Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 10

 

  Главная      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     8      9      10      11     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 10

 

 

S

YSTEM

 

 

traffic signal backplate, 9-24 
traffic violation recording, 9-30 
training, 9-49, 9-92 
traveller information system (TIS), 9-59 
vehicle actuation and system detectors, 9-27 
vehicle detection system, 9-58 
vehicle detector pole, 9-59 

vehicular signal heads, 9-22 
vehicular signal poles, 9-21 
video surveillance system, 9-4 
video surveillance system (VSS), 9-54 
watchdog timer, 9-39 
wireless ethernet bridge, 9-69 

 

 

STANDARD CONSTRUCTION SPECIFICATIONS 

PART 1 

ROAD UTILITIES 

CHAPTER 10 

– LIGHTING & ELECTRICAL 

DISTRIBUTION WORKS 

DOCUMENT

 

NO:

 

TR-542-1 

SECOND

 

EDITION 

SEPTERMBER

 

2020

 

 

G

ENERAL 

R

 

 

 

iv. 

Dimensions 

v. 

Reinforcing details 

vi. 

Details of supports left in place 

vii. 

Locations of all services encountered 

viii. 

Any other information requested by the Engineer 

ix. 

For mechanical equipment the details shall include the whole plant as erected 

3.  Contract  plans  shall  be  supplemented  as  necessary  by  schedules  and  data  sheets 

indicating:  

i. 

Quantity 

ii. 

Quality 

iii. 

Types of materials installed 

4.  Draft record drawings shall be submitted to the Engineer for his approval, and then finalized 

in accordance with any amendments required by him 

5.  The Engineer will furnish the Contractor 1 set of A3 hard copy and 1 set of softcopy on CD 

of original Contract plans. Soft copy shall be provided in PDF and Microstation-V8 format. 
Microstation-V8 file shall be converted to AutoCAD (.DWG) format and included.  

i. 

The  Contractor  shall  correct  where  required  to  portray  the  works  as  actually 
constructed.  The  Contractor  shall  prepare  and  supply  the  Engineer  the  revised  A1 
hardcopy and CDs marked “As-Built” Record Drawings for his approval. 

ii. 

On completion of the works the record drawings shall be handed over to the Engineer 
together  with  the  CDs.  Submitted  softcopies  of  the  as-built  drawings  shall  be  in 
AutoCAD  (.DWG)  format.  If  required  by  the  Owner  or  Engineer  to  be  submitted  in 
Microstation-V8  format,  the  Contractor  shall  be  responsible  to  convert  the  as-built 
drawings accordingly. The Contractor shall be responsible for editing and updating of 
the AutoCAD files required to provide as-built drawings in AutoCAD (.DWG) format 
that fully reflect the Contract documents with the as-built information. 

iii. 

Record drawing submission shall include:  

a) 

Ten bound sets of  “as-built” record drawings (5 in A3 and 5 in A1) 

b)  Three sets of CDs 

c)  Each drawing shall have the Contract details and drawing number detailed to the 

approval of the Engineer. 

c.  No final payment shall be made except for work that has been completed in accordance with 

the specificatio

n and has been duly presented on the “as-built” record drawings. 

d.  The  Contractor  shall  not  be  entitled  to  any  extra  payment  or  extension  of  time  for  the 

preparation of the record drawings. 

1.11.10 

Mistakes in Information 

The  Contractor  shall  be  responsible  for  and  shall  pay  the  extra  cost,  if  any,  occasioned  by  any 
discrepancies, errors, or omissions in drawings and other particulars supplied by him, whether they 
have been approved by the Engineer or not. 

 

G

ENERAL 

R

 

 

 

1.12 

Regulatory Requirements 

1.12.1 

Description 

Comply with all codes, standards, specifications of regulatory agencies having jurisdiction over this 
project including, but not limited to, those specified herein. 

1.12.2 

Codes 

All  reference  to  codes,  regulations,  local  and  administrative  orders  of  the  specifications  and 
standards  referred  to  in  the  Contract  documents  shall  mean,  and  are  intended  to  be,  the  latest 
edition,  amendment  or  revision  of  such  reference  in  effect  as  of  the  date  of  submission  of  these 
tender documents by the bidder.  

