulate Ground Handling Procedures which clearly define
the lines of responsibilities for Ground Handling functions applicable at all
proposed operation bases, including the third party/contractual arrangements
and oversight thereof.
a. Fuel Services
b. Passenger Services
c. Baggage Services
d. Cabin Services
e. Weight Control
f. Ground Support Equipment
3.12.2 Ground Handling Procedures shall contain ground handling processes,
procedures and training requirements and subcontracting policies for all ground
handling operations.
3.13 Flight Safety Manual
3.13.1 An operator shall develop a Flight Safety Manual which shall lay down the
Company’s safety policies, flight safety awareness and accident/ incident
prevention programme in accordance with requirements stipulated in CAR
Section 5 Series F Part I.
3.14 Safety Management Systems Programme
3.14.1 An operator shall develop a Safety Management Systems Programme in
conformity to the State’s Safety Programme to ensure that all reasonable
Page 13 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
measures have been taken in order to identify possible risks inherited in the
system and human errors that may adversely affect flight safety and to mitigate
such risks and errors. The guidance material in addition to mandatory
requirements are published in CAR Section 1 Series C Part I.
3.14.2 The operator shall ensure that all personnel involved in operations of helicopter
are trained on SMS to the satisfaction of DGCA.
3.14.3 As a minimum the following shall be covered in the operators SMS programme.
a. The identification of safety hazards;
b. The necessary remedial action to mention an acceptable level of safety;
c. Continuous monitoring and regular assessment of the safety level achieved;
and
d. Continuous improvement to the overall level of safety
3.15 Flight Safety Documents System
3.15.1 General
i)
Flight Safety Documents System encompasses all the safety related
documents published by the operator in view of guiding the users to
establish safety in the organization. Flight Safety Documents System needs
to be in the form of Manuals, Training Programmes, Checklists etc. and
needs to be organized in the following manner.
a. Time critical information, e.g., information that can jeopardize the safety of
the operation if not immediately available.
b. Time sensitive information, e.g., information that can affect the level of
safety or delay the operation if not available in a short time period.
c. Frequently used information
d. Reference information, e.g., information that is required for the operation but
does not fall under b) or c) above, and
e. Information that can be grouped based on the phase of operation in which
it is used.
ii)
Time critical information should be placed early and prominently in the flight
safety documents system. Time critical information, time sensitive
information, and frequently used information should be placed in cards and
quick-reference guides.
Page 14 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
iii)
The requirement of the Flight safety Document System to be published in
the OM and CAME as all the other publications forms a part of or link to the
OM and CAME.
3.16 Passenger Safety Briefing Card
3.16.1 An operator shall provide each passenger seat with a safety briefing card
containing in pictographic form, the information required. The safety briefing cards
need to be provided to supplement oral briefings and be in particular to the type and
model of helicopter and the specific emergency equipment in use. The safety briefing
card shall have the prior approval of the DGCA.
3.16.2 The passenger safety briefing card shall contain the following information as
a minimum
When seat belts are to be fastened. Illustration showing the fastening,
tightening and unfastening of seat belts.
When and how Oxygen equipment is to be used.
Restrictions on Smoking.
Location and method of opening emergency exits.
How to brace oneself while experiencing impact loads for all seat orientations.
Location and Use of Life Saving Rafts/Jackets for over water flights
Restrictions on use of mobile phone, laptops, electronic devices, etc
Route from passenger area to emergency exits, if applicable
3.16.3 For helicopters when cabin crewmembers are not required, all of 3.16.2 & the
location of the safety equipment in the helicopter shall be depicted in the safety card.
3.17 Minimum Equipment List
3.17.1 The operator is required to prepare the MEL based on the MMEL and shall
submit the same to the Certification Team for initial approval. The PAWI shall
scrutinize the MEL as per the APM checklist on the basis of the MMEL.
3.17.2 While approving the MEL, the procedures against (M) and (O) items are also
required to be approved. In case the manufacturer has provided a Dispatch Deviation
Guide (DDG)/ Configuration Deviation List(CDL) for the type of aircraft, while approving
the MEL, it shall be ensured that the DDG/ CDL is customized to the specific aircraft
configuration and MEL.
Page 15 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
3.17.3 After scrutiny by PAWI, it shall be submitted to the POI on file for further scrutiny
of the MEL from operations angle. A copy of the latest MMEL shall also be provided
to the POI who will scrutinize the MEL and complete the applicable job aid.
3.17.4 On successful review from operations angle the MEL and the duly signed
checklist will be returned to PAWI for approval action.
3.18 Statistical Returns
3.18.1 Each operator holding an AOP/AOC issued by the DGCA is required to
implement a programme to ensure that statistical returns in respect of commercial
operations will be furnished to the DGCA on a regular basis as stipulated in CAR
Section 3 Series C.
4.
Permission to import helicopter
4.1
Permission to import helicopter shall be granted by Air Transport Directorate
(o/o DGCA). DGCA will issue the permission for import of helicopter subject to the
preparation and submission of documents required for the grant of AOP/AOC by the
applicant and their approval/ acceptance by DGCA. Requirements for import of
helicopter are stipulated in CAR Section 3 Series C
4.2
For applicants of Scheduled air operators permit, the permission shall be
subject to obtaining in-principle approval from the Ministry of Civil Aviation.
5.
The Demonstration and Inspection Phase
CAR Section 3 Series C stipulates requirements for demonstration for the issue/
amendment to an AOP/AOC.
Note 1: Evacuation and ditching Demonstration including proving flight(s) are
required for AOC/ AOP applicants on addition/ induction of new helicopter
types introduced after 21st May 2009.
Note 2: Type trained Flight Operations Inspector, Airworthiness Inspector and Cabin
Safety Inspector will be required for the proving flight readiness check and
for the proving flights. In case of non-availability of type trained inspector(s),
the activity can be carried out by inspector(s) type-rated on similar category
and after undergoing a differences briefing.
5.1. General
5.1.1. Detailed requirements for facilities, staff, equipment and procedures are set out
in CARs and Circulars. The purpose of the pre-certification inspection is to ensure that
the requirements have been satisfied as explained in the written procedures of the
applicant. (See Appendix I for details)
Page 16 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
5.1.2. The DGCA must be satisfied that qualified and trained personnel are employed
in sufficient numbers on a full-time basis, where required. Amongst other
requirements, adequate facilities and equipment must be provided to allow staff to
carry out their duties related to the conduct of operations in compliance with
regulations and specifications or instructions contained in the company Operations
Manual.
5.1.3. Some of the work involved in the conduct of operations may be contracted out.
Such work may vary from non-operational aspects such as using an outside
accounting firm or contract catering through to essential items such as passenger
handling, helicopter servicing, helicopter maintenance at various levels, training of
flight, technical or cabin crew, or even to the extent of leasing helicopter and operating
crews. Operational items or services of any nature that are provided under contract
will normally require inspection and approval by the DGCA. The sub-contracting of
services can be accomplished only from another organization(s) acceptable to the
DGCA.
5.1.4 In order to demonstrate that the helicopter seating configuration and crew
training and emergency procedures will permit successful evacuation of passengers
in an emergency situation, the applicant will have to perform an emergency evacuation
demonstration prior to issuance of an AOP/ AOC for each helicopter type above 5700
kgs which the applicant intends to operate.
5.1.5 The applicant must demonstrate competency in removing and launching life rafts
or slide rafts and in the use of emergency and survival equipment contained in those
rafts, as applicable.
5.2
Proving/ Validation Flights
5.2.1 Proving flights will be required to demonstrate the readiness of the applicant to
conduct operations using the equipment, facilities, services and personnel identified
in the application and the associated documents in accordance with the procedures
spelt out in the Operations Manual. When these flights are conducted with
passengers e.g for re-certification of existing operators the flights will be termed as
validation flights. The scope and nature of proving flights are detailed in Appendix ‘I’
Para 18.
5.2.2. An initial draft of the Operations Specifications will be drawn up by the
applicant’s personnel and discussed in detail with the DGCA’s certification team who
will indicate to the applicant whether or not they are acceptable. This iteration (which
will be clearly labelled draft) will be used during the proving flights after clearance from
the Certification Team, which includes inspectors from Flight Standards, Airworthiness
and Cabin Safety. The draft Operations Specifications may be subsequently modified
as required by DGCA or requested by the operator before the final version is issued
by the DGCA with the Air Operator Permit to form a part of the Operations Manual.
Page 17 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
5.2.3 The applicant/ operator will be required to conduct proving/ validation flights for
the following purpose:
• First issue of an AOC/ AOP for scheduled or non-scheduled operations.
• The introduction of a new helicopter type in the organisation.
• Any other circumstances as considered necessary by DGCA.
Conduct of proving flight readiness check may be required for operations in a
new area of operations.
5.2.4
Conduct of a proving flight
Applicant for a non-scheduled operator’s/ Scheduled Commuter Service
permit with helicopter will be required to conduct a minimum of 2 flight
sectors on intended routes/ area of operations, with total duration of not less
than 2 flights hours.
5.3 Evacuation and Ditching Demonstration
5.3.1 Evacuation and Ditching drills will be required to demonstrate the readiness of
the applicant to demonstrate its capability to carry out evacuation/ ditching in
the event of an emergency, where applicable. The scope and nature of these
demonstrations are detailed in Appendix ‘I’ Paras 19 and 20.
6.
Certification Phase
6.1
Final version of the Operation Specifications
6.1.1 Application for approval for special operations shall be submitted along with
para wise compliance of the CAR related to the operation. The supporting documents
fulfilling requirements of the relevant CAR and the specified Checklist shall also be
submitted by the operator. The checklist should comprise the compliance and its
location in the notes section. Verification remarks column of the checklist will be used
by DGCA officer for reviewing the request for approval.
6.1.2 PAWI shall scrutinise the application from airworthiness aspects and following
satisfactory CAR compliance, the same shall be forwarded to the POI for scrutiny of
Operations aspects. POI will evaluate the documents and complete the job aids and
forward the same to CFOI for issue of approval letter for the Special operations.
Approval copy for Special Ops will be forwarded to DAT for necessary action for
inclusion into Ops Specs.
Page 18 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
6.1.3 Upon successful completion of the proving flights, the certification team will
review the Compliance Statement to ensure all requirements have been satisfied for
the approval of Op Specs and grant of an Air Operator Permit/ Certificate.
6.2
Issue of an Air Operator Permit/ Air Operator Certificate
6.2.1 Based on the recommendations of the Certification team, the Project manager
will submit the file for approval of the Competent Authority. The detailed process to be
followed is given in Chapter 4.
6.2.2 Competent Authority, if satisfied, that the certification process has been
conducted according to the required standards, may approve the issuance of the
AOP/AOC along with required Operations Specifications certifying the competency of
the applicant as an air operator.
6.2.3 A scheduled commuter operator before starting operations shall have the
schedule approved from DGCA.
6.2.4 Certified true copy of an AOP/AOC along with Operations Specification shall be
carried on board each helicopter operated by the operator.
NOTE:
Sample of an Air Operator’s Permit/ Certificate & Operations
Specification is at Appendix E.
7.
Renewal of Air Operator Permit/ Certificate
An applicant who is a holder of an AOP/ AOC shall apply for the renewal, to the DGCA
at least a minimum of 90 days prior to the date of expiry. The requirements for renewal
of the AOP/ AOC shall be as per the applicable part of CAR Section 3 Series C.
7.1
The Application for Renewal
7.1.1 A request for renewal of an AOP/ AOC shall be forwarded to the DGCA in the
prescribed form (Appendix L) at least 90 days prior to the lapse of the validity of the
AOP/ AOC.
