Military reference books and manuals (2009-2023, Volume 2) - page 15

 

  Index      Manuals     Military reference books and manuals (2009-2023, Volume 2)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     13      14      15      16     ..

 

 

 

Military reference books and manuals (2009-2023, Volume 2) - page 15

 

 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

133 

    

CFACC 

combined force air component command 

CI 

counterintelligence 

CJSOTF 

combined joint special operations task force 

CL 

combat load 

CMO 

civil-military operations 

CNO 

computer network operations 

COA 

course of action 

COCOM 

combatant command (command authority) 

COIN 

counterinsurgency 

COMSEC 

communications security 

CONOPS 

concept of operations 

CONUS 

continental United States 

COP 

common operational picture 

CP 

counterproliferation 

CPOF 

command post of the future 

CT 

counterterrorism 

 

 

 

D

 

D3A 

decide, detect, deliver, and assess 

DA 

direct action 

DLD 

digital liaison detachment 

DGS 

distributed ground system 

DIRSPACEFOR 

Director of Space Forces (DS4) 

DOCEX 

document exploitation 

DOD 

Department of Defense 

DSU 

direct support unit 

 

 

 E 
EHF 

extremely high frequency 

EMDCOA 

enemy most dangerous course of action 

EMPCOA 

enemy most probable course of action 

EOD 

explosive ordnance disposal 

EPW 

enemy prisoner of war 

EW 

electronic warfare 

EXCHECK 

execution checklist 

EXFIL 

exfiltration 

 

 

 

F

 

5Ws 

who, what, where, when, and why 

F2T2EA 

find, fix, track, target, engage, and assess 

F3EAD 

find, fix, finish, exploit, assess, and disseminate 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

134 

17 March 2010 

    

 

FARP 

forward arming and refueling point 

FBCB2 

Force XXI battle command brigade and below 

FC 

fires cell 

FECC 

fires and effects coordination cell 

FFIR 

friendly force information requirement 

FFT 

friendly force tracking 

FID 

foreign internal defense 

FM 

frequency modulation 

FOB 

forward operations base 

FRAGORD 

fragmentary order 

FFT 

friendly force tracking 

FSA 

fire support area  

FSCC  

fire support coordination center 

FSCM 

fire support coordination  measure  

FSE 

fire support element 

FSF 

foreign security forces 

FSO 

fire support officer 

 

 

 

G

 

GARS 

Global Area Reference System 

GCC 

geographic combatant commander 

GCCS 

Global Command and Control System 

GEOINT 

geospatial intelligence 

GFC 

ground force commander 

GMLRS 

Guided Multiple Launch Rocket System 

GPS 

Global Positioning System 

GRG 

gridded reference graphic 

 

 

 

H

 

HF 

high frequency 

HHQ 

higher headquarters 

HMMWV 

high mobility multipurpose wheeled vehicle 

HN 

host nation 

HPT 

high-payoff target 

HUMINT 

human intelligence 

HVI 

high-value individual 

HVT 

high-value target 

 

 

 

I

 

I & I 

integration and interoperability 

IDN 

Initial Distribution Number 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

135 

    

IED 

improvised explosive device 

IGO 

intergovernmental organization 

IMU 

inertial measurement unit 

INFIL 

infiltration 

INTREP 

intelligence report 

INTSUM 

intelligence summary 

IO 

information operations 

IPB 

intelligence preparation of the battlefield / battlespace 

IPI 

indigenous populations and institutions 

IPOE 

intelligence preparation of the OE 

IPW 

interrogation of prisoners of war 

IR 

infrared 

ISAF 

International Security Assistance Force 

ISR 

intelligence, surveillance, and reconnaissance  

IW 

irregular warfare 

 

 

 J, 

K

 

J-3 

operations staff section 

JAAT 

joint air attack team 

JADOCS  

Joint Automated Deep Operations Coordination System 

JAOC 

joint air operations center 

JCMOTF 

joint civil-military operations task force 

JFACC 

joint force air component commander 

JFC  

joint force commander  

JFE 

joint fires element 

JFLCC 

joint force land component commander 

JFMCC 

joint force maritime component commander  

JFO 

joint fires observer 

JFSOCC 

joint force special operations component commander 

JIOC 

Joint Intelligence Operations Center 

JIPTL 

Joint integrated prioritized target list 

JISE 

Joint Intelligence Support Element 

JOA 

joint operations area 

JOC 

joint operations center 

JP 

joint publication 

JPOTF 

joint psychological operations task force  

JRTC 

joint readiness training center 

JSCP 

Joint Strategic Capabilities Plan 

JSOA  

joint special operations area 

JSOAC 

joint special operations air component 

JSOTF 

joint special operations task force 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

136 

17 March 2010 

    

 

JSPOC 

Joint Space Operations Center 

JTAC 

joint terminal attack controller 

JTF 

joint task force 

JWICS 

Joint Worldwide Intelligence Communications System 

 

 

 

L

 

LAN 

local area network 

LeMay Center 

Curtis E. LeMay Center for Doctrine Development and 
Education 

LNO 

liaison officer 

LOC 

line of communications 

 

 

 

M

 

MARSOC 

Marine Corps special operations command 

MARSOF 

Marine Corps special operations forces 

MASINT 

measurement and signature intelligence 

MCCDC 

US Marine Corps Combat Development Command  

MCM 

maneuver control measure 

MCPDS 

Marine Corps Publications Distribution System 

MCRP 

Marine Corps reference publication 

MCS 

maneuver control system 

MDMP 

military decision-making process 

ME 

main effort 

MEDEVAC 

medical evacuation 

MEF 

Marine expeditionary force 

METT-T 
(USMC) 

mission, enemy, terrain and weather, troops and support 
available-time available 

METT-TC 
(USA) 

mission, enemy, terrain and weather, troops and support 
available-time available, and civil considerations 

MGRS 

military grid reference system 

MHE 

materials handling equipment 

MILDEC 

military deception 

MILSTRIP 

Military Standard Requisitioning and Issue Procedure 

MLRS 

Multiple Launch Rocket System 

MMC 

material management center 

MND 

multinational division 

MTTP 

multi-Service tactics, techniques, and procedures 

MSOAG 

Marine Special Operations Advisory Group 

MSOB 

Marine special operations battalion 

MSOC 

Marine special operations company 

MSOS 

Marine special operations school 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

137 

    

MSOSG 

Marine special operations support group 

MSOT 

Marine special operations team 

MWR 

morale, welfare, and recreation  

 

 

 

N

 

NAI 

named area of interest 

NATO 

North Atlantic Treaty Organization 

NAVSOC 

Navy special operations component 

NAVSOF 

naval special operations forces 

NAVSUP 

Navy supplement 

NFA 

no-fire area 

NGO 

nongovernmental organization 

NIPRNET 

Nonsecure Internet Protocol Router Network 

NIST 

national intelligence support team 

NLW 

nonlethal weapon 

NOFORN 

not releasable to foreign nationals 

NSAV 

nonstandard aviation vehicle 

NSWTG 

naval special warfare task group 

NSWTU 

naval special warfare task unit 

NTC 

National Training Center 

NSFS 

naval surface fire support 

NTTP 

Navy tactics, techniques, and procedures 

NVG 

night vision goggle 

 

