Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 18

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     16      17      18      19     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 18

 

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-17 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

accept the resin injection work represented by the core samples when the core samples indicate that 
90% of the crack void greater than 0.15 mm wide has been filled with resin and the concrete of the 
core sample is bonded through the crack into a unit. 

When resin injection work does not satisfy the acceptance criteria, the Contractor shall perform the 
work  again  and  correct  it  as  necessary  at  no  expense  to  the  Owner.  The  Contractor  shall  install 
additional injection ports, as required, to achieve satisfactory reinjection of resin. 

After resin injection work is completed and accepted, the Contractor shall fill the core holes with a 
suitable proprietary epoxy mortar as approved by the Engineer.  

29.6 

Sealing Concrete Surfaces and Cracks 

All  exposed  concrete  surfaces  for  structures  indicated  on  the  Contract  plans  not  to  be  painted  or 
waterproofed shall be sealed by the Contractor using materials, surface preparation, and application 
of  penetrant  sealers  and  high  molecular  weight  mathacrylates  as  applicable,  as  specified  in  this 
section,  and  in  accordance  with  each  material  manufacturer

’s  recommendations.  The  Contractor 

shall consult with the Engineer in the event of conflict between a 

manufacturer’s recommendations 

and this specification. The Contractor shall perform surface preparation and application for all areas 
as shown in the Contract plans or in accordance with the Engineer

’s directions.  

29.6.1 

Penetrant Sealers 

Penetrant sealers shall meet the requirements outlined in this section. 

29.6.1.1 

Materials for Penetrant Sealers 

The Contractor shall use alkylalkoxysilane penetrant sealers with 40% solids and active materials 
dispersed in water. Such sealers shall meet the requirements shown in Table 29-3. 

Table 29-3: Physical properties of penetrant sealers 

Property 

Characteristic 

Appearance 

Clear 

VOC content (EPA method 24) 

Less than 350 g/l 

Flash point (ASTM D3278 - 96(2011)) 

Greater than 93

o

 C SETA 

Resistance to chloride ion penetration AASHTO T 259-
2002(R 2006) and AASHTO T 260-97 (2011) 

Less than 0.18 kg/m

(criteria of 1.5) 

at 12.5 mm level; 0.00 kg/m

(criteria 

of 0.75) at 25 mm level 

Water absorption test (ASTM C642 - 06) 

0.50% maximum / 48 hours; 

1.5% maximum / 50 days 

NCHRP 244 

Water weight gain 

85% reduction (minimum) 

Absorbed chloride 

95% reduction (minimum) 

Scaling resistance test (ASTM C672 / C672M - 12) 

(Non-air-entrained concrete) 0 rating 
No scaling (100 cycles) 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-18 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.6.1.2 

Surface Preparation for Penetrant Sealers 

The  Contractor  shall  prepare  concrete  surfaces  to  receive  a  penetrant  sealer  in  accordance  with 
these  specifications,  dependent  on  whether  the  surfaces  are  of  recently  cast  concrete  (new 
construction) or of existing concrete. 

a.  Surface Preparation for New Construction 

The Contractor shall remove substances such as dust, grime, dirt, curing compounds, form oil, and 
debris by water blasting, light sandblasting, wire brushing, or any other methods that are acceptable 
to the E

ngineer, all in accordance with the penetrant sealer manufacturer’s recommendations. As a 

final cleaning operation, when using cleaning methods other than water blasting, the Contractor shall 
wash cleaned surfaces with water as described in Section 4.3.8 of Chapter 4, Concrete Works, of 
these standard specifications. 

b.  Surface Preparation for Existing Concrete 

The  Contractor  shall  remove  substances  such  as  dust,  grime,  dirt,  stains,  mineral  deposits,  oil, 
bituminous materials, debris, and all other deleterious material by using water blasting equipment of 
sufficient operating capacity and pressure, all in accordance with the penetrant sealer manufacturer’s 
recommendations. 

c.  Cleaning Equipment for Penetrant Sealer 

The  Contractor  shall  use  approved  water  blasting  equipment  to  clean  existing  concrete  surfaces. 
The Contractor shall use water blasting equipment that is specifically manufactured to clean concrete 
surfaces. Such equipment shall have a minimum rated nozzle capacity of 41.5 MPa using the spray 
head proposed for use in the work. 

d.  Water for Blasting to Prepare for Penetrant Sealer 

The Contractor shall use water that meets the requirements outlined in Section 4.3.8 of Chapter 4, 
Concrete Works, of these standard specifications. 

e.  Method for Cleaning Concrete Surface for Penetrant Sealer  

During the cleaning operation, the Contractor shall be sufficiently careful to minimize the removal of 
the  concrete  matrix.  The  Contractor  shall  furnish  hand  tools,  power  grinders,  and  other  similar 
equipment  to  remove  materials  that  cannot  be  removed  by  water  blasting  without  abrading  the 
concrete matrix beyond acceptable limits. As a final cleaning step, the Contractor shall use water 
blasting equipment to wash all concrete surfaces that have been cleaned by other methods.  

The  Contractor  shall  limit  the  duration  of  water  blasting  to  provide  a  light  abraded  surface.  The 
Contractor shall not allow surface abrasion to exceed 0.4 mm. The Engineer may not require further 
cleaning of stains that are still apparent after abrading to a depth of 0.4 mm. The Contractor shall 
avoid exposing coarse aggregate to water blasting. 

If any concrete surfaces become contaminated after cleaning, the Contractor shall clean them again 
at no expense to the Owner before applying the penetrant sealer. 

29.6.1.3 

Application of Penetrant Sealers  

The  Contractor  shall  apply  a  penetrant  sealer  only  to  surfaces  that  have  been  prepared  in 
accordance with these specifications and in a way that has been approved by the Engineer. When 
applying penetrant sealer, the Contractor shall comply with the specifications in this article and the 
penetran

t sealer manufacturer’s recommendations. 

Before applying any penetrant sealer, the Contractor shall cure concrete for at least 21 days. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-19 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

The  Contractor  shall  apply  penetrant  sealer  no  later  than  ten  days  after  completing  the  surface 
preparation,  in  a  way  determined  by  the  Engineer,  before  any  contamination  of  the  prepared 
surfaces. 

a.  Equipment for the Application of Penetrant Sealer  

The  Contractor  shall  apply  the  penetrant  sealer  using  any  suitable  air  or  airless  sprayer  with  an 
operating pressure of approximately 0.14 MPa. 

b.  Limitations to the Application of Penetrant Sealer  

The  Contractor  shall  apply  penetrant  sealer  material  only  when  the  ambient  air  temperature  is 
between 10º C and 32º C. The Contractor shall apply penetrant sealer only to concrete surfaces that 
have dried for at least 48 hours after water last contacted the concrete surfaces. A penetrant sealer 
shall not be applied when winds are blowing 40 km/h or more, during rainfall, or when water spray 
or mist is present. 

c.  Method for Applying Penetrant Sealers  

The Contractor shall apply penetrant sealer only to concrete surfaces that have been prepared in 
accordance with the requirements and limitations set forth in the specifications of Article 29.6.1.3. 
To determine the actual coverage rate in square metres per gallon, the Contractor shall conduct a 
field trial at the beginning of any penetrant sealer application operation. The Contractor shall conduct 
additional  confirmation  field  trials  once  for  every  465  square  metres  of  sealant  applied,  on  each 
production day during the application process, or when the character of the work changes, whichever 
occurs sooner. For each field trial, the Contractor shall determine the optimum coverage rate for 46.5 
square  metres  of  surface  area.  The  Contractor  shall  maintain  a  rate  of  application  that  ensures 
coverage  of  from  14.4  to  20.9  square  metres  per  gallon  of  penetrant  sealer  used.  Application  of 
penetrant sealer shall be uniform, without puddling or skips. The Contractor shall use a squeegee to 
redistribute any penetrant sealer that, after application, puddles in low areas over concrete surfaces. 

Generally, the Contractor shall begin applying penetrant at the lowest elevation and proceed upward 
to higher elevations. 

The  Contractor  shall  maintain  operating  pressures  in  the  sprayers  used  for  application  of  the 
penetrant sealer material sufficiently low to prevent atomization or misting of the material. 

29.6.1.4 

Control of Concrete Sealing Materials 

The Contractor shall control sealing materials in accordance with the specifications and requirements 
outlined in this article.  

a.  Packaging and Identification of Concrete Sealing Materials 

The Contractor shall deliver the penetrant sealer to the Project in unopened, sealed containers with 
the manufacturer’s label identifying the product and with numbered seals intact. The Contractor shall 
ensure that each container is clearly marked by the manufacturer with the following information: 

  Man

ufacturer’s name and address 

  Product name 

  Date of manufacture 

  Expiration date 

  Lot identification number 

  Container serial number 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-20 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

b. 

Manufacturer’s Certification for Penetrant Sealer  

The Contractor shall give the Engineer a certification from the manufacturer that confirms that the 
penetrant  sealer  meets  the  requirements  outlined  in  Article  29.6.1.4.  The  Contractor  shall  not 
incorporate sealer into the Project until the Engineer has accepted and approved the certification for 
the material. The Contractor shall submit such certification for each lot of material delivered to the 
Project. In each certification, the Contractor shall identify the serial or lot numbers of the containers 
certified.  

c.  Sampling Sealing Materials for Tests 

The Engineer may require samples from each lot or container of materials delivered to the Project 
or  from  containers  at  the  point  of  use.  When  samples  are  required,  the  Contractor  shall  furnish 
samples in accordance with the E

ngineer’s instructions. 

d.  Storage of Sealing Materials 

The Contactor shall store materials delivered to the job site in original unopened containers within 
an appropriate storage facility.  The Contractor shall use a storage facility that provides protection 
from the elements and safe and secure storage of the materials. 

e.  Disposal of Unused Sealing Materials  

The Contractor shall not return unused material in opened containers to storage for later use. The 
Contractor shall either apply such material to appropriate areas on concrete surfaces or remove and 
dispose of it at offsite locations that have been provided by the Contractor. 

f.  Acceptance of Sealing Materials 

The Engineer shall accept an application of penetrant sealer after determining that the Contractor 
has properly cleaned all surface areas to be sealed and has applied the penetrant sealer within the 
required rates of application. 

29.6.2 

High Molecular Weight Methacrylate Sealers  

The  Contractor  shall  perform  the  surface  preparation  and  application  of  a  high  molecular  weight 
methacrylate (HMWM) to seal cracks on horizontal and slightly sloped concrete surfaces in a manner 
approved  by  the  Engineer.  Applications  on  bridge  decks  and  other  concrete  roadway  surfaces 
require the addition of sand over the treated areas to increase the friction (skid) number, as described 
in ASTM E274 / E274M - 11. 

The Engineer must approve the rate of application (amount of sealant in cubic metres per square 
metre of concrete), the application method, and equipment before the Contractor shall commence 
working.  The  Contractor  shall  submit  a  written  sealer  application  plan  based  on  the  total  area  of 
cracked  surfaces,  size  and  depth  of  cracks,  and  internal  conditions  of  cracks  to  the  Engineer  for 
approval.  In  addition,  the  Contractor  shall  provide  at  least  14  days  advanced  notice  to  enable 
personnel from the Owner to be present at the beginning of work to evaluate the cracks and provide 
final  approval  of  the  application  rate.  The  Contractor  shall  make  arrangements  with  the  material 
manufacturer to provide on-site technical assistance for the initial application and to certify that the 
mixing ratio, application methods, and sand broadcasting are correct and in accordance with their 
recommendations. 