7.1.2 The DGCA will then confirm a date for an inspection for AOP/ AOC renewal.
7.2
Inspection for Renewal of AOP/ AOC
7.2.1 The purpose of this inspection is to ensure that the applicant has maintained
the initial conditions of certification and is in a position to continue maintaining the
applicable certification standards.
7.2.2 It will be necessary for the DGCA to look in to any or all aspects of the operation
to ensure that the operator has continued to maintain the standards that were required
for initial certification, in particular to safety surveillance records in relation to training
Page 19 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 3
Helicopters
Revision 0
July 2017
& checking records of flight crewmembers, base inspections, regulatory audits and
incidents / accidents reports etc. DGCA will renew the AOP/ AOC on the basis of the
satisfactory Audit Report. In case of short-comings, DGCA will inform the AOP/ AOC
holder well before the date of expiry of the AOP/ AOC to take appropriate corrective
actions up to the level of satisfaction of DGCA. Renewal of AOP/ AOC will be denied
in case the AOP/ AOC holder fails to come up with adequate corrective actions to the
best satisfaction of DGCA.
7.2.3 A formal Inspection shall be carried out by the Inspectors prior to renewal of
AOP/AOC. The Project Manager will determine the Inspection team & the relevant
areas that will be inspected by the team.
7.3
Lapsed AOP/ AOC
7.3.1 An AOP/AOC after issue requires renewal prior to expiry of the validity specified
thereon.
7.3.2 If the validity of an AOP/AOC lapsed, it may be restored after completion of a
process which may entail a part or whole of the certification process as may be
determined by the DGCA.
7.4
Amendment to AOP/ AOC/ Operations Specifications
7.4.1 Any requests for amendments to the Operations Specifications, Authorizations
or Limitations issued to AOP/ AOC holder, shall be forwarded to the Air
Transport Directorate of the DGCA by duly completing the document in
Appendix M. Air Transport Directorate will obtain confirmation from relevant
directorates of DGCA, by circulating the “Confirmation for Ops-Spec
amendments” form depending on the amendment requested by the Operator,
prior to granting approval.
7.4.2 Amendment to Ops Specs will be required for the following but not limited to:
a) Addition of new type of helicopter in the organization.
b) Addition of same type of helicopter in the organization.
c) Special operations.
d) Commencement of international operations to new destination.
7.4.3 For a) and c) the certification process applicable for issue of AOP/ AOC will be
followed. For d), the checklist for international operations will be complied.
(Appendix N). For b) the procedure at Chapter 5 shall be followed.
Page 20 of 21
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
CHAPTER 4 - CERTIFICATION PROCESS
1. Air Operator’s Certification Team
1.1. The certification of an air operator shall be carried out by an Air Operator’s
Certification (AOC) Team.
1.2. The AOC team comprises of Flight operations, airworthiness, cabin safety, and
dangerous goods inspectors (and other personnel as appropriate). Amongst
the assigned flight operations inspectors and airworthiness Inspectors, one
each shall be nominated as Principal Flight Operations Inspector (POI) and
Principal Airworthiness Inspector (PAWI).
The structure of the team is given below:
Project Manager (Technical)
Operations
Principal Operations
Principal Airworthiness
Inspector (POI)
Inspector (PAWI)
Cabin Safety
Air Safety
Ground Handling
Dangerous Goods
(As Required)
Air Operator’s Certification Team
1.3. The AOP/ AOC team shall be headed by the Project Manager who shall either
be a Deputy CFOI/ SFOI.
1.4.
The POI and the PAWI are responsible for Operations and Airworthiness
related matters for the issuance of an AOP/ AOC.
1.5.
POIs and PAWIs have with them flight operations inspectors and airworthiness
inspectors (at the regional offices) to assist in the certification process.
Page 1 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
1.6.
DAT (AOC) during Phase 1 of the certification process will obtain nominations
of inspectors (flight operations, airworthiness, Cabin Safety and Dangerous
Goods or any other discipline, as required) from AOCMB, for the formation of
the AOP/ AOC team.
1.7.
Nomination of POI/ PAWI: On receipt of intimation from Air Transport
Directorate:
CFOI along with DDG(DAW) shall identify the certification team, depending
on the size of the intended organization, consisting of PM, POI, PAWI, Cabin
Safety Inspector(s), Dangerous Goods Inspector(s), Air Safety representatives
and such additional Flight Operations Inspectors (FOI)/ Airworthiness
Inspectors from concerned regional offices to assist the POI and the PAWI.
The POI will act as the Team Leader (Operations) for FOIs, CSIs and DGIs for
such cases while the PAWI will be the Team Leader (Airworthiness) for the
Airworthiness Inspectors in his team.
Nomination of the Certification Team after approval by CFOI shall be sent to
DAT.
1.8.
Selection Policy - POI and PAWI:
1.8.1. Principal Operations Inspector (POI): POIs may be selected from any of the
FOIs trained in certification process. The additional FOI if nominated should
be trained on the tasks assigned to him/ her by the POI. The POI/ FOI must
be type rated for the relevant aircraft.
1.8.2. Principal Airworthiness Inspector (PAWI): PAWIs should be an
Airworthiness officer of the level of at least Dy. Director of Airworthiness for
an applicant of AOC and Asst Director of Airworthiness for applicant of NSOP.
The nominated officer as PAWI should have experience of at least ten year
of service in the directorate and trained on certification process.
1.8.3. Airworthiness Inspector(s): The nominated Airworthiness Official shall be an
officer of the level of at least Asst. Director of Airworthiness. The nominated
officer normally should be from the concerned regional office where the
operator is based. In the event of non-availability of adequately trained officer
from the concerned regional office, DAW (Hqrs) may nominate appropriately
trained officer from Hqrs/ other regional offices. The nominated officer as
Inspector (Airworthiness) should have experience of at least five years of
service and should be familiar with the process followed for certification of
AMO, CAMO, air operator certification process, Special operations etc. The
officer must have received type training on the type or on similar type of
helicopter applied for issuance of AOP/AOC for operation.
Page 2 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
2.
Pre-application Phase
Pre - application Phase
NOC Received
Initial Enquiry
Apply for NOC
Send Statement
to MoCA
of Intent
YES
Facilitate Enquiry
Arrange for pre-
application meeting
Is a
Statement
of Intent
required?
Proceed to
Formal
Conduct pre-
Application
application meeting
phase
2.1. Perform Enquiry
2.1.1 The Applicant will make initial contact with Dte of AT in regards to applying for an AOP/
AOC.
2.1.2 The Air Transport Directorate will:
a. Offer non-technical advice as required.
b. Direct the Applicant to relevant forms and guidance material.
Statement of Intent
An applicant will be required to:
Apply to Ministry of Civil Aviation for obtaining Initial No-Objection Certificate; and
Formally notify the DGCA in the form of a Statement of intent (3 copies) once decided
to proceed with obtaining an AOP/AOC.
Page 3 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
2.2. Pre-application meeting
2.2.1. On receipt of the Statement of Intent, Air Transport Directorate will:
Provide one copy of the Statement of Intent to AOCMB
Initiate the process of obtaining nominations of inspectors (flight operations,
airworthiness, Cabin Safety and Dangerous Goods or any other discipline, as
required) from AOCMB, for the formation of the AOC/AOP team.
Arrange for a pre-application meeting after formation of AOC/ AOP team
Pre-application Meeting
The Applicant must:
o Provide any information required by DGCA.
o Seek clarification on any areas of the certification process where required.
The DGCA Project Team will:
o Ensure the Applicant understands the requirements of the certification
process and has an appreciation of the resources that could be involved.
o Take minutes of the pre-application meeting.
DAT will:
(i) Prepare and finalise minutes of the pre-application meeting.
(ii) Distribute the minutes to all attendees.
(iii) Keep a record of the minutes on file.
Note: All documents pertaining to Phase 1 go to Phase 1: Pre-application
folders for the applicant.
Proceed to 3. Formal Application Phase
Page 4 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
3.
Formal Application Phase
Formal Application Phase
Formal
Application
phase
Attend formal
starts
application meeting
Complete and provide
Complete application
formal application with
and submit again
fees
Perform non-technical
assessment
Is
application
complete
and fee
YES
Allocate technical
Arrange for formal
assessment team
application meeting
application meeting
Proceed to
Document
Conduct formal
Evaluation
application
phase
The Applicant must:
Complete the relevant AOP/ AOC Form (3 copies). (On receipt of initial NOC from MoCA).
Prepare all required supporting documentation.
Send the signed AOP/ AOC Application Form together with all required supporting
documentation to DGCA.
Page 5 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
3.1. Perform technical /non-technical assessment
3.1.1. DAT will:
Receive the application and supporting documentation and acknowledge their receipt via
email.
Review the application for completeness along with fees.
Note: Initial overview of technical documents to be done by AOCMB.
If no deficiencies, proceed to 3.1.3.
If deficiencies, provide written advice to the Applicant of the deficiencies and request
Applicant to address the deficiencies before the application is processed.
3.1.2. The Applicant will:
Provide required information to DGCA if they wish to continue with their application.
3.1.3. The DAT will:
(a) Provide two copies of the application along with requisite documents to
certification team members.
(b) Call for a formal application meeting.
3.1.4 On receipt of the formal application from DAT, the PM will:
(a) Identify suitable date for the formal application meeting.
(b) Organize the formal application documentation into the Formal Application
section of the master certification file.
3.2. Formal application meeting
3.2.1. DAT will:
a.
Arrange for the formal application meeting.
b.
Inform the applicant of the formal application meeting.
c.
Provide a draft agenda (prepared in consultation with PM) for the meeting.
d.
Advice the applicant on any information needed to provide for the formal
application meeting.
Page 6 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
Formal application Meeting
The formal application meeting will be attended by:
a. Applicant’s team
b. Project Manager
c. POI and other officials related to Operations
d. PAWI and officers of concerned airworthiness regional office
e. Officials from DAT
f. Any other official required
3.3. During the formal application meeting:
3.3.1. The Applicant must:
a. Provide any information required by DGCA during the formal meeting.
b. Confirm on the Schedule of Events.
c. Confirm the draft Ops Specs.
d. Seek clarification on any areas of the certification process where
required.
3.3.2. The DGCA Certification Team will:
a. Review the Schedule of Events and discuss with the Applicant.
b. Take minutes of the formal application meeting.
3.4. After the meeting:
3.4.1. DAT will:
a. Prepare and finalise minutes of the formal application meeting.
b. Distribute the minutes to all attendees and to AOCMB.
c. Keep a record of the minutes on file.
3.4.2. PM will finalise the Schedule of Events
Note: All documents pertaining to Phase 2 go to Phase 2: Formal Application
folders for the applicant.
Proceed to 4. Document Evaluation Phase
Page 7 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
4.
Document Evaluation Phase
This phase establishes whether the documentation provided by the Applicant is
complete and suitable for proposed operations, and meets the safety and legislative
requirements applicable to the operations proposed in the AOP/ AOC application.
Document Evaluation Phase
Participate in
documentation
Document
assessment
Evaluation
Phase
starts
Advice for
correction
PERFORM EVALUATION
NO
OPERATIONS Document(s)
CABIN SAFETY Document(s)
Is the
Start technical
document-
Document
ation
Evaluation
DANGEROUS GOODS Document(s)
satisfactory?