 

 

O

 

OCIE 

organizational clothing individual equipment 

OCONUS 

outside the continental United States 

ODA 

operational detachment-Alpha 

OE 

operational environment   

OEF 

Operation ENDURING FREEDOM 

OGA 

other government agency 

OIF 

Operation IRAQI FREEDOM 

OPCON 

operational control 

OPIR 

overhead persistent infrared 

OPLAN  

operation plan 

OPORD 

operation order 

OPR 

office of primary responsibility 

OPSEC 

operations security 

OPSKED 

operational schedule 

OPSUM 

operation summary 

OSD 

Office of the Secretary of Defense  

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

138 

17 March 2010 

    

 

OSINT 

open source intelligence 

 

 

 

P

 

PACE 

primary, alternate, contingency, emergency plan 

PIC 

provincial Iraqi control 

PIR 

priority intelligence requirement 

PLT 

platoon 

PMESII 

political, military, economical, social, information, and 
infrastructure 

PMESII-PT 
(USA) 

political, military, economical, social, information, 
infrastructure-physical environment and time 

PNT 

precision, navigation, and timing 

POC 

point of contact 

POI 

person of interest 

POL 

petroleum, oils, and lubricants 

POSREP 

position report 

PR 

personnel recovery 

PREPO 

prepositioned 

PSYOP 

psychological operations 

 

 

 

Q

 

QDR 

Quadrennial Defense Review 

QRC 

quick reference checklist 

QRF 

quick response force 

 

 

 

R

 

RDSP 

rapid decision-making synchronization process 

RFI 

request for information 

RFT 

red force tracker 

RHIB 

rigid hull inflatable boat 

ROE 

rules of engagement 

ROZ 

restricted operations zone 

 

 

 

S

 

SA 

situational awareness 

SACC 

supporting arms coordination center 

SATCOM 

satellite communications 

SBT 

special boat team 

SDV 

SEAL delivery vehicle 

SE 

site exploitation 

SE1 

supporting effort 1 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

139 

    

SE2 

supporting effort 2 

SEAL 

sea-air-land team 

SF 

special forces 

SFLE 

special forces liaison element 

SFODA 

special forces operational detachment-alpha 

SIGINT 

signals intelligence 

SIPRNET 

SECRET Internet Protocol Network 

SITREP 

situation report 

SME 

subject matter expert 

SO 

special operations 

SOA 

special operations aviation 

SOCCE 

special operations command and control element 

SOC-R 

special operations craft-riverine 

SODARS 

special operations debrief and retrieval system 

SOF 

special operations forces 

SOI 

sphere of influence 

SOLE 

special operations liaison element 

SOP 

standard operating procedure 

SOTF 

special operations task force 

SOW 

special operations wing 

SOWT 

special operations weather team 

SPINS 

special instructions 

SR 

special reconnaissance 

SSE 

sensitive site exploitation 

SSR 

space support requirement 

 

 

 

T

 

TACLAN 

tactical local area network  

TACON 

tactical control 

TACP 

tactical air control party 

TAI 

target area of interest 

TAIS 

transportation automated information systems 

TBMCS 

theater battle management core system 

TECHINT 

technical intelligence 

TF 

task force 

TGO 

terminal guidance operations 

TGT 

target 

THF 

temporary holding facility 

THT 

tactical human intelligence team 

TIC 

troops in contact 

TIP 

target information packet 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

140 

17 March 2010 

    

 

TLAM 

Tomahawk land attack missile 

TLE 

Tomahawk land attack missile liaison element 

TOC 

tactical operations center 

TPT 

tactical PSYOP team 

TRADOC 

United States Army Training and Doctrine Command 

TRP 

target reference point 

TSE 

tactical site exploitation 

TSOC 

theater special operations command 

TST 

time-sensitive target 

TTP 

tactics, techniques, and procedures 

TU 

task unit 

 

 

 

U

 

UAS 

unmanned aircraft system 

UHF 

ultra high frequency 

US 

United States 

USAF 

United States Air Force 

USASOC 

United States Army Special Operations Command 

USCENTCOM 

United States Central Command 

USSOCOM 

United States Special Operations Command 

USSTRATCOM 

United States Strategic Command 

UTM 

universal transverse mercator  

UW 

unconventional warfare 

UXO 

unexploded ordnance 

 

 

 

V

 

VHF 

very high frequency 

VTOL 

vertical takeoff and landing 

 

 

 

W

 

WARNORD 

warning order 

WFF 

warfighting function 

WMD 

weapons of mass destruction 

 

X, W, Z

 

ZOR 

zone of responsibility 

 
PART II — TERMS AND DEFINITIONS 
 

advanced operations base—

In special operations, a small temporary base 

established near or within a joint special operations area to 
command, control, and / or support training or tactical 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

141 

    

operations.  Facilities are normally austere.  The base may 
be ashore or afloat.  If ashore, it may include an airfield or 
unimproved airstrip, a pier, or an anchorage.  An advanced 
operations base is normally controlled and / or supported by 
a main operations base or a forward operations base. Also 
called 

AOB

. (JP 1-02. Source: JP 3-05.1) 

air component coordination element—(

DOD) An Air Force component 

element that interfaces and provides liaison with the joint 
force land component commander, or commander Army 
forces. The air component coordination element is the senior 
Air Force element assisting the joint force land component 
commander, or commander Army forces in planning air 
component supporting and supported requirements. The air 
component coordination element is responsible to the joint 
force air component commander and coordinates with the 
joint force land component commander's staff, representing 
the joint force air component commander's needs in either a 
supporting or supported role. Also called 

ACCE

.  (JP 1-02) 

air liaison officer—(

DOD) The senior tactical air control party member attached 

to a ground unit who functions as the primary advisor to the 
ground commander on air power. An air liaison officer is 
usually an aeronautically rated officer. Also called 

ALO

.  (JP 

1-02) 

area of operations—

An operational area defined by the JFC for land and naval 

forces.  Areas of operation do not typically encompass the 
entire operational area of the JFC, but should be large 
enough for component commanders to accomplish their 
missions and protect their forces.  Also called 

AO

. (JP 1-02. 

Source: JP 3-0). 

battlefield coordination detachment—(

DOD) An Army liaison that provides 

selected operational functions between the Army forces and 
the air component commander. Battlefield coordination 
detachment located in the air operations center interface 
includes exchanging current intelligence and operational 
data, support requirements, coordinating the integration of 
Army forces requirements for airspace coordinating 
measures, fire support coordination measures, and theater 
airlift. Also called 

BCD

. (JP 1-02) 

combined joint special operations task force—

A task force composed of 

special operations units from one or more foreign countries 
and more than one US Military Department formed to carry 
out a specific special operation or prosecute special 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

142 

17 March 2010 

    

 

operations in support of a theater campaign or other 
operations.  The combined joint special operations task force 
may have conventional nonspecial operations units assigned 
or attached to support the conduct of specific missions. Also 
called 

CJSOTF. 