The  Contractor  shall  maintain  a  daily  log  of  resin  material  used,  which  shall  be  verified  by  the 
Engineer. In this log, the Contractor shall include the drum or container identification number, the 
date, and the location of use. The Contractor shall retain the empty resin containers at the jobsite 
until the Engineer verifies the use of the resin and authorizes removal of the containers from the site. 

29.6.2.1 

Materials for a Methacrylate System 

A methacrylate system shall consist of the following three components: 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-21 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

  Methacrylate monomer 

  Cumene hydroperoxide (CHP) initiator 

  Cobalt promoter 

The  Contractor  shall  use  an  HMWM  monomer  that  has  been  approved  by  the  Engineer.  The 
Contractor shall use an initiator and promoter that have been recommended and produced by the 
same monomer manufacturer. The manufacturer shall submit the following documentation for the 
Engineer’s approval: 

 

Manufacturer’s material installation instructions showing that the product can be installed in 
accordance with the requirements in this article. 

  Independent  laboratory  test  data  and  results  showing  that  the  product  has  been  tested  in 

accordance with the requirements of this article and meets the requirements. 

a.  Properties of Methacrylate Material 

The  Contractor  shall  use  a  methacrylate  material  that  meets  the  physical  and  performance 
requirements outlined in Table 29-4 .  

Table 29-4: Physical properties of methacrylate resin 

Property 

Characteristic 

Viscosity (Brookfield RVT) 

14-20 cps at 50 rpm 

Density (ASTM D1481 - 02(2007)) 

1,018 

– 1,078 kg/m

3

 at 25

o

 C 

Flash point (ASTM D3278 - 96(2011)) 

> 93

o

 C (Pensky Martens CC) 

Odour 

Low 

Bulk cure speed 

3 hours at 23

o

 C (maximum) 

Surface cure 

8 hours at 23

o

 C (maximum) 

Gel Time (ASTM D2471-99) 

60 minutes (maximum) 

Tack free time 

5 hours (maximum) at 22

o

 C and 

50% relative humidity 

Compressive strength (AASHTO T 106M/T 106-12) 

45 MPa (minimum) 

Tensile Strength (ASTM C307 - 03(2012)) 

9.0 MPa (minimum) 

Shear bond adhesion (ASTM C882 / C882M - 12) 

4.5 MPa (minimum) 

Wax content 

0% 

All three components of the methacrylate system shall have a shelf life of at least 12 months and 
shall be no more than 8 months old at the time of application. The Contractor shall provide each 
container shipped to the job site with the following information on a manufacturer’s label:  

 

manufacturer’s name  

  product name 

  lot or batch number  

  date of production  

  drum serial number  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-22 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

The  Contractor  shall  identify  the  catalysts  by  their  generic  classification  and  provide  the  date  of 
manufacture for each. 

b.  Sand for a Methacrylate System 

The Contractor shall use uniformly graded 0.2 - 0.6 mm (or similar), clean, bagged, blast sand for 
spreading over the applied material on bridge decks and other riding surfaces as recommended by 
the manufacturer. They shall certify that the sand has a maximum moisture content of 0.25% or less 
and that the maximum amount of dust or other material that may pass through a No. 200 sieve does 
not exceed 0.75%.  

The Contractor shall store the sand at a location that will preserve the above described conditions 
and characteristics of the sand until it has been applied. 

29.6.2.2 

Surface Preparation for a Methacrylate System 

Preparing a surface for a methacrylate system requires cleaning and containment. 

a.  Cleaning a Surface for a Methacrylate System 

On the day of application, the Contractor shall thoroughly power  sweep  the area to be treated to 
remove all dust, dirt, and debris. On bridge decks and other riding surfaces, the Contractor shall use 
a  tractor-mounted  power  broom  with  non-metallic  bristles  (or  a  suitable  alternative  tool)  that  is 
suitable for the intended purpose. The Contractor shall use a power vacuum after sweeping when 
sealing cracks on grooved bridge decks. The Contractor shall clean the deck again as necessary 
just before the application to remove debris that may have been blown back onto the work area by 
adjacent traffic or other means. If oils and oil-based substances are present, the Contractor shall 
remove them from the concrete surface using an approved solvent. 

b.  Containing Sealing Material for a Methacrylate System 

The  Contractor  shall  provide  adequate  containment  to  prevent  the  sealer  material  from  flowing 
beyond the designated area of application. The Contractor shall plug any drain holes or openings 
within the work area. Airborne material shall be prevented from dispersing onto open traffic lanes or 
outside the work area. 

29.6.2.3 

Method for Applying Methacrylate 

When  applying  methacrylate,  the  Contractor  shall  comply  with  the  standards  and  requirements 
outlined in this article. 

a.  Equipment for Applying Methacrylate 

The Contractor shall apply the material according to the manufacturer’s specifications using mobile 
equipment capable of distributing material on large areas of decks and riding surfaces. Such material 
shall be applied by hand using adequate containers for isolated or localized applications. 

b.  Mixing Methyl Methacrylate 

The  Contractor  shall  mix  the  methylmethacrylate  material  following  the  manufacturer’s  specified 
mixing proportions for the catalysts. Initial mixing shall be performed by equally dividing the resin to 
be used into two separate containers. In all instances, the Contractor shall mix the initiator (CHP) at 
the HMWM manufacturer’s specified volume with 50% of the monomer resin in one container and 
the  cumene  promoter 

at  the  HMWM  manufacturer’s  specified  volume  with  the  other  50%  in  the 

second container. After properly blending the monomer resin and cumene promoter, the Contractor 
shall combine the two resins and mix them in accordance with the manufacturer’s instructions. For 
spray bar application, the Contractor shall mix the activator and resin blend and the promoter and 
resin blend through a static mixer in the feed line that is located ahead of the material distribution 
bars where polymerization will start. The Contractor shall calibrate the valves to the static mixer to 
ensure a one to one mixing ratio of the two blends. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-23 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

c.  Mobile Distribution Method for Material Application  

The  Contractor  shall  apply  the  material  only  under  weather  conditions  recommended  by  the 
manufacturer and when no rainfall has occurred during the previous 48 hours and no rain is expected 
for the next 6 hours following completion of the application. Unless the Engineer directs otherwise, 
the Contractor shall distribute the monomer uniformly over the work area using a pressure nozzle or 
spray head distribution bar system. The Contractor shall provide feed to the distribution bars using 
positive  displacement  pumps  that  move  equal  amounts  of  the  two  monomer  blends  from  two 
calibrated drums. 

Material  application  equipment  shall  be  calibrated  to  mix  the  two  monomer  blends  to  the 
recommended ratio (by volume) within ±5%. The Contractor shall calibrate discharge volume to the 
moving speed to provide a discharge rate capability ranging from 1,230 to 4,900 m

2

/m

3

 at a pressure 

ranging from 0.10 to 0.41 MPa. 

A typical application rate of the material is approximately 2,450 m

2

/m

3

. Before the Contractor applies 

the monomer, the Engineer will determine the final production application rate based on the internal 
characteristics  of  the  cracks  as  determined  from  the  cores  that  the  Contractor  supplied  that  the 
Engineer approves as being representative of the overall cracking conditions. 

d.  Localized Distribution Method for Material Application  

In  localized  small  areas  or  areas  where  the  Engineer  considers  the  use  of  mobile  distribution 
equipment to be impractical, the Contractor shall distribute the material by hand over the work area 
using pails or other suitable containers that are adequate for the size of the area. In areas that the 
Engineer deems to be sufficiently large, the Contractor shall use mobile distribution equipment. 

The  Contractor  shall  apply  the  material  only  under  weather  conditions  recommended  by  the 
manufacturer and only on areas that have remained dry for at least 48 hours. The Contractor shall 
ensure that the area remains dry for the next 6 hours following completion of the application. 

e.  Sealing of Cracks 

Regardless of the method used to apply the material over a concrete surface, the Contractor shall 
work the material back and forth over the cracks to maximize the amount of material to be absorbed 
by the cracks. The Contractor shall move the material over the cracks using brooms, squeegees, or 
paint brushes, as appropriate for the size of the area. The Contractor shall commence this operation 
immediately after distributing the material on the concrete surface. This operation shall be continued 
until  no  additional  material  is  flowing  inside  the  cracks  or  the  material  begins  to  exhibit  signs  of 
polymerization. 

The Contractor shall not distribute material over areas larger than what the available personnel can 
effectively work over the cracks within the limits of the pot life. 

f.  Sand Distribution after Material Application 

The  Contractor  shall  apply  sand  over  the  monomer-treated  area  within  a  timely  period  after  the 
application  of  the  material.  This  length  of  time  shall  be  based  on 

the  manufacturer’s 

recommendations for the existing conditions. The Contractor shall use equipment that will produce 
a uniform distribution of the sand over  the treated area. Any wheel-mounted sand spreader used 
shall  have  pneumatic  tires  that  are  compatible  with  the  treatment  material  and  that  leave  no  tire 
footprints on the deck surface. 

The Contractor shall use an initial application rate of 3.25 (±0.027) kg of sand per square meter of 
treated area, and adjust the rate as necessary to produce a skid number (SN) of no less than 25 at 
24 hours and 30 at 7 days as described in ASTM E274 / E274M - 11. The Contractor shall coordinate 
with the Engineer to conduct a preliminary on-site skid test to determine the actual sand application 
rate prior to the beginning of production application. If friction numbers below those specified are 
obtained,  the  Contractor  shall  completely  remove  all  loose  sand  from  the  surface  and  apply  the 
material  again  at  a  rate  of  3,680  m

2

/  m

3

,  spreading  additional  sand  as  necessary  to  achieve  the 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-24 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

specified skid numbers. The Contractor shall remove surface material by grinding or other approved 
method if satisfactory friction values are not achieved. In accordance with the Engineer’s directions, 
the Contractor shall conduct friction tests. 

29.6.2.4 

Opening Roadway Surfaces to Traffic 

The Contractor shall protect the sand covered area from vehicular traffic until the material has fully 
cured. When curing is complete, the Contractor shall use a power vacuum to remove excess sand 
from the riding surface before opening the area to traffic. 

29.6.2.5 

Cure Test 

The  Contractor  shall  test  curing  on  the  treated  area  using  a  cotton  strand  or  cotton  ball.  The 
Contractor shall consider the material fully cured and ready for traffic when the material does not 
adhere to the cotton ball when pressed against the treated surface and then pulled away. Before 
reopening the area to traffic, the Contractor shall obtain approval from the Engineer. 

29.7 

Epoxy Compounds 

When using epoxy compounds,  the Contractor shall comply with the standards and requirements 
outlined in this section. 

29.7.1 

Types of Epoxy Compounds 

Epoxy  resin  compounds  for  the  application  to  Portland  cement  concrete,  bituminous  cement 
concrete, metals, and other type surfaces shall be two component systems of applicable types, as 
designated in Table 29-5.  

Table 29-5: Types of epoxy compounds 

Type 

Description 

An epoxy resin, for bonding fresh concrete to hardened concrete. 

An  epoxy  resin  adhesive,  for  bonding  hardened  concrete  to  hardened 
concrete and constructing doweled splices in precast prestressed concrete 
piles. 

A fluid epoxy for crack injection in the repair of old structures. 

 

F-1 
F-2 

An  epoxy  for  repairing  spalled  areas  on  concrete  bridge  structures  with 
these subtypes: 

  A non sagging gel type for vertical surfaces. 

  A pourable type for repairs where forms are to be used. 

An epoxy for rebuilding expansion joints and associated wearing surfaces. 

An epoxy for structural bonding where asphalt overlays are to be in 
contact with the hardened compound. 

An epoxy for filling small holes in concrete such as lifting bolt cut-outs on 
beams, etc. 

An epoxy for installing rebar and anchor bolts into hardened concrete. 

