Page 8-126 

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical

Prior to installation all relocated metal light standards shall have existing painted 
identification markings removed. Manufactures Identification tag shall not be removed. 
Damaged surfaces and coatings shall be repaired with material matching the existing 
coating.

All new light standards shall have an approved metal tag riveted to the pole 
above the handhole. The information provided on the tag shall be as noted on the 
preapproved drawings. 

All new and relocated metal light standards shall be numbered for identification using 
painted 4 inch block gothic letters (similar to series C highway lettering) and numbers 
installed 3 feet above the base facing the Traveled Way. Paint shall be black enamel alkyd 
gloss conforming to Federal Specification TT-E-489. The following information shall be 
provided as shown in the Plans:

NN

CC-SSSS

VVV

Where:

NN  =  Is the pole number as identified in the Plans. May be one or more characters.

CC 

=  Is the circuit letter as identified in the Plans. May be one or more characters.

SSSS  =  Is the service cabinet number as identified in the Plans. Do not include the 

two or three letter prefix. Up to four digits - do not include leading zeros.

VVV  =  Is the operating voltage of the luminaire. Always three digits.

In setting timber poles, the Contractor shall provide a minimum burial of 10 percent of the 
total pole length plus 2 feet and shall rake the poles as shown in the Plans. 

8-20.3(13)B

 

Vacant

8-20.3(13)C

 

Luminaires

The Contractor shall mark the installation date on the inside of the luminaire ballast or 
driver housing using a permanent marking pen.

All luminaires shall be mounted level, both transverse and longitudinally, as measured 
across points specified by the manufacturer. Leveling and orientation shall be 
accomplished after pole plumbing.

8-20.3(13)D

 

Sign Lighting

Sign illumination equipment shall include fixtures, brackets, conduit, electrical wire, and 
other material required to make the sign lighting system operable. Sign illumination 
fixtures shall be fused according to the table in 

Section 9-29.7

.

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical 

8-20

8-20.3(13)E

 

Sign Lighting Luminaires

The sign lighting luminaire shall be supported by a lighting bracket assembly as detailed 
in the Plans. If the sign Structure includes a maintenance walkway, the luminaire fixture 
mounting plate shall be bolted to the walkway grating.

An isolation switch shall be provided in the line side conductors, mounted over the 
Shoulder to de-energize all luminaires for maintenance purposes. The switch shall be 
single pole, single throw, or double-pole, single throw as necessary to open all conductors 
to the luminaires other than neutral and ground conductors. The switch shall contain 600-
volt terminal strips on the load side with solderless box lugs as required plus 4 spare lugs 
per strip. The switch enclosure shall be rated NEMA 3R.

8-20.3(14)  Signal Systems

8-20.3(14)A

 

Signal Controllers

All control cabinets and control equipment shall be factory wired ready for operation. 
Field work will be limited to placing cabinets and equipment and connecting the field 
wiring to field terminal strips. All controller cabinets shall be installed on a silicone seal 
pad.

Controllers for portable traffic signal systems shall conform to the requirements of 

Section 9-29.13(7)

.

8-20.3(14)B

 

Signal Heads

Unless ordered otherwise by the Engineer, signal heads shall not be installed at any 
intersection until all other signal equipment is installed and the controller is in place, 
inspected, and ready for operation at that intersection, except that the signal heads may 
be mounted if the faces are covered to clearly indicate the signal is not in operation.

Three section displays mounted on type M mounts shall have the plumbizer between the 
top and second display. Four and five section vertical displays mounted on type M mounts 
shall have the plumbizer between the second and third display.

8-20.3(14)C

 

Induction Loop Vehicle Detectors

Induction loops shall be constructed as detailed in the Contract and the following:
1.  Loop wire shall conform t

Section 9-29.3

.

2.  Lead-in cable shall conform to 

Section 9-29.3

.

3.  All loops shall be installed after grinding or prior to paving the final lift of asphalt 

designated in the Contract. Loop conductors shall be held at the bottom of the saw 
cut by high temperature backer rod (sized to fit snugly in the saw cut). Two-inch-long 
pieces of the backer rod shall be installed on 24-inch centers along the entire loop 
and home run(s) and at the entrance and exit of all turns greater than 45 degrees. 
If new loops are installed over existing the old loops shall be removed by grinding 
and the grinding shall be deep enough to destroy any existing operational loop 
conductors. If not listed as incidental to another item or paid for under another Bid 

Page 8-128 

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical

item the additional Work to remove the existing loops shall be paid in accordance 
with 

Section 1-04.4

.