(JP 1-02. Source: JP 3-05) 

concept of operations—

A verbal or graphic statement that clearly and concisely 

expresses what the joint force commander intends to 
accomplish and how it will be done using available 
resources. The concept is designed to give an overall picture 
of the operation. Also called 

CONOPS

 (JP 1-02. Source: JP 

5-0) 

conventional forces—

1. Those forces capable of conducting operations using 

nonnuclear weapons. 2. Those forces other than designated 
special operations forces. Also called 

CF. 

(JP 1-02. Source: 

JP 3-05) 

fires—

The use of weapon systems to create a specific lethal or nonlethal effect 

on a target. (JP 1-02. Source: 3-0) 

information operations—(

DOD) The integrated employment of the core 

capabilities of electronic warfare, computer network 
operations, psychological operations, military deception, and 
operations security, in concert with specified supporting and 
related capabilities, to influence, disrupt, corrupt or usurp 
adversarial human and automated decision making while 
protecting our own. Also called 

IO

. (JP 1-02) 

integration—(

DOD, NATO) 1. (DOD only) In force protection, the synchronized 

transfer of units into an operational commander’s force prior 
to mission execution.  2. (DOD only) The arrangement of 
military forces and their actions to create a force that 
operates by engaging as a whole.  3. In photography, a 
process by which the average radar picture seen on several 
scans of the time base may be obtained on a print, or the 
process by which several photographic images are 
combined into a single image.  (JP 1-02. Source: JP 1) 

intelligence, surveillance, and reconnaissance—

An activity that synchronizes 

and integrates the planning and operation of sensors, 
assets, and processing, exploitation, and dissemination 
systems in direct support of current and future operations.  
This is an integrated intelligence and operations function.  
(JP 1-02. Source: JP 2-01)  Army only addition: For Army 
forces, this activity is a combined arms operation that 
focuses on priority intelligence requirements while answering 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

143 

    

the commander’s critical information requirements. Also 
called 

ISR.

 (Source: FM 3-0) 

interoperability—(

DOD, NATO) 1. The ability to operate in synergy in the 

execution of assigned tasks.  2. (DOD only) The condition 
achieved among communications-electronics systems or 
items of communications-electronics equipment when 
information or services can be exchanged directly and 
satisfactorily between them and / or their users.  The degree 
of interoperability should be defined when referring to 
specific cases.  (JP 1-02. Source: JP 3-32) 

irregular warfare—

A violent struggle among state and non-state actors for 

legitimacy and influence over the relevant population(s). 
Irregular warfare favors indirect and asymmetric approaches, 
though it may employ the full range of military and other 
capacities, in order to erode an adversary's power, influence, 
and will. Also called 

IW.

 (JP 1-02. Source: JP 1) 

joint fires—

Fires delivered during the employment of forces from two or more 

components in coordinated action to produce desired effects 
in support of a common objective.  (JP 1-02. Source: JP 3-0) 

joint fire support—

Joint fires that assist air, land, maritime, and special 

operations forces to move, maneuver, and control territory, 
populations, airspace, and key waters.  (JP 1-02. Source: JP 
3-0) 

joint operations area—

An area of land, sea, and airspace, defined by a GCC or 

subordinate unified commander, in which a joint force 
commander (normally a joint task force commander) 
conducts military operations to accomplish a specific 
mission. Also called 

JOA.

 (JP 1-02. Source: JP 3-0) 

joint special operations area—

An area of land, sea, and airspace assigned by 

a joint force commander to the commander of a joint special 
operations force to conduct special operations activities.  It 
may be limited in size to accommodate a discrete direct 
action mission or may be extensive enough to allow a 
continuing broad range of unconventional warfare 
operations. Also called 

JSOA.

 (JP 1-02. Source: JP 3-0)

 

naval special warfare task unit—

A provisional subordinate unit of a naval 

special warfare task group. Also called 

NSWTU.

 (JP 1-02. 

Source: JP 3-05.1) 

operational area—

An overarching term encompassing more descriptive terms 

for geographic areas in which military operations are 
conducted.  Operational areas include, but are not limited to, 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

144 

17 March 2010 

    

 

such descriptors as area of responsibility, theater of war, 
theater of operations, joint operations area, amphibious 
objective area, joint special operations area, and area of 
operations.  (JP 1-02. Source: JP 3-0) 

operational control—

Command authority that may be exercised by 

commanders at any echelon at or below the level of 
combatant command. Operational control is inherent in 
combatant command (command authority) and may be 
delegated within the command. When forces are transferred 
between combatant commands, the command relationship 
the gaining commander will exercise (and the losing 
commander will relinquish) over these forces must be 
specified by the Secretary of Defense. Operational control is 
the authority to perform those functions of command over 
subordinate forces involving organizing and employing 
commands and forces, assigning tasks, designating 
objectives, and giving authoritative direction necessary to 
accomplish the mission. Operational control includes 
authoritative direction over all aspects of military operations 
and joint training necessary to accomplish missions 
assigned to the command. Operational control should be 
exercised through the commanders of subordinate 
organizations. Normally this authority is exercised through 
subordinate joint force commanders and Service and/or 
functional component commanders.  Operational control 
normally provides full authority to organize commands and 
forces and to employ those forces as the commander in 
operational control considers necessary to accomplish 
assigned missions; it does not, in and of itself, include 
authoritative direction for logistics or matters of 
administration, discipline, internal organization, or unit 
training. Also called 

OPCON.

 (JP 1-02. Source: JP 1.) 

operational environment—(

DOD) A composite of the conditions, 

circumstances, and influences that affect the employment of 
capabilities and bear on the decisions of the commander.  
Also called 

OE

.  (JP 1-02) 

psychological operations—(

DOD) Planned operations to convey selected 

information and indicators to foreign audiences to influence 
their emotions, motives, objective reasoning, and ultimately 
the behavior of foreign governments, organizations, groups, 
and individuals. The purpose of psychological operations is 
to induce or reinforce foreign attitudes and behavior 

    

 

FM 6-03.05 / MCWP 3-36.1 / NTTP 3-05.19 / AFTTP 3-2.73 / 

USSOCOM Pub 3-33 v.3 

17 March 2010 

145 

    

favorable to the originator's objectives. Also called 

PSYOP

(JP 1-02) 

special operations forces—

Those Active and Reserve Component forces of 

the Military Services designated by the Secretary of Defense 
and specifically organized, trained, and equipped to conduct 
and support special operations. Also called 

SOF. 

(JP 1-02. 