An epoxy for underwater sealing of the bottom of the jacket of an integral 
pile jacket system. 

An epoxy for coating the interior of sewage disposal tanks. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-25 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Type 

Description 

A coal tar epoxy coating for steel sheet piles and H piles (water 
immersion). 

An epoxy for preparing mortars and concrete for patching Portland cement 
concrete pavement. 

An epoxy for bonding metals. 

An epoxy for use in post tensioning anchorage protection systems. 

Hot applied coal tar epoxy tape. 

29.7.2 

Epoxy Design Requirements 

All types of compounds, except L and M, shall contain no volatile solvent. 

All types of compounds, except F, J, L, M, and N, shall be basically pure reactive material with a 
maximum ash content of 2%. 

All types of compounds shall have simple mix ratios of one-to-one or two-to-one or shall be supplied 
in pre-measured containers in which all of the contents of both packages are to be mixed. 

Epoxy design terms have the following meanings: 

Low modulus: 

A stress-strain property for which ultimate tensile strength is attained at over 
10% elongation. 

High modulus: 

A stress-strain property for which ultimate tensile strength is attained at under 
6% elongation. 

Non-sagging gel: 

Grades of mixed compounds that will not perceptibly flow under their own 
weight on a vertical surface in their unhardened state. 

Pourable: 

Grades of mixed compound that are sufficiently fluid that they (either neat or 
filled) can be cast into a mould and will take the shape of that mould. 

29.7.2.1 

Certifications for Epoxy Products 

The Contractor shall give the Engineer certification documents from the manufacturer of the epoxy 
confirming that the epoxy meets the requirements outlined in Section 29.7.2. Each such certification 
shall cover one batch of epoxy materials and shall conform to the specifications in Section 29.7. 

29.7.3 

Specific Requirements for Type A and Type B Epoxy 
Compounds 

Type A and type B epoxy compounds shall comply with the requirements outlined in this section. 

29.7.3.1 

Mixing and Applying Type A and Type B Epoxy Compounds  

Types  A  and  B  epoxy  compounds  (for  bonding  fresh  concrete  to  hardened  concrete  or  bonding 
precast concrete parts) shall be m

ixed, applied, and cured in accordance with the manufacturer’s 

directions, or as might be directed otherwise by the Engineer.  

Epoxy compounds shall be used only under conditions that are compatible with the material being 
applied and in accordance with the specific directions of their manufacturers. Extreme care shall be 
taken to avoid a de-bonding effect after the application.  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-26 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.7.3.2 

Performance Tests for type A and type B Epoxy Compounds 

The Contractor shall test type A and type B epoxy compounds in accordance with the specifications 
in this article. 

  Epoxy Bonding Compounds shall be prepared and tested in accordance with FM 3-C882 to 

ensure that the ratio of the compressive strength of the composite cylinder to the compressive 
strength of the weaker concrete is not be less than 0.90. 

  Epoxy mortar shall be prepared and tested in accordance with FM 3 C-882 to ensure that the 

average compressive strength of the three test specimens is at least 34.5 MPa. 

29.7.4 

Specific Requirements for Type E Epoxy Compounds 

In  addition  to  the  specifications for  type  B  compounds, type  E  epoxies  (which  are  used  for  crack 
injection) shall also comply with the requirements shown in Table 29-6. The epoxy resin compound 
shall be used only for dry cracks. 

Table 29-6: Additional requirements for type E epoxy compounds 

Property 

Characteristic 

Viscosity five minutes after mixing 

300 to 600 cps at 25

o

 C by ASTM D2393-86 

Wet bond strength to concrete (minimum) 

1.72 MPa at seven days by FM 5-518 

29.7.5 

Specific Requirements for Type F Epoxy Compounds 

Type F epoxies (which are for repairing spalled areas) shall meet the requirements in this section. 
For repairs  to  surfaces, including  vertical  surfaces, subtype  F-1  epoxy  shall  be  a  trowellable,  low 
modulus, non-sagging gel epoxy compound that can bond to wet surfaces with the properties shown 
in Table 29-7. 

Table 29-7: Properties for subtype F-1 compounds 

Property 

Characteristic 

Colour 

Match gray in accordance with instructions from the 
Engineer 

Viscosity 

Gel 

Maximum sand loading 

2.25 parts sand to one part mixed epoxy by volume 

Elongation in tension (minimum) 

10% by ASTM D638 - 10, seven day cure 

Wet bond to steel and concrete (minimum)  1.72 MPa by FM 5-518 

For filling larger spalls where a form is required to build back to the original surface, subtype F-2 
shall be a pourable, low modulus compound that can bond to wet surfaces with the properties shown 
in Table 29-8.  

Table 29-8: Properties for subtype F-2 compounds 

Property 

Characteristic 

Colour 

Match gray in accordance with instructions from the 
Engineer 

Maximum sand loading 

2.25 parts sand to one part mixed epoxy by volume 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-27 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Property 

Characteristic 

Elongation in tension (minimum) 

10% by ASTM D638 - 10, seven day cure 

Exotherm 

43

o

 C by ASTM D2471-99, one pint sample 

Wet bond to steel and concrete (minimum)  1.72 MPa by FM 5-518 

29.7.6 

Specific Requirements for Type G Epoxy Compounds 

Type G epoxies (which are for rebuilding expansion joints) shall be pourable epoxies that can mix 
with sand and meet the requirements shown in Table 29-9.  

Table 29-9: Requirements for the mix of type G epoxy compounds 

Compressive strength 

Characteristic 

At 24 hours (minimum) 

31.03 MPa 

At seven days (minimum, by the method 
outlined in Article 29.7.3.2) 

51.71 MPa 

Bond to wet concrete at seven days (by 
FM 5-518) 

1.72 MPa 

Maximum sand loading 

2.25 parts to one part mixed epoxy by volume 

Elongation in tension at seven days 
(minimum, based on ASTM D638 - 10)   

2% 

Colour 

Natural 

Exotherm (maximum, by test method 
ASTM D2471-99, one pint size) 

43

o

 C 

29.7.7 

Specific Requirements for Type H Epoxy Compounds 

Type H epoxies (which are for structural bonding where bituminous pavement overlays will come in 
contact with the hardened compound) shall meet the requirements for type A and type B compounds. 
In addition, the manufacturer shall provide test data that shows that cutback and emulsified asphalts, 
asphalt cement, and bituminous mixes shall bond to but not soften or otherwise damage the epoxy 
after a curing period of four days. 

29.7.8 

Specific Requirements for Type I Epoxy Compounds 

Type  I  epoxies  (which  are  for  cosmetic  patching  of  small  areas  on  new  concrete  structures  and 
components) shall be of any non-sagging grade that has a gray colour, as selected by the Engineer, 
and that has been demonstrated to the Engineer to bond satisfactorily to the concrete. 

29.7.9 

Specific Requirements for Type J Epoxy Compounds 

Type  J  epoxies  (which  are  for  installing  rebar  and  anchor  bolts  into  the  hardened  concrete)  shall 
meet the  requirements  of  Section  29.8  and  shall  be  installed  in  accordance  with  the  directions  in 
Section 29.9. When the Contract documents call for the use of Type J, Class I, II, III, IV, epoxy or a 
Class IV Adhesive Anchor System, the Contractor shall use materials that meet the requirements of 
Section 29.8, constructed in accordance with Section 29.9. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-28 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.7.10 

Specific Requirements for Type K Epoxy Compounds 

Type K epoxies (which are for sealing the bottom of integral pile jackets in the repair of concrete 
piles) shall harden underwater and meet the requirements outlined in Table 29-10 for the sand-epoxy 
mix. 

Table 29-10: Requirements for the sand epoxy mix of type K compounds 

Property 

Characteristic 

Compressive strength at seven days (minimum, 
by the method outlined in Article 29.7.3.2) 

31.03 MPa 

Bond 

Bond to wet concrete (minimum) 

1.72 MPa 

Bond to wet pile jacket (minimum, by Florida 
Method FM 5-518) 

1.03 MPa 

Maximum sand loading 

2.25 parts to one part mixed epoxy, by 
volume 

Viscosity of mixed epoxy component at 25°C, 
five minutes by ASTM D2393-86 

1,000 to 2,000 cps 

An epoxy sand mix shall be capable of flowing through water in the void area of the jacket to provide 
a water tight seal of the depth indicated on the  Contract plans or approved shop drawings and to 
maintain this seal during subsequent construction steps. 

29.7.11 

Specific Requirements for Type L Epoxy Compounds 

Type L epoxies (which are for coating the interior of sewage disposal system tanks) shall be of an 
approved type. Manufacturers shall submit data and a record of previous usage showing satisfactory 
performance  in  the  protection  of  concrete  from  the  aggressive  effect  of  sewage  for  a  five  year 
minimum to the Engineer. 

29.7.12 

Specific Requirements for Type M Epoxy Compounds 

Type M epoxy coatings (which are for steel sheet and H piles used in bridges, fender systems and 
other structures that are  subject to immersion in water) shall comply with the requirements of  US 
Army  Corps  of  Engineers  Guide  Specifications  (USACE  C-200).  Products  not  meeting  these 
requirements may be approved by the Engineer on the basis of data furnished by the manufacturer 
that documents equal or superior performance. 

29.7.13 

Specific Requirements for Type N Epoxy Compounds 

Type  N  epoxy  adhesives  (which  are  for  making  epoxy  mortar  or  concrete  for  patching  Portland 
cement concrete pavement) shall be any of approved products listed at the time of the work. The 
Contractor  shall  submit  mix  designs  for  mortar  and  concrete  to  the  Engineer  at  the  time  of  the 
preconstruction conference. To obtain approval, the Contractor shall conduct a field demonstration 
that verifies that the epoxy meets the criteria of bonding to the pavement, matching colour, having 
sufficient durability, and lacking excessive surface slicking under traffic flow. 

Basic approval of new adhesives shall be made by the Engineer using a six month road test with 
mortar-concrete mix designs as recommended by the epoxy manufacturer. 

29.7.14 

Specific Requirements for Type Q Epoxy Compounds 

Type Q epoxy materials (which protect anchorages of posttensioning tendons or bars and may serve 
other uses indicated in the Contract plans) shall produce a low exothermic reaction and have flow 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-29 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

and fill characteristics that are suitable for machine base plate applications. Such material shall be 
extended  with  the  aggregate  supplied  by  the  manufacturer.  The  Contractor  shall mix  with  the full 
aggregate loading unless the use of less aggregate is approved by the Engineer. 

Such material shall be factory pre-proportioned and shall  include factory-supplied aggregate. The 
Contractor shall deliver such products in their original containers with the 

manufacturer’s name, the 

date  of  manufacture,  a  product  identification  label,  and  batch  numbers.  Such  materials  must  be 
within  the  manufacturer’s  recommended  shelf  life.  The  Contractor  shall  store  and  condition  the 
product in full compliance with manufacturer’s recommendations. 

Epoxy grout plus aggregate mix shall meet or exceed the specified physical properties stated in this 
section as determined by the standard ASTM test methods identified in Table 29-11. 

