|
|
BOB–TACH Removal And Installation Tilt the Bob–Tach forward, so it is parallel to the floor. Put Remove the retainer nut (Item 1) [B] from the pivot pin. Installation: Tighten the retainer bolt to 18–20 ft.–lbs. Remove the grease fitting from the pivot pin [C]. Remove the rod end pivot pin (Item 1) [C]. Remove the tilt cylinder rod end. Remove the seals (Item 1) [D]. Revised May 98 A N–00807 1 C P–03915 1 D P–03911 1 –5–16– 773 BICS Loader Service Manual B P–04601 1 |