GROUND OPERATIONS
Document(s)
YES
AIRWORTHINESS Document(s)
Approve
Document(s
Proceed to
Inspection and
Demonstration
phase
Page 8 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
4.1. Document evaluation:
4.1.1. The Project Manager must:
a. Gather all documents required for the technical documentation
assessment, in the master certification file, and assign them to the
appropriate team members for review and assessment.
b. Coordinate the following technical documentation assessments, in
accordance with procedures laid down in respective area manuals:
Operations
CAP 8200 - Flight Operations Inspectors
Manual
CAP 8100 - Preparation and Certification
of Operations Manual
CAP 8300 - Flight Operations Inspector’s
Performance
Based
Navigation
Operational Approval Handbook
Cabin Safety
CAP 8400 - Cabin Safety Inspector
Handbook
Airworthiness
Airworthiness Procedures Manual
Dangerous Goods
Dangerous
Goods
Inspectors’
Handbook
Safety Management System
CAR Section 1 Series C Part I
If not satisfactory, advise applicant for amendment.
Liaise with the Applicant to address any deficiencies that have been found. Deficiencies
must be confirmed to the Applicant in writing. Advise the Applicant, in writing, that the job
may be suspended until the deficiencies are addressed.
4.1.2 The Applicant must:
Address the deficiencies cited by DGCA and provide required documentation
or advice DGCA in a timely manner.
4.2. End of Document evaluation:
4.2.1. Certification Team Members must:
Page 9 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
a. Process acceptance/ approval of documents as required by regulations
in accordance with table listed below.
b. Communicate readiness of acceptance/ approval of documents to
Project Manager who will then confirm them to the applicant in writing
once the documents are approved/ accepted.
Document approval by AOCMB
Review by type qualified
Approved/
Approval*
Airworthiness
Operations
accepted
Minimum Equipment List
1.
AWI
FOI
Approved
DDAW(H)
(MEL)
2.
CDL
AWI
-
Accepted
DDAW(H)
3.
Operations Manual
Part A - General
(a)
-
FOI
Approved
CFOI/ PM
Operations Manual
(b)
OM Part B - Aircraft type specific information
i)
Aircraft Flight Manual
Approved/
AWI
FOI
CFOI/PM
(AFM)
Accepted
ii)Performance planning
-
FOI
Accepted
CFOI/PM
Document
OM
Part C - Route
(c)
-
FOI
Approved
CFOI/PM
Manual
(d)
OM Part D - Training Program
i) Flight Crew
-
FOI
Approved
CFOI/PM
ii) Cabin Crew
-
CSI
Approved
PM/CSI
iii) Flight Dispatch
-
FOI
Accepted
CFOI/PM
Continuing Airworthiness
4.
Maintenance Exposition
AWI
-
Approved
DAW
(CAME)
5.
Maintenance Program
AWI
-
Approved
DAW
Training Manual for
6.
AWI
-
Approved
DAW
maintenance personnel
SEP Manual (where
7.
--
CSI
Accepted
PM/CSI
Applicable)
Flight Dispatch Manual
8.
--
FOI
Accepted
CFOI/PM
(where applicable)
Safety Management
9.
-I
DAS
Accepted
JDG(DAS)
System (SMS) Manual
10.
Special Operations (PBN etc)
Page 10 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
Review by type qualified
Approved/
Approval*
accepted
Airworthiness
Operations
Process (Spl Ops approval
Approved
a)
for inclusion in Ops Spec.
AWI
POI
CFOI/PM
(Spl Ops)
or Letter of Authorisation)
Manual (Maintenance) for
b)
specific operation (if
AWI
--
Approved
DAW
applicable)
Manual (Operations) (Part
c)
--
POI
Approved
CFOI/PM
of OM)
Weight and Balance
11.
AWI
-
Accepted
DAW
Manual
Aircraft Loading and
12.
handling Manual or Ground
AWI
Accepted
DAW
Handling Manual
13.
Dangerous Goods Manual
--
DGI
Approved
DRI
14.
Passenger Briefing Card
AWI
CSI
Approved
PM/ CSI
Aircraft Search procedure
15.
AWI
FOI/ CSI
Approved
CFOI/ PM
checklist
16.
Load and Trim Sheet
AWI
--
Approved
DDAW
Aircraft Journey Log book/
17.
Maintenance Deferred
AWI
--
Approved
DDAW
Defects Log
Flight Safety Documents
18.
-
ASO
Accepted
DAS
System
Simulator/ flight training
19.
--
FOI
Approval
CFOI/ PM
device
Note: All documents pertaining to Phase 3 go to Phase 3: Documentation Evaluation
folders for the applicant.
Proceed to 5. Inspection and Demonstration Phase
Page 11 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
5. Inspection and Demonstration Phase
Inspection and Demonstration Phase
Participate in
inspection(s) and
Inspection and
testing
Demonstration
Phase starts
Provide Advice
Plan
OPERATIONS
CABIN SAFETY
Start Inspection and
Are the
testing
DANGEROUS GOODS
Inspection(s)
and testing
satisfactory?
GROUND OPERATIONS
AIRWORTHINESS
Plan PROVING
FLIGHTS (as required)
Conduct
Proceed to
Certification
PROVING FLIGHTS
phase
Verification and Testing
a. This phase will also include the verification and testing phase for confirmation of the
documentation approved/ accepted by DGCA.
b. Area-wise verification and testing will be sought by respective area Inspectors.
Page 12 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
5.1. Verification and Testing:
5.1.1. The certification team member(s), under the coordination and guidance
of the Project Manager shall:
a) Verify and test for confirmation of the documentation approved/ accepted
by DGCA.
b) Plan and conduct evacuation exercises, as required.
c) Plan and conduct ditching exercises, as required.
d) Advice on any changes required in the documents, in writing, as a result
of verification/ testing/ exercises.
5.1.2. The Applicant must:
a. Participate in the test/ verification/ demonstration.
b. Amend the documents, as required.
5.2. Final Inspection for issuance of an AOP/AOC:
5.2.1. The Project Manager and the Team shall:
a. Plan Final Inspection of the applicant for issue of an AOP/AOC.
b. Conduct the final inspection.
5.2.2. The Applicant must:
a. Participate in the final inspection.
Any deficiencies found during the Inspection and Demonstration phase will
need to be corrected before going for the Certification Phase
Note: All documents pertaining to Phase 4 go to Phase 4: Inspection and
Demonstration folders for the applicant.
Proceed to 6. Certification Phase
Page 13 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
6. Certification Phase
Complete Documentation and Checklists
6.1.1. Technical Assessment Team (POI and PAWI) must:
Complete all checklists pertaining to their areas
Submit completed checklists to the PM
Certification Phase
TECHNICAL ASSESSMENT TEAM
PROJECT MANAGER
Complete
Review and complete
DOCUMENTATION/ CHECKLISTS
Compliance Statement
OPERATIONS
Prepare
Put up to
AIR OPERATOR’S PERMIT/
CABIN SAFETY
Director General
CERTIFICATE
for approval and
issuance of AOP
DANGEROUS GOODS
Finalize
and Ops Spec
OPS SPECIFICATIONS
GROUND OPERATIONS
AIRWORTHINESS
In coordination with
Issue AOP and
POI
Operations
Specifications
Schedule approved
AOP and Operations
(for Scheduled Operators only)
+
Specifications
Operator commences
operations
Page 14 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
POI must complete Checklists (03 - 15)
PAWI must complete Checklists (15 and 20 - 36)
PM must complete Checklist (02)
DAT must complete Checklist (01)
6.1.2 Project Manager must:
a. Complete Checklist 02
b. Review the completed checklists provided by POI and PAWI for
completion.
c. Finalize Ops Spec
d. Send completed Checklist 02 and Ops Spec to DAT for initiating process
for issuance of AOP/AOC
6.2. Preparation of AOP/AOC and Ops Spec
6.2.1 On receipt of completed Checklist 01 and Ops Specs, DAT shall:
a. Complete Checklist 01
b. Complete Appendix J
c. Prepare AOP/AOC
d. Prepare final Ops Specs and obtain approval of CFOI before putting up AOP
and Ops Specs to Director General through the Joint Director General for
approval and signature.
6.3
Issuance of AOP/AOC and Ops Spec
6.3.1 DAT shall:
Issue the AOP/AOC and Ops Spec to the applicant
Provide a copy of AOP/AOC and Ops Spec to AOCMB for filing in Phase 5
section of the certification file.
Page 15 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 4
Helicopters
Revision 0
July 2017
6.3.2 Applicant shall:
Receive AOP/AOC and may start operations provided the Schedule is
approved (for scheduled operators only).
6.3.3 PM shall:
Ensure that all documentation, checklists, approval signoffs, demonstration and
inspection documents, etc., are organized in the five-phase certification master
folders for the operator in AOCMB.
Note: The master file may consist of several binders reflecting the five phases
of the certification process, with additional referenced and incorporated
files or binders for such certification events as special operations
approvals and demonstration event.
Store all 5-Phase binders for the applicant at assigned locations. These form
the initial certification documents for the operator. Any amendment to the Ops
Specs (depending on the change required) shall be treated as a new
certification process and requiring a minimum of at least Phases 3, 4 and 5
completion.
Note: All documents pertaining to Phase 5 go to Phase 5: Certification folders
for the applicant.
END PROCESS
Page 16 of 16
CAP 3400
Air Operator
Certification Manual -
Chapter 5
Helicopters
Revision 0
July 2017
CHAPTER 5 - MANAGEMENT OF AIR OPERATOR PERMIT/ CERTFICATE
1. Air Operator Certificate (AOC)/ Non-Scheduled Operator Permit (NSOP)
Team(AOP)
1.1 The continued management of an Air Operator Permit/ Certificate shall be carried
out by the dedicated Certificate Management team assigned to the Air Operator.
1.2 The Certificate Management team shall comprise of Flight operations,
airworthiness, cabin safety, and dangerous goods inspectors (and other personnel
as appropriate). Amongst the assigned flight operations inspectors and
airworthiness Inspectors, one each shall be nominated as Principal Flight
Operations Inspector (POI) and Principal Airworthiness Inspector (PAWI).
1.3 The structure of the Certificate Management team shall be same as the
Certification team except that there shall be no Project Manager.
1.4 The functions of the Certificate Management team shall include continuous
management of the Air Operator Permit/ Certificate and would consist of
amendments to operator’s documents based on changes in regulations or on
specific request of the operator. It would also include continued inspection and
surveillance of assigned certificated air operators (airworthiness and operations
aspects) to ensure continual compliance with regulations and safe operating
practices.
2. Changes to Documents.
2.1 Application Procedure. Application for amendments to existing approvals/
additional approvals shall be submitted to the Regional offices along with para wise
compliance of the CAR related to the approval sought. The supporting documents
fulfilling requirements of the relevant CAR and the specified Checklist shall also be
submitted by the operator. The checklist should comprise the compliance and its
location in the notes section. Verification remarks column of the checklist will be
used by DGCA officer for reviewing the request for approval.
Page 1 of 2
CAP 3400
Air Operator
Certification Manual -
Chapter 5
Helicopters
Revision 0
July 2017
2.2 Amendments to the Ops Manual/ Checklists shall be submitted by the operators to
the POI. POI shall vet the same and get the amendments approved in accordance
with the applicable procedure for initial approval of the document.
2.3 Amendments to the MEL shall be submitted by the operator to the Regional Airworthiness
Office (RAO). The RAO shall scrutinize the MEL as per the APM checklist on the basis of
the MMEL. RAO shall forward the MEL to the POI along with the copy of the latest MMEL.
A link for the MMEL approved by the EASA and FAA has also been provided on the
DGCA’s website (http://dgca.nic.in). FOIs may obtain updated/latest copies of the MMEL
from the site. It needs to be ensured that the MEL is not less restrictive than the MMEL.