Table 29-11: Standard ASTM test methods for epoxy grout plus aggregate mix for type Q 

epoxy 

Property 

Test value 

Test method 

Compressive strength cubes seven day 
cure at 25

o

 C 

> 68.95 MPa 

ASTM C579 - 01(2012) 
Test Method B 

Tensile strength at seven days 

> 14.48 MPa 

ASTM C307 - 03(2012) 

Flexural strength at seven day cure at 25

o

 C  > 24.82 MPa 

ASTM C580 - 02(2012) 

Modulus of Elasticity, seven day cure at 25

o

 

< 14,480 MPa 

ASTM C580 - 02(2012) 

Coefficient of thermal expansion at 23

o

 to 

99

o

 C 

< 36 x 10

-6

 

mm/mm/

o

ASTM C531 - 00(2012) 

Peak exotherm, specimen  
300 mm x 300 mm x 75 mm 

< 66

o

 C 

ASTM D2471-99 

Slant shear at seven days (bond strength to 
concrete) 

> 20.68 MPa 

ASTM C882 / C882M - 12 

Thermal compatibility 

Five cycles passed 

ASTM C884 / C884M - 
98(2010) 

Linear shrinkage at seven days 

0.025% 

ASTM C531 - 00(2012) 

Flowability and bearing area 

90% contact area 

ASTM C1339 - 02(2012) 

Gel time, specimen  
300 mm x 300 mm x 75 mm 

< 4.00 hours 

ASTM D2471-99 

29.7.15 

Specific Requirements for Type T Tape Compounds 

Type  T  hot  applied  coal  tar  epoxy  tape  (which  protects  tie  back  rods  on  sheet  pile  walls  and 
bulkheads)  shall  comply  with  the  requirements  of  the  ANSI/AWWA  C203-08.  Application  shall 
comply with the manufacturers

’ published recommendations. 

29.7.16 

Packaging, Labelling, and Safety for Epoxy 

All containers shall be identified as Component A - contains epoxy resin or Component B - contains 
hardener, and shall show the type, mixin

g directions, batch numbers, manufacturer’s name, date of 

packaging,  shelf  life  expiration  date  and  quantity  (in  kilograms  or  liters).  Mix  ratios  shall  be 
prominently shown on labels. Potential hazards shall be stated on each package in accordance with 
the Federal Hazardous Products Labeling Act. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-30 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.7.17 

Storage of Epoxy 

The Owner shall not accept the use of epoxy materials that have been in storage for more than 12 
months. 

29.7.18 

Fillers for Mixing Mortars and Grouts 

Fillers for mixing mortars and grouts may be as recommended by the manufacturer of the particular 
epoxy  compound  and  may  be  supplied  as  packages  accompanying  the  epoxy  or  premixed  in 
accordance with approved properties. 

If a manufacturer recommends only the gradation of filler, it shall be a silica sand that is commercially 
available  in  UAE  and  shall  be  a  gradation  listed  in  Table  29-12  or  a  specified  blend  of  these 
gradations. 

The silica sands specified in Table 29-12 shall be clean, kiln dried, packaged in strong moisture proof 
bags, and be chloride free. They shall contain no more than 0.2% organic trash. 

Fillers shall not be used with type E, type J, type L, or type M compounds. 

When the fillers specified in Table 29-12 are used, the maximum amount shall be 2.25 volumes to 
one volume of mixed compound.  

Table 29-12: Gradation requirements for fillers for use with epoxy compounds 

Grade 

C* 

D** 

Sieve opening size

 

Required passing percentage 

No. 4

 

 

 

95-100% 

95-100% 

No. 6

 

 

90-100% 

 

 

No. 8

 

 

 

0-15% 

85-100% 

No. 16

 

 

 

 

65-97% 

No. 20 
No. 30 
No. 50 
No. 100

 

80-100% 

0-40% 
0-10% 

0-20% 

 

 

25-70% 

5-35% 

0-7% 

*For use only in sections 38 mm or greater in thickness. 

**Same as quartz sand fine aggregate for cement concrete. 

29.8 

Adhesive Bonding Material Systems 

Adhesive bonding material systems for structural applications shall consist of pre-packaged two-part 
chemical  components.  Material  systems  shall  be  specifically  intended  for  use  in  structural 
applications  for  bonding  anchors  and  dowels  to  hardened  concrete.  Applications  are  limited  to 
anchors and dowels installed in positions ranging from vertically downward to horizontal. 

The  Contractor shall not use material from containers  that  are damaged or  have been previously 
opened. The Contractor shall use only full packages of components and shall not combine epoxy 
bonding components from bulk supplies. 

Material systems for Type HV (High Viscosity) and Type HSHV (High Strength and High Viscosity) 
shall be pre-packaged to automatically proportion and mix the materials for use. The Owner shall 
not permit the Contractor to manually proportion components. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-31 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Type HV Adhesives: 

The Contractor shall use Type HV adhesive bonding materials for all horizontal 

installations and vertical installations other than constructing doweled pile splices, except when Type 
HSHV is required. Type HV adhesives may not be substituted for Type HSHV adhesives.  

Type HSHV  Adhesives: 

The

 

Contractor shall use higher strength Type HSHV adhesive bonding 

materials to install traffic railing barrier reinforcement and anchor bolts in existing concrete bridge 
decks  and  approach  slabs.  The  Contractor  may  substitute  Type  HSHV  adhesives  for  Type  HV 
adhesives. 

29.8.1 

Certification of Adhesive Bonding Products 

The Contractor shall provide the Engineer with certification documents from the manufacturer of the 
adhesive  bonding  material  system  that  confirm  that  the  bonding  products  meet  the  requirements 
outlined  in  this  section.  Each  certification  shall  conform  to  the  requirements  described  in  these 
specifications and shall cover only one lot of adhesive materials. 

29.8.2 

Minimum Performance Requirements for Adhesive Bonding 
Materials  

When tested in accordance with FM 5-568, the adhesive bonding material system, for general use, 
shall meet the requirements shown in Table 29-13.  

Table 29-13: Uniform bond stress for adhesive bonding material 

Uniform bond stress 

Type HV 

Type HSHV 

Confined tension 

15.79 MPa 

21.10 MPa 

Damp-hole installation 

11.58 MPa 

12.62 MPa 

Elevated temperature 

15.79 MPa 

21.10 MPa 

Horizontal orientation 

14.20 MPa 

14.20 MPa 

Short-term cure 

11.79 MPa 

11.79 MPa 

Specified bond strength 

7.45 MPa 

12.62 MPa 

The Contractor shall apply the following rules to determine the maximum coefficient of variation for 
uniform bond stress at 20% of long-term load (creep): 

1.  Rate of displacement shall decrease during the 42 day application of load. 

2.  At 42 days, the total displacement due to creep (with load still applied) shall be less than 0.75 

mm; during the last 14 days of the 42 day load duration, the total displacement due to creep 
shall be less than 0.075 mm. 

3.  After removal of the 42 day load, the uniform bond stress from a subsequent confined tension 

test shall be at least 12.59 MPa. 

29.8.3 

Product Identification (Fingerprint) Properties for Adhesive 
Bonding Materials  

References  for  comparison,  including  infrared  absorption,  density  or  average  weight,  gel  time  or 
setting time, and bond strength shall be determined in accordance with FM 5-569. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-32 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.8.4 

Packaging and Marking Adhesive Bonding Materials 

An  adhesive  bonding  material  system  shall  be  delivered  to  the  Project  site  in  original  unopened 
containers with manufacturer’s labelling that identifies each product. Each package shall be clearly 
marked with the following information: 

 

Manufacturer’s name and address 

  Product name 

  Date of manufacture 

  Expiration date 

  Lot identification number 

  Storage and handling requirements 

Each package shall include the manufacturer’s instructions for anchor and dowel installation. Such 
instructions shall include the following information: 

a.  Diameters of drilled holes for applicable anchor and dowel sizes 

b.  Cleaning  procedure  for  drilled  holes,  including  a  description  of  permitted  and  prohibited 

equipment and techniques 

c.  Allowable temperature ranges for storage, installation and curing 

d.  Identification of acceptable mixing/dispensing nozzles 

e.  Fabrication requirements for anchors and dowels 

f.  Description of tools permitted or required for installation 

g.  Method of identifying properly proportioned and mixed adhesive materials 

h.  Time and temperature schedule for initial set and full-strength cure 

i.  Special requirements for special installation conditions, such as damp holes, or horizontal 

or near horizontal orientation of the anchor or dowel. 

29.9 

Adhesive-bonded Anchors and Dowels 

The Contractor shall prepare and install adhesive bonded anchors and dowels in hardened concrete 
as  indicated  in  the  Contract  plans,  as  directed  by  the  Engineer,  and  in  accordance  with  the 
manufacturer’s instructions and the requirements described in this section. 

Anchors and dowels described in this section are intended for use in structural applications where 
designated on the Contract plans. 

29.9.1 

Adhesive-bonded Anchors and Dowels 

The Contractor shall use adhesive bonding material systems that meet the requirements of Section 
29.8. For applications that involve the installation of traffic railing barrier reinforcement and anchor 
bolts  on  existing  bridge  decks  and  approach  slabs,  the  Contractor  shall  use  only  type  HSHV 
adhesives. 

29.9.2 

Storage of Adhesive-bonded Anchors and Dowels 

The  Contractor  shall  store  materials  delivered  to  the  job-site  in  the  original  unopened  containers 
within  an  appropriate facility  that  is  capable  of maintaining  storage conditions  consistent  with  the 
manufacturer’s recommendations. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-33 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.9.3 

Equipment for installing Adhesive-bonded Anchors and 
Dowels 

The Contractor shall ensure that the equipment used to install adhesive-bonded anchors and dowels 
is in conformance with the recommendations of the anchor and dowel manufacturer. 

29.9.4 

Preparing Concrete Members for Adhesive-bonded Anchors 
and Dowels 

The Contractor shall ensure that concrete members that receive adhesive-bonded anchors or dowels 
are structurally sound and free of cracks in the vicinity of the anchor or dowel to be installed. Unless 
the adhesive manufacturer recommends the use of other equipment, the Contractor, using a rotary 
hammer drill and bit, shall drill holes to the diameter required by the manufacturer, but no less than 
105% of the diameter including deformations, and no more than 150% of the nominal diameter of 
the steel bar anchor or dowel. 

The Contractor shall use a metal detector that is specifically designed for locating steel in concrete 
to  avoid  conflicts  with  existing  steel  reinforcement  whenever  placement  tolerances  and  edge 
clearances  permit.  The Contractor  shall  perform  core  drilling  to clear  existing steel  reinforcement 
only  when  approved  by  the  Engineer.  The  Contractor  shall  dry  drilled  holes  completely  before 
cleaning and installing the anchors or dowels. 

The  Contractor  shall  clean  and  prepare  drilled  holes  in  accor

dance  with  the  manufacturer’s 

recommendations, but shall use no method that is less effective than using oil-free compressed air 
to remove loose particles from drilling, brushing inside surface to free loose particles that are trapped 
in  pores,  and  using  compressed  air  again  to  remove  any  loose  particles  that  still  remain.  The 
Contractor  shall  use  a  non-metallic  bristle  brush  and  shall  avoid  over-brushing  to  the  point  of 
polishing the inside surface of the drilled hole. 

29.9.5 

Method of Installing Adhesive-bonded Anchors and Dowels 

The Contractor shall remove all debris, oils, and any other deleterious material from the anchors and 
dowels to avoid contamination of the adhesive bonding material. The Contractor shall install anchors 
or  dowels  in  accordance  with  the  details  shown  on  the  Contract 

plans  and  the  manufacturer’s 

instructions,  paying  particular  attention  to  any  requirements  and  limitations  caused  by  anchor 
position, dampness, ambient temperatures, and curing. 

The Contractor shall use adequate quantities of the adhesive bonding material to fill each drilled hole 
to within 6.0 mm of the concrete surface, as measured after placement of the steel bar or anchor. 
For horizontal and inclined installations, the Contractor shall provide temporary supports to maintain 
the anchors or dowels in the centre of the drilled holes until adhesive bonding material has cured. 