Source: JP 3-05.1) 

special operations task force—

A temporary or semi-permanent grouping of 

ARSOF units under one commander and formed to carry out 
a specific operation or a continuing mission. Also called 

SOTF

. (Source: FM 3-05) 

support—

1. The action of a force that aids, protects, complements, or sustains 

another force in accordance with a directive requiring such 
action. 2. A unit that helps another unit in battle. 3. An 
element of a command that assists, protects, or supplies 
other forces in combat.  (JP 1-02. Source: JP 1) 

supported commander—

1. The commander having primary responsibility for all 

aspects of a task assigned by the Joint Strategic Capabilities 
Plan or other joint operation planning authority. In the 
context of joint operation planning, this term refers to the 
commander who prepares operation plans or operation 
orders in response to requirements of the Chairman of the 
Joint Chiefs of Staff. 2. In the context of a support command 
relationship, the commander who receives assistance from 
another commander's force or capabilities, and who is 
responsible for ensuring that the supporting commander 
understands the assistance required.  (JP 1-02. Source: JP 
3-0) 

supporting commander—

1. A commander who provides augmentation forces 

or other support to a supported commander or who develops 
a supporting plan. This includes the designated combatant 
commands and Department of Defense agencies as 
appropriate. 2. In the context of a support command 
relationship, the commander who aids, protects, 
complements, or sustains another commander's force, and 
who is responsible for providing the assistance required by 
the supported commander.  (JP 1-02. Source: JP 3-0) 

synchronization—

1. The arrangement of military actions in time, space, and 

purpose to produce maximum relative combat power at a 
decisive place and time. 2. In the intelligence context, 
application of intelligence sources and methods in concert 
with the operation plan to ensure intelligence requirements 

FM 6-03.05

 / 

MCWP 3-36.1

 / 

NTTP 3-05.19

 / 

AFTTP 3-2.73

 /

 

USSOCOM Pub 3-33 v.3

 

146 

17 March 2010 

    

 

are answered in time to influence the decisions they support. 
(JP 1-02. Source: JP 2-0) 

tactical air control party—

(DOD) A subordinate operational component of a 

tactical air control system designed to provide air liaison to 
land forces and for the control of aircraft. Also called 

TACP

(JP 1-02) 

tactical control—

Command authority over assigned or attached forces or 

commands, or military capability or forces made available for 
tasking, that is limited to the detailed direction and control of 
movements or maneuvers within the operational area 
necessary to accomplish missions or tasks assigned. 
Tactical control is inherent in operational control. Tactical 
control may be delegated to, and exercised at any level at or 
below the level of combatant command. Tactical control 
provides sufficient authority for controlling and directing the 
application of force or tactical use of combat support assets 
within the assigned mission or task. Also called 

TACON. 

(JP 

1-02. Source: JP 1) 

time-sensitive targets—

A joint force commander designated target requiring 

immediate response because it is a highly lucrative, fleeting 
target of opportunity or it poses (or will soon pose) a danger 
to friendly forces. Also called 

TST. 

(JP 1-02. Source: JP 3-

60)

  

unconventional warfare - 

(DOD) A broad spectrum of military and paramilitary 

operations, normally of long duration, predominantly 
conducted through, with, or by indigenous or surrogate 
forces who are organized, trained, equipped, supported, and 
directed in varying degrees by an external source. It 
includes, but is not limited to, guerrilla warfare, subversion, 
sabotage, intelligence activities, and unconventional assisted 
recovery. Also called 

UW

.  (JP 1-02. Source: JP 3-05) 

 

 

 

FM 6-03.05

 

 

MCWP 3-36.1

NTTP 3-05.19
AFTTP 3-2.73

USSOCOM Pub 3-33 v.3

 
 

 

17 MARCH 2010

 

By Order of the Secretary of the Army:

 

         Official:

 

 

GEORGE W. CASEY JR.

 

 

General, United States Army

 

 

Chief of Staff

 
   

JOYCE MORROW

   

Administrative Assistant to the

 

 

Secretary of the Army

 

 

1011713

 

 

DISTRIBUTION:

 

Active Army, Army National Guard, and US Army Reserve:

 

Distribute in accordance with the initial distribution number (IDN) 116009,

 

requirements for FM  6-03.05.

 
 
 

By Order of the Secretary of the Air Force

 

 

STEPHEN J. MILLER

 

Major General, US Air Force

 

Commander

 

Curtis E. LeMay Center for  

 

Doctrine Development and Education

 

ACCESSIBILITY:

  Publications and forms are available on the e-Publishing Web site 

at www.e-publishing.af.mil for downloading or ordering.

RELEASABILITY:

  Distribution authorized to US Government agencies and their 

contractors only to protect technical or operational information 

from automatic dissemination under the International Exchange 

Program or by other means. This determination was made on  

25 September 2008

.

 

OFFICE OF THE DIRECTOR OF NATIONAL INTELLIGENCE NATIONAL COUNTERINTELLIGENCE EXECUTIVE 

WASHINGTON, 

DC 20505  

April 23, 2012 
 

MEMORANDUM FOR: Distribution  

SUBJECT: Technical Specifications for Construction and Management of Sensitive Compartmented 

Information Facilities, Version 1.2 

REFERENCES: A. Memorandum, Same Subject dated May 5, 2011

 

  B.  ICD 705, Sensitive Compartmented Information Facilities  
  C. ICS 705-1, Physical and Technical Standards for Sensitive Compartmented 

Information Facilities  

  D. ICS 705-2, Standards for the Accreditation and Reciprocal Use of Sensitive 

Compartmented Information Facilities  

 
 

This memorandum promulgates Version 1.2 of the Technical Specifications for Construction and 

Management of Sensitive Compartmented Information Facilities to the Intelligence Community which 
shall replace Version 1.1, effective immediately.  

The Technical Specifications was designed to be a living document that enables periodic updates 

to keep up with changing and emerging technology.   Based upon input from the Intelligence Community 
and as a result of a cooperative effort by physical and technical experts from the IC elements and our 
industrial partners, this Version 1.2 of the Technical Specifications has been updated to meet the needs of 
the community and enhance the standards identified in ICS 705-1, Physical Security Standards for 
Sensitive Compartmented Information Facilities.  

Questions may be directed to Mr. Robert Maher, Senior Policy Officer for Physical and Technical Security 
at 932-0773 (secure) or 7301-227-8561(non-secure). 

 

Francisco Montoya Jr. 

 Attachments:  

 
  

ICD 705 -Technical Specifications Version 1.2 

Summary of Changes 

 

 

Summary of changes to Technical Specifications for Construction and Management of Sensitive 
Compartmented Information Facilities  

 
Cover – Change date and version  
 
Page 3 – Added note to warn users of classification when associating threat information and facility 
location.  
 
Page 4 – Re-worded approval of CAs to designate the AO as the primary approval authority of 
Compartmented Areas within SCIFs.  
 
Pages 8-9 – Changed “Type X Gypsum” to “wallboard” to remove the standard of fire resistant gypsum 
and permit use of other wallboard types. 
 
Pages 8-9 – Changed references to wall design drawings to “suggested” wall types to enable variety of 
wall construction techniques to meet the security standards. 
 
Page 9 – Added explanation to glue and screw plywood to ceiling and floor to clarify standard. Stud 
placement changed to 16 on center to match drawing and correct error. 
 
Page 9 – Added statement for runners at ceiling and floor in Walls B and C to clarify and equal Type A 
Wall.  
 
Page 9 – Added statement to finish wall and paint from true floor to true ceiling in Walls B and C to 
clarify and equal Type A Wall. 
 
Pages 18 – 19 Replaced drawings to reflect “suggested” wall construction methods and remove 
references to “Type X gypsum wallboard”. 
 
Page 34 – Removed 5 minute forced entry standard – as agreed by the PTSEWG, security in depth of 
Chief of Mission facilities and enhanced walls were sufficient physical protection. 
 