On successful review from operations angle and completion of checklist the MEL will be
returned to Regional office for approval.
2.4 Whenever an additional aircraft is added by an operator to their fleet that already
has such approvals, the approval may be granted by the AOCMB after scrutiny of
operator’s request from Airworthiness aspects and Operations aspects. The
checklists for Airworthiness aspects will be completed and documents forwarded
to POI by Regional Airworthiness Office. The POI will review the operations
aspects and assess the applicant’s capability to absorb the new helicopter(s) in
terms of availability of trained crews, maintenance arrangements, parking slots etc.
POI will complete the checklist before returning to Regional Airworthiness Office.
Approval letter shall be issued by the regional office under intimation to the Air
Transport Directorate for endorsement in the AOC.
2.5 In the case of applications for amendments to Op Specs, Regional Airworthiness
Office shall scrutinise the application from airworthiness aspects and following
satisfactory CAR compliance, the application along with a copy of completed
checklist shall be forwarded to the Airworthiness Directorate at DGCA HQ. The
application in respect of the operator based in a sub-regional office, after scrutiny
from airworthiness angle, shall be forwarded to Regional Airworthiness Office for
further action. After satisfactory evaluation and completion of checklist,
Airworthiness Directorate shall forward the proposal to FSD at DGCA, HQ for
scrutiny of Operational aspects. POI will evaluate the documents and complete the
job aids and forward the same to CFOI for issue of approval letter for the Special
operations. Approval copy for Special Ops will be forwarded to DAT for necessary
action for inclusion into Ops Specs.
Page 2 of 2
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
APPENDIX A - Application For Permission To Establish Air Transport Services
In India
Form No. : DGCA/OP/001
For office use
APPLICATION FOR
only
PERMISSION TO ESTABLISH
AIR TRANSPORT SERVICES
AT File
IN INDIA
Number:
The undersigned applies for the permission pursuant to Aircraft Rules, 1937 to establish Air
Transport Services in India as herein described and certifies that the facts stated in this
application are complete, accurate and timely and that the copies of any documents to the
application are true copies.
1. Particulars of the Applicant
i.
Name of the Operator:
ii.
Doing Business As:
iii.
Registered as:
iv.
Chief Executive Officer
Name
Title
Nationality
Telephone:
Contact Details
Fax:
Email:
Telephone:
Mailing address
v.
Fax:
(Head Office):
email:
Page 1 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
vi.
Mailing address
Telephone:
(Main Flight
Operations
Fax:
Base):
email:
vii.
Principle place of
Telephone:
business (if
different from v &
Fax:
vi):
email:
2.
Details of NOC
No.:
(issued by Ministry
of Civil Aviation)
Dated:
Valid upto:
Scope of Operation
Category of
Operations
Domestic
International
proposed
Passengers
Cargo
Mail
Passengers
Cargo
Mail
3.
Scheduled
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Commuter
Non-Scheduled
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
4.
Proposed Routes:
(Please indicate proposed destinations, alternates, weekly frequencies and place(s) where the
traffic rights are sought - if applicable)
Page 2 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
5.
Particulars of connecting services:
(Please furnish particulars regarding agreements with other carriers for Code-sharing, Block
Seat arrangements etc.)
6.
Insurance:
(Please attach a concise statement of present and/ or proposed insurance coverage and limits
for employees, passenger liability, cargo and liability to third parties for injury or damages)
7.
Operational Details
A.
Nominated Accountable Manager
Name
Title
Qualification
Experience
B.
Organizational Structure and Nominated Post Holders of the company:
(Attach the organization Structure)
Position
Name
Qualifications
Experience
i.
Director Flight Operations
ii.
Director Engineering &
Maintenance
iii.
Director Quality Assurance
iv.
Director Safety Management
System
v.
Director Flight Safety
vi.
Director Training
vii.
Director Security
viii.
Director Cabin Safety - if
applicable
Page 3 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
C.
Helicopter Details
i.
Type of helicopter
ii.
Year of Manufacture
iii.
Serial number
iv.
Registration number
v.
Type of engines
vi.
Maximum seating capacity
vii.
MTOW
viii.
Design service goal
ix.
Flight cycles
x.
Crew Requirement
xi.
Communication equipment
available
xii.
Navigation equipment
available
xiii.
Surveillance and safety
equipment available
D.
Method of acquisition of helicopter:
Dry Lease
Owned
Wet Lease
Note: At least one helicopter will be either owned or dry leased.
Page 4 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
Hangar and parking facilities available:
E.
Places of proposed operations and facilities and service available:
F.
Training programmes for operational staff including particulars of simulators intended
to be used for training: (Please attach training programmes)
G.
Training, Testing and checking arrangements for operational staff:
H.
Preflight preparations , facilities for Flight-Following and Dispatch Procedures:
I.
Line stations, staff and procedures, arrangement, facilities and services available for
flight dispatch:
J.
Page 5 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
Proposed Flight Schedule :
K.
Scheme for flight time, flight duty period, duty period and rest periods for fatigue
management of flight and cabin crew members:
L.
Minimum number of flight crew and method of proposed recruitment:
M.
Special approvals required:
DANGEROUS
PBN
HEMS
GOODS
N.
ANY OTHER
ANY OTHER
ANY OTHER
8.
Maintenance arrangements : (Please provide following information)
a) Maintenance Management Exposition
b) Maintenance Control Manual/CAME
c) Operator’s helicopter maintenance programmes
d) Journey Log
Page 6 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
e) Where appropriate, the technical specification(s) of the maintenance contract(s)
between the operator and any approved maintenance organization
f) Number of helicopters
9.
Manuals : (Please provide following manuals in English language)
The following manuals in English (2 copies each) must accompany the application,
a) Operations Manual
b) Safety Management Systems Manual
c) Flight Safety Manual
d) Security Manual duly approved/ under approval by BCAS
e) Rotorcraft Flight Manual and Cockpit Checklists
f) Master Minimum Equipment List and Operator’s MEL
g) Maintenance Control Manual
h) Maintenance Schedule in respect of each helicopter
i)
Training Manual for maintenance personnel
j)
Company Administrative Procedures Policy (Only for Acceptance)
Note : Individual manuals and items listed below may form part of the ops manual.
k) Training Manual
l)
Area Manual/ Navigation Information
m) Flight and Duty Time Limits information
n) Information for undertaking Special Operations
o) Dangerous Goods Manual
p) Weight and Balance Manual including Load and Trim Sheet
q) Safety and Emergency Procedures Manual including Helicopter Search
procedure checklist
r) Dispatch procedures information (Operational control, dispatch, flight
following) etc
s) Ground Handling Manual
t) Normal and emergency checklist
u) Passenger briefing card
10.
Declaration of Compliance
Page 7 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
11.
Schedule of Events
(Please complete Appendix B)
12.
Training proposals for DGCA Inspectors
(The applicant shall provide complete training (type courses) at its own expenses for
two Flight Operations Inspectors, two Airworthiness Inspectors and any other officer as
desired by DGCA, if the applicant intends operating helicopter which are not familiar to
DGCA Inspectors)
13.
Contracted Services
(Please provide details of facilities, services and equipment or personnel , which the
applicant has contracted)
14.
Line Station Management
(Please provide details as to how the applicant intends maintaining and operating its
line stations )
15.
Accident Victim Relief Programme
Additional information (Please supply any other information, which the applicant deems
16.
necessary and suitable in support of the application)
Page 8 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
Nature & description of helicopter livery : (Please attach a colour photograph)
17.
Details of Fees
(As per Aircraft Rules, 1937)
18.
Date:
Place:
Name and Signature of proposed Accountable Manager
Page 9 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
FORMAL APPLICATION
1.
General
1.1
Applicants seeking permission to establish air transport services in India in pursuance
of Aircraft Rules, 1937 shall submit their applications to Director General of Civil Aviation in
strict accordance with the procedures explained below.
1.2
Applicants should be fully aware of the requirements of the Directorate General of Civil
Aviation and its procedures for the initial certification of an operator. In this regard, applicants
are advised to make themselves familiar with the relevant rules, Civil Aviation Requirements
and procedures contained in Flight Operations Inspector Manual, Airworthiness Procedures
Manual and all other Manuals as applicable to the proposed operation.
1.3
The formal application “Application for Permission to establish Air Transport Services
in India” can be downloaded from DGCA’s Website under Forms.
1.4
Application shall be completed in full and adequate information pertaining to significant
and relevant facts, with respect to each of the areas described therein. In case an operator
feels that a particular paragraph in the form is not applicable to its scope of operations, the
same may be reflected as ‘Not Applicable’.
2.
Exhibits and Documents: Exhibits and Documents should be attached with the
application and shall be properly identified with the pertinent portion of the application.
3.
Signature: The original of the application shall be signed by the applicant/ proposed
Accountable Manager.
4.
Amendment: Any change in the application by the applicant or additional information
required by DGCA shall be in the form of an amendment to the original application.
5.
Maps: One set of maps is required showing particulars of the routes, including
distances in statute mile or nautical miles between the adjacent stopping places and
between the terminals of the route.
Instructions for Filling the Form
Pt 1. Particulars of the Applicant: Provide all the details as required in the form.
Pt. 2. Details of NOC: Provide the NOC number and the date of issue of the NOC including
its validity.
Pt. 3. Category of Operations Proposed:
Page 10 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
a)
Indicate whether the proposed operations are domestic or international.
b)
Specify whether the operations would be Scheduled Commuter or Non-Scheduled
c)
Further, indicate whether the operations would be
a. Passengers only;
b. Cargo only;
c. Passengers, cargo and mail
Pt. 4. Proposed Routes: Provide the proposed destinations, alternates, weekly frequencies
etc. Specify if traffic rights are sought (applicable for International Ops)
Pt.
5. Particulars of connecting services:
Please furnish Particulars regarding
agreements with other carriers for Code-sharing, Block Seat arrangements etc if applicable
Pt. 6. Insurance A concise statement shall be furnished of present and / or proposed
insurance coverage and limits for;
a. Employees
b. Passenger liability
c. Cargo
d. Liability to third parties for injury or damages
Pt. 7. Operational details
The applicant shall provide detailed information concerning the following;
A. Nominee for the Accountable Manager with his/her qualifications and experience.
B. Organizational Structure and Nominated Post Holders of the company:
a. Attach the organization Structure
b. Provide the details of nominated post holders. The minimum post holders are specified in
the form wherein some of the post may be held concurrently by the same person. However,
the Director Safety Management shall be an independent functionary reporting directly to the
Accountable Manager only. Similarly the company may decide to have additional post holders
by splitting the responsibilities e.g. separate Directors for Operations and Training. This
organizational structure should be commensurate with the overall scope of operations of the
company.
C. Helicopter Details: Type of helicopter intended to be used for operations with year of
manufacture, serial number, registration number, type of engines, maximum seating capacity,
Page 11 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
MTOW, Design service goal, Flight cycles, crew requirement, Communication, navigation and
surveillance and safety equipment available.
D. Method of acquisition of helicopter: Owned/ Dry lease/ Wet lease along with certified copy
of agreement in the case of a lease. At least one helicopter will be either owned or dry leased.
E. Hangar & Parking facilities available: Provide details
F. Places of proposed operations and facilities and services available: Provide details
G. Training programmes for all operational staff including particulars of simulators intended to
be used for training: Please attach training programmes
H. Training, Testing and Checking arrangements for all operational staff: Provide details
I. Pre-flight preparation, facilities for Flight-following and Dispatch procedures: Provide details
J. Lines stations, staff and procedures, arrangement, facilities and services available for flight
dispatch: Provide details
K. Proposed Flight Schedule: Provide proposed schedule (in case of Scheduled Commuter
Operators only)
L. Scheme for flight time, flight duty periods, duty periods and rest periods for fatigue
management of flight and cabin crewmembers: Provide details.