4.  Each loop shall be the size and number of turns indicated in the Plans. 
5.  No loop installation will be done in rainy weather or when the pavement is wet.
6.  All sawcuts shall be cleaned with a high-pressure washer and dried with 100 psi 

minimum air pressure, to the satisfaction of the Engineer. If traffic is allowed over the 
sawcut prior to wire installation, the sawcuts shall be cleaned again.

7.  Wiring shall be installed with a blunt-nosed wooden wedge.
8.  Prior to the installation of the high temperature backer rod all slack shall be removed 

from the wiring. Kinks in wiring or folding back of excess wiring will not be allowed.

9.  High temperature backer rod, sized for snug fit shall be installed in the saw cut on 

2-foot centers and at all sharp turns. 

10.  Install sealant as per Contract or as approved by the Engineer.
11.  Sealant shall be applied such that air bubbles or foam will not be trapped in 

the sawcut.

8-20.3(14)D

 

Test for Induction Loops and Lead-In Cable

All tests shall be performed by the Contractor in the presence of the Engineer for each 
loop. The tests shall be performed at the amplifier location after complete installation of 
the loop. All costs associated with testing shall be included in the unit Contract prices of 
the respective Bid items.

Test A – The DC resistance between the two lead-in cable wires will be measured by 
a volt ohmmeter. The resistance shall not exceed 10 ohms.
Test B – A megohm meter test at 500 volts DC shall be made between the lead-in 
cable shield and grounding, prior to connection to grounding. The resistance shall 
equal or exceed 100 megohms.
Test C – A megger test shall be made between the loop circuit and grounding. The 
resistance shall equal or exceed 100-megohms.
Test D – An inductance test to determine the inductance level of each inductance 
loop. The Contractor shall record the inductance level of each inductance loop 
installed on the project and shall furnish the findings to the Engineer. An inductance 
level below 150 microhenries is considered a failure for a Type 1 loop, any one round 
loop and an inductance level below 75 microhenries is considered a failure for a Type 
2 loop.

If any of the installations fails to pass all tests, the loop installation or lead-in cable shall 
be repaired and replaced and then retested.

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical 

8-20

8-20.3(14)E

 

Signal Standards

Traffic signal standards shall be furnished and installed in accordance with the methods 
and materials noted in the Contract and the following:
1.  All dimensions and orientations will be field verified by the Engineer prior to 

fabrication.

2.  The signal standard component identification shall conform to details in the Plans.
3.  Disconnect connectors complete with pole and bracket cable shall be installed in any 

signal standard supporting a luminaire. Illumination wiring installation shall conform 
to details in the Plans for slip base wiring.

4.  No field drilling will be allowed on signal mast arms except for the installation of any 

required pre-empt indicators, pre-empt detectors, microwave detector, or type “N” 
signal mountings. The maximum diameter shall be 1 inch.

5.  All pole entrances required for pole-mounted signal heads, cabinets, signs, 

pedestrian push button assemblies, etc., shall be field drilled.

6.  Damage to the galvanized pole surface resulting from field drilling shall be repaired 

with approved zinc rich paint.

7.  Field welding will not be allowed, except as shown in the Plans. 
8.  All tenons shall be factory installed.
9.  All welding shall be completed prior to galvanizing.
10.  Foundations shall be constructed to provide the pole orientation noted in the 

Plans. Anchor bolts shall be tightened in accordance with Sections

 6-03.3(33)

 and 

8-20.3(4)

.

11.  Slip base installation for Type RM and FB signal standards shall conform to the slip 

base installation requirements specified in 

Section 8-20.3(13)A

, except that the 

specified torque for the ¾-inch diameter clamping bolts shall be 50 foot-pounds.

12.  The pole shall be plumbed after signal heads are installed.
13.  The space between the bottom base plate and the top of foundation shall be filled 

with grout with a ⅜-inch plastic drain tube.

Signal standards shall not be erected on concrete foundations until the foundations have 
attained 2,400 psi or 14 days after concrete placement. Signal standards without mast 
arms may be erected after 72 hours. Type IV and V strain pole standards may be erected 
but the messenger cable (span wire) shall not be placed until the foundation has attained 
2400 psi or 14 days after concrete placement.

Page 8-130 

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical

Signal supports used with portable traffic signal systems shall provide a minimum of two 
signal displays, spaced a minimum of 8 feet apart. 