29.9.6 

Testing Adhesive-bonded Anchors and Dowels 

The Contractor shall field test installed anchors and dowels for traffic railing barrier applications using 
type HSHV adhesives. The Engineer may also require testing of installed anchors and dowels for 
other applications. 

29.9.6.1 

Field Tests for Adhesive-bonded Anchors and Dowels 

The Contractor shall engage an independent testing agency to perform field testing of the installed 
anchors and dowels under the direction of a Professional Engineer. The Contractor shall submit test 
reports for each lot that has been signed and sealed by the Professional Engineer. The Contractor 
shall  perform  restrained  static  tension  tests  to  prevent  damage  to  the  surrounding  concrete.  A 
restrained test is defined as a test conducted in accordance with ASTM E488 / E488M - 10, except 
that the ASTM E488 / E488M - 10 support clearance requirements for test equipment do not apply. 
A reaction base shall be approximately equal to a drilled hole

’s diameter for the anchor to preclude 

concrete or masonry failure while allowing bond failure. Field testing does not require a displacement 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-34 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

measurement. The Contractor shall test individual anchors and dowels by proof loading in tension 
to 85% of the specified bond strength defined in Section 29.8, based on the nominal anchor or dowel 
diameter and embedment depth. Tension shall not exceed 90% of the yield strength of the anchor 
or dowel, unless otherwise shown in the Contract documents. 

The Contractor shall divide the anchors and dowels into lots for testing and acceptance. Each lot 
shall contain no more than 100 anchors or dowels, of the same diameter, embedment length, and 
adhesive bonding material system. Randomly, the Contractor shall select four of the anchors and 
dowels in each lot for testing, except if there are three or fewer anchors or dowels in a lot, in which 
case,  the  Contractor  shall  test  all  anchors,  unless  otherwise  directed  by  the  Engineer.  If  three 
consecutive lots have no failing tests, the Contractor shall sample the next three lots at a 2% rate; if 
these lots have no failing tests, the Contractor shall sample at a rate of 1% for the remaining  lots 
unless there is a failure.  

Regardless of lot size, however, the Contractor shall sample at least one dowel per lot. For every 
failed field test, the Contractor shall perform two additional field tests on adjacent untested anchors 
or dowels within a lot. The Contractor shall continue additional field tests until no more test failures 
occur, or until all anchors and dowels within a lot have been tested. After any lot fails, the Contractor 
shall increase the sampling rate to 4% for the next lot to be tested, but shall not test fewer than one 
dowel per lot and shall conform to the sampling rate procedure above, including rate reductions as 
appropriate. 

29.9.6.2 

Removal and Replacement of Adhesive-bonded Anchors and 
Dowels that Have Failed Testing  

The Contractor shall remove all anchors and dowels that fail the field test, without damage to the 
surrounding concrete. The Contractor shall drill holes again to remove adhesive bonding material 
residue and clean them in accordance with the directions in Section 29.9.4. New anchors and dowels 
shall  be  reinstalled  in  accordance  with  the  directions  in  Section  29.9.5.  The  Contractor  shall  not 
reuse  anchors  and  dowels  that  have  failed  testing  unless  the  Engineer  has  approved  doing  so. 
Reinstalled anchors shall be assigned only for new lots with anchors or dowels of the same diameter, 
embedment length, and adhesive bonding material system. The Contractor shall field test reinstalled 
anchors in accordance with the directions in Article 29.9.6.1. 

29.9.7 

Acceptance of Installed Adhesive-bonded Anchors and 
Dowels 

The Engineer will accept adhesive-bonded anchors and dowels after determining that they meet the 
material requirements outlined in Section 29.8, the installation and testing requirements described 
in this section, and the placement requirements of the Contract plans. 

29.10 

Embedment Anchors 

Using embedment anchors includes installation and field testing of cast-in-place, grouted, adhesive-
bonded, expansion, and undercut steel anchors. 

29.10.1 

Prequalification for Embedment Anchors 

The Contractor shall prequalify the following materials: 

  Concrete anchors, including cast-in-place 

  All bonded anchor systems, including grout, chemical compounds, and adhesives 

  Undercut steel anchors   

For such prequalification, the Contractor shall use universal test standards that are designed to allow 
approved anchor systems to be employed for any construction attachment use. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-35 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Tests for adhesive-bonded and other bonding compounds shall be conducted in accordance with 
ASTM

’s Standard Test Methods for Testing Bond Performance of Bonded Anchors (ASTM E1512 - 

01(2007)). 

Expansion anchors shall be tested in accordance with ASTM

’s Standard Test Methods for Strength 

of Anchors in Concrete Elements (ASTM E488 / E488M - 10). 

Embedment  anchor  details  shall  comply  with 

Appendix  B,  Steel  Embedments  in  ACI’s  Code 

Requirements for Nuclear Safety Related Concrete Structures and Commentary (ACI 349-06). 

For  anchor  systems  other  than  mechanical  expansion  anchors,  the  Contractor  shall  provide  the 
Engineer  with  certified  test  reports  that  have  been  prepared  by  an  independent  laboratory.  Such 
reports shall document that the system is capable of achieving the minimum tensile strength of the 
embedment steel. 

29.10.2 

Materials for Embedment Anchors 

The  Contractor  shall  provide  mill  test  reports  to  the  Engineer  to  certify  the  physical  properties, 
chemistry, and strengths used to manufacture the anchors. 

Either  an  epoxy,  vinylester,  or  polyester  chemical  compound  shall  be  acceptable  for  adhesive 
anchors. Moisture-insensitive,  high-modulus, low shrinkage, and high-strength adhesives shall be 
used. 

The Owner prohibits the use of additives to grout and bonding materials that are corrosive to steel 
or zinc/cadmium coatings. 

29.10.3 

Construction Methods for Embedment Anchors 

Adequate  edge  distance,  embedment  depth,  and  spacing to  develop  the required  strength  of the 
embedment  anchors  shall  be  provided.  The  correct  drill-hole  diameter,  as  specified  by  the 
manufacturer, shall be used. Rotary impact drilling shall be used unless diamond core drilling has 
been specified or tested. If a reinforcing bar is encountered during drilling, the hole shall be moved 
to a different location or the reinforcing steel shall be drilled through using a diamond core bit as 
directed  by  the  Engineer.  Abandoned  holes  shall  be  patched  with  an  approved  bonding material. 
Holes shall be thoroughly cleaned as recommended by the manufacturer. 

The Contractor shall remove all loose dust and concrete particles from the hole and shall prepare 
bonding material and install anchors according to the manufacturer's instructions or direction from 
the Engineer. 

Improperly installed embedded anchors or anchors that lack the required strength shall be removed 
and replaced, at the Contractor's expense, to the satisfaction of the Engineer. 

29.10.4 

Inspection and Testing for Embedment Anchors 

Where specified, sacrificial tests of the anchor system shall be done at the job site to the ultimate 
loads to document that the system can achieve pullout loads equalling the full minimum tensile value 
of the anchor employed. Anchor testing shall be done on fully cured concrete samples. At least three 
anchors  shall  be  tested  by  ASTM  E488  /  E488M  -  10  methods,  unless  otherwise  specified.  The 
Contractor may use any prequalified anchor systems that meet the requirements outlined above. 

Provision  shall  be  made  for  use  of  an  alternative  system  that  will  reach  the  designated  pullout 
requirement, without delay in progress, if the job site proof loading proves incapable of achieving 
minimum tensile values or the load required by the Engineer, or if too little concrete exists in which 
to develop full ductile loads. 

After bonding material has been installed and has cured, the Contractor shall torque each anchor 
system to its specified values using approved torque methods. If torque values are not specified, the 
Contractor shall use the manufacturer's recommendations or values provided by the Engineer. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-36 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.11 

Bridge Deck Wearing Surfaces 

Installing  wearing  surfaces  shall  consist  of  placing  a  wearing  surface  of  durable  and  impervious 
material  on  the  roadway  surface  of  bridge  decks,  tunnels,  and  underpasses.  It  includes  the 
preparation  of  surfaces  of  either  existing  or  new  decks  to  receive  such  an  overlay  of  surfacing 
material. 

Wearing  surfaces  of  bridge  decks,  tunnels,  and  underpasses  shall  be  asphaltic  concretes.  The 
thickness  of  wearing  surfaces  shall  be  as  designated  in  the  Contract  documents.  Materials  and 
installation  requirements  for  asphaltic  concrete  wearing  surfaces  shall  be  in  compliance  with  the 
applicable requirements of Chapter 3, Pavement, of these standard specifications. Unless otherwise 
specified in the Contract documents or directed by the Engineer, an asphaltic concrete overlay shall 
not be used directly on a Portland cement concrete deck without waterproofing the roadway surface 
as per Section 28.5 of Chapter 28, Waterproofing, of these standard specifications.  

If the type of wearing surfaces is not specified in the Contract documents, the selection of a wearing 
surface by the Contractor shall subject 

to the Engineer’s approval and shall include evaluation of the 

following requirements: 

  Sufficient  ductility  and  strength  to  accommodate  expansion,  contraction,  and  imposed 

deformation without cracking or debonding 

  Sufficient  fatigue  strength  to  withstand  flexural  stresses  due  to  composite  action  of  the 

wearing surface with the bridge deck resulting from local flexure 

  Sufficient durability to resist rutting, shoving, and wearing 

  Imperviousness to water, motor vehicle fuels, and oils 

  Resistance to deterioration from solar radiation and aging 

  Provision of skid-resistant surface 

  Ability to distribute wheel loads 

When specified in the particular specifications, Latex-modified Concrete type wearing surfaces shall 
be furnished and installed in accordance with the requirements of the following sections. 

29.11.1 

General Requirements for the Installation of Latex-modified 
Concrete Type Wearing Surfaces 

All equipment used to prepare the surface and to proportion, mix, place, and finish the latex concrete 
shall  be  subject  to  approval  by  the  Engineer  before  use.  This  approval  will  be  contingent  on 
satisfactory performance and will be rescinded in the event such performance is not being achieved. 
Equipment shall be on hand sufficiently ahead of the start of construction operations to be examined 
and  approved.  Any  equipment  that  leaks  oil  or  any  other  containment  onto  the  deck  shall  be 
immediately removed from the job site until repaired. 

A  technician  who  is  well-experienced  in  the  proportioning,  mixing,  placing,  and  finishing  of  latex-
modified concrete shall be employed by the Contractor and shall be present and in technical control 
of the work whenever these operations are underway. The Contractor shall submit the qualifications 
of  this  technician,  including  a  list  of  projects  on  which  the  technician  was  employed  and  the 
technician's level of responsibility on each, to the Engineer, who must approve the employment of 
this technician before operations start. 

Approval  by  the  Engineer  of  equipment  or  technicians  shall  not  relieve  the  Contractor  of  any 
responsibility for the successful completion of the work. 

If  not  otherwise  specified  in  the  Contract  documents,  the  minimum  thickness  of  latex-modified 
concrete wearing surfaces shall be 32 mm. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-37 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.11.2 

Materials for the Installation of Latex-modified Concrete 
Wearing Surfaces 

29.11.2.1  Portland Cement 

Portland cement shall conform to the requirements outlined in Section 4.3.1 of Chapter 4, Concrete 
Works, of these Standard Specifications, except that only types I or II shall be used. 

29.11.2.2  Aggregates 

Aggregate shall conform to the requirements of AASHTO M 6-08 for fine aggregate and to AASHTO 
M 80-08 for coarse aggregate. Coarse aggregate shall be graded 13 mm to 4.75 mm per AASHTO 
M 43-05 (2009) (ASTM D448 - 08). 

29.11.2.3  Water 

Water for mixing concrete shall conform to the requirements outlined in Section 4.3.8 of Chapter 4, 
Concrete Works, of these Standard Specifications. 