M. Minimum number of flight & cabin crewmembers
N. Special approvals sought such as Transport of Dangerous Goods by Air, Hill Ops, Offshore
Ops, AMT/ HEMS, External Load, Hoist Ops, RNP/ PBN etc.
Pt. 8. Maintenance Arrangements
In respect of the operator’s maintenance system, the following information must be included
in the initial application for an AOP/ AOC and when applicable, any variation or renewal applied
for and each helicopter type to be operated;
a. The maintenance management exposition
b. Maintenance Control Manual/CAME
c. The operator’s helicopter maintenance programme(s)
d. Journey log
e. Where appropriate the technical specification(s) of the maintenance contract(s) between
the operator and a any approved maintenance organization.
f. The number of helicopters.
Page 12 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix A
Helicopters
Revision 0
July 2017
Pt. 9. Manuals to be produced with the formal application. The manuals in English (2
copies each) as given in item 9 of Appendix A must accompany the application.
Pt. 10. Declaration of Compliance
The Operator shall provide along with the application a State of Compliance in respect of each
Regulation in the Aircraft Rules, 1937 and the applicable Civil Aviation Requirements. The
operator shall use Appendix - C for this purpose.
Pt. 11. Schedule of Events
The Operator shall provide a time schedule indicating as to how he proposes to establish
major facilities, services or equipment needed for the establishment of the proposed services.
The operator shall use Appendix - B for this purpose.
Pt. 12. Training proposed for DGCA Inspectors
The Applicant shall provide complete training (type course) at its own expense, for two Flight
Operations Inspectors, two Airworthiness Inspectors and any other officer(s) of DGCA as
specified by DGCA. Such training will be arranged if the applicant intends operating helicopter,
which are not familiar to DGCA inspectors.
Pt. 13. Contracted Services
Details of facilities, services and equipment or personnel, which the Applicant has contracted,
should be clearly specified.
Pt. 14. Line Station Management
Details as to how the applicant intends maintaining and operating its line stations should be
explained.
Pt. 15. Accident Victim Relief Programme: Provide details
Pt. 16. Additional Information
Supply any other information, which the applicant deems necessary and suitable in support of
the applicant.
Note: It would be desirable, if an applicant for an AOP/ AOC meets the relevant officials in
DGCA with prior appointment to gather the required information and obtain clarifications on
matters, which are not understood by him, prior to compilation of the application.
Pt. 17. Nature and description of helicopter livery: Provide details along with a colour
photograph.
Pt. 18. Details of Fees
The application should be accompanied with the applicable fees.
Page 13 of 13
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
APPENDIX B - Schedule of Events
Director General of Civil Aviation, India
Application for an Air Operator Permit/ Certificate - Schedule
of Events
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
1.0
Pre application Phase
Submission of pre-application
(Statement of Intent)
Assignment of Certification Team by
*
DGCA)
Pre-application meeting
*
2.0
Initial application review phase
Submission of Formal Application
Initial Application Review
*
Formal Application Meeting
*
3.0
Documentary Evaluation Phase
A. MANAGEMENT RESUMES
Submission of Management Resumes
Completion of Compliance Checklist 01 -
Assessment of General Status
*
Review and acceptance of Management
Resumes
Page 1 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
*
a) Accountable Manager (General
manager / Chief executive Officer)
b) Director Flight Operations
c) Director Engineering and
Maintenance
d) Director Safety Management (SMS)
e) Director Training
f)
Director Flight Safety
g) Directory Quality
h) Director Security
i)
Director Cabin Safety - if applicable
B. DOCUMENTS
1. Operations Manual
Submission of Operations Manual (OM)
Completion of compliance Checklists
*
03, 04, 05, 06, 07, 08 and 11(if applicable)
Review and approval of the Operations
Manual
*
2. Safety & Emergency Procedures
Manual
Submission of Cabin Crew member
Safety & Emergency Procedures Manual
Review and Acceptance of Safety &
Emergency Procedures Manual
*
3. Flight Safety Manual
Submission of Flight Safety Manual
Review and approval of Flight Safety
*
Manual
Page 2 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
4. Safety Management Systems
Manual
Submission of Safety Management
Systems Manual
Review and approval of Safety
*
Management Manual
5. Flight Operations Training Manual
Submission of the Flight Operations
Training Manual
Review and approval of the Flight
*
Operations Training Manual
6. Proposed Flight Crew
Qualifications
Submission of Proposed Flight Crew
Qualifications
Review and acceptance of Proposed
*
Flight Crew Qualifications
7. Helicopter Operating Manual (OM)
Submission of an updated Helicopter
Operating Manual (OM)
Submission of Copy of Current Rotorcraft
Flight Manual
Completion of compliance Checklist 03
*
8. Normal and Emergency Checklists
Submission of Normal and Emergency
Checklists
Review and Acceptance of Normal and
*
Emergency Checklists
9. Load and Trim Sheet
Page 3 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
Submission of Load and Trim Sheet
Review and Approval of Load and Trim
*
Sheet
10. Route and Heliport Manual
Submission of the Route/Area Manual
Review and acceptance of the Route/
*
Area Manual
11. Minimum Equipment List (MEL)
Submission of Helicopter MMEL
Submission of Minimum Equipment List
(MEL)
Submission of Current Manufacturer’s
MMEL Deviation Guide
Completion of compliance Checklist 27
*
Review and Approval of Minimum
*
Equipment List (MEL)
12. Maintenance Control Manual/
CAME
Submission of the Maintenance Control
Manual/ CAME
Completion of Checklist 4, 16, 20, 21, 22,
*
23, 24, 26, 28, 29, 34 & 35 Conformance
report
Review and Approval of the Maintenance
*
Control Manual / CAME
13. Helicopter Journey Log book
Submission of a Proposed Helicopter
Journey Log book
Page 4 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
*
Approval of a Proposed Helicopter
Journey Log book
14. Maintenance Deferred Defects Log
Submission of a Proposed Maintenance
Deferred Defects Log (part of Journey Log
book)
Submission of Checklist 35 Conformance
*
report
Approval of a Proposed Maintenance
*
Deferred Defects Log
15. Weight and Balance Manual
Submission of a Weight and Balance
Manual
Submission of compliance Checklist 25
*
Review and acceptance of the Weight and
*
Balance Manual
16. Ground Handling Manual
Submission of a Ground Handling Manual
Submission of compliance Checklist 02
*
Review and acceptance of the Ground
*
Handling Manual
17. Maintenance Program
Submission of the Maintenance Program
Submission of Current Manufacturer’s
Planning Document
Approval of the Maintenance Program
*
18. Flight Safety Documents System
Page 5 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
Submission of Flight Safety Documents
System
Acceptance of the Flight Safety
*
Documents System
19. Security Manual (to be submitted to
BCAS for approval)
C. OTHER EVALUATIONS
Submission of a copy of Helicopter Lease
or Ownership Papers
Approval of the lease: maintenance and
*
operational control
Submission of a copy of the Helicopter
Insurance Policy
Submission of Draft contract agreement
for continuous Airworthiness)
4.0 Inspection and Demonstration Phase
Inspection of Helicopter (compliance of
*
Checklist 3,09 & 30)
Training Facilities & Equipment Inspection
*
(Compliance of Checklist 12)
Simulator/Training Device Inspections
*
Authorization for commencement of flight
*
crew ground Training
Authorization of commencement of Flight
*
crew flight training
Evaluation of the flight crew flight training
*
Evaluation of designee actions
*
Designation of examiners
*
Page 6 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
Authorization for commencement of cabin
*
crew ground training
Evaluation of Operators Cabin
*
crewmember Training
Maintenance Training Facility Inspections
*
Authorization for commencement of
*
maintenance training
Structure & Support Service Inspection
*
(Check List 10)
Operational Control Inspection
*
Station (Base/Line) Inspection
*
Maintenance Main Base & Facility
*
Inspection(Check List 10, 22, 24, 26 & 35)
Maintenance Control Inspection (Checklist
*
31)
Contractor Maintenance Facility
*
Inspections (Checklist 22, 24 & 33), if not
approved by DGCA
Maintenance Station Inspection (Checklist
*
22, 23, 24 & 33)
Helicopter Records Inspection (Checklist
*
07, 29 & 31)
Fuelling of helicopter (Checklist 23)
*
Preparation for the Ground Ditching /
Evacuation demonstration if applicable
Conduct of ground/ditching evacuation
*
demonstration
Preparation for the Proving Flight(s)
Page 7 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix B
Helicopters
Revision 0
July 2017
Name of
Company
Necessary document, action or event
Date
Proposed
Date received/
returned for
Reference
Date
accomplished
Changes
Note: Items with an * will be completed by DGCA
Conduct of the Proving Flight(s) (Check
*
List 19)
Helicopter Inspection
*
Maintenance Flight Deck En-route
*
Inspection
Method of Flight Supervision
*
Minimum Safe Altitudes
*
Passenger Briefing Card
5.0
Certification Phase
Prepare Air Operator Permit/ Certificate
*
Prepare Operations Specifications
*
Page 8 of 8
CAP 3400
Air Operator
Certification Manual -
Appendix C
Helicopters
Revision 0
July 2017
APPENDIX C - Statement of Compliance
DECLARATION OF CONFORMANCE TO RULES AND CIVIL AVIATION
REQUIREMENTS
AIR OPERATOR COMPLIANCE CHECK LIST
Minimum requirements for
grant of Permit to operate Non-
Scheduled Air Transport
Services
Requirements for Grant of
AOC for Scheduled Commuter
Air Transport Service
Safety Management System
(SMS)
Minimum Equipment List
(MEL)
Continuing Airworthiness
Requirements
Weight and balance control of
an aircraft
Provision of Medical Supplies
in Aircraft
Aircraft Log Books
Document to be carried on
board by Indian registered
aircraft
Page 1 of 4
CAP 3400
Air Operator
Certification Manual -
Appendix C
Helicopters
Revision 0
July 2017
Description in brief
Level of Operator’s
Satisfactory/
compliance
Unsatisfactory
Mark first with:
(to be filled by)
R for Read, Ustd for
DGCA
Understood and Cmpd for
compliance
(please give reference to the
applicable Page, Section and
S
U
Chapter, Volume and the title of
the Company’s relevant
document which gives effect to
the regulatory requirements,
when compliance is indicated)
D5F-F1
Flight Safety Awareness and
Accident/ Incident Prevention
Programme.
D5F-F2
Monitoring of DFDR/ QAR/
PMR data for Accident/Incident
Prevention
D5F-F3
Procedure for Medical
examination of aircraft
personnel for alcohol
consumption
D5X-X1
Safety Hazard - Use of
Mobile/Cellular Telephones
inside the Aircraft during flight.
D7D-D6
Requirements for the Qualification
of Aircraft Full Flight Simulators
and Synthetic Flight Training
Devices
D7I-I4
Criteria for Approval of Check
Pilot, Instructors and
Examiners for Operations with
Helicopters
D7I-I7
Criteria for approval of Ground
Instructors
D7I-I8
Criteria for approval of CRM
Facilitators
D7I-I9
Authorization of Synthetic
Flying Instructors for
Helicopters
D7J-J1
Flight Duty Time and Flight
Time Limitations - Cabin
Attendant
Page 2 of 4
CAP 3400
Air Operator
Certification Manual -
Appendix C
Helicopters
Revision 0
July 2017
Flight and Duty Time
Limitations and Rest
Requirements of flight crew
engaged in helicopter
operations.