Page 53 – Updated FIPS encryption standards and certification to remove a standard that could not be 
met by commercial alarm systems.  
 
55, 56, 63, and Fixed Facility Checklist – Replaced Federal Information Processing Standards (FIPS) 140-2 
with Advanced Encryption Standard (AES) to remove a standard that could not be met by commercial 
alarm systems. 
 
Page 83 – Added statement previously found in DCID 6/9 which reinforced the ability to allow TSCM and 
TEMPEST test equipment into SCIFs without inspection or delay.  
 
Page 112 TEMPEST Checklist – Removed references to “inspectable space” as requested by the TEMPEST 
Advisory Group (TAG).  
 
Page 113 TEMPEST Checklist – Removed references to “Red-SCI” information. 
 
Page 114 TEMPEST Checklist – Removed parenthetical reference to cell phones and Bluetooth. 

Pages 120 to 128 - Replaced Compartmented Area Checklist to reflect IC standards. 

Pages 154 to 156 – Replaced Co-Use and MOA Form to include “joint-use” statements. 

UNCLASSIFIED 

 

UNCLASSIFIED 

 

 
 

T

ECHNICAL 

S

PECIFICATIONS FOR 

C

ONSTRUCTION 

AND 

M

ANAGEMENT OF 

S

ENSITIVE 

C

OMPARTMENTED 

I

NFORMATION 

F

ACILITIES 

 

VERSION 1.2 

 

IC Tech Spec‐for ICD/ICS 705 

 

 
 
 

An Intelligence Community Technical Specification 

Prepared by the  

Office of the National Counterintelligence Executive 

 
 

April 23, 2012 

UNCLASSIFIED 

 

 

 

 

UNCLASSIFIED 

Table of Contents 

Chapter 1.

 

Introduction ................................................................................................................. 1

 

A.

 

Purpose ................................................................................................................................ 1

 

B.

 

Applicability ....................................................................................................................... 1

 

Chapter 2.

 

Risk Management ........................................................................................................ 2

 

A.

 

Analytical Risk Management Process ................................................................................ 2

 

B.

 

Security in Depth (SID) ...................................................................................................... 3

 

C.

 

Compartmented Area (CA) ................................................................................................. 4

 

Chapter 3.

 

Fixed Facility SCIF Construction ................................................................................ 6

 

A.

 

Personnel ............................................................................................................................. 6

 

B.

 

Construction Security.......................................................................................................... 7

 

C.

 

Perimeter Wall Construction Criteria ................................................................................. 8

 

D.

 

Floor and Ceiling Construction Criteria ........................................................................... 11

 

E.

 

SCIF Door Criteria ............................................................................................................ 11

 

F.

 

SCIF Window Criteria ...................................................................................................... 12

 

G.

 

SCIF Perimeter Penetrations Criteria ................................................................................ 13

 

H.

 

Alarm Response Time Criteria for SCIFs within the U.S. ............................................... 14

 

I.

 

Secure Working Areas (SWA).......................................................................................... 14

 

J.

 

Temporary Secure Working Area (TSWA) ...................................................................... 14

 

Chapter 4.

 

SCIFs Outside the U.S. and NOT Under Chief of Mission (COM) Authority ......... 20

 

A.

 

General .............................................................................................................................. 20

 

B.

 

Establishing Construction Criteria Using Threat Ratings ................................................. 20

 

C.

 

Personnel ........................................................................................................................... 23

 

D.

 

Construction Security Requirements ................................................................................ 24

 

E.

 

Procurement of Construction Materials ............................................................................ 27

 

F.

 

Secure Transportation for Construction Material ............................................................. 30

 

G.

 

Secure Storage of Construction Material .......................................................................... 31

 

H.

 

Technical Security ............................................................................................................ 31

 

I.

 

Interim Accreditations ...................................................................................................... 31

 

UNCLASSIFIED 

 

 

 

 

ii 

UNCLASSIFIED 

Chapter 5.

 

SCIFs Outside the U.S. and Under Chief of Mission Authority ............................... 32

 

A.

 

Applicability ..................................................................................................................... 32

 

B.

 

General Guidelines............................................................................................................ 32

 

C.

 

Threat Categories .............................................................................................................. 33

 

D.

 

Construction Requirements ............................................................................................... 34

 

E.

 

Personnel ........................................................................................................................... 35

 

F.

 

Construction Security Requirements ................................................................................ 37

 

G.

 

Procurement of Construction Materials ............................................................................ 39

 

H.

 

Secure Transportation for Construction Material ............................................................. 41

 

I.

 

Secure Storage of Construction Material .......................................................................... 42

 

J.

 

Technical Security ............................................................................................................ 42

 

K.

 

Interim Accreditations ...................................................................................................... 42

 

Chapter 6.

 

Temporary, Airborne, and Shipboard SCIFs ............................................................. 43

 

A.

 

Applicability ..................................................................................................................... 43

 

B.

 

Ground-Based T-SCIFs .................................................................................................... 43

 

C.

 

Permanent and Tactical SCIFS Aboard Aircraft .............................................................. 45

 

D.

 

Permanent and Tactical SCIFs on Surface or Subsurface Vessels ................................... 47

 

Chapter 7.

 

Intrusion Detection Systems (IDS) ............................................................................ 53

 

A.

 

Specifications and Implementation Requirements ............................................................ 53

 

B.

 

IDS Modes of Operation ................................................................................................... 57

 

C.

 

Operations and Maintenance of IDS ................................................................................. 59

 

D.

 

Installation and Testing of IDS ......................................................................................... 60

 

Chapter 8.

 

Access Control Systems (ACS) ................................................................................. 62

 

A.

 

SCIF Access Control......................................................................................................... 62

 

B.

 

ACS Administration.......................................................................................................... 63

 

C.

 

ACS Physical Protection ................................................................................................... 63

 

D.

 

ACS Recordkeeping.......................................................................................................... 63

 

E.

 

Using Closed Circuit Television (CCTV) to Supplement ACS........................................ 64

 

F.

 

Non-Automated Access Control ....................................................................................... 64

 

UNCLASSIFIED 

 

 

 

 

iii 

UNCLASSIFIED 

Chapter 9.

 

Acoustic Protection ................................................................................................... 65

 

A.

 

Overview ........................................................................................................................... 65

 

B.

 

Sound Group Ratings ........................................................................................................ 65

 

C.

 

Acoustic Testing ............................................................................................................... 65

 

D.

 

Construction Guidance for Acoustic Protection ............................................................... 66

 

E.

 

Sound Transmission Mitigations ...................................................................................... 66

 

Chapter 10.

 

Portable Electronic Devices (PEDs) .......................................................................... 68

 

A.

 

Approved Use of PEDs in a SCIF..................................................................................... 68

 

B.

 

Prohibitions ....................................................................................................................... 69

 

C.

 

PED Risk Levels ............................................................................................................... 69

 

D.

 

Risk Mitigation ................................................................................................................. 70

 

Chapter 11.

 

Telecommunications Systems ................................................................................... 73

 

A.

 

Applicability ..................................................................................................................... 73

 

B.