When portable traffic signals are used to provide alternating one-way control, a minimum 
of one of the signal displays shall be suspended over the Traveled Way. The minimum 
vertical clearance to the Traveled Way for this signal display is 16′ 6″.

Timber strain poles shall be set a burial depth of 10 percent of the total length plus 2 feet 
and shall be raked as noted in the Plans.

8-20.3(15) Grout

Grout shall conform to the requirements of Section

 6-02.3(20)

 and 

9-20.3(4)

.

8-20.3(16)  Reinstalling Salvaged Material

 

When the Contract requires salvaged electrical equipment to be reinstalled, the 
Contractor shall furnish and install all necessary materials and equipment, including 
anchor bolts, nuts, washers, concrete, etc., required to install the salvaged equipment. 

8-20.3(17)  “As Built” Plans

Upon Physical Completion of the Work, the Contractor shall submit corrected shop 
drawings, schematic circuit diagrams, or other drawings necessary for the Engineer to 
prepare corrected Plans to show the Work as constructed.

These drawings shall be on sheets conforming in size to the provisions of 

Section 1-05.3

.

8-20.4 Measurement

Conduit of the kind and diameter specified will be measured, through the junction boxes, 
by the linear foot of conduit placed, unless the conduit is included in an illumination 
system, signal system, intelligent transportation system, or other type of electrical system 
lump sum Bid item.

Casing will be measured by the linear foot for the actual length of casing placed, unless 
the casing is included in an illumination, signal, or other electrical system lump sum 
Bid item.

Directional boring will be measured by the linear foot for the length of the boring tunnel.

Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical 

8-20

8-20.5 Payment

Payment will be made for each of the following Bid items that are included in the 
Proposal:

“Illumination System ____”, lump sum.
“Traffic Signal System ____”, lump sum.
“ITS ____”, lump sum.
The lump sum Contract price for “Illumination System, ____”, “Traffic Signal System 
____”, or “ITS _____” shall be full pay for the construction of the complete electrical 
system, modifying existing systems, or both, including sign lighting systems, 
as described above and as shown in the Plans, and herein specified, including 
excavation, backfilling, concrete foundations, conduit, wiring, restoring facilities 
destroyed or damaged during construction, salvaging existing materials, and for 
making all required tests. All additional materials and labor, not shown in the Plans or 
called for herein and which are required to complete the electrical system, shall be 
included in the lump sum Contract price. 
“Conduit Pipe ____ In. Diam.”, per linear foot. 
The unit Contract price per linear foot for “Conduit Pipe____ In. Diam.” shall be full 
pay for furnishing all pipe, pipe connections, elbows, bends, caps, reducers, conduits, 
unions, junction boxes, and fittings; for placing the pipe in accordance with the 
above provisions, including all excavation, jacking, or drilling required, backfilling of 
any voids around casing, conduits, pits, or trenches; restoration of native vegetation 
disturbed by the operation, chipping of pavement, and bedding of the pipe; and all 
other Work necessary for the construction of the conduit, except that when conduit 
is included on any project as an integral part of an illumination, traffic signal, or ITS 
system, and the conduit is not shown as a pay item, it shall be included in the lump 
sum price for the system shown.
All costs for installing conduit containing both signal and illumination wiring shall be 
included in the Contract prices for the signal system.
All costs for installing junction boxes containing both illumination and signal wiring 
shall be included in the Contract prices for the signal system.
“Casing”, per linear foot. 
The unit Contract price per linear feet for “casing” shall be full payment for boring, 
jacking or drilling for installing casing, and backfilling any voids around the casing and 
pits or back filling of the trenches required to install the casing. This cost will also 
include any restoration of native vegetation disturbed by the operation.
“Directional Boring”, per linear foot
The unit Contract price per linear foot for “Directional Boring”, shall be full pay for 
furnishing all labor, materials, equipment and electrical supervision associated with 
the directional boring.

Page 8-132 

Permanent Signing

8-21 

Permanent Signing

8-21.1 

Description

This Work consists of furnishing and installing permanent signing, sign removal, sign 
relocation, and refacing existing signs in accordance with the Plans, these Specifications, 
and at the locations shown in the Plans or where designated by the Engineer.

8-21.2 Materials

Materials shall meet the requirements of the following sections:
 

Roadside Sign Structures 

9-06.16 

Permanent Signs 

9-28 

Sign Support Structures 

9-28.14

The Contractor shall submit a Manufacturer’s Certificate of Compliance for all permanent 
signs in accordance with 

Section 1-06.3

; a copy of the Manufacturer’s Certificate of 

Compliance shall be available at the fabricator’s plant. Permanent signs will be inspected 
at the fabricator’s plant prior to shipment to the project unless otherwise accepted by the 
Engineer. Signs without an approved decal will not be installed on the project with the 
exception of double-faced signs which do not receive decals or fabricator’s stickers.