There may be items for which there are no relative codes, specifications or standards:  

1.  Materials  and  workmanship  of  such  items  shall  be  of  suitable  quality  as  determined  by  the 

Engineer.  

2.  Details  that  qualify  such  items  as  being  of  the  acceptable  quality  shall  be  submitted  to  the 

Engineer for approval in accordance with Section 1.11.  

1.12.3 

Government Bodies 

The Contractor shall carry out all works in strict accordance with current codes, regulations, local 
and administrative orders, specifications and standards of all government bodies. 

1.12.4 

Permits, Licenses and No Objection Certificates 

The Owner shall hold the Contractor responsible for compliance with the obligations imposed by the 
no objection certificate (NOC) to the extent that the Contractor

’s fulfilment of his obligations under 

the Contract may result in conditions requiring actions to comply with the NOC. 

NOCs shall be obtained separately in respect of each section 

Failure to complete the work including reinstatement of surfaces within the time specified in the NOC 
may cause the suspension of the issue of further NOC’s for that particular section. 

Unless  otherwise  explicitly  provided  for  in  these  specifications,  all  permits,  licenses  and  NOCs 
required for the proper execution of the works shall be obtained by the Contractor: 

1.  Before commencement of the execution of works on site 

2.  On satisfactory completion of each section 

1.12.5 

Notice of Intent 

The Contractor shall comply with the following requirements. 

a.  The  Contractor  will  encounter  existing  services  during  the  course  of  the construction  of  the 

works. The Contractor must obtain his own information regarding:  

1.  Nature of the ground and subsurface at the site  

2.  Position of  all underground pipelines and services affected by permanent and temporary 

works  

b.  Positions of services shown on the Contract plans have been based on information extracted 

from the records of the various service authorities and must be regarded as approximate only: 

1.  The Engineer does not guarantee either the accuracy of the information or the location of 

such apparatus as shown on the Contract plans 

2.  No warranty must be implied as to the position, depth, size or gradient thereof 

 

G

ENERAL 

R

 

 

 

c.  Before opening up the ground for any purpose the Contractor must:  

1. 

Notify all concerned parties by issue of a formal “notice of intent” 

2.  Obtain information by formal notice regarding the location of all underground services 

3.  Complete  responsibility  for  obtaining  this  information  rests  with  the  Contractor  or  party 

requiring to open up the ground 

d. 

“Notices of Intent” are required to be circulated to all concerned parties. Contract plans and 
notices  shall  be  sent  in duplicate,  one  of  which shall  be  retained  by the addressee  and  the 
other returned to the sender duly marked to show all services within the proposed works. 

e.  "Notice of Intent" will be given 14 (fourteen) days in advance of the proposed works: 

1. 

In the event that the work is not started within 8 (eight) weeks of the date of the “Notice of 
Intent”, it will be deemed to have elapsed 

2. 

A further “Notice of Intent” will then be submitted 

f.  All locating work shall be carried out in advance of excavation work 

1.  The  Contractor  shall  obtain  all  information  and  assistance  available  from  the  service 

Authorities for locating the mains and services 

2.  Engineer's approval shall be obtained for any trial excavations that may be necessary to 

confirm or establish the locations 

3.  Absence of such information shall not relieve the Contractor of his liability for: 

i. 

Cost of any repair work necessitated by damage caused by him to such mains and 
services in the course of his work 

ii. 

Cost of all losses arising from their disruption 

iii. 