29.11.2.4  Latex Emulsion for the Wearing Surfaces 

Formulated latex emulsion admixture shall be a non-hazardous, film forming, polymeric emulsion in 
water,  to  which  all  stabilizers  have  been  added  at  the  point  of  manufacture,  and  shall  be 
homogeneous and uniform in composition. 

a.  Physical Properties of Latex Emulsion for the Wearing Surfaces 

The latex modifier shall conform to the requirements shown in Table 29-14. 

Table 29-14: Polymer type stabilizers styrene butadiene 

Property 

Value 

Latex 

Nonionic surfactants 

Portland cement composition 

Polydimethyl siloxane 

Percent solids 

46.0% to 49.0% 

Mass per litre at 25

o

 C 

1.0 kg 

Colour 

White 

A  Certificate  of  Compliance  signed  by  the  manufacturer  of  the  latex  emulsion,  certifying  that  the 
material conforms to the above Specifications, shall be furnished for each shipment used in the work. 

Latex admixture to be stored shall be kept in suitable enclosures that will protect it from prolonged 
exposure to temperatures in excess of 30° C. Containers of latex admixture may be stored at the 
bridge site for a period not to exceed ten days. Such stored containers shall be covered completely 
with suitable insulating blanket material to avoid excessive temperatures. 

29.11.3 

Mix Design of Latex-modified Concrete for Wearing Surfaces 

The  latex-modified  concrete  for  use  on  the  Project  shall  be  a  workable  mixture  that  meets  the 
requirements specified in Table 29-14 and Table 29-15. 

  Following sampling of the discharged, normally mixed material, the commencement of the 

slump test shall be delayed from 4 to 5 minutes. 

  Water may be added to obtain slump within the prescribed limits. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-38 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

  Dry  weight  ratios  are  approximate  and  should  produce  good  workability;  due  to  gradation 

changes, however, these may be adjusted within limits established by the Engineer. Parts by 
weight of sand may be increased by as much as 0.2 if the coarse aggregate is reduced by 
an equivalent volume.  

Table 29-15: Approximate latex-modified concrete mixture proportions 

Ingredient 

Amount for a volume of one cubic metre 

Cement 

299 kg 

Sand 

776 kg 

Coarse aggregate 

517 kg 

Latex* 

92.7 litres 

Water 

71.9 litres 

*Assumed 48% solids, 52% water by mass 

Because  of  the  surfactants  used  in  the  manufacture  of  latex,  excessive  amounts  of  air  can  be 
entrained  when  latex  is  mixed  into  a  Portland-cement  system,  unless  an  antifoam  agent  is 
incorporated in the latex. 

For styrene-butadiene latexes, these are usually silicone products and are often added by the latex 
supplier. The relationship between air content and antifoam agent content is a function of the specific 
latex,  in  particular,  the  level  and  type  of  its  surfactant  system  and  antifoam  agent  used.  Field 
experience has shown that the composition of the cement and the aggregates can affect air content, 
so it is important to evaluate the mixture before use. No reported work has been done to identify the 
components of the cement or aggregates that affect the air content. 

29.11.4 

Applying Latex-modified Concrete for Wearing Surfaces 

Procedures to apply wearing surfaces shall comply with the requirements and specifications outlined 
in this section. 

29.11.4.1  Preparing the Surface  

When  preparing  the  surface  for  a  wearing  surface  overlay,  the  Contractor  shall  comply  with  the 
specifications and requirements outlined in this article. 

a.  Preparing New Deck Surface for the Wearing Surface Overlay 

Surfaces of new decks upon which a wearing surface overlay is to be placed shall be finished to a 
rough texture by coarse brooming or other approved methods. 

After curing of the deck concrete is complete and before placement of the overlay, the Contractor 
shall  blast-clean  the  entire  area  of  the  deck  surface  and  the  vertical  faces  of  curbs,  concrete 
parapets,  and barrier walls up to a height of 25 mm above the top elevation of the overlay. Such 
blast-cleaning shall produce a bright, clean appearance that is free from laitance, curing compound, 
dust, dirt, oil, grease, bituminous material, paint, and all foreign matter. Blast cleaning for an area of 
the deck shall normally be performed within 24 hours before placement of the overlay on the area. 
Blast cleaning may be performed by either wet sandblasting, high-pressure water blasting, blasting 
grits, shrouded dry sandblasting with dust collectors, or another method approved by the Engineer. 
Water blasting equipment shall operate with a minimum pressure of 24.5 MPa. Any blast cleaning 
method used shall  conform to applicable air and water pollution regulations and to applicable safety 
and health regulations. All debris, including dirty water, that results from blast cleaning operations 
shall be immediately and thoroughly cleaned from the blast-cleaned surfaces and from other areas 
where  debris  may  have  accumulated.  All  blast-cleaned  areas  shall  be  protected  as  necessary 
against contamination before placement of the overlay. Contaminated areas and areas exposed for 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-39 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

more than 36 hours after cleaning shall be blast-cleaned again, as directed by the Engineer, and at 
the Contractor's expense. 

Immediately  before  placing  the  overlay,  the  Contractor  shall  remove  all  dust  and  other  debris  by 
flushing the area with water or blowing the area with compressed air. Prepared surfaces shall then 
be soaked with clean water for at least one hour before the placement of the latex overlay. Before 
the overlay is applied, all free water shall be blown out and off, and this procedure shall continue 
until the surface appears dry or barely damp.  

An air supply system for blast cleaning and blowing shall be equipped with an oil trap in the air line, 
and provisions shall be made to prevent oil or grease contamination of the surface by any equipment 
before placement of the overlay. 

b.  Preparing Existing Deck Surface for Wearing Surface Overlay 

Any surfaces of existing decks that have become contaminated by traffic usage shall be scarified to 
the depth specified in the Contract documents. If no depth is shown or specified, a minimum of 6 
mm of material shall be removed by scarification. 

Before beginning scarification and until operations are completed, all deck drains, expansion joints, 
and other openings where the Engineer determines that damage could result shall be temporarily 
covered or plugged to prevent entry of debris. 

Scarifying shall be done with power operated mechanical scarifiers, or other approved devices, that 
are capable of uniformly removing the existing surface to the depths required without damaging the 
underlying concrete. Machine scarifiers shall not be operated in ways that damage hardware, such 
as drain grates and expansion joint  armour. In areas that machine scarifying cannot reach and in 
areas  of  spalling  and  where  steel  reinforcement  is  exposed,  scarifying  and  the  removal  of 
deteriorated  or  unsound  concrete  shall  be  accomplished  with  hand  tools.  Pneumatic  hammers 
heavier than nominal 200 N shall not be used. 

No  scarifying  or  chipping  shall  be  allowed  within  1.8  m  of  a  new  overlay  until  48  hours  after  its 
placement. 

In  areas  where  the  Engineer  determines  that  deteriorated  or  unsound  concrete  has  been 
encountered, such concrete shall be removed to a depth of 20 mm below the top mat of reinforcing 
steel. A minimum of 20 mm clearance shall be required around the reinforcing steel, except where 
lower  bar  mats  make  this  impractical.  Care  shall  be  exercised  to  prevent  damaging  the  exposed 
reinforcing steel. All reinforcing steel shall be blast-cleaned. Repaired areas are to be filled during 
the overlay operation. 

After scarification and removal of unsound concrete has been completed, the deck surface shall be 
blast-cleaned and prepared as specified in Sub-article a of Article 29.11.4.1. 

29.11.4.2  Proportioning and Mixing to Apply the Wearing Surfaces 

The  Contractor shall submit to the Engineer for approval, 14 days prior to date of placement, the 
proposed mix design in writing and samples of all mix materials in sufficient quantity to produce a 
minimum of 0.08 m3 of concrete for laboratory mix design testing. 

Proportioning and mixing equipment shall be a self-contained, mobile, continuous mixing, volumetric 
proportioning-type mixer. 

Continuous-type mixers shall be equipped so that the proportions of the cement, natural sand, and 
coarse aggregate can be fixed by calibration of the mixer and cannot be changed without destroying 
a seal or other indicating device affixed to the mixer. In addition to being equipped with a flow meter 
for  calibrating  the  water  supply  portion  of  the  mixer,  the  mixer  shall  also  be  equipped  with  a 
cumulative-type water meter that can be read to the nearest 0.4 Litres. Water meters shall be readily 
accessible, accurate to within one percent, and easy to read. Both water meters shall be subject to 
checking by the Engineer each time the mixer is calibrated. The Contractor shall provide approved 
methods for adding an admixture. Admixtures shall be added so as to be kept separated as far as is 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-40 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

practicable. The Contractor shall calibrate a continuous-type mixer to the satisfaction of the Engineer 
before starting the work. Yield checks normally will be made for each 38 m3 of mix. Recalibration 
will be necessary when indicated by the yield checks and at any other times that the Engineer deems 
necessary  to  ensure  proper  proportioning  of  the  ingredients.  Continuous-type  mixers  that  entrap 
unacceptable volumes of air in the mixture shall not be used. 

The mixer shall be kept clean and free of partially dried or hardened materials at all times. It shall 
consistently  produce  a  uniform,  thoroughly  blended  mixture  within  the  specified  air  content  and 
slump limits. Malfunctioning mixers shall be immediately repaired or replaced with acceptable units. 

Aggregate stockpiles being used should be of uniform moisture content. Mixing capability shall be 
such that finishing operations can proceed at a steady pace, with final finishing completed before 
the formation of the plastic surface film. 

29.11.4.3  Installation Procedures for the Wearing Surfaces 

The Contractor shall provide a detailed work plan, which shall include equipment and manpower, for 
approval before beginning any work. 

Concrete  batches  shall  not  be  carted  over  the  completed  overlay  until  the  overlay  concrete  has 
attained a compressive strength of 21 MPa. If carts are used,  the Contractor shall provide timber 
planking of at least 20 mm thickness for the remainder  of the curing period. The Contractor shall 
provide  carts  equipped  with  pneumatic  tires.  Curing  operations  shall  not  be  interrupted  for  the 
purpose of carting concrete over finished slabs. 

a.  Weather Restrictions for the Wearing Surface Installation 

The Contractor shall not start the placement of latex-modified concrete when the temperature is or 
is  expected  to  fall  below  7°  C  or  rise  above  27°  C),  or  when  high  winds,  rain,  or  low  humidity 
conditions are expected to occur before final set of the concrete. If any of these conditions occur 
during placement, placement shall be terminated and a straight construction joint formed. Placement 
at night may be necessary when daytime conditions are not favourable. If placement is performed at 
night, adequate lighting shall be provided by the Contractor. 

b.  Equipment for the Wearing Surface Installation 

Placing and finishing equipment shall include hand tools for placing and brushing in freshly mixed 
latex-modified concrete and for distributing it to approximately the correct level for striking off with 
the screed. Hand-operated vibrators, screeds, and floats shall be used for consolidating and finishing 
small areas. 

An approved finishing machine complying with the following requirements shall be used for finishing 
all large areas of work: 

1.  The finishing machine shall be self-propelled and capable of forward and reverse movement 

under positive control. The length of the screed shall be sufficient to extend at least 150 mm 
beyond the edge of both ends of the section being placed. This finishing machine shall also 
be capable of consolidating the concrete by vibration and of raising all screeds to clear the 
concrete  for  travelling  in  reverse.  This  machine  shall  be  either  a  rotating  roller-type  or  an 
oscillating screed-type. 

2.  Rotating  roller-type  machines  shall  have  one  or  more  rollers,  augers,  and  25  to  40  Hz 

vibratory pans. 