8-21.3 

Construction Requirements

8-21.3(1)  Location of Signs

Signs are located in the Plans by station numbers. These are tentative locations subject 
to change by the Engineer. The post lengths specified in the Plans are estimated for Bid 
purposes only. Final lengths of timber posts will be determined or verified by the Engineer 
at the request of the Contractor prior to fabrication. Final lengths of steel posts will be 
determined by the Engineer prior to fabrication.

8-21.3(2)  Placement of Signs

All reflectorized signs located less than 30 feet from the edge of the lane should be 
turned out approximately 3 degrees from the pavement edge of oncoming traffic 
lanes, and those located 30 feet or more from the edge of the lane should be turned in 
approximately 3 degrees from the pavement edge of oncoming traffic lanes. All sign posts 
shall be plumb and signs level. The signs shall be inspected at night by the Engineer and, 
if specular glare occurs from failure to install at 3 degrees as stipulated, the Contractor 
shall reinstall the signs at no expense to the Contracting Agency. The post holes shall 
be of sufficient dimensions to allow placement and thorough compaction of selected 
backfill material completely around the post. Selected backfill material shall consist of 
earth or fine sandy gravel free from organic matter with no individual particles exceeding 
1½ inches in diameter.

Permanent Signing 

8-21

8-21.3(3)  Sign Covering

When notified by the Engineer, the Contractor shall cover or uncover certain signs to 
facilitate and control the operation of the project. The covering shall consist of 4 mils 
minimum thickness black polyethylene sheeting of sufficient size to entirely cover the 
sign, unless otherwise approved by the Engineer, and shall extend over the edges of the 
sign and fastened on the back. The Contractor shall not use any type of adhesive tape 
on the face of the signs. Other methods of covering may be considered if approved by 
the Engineer.

8-21.3(4)  Sign Removal

Where shown in the Plans or ordered by the Engineer, the existing signs and, if so 
indicated, the sign Structures shall be removed by the Contractor. 

Sign Structures shall include sign bridges, cantilever sign Structures, bridge-mounted sign 
brackets, and any other sign-mounting Structure shown in the Plans to be removed by the 
Contractor.

The embedded anchors attaching signs and sign Structures specified for removal to 
existing concrete Structures shall be removed a minimum of 1 inch beneath the existing 
concrete surface. The void left by removal of the embedded anchors shall be coated 
with epoxy bonding agent and filled with mortar conforming to 

Section 9-20.4(2)

. The 

epoxy bonding agent shall be Type II, conforming to 

Section 9-26.1

, with the grade and 

class as recommended by the epoxy bonding agent manufacturer and as approved by the 
Engineer. The mortar shall consist of cement and fine aggregate mixed in the proportions 
to match the color of the existing concrete surface as near as practicable.

Where indicated, the Contractor shall remove concrete pedestals to a minimum of 2 feet 
below Subgrade or finished ground elevation and backfill the hole to the satisfaction of 
the Engineer. Where an existing sign post is located within a sidewalk area, the Contractor 
shall remove the post and finish the area so as to make the sidewalk continuous. Where 
signs are removed from existing overhead sign Structures, the existing vertical sign 
support braces shall also be removed. The removed aluminum signs, wood signs, wood 
sign posts, wood structures, metal sign posts, wind beams, and other metal structural 
members and all the existing fastening hardware connecting such members shall become 
the property of the Contractor and shall be removed from the project. Salvage value of 
the removed signs and sign Structure members shall be reflected in the Contractor’s Bid 
price for other items of Work.

Page 8-134 

Permanent Signing

8-21.3(5)  Sign Relocation

Where shown in the Plans, the existing signs and, if so indicated, the sign Structures shall 
be relocated by the Contractor to the location noted. Where the existing sign Structure is 
mounted on concrete pedestals, the Contractor shall remove the pedestal to a minimum 
of 2 feet below finished grade and backfill the remaining hole with material similar to that 
surrounding the hole. Where the existing Structure is to be relocated, the Contractor shall 
provide necessary materials, labor, and hardware, and if so indicated, electrical conduit, 
conductors, etc., electrical services, and connections so as to erect and provide an 
operable unit to the satisfaction of the Engineer. All materials damaged by the Contractor 
shall be replaced at no cost to the Contracting Agency. Unless otherwise allowed, 
relocation of each existing sign and Structure shall be accomplished during the day in 
which it was removed. Relocation of overhead signs and Structures shall be accomplished 
during the hours between 12 midnight and 4:00 a.m. or as approved by the Engineer.