 

Unclassified Telephone Systems ...................................................................................... 73

 

C.

 

Unclassified Information Systems .................................................................................... 74

 

D.

 

Using Closed Circuit Television (CCTV) to Monitor the SCIF Entry Point(s) ............... 75

 

E.

 

Unclassified Wireless Network Technology .................................................................... 75

 

F.

 

Environmental Infrastructure Systems .............................................................................. 75

 

G.

 

Emergency Notification Systems ...................................................................................... 76

 

H.

 

Systems Access ................................................................................................................. 76

 

I.

 

Unclassified Cable Control ............................................................................................... 77

 

J.

 

References ......................................................................................................................... 77

 

Chapter 12.

 

Management and Operations ..................................................................................... 79

 

A.

 

Purpose .............................................................................................................................. 79

 

B.

 

SCIF Repository................................................................................................................ 79

 

C.

 

SCIF Management ............................................................................................................ 80

 

D.

 

SOPs .................................................................................................................................. 81

 

E.

 

Changes in Security and Accreditation ............................................................................. 82

 

F.

 

General .............................................................................................................................. 82

 

UNCLASSIFIED 

 

 

 

 

iv 

UNCLASSIFIED 

G.

 

Inspections ........................................................................................................................ 83

 

H.

 

Control of Combinations................................................................................................... 83

 

I.

 

De-Accreditation Guidelines ............................................................................................ 84

 

J.

 

Visitor Access ................................................................................................................... 84

 

K.

 

Maintenance ...................................................................................................................... 86

 

L.

 

IDS and ACS Documentation Requirements .................................................................... 86

 

M.

 

Emergency Plan ................................................................................................................ 87

 

Chapter 13.

 

Forms and Plans ........................................................................................................ 89

 

Fixed Facility Checklist ............................................................................................................ 90

 

TEMPEST Checklist ............................................................................................................... 110

 

Compartmented Area Checklist .............................................................................................. 120

 

Shipboard Checklist ................................................................................................................ 130

 

Aircraft/UAV Checklist .......................................................................................................... 144

 

SCIF Co-Use Request and MOA ............................................................................................ 154

 

Construction Security Plan (CSP) ........................................................................................... 157

 

 

           UNCLASSIFIED 

Chapter 1 

 

 

Introduction 

 

 

 

 

UNCLASSIFIED 

Chapter 1.

 

Introduction 

A.

 

Purpose  

This Intelligence Community (IC) Technical Specification sets forth the physical and 
technical security specifications and best practices for meeting standards of Intelligence 
Community Standard (ICS) 705-1 (Physical and Technical Standards for Sensitive 
Compartmented Information Facilities).  When the technical specifications herein are applied 
to new construction and renovations of Sensitive Compartmented Information Facilities 
(SCIFs), they shall satisfy the standards outlined in ICS 705-1 to enable uniform and 
reciprocal use across all IC elements and to assure information sharing to the greatest extent 
possible.  This document is the implementing specification for Intelligence Community 
Directive (ICD) 705, Physical and Technical Security Standards for Sensitive 
Compartmented Information Facilities (ICS-705-1) and Standards for Accreditation and 
Reciprocal Use of Sensitive Compartmented Information Facilities (ICS-705-2) and 
supersedes Director of Central Intelligence Directive (DCID) 6/9. 
 
The specifications contained herein will facilitate the protection of Sensitive Compartmented 
Information (SCI) against compromising emanations, inadvertent observation and disclosure 
by unauthorized persons, and the detection of unauthorized entry.   

B.

 

Applicability  

IC Elements shall fully implement this standard within 180 days of its signature.  
 
SCIFs that have been de-accredited but controlled at the SECRET level (IAW 32 Code of 
Federal Regulations (CFR) parts 2001 and 2004) for less than one year may be reaccredited 
one time using the previous standard.  The IC SCIF repository shall indicate that the 
accreditation was based upon the previous standards.  

 

           UNCLASSIFIED 

Chapter 2 

 

 

Risk Management 

 

 

 

 

UNCLASSIFIED 

Chapter 2.

 

Risk Management 

A.

 

Analytical Risk Management Process  

1.

 

The Accrediting Official (AO) and the Site Security Manager (SSM) should evaluate 

each proposed SCIF for threats, vulnerabilities, and assets to determine the most efficient 
countermeasures required for physical and technical security.  In some cases, based upon 
that risk assessment, it may be determined that it is more practical or efficient to mitigate 
a standard.  In other cases, it may be determined that additional security measures should 
be employed due to a significant risk factor.  

2.

 

Security begins when the initial requirement for a SCIF is known. To ensure the 

integrity of the construction and final accreditation, security plans should be coordinated 
with the AO before construction plans are designed, materials ordered, or contracts let. 

a)

 

Security standards shall apply to all proposed SCI facilities and shall be 

coordinated with the AO for guidance and approval.  Location of facility 
construction and or fabrication does not exclude a facility from security standards 
and or review and approval by the AO.  SCI facilities include but are not limited 
to fixed facilities, mobile platforms, prefabricated structures, containers, modular 
applications or other new or emerging applications and technologies that may 
meet performance standards for use in SCI facility construction.  

b)

 

Mitigations are verifiable, non-standard methods that shall be approved by the 

AO to effectively meet the physical/technical security protection level(s) of the 
standard.  While most standards may be effectively mitigated via non-standard 
construction, additional security countermeasures and/or procedures, some 
standards are based upon tested and verified equipment (e.g., a combination lock 
meeting Federal Specification FF-L 2740A) chosen because of special attributes 
and could not be mitigated with non-tested equipment.  The AO‟s approval is 
documented to confirm that the mitigation is at least equal to the 
physical/technical security level of the standard.  

c)

 

Exceeding a standard, even when based upon risk, requires that a waiver be 

processed and approved in accordance with ICD 705.  

3.

 

The risk management process includes a critical evaluation of threats, vulnerability, 

and assets to determine the need and value of countermeasures.  The process may include 
the following:  

a)

 

Threat Analysis.  Assess the capabilities, intentions, and opportunity of an 

adversary to exploit or damage assets or information.  Reference the threat 
information provided in the National Threat Identification and Prioritization 
Assessment (NTIPA) produced by the National Counterintelligence Executive 
(NCIX) for inside the U.S. and/or the Overseas Security Policy Board (OSPB), 
Security Environment Threat List (SETL) for outside the U.S. to determine 
technical threat to a location.  When evaluating for TEMPEST, the Certified 

 

           UNCLASSIFIED 

Chapter 2 

 

 

Risk Management 

 

 

 

 

UNCLASSIFIED 

TEMPEST Technical Authorities (CTTA) shall use the National Security Agency 
Information Assurance (NSA IA) list as an additional resource for specific 
technical threat information.  

NOTE: These threat documents are classified. 

Associating the threat level or other threat information with the SCIF location 
(including country, city, etc.) will normally carry the same classification level 
identified in the threat document. Ensure that SCIF planning documents and 
discussions that identify threat with the country or SCIF location are protected 
accordingly.