Cabin Crew Training
Flight Dispatchers Training
and Approval
Load and Trim Sheet
Requirements
Preparation and use of Cockpit
and emergency check list
Flight Crew Training And
Qualification Requirements For
Commercial Helicopter
Operations
Operation of Commercial Air
Transport - Helicopters
Requirements for preparation
of Operations Manual
Performance Based
Navigation (PBN)
Aero-Medical Transport
Rules of the Air
Establishment of Minimum
Flight Altitudes
Approval of Dangerous Goods
Training Programme
Page 3 of 4
CAP 3400
Air Operator
Certification Manual -
Appendix C
Helicopters
Revision 0
July 2017
Description in brief
Level of Operator’s
Satisfactory/
compliance
Unsatisfactory
Mark first with:
(to be filled by)
R for Read, Ustd for
DGCA
Understood and Cmpd for
compliance
(please give reference to the
applicable Page, Section and
S
U
Chapter, Volume and the title of
the Company’s relevant
document which gives effect to
the regulatory requirements,
when compliance is indicated)
AIC
Procedure and precaution
10/1983
regarding fuelling and
defuelling of aircraft, fire and
general safety.
AIC
Avoidance of fire hazard-
18/1985
fuelling near jet aircraft.
AIC
Grant of Permission for
3/2010
providing ground handling
services at Airports other than
those belonging to the Airports
Authority of India
General
Employment of Services of
AC 1 of
Aviation Medicine Specialist by
2011
all Operators
OC
Helicopter Emergency Medical
02/2016
Services
Page 4 of 4
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 0
July 2017
APPENDIX D - Certification Check Lists
General
1.
There are 30 checklists which are required to be completed prior to certification
of applicant for AOP/ AOC.
a. Checklist number 02-15 will be completed by the POI with the assistance
of Operations team members.
b. Checklists number 15 and 20-36 will be completed by PAWI with the
assistance from airworthiness team members.
c. Check list 01 together with the Final report will be completed by the
Project Manager at the completion of the Certification Process.
2.
The rest of the Team Members will use their respective checklists for
conformance of their respective discipline as per their Inspector Manual.
3.
The Checklists contain only the items that should be examined or looked into.
The inspector concerned will determine the standards (assessment criteria)
against which an item in the checklist should be assessed. The following
principles will be used a rule of thumb.
a. Check the item against the rules/ requirements issued, and in the
absence of such,
b. Check the item against the requirements in the Chicago Convention or
any Annex thereto - The guidance in these Checklists may change
from time to time to comply with requirements published by ICAO
and as stipulated by the DGCA.
4.
The Checklist is provided only for the guidance of the Civil Aviation Inspectors.
However, if an applicant is desirous of knowing the result of an assessment in
respect of a particular area, the inspector concerned may issue a copy to the
applicant.
Page 1 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 0
July 2017
CL 01(DGCA/OP/CL/01)
Certification of Applicants For Air Transport Operations in India
CHECKLIST 01 - Assessment of General Status
Name of the Applicant: ………………………………………………………………………
[When an item is marked to be unsatisfactory, indicate reasons under the Remarks column in detail]
Status
Item
Remarks
Sat
Unsat
A.
Initial NOC by Ministry
1.
NOC No.
2.
Validity
B.
Insurance Arrangements: Whether
the applicant has organized an
adequate Insurance Policy from an
Organization acceptable to DGCA in
respect of
1.
Aircraft
2.
Passengers & Cargo
3.
Third Party liabilities
4.
Crewmembers
5.
Applicant’s staff & general properties
6.
Victim Protection Plan in case of an
accident
General Remarks :
………………………………………
…………………………..
………………………
Name of the Officer (DAT)
Signature
Date
Page 2 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 02(DGCA/OP/CL/02)
Certification of Applicants For Air Transport Operations in India
CHECKLIST 02 - Technical assessment for issue of Air Operator Certificate
(AOC) / Operations Specifications
Name of the Applicant: ………………………………………………………………………
(The Satisfactory column is the outcome, subsequent to the review of all below items )
Sat
Date and Review
Item
Administrative
Checklists 02-15 (CL 16-19
intentionally left for future use)
Checklists 20 - 36
Completed Compliance Statement
Management Personnel Acceptance
Accountable Manager
Director Flight Operations
Director Engineering and Maintenance
Director Quality
Director Safety Management
Director Flight Safety
Director Training
Director Security
Director Cabin Safety - if applicable
Documentation and its
approval/ acceptance
Operations Manual
Safety Management Systems Manual
Training Manual, if applicable
Security Manual
Route Manual/ Navigation Information,
if applicable
Dangerous Goods Manual, if applicable
Rotorcraft Flight Manual
Page 3 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Date and Review
Item
Master Minimum Equipment List and
Operator’s MEL
CAME
Maintenance Schedule in respect of each
helicopter
Weight and Balance Manual, if applicable
Safety and Emergency Procedures
Manual, if applicable
Passenger Briefing Card
Flight Safety Manual
Ground Handling Manual, if applicable
Any other Manual produced by the
Manufacturer
Special authorizations
a) AMT/ HEMS
b) RNP/ PBN
c) Transport of Dangerous Goods by Air
Additional Information requirement for
endorsement on Permit
Continuing Airworthiness (Continuous
Maintenance Organization Approval -
CAMO)
General Remarks :
…………………………………
…………………….
………………… Date
Name of the Project Manager
Page 4 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 03(DGCA/OP/CL/03)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 03 - Assessment of Post Holders
Name of the Applicant: ……………………… Location……………………………….
(The Satisfactory column is the outcome subsequent to the review of all below items )
Date & Review
Sat
Item
Qualified and Competent Employees:
Organization has suitably qualified and
competent employees (Refer Appendix H)
to act as:
1.
Accountable Manager
2.
Director Flight Operations
3.
Director Training
4.
Director Engineering and Maintenance
5.
Director Quality
6.
Director Safety Management
7.
Director Flight Safety
8.
Director Security
9.
Director Cabin Safety - if applicable
10.
Director Ground Operations
11.
Chief Pilot(s)
Remarks:
……………………….
………………………
…………………
Name of Inspector
Signature
Date
Page 5 of 94
CAP 3400
Air Operator
Appendix D
Certification Manual -
Helicopters
Revision 1
June 2018
CL 04(DGCA/OP/CL/04)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 04 - Assessment of Operations Manual
Name of the Applicant: ……………………… Location……………………………….
(The Satisfactory column is the outcome subsequent to the review of all below items )
Guidelines This checklist is subdivided in to five steps viz;
1. Checking the Operations Manual against the Declaration of Conformance/
Compliance Statement for completeness and acceptability.
2. Checking specific material required by legislation for acceptability.
3. Checking material copied in to the Operations Manual for agreement with the Flight
Manual.
4. Checking the Operations Manual against CAR Section 8 Series O Part VII and CAP
8100 for completeness and uniformity with the given standard format.
5. Checking that all changes required by DGCA to the Operations Manual have been
included in the final draft.
Sat
Item
Date & Review
A.
Conformity of the Manual with relevant
CARs (CAR compliance)
B.
All text and material taken from a flight
Manual and placed into the Operations
Manual has been checked for accuracy,
completeness and agreement with the
original text or material
C.
Checklist for OM Part A completed as per
CAP 8100
D.
Checklist for OM Part B completed as per
CAP 8100
E.
Checklist for OM Part C completed as per
CAP 8100
Page 6 of 94
F.
Checklist for OM Part D completed as per
CAP 8100
General Remarks:
……………………………
…………………………
...…………………
Name of the Inspector
Signature
Date
Page 7 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 05(DGCA/OP/CL/05)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 05 - Organizational Structure, Staffing and Administrative Facilities
Name of the Applicant …………………………
Location
…………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
Qualified and Competent Employees:
Organization has sufficient number of
A.
suitably qualified and competent
employees to act as;
1.
Flight Crew
2.
Cabin Crew, if applicable
3.
Technical trainers and crew
4.
Operational Planning and Control
5.
Passenger and Load Handling
6.
Administrative Support
B.
Administrative Facilities
1.
Office Accommodation and equipment
2.
Office support staff
Communication/ Information System that
3.
can communicate efficiently and rapidly
with all crew and operational support staff
4.
Printing and/ or distribution facilities
5.
Office Environment
6.
Facilities for Record Keeping
7.
Technical Library
a.
Facilities
b.
Arrangements
c.
Availability of documents such as
Page 8 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
i.
Aircraft Act and Rules
ii.
Civil Aviation Requirements (CAR)
iii.
Operations Manual
iv.
Maintenance Control Manual (CAME)
v.
Minimum Equipment list
vi.
Flight and Duty Time Limitations
viii.
Applicable Maps & Charts
ix
Rotorcraft Flight Manual
x.
Other important documents
C.
Registered Office
Principal or Designated Officer : Person
responsible to the Company as the
1.
contact person for communication
between DGCA and the Company
Contact numbers
2.
Remarks:
……………………….
………………………
…………………
Name of Inspector
Signature
Date
Page 9 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 06(DGCA/OP/CL/06)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 06 - Assessment of Flight Manual and Cockpit Checklists
Name of the Applicant
………………………………………………………………..
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A.
Documents are available in the English
Language
If the Flight Manual is a translation, has
the translated copy been approved by the
Manufacturer.
B.
Information in the Flight Manual is current
and up to date.
C.
Flight Manual contains:
1.
Identification of the helicopter
2.
Operating procedures including, normal,
abnormal and emergency procedures
3.
Helicopter Limitations
4.
Performance and loading information
D.
The Flight Manual supplements and
appendices are appropriate to the serial
numbered helicopter
E.
The Flight Manual has performance
information appropriate to the helicopter
F.
Cockpit Checklists
1.
Checklists encompass at least items in
Flight Manual checklists
2.
Any differences from the RFM justified by
the applicant are satisfactory
3.
Ops Manual instructions provide adequate
procedures in the use of checklists
Page 10 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
4.
Multi-crew checklists indicate clearly which
duties are to be performed by each
crewmember, the appropriate challenges,
actions required and responses to be
used.
5.
Checklists, expanded and abbreviated are
published as part of the Ops Manual.
6.
Abbreviated checklists are consistent with
expanded checklists in the RFM
7.
Checklists accessible to all flight crew
during flight
8.
Checklist printing is legible under adverse
visual conditions
9.
Checklist presented in durable form
F.
The Flight Manual contains an acceptable
Loading System
G.
The Flight Manual contains all relevant
amendments - e.g. additional equipment
installation etc
H.
The Flight Manual has supplements
relevant to the applicant’s planned special
operations - e.g , HEMS,PBN etc.
General Remarks:
………………………
………………...
…………….
Flight Operations Inspector’s Name
Signature
Date
Page 11 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 07(DGCA/OP/CL/07)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 07 - Provision of Operational Information and Support to Crew
Name of the Applicant ……………………………………………………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A.
Availability of Operator Generated
Information for Crew Use - Tables/
Graphs/ Diagrams
1.
Navigation information/ route data
cards
2.
Performance Information
3.
Obstacle Avoidance Procedures
Operator understands requirements to
assess engine-out obstacle avoidance
during climb and cruise
Suitable staff and facilities to devise
obstacle avoidance procedures for
takeoff and climb
Procedures given in a simple and
understandable presentation
4.
Instrument approach Minima
5.
Maximum Weight for Take-off and
Landing - reference of the applicable
charts from the latest copy of RFM
6.