8-21.3(6)  Sign Refacing

Where indicated in the Plans or in the Special Provisions, the Contractor shall reface 
existing signs with sheet aluminum overlay panels. Unless otherwise indicated in the 
Plans or allowed by the Engineer, all Work shall be accomplished while the existing sign is 
in place. Modifications to each sign shall be completed during the same day in which the 
Work is commenced.

Prior to the installation of overlay panels, the existing legend (message and border) shall 
be removed. The aluminum overlay panels shall be butt jointed. Aluminum or stainless 
steel screws, a minimum of ½ inch in length, shall be used to attach overlay panels to 
existing plywood signs. In addition to the screws, two ¼-inch diameter by 1-inch-long 
aluminum or stainless steel bolts shall be installed through the top of each panel and the 
plywood sign. Aluminum blind rivets shall be used to attach overlay panels to existing 
aluminum signs. Screws or rivets shall be installed at 24-inch centers. Unless otherwise 
noted, sign background material shall be in accordance with 

Section 9-28

.

After installation of overlay panels, the existing legend shall be reinstalled or, where 
indicated in the Plans, new legend or portions thereof shall be furnished and installed by 
the Contractor. Direct applied legend shall be applied to the new face prior to resurfacing. 
Layout and letter spacing shall be in accordance with Contracting Agency standards 
unless otherwise approved by the Engineer. New legend components shall be of the same 
type and size as the existing materials, and it shall be the Contractor’s responsibility to 
verify material type and size. Materials damaged by the Contractor shall be replaced at no 
expense to the Contracting Agency.

Permanent Signing 

8-21

8-21.3(7)  Sign Message Revision

Where indicated in the Plans or in the Special Provisions, the Contractor shall revise 
existing sign messages or layouts. The Contractor shall remove and reinstall portions of or 
all of the existing message or furnish and install new message components as necessary 
to provide the revised message as indicated. Prior to installing the revised message, 
the Contractor shall thoroughly clean the sign face and plug all existing rivet holes with 
aluminum blind rivets painted the same color as the sign background. Plugging screw 
holes in plywood signs will not be required. Modifications to the sign shall be completed 
during the same day in which Work is commenced and while the sign is in place. All 
new materials necessary to accomplish this Work shall be the same type and size as 
the existing components, and it shall be the Contractor’s responsibility to verify such 
component type and size. Materials damaged by the Contractor shall be replaced at no 
expense to the Contracting Agency. Existing materials not reinstalled shall become the 
property of the Contractor and shall be removed from the project.

8-21.3(8)  Sign Cleaning

Signs shall be cleaned after relocation or installation to the satisfaction of the Engineer. 
The Contractor shall not use cleaning solvents that would be harmful to the sign finish.

8-21.3(9)  Sign Structures

8-21.3(9)A 

Fabrication of Steel Structures

Fabrication shall conform to the applicable requirements of 

Sections 6-03

 and 

9-06

All welded connections of sign bridge and cantilever sign Structure posts, arms, and 
beams, including base and connection plates, shall be cleaned prior to welding to remove 
all mill scale from within 2 inches of the weld. As an alternative to the blast cleaning 
requirements of 

Section 6-03.3(13)

, the Contractor may perform the cleaning using power 

hand tools as approved by the Engineer. Unless otherwise specified in the Plans or Special 
Provisions, metal surfaces shall not be painted.

All fabrication, including repairs, adjustments or modifications of previously fabricated 
sign structure members and connection elements, shall be performed in the shop, under 
a Working Drawing prepared and submitted by the Contractor for the original fabrication 
or the specific repair, adjustment or modification. Sign structure fabrication repair, 
adjustment or modification of any kind in the field is not permitted. If fabrication repair, 
adjustment or modification occurs after a sign structure member or connection element 
has been galvanized, the entire member or element shall be re-galvanized in accordance 
with AASHTO M 111.

Page 8-136 

Permanent Signing

8-21.3(9)B 

Erection of Steel Structures

Erection shall conform to the applicable requirements of 

Sections 6-03

 and 

8-21.3(9)F

.  