3.  Oscillating  screed-type  machines  shall  have  vibrators  on  the  screeds  whose  frequency  of 

vibration can be varied between 50 and 250 Hz. The 

screed’s bottom face shall be not less 

than 100 mm wide and shall be metal. 

Rails shall be required for the finishing machine to travel on. Rails shall be sufficiently rigid to support 
the weight of the machine without appreciable deflection and shall be placed outside of the overlay 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-41 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

area. Rail anchorages shall provide horizontal and vertical stability and shall not be shot ballistically 
into concrete that will not be overlaid. 

A suitable portable lightweight or wheeled work bridge shall be furnished for use behind the finishing 
operation. 

c.  Placing the Wearing Surface 

The  finishing  machine  shall  be  test-run  over  the  entire  area  to  be  overlayed  each  day  before 
placement is started to ensure that the required overlay thickness will be achieved. 

Immediately ahead of placing the overlay mixture, a thin coating of the polymer modified concrete 
mixture to be used for the overlay shall be thoroughly brushed and scrubbed onto the surface as a 
grout-bond coat for the overlay. More coarse particles of the mixture that cannot be scrubbed into 
contact with the surface shall be removed and disposed of in a manner approved by the Engineer. 
The Contractor shall be careful to ensure that all vertical and horizontal surfaces receive a thorough, 
even coating and that the rate of progress is limited so that the material brushed on does not become 
dry before it is covered with the full depth of latex-modified concrete. 

The latex-modified concrete shall be placed on the prepared and grout-coated surface immediately 
after being mixed. This mixture shall be placed and struck off approximately 6 mm above final grade, 
then consolidated by vibration and finished to final grade with the approved finishing machine. Spud 
vibrators may be used in deep pockets, along edges, and adjacent to joint bulkheads. Supplemental 
vibration shall be provided along the meet lines where adjacent pours come together and along curb 
lines. Hand finishing with a float may be required along the edge of the pour or on small areas of 
repair. 

Screed  rails  and  construction  bulkheads  shall  be  separated  from  the  newly  placed  material  by 
passing a pointing trowel along their inside face. Expansion dams shall not be separated from the 
overlay. The Contractor shall be careful to ensure that this trowel cut is made for the entire depth 
and length of rails after the mixture has stiffened sufficiently. 

d.  Finishing the Wearing Surface 

Finishing  equipment  shall  be  operated to  produce  a  uniform, smooth,  and  even-textured  surface. 
The final surface shall not vary more than 3 mm from a 3 metre straightedge placed longitudinally 
on it. Before the plastic film forms, the surface shall be textured by tinning in accordance with the 
requirements  of  Section  21.10.1  of  Chapter  21,  Concrete  Structures,  of  these  Standard 
Specifications. 

e.  Installing Construction Joints for the Wearing Surfaces 

Planned  construction  joints  shall  be  formed  by  bulkheads  set  to  grade.  Before  placing  concrete 
against previously placed overlay material, the construction joint shall be sawed to a straight vertical 
edge. Sawing of joints may be omitted if the bulkhead produces a straight, smooth, vertical surface. 
The 

joint’s face shall be sand or water blasted to remove loose material. 

The Owner shall permit longitudinal construction joints only at the centreline of roadway or at lane 
lines unless otherwise shown in the Contract documents or permitted by the Engineer. 

If delays in the placement operation exceed one hour, an approved construction joint shall be formed 
by removing all material not up to finish grade and sawing the edge in a straight line. During minor 
delays of one hour or less, the end of the placement may be protected from drying with several layers 
of clean, wet burlap. 

29.11.5 

Curing Latex-modified Concrete Wearing Surfaces 

The wearing surface shall be promptly covered with a single layer of clean, wet burlap as soon as 
the surface can support it without deformation. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-42 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Within one hour after covering a surface with wet burlap, the Contractor shall wet the burlap again, 
if necessary, place 

a layer of 100 μm polyethylene film or wet burlap-polyethylene sheets over the 

wet burlap, and cure the surface 24 hours. 

During cold weather, freshly placed LMC shall be protected from temperatures below 7° C during 
the first 72 hours of curing. If the temperature falls below 7° C during curing, the duration of the wet 
cure shall be extended as directed by the Engineer. 

The Owner shall prohibit traffic on an overlay while it is curing. 

29.11.6 

Testing and Acceptance of Latex-modified Concrete Wearing 
Surfaces 

After  curing  is  completed,  the  Contractor  shall  visually  inspect  an  overlay  for  cracking  and  other 
damage.  The  Contractor  shall  also  use  a  chain  drag  or  other  suitable  device  to  inspect  wearing 
surfaces for de-laminations and bond failures. 

The  Contractor  shall  seal  surface  cracks  that  are10  mm  deep  or  less  with  an  epoxy  penetrating 
sealer followed by an application of approved sand. 

To repair  cracks that are deeper than  10 mm, the  Contractor shall use methods approved by the 
Engineer or remove and replace the affected portions of the wearing surface. The Contractor shall 
remove and replace any delaminated or unbounded portions of a wearing surface or portions that 
have been damaged by rain. 

After completion of the wet cure, the surface shall be tested for flatness and corrected, if necessary, 
as  provided  in  Section  21.10.1.4  of  Chapter  21,  Concrete  Structures,  of  these  Standard 
Specifications.  

All corrective work shall be at the Contractor's expense. 

29.11.6.1  Compression Strength Test for the Wearing Surfaces 

Compression strength test shall be done according to ASTM C31 / C31M - 12. Specimens shall be 
cured  at  the  job  site  under  the  same  conditions  as  the  overlay.  Specimens  shall  be  tested  to 
determine when overlay has achieved a specified strength of 21 MPa or as specified in the Contract 
documents for opening to traffic. 

29.12 

Drip Check Angle 

Where shown on the Contract plans, the Contractor shall fix 25 x 25mm stainless steel angle bedded 
on  approved  gun  applied  sealant  to  outside  faces  of  bridge  deck  concrete.  The  Contractor  shall 
design fixings of stainless steel and drill them on the Project site.  

29.13 

Lockable Doors, Access Covers, and Internal Access 
Walkways 

Lockable doors, access covers, frames, and internal access steelwork shall be as detailed on the 
Contract plans. All doors and access covers shall include an approved arrangement for locking from 
the outside. Access covers in the soffit and top slab of decks and cross beams shall include a means 
of securing in the open position. 

29.14 

End walls for ducts 

Ends of contingency utility ducts shall terminate in cast-in-situ cantilevered concrete retaining walls 
(duct end wall) to help protect the roadway, sidewalk, curbs, and other works over the ducts from 
damage due to excavation. Such protection shall enable workers to open the end of the ducts for 
utility placement at some future date. Duct end walls shall be constructed at the locations and to the 
details as shown on the Contract plans and as approved by the Engineer, and in accordance with 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-43 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

the  applicable  requirements  of  Chapter  4,  Concrete  Works,  Chapter  5,  Reinforcing  Steel,  and 
Chapter 21, Concrete Structures, of these standard specifications.  

29.14.1 

Materials for the Construction of End Walls for Ducts 

All concrete and reinforcing steel for duct end walls shall comply with the requirements under Section 
4.3 of Chapter 4, Concrete Works, and Section 5.3 of Chapter 5, Reinforcing Steel, of these Standard 
Specifications. Blinding concrete shall be of Class 15/20 concrete. The structural end wall concrete 
shall  be  of  Class  35/20.  Reinforcement  shall  be  Grade  60,  uncoated  rebar,  unless  designated 
otherwise. 

Waterproofing shall meet the requirements outlined in Section 28.2 of Chapter 28, Waterproofing.  

Coal tar epoxy protective coatings shall meet the requirements outlined in Section 24.5 of Chapter 
24, Painting. Duct pipe extending through the headwall shall meet the appropriate pipe requirements 
for  the  various  types  and  sizes  of  contingency  utility  ducts  as  otherwise  specified  in  Chapter  12, 
Storm Water Drainage, of these Standard Specifications. End caps for the contingency utility ducts 
shall  be  commercially  manufactured  of  materials  similar  to  the  respective  contingency  utility  duct 
pipe material and sized to match the belled joint end of the duct pipe, using a rubber gasketed seal, 
meeting the requirements as otherwise specified for pipe joints for the respective contingency utility 
duct pipe material type. Each cap shall have a pulling handle and attachment for a wire pulling rope 
where such is applicable for electrical and telephone ducts. For smaller PVC ducts (ducts with 20 
cm or smaller diameters), the Contractor may use a tight fitting PVC cap as an option to the gasketed 
cap; such cap can be inserted into the bell end of a typical PVC-bonded type pipe joint fitting that is 
sealed with a liberal application of silicone sealer.  

All contingency utility duct pipe end caps shall be suitable for long term buried conditions and shall 
makes the duct water tight.  

29.14.2 

Construction Methods for End Walls for Ducts 

Each duct end wall shall be designed site specific by the Contractor and shown in plans and sections 
of  shop  drawings,  which  shall conform to  the typical  details  and  locations  shown  on  the  Contract 
plans, or as otherwise approved by the Engineer. 

Excavation,  dewatering,  construction  and  backfilling  for  duct  end  walls  shall  meet  the  applicable 
construction requirements for surface drainage structures as detailed in Chapter 12, Storm Water 
Drainage, of these Standard Specifications. Forms shall be smooth and tight fitting forms that can 
be  held  rigidly  to  line  and  grade  during  placement  of  concrete  and  that  can  be  readily  removed 
without injuring the green concrete. Duct end wall base slab shall be placed in conjunction with the 
contingency utility duct construction such that the contingency utility duct pipe can be placed true to 
grade  with  the  capped  bell  end  of  the  duct  pipe  installed flush  with  the face  of the  end  wall.  The 
contingency utility duct pipe shall be fixed and held securely in position such that it is not displaced 
during the duct end wall concrete placement. The backfilled back-side surface of a duct end wall and 
base  slab  shall  be  protected  with  waterproofing  membrane  that  complies  with  Section  28.2  of 
Chapter  28,  Waterproofing.  The 

duct  end  wall’s  backfilled  front  surface  (the  side  that  can  be 

excavated for utility placement at some future date) shall be protected with a coal tar epoxy coating. 
Exposed  portions  of  the  duct  end  wall  surfaces  along  the  top  shall  be  protected  with  a  clear 
penetrating epoxy sealant.  

The 

duct end wall’s top shall be rubbed finish to match the particular curb or top configuration in 

accordance  with  each  site's  requirements,  as  shown  on  the  shop  drawings  and  approved  by  the 
Engineer. The 

duct end wall’s final finish shall be obtained by rubbing with a fine carborundum stone 

and water. Rubbing shall be continued until 

a duct end wall’s entire surface is of a smooth texture 

and uniform colour. After the final rubbing is completed and the surface has dried, it shall be rubbed 
with burlap to remove loose powder and shall be left free from all unsound patches, paste, powder, 
and objectionable marks.  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-44 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Appropriate utility markers shall be installed in the top of the duct end wall on the centreline of the 
matching  duct  type,  immediately  after  towelling  smooth  the  freshly  placed  concrete.  The  utility 
marker shall be pushed into the wet concrete, on duct and end wall width centrelines, such that the 
marker is flush with the surface of the end wall. The Contractor shall be careful to remove any wet 
concrete from the surface of the utility marker and to leave the top of the end wall equal to the rubbed 
type finish, as described above.  

Before backfilling, the Contractor shall allow the duct end wall concrete to cure to 7-day concrete 
strength, clean the ducts, and cap and seal the contingency utility duct pipe ends. After  obtaining 
final approval from the Engineer, the Contractor shall backfill the end wall with load bearing borrow 
material.  Such  backfill  shall  be  compacted  as specified for  the  placement  of  load  bearing  borrow 
materials, in equal height lifts on each side of the end wall, such that uneven pressure is not exerted 
on the wall from either side. 