Any information applicable to special
operations e.g. performance limitations
B.
Flight Planning
1.
Weather information
2.
Aeronautical Information (NOTAMS)
3.
Dangerous Goods Information
Page 12 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
C.
Quality Control
1.
Company-generated information
provided for cockpit use is controlled
for currency and availability
2.
System responsive to changes in
source data
3.
System verified for accuracy on an
ongoing basis
4.
Procedures given in a simple and
understandable presentation
D.
Operational Control/ Support
1.
Staff
a.
Qualifications
b.
Training
c.
Competence
d.
Adequacy in strength (number)
2.
Suitability of accommodation
3.
Availability of appropriate information
4.
Reliability of system to convey current
information to crew
5.
Presence of Dangerous Goods on
board
General Remarks:
……………………
………………
…………….
Name of the Inspector
Signature
Date
Page 13 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 08(DGCA/OP/CL/08)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 08 - Arrangements for Maintenance of Documents/ Records
Name of the Applicant …………………………………………………………………...
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A
Flight Crew Records
1.
Licence currency status
a.
Licence
b.
Medical
c.
Ratings
d.
Special authorizations
e.
Endorsements/Limitations
f.
Validity of Licence (age >60 years of age)
2.
Recent experience status
a.
Recency (3-take-offs & landings on type)
b.
Bi-annual Helicopter Type Proficiency
Check
c.
Recency of Route / Role
Qualification (12 months)
d.
Special Ops (as applicable)
e.
Recency of Instrument Rating (12
months)
B.
Flight and Duty time limitation
records for Flight and Cabin
Crewmembers
1.
Check for allocation of home base to all
flight crew
2.
Check for 24 hours, 7 days, 28 days and
365 day limit
3.
Check for minimum days off including
Page 14 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
after night flying.
4.
Check for daily and monthly cumulative
duty hours
5.
Report on exceeding Flight & Duty Time
Limitations
6.
Conformance of the flight duty roster to
the Flight and Duty Time Limits
1.
Competency in Safety and
Emergency Procedures (Annual)
a.
Flight Crew
b.
Cabin Crew, if applicable
2.
Competency in Transport/ Handling
of Dangerous Goods (24 months)
a.
Cargo Acceptors and supervisors
b.
Handlers/Loaders and Supervisors
c.
Flight Crew
d.
Cabin crew, if applicable
e.
Passenger Security Staff
3.
Competency in Security
Procedures (24 months)
a.
Cargo Acceptors and Supervisors
b.
Handlers/ Loaders and Supervisors
c.
Flight Crew
d.
Cabin crew
e.
Passenger Security Staff
D.
Trip Records (Journey Logbook) -
Preserved for two years
1.
Entries made in ink or indelible pencil
2.
Contents as per CAR Section 2 Series X
Part VI
E.
Operational Flight Planning Form
F.
Flight Release
G.
Navigation Log
H.
Fuel and Oil records
Page 15 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
I.
Helicopter Loading
1.
Load sheet
2.
NOTOC (Dangerous Goods )
3.
Passenger Manifest
4.
Cargo Manifest
J.
Log Books and their preservation
1.
Aircraft log book
2.
Engine log book (for each engine)
3.
Personal Flying log book (for each pilot)
4.
Radio maintenance log book
K.
Documents Carried on Board
i. Certificate of Registration;
ii Certificate of Airworthiness;
iii Airworthiness Review Certificate
(ARC);
iv A document attesting Noise
Certification of the helicopter;
v Air Operator’s Permit;
vi Licences for each member of the flight
crew;
vii Aeromobile Radio Operation Licence
for Radio Communication apparatus;
viii Journey Log Book approved by the
DGCA;
ix Operations Manual;
x Minimum Equipment List;
xi Rotorcraft Flight Manual ;
xii SEP Manual
xiii Cockpit and Emergency Check List
xiv Helicopter search procedure checklist;
xv Maintenance Release/ Certificate to
release to service;
xvi LOPA (Layout of Passenger
Arrangement);
xvii Emergency and Safety Equipment
Layout;
xviii. Route including current and suitable
navigation charts/ maps for the planned
flight route and all other routes along
which it is reasonable to expect that the
Page 16 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
flight may be diverted ( applicable for
commuter schedule airline)
xix. Weight Schedule ;
xx. . Load and Trim Sheet;
xxi. Passenger Manifest;
xxii. Cargo Manifest; and
xxiii. NOTOC (if applicable).
L.
Incident/Accident Reporting
1.
ATC/Near miss(Airprox) Forms
2.
Notification of Death on board Form
3.
General Incident Reporting Form
4.
Report on Unruly Passenger Form
5.
RA form
6.
Wildlife Form
7.
Other (Pl. specify)
General Remarks:
……………………………………..
…………………
…..………………
Name of the Inspector
Signature
Date
Page 17 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 09(DGCA/OP/CL/09)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 09 - Inspection of Loading and Load Control
Name of the Applicant …………………………………………………………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A
Load System
1.
Approved by Weight Control Authority
2.
System appropriate for operations in
regard to ease of use, speed of use,
appropriate units and divisions used
3.
Instructions given in the Operations
Manual
4.
If computer is used:
System checked for accuracy
(applicant should demonstrate)
Manual backup system is available
B.
Approval of Load and Trim
Personnel
1.
Properly appointed by the Operator and
approved by DGCA
2.
Approval process, training syllabus and
competency checks contained in a
company controlled document
3.
Appropriate training and competency
check is provided
4.
Competency checked during inspection
5.
Responsibilities are defined in
Operational Manual
C.
Load Sheet/ AUW Calculation
1.
Signed by pilot or approved load/ trim
sheet personnel
Page 18 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
2.
Contains all information for proper
weight and balance control
3.
Copy carried in the helicopter and one
left at the place of departure
D.
Communications Systems:
satisfactory communication system
provided between load/trim
personnel and:(if applicable)
1.
Passenger check-in
2.
Cargo acceptance
3.
Helicopter loaders
4.
Fuel suppliers
5.
Crew
E.
Cargo Loading
1.
System to ensure cargo loaded in
correct holds
2.
Cargo restraint adequate
Remarks:
…………………………………….
…………………
..……………..
Name of the Inspector
Signature
Date
Page 19 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 10(DGCA/OP/CL/10)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 10 - Inspection of Helicopter
Name of the Applicant …………………………………………………………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
*
Items marked with asterisk are to be checked only if applicable.
Sat
Item
Date & Review
A.
Flight-deck items
1.
Required radio and navigation equipment
2.
All equipment required by regulations
3.
All control switches, indicators and gauges
visible and accessible to appropriate crew
4.
Fleet standard layout of instruments and
equipment (changes if any)
5.
Secure flight-deck Door *
B.
Safety and Security Equipment
1.
Appropriate survival equipment carried*
2.
Torches at each crew station
3.
Crash Axe
4.
Safety Briefing Cards
5.
Fire extinguishers - required number, type,
location suitable, serviced and certified OK
6.
Safety belts/ harness
7.
Passenger Seats
8.
ELT - number as required
9.
First Aid Kits - number as required
10.
Medical Kit / universal precautionary kit
11.
Megaphones/ PA Equipment*
12.
Life vest - accessible to flight/cabin crew *
13.
Life rafts meet stowage requirements*
14.
Signaling equipment (if life raft required)*
15.
Life Jackets for pax/ infants*
16.
Emergency Response Kit (For handling of
Page 20 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
DG Incidents)*
17.
Oxygen supplies comply with CAR*
18.
Portable breathing equipment/ smoke
goggles and oxygen for flight crew*
19.
Portable breathing equipment for cabin
crew/ passengers*
C.
Cabin Layout
1.
Passenger seats do not obstruct
emergency exits or Aisles/ can be used as
a strong hold in case of turbulence ,
decompression*
2.
Passenger seating does not exceed
maximum number approved in type
certificate
3.
Passenger Seats provided with seats belts
4.
Weight Placards/ Exit Signs/ Decals for
emergency equipment/ No Smoking,
Fasten seat belt signs/Life jacket location *
5.
Lavatory Fire Protection Arrangements
(Waste bin extinguisher, Smoke detector)*
6.
Carry-on Baggage Restraints*
7.
No major aircraft configuration change as
compared to manufacturer LOPA
D.
Cabin Crewmember Seating*
1.
Nearest practicable to emergency exists
2.
Seat equipped with shoulder harness
3.
Access to intercom when seated
Remarks:
……………………………
………………………….
… …………
Inspector’s Name
Signature
Date
Page 21 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 11(DGCA/OP/CL/11)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 11 - Inspection of Operational Bases and Passenger Handling
Name of the Applicant: …………………………………………………………………
Name of the Operating Base:……………………………………………………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A.
Availability of Company
Documentation at Bases
1.
Specific take-off & landing charts
2.
Route briefing/ SOP
3.
Accuracy of Operations Manual
information
4.
Reference Library
B.
Heliports
1.
Type (Licensed/ Non-Licensed)
2.
Lighting availability
3.
Windsock availability
4.
Approved QNH source
5.
Adequate data on obstacle gradients,
movement areas, hazards etc
Suitability for type of helicopter
6.
operated
C.
Airspace
1.
Controlled or uncontrolled
2.
Obstacle Limiting Areas/ Surfaces
D.
Dispatch
Page 22 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Date & Review
Sat
Item
1.
NOTAM and Weather availability
2.
Flight notification
3.
Communications
4.
Suitable “work area”
5.
Crew rest
E.
Local Load Control Systems
1.
Scales for weighing baggage/ cargo/
passengers
2.
Cargo handling and manifests
3.
Load sheet preparation
4.
Identification and prevention of
carriage of Dangerous Goods by
passengers
5.
Passenger manifest
F.
Marshalling/ Parking
1.
Designated marshallers
2.
Standards signals
G.
Security and Dangerous Goods
1.
Staff trained in DG identification and
handling
2.
Passenger security check
3.
Passenger airside safety
H.
Refuelling
1.
Refuelling Precautions
2.
Fire extinguishers
I.
Passenger Handling Arrangements
1.
Identification of passengers and seat
allocation
2.
Checking and prevention of passengers
carrying restricted items onboard
3.
Control of loose articles in cabin (carry-
Page 23 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
on-baggage)
4.
Procedure for issue of Boarding Card
5.
Passengers occupying assigned seats
J.
Ground Handling Arrangements/
Procedures CONTRACTUAL
1.
Contract Services
a.
Check how management establishes
control over the contractor performance.
b.
Does the management assure adequate
training for the contractor personnel?
c.
Are copies of the training qualifications
available and current?
d.
Does the operator ensure all licensed
and authorized personnel from the
contractor are trained and qualified to
perform the required activities?
e.
Is there a procedure to establish
adequate control over contractor?
f.
Does the Operator contracting other
organization retain responsibility for the
maintenance standard?
g.
Check standard issued to contractors,
level of supervision and the quality
system
h.
Does the operator ensure that flight
dispatcher when performing flight
dispatch function, to hold a valid and
current INDIAN DGCA license or
equivalent authorization?
i.
Does the operator ensure that flight
dispatcher when performing flight
dispatch function, to hold a valid and
current INDIAN DGCA license or
equivalent authorization?
j.
Does the operator ensure that the
contractors have access to the relevant
Page 24 of 94
section of the INDIAN DGCA CAR
(www.dgca.nic.in) and the operators
relevant part of the Operations manual?
k.
Does the operator ensure that internal
audits on contractors ground operations
are conducted by quality operations, at
least once in every two years?
Does the operator ensure that pre and
post flight records and documentation
l.
are retained and kept in accordance with
DGCA regulations
m.