  It is critical to identify other occupants of common and adjacent 

buildings.  (However, do not attempt to collect information against U.S. persons 
in violation of Executive Order (EO) 12333.)  In areas where there is a diplomatic 
presence of high and critical threat countries, additional countermeasures may be 
necessary.  

b)

 

Vulnerability Analysis.  Assess the inherent susceptibility to attack of a 

procedure, facility, information system, equipment, or policy.  

c)

 

Probability Analysis.  Assess the probability of an adverse action, incident, or 

attack occurring.  

d)

 

Consequence Analysis.  Assess the consequences of such an action (expressed 

as a measure of loss, such as cost in dollars, resources, programmatic 
effect/mission impact, etc.).  

B.

 

Security in Depth (SID)  

1.

 

SID describes the factors that enhance the probability of detection before actual 

penetration to the SCIF occurs.  The existence of a layer or layers of security that offer 
mitigations for risks may be accepted by the AO.  An important factor in determining risk 
is whether layers of security already exist at the facility.  If applied, these layers may, 
with AO approval, alter construction requirements and extend security alarm response 
time to the maximum of 15 minutes.  Complete documentation of any/all SID measures 
in place will assist in making risk decisions necessary to render a final standards decision.  

2.

 

SID is mandatory for SCIFs located outside the U.S. due to increased threat.  

3.

 

The primary means to achieve SID are listed below and are acceptable.  SID requires 

that at least one of the following mitigations is applied:  

a)

 

Military installations, embassy compounds, U.S. Government (USG) 

compounds, or contractor compounds with a dedicated response force of U.S. 
persons.   

b)

 

Controlled buildings with separate building access controls, alarms, elevator 

controls, stairwell controls, etc., required to gain access to the buildings or 
elevators.  These controls shall be fully coordinated with a formal agreement or 
managed by the entity that owns the SCIF.  

c)

 

Controlled office areas adjacent to or surrounding SCIFs that are protected by 

alarm equipment installed in accordance with manufacturer‟s instructions.  These 

 

           UNCLASSIFIED 

Chapter 2 

 

 

Risk Management 

 

 

 

 

UNCLASSIFIED 

controls shall be fully coordinated with a formal agreement or managed by the 
entity that owns the SCIF.  

d)

 

Fenced compounds with access controlled vehicle gate and/or pedestrian gate.   

e)

 

The AO may develop additional strategies to mitigate risk and increase 

probability of detection of unauthorized entry. 

 

C.

 

Compartmented Area (CA) 

1.

 

Definition  

A CA is an area, room, or a set of rooms within a SCIF that provides controlled 
separation between control systems, compartments, sub-compartments, or Controlled 
Access Programs.  

2.

 

Requirements 

a)

 

The CA shall be approved by the AO with the concurrence of the CA Program 

Manager or designee. The CA Checklist (Chapter 13) shall be used to request 
approval.  

b)

 

Any construction or security requirements above those listed herein require 

prior approval from the element head as described in ICS 705-2.  

3.

 

Access Control 

a)

 

Access control to the CA may be accomplished by visual recognition or 

mechanical/electronic access control devices.  

b)

 

Spin-dial combination locks shall not be installed on CA doors.  

c)

 

Independent alarm systems shall not be installed in a CA.  

4.

 

Visual Protection of CA Workstations 

If compartmented information will be displayed on a computer terminal or group of 
terminals in an area where everyone is not accessed to the program, the following 
measures may be applied to reduce the ability of “shoulder surfing” or inadvertent 
viewing of compartmented information:  

 

Position the computer screen away from doorway/cubicle opening.  

 

Use a polarizing privacy screen.  

 

Use partitions and/or signs.  

 

Existing private offices or rooms may be used but may not be a mandatory 
requirement.  

5.

 

Closed Storage  

When the storage, processing, and use of compartmented information, product, or 
deliverables is required, and all information shall be stored while not in use, then all of 
the following shall apply: 

 

           UNCLASSIFIED 

Chapter 2 

 

 

Risk Management 

 

 

 

 

UNCLASSIFIED 

a)

 

Access and visual controls identified above shall be the standard safeguard.   

b)

 

Compartmented information shall be physically stored in a General Services 

Administration (GSA) approved safe.  

6.

 

Open Storage 

In rare instances when open storage of information is required, the following apply: 

a)

 

If the parent SCIF is accredited for open storage, a private office with access 

control on the door is adequate physical security protection.  

b)

 

If the parent SCIF has been built and accredited for closed storage, then the 

CA perimeter shall be constructed and accredited to open storage standards.  

c)

 

The CA AO may approve open or closed storage within the CA.  Storage 

requirements shall be noted in both the CA Fixed Facility Checklist (FFC) and, if 
appropriate, in a Memorandum of Understanding (MOU).  

7.

 

Acoustic and Technical Security 

a)

 

All TEMPEST, administrative telephone, and technical surveillance 

countermeasure (TSCM) requirements for the parent SCIF shall apply to the CA 
and shall be reciprocally accepted.  

b)

 

When compartmented discussions are required, the following apply:  

(1)

 

Use existing rooms that have been accredited for SCI discussions. 

(2)

 

Use administrative procedures to restrict access to the room during 

conversations.

 

           UNCLASSIFIED 

Chapter 3 

 

 

Fixed Facility SCIF Construction 

 

 

 

 

UNCLASSIFIED 

Chapter 3.

 

Fixed Facility SCIF Construction  

Requirements outlined within this chapter apply to all fixed facility SCIFs.  Additional 
information and requirements for facilities located outside the U.S., its possessions or 
territories, are found in Chapters 4 and 5.  Additional information and requirements for 
temporary SCIFs are described in Chapter 6. 

A.

 

Personnel 

Roles and responsibilities of key SCIF construction personnel are identified in ICS 705-1 
and restated here for reference.

 

 

1.

 

AO  Responsibilities  

a)

 

Provide security oversight of all aspects of SCIF construction under their security 

purview.  

b)

 

Review and approve the design concept, Construction Security Plan (CSP), and 

final design for each construction project prior to the start of SCIF construction.  

c)

 

Depending on the magnitude of the project, shall determine if the Site Security 

Manager (SSM) performs duties on a full-time, principal basis, or as an additional 
duty to on-site personnel.  

d)

 

Accredit SCIFs under their cognizance.  

e)

 

Prepare waiver requests for the IC element head or designee. 

f)

 

Provide the timely input of all required SCIF data to the IC SCIF repository.  

g)

 

Consider SID on USG or USG-sponsored contractor facilities to substitute for 

standards herein.  (SID shall be documented in the CSP and the FFC.)  

2.

 

Site Security Managers (SSMs) Responsibilities 

a)

 

Ensure the requirements herein are implemented and advise the AO of 

compliance or variances.  

b)

 

In consultation with the AO, develop a CSP regarding implementation of the 

standards herein.  (This document shall include actions required to document the 
project from start to finish.)  

c)

 

Conduct periodic security inspections for the duration of the project to ensure 

compliance with the CSP.  

d)

 

Document security violations or deviations from the CSP and notify the AO 

within 3 business days.   

e)

 

Ensure that procedures to control site access are implemented. 

 

           UNCLASSIFIED 

Chapter 3 

 

 

Fixed Facility SCIF Construction 

 

 

 

 

UNCLASSIFIED 

3.