29.15 

Scour Protection 

If scour protection is specified in the Contract documents or Contract plans, it shall comprise a layer 
of 5kg to 100kg rock and shall be installed around the marine bridge piers as shown on the Contract 
plans, with a geo-textile layer (having minimum grade 600 g/m

2

) under the rock.   

29.15.1 

Method Statement 

No  later  than  two  (2)  months  before  commencement  of  construction  of  the  scour  protection,  the 
Contractor shall submit to the Engineer for consent, full details of the proposed construction methods 
for the structure(s). 

The details shall include, but not be limited to: 

a.  Proposed  source(s)  of  rock  material  including  documentation  showing  that  the  proposed 

materials from each quarry or quarry face comply with the specification, and evidence that 
the source(s) can supply the required quantity at the required rates. 

b.  Method  statement  for  quarrying,  grading,  sorting,  stacking,  inspection,  weighing  and 

transportation of the rock materials. The Contractor shall give his proposals for sampling and 
testing  rock  and  for  ensuring  compliance  with  the  requirements  of  these  specifications. 
Details shall include the sampling rate and size of sample and shall take into account such 
factors  as  the  number  of  quarries  or  quarry  faces,  rate  of  delivery  to  site,  methods  of 
stockpiling and handling and rate of placing. 

c.  Method statement for the construction of the scour protection including, but not limited to, 

  Proposed plant and labour resources 

  Method of placing the rock materials 

  Founding of the seabed 

  Geo-textile placement 

  Aggregate bedding layers over geo-textile 

  Construction programme 

  Setting out control, inspection and survey procedures 

  Monitoring of seabed and fill displacements and settlement 

  Environment protection and silt screens 

d.  Health and Safety considerations 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-45 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.15.2 

Rock Materials 

29.15.2.1  Physical Properties 

Rock shall comply with Requirements (1) to (4) presented in Table 29-16 when tested in accordance 
with  BS  812-103.1:1985,  Requirement  (5)  when  tested  in  accordance  with  ASTM  C131  -  06  and 
Requirement (6) when tested in accordance with Appendix B of BS 6349-1:2000: Part 1. Submerged 
rock means all material below -0.5m NADD (New Abu Dhabi Datum), wetted rock means all material 
that lies above -0.5m NADD. The frequency of testing shall be as per the particular specifications 
and as approved by the Engineer.  

The  petrography  analysis  of  the  rocks  shall  be  submitted  by  the  C

ontractor  for  the  Engineer’s 

evaluation and approval. 

Table 29-16: Rock physical properties for scour protection 

 

Material property 

Submerged rock 

Wetted rock 

Saturated surface dry density 

> 2,600 kg/m3 

>2,750 kg/m3 

Water absorption 

< 3% by weight 

< 1% by weight 

Aggregate impact value 

< 30% 

<30% 

Ten percent fines value 

> 100kN 

>150kN 

Los Angeles abrasion value 

< 30% 

< 20% 

Soundness of coarse agg. (5 cycles 
MgSO4) 

< 10% 

< 5% 

29.15.2.2  Cracks, Laminations and Other Deficiencies 

Individual rocks for rock armour units shall be free from cracks, laminations and cleavage planes, 
weathered  material  and  solution  cavities.  All  rocks  shall  be  free  of  all  remains  of  quarry  blasting 
materials. 

29.15.2.3  Length to Thickness Ratio 

No more than 50% of the rock armour units shall have a length to thickness ratio (L/d) greater than 
2, and no rock shall have an L/d ratio greater than 3, where the length, L, is defined as the greatest 
distance between any two points on the rock, (ie. diametrically opposite corners of a cuboidal block), 
and the thickness, d, the minimum distance between two parallel straight lines through which the 
rock can just pass. 

29.15.2.4  Grading of Rock 

The grading for  rock shall  be  in  accordance  with  the  system  described  in  the  Rock  Manual  2007 
(CIRIA-C683), the Use of Rock in Hydraulic Engineering. 

The system is analogous to particle size distribution charts for aggregates but the horizontal axis is 
the weight of a rock instead of a sieve size, and the vertical axis is the "cumulative percentage by 
weight of all rocks in a given sample that are lighter than", instead of the "percentage passing". 

Rather  than  using  grading  envelopes  drawn  on  a  cumulative  plot  to  define  the  limits  of  standard 
grading, the system adopted shall refer to a series of specified weights of stones, (rock sizes a, b, c 
and  d  in  increasing  size  order),  and  the  associated  allowable  range  of  "y",  the  "cumulative 
percentage by weight lighter than" values. 

In addition, an effective mean weight, W

em

, is specified. It is the arithmetic mean weight of all rocks 

in a given sample, excluding those lighter than the lightest rock size (a). Rock for the structure(s) 
shall be classified by weight and comply with the grading(s) indicated in  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-46 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

 

Table 29-17. 

The Contractor shall provide and display in a prominent location, to the agreement of the Engineer, 
a series of sample rocks clearly marked with their weight covering the range of rock sizes to be used 
on the Project. These rocks shall be used as a visual reference to assist in rock inspections. 

 

Table 29-17: Rock grading(s) 

Rock 

Class 

Class 

Description 

Rock Size (kg) 

W

em

 (kg) 

(a) 

(b) 

(c) 

(d) 

min 

max 

5 to 100 kg rock 

100 

150 

15 

45 

Allowable range of y 

y<2% 

0%<y<10% 

70%<y<100% 

97%<y 

 

 

29.15.2.5  Quality Control 

The Contractor shall undertake sampling and testing for each quarry, quarry face or other source in 
accordance with the schedule set out in Table 29-18 for the tests set out in Article 29.15.2.1, Article 
29.15.2.2, Article 29.15.2.3, and Article 29.15.2.4  

 

Table 29-18: Rock test requirements for scour protection 

 

Frequency of Testing 

Sample Size for Grading and Visual 

Inspection 

Class A 

Every 2,000 tonnes 

5 tonnes 

The Contractor shall undertake sampling and testing for each quarry, quarry face or other source 
before commencement of the work for the tests (2), (3), (4), (5) and (6) set out in Article 29.15.2.1. 

In addition, the Contractor shall undertake additional sampling and testing when circumstances so 
dictate or as instructed by the Engineer. 

Any rock in non-compliance shall be rejected and removed from the site by the Contractor. 

29.15.3 

Placing of Rock Materials 

29.15.3.1  Transporting and Depositing Rock Materials 

The Contractor shall supply and transport rock material by land or sea, or a combination of both, and 
deposit it by means of marine or land operated plant. The Contractor shall take all precautions and 
provide all means necessary to ensure that the various classes of rock material are deposited in the 
position and to the slopes indicated on the Contract plans. The rock materials shall be placed using 
techniques to achieve a dense fill with no segregation and no contamination from seabed deposits. 

29.15.3.2  Grading of Armouring to be Maintained 

The  grading  of  armouring  within  each  class  shall  be  correctly  maintained  and  to  this  end  the 
Contractor shall take all actions necessary to remove any rocks that may have been displaced by 
wave  or  other  action  and  washed,  or  swept  or  otherwise  moved  into  voids  of  previously  placed 
armouring, before any further armouring necessary to complete the sections is placed. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-47 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.15.3.3  Survey Equipment 

The Contractor shall provide and operate all necessary equipment required for progress surveying 
of  the  structure(s).  This  shall  include  but  not  be  limited  to  suitable  optical/  electronic  survey 
equipment for above water surveys and a launch fitted with approved echo sounding equipment for 
executing  soundings.  The  soundings  shall  be  expressed  as  reduced  levels  and  shall  be  fully 
compensated for tides and motion of the survey vessel. Soundings shall be accurate to ± 0.05m. 

29.15.3.4  Construction Survey 

Surveys  shall  be  carried  out  before rock  placing  commences,  and  on  the  completion  of  any  rock 
layer. As a minimum these shall comprise cross sections at 5m centres across the scour protection 
perpendicular to the pile caps. No surface shall be covered until the profile survey for the previous 
layer has been completed, and it has been agreed by the Engineer that this layer meets the specified 
requirements. 

29.15.3.5  Above Water Survey Technique for Rock Armour 

Rock armour above 0.0m NADD shall be surveyed using optical/electronic survey equipment. The 
level and position of each rock on each profile shall be measured and recorded. The location of the 
staff or target on each rock shall be discussed and agreed with the Engineer but shall generally be 
on the highest point of the outermost part of the rock. Consistency of measurements is of the essence 
to obtain meaningful results. 

29.15.3.6  Below Water Survey Techniques for Rock Structures 

Rock profiles below low water level shall be surveyed using a suitable echo sounder. The vessel on 
which this equipment is installed shall also be fitted with suitable positioning equipment to allow the 
survey lines sailed to be repeated to allow accurate comparisons of changes between surveys. For 
the portions of the scour protection close to low water level the surveys shall be carried out at high 
tide to allow the greatest possible overlay with the above water surveys as set out in this article. 

29.15.3.7  Presentation of Results 

At each profile, the actual measured profile of each part of the rock shall be plotted on the same plot 
so that actual profile and layer thicknesses may be compared to the specified requirements. These 
plots shall be at a minimum scale of 1:50. 

29.15.3.8  Tolerances 

Rock materials shall be placed to the levels, dimensions and slopes shown on the Contract plans. 
Rock Materials shall comply with the tolerances given in the Table 29-19. 

Table 29-19: Rock material tolerances 

Armour Class 

Description 

Tolerance on layer thickness 

Class A 

5 to 100kg 

-100mm 

+300mm 

Notwithstanding the tolerances tabulated above, the following requirements shall apply: 

a.  No two adjacent actual measured profiles shall both be in the negative tolerance band. 

b.  No two adjacent layer thicknesses shall both be in the negative tolerance band. 

In  addition  to  the  above  tolerances,  all  profiles  shall  be  reviewed  for  general  acceptability  and 
undesirable  trends  shall  be  corrected.  In  particular,  attention  shall  be  paid  to  deviation  from  the 
design slope and unacceptable deviations shall be corrected. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-48 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.16 

Sea Port Authority Works 

When a marine bridge crosses a navigable waterway and includes permanent piers with submerged 
obstructions close to the navigation channel(s), the navigable channel(s) must remain open to sea 
traffic during construction. 

29.16.1 

Navigation beacons 

Within the navigation channel and in close proximity to its sides, upon each corner of the submerged 
pile caps shall be fixed approved solar powered navigation beacons. They shall be of the Pharos 
Marine  type  LBEA-85/R  complete  with  SZ-10-100  solar  system  (or  equal  approved)  mounted  on 
3.5m painted steel posts secured to the top of the pile caps with stainless steel fixing sockets cast 
into the concrete. 

The Contractor shall submit full details of the proposed beacons together with the fixing details in a 
timely manner to ensure the necessary approvals are obtained without any delay to pier construction. 

During construction, the Contractor shall ensure that any obstructions placed within or close to the 
navigation channel(s) are suitably protected by temporary warning beacons to the approval of the 
Sea Port Authority. 

29.16.2 

Navigation direction signs 

The Contractor shall provide such navigation direction signs together with any lights, power supply 
and cabling as are required by the Sea Port Authority for the purposes of delineating the shipping 
channels beneath the marine bridge spans. The Contractor shall submit for the Engineer’s approval 
details of suitable signing in accordance with the recommendations of the International Association 
of Marine Aids to Navigation and Lighthouse Authorities (IALA) 

 

 

 

 

 

 

 

 

Content      ..     16      17      18      19     ..