Section 8-21.3(9)F

 notwithstanding, the Contractor may erect a sign bridge prior to 

completion of the shaft cap portion of one foundation for one post provided the following 
conditions are satisfied:
1.  The Contractor shall submit a Type 2E Working Drawing consisting of design 

calculations and details of the temporary supports and falsework supporting the 
sign bridge near the location of the incomplete foundation. The submittal shall 
include the method of releasing and removing the temporary supports and falsework 
without inducing loads and stress into the sign bridge.

2.  The Contractor shall submit a Type 2 Working Drawing consisting of the method 

used to secure the anchor bolt array in proper position with the sign bridge while 
casting the shaft cap concrete to complete the foundation.

3.  The Contractor shall erect the sign bridge and temporary supports and falsework, 

complete the remaining portion of the incomplete foundation, and remove the 
temporary supports and falsework, in accordance with the accepted Working 
Drawings.

8-21.3(9)C Timber 

Posts

Timber sign posts shall conform to the requirements of 

Section 9-28.14(1)

.

8-21.3(9)D 

Aluminum Structures

Welding of aluminum shall be in accordance with 

Section 9-28.14(3)

.

8-21.3(9)E 

Bridge Mounted Sign Brackets

The Contractor shall fabricate and install sign supports for mounting signs on bridge 
Structures at the locations and as shown in the Plans, including inserts and anchor 
bolts. Fabrication and installation shall be in accordance with applicable requirements of 
Sections

 6-03

 and 

9-06

. Metal surfaces shall not be painted.

The quantity of structural carbon steel shown in the Contract is listed only for the 
convenience of the Contractor in determining the volume of Work involved and is not 
guaranteed to be accurate. The prospective Bidders shall verify this quantity before 
submitting a Bid. No adjustments other than for approved changes will be made in the 
lump sum Contract price for the bridge mounted sign brackets, even though the actual 
quantity of structural carbon steel required may deviate from that listed.

Permanent Signing 

8-21

8-21.3(9)F Foundations

The excavation and backfill shall conform to the requirements of 

Section 2-09.3

Where 

obstructions prevent construction of planned foundations, the Contractor shall construct 
an effective foundation satisfactory to the Engineer.

The bottom of concrete foundations shall rest on firm ground. If the portion of the 
foundation beneath the existing ground line is formed or cased instead of being cast 
against the existing soil forming the sides of the excavation, then all gaps between 
the existing soil and the completed foundation shall be backfilled and compacted in 
accordance with 

Section 2-09.3(1)E

.

Concrete placed into an excavation where water is present shall be placed using an 
approved tremie. If water is not present, the concrete shall be placed such that the free-
fall is vertical down the center of the shaft without hitting the sides, the steel reinforcing 
bars, or the steel reinforcing bar cage bracing. The 

Section 6-02.3(6)

 restriction for 5-feet 

maximum free-fall shall not apply to placement of Class 4000P concrete into a shaft.

Foundations shall be cast in one operation where practicable. The exposed portions shall 
be formed to present a neat appearance. Class 2 surface finish shall be applied to exposed 
surfaces of concrete in accordance with the requirements of 

Section 6-02.3(14)B

.

Where soil conditions are poor, the Engineer may order the Contractor to extend the 
foundations shown in the Plans to provide additional depth. Such additional work shall be 
paid for according to 

Section 1-04.4

.

Forms shall be true to line and grade. Tops of foundations for roadside sign structures 
shall be finished to ground line unless otherwise shown in the Plans or directed by the 
Engineer. Tops of foundations for sign bridges and cantilever sign structures shall be 
finished to the elevation shown in the Plans.

Both forms and ground that will be in contact with the concrete shall be thoroughly 
moistened before placing concrete; however, excess water in the foundation excavation 
will not be permitted. Forms shall not be removed until the concrete has set at least 3 
days. All forms shall be removed, except when the Plans or Special Provisions specifically 
allow or require the forms or casing to remain.

Foundation concrete shall conform to the requirements for the specified class, be cast-in-
place concrete, and be constructed in accordance with 

Sections 6-02.2

 and 

6-02.3

.

After construction of concrete foundations for sign bridge and cantilever sign structures, 
the Contractor shall survey the foundation locations and elevations, the anchor bolt array 
locations and lengths of exposed threads. The Contractor shall confirm that the survey 
conforms to the sign structure post, beam, span and foundation design geometry shown 
in the Plans prior to completion of the sign structure foundation, and shall identify any 
deviations from the design geometry shown in the Plans. When deviations are identified, 
the Contractor shall notify the Engineer and submit a Type 2 Working Drawing consisting 
of the Contractor’s proposed method(s) of addressing the deviations.