 

CTTA Responsibilities 

a)

 

Review SCIF construction or renovation plans to determine if TEMPEST 

countermeasures are required and recommend solutions.  (To the maximum extent 
practicable, TEMPEST mitigation requirements shall be incorporated into the SCIF 
design.)  

b)

 

Provide the Cognizant Security Authority (CSA)AO with documented results of 

review with recommendations.  

4.

 

Construction Surveillance Technicians (CSTs) Responsibilities  

Supplement site access controls, implement screening and inspection procedures, as 
well as monitor construction and personnel, when required by the AO  

B.

 

Construction Security 

1.

 

Prior to awarding a construction contract, a CSP for each project shall be developed 

by the SSM and approved by the AO.     

2.

 

Construction plans and all related documents shall be handled and protected in 

accordance with the CSP.  

3.

 

For SCIF renovation projects, barriers shall be installed to segregate construction 

workers from operational activities and provide protection against unauthorized access 
and visual observation.  Specific guidance shall be contained in the CSP.   

4.

 

Periodic security inspections shall be conducted by the SSM or designee for the 

duration of the project to ensure compliance with construction design and security 
standards.  

5.

 

Construction and design of SCIFs should be performed by U.S. companies using U.S. 

citizens to reduce risk, but may be 

performed 

by U.S. companies using U.S. persons (an 

individual 

who has been lawfully admitted for permanent residence as defined in 8 

U.S.C. 1 101(a)(20) or who is a protected individual as 

defined 

by Title 8 U.S.C. 1 324b 

(a)(3)).  

T

he AO shall ensure mitigations are implemented when using non

-

U.S. citizens. 

These mitigations 

shall be documented 

in 

the CSP.

  

6.

 

All site control measures used shall be documented in the CSP.  Among the control 

measures that may be considered are the following: 

 

Identity verification.  

 

Random searches at site entry and exit points.  

 

Signs at all entry points listing prohibited and restricted items (e.g., cameras, 
firearms, explosives, drugs, etc.).  

 

Physical security barriers to deny unauthorized access.  

 

Vehicle inspections. 

 

 

           UNCLASSIFIED 

Chapter 3 

 

 

Fixed Facility SCIF Construction 

 

 

 

 

UNCLASSIFIED 

C.

 

Perimeter Wall Construction Criteria  

1.

 

General 

a)

 

SCIF perimeters include all walls that outline the SCIF confines, floors, ceilings, 

doors, windows and penetrations by ductwork, pipes, and conduit. This section 
describes recommended methods to meet the standards described within ICS 705-1 
for SCIF perimeters.  

b)

 

Perimeter wall construction specifications vary by the type of SCIF, location, use 

of SID, and discussion requirements.  

c)

 

Closed storage areas that do not require discussion areas do not have any forced 

entry or acoustic requirements.  

d)

 

Open storage facilities without SID require additional protection against forced 

and surreptitious entry.  

e)

 

When an existing wall is constructed with substantial material (e.g., brick, 

concrete, cinderblock, etc.) equal to meet the perimeter wall construction standards, 
the existing wall may be utilized to satisfy the specification.  

2.

 

Closed Storage, Secure Working Area (SWA), Continuous Operation, or Open 

Storage with SID - Use Wall A - Suggested Standard Acoustic Wall (see construction 
drawing for details).  

a)

 

Three layers of ⅝ inch-thick wallboard, one layer on the outside of the SCIF and 

two on the inside of the SCIF provide adequate rigidity and acoustic protection 
(Sound Class 3).

 

 

b)

 

Wallboard shall be attached to 3 ⅝ inch-wide metal studs or wooden 2 x 4 studs 

placed a maximum of 24 inches on center.  

c)

 

Continuous runners (same gauge as studs) for securing studs shall be anchored to 

the true floor and true ceiling structures.  

d)

 

The interior two layers of wallboard shall be mounted so that the seams do not 

align (i.e., stagger joints).  

e)

 

Acoustic fill shall be placed between the studs in a manner which prevents 

slippage.  

f)

 

The top and bottom of each wall shall be sealed with an acoustic sealant where it 

meets the slab.  

g)

 

Wall penetrations shall be treated and sealed with acoustic material.  

h)

 

Entire wall assembly shall be finished and painted from true floor to true ceiling.   

3.

 

Open Storage without SID -- Use Wall B - Suggested Wall for Expanded Metal or 

Wall C - Suggested Wall for Plywood.   

 

           UNCLASSIFIED 

Chapter 3 

 

 

Fixed Facility SCIF Construction 

 

 

 

 

UNCLASSIFIED 

a)

 

Three layers of ⅝ inch-thick wallboard, one layer on the outside of the SCIF and 

two on the inside of the SCIF provide adequate rigidity and acoustic protection 
(Sound Class 3).

 

 

b)

 

Metal studs shall be 3 ⅝ inch-wide, 16 gauge metal, mounted a maximum of 16 

inches on center.  

c)

 

Wooden studs will be 2 x 4 studs mounted a maximum of 16 inches on center.  

d)

 

Continuous runners (same gauge as studs) for securing studs shall be anchored to 

the true floor and true ceiling structures. 

e)

 

Wall B - Suggested Wall for Expanded Metal (see drawing for Wall B-Suggested 

Construction for Expanded Metal).  

(1)

 

Three-quarter inch mesh, # 9 (10 gauge) expanded metal shall be affixed to 

the interior side of all SCIF perimeter wall studs.  

(2)

 

Expanded metal shall be spot-welded to the studs every six inches along the 

length of each vertical stud and at the ceiling and floor.  

(3)

 

Hardened screws with one inch washers or hardened clips may be used in 

lieu of welding to fasten metal to the studs.  Screws shall be applied every six 
inches along the length of each vertical stud and at the ceiling and floor. 

(4)

 

Fastening method shall be noted in the FFC.  

(5)

 

Entire wall assembly shall be finished and painted from true floor to true 

ceiling. 

f)

 

Wall C - Suggested Wall for Plywood (see drawing for Wall C-Suggested 

Construction for Plywood). 

(1)

 

Two layers of ⅝ inch-thick wallboard, one layer on the outside of the SCIF 

and one on the inside of the SCIF.  A plywood layer shall substitute one layer of 
wallboard on the inside wall as compared to the standard acoustic wall. 

(2)

 

Wallboard shall be attached to 3 ⅝ inch-wide metal studs or wooden 2 x 4 

studs placed a maximum of 16 inches on center. 

(3)

 

Continuous runners (same gauge as studs) for securing studs shall be 

anchored to the true floor and true ceiling structures. 

(4)

 

One layer of ⅝ inch-thick plywood shall be attached vertically, directly to the 

wall studs.  

(5)

 

 The plywood shall be continuously glued and screwed to the studs every 12 

inches along the length of each stud and at the ceiling and floor .  

(6)

 

Entire wall assembly shall be finished and painted from true floor to true 

ceiling. 

4.

 

 Radio Frequency (RF) Protection for Perimeter Walls  

 

 

 

 

 

 

 

Content      ..     13      14      15      16     ..