All costs for executing any bore holes and trial holes shall be deemed to be included 
in the Contractor's rates for the relevant item or items in the bills of quantities 

g.  No public or private facility shall be extinguished or interrupted without the written permission 

of the Engineer. Such permission will not be given until:  

1.  Suitable  permanent  or  temporary  alternatives  approved  by  the  Engineer  have  been 

provided by the Contractor, or 

2.  In the case of accommodation works, by the Owner of the facility or his agents.  

h.  The Contractor shall make arrangements with the service and public authorities concerned for 

the phasing into his program of works of all work that needs to be done by:  

1.  Service and public authorities concerned or their Contractors 

2.  The Contractor himself concurrently with the works 

i.  The Contractor shall take any and all measures reasonably required by any public or service 

authority  for  the  support  and  full  protection  of  all  mains,  pipes,  cables  and  other  apparatus 
during the progress of the works 

1.  Construct and provide to the satisfaction of the authority concerned, all works necessary for 

the prevention of damage or interruption of services at no additional cost to the Owner 

2.  If  in  the  execution  of  the  works,  by  reason  of  any  subsidence  caused  by,  or  any  act  of 

neglect or default of the Contractor, any damage to any apparatus or any interruption of, or 
delay to the provision of any service is caused, the Contractor shall: 

i. 

Report it to the Engineer immediately 

ii. 

Bear and pay the cost reasonably incurred by the authority concerned in making good 
such damage 

 

G

ENERAL 

R

 

 

 

iii. 

Make  full  compensation  to  the  authority  for  any  loss  sustained  by  reason  of  such 
interruption or delay 

j.  The Contractor shall, at all times during the progress of the works, afford facilities to properly 

accredited agents of any public service authority for access to all or to any of their apparatus 
situated in or under the site, as may be necessary for:  

1.  Inspection,  reporting,  maintaining,  removing,  renewing  or  altering  such  apparatus  in 

connection with the construction of the works 

2.  Any other purposes whatsoever 

k.  Absence of information shall not relieve the Contractor of his liability for the cost of:  

1.  Any repair work necessitated by damage caused by him to such mains and services in the 

course of his work 

2.  All losses arising from their disruption 

l.  Any  temporary  or  permanent  diversion  of  mains  and  services  will  only  be  permitted  after 

agreement with the appropriate service authority and the Engineer:  

1.  Permanent diversions will only be considered where: 

i. 

Main  or  service  occupies  the  line  and  level  of  the  pipe  work  or  structure  to  be 
constructed by the Contractor 

ii. 

Position of the main or service completely prevents construction 

2.  Only permanent diversions that the Engineer considers essential for the above reasons will 

be measured and paid for under the items in the bills of quantities 

3.  Temporary  diversion  and  restoration  of  mains  or  services  shall  be  at  the  Contractor's 

expense 

1.12.6 

Protection of Existing Property and Utilities 

The Contractor shall comply with the following requirements and specifications to protect existing 
property and utilities. 

a.  The Contractor shall conduct his operations in such a manner as to avoid injury or damage to:  

1.  Adjacent property 

2.  Improvements 

3.  Facilities 

b.  The  Contractor  shall  protect  from  injury  or  damage  to  adjacent  property;  improvements  or 

facilities including but not limited to the following:  

1.  Buildings 

2.  Trees 

3.  Landscaping and planting areas 

4.  Ground cover 

5.  Shrubbery 

6.  Pole lines 

7.  Fences 

8.  Guard rails 

9.  Guide posts 

10. Culvert and property markers 

11. Signs 

12. Structures 

&

 

E

LECTRICAL 

D

ISTRIBUTION 

W

ORKS

 

10 

LIGHTING  AND  ELECTRICAL  DISTRIBUTION 
WORKS 

Specifications for the construction of the Roadway Lighting and Low Voltage Electrical Networks, 
which  consists  of  all  associated  el  earthworks,  supply  and  installation  of  all  materials,  all  testing 
requirements and all subsidiary and related work items, shall be consistent with the requirements of 
the latest issue of: - 

1.  PR 402- Abu Dhabi Lighting Manual

All Electrical Distribution requirements shall be as per the requirements of: - 

1.  Abu Dhabi Water and Electricity Authority (ADWEA)

2.  Al Ain Distribution Company (AADC)

3.  Abu Dhabi Distribution Company (ADDC)

4.  Department of Energy Electricity Wiring Regulations (DOE EWR)

 

 

 

 

 

 

 