Page 8-138 

Permanent Signing

Sign structures shall not be erected on concrete foundations until the Contractor confirms 
that the foundations and the fabricated sign structures are either compatible with each 
other and the design geometry shown in the Plans, or have been modified in accordance 
with this section and as approved by the Engineer to be compatible with each other, and 
the foundations have attained a compressive strength of 2,400-psi.

In addition to the basic requirements, sign bridges and cantilever sign structures shall be 
installed in accordance with the following:
1.  Foundation excavations shall conform to the requirements of 

Section 2-09.3(3)

.

2.  Tops of foundations for sign bridges and cantilever sign structures shall be finished 

to the elevation shown in the Plans.

3.  Steel reinforcing bars shall conform t

Section 9-07

4.  Concrete shall be Class 4000P, except as otherwise specified. The concrete for 

the shaft cap (the portion containing the anchor bolt array assemblies above the 
construction joint at the top of the shaft) shall be Class 4000.

5.  All bolts and anchor bolts shall be installed so that two full threads extend beyond 

the top of the top heavy-hex nut. Anchor bolts shall be installed plumb, plus or minus 
1 degree.

6.  Plumbing of sign bridges and cantilever sign structures shall be accomplished by 

adjusting leveling nuts. Shims or other similar devices for plumbing or raking will not 
be permitted.

7.  The top heavy-hex nuts of sign bridges and cantilever sign structures shall be 

tightened in accordance with 

Section 6-03.3(33)

, and by the Turn-of-Nut Method to 

a minimum rotation of ¼ turn and a maximum of ⅓ turn past snug tight. Permanent 
marks shall be set on the base plate and nuts to indicate nut rotation past snug tight.

In addition to the basic requirements, roadside sign structures shall be installed in 
accordance with the following:
1.  Tops of foundations shall be finished to final ground line unless otherwise shown in 

the Plans or staked by the Engineer.

2.  Steel reinforcement, including spiral reinforcing, shall conform to 

Section 9-07.2

.

3.  Unless otherwise shown in the Plans, concrete shall be Class 4000P. Class 4000P 

concrete for roadside sign structures does not require air entrainment.

4.  The assembly and installation of all Type TP-A or Type TP-B bases for roadside sign 

structures shall be supervised at all times by either a manufacturer’s representative 
or an installer who has been trained and certified by the manufacturer of the 
system. If the supervision is provided by a trained installer, a copy of the installer’s 
certification shall be provided to the Engineer prior to installation.

Permanent Signing 

8-21

5.  For all Type TP-A or TP-B bases, the Contractor shall attach four female anchors to 

a flat rigid template following the manufacturer’s recommendations. The Contractor 
shall lower the anchor assembly into fresh concrete foundation and vibrate into 
position such that the tops of the anchor washers are flush with the finished top 
surface of the foundation. The Contractor shall support the template such that all 
anchors are level and in their proper position.

Slip base and hinge connection nuts of roadside sign structures shall be tightened using a 
torque wrench to the torque, following the procedure specified in the Plans.

8-21.3(9)G 

Sign Structure Identification Information

Whenever existing bridge-mounted sign brackets, cantilever sign structures, or sign 
bridge structures are removed from their anchorage, whether temporary or permanent, 
the Contractor shall provide the sign structure identification information, attached to the 
sign structures, to the Engineer. The identification information may be in the form of a 
riveted plate, sticker, or other means.

8-21.3(10)  Sign Attachment

Sign panels consisting of sheet aluminum or fiberglass reinforced plastic shall be attached 
or mounted to signposts or sign structures as shown in the Plans.

Signs not conforming to the above, including all variable message sign (VMS) assemblies 
and other message boardtype assemblies, shall be attached or mounted to signposts or 
sign structures by means of positive connections—defined as through-bolted connections. 
The use of clips or clamps to accomplish the attachment or mounting of such signs and 
assemblies is prohibited.

8-21.3(11)  Multiple Panel Signs

After installation of multiple panel signs, the Contractor shall furnish and install an 
approved reinforced aluminized tape on the reverse side of the sign to prevent visible 
light through the seam. The tape shall be pressure sensitive and a minimum of 2 inches 
wide and 2 mils thick. In lieu of tape, the Contractor may use 1-inch-wide aluminum 
sheeting riveted to the sign back. The aluminum shall be a minimum of 0.032 inch thick. 
Rivet heads shall match the sign face color.