Does the operator ensure copies of the
individual training record on all
contractors personnel are properly
kept?
n.
Does the operator ensure that the
updating of Indian `regulation and
operators Operations manual held by
the contractors?
o.
Management and Organization
-
Ground staff- Are the ground handling
operations described in the relevant
section the Operations Manual?
p.
Management and Organization
-
Accommodation -Is the Operator
working space at each operating base
sufficient for the needs of the ground
staff, storage and records?
General Remarks:
……………………………
………………………….
…………………
Name of the Inspector
Signature
Date
Page 25 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL - 11A (DGCA/OP/CL/011-A)
Certification of Applicants for Air Transport Operations in India
CHECKLIST - 11A - Inspection of Ground Handling Arrangements
Name of the Applicant: …………………………………………………………………
Name of the Operating Port: ……………………………………………………………
[The Satisfactory column is the outcome subsequent to the review of all below items]
Item
Date & Review
Sat
1. Ground Handling Arrangements.
a. The Ground Services are handled by the operator ( ) or by
a third party ( ) Ground Handling Agent?
b. Does the operator have a contract or service level
agreement with the third party Ground Handling Agent prior
to obtaining ground operations / handling services?
c. Does the operator have procedure to conduct audit on the
third party Ground Handling Agent, handling operator
within a defined period? Has the same been documented
by the operator?
d. Does the operator conduct audit on the third party Ground
Handling Agent during initial, renewal or significant
variation of the ground operations activities? Has the same
been documented by the operator?
e. Does the operator’s contract or service level agreement
with the third party Ground Handling Agent include the
following:
a. Statement to indicate that the operator retains the
responsibility in maintaining the ground operations
standards as outlined in the operators OM or Ground
handling manual.
b. Validity of the contract.
c. Does the contract list all ground operations areas that
are being contracted.
d. Statement that the contractor can be supervised by the
operators personnel stationed at the location if required
or by other equivalent mean.
e. Statement to indicate that all contractors personnel
assigned to the contracted activities are trained to the
operator’s standard as stipulated in the relevant
manual.
Page 26 of 94
Item
Date & Review
Sat
f. Statement to indicate that all contractors’ personnel
assigned to the contracted activities undergo recurrent
training as required by the operator and specified in the
operator’s manual.
g. The agreement shall indicate the contractor will allow
the operator including the DGCA inspectors to have
access to all premises, facilities, data, documents,
records and staff during the audit or when required.
h. Statement to indicate that the contractor shall carry out
all ground operations activities as described by the
operators OM and GOM
i.
Statement to indicate that the contractor must have an
SMS system as required.
j.
Statement to indicate that contractor must have a safety
reporting system. All flight safety including occupational
safety reports that are associated to the operations to
be submitted to the operator within the time frame as
stipulated in the SMS manual.
k. The contract must specify the operators safety
performance indicators as well as service level
performance related to safety issues which includes
ground incident etc.
1.1 Contract Services
a. Check how management establishes control over the
contractor performance.
b. Does the management assure adequate training for the
contractor personnel? Has the same been documented by the
operator?
c. Are copies of the training qualifications available and
current?
d. Does the operator ensure all licensed and authorized
personnel from the contractor are trained and qualified to
perform the required activities? Has the same been
documented by the operator?
e. Is there a procedure to establish adequate control over
contractor?
f. Does the Operator contracting other organization retain
responsibility for the maintenance standard?
g. Check standard issued to contractors, level of supervision
and the quality system
h. Does the operator ensure that flight dispatcher when
performing flight dispatch function, to hold a valid and
current INDIAN DGCA license or equivalent authorization?
i. Does the operator ensure that internal audits on contractors’
ground operations are conducted by quality operations, at
least once in every two years?
Page 27 of 94
Item
Date & Review
Sat
j. Does the operator ensure that pre and post flight records and
documentation are retained and kept in accordance with
DGCA regulations? Has the same been documented by the
operator?
k. Does the operator ensure copies of the individual training
record on all contractors’ personnel are properly kept?
l. Does the operator ensure that the updating of Indian
regulation and operator’s Operations manual held by the
contractors?
m. Management and Organization - Accommodation -Is the
Operator working space at each operating base sufficient
for the needs of the ground staff, storage and records?
2. Refuelling Procedures
a. Does the operations manual contain enough information &
guidance, procedures about refuelling for staff to perform
their duties and for the passengers to follow?
b. Re-fuelling/de-fuelling with passengers embarking on board
or Disembarking. Has the same been documented by the
operator?
c. Does the Operator have one qualified person remaining at
a specified location during fuelling operations with
passengers on board?
d. Is the qualified person manning the re-fuelling process
capable of handling emergency procedures concerning
fire protection and firefighting, handling communications
and can initiate and direct an evacuation?
e. Does the Operator have a two-way communication by the
aeroplane’s inter-communication system or other suitable
means between the ground crew supervising the refuelling
and the qualified personnel on board the aeroplane?
f. Does the operator documents have a procedure, for refuel,
defuel and fuel spillage.
h. Does the have a provision for a safe and rapid
evacuation? Has the same been documented by the
operator?
3. Aircraft Towing & Movement
a. Does the operations manual contain enough information,
guidance & procedures about Aircraft Towing & Movement
for staff to perform their duties?
b. Does the push-back and towing procedures comply with
the appropriate standard and procedures?
4. Operation of Ground Service Equipment
a. Enough information & guidance, procedures for staff to
perform duties?
5. Ramp Area
a.
Is the Ramp Area clean & clear of FOD?
b.
Does it include an FOD bin/container?
Page 28 of 94
Item
Date & Review
Sat
c.
Is there is a regular program for inspecting & cleaning
ramp surface?
d.
Does the airport have a facility for snow removal? (If
applicable)?
6.Passenger Movement
a.
Is there any protection from jet or prop blast?
b.
Is there any movement of passengers across the ramp?
c.
Is there any Procedure for handling handicapped
passengers?
7.Marshalling
a.
Check proper procedures have been followed & safe
operation. Has the same been documented by the
operator?
8. Chocks/Mooring
a.
Check procedures are established to Ensure chocks in
place and the personnel are adequately trained. Has the
same been documented by the operator?
9. Accident/Incident
a. Is there is enough information & guidance, procedures for
staff to act after an accident/incident?
b. Is the procedure constantly updated?
c. Is the procedure in line with the DGCA procedures?
10. Severe Weather
a. Does the Operator have procedures for Severe Weather
Operations?
b. Is the procedure constantly updated?
c. How does the Operator notify Flight Crew? Has the same
been documented by the operator?
11. Carry-on Baggage
a. Does the Operator have procedures on Carry-on Baggage?
Has the same been documented by the operator?
b. Is the information & guidance, procedures enough for the
staff to perform their duties?
12. Hazardous Materials
a. Does the Operator have procedures for the Hazardous
Materials?
b. Is the procedure constantly updated?
c. How to notify Flight Crew?
d. Is the information & guidance, procedures enough for the
staff to perform their duties?
13. Dangerous Goods Carriage
a. DG Approval granted by DGCA.
b. Check Handling agent/contract services.
c. Check "Classification", ensure that articles & substances
are classified as DG as specified in the Technical
Instructions (TI).
Page 29 of 94
Item
Date & Review
Sat
d. Check packing complied with packing requirements, as
specified in the
Tl.
e. Check labelling. & marking, ensure that packages, over
packs & freight containers are labelled & marked as
specified in the Tl.
f. Check latest lATA & ICAO Tl for DG.
g. Emergency procedures for DG
leakage/spillage/contamination etc. Has the same been
documented by the operator?
14. Trip Records Disposition
A copy of the operational flight plan where appropriate;
a. Copies of the relevant part(s) of the aeroplane technical
log;
b. Route specific NOTAM and documentation.
c. Mass and balance documentation as required and special
loads notification.
15. Contingency Planning
a. Check for availability.
b. To have action plan for accidents, injury, illness, fuel spills,
bomb threats, hijacking, severe weather & hazardous
materials spills.
c. Action plan should be easily accessible.
d. Action plan should contain emergency notification checklist
& procedures for suspending or cancelling operations.
e. Check Emergency telephone listing for currency & easy
access.
16. Passenger Screening
a. Hand baggage inspection: An Operator must establish
procedure ensure that only hand baggage is taken in the
cabin as can be adequately and securely stowed, does not
block exit or cause injury or damage.
17. Limited Access Areas
a. Access to ramp area.
b. Access to other restricted areas.
18. Ramp
a. Check ramp vehicles parked within safety lanes. Has the
same been documented by the operator?
19. Cargo Loading
a. System to ensure cargo loaded in correct location.
b. Cargo loading locations are included on load sheet.
c. Cargo restrain system/s adequate:
Page 30 of 94
d. Certification
e. Labelling
f. FIDEX units
g. User Instructions
h. Cargo netting.
i. Cargo tie-down points
Remarks:
…………………………….…………
……………………….…….
……………..…………
Name of the Inspector
Signature
Date
Page 31 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
CL 12(DGCA/OP/CL/12)
Certification of Applicants for Air Transport Operations in India
CHECKLIST 12 - Inspection of Training Facilities
(Not required if facilities are out-sourced to an approved ATO/ GTO)
Name of the Applicant …………………………………………………………………
(The Satisfactory column is the outcome subsequent to the review of all below items )
Sat
Item
Date & Review
A
Class Room & Training Areas
1.
Number & Size adequate for the
purpose
2.
Student accommodation
a.
Seating/Writing
b.
Visibility
c.
Hearing
d.
Minimal visual and aural distractions
3.
Heating/Cooling/Ventilation/Lighting
4.
Equipment
, such as black/white
boards, viewgraphs, projectors, video
etc.
B.
Special Equipment
[
Syllabus-
identified training aids adequate for
purpose ]
1.
Briefing Rooms
2.
Number/size appropriate to task
3.
Adequately furnished / equipped
4.
Briefing Room for cabin crew to
conduct pre flight briefing
C.
Recording System Security
Page 32 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
1.
Controlled access
2.
Privacy / Tampering
3.
Adequate/ effective/ Usable
D.
Course Records Adequate to monitor
effectiveness of training system
E.
Individual Training Records Detailed
records kept with respect to each
operating crew member, recording at
least;
1.
Each ground training course completed
or attempted, including results for each
phase or subject and the final
assessment of the standard achieved
2.
Each endorsement training course
competed, including results for each
phase of training, the number of time
each exercise was undertaken and the
results of checks or tests
3.
Each flight or simulator proficiency
check completed or attempted,
including the number of times each
exercise was undertaken and the
results of the tests or checks
4.
Any other training over and above that
prescribed, undertaken in an helicopter
or simulator, including the exercises
completed or attempted and an
assessment of the standard achieved
F.
Examination Facilities
1.
Exam rooms/area adequate for
purpose
2.
Equipment adequate for purpose
3.
Secure storage for exam papers
4.
Unused papers
Page 33 of 94
CAP 3400
Air Operator
Certification Manual -
Appendix D
Helicopters
Revision 1
June 2018
Sat
Item
Date & Review
5.
Completed papers
G.
Administration
1.
Adequate accommodation/ Facilities
2.
Adequate support services
Training schedules coordinated with
operational
4.
Adequate qualified staff available to
conduct training courses
5.
Facilities available for the production of
required training course notes and
material
Remarks:
…………………………………
…………………………
….……………..
Name of the Inspector
Signature
Date
Page 34 of 94

 

 

 

 

 

 

 

 

Content      ..      1       2         ..

 

//////////////////////////////////////////