8-21.3(12)  Steel Sign Posts

For roadside sign structures on Type TP-A or Type TP-B bases, the Contractor shall use 
the following procedures and manufacturer’s recommendations:
1.  The couplings, special bolts, bracket bolts, and hinge connection nuts on all Type 

TP-A or Type TP-B bases shall be tightened using the Turn-of-Nut Tightening 
Method to a maximum rotation of ½ turn past snug tight.

2.  The Contractor shall shim as necessary to plumb the steel signposts.

Page 8-140 

Permanent Signing

For roadside sign structures on all Type PL and SB slip bases, the Contractor shall use the 
following procedures:
1.  The Contractor shall assemble the steel signpost to stub post with bolts and flat 

washers as shown in the Plans.

2.  Each bolt shall be tightened using a torque wrench to the torque, following the 

procedures specified in the Plans.

For roadside sign structures on SB-1, SB-2, or SB-3 slip bases, the Contractor shall use 
the following procedures and manufacturer’s recommendations:
1.  The Contractor shall attach the perforated square steel post or solid square steel 

post to the upper slip plate with bolts, nuts, and washers as shown in the Plans.

2.  The three bolts connecting the upper and lower slip plates shall be tightened to 

torque, using a torque wrench, following the procedures in the Plans.

For roadside structures on ST-2 and ST-4 sign supports, the Contractor shall use the 
following procedures:
1.  The Contractor shall attach the perforated square steel post to the lower sign post 

support with bolts, nuts, and washers as shown in the Plans.

8-21.4 Measurement

Sign covering will be measured in square feet of the area of the sign covered.

8-21.5 Payment

Payment will be made for each of the following Bid items that are included in the 
Proposal:

“Permanent Signing”, lump sum.
“Sign Bridge No. ____”, lump sum.
“Cantilever Sign Structure No. ____”, lump sum. 
All costs in connection with surveying completed concrete foundations for sign 
bridges and cantilever sign structures shall be included in the lump sum contract 
price for “Structure Surveying”, except that when no Bid item is included in the 
Proposal for “Structure Surveying” then such costs shall be included in the lump sum 
contract price(s) for “Sign Bridge No. ___” and “Cantilever Sign Structure No. ___”.
“Bridge Mounted Sign Bracket No. ____”, lump sum.
“Sign Covering”, per square foot.

Pavement Marking 

8-22

8-22 

Pavement Marking

8-22.1 Description

This Work consists of furnishing, installing, and removing pavement markings upon the 
Roadway surface in accordance with the Plans, 

Standard Plans

, the FHWA publication 

Standard Alphabet for Highway Signs and Pavement Markings and these Specifications, 
at locations shown in the Contract or as ordered by the Engineer in accordance with 

Section 1-04.4

.

Pavement Markings may be either Longitudinal (long) Line Markings or Transverse 
Markings. Longitudinal line markings are generally placed parallel and adjacent to the flow 
of traffic. Transverse markings are generally placed perpendicular and across the flow of 
traffic. Word and symbol markings are classified as transverse markings. Traffic letters 
used in word messages shall be sized as shown in the Plans.

8-22.2 Materials

Material for pavement marking shall be paint or plastic as noted in the Bid item meeting 
the requirements of 

Section 9-34

. Glass beads for paint shall meet the requirements 

o

Section 9-34.4

. Glass beads for plastic shall be as recommended by the material 

manufacturer.

8-22.3 

Construction Requirements

8-22.3(1)  Preliminary Spotting

The Engineer will provide necessary control points at intervals agreed upon with the 
Contractor to assist in preliminary spotting of the lines before marking begins. The 
Contractor shall be responsible for preliminary spotting of the lines to be marked. 
Approval by the Engineer is required before marking begins. Preliminary spotting to guide 
the striping machine is required for all longitudinal lines except where a clearly visible 
separation is present. Preliminary spotting shall be provided at a spacing of 100 feet 
maximum on tangents and 25-feet maximum on curves. The color of the material used for 
spotting shall match the color of the permanent marking.

8-22.3(2)  Preparation of Roadway Surfaces

All surfaces shall be dry, free of any loose debris, and within the proper temperature range 
prior to striping. When required by the pavement marking manufacturer’s installation 
instructions, pavement markings that will adversely affect the bond of new pavement 
marking material to the roadway surface shall be removed from pavement surfaces in 
accordance with 

Section 8-22.3(6)

.

Remove all other contaminants from pavement surfaces that may adversely affect the 
installation of new pavement marking.

 

 

 

 

